Loading...
HