Loading...
HomeMy WebLinkAboutPermit M09-081 - 1101 BUILDING1101 BUILDING 1101 ANDOVER PK W M09 -081 Parcel No.: 8836500110 Address: Suite No: Tenant: Name: Address: Owner: Name: Address: Value of Mechanical: $54,000.00 Type of Fire Protection: doc: IMC -10/06 City a Tukwila Contact Person: Name: BILL KUKAHIKO Address: 340 UPLAND DR , TUKWILA WA Contractor: Name: SEA AIRE INCORPORATED Address: 340 UPLAND DRIVE , TUKWILA, WA Contractor License No: SEAAII*206JQ Furnace: <100K BTU >100K BTU Floor Furnace Suspended/Wall/Floor Mounted Heater Appliance Vent Repair or Addition to Heat /Refrig /Cooling System.... Air Handling Unit <10,000 CFM >10,000 CFM Evaporator Cooler Ventilation Fan connected to single duct Ventilation System Hood and Duct Incinerator: Domestic Commercial/Industrial Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http://www.ci.tukwila.wa.us 1101 ANDOVER PK W TUKW 1101 BUILDING 1101 ANDOVER PK W , TUKWILA WA G -FORE ASSOCIATES LLC 5906 MONT BLANC PL NW , ISSAQUAH WA MECHANICAL PERMIT DESCRIPTION OF WORK: REMOVE EXISTING ROOF TOP AIR CONDITIONING UNIT AND INSTAL NEW UNIT WITH VFD EOUIPMENT TYPE AND OUANTITY 0 0 0 0 0 0 0 1 0 0 0 0 0 0 * *continued on next page ** M09 -081 Permit Number: Issue Date: Permit Expires On: Phone: Phone: 206 -575 -8051 Phone: 206 575 -8051 Expiration Date: 04/26/2010 M09 -081 07/15/2009 01/11/2010 Fees Collected: $813.00 International Mechanical Code Edition: 2006 Boiler Compressor: 0 -3 HP /100,000 BTU 0 3 -15 HP /500,000 BTU 0 15 -30 HP /1,000,000 BTU.. 0 30 -50 HP /1,750,000 BTU.. 0 50+ HP/1,750,000 BTU 0 Fire Damper 0 Diffuser 0 Thermostat 0 Wood/Gas Stove 0 Water Heater 0 Emergency Generator 0 Other Mechanical Equipment Printed: 07 -15 -2009 Permit Center Authorized Signature: Signature: Print Name: doc: IMC -10/06 S City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Fax: 206 - 431 -3665 Web site: http://www.ci.tukwila.wa.us w I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this mechanical permit. S Permit Number: M09 -081 Issue Date: 07/15/2009 Permit Expires On: 01/11/2010 j4/i Date: "7- IS 0 9 Date: 7 - ` This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. M09 -081 Printed: 07 -15 -2009 Parcel No.: 8836500110 Address: 1101 ANDOVER PK W TUKW Suite No: Tenant: 1101 BUILDING 1: ** *BUILDING DEPARTMENT CONDITIONS * ** 5: Readily accessible access to roof mounted equipment is required. 12: ** *FIRE DEPARTMENT CONDITIONS * ** doc: Cond -10/06 • • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us PERMIT CONDITIONS Permit Number: M09 -081 Status: ISSUED Applied Date: 06/30/2009 Issue Date: 07/15/2009 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431- 3670). 4: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 6: All construction shall be done in conformance with the approved plans and the requirements of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. 7: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 8: Manufacturers installation instructions shall be available on the job site at the time of inspection. 9: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the Cityof Tukwila Permit Center. 10: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206- 431 - 3670). 11: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 13: The attached set of building plans have been reviewed by the Fire Prevention Bureau and are acceptable with the following concerns: 14: H.V.A.C. units rated at greater than 2,000 cfm require auto - shutdown devices. These devices shall be separately zoned in the alarm panel and local U.L. central station supervision is required. (City Ordinance #2051) 15: H.V.A.C. systems supplying air in excess of 2,000 cubic feet per minute to enclosed spaces within buildings shall be equipped with an automatic shutoff. Automatic shutoff shall be accomplished by interrupting the power source of the M09 -081 Printed: 07 -15 -2009 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us • air- moving equipment upon detection of smoke in the main return-air duct served by such equipment. Smoke detectors shall be labeled by an approved agency for air -duct installation and shall be installed in accordance with the manufacturer's installation instructions. (I1VMC 606.1, 606.2.1) 16: Remote indicator lights are required on all above ceiling smoke detectors. (City Ordinance #2051) 17: Duct smoke detectors shall be capable of being reset from a single point near the alarm panel. (City Ordinance #2051) 18: Duct detectors shall send a supervisory signal only upon activation. (City Ordinance #2051) 19: All new fire alarm systems or modifications to existing systems shall have the written approval of The Tukwila Fire Prevention Bureau. No work shall commence until a fire department permit has been obtained. (City Ordinance #2051) (IFC 104.2) 20: An electrical permit from the City of Tukwila Building Department Permit Center (206- 431 -3670) is required for this project. 21: Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (City Ordinances #2050 and #2051) 22: Any overlooked hazardous condition and/or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. 23: These plans were reviewed by Inspector 511. If you have any questions, please call Tukwila Fire Prevention Bureau at (206)575 -4407. doc: Cond -10106 * * continued on next page ** M09 -081 Printed: 07 -15 -2009 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us I hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any other work construction or the performance of work. Signature: � IQ Date: 7 I - L) 9 Print Name: doc: Cond -10/06 M09 -081 ordinances governing or local laws regulating Printed: 07 -15 -2009 SITE'' LOCATION Site Address: Tenant Name: Property Owners Name: G - FORE Mailing Address: 415 BAKER BLVD #200 Name: BILL KUKAHIKO CITY OF TUKWIL1,, Community Developm4 Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 httpl/www.ci.tukwila.wa.us Company Name: Sea - Aire Inc. Mailing Address: 340 UPLAND DR. Contractor Registration Number: SEAAII*206JQ Contact Person: E -Mail Address: MECHANICAL PERMIT APPLICATION M echanical. P jest No ce ay only, Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **Please Print** 1101 BLDG Z AbVi DAVE DUNN H:\Applications\Forms- Applications On Line \2009 Applications \1 -2009 - Mechanical Permit Application. doc Revised. 1 -2009 bh King Co Assessor's Tax No.: 983 1o57) Suite Number: TUKWILA City New Tenant: ❑ Yes [y No WA State Floor: 98188 Zip Day Telephone: (206) 575 -8051 Mailing Address: 340 UPLAND DR. TUKWILA WA 98188 E - Mail Address: billk @sea - aire.com City State Zip Fax Number: (206) 575 -0653 TUKWILA WA 98188 City State Zip Contact Person: BILL KUKAHIKO Day Telephone: (206) 575 - 8051 E - Mail Address: billk @sea - aire.com Fax Number: (206) 575 - 0653 Expiration Date: stampe by A i Company Name: Mailing Address: cit Contact Person: Day Telephone: E -Mail Address: Fax Number: State Zip ENGINEER OF RECORD — All plans most be wet stamped by Engineer off Record Company Name: Mailing Address: cit Day Telephone: Fax Number: State Zip Page 1 of 2 q . ; -� y - ;�,• 1 UnitiType } t:r ... �Qt Ts:•t � .'A. -": T- •s ;<<Unit Ty�ie.� ' i �` t.. Qty, :»ct ��, r. Whit Type. sa :,,,- ;�QtY a x.- oa Zr�� � . HBoiler/Corii ressor: � p ':� »r Qty •. Furnace <100K BTU Air Handling Unit >10,000 CFM Fire Damper 0 -3 HP /100,000 BTU Furnace >100K BTU Evaporator Cooler Diffuser 3 -15 HP /500,000 BTU Floor Furnace Ventilation Fan Connected to Single Duct Thermostat 15 -30 HP /1,000,000 BTU Suspended/Wall/Floor Mounted Heater Ventilation System Wood/Gas Stove 30 -50 HP /1,750,000 BTU Appliance Vent Hood and Duct Emergency Generator 50+ HP /1,750,000 BTU Repair or addition to Heat/Refrig /Cooling System Incinerator — Domestic Other Mechanical Equipment Air Handling Unit <10,000 CFM Incinerator — Comm /Ind Valuation of Project (contractor's bid price): $ 54,000 Scope of Work (please provide detailed information): REMOVE EXISTING ROOF TOP AIR CONDITION AND INSTALL NEW UNIT WITH VFD Use: Residential: New Commercial: New Fuel Type: Electric Replacement Replacement Indicate type of mechanical work being installed and the quantity below: Gas ❑ Other: Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR AUTHORIZED AGENT: Signature: C; I Print Name: 1 Kui/\x Mailing Address: 3 CC L 1r--tarNX, 70� Date Application Accepted: (p-30 -D1 H:\Applications\Forms- Applications On Line\2009 Applications \1 -2009- Mechanical Permit Application.doc Revised: 1 -2009 bh Day Telephone: 20 , t .,v (ck City State Date: 6,/i_D/CD9 7 - ge)s1 ss 1Sab Zip Date Application Expires: �-- 3o- aci. Staff Initials: (44( Page 2 of 2 i Parcel No.: 8836500110 Address: 1101 ANDOVER PK W TUKW Suite No: Applicant: 1101 BUILDING Receipt No.: R09 -01107 Initials: User ID: WER 1655 Payee: SEA -AIRE ACCOUNT ITEM LIST: Description MECHANICAL - NONRES • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http://www.ci.tulcwila.wa.us TRANSACTION LIST: Type Method Descriptio Amount Payment Check 047716 650.40 Authorization No. RECEIPT Account Code Current Pmts 000.322.102.00.0 650.40 Total: $650.40 Permit Number: M09 -081 Status: APPROVED Applied Date: 06/30/2009 Issue Date: Payment Amount: $650.40 Payment Date: 07/15/2009 02:47 PM Balance: $0.00 PAYMENT RECEIVED doc: Receiot -06 Printed: 07 -15 -2009 Parcel No.: 8836500110 Address: 1101 ANDOVER PK W TUKW Suite No: Applicant: 1101 BUILDING Receipt No.: R09 -01009 Payee: SEA AIRE MECHANICAL ACCOUNT ITEM LIST: Description PLAN CHECK - NONRES • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us Payment Check 047652 162.60 Authorization No. RECEIPT Initials: WER Payment Date: 06/30/2009 02:54 PM User ID: 1655 Balance: $650.40 TRANSACTION LIST: Type Method Descriptio Amount Account Code Current Pmts 000/345.830 162.60 Total: $162.60 Permit Number: M09 -081 Status: PENDING Applied Date: 06/30/2009 Issue Date: Payment Amount: $162.60 PAYMENT RECEIVED doc: Receiot -06 Printed: 06 -30 -2009 Project: ; ,� I . di- 7 J Type of Inspection: Address: A / 1 0 / A 6 o Lief' werr Date Called: 0 S�,� -0Ke S(,� JJ ..� Special Instructions n r 6, ! e .5d 1 N (P Date Wanted 3] � — CJ -fa ` �,�, p.m. Requester: Phone . ( / s re os/ A - -� INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION le ' 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 Approved per applicable codes. Corrections required prior to approval. COMMENTS: f (N tll w [J01 P P1� Insdector: Date: 3 C, _ ri $60.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: COMMENTS: , 1!) n 1 k-. 71) 4-4-1/44E A --L-A / 4 7 A 5 r Ste' e Di�� - e cX re ✓e S T A--4 fl e . . . . ( J n t..J : Ten 014 0 f r e 6 t e "It 1 r ti I Z.49G 7 -59c -41D'1 r A- Stitdfce , , , r d 0 L k . ) C'te A l a e A , .\ s p P -Or �. 0) n G A--P Ai M /-o A'1'4 e 14 Ai 1 S M J ir--p ski A on c.j :7 13 ,J . 4 n P n 417 / P.AT , g 4)71, Je_ ,t-c k i„..): (I ii,1 ,Ac D Q < . O/Ns 5 A ,L e A Proj( (0 1 Bu t ,( r Type of Inspectjon: Q q �,( d I �� 1 L\ Address: 1 0 1 A11 er I,JPSt' Date Called: Special Instructions: ` l �r rem,? L a o . „ h v Ke 0 MA ran -�'� F;ti4 ry Date Wanted: C, 1 2 - 7 - 01 p.m. Requester: Phone No: Sys— 'OSI $�l INSPECTION NO. Approved per applicable codes. Inspector: ' INSPECTION RECORD Retain a copy with permit PER NO. CITY OF TUKWILA BUILDING DIVISION .e- 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 z orrections required prior to approval. Date: z El $60.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: Project:. • Co _, Sprinklers: / Fire Alarm : Type of Inspection: AddressT I/4/ Suite #: At Ja` A w Contact Person: ?Ai // Iv4s //I 664-4r '. r Special Instructions: Occupancy Type: Phone No.: .2 UG S .5'" $'D..5 Needs Shift Inspection: Sprinklers: / Fire Alarm : P__, - I Hood & Duct: Monitor: t4-e. Pre - Fire: Permits : Occupancy Type: INSPECTION NUMBER • �J Approved per applicable codes. INSPECTION RECORD Retain a copy with permit CITY OF TUKWILA FIRE DEPARTMENT 444 Andover Park East, Tukwila, Wa. 98188 206- PERMIT NUMBERS 75 -4407 n Corrections requited prior to approval. COMMENTS: 1 -khz 46 A .910-G-vt 4 OL rierud 64 - E..,•.i.� ...._.��t H4 ._._ f ee•t' a s SU P. `,�• uX Word /InSpection Record Form.Doc L ' ' v i :pector:� Date : d - r $80.00 EINSPECTION FEE REQUIRED. .aXou will receive an invoice from the City of Tukwila Finance Department. Call to schedule a reinspection. • 1/13/06 Hrs.: 0 T.F.D. Form F.P. 113 ry STM 030E — 035E Cooling/Electric/Hot Water Certified Drawing I �. . McQuay International certifies that Its equipment will conform to this drawing and McQuay's published specifications, subject to its published warranty. Purchaser must determine that the equipment is fit and sufficient for the job specifications. No change to this drawing may be made unless approved In writing by McQuay. www.mcauay.com 1131118 -01 View: Isometric Model: 30 — 35 ton Date: 6/3/2009 Unit Tag: CUR300 Condensate Drain Side 54.25 (1378 mm) From Corner 5.00 (127 mm) From Bottom @2009 McQuay International Plenum Fan Access Filter /Coil Access Optional Exhaust Hood OA Hood From Bottom of Unit 27.00 (686 mm) Control Panel -j Filter /Coil Access Return Access -� 86.75 (2203 mm) Return Opening X5.38 (137 mm) 54.25 (1378 mm) Condensate Drain 5.38 (137 mm) 181.31 (4605 mm) 205.25 (5213 mm) 5.00 (127 mm) 70.38 (1788 mm) 23.25 (591 mm) Return Opening REVIEWED FOR CODE COMPLIANCE APPROVED JUL 1 3 2009 City of Tukwila BUILDING DIVISION' RECEIVED 21.00 (533 mm) Supply Opening /Iil' 30 PERMIT CENTER ery Air Conditioning Root Curb -- -- -- -- Supply I {lb — 1,""1 2%" I — r _— r- -- I I 28 I Return . =... •■■■ -- i. - - - -- . J L13/4" 101' Inside Curb �33. 134" Inside Curb GENERAL REQUIREMENTS The mechanical installation of Packaged Rooftop VAV units consists of making final connections between the unit and building services; supply and return connections; drain connections (if required); and, set up of rainhood over outside air intake opening. DUCT CONNECTIONS 1. VERTICAL DISCHARGE Supply and return duct openings are provided in the unit base to permit vertical side -by -side duct systems without further field modifications to the unit. When side by side sheet metal ducts are constructed in accord- ance with the detail shown they are easily inserted through the unit openings, pulled down to lock them over the upward unit flange and require no additional screw or rivet fasteners. Secure all ducts to building structure. Use flexible duct connectors between unit and ducts as required. Insu- late and weatherproof all external duct work, joints and all roof openings with flashing and mastic in accord- ance with local codes. Ducts in unconditioned spaces must be insulated and covered with vapor barrier. Unit Outline L ACRB 2550 (FULL PERIMETER CURB) 1 The internal systems of the unit are completely factory installed and tested prior to shipment and no additional field labor is required. I c ) SUPPLY ACRB 2535 (CANTILEVER CURB) 88W 101 /,a Inside Curb H 22" 84" ,. 3%5 1% DUCT CONNECTIONS (cont.) CONDENSER FANS (VERTICAL DISCHARGE(_ 93 . - L5 CONDENSER COIL 2 ELECTRIC SUPPLY (THRU BOTTOM OF UNIT) RIGGING HOLES (4) 22 1 8'. 22 6 •. 100% O.A ECONOMIZER (OPTIONAL( BLOWER MOTOR AND DRIVE ACCESS (OPPOSITE SIDE) ELECTRIC SUPPLY 25% OUTSIDE AIR 1 CONDENSATE DRAIN (F.P.T.) FILTER 8 DAMPER ACCESS ELECTRIC ACCESS PANEL C HEATING SECTION EVAPORATOR COIL ELECTRIC CONTROL ELECTRIC HEAT ACCESS PANEL PACKAGED ROOFTOP UNIT TECHNICAL DATA Job Name: Date: Submitted By: 1101 Building CUR300 6/12/2009 Kendal B Martin Unit Description: McQuay Model Number. Unit Dimensions & Weights: Unit Length: Unit Height: Unit Width: Unit Weight Unit Construction: Exterior: Insulation: Liners: Doors: Approval Listing: Unit Electrical Data: Unit Voltage: MCA: MROPD: Field Connection: Unit Control Data Temperature Controls: Application: Unit Tag: CUR300 © McQuay International 2006, www.mcouay.com MPS030E 205.2 in 55.5 in 97.5 in 3900 lb Prepainted Galv Steel R -value of 4.0 Double wall construction Fan, Filter, Control Panel, and Gas Heat section cETLus 208 v/3 ph 157.7 A 175 A Power Block, Field powered 115V GFI outlet DDC controls, no BAS communication card Variable volume, with VFD Page 1 of 4 C') C 7a w 0 0 McQuaV Air Conditioning PACKAGED ROOFTOP UNIT TECHNICAL DATA Component #1 — Return /Outside /Exhaust Air Outside Air Option: Type: Damper: Leakage Rate: Damper Air Pressure Drop: Filters: Efficiency / Type: Face Area: Face Velocity: Air Pressure Drop: Exhaust Fan Options: Type: Diameter /Quantity: Performance: Airflow: Max Static pressure: Coil: Motor: Drive: Horsepower /Quantity: Type: Quantity: Full Load Current: Type: Fins per inch: Rows: Face Area: Face Velocity: Air Pressure Drop: Performance: Total Capacity: Sensible Capacity: Entering Air Temperature: Leaving Air Temperature: Ambient Air Temperature: Drain Pan: Material: Unit Tag: CUR300 © McQuay International 2006, www.mcquay.com 0 -100% Econ with comparative enthalpy control Low leak with blade and jamb seals 3 cfm /sq ft @1" differential pressure 0.17 inH 30% Pleated / 30% Pleated 32.0 ft 375 ft/min 0.05 inH Power Exhaust - Modulating - Building pressure control Prop 26 "/2 9000 CFM 0.50 inH 1.00 HP /2 Open drip proof 2 4.O A Direct Drive Component #2 — Cooling Coil Section: 12 4 25.4 ft 472 ft/min 0.48 inH 377701 Btu /hr 294645 Btu /hr 80.0 °F /67.0 °F 57.5 °F / 57.1 °F 95.0 °F Polymer drain pan Page 2 of 4 Air Conditioning PACKAGED ROOFTOP UNIT TECHNICAL DATA Component #3 - Fan Section: Fan: Type: Fan Wheel Diameter: Performance: Motor: Drives: Air Flow: 12000 CFM Total Static Pressure: 2.20 inH Fan Speed: 1693 RPM Brake Horsepower: 8.5 HP Altitude: 0 ft Horsepower: 15 HP Type: Open drip proof, Premium efficiency Efficiency: 93.0 % Full Load Current: 37.4 A Type: Service factor: Construction: Vibration Isolation: Compressor: Quantity: Type: Full Load Current: External Static Pressure: Outside air damper: Filter: Cooling Coil: Hot Water Heat: Total Static Pressure: 3 AF SWSI 24" Fixed 120% 1 inch spring, seismic Component #4 - Condensing Section Scroll Compressor 1: 35.4 A Compressor 2: 26.9 A Compressor 3: 26.7 A Power (Total): 25.9 kW Capacity Control: 5 steps Isolation: Rubber In Shear Condenser Coil: Type: Aluminum tube micro channel Rows: Micro Channel Fins Per Inch 18 Fin Material: Aluminum Compressor Isolation Valves: Compressor Isolation Valves Condenser Fan Motors: Number Of Motors: 3 Full Load Current: Unit Efficiency: Refrigerant Type: Unit EER /SEER: 4.20 A R410A 11.5 - EER Internal Pressure Drop Calculation: 1.50 inH 0.17 inH 0.05 inH 0.48 inH 0.00 inH 2.20 inH Unit Tag: CUR300 © McQuay International 2006, www mcquay.corn Page 3 of 4 McQuav • Air Conditioning PACKAGED ROOFTOP UNIT TECHNICAL DATA Unit Sound: Notes: Frequency: Inlet Sound Power: Outlet Sound Power: Casing Radiated Sound Power: 63 125 250 500 1000 2000 4000 8000 78 79 89 84 79 75 72 67 83 87 96 93 90 85 80 75 90 95 92 92 89 86 87 84 Unit Tag: CUR300 © McQuay International 2006, www.rncquay.com Page 4 of 4 McQuay • Air Conditioning December 24, 2009 Michael Hurt 340 Upland Dr Tukwila, WA 98188 RE: Request for Permit Extensions Mechanical Permit Numbers M09 -081 1101 Building —1101 Andover Pk W Dear Mr. Hunt, This letter is in response to your written request for an extension to Permit Number M09 -081. The Building Official has reviewed your letter and considered your request to extend the above referenced permit. The City of Tukwila Building Department will be extending the permit an additional 180 days from the date of expiration, through July 9, 2010. If you should have any questions, please contact our office at (206) 431 -3670. Sincerely, Je ifer Marshall Pe it Technician File: M09 -08I e it I% �` Tel " ''� t ��; � "� f %' Jim Haggerton, Mayor Department of Community I' evelopment Jack Pace, Director W:\Permit Center\Extension Letters \Permits\2009Vv109 -081 Permit Extension.doc 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 0 Phone: 206- 431 -3670 • Fax: 206 - 431 -3665 12/18/2009 Bob Benedicto 6300 Southcenter Blvd. Suite 100 Tukwila, Wa 98188 Dear Mr. Benedicto: Michael Hurt Sea -Aire, Inc. RECEIVED DEC 2 1 2009 D EVELOPMENT Phone: (206) 575 -8051 Fax: (206) 575 -0653 Sir, this is a written request for a mechanical permit extension for permit number M09- 081. The site location is 1101 Andover Park W, in Tukwila. Due to scheduling conflicts, there is still updating to the alarm system that must be done prior to the final inspection. We are working with the alarm company to complete the work so we can call the fire department to do their inspection. If you have any questions, please feel free to call Bill Kukahiko or myself at Sea -Aire, Inc. at 206 -575 -8051. Sincerely, 1Z -Z3 o (it (� a - 0110 \lip ALL INFORMATION CONTAINED WITHIN IS PROPERTY OF SEA -AIRE, INC. Service charge of 1'/2% per month will be added on all accounts over 30 days. Should collections or suit become necessary to enforce BILL KUKAHIKO 340 UPLAND DR TUKWILA WA 98188 RE: Permit No. M09 -081 1101 ANDOVER PK W TUKW Dear Permit Holder: Sincerely, Bill Rambo Permit Technician File: Permit File No. M09 -081 Department of Community Development 1 ,1 Jim Haggerton, Mayor Jack Pace, Director In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and /or the National Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180 days. Your permit will expire on 01/11/2010. Based on the above, you are hereby advised to: 1) Call the City of Tukwila Inspection Request Line at 206 - 431 -2451 to schedule for the next or final inspection. Each inspection creates a new 180 day period. -or- 2) Submit a written request for permit extension to the Permit Center at least seven (7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit. The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your extension request is granted, you will be notified by mail. In the event you do not call for an inspection and /or receive an extension prior to 01/11/2010, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. • c 6300 Southcenter Boulevard, Suite #100 0 Tukwila, Washington 98188 0 Phone: 206 - 431 -3670 0 Fax: 206 - 431 -3665 ACTIVITY NUMBER: M09 -081 DATE: 06 -30 -09 PROJECT NAME: 1101 BUILDING SITE ADDRESS: 1101 ANDOVER PK W X Original Plan Submittal Response to Correction Letter # Response to Incomplete Letter # Revision # After Permit Issued DEP RTMENTS: Buil ing ivision Public Works fl DETERMINATION O COMPLETENESS: (Tues., Thurs.) DUE DATE: 07-02-09 Complete Comments: Permit Center Use Only INCOMPLETE LETTER MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: LETTER OF COMPLETENESS MAILED: TUES /THURS ROXITING: Please Route REVIEWER'S INITIALS: APPROVALS OR CORRECTIONS: Approved 1 I Approved with Conditions Notation: REVIEWER'S INITIALS: Documents/routing slip.doc 2 -28 -02 1 1 3 ERMIT Y PLAN REVIEW/ROUTING SLIP Structural Incomplete Structural Review Required Fire Prevention u • No further Review Required DATE: DATE: Planning Division Permit Coordinator Not Applicable Not Approved (attach comments) DUE DATE: 07 -30-09 Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: License Name Type Specialty 1 Specialty 2 Effective Date Expiration Date Status SEAAISM081 B9 SEA AIRE SHEET METAL INC CONSTRUCTION CONTRACTOR GENERAL UNUSED 1/29/1992 6/19/2010 ACTIVE MCINTDCO55QW MCINTYRE DEVELOPMENT CO INC CONSTRUCTION CONTRACTOR GENERAL UNUSED 11/16/1995 11 /3/2000 ARCHIVED MARTIAC081 B9 MARTIN AIR CONDITIONING INC CONSTRUCTION CONTRACTOR GENERAL UNUSED 1/29/1992 1/20/1994 ARCHIVED Bond Bond Company Name Bond Account Number Effective Date Expiration Date Cancel Date Impaired Date Bond Amount Received Date 4 AMERICAN STATES INS CO 6162430 04/18/2002 Until Cancelled 01/01/1980 $12,000.0004/18 /2002 3 SAFECO INS CO 4 683781 04/18/1998 Until Cancelled 04/18/2002 MCINTYRE, CHRISTINE L $6,000.00 01/01/1980 Name Role Effective Date Expiration Date MCCURRY, JOHN M 01/01/1980 MCCURRY, JUDY A 01/01/1980 MCCURRY, JENNIFER L 01/01/1980 MCCURRY, DEBRA J 01/01/1980 MCINTYRE, FRANCIS D 01/01/1980 01/01/1980 MCINTYRE, CHRISTINE L 01/01/1980 01/01/1980 Untitled Page General /Specialty Contractor A business registered as a construction contractor with L &I to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. Business and Licensing Information Name Phone Address Suite /Apt. City State Zip County Business Type Parent Company SEA AIRE INC 2065758051 340 UPLAND DR TUKWILA WA 98188 KING Corporation UBI No. Status License No. License Type Effective Date Expiration Date 4/26/2010 Suspend Date Specialty 1 GENERAL Specialty 2 UNUSED 600360471 ACTIVE SEAAII*206JQ CONSTRUCTION CONTRACTOR 4/18/1980 Other Associated Licenses Business Owner Information Bond Information • 1 Page 1 of 2 https: // fortress .wa.gov /lni/bbip/Detail.aspx 07/15/2009 GAS BOILER SCHEDULE UNIT NO. AREA SERVED MFG & MODEL NO. GPM MBH 1 EWT °F 1 LWT °F DP FT MODULATION VOLT /PH wr LBS NOTES INPUT OUTPUT B -1 - BUILDING AJAX WNG -350W 26 350 280 140 1.. 160 - N/A 120/1 1020 NEW, 1-4 7,500 500 . • -. 7.5 973 460 . 3 0 s�� ze - 1 teams soar si4 MoTe]_ ; H - 2 row H.W. Heat_na. Coil 20" forward curve- an Flat filter box 'wi h Farr 30/30 typ filters ,. i3av /b= w;E r AIR -HANDLING EQUIPMENT SCHEDULE 5 Y al • DESCR9PTION CFM - . (SP) •• FAN RPM POTOR ELECTRICAL REMARKS HP RNA VOLT Ph AC -1 • • Air Conditioning (Rooftop) • Unit 13,500 (ESP 2.4) • Refer to at R.T. Listing • . • ' 460 3 0 E tJ c, - '1Jo C 1.4- -�, �7 Climate R300 total BTUH 371,400 Sens. heat ratio ..80 Compressor F.L.A. '67.5 L.R.A. 283 Evaporator Blower 15 H.P. 1725 R. -).M. F.L.A. 20.5 Condenser Fan (3) ( 1:5'H.P. . 1140 R.P.M. • F.L.A. 7.8 -4 Unit Weight :rig -s 9.5oca )bs HU-1 Heating Unit • • • 7,500 500 . • -. 7.5 973 460 . 3 0 s�� ze - 1 teams soar si4 MoTe]_ ; H - 2 row H.W. Heat_na. Coil 20" forward curve- an Flat filter box 'wi h Farr 30/30 typ filters ,. i3av /b= w;E r r 1 it 3 '1I • � ( ri' G oLi . 1.0 5 t T E E3 OT; -1 5 C , - rYF:) l"1RE 1zDT�GTIO�I il?i1 � f1C- �o'(IG LJ pil i :r p G •1„l. 51 -1•PJ� L i ' i • Fl zt; rRo'i'�T 101 . vALv e —r.1'r w M E,T E,12. � EEZF L6I 1 17fA1t -rHg.ouc,,H WALL- ( TY P,) 3 "VT12 s< .. Sa'i _ • �TS.S:f1 —::T]. .... __. ._ St_.__..•: S^= Tt: '.V�•',•,Y.�`�+,1r___�_Y.'�!_�. »�YY.�l: S.S EXISTINei O 4AS IMA r N � .• 6X1 S rtbl & PtJN/4LER MAW LJ NF�t Nk us.!t()-1u -1 sTi i/. SITE PLA I <141-Q— /1Z' 5 i- i -ro 5.S • of -T K IA I LA '.' ofz.Pow OF UV E 1z JA I6i (3 :r( ) . • ��2: - ---5 ;E EXPANSION REVIEWED F5 CODE COMPLIANCE APPROVED t y JUL 1 3 2009 City of ila BUILDING DIVISION REVISIONS No changes shall be made to the scope of work without prior approval of Tukwila Building Division. NOTE: Revisions will require a new plan submittal and may include additional plan review fees. `` g9 6a1I-E( ct: 1.1s3.41 PiPara�: t ye. °e9 Wm � - 106 -1903 ,m s =� " ' ;gym :.r-sh L c o 223 -03 - ;A —C j EXPIRES 6 - -a al IF. NIANAPT 'Bo% uve NOTES: 1. FIELD VERIFY ALL EXISTING FIELD CONDITIONS BEFORE INSTALLING NEW BOILER 2. ELECTRICAL CONTRACTOR TO PROVIDE 110 VOLT CONVENIENCE OUTLET PER CODE WITHIN 25 FEET OF UNIT. S. •FIELD VERIFY EXISTING ENTERING .A ND LAVING WATER TEMPERATURE AND BALANCE NEW SYS _M TO MATCH 4. EXISTING PUMP GPM, SHOULD BE FIELD VERIFIED AND NOTED ON ASBUILT. • f L -1J -1 10 G� SR' CE: l3e-l.ow ..... _._:.. 1' -a II 0 . ROOF PLAN _ r 145Af 11Ja y PA RT IRL. HFVNT\ ON CiTy O � 1 tde Fg Ua D; , 7oiLE<-f • E.\41-1 A,us l-looD - D" go1L -R ---: Cpst.A0) I • r 1d -1 CIO 1PRO { 3 . 3T" NT or -)MI 1.1N ;T\' DEVELOP , -NT • M()`1-081 CITY WII A JAN 004 PERMIT ENTER RUCTION. NO— i ER FINAL BY THE ION 0 RECEIVED JUN 3 0 PERMIT CENTER t • - St §FELE C 3i Penult coo.. M ° T hl Plan review approval is sub! E~ « e and omissions. Approval of c lion . vents does not authorize the violation of any adopted },, 3 or • ance. Receipt of approved Field Copy and ., { ions is acknowledged: Date:, 7/ / ( it City Of 1'ICia►ila BUILDING ' SION '4I REVS l USWERlEKX 1 -2Cp.t U. 31 1101 AM DOk3 { 111 0t '< MLA- CD13 Fg..a.I3g uv}�� ^• 11 < fL.A- W. 1lG�i r ` 140 AL { vine ;a. �y == EY: 3. G t. a: ;RAMC 11:3343EEr Slur -," rr.1i —+ TM -O( DAt? ISSUE DATE: DATE ;::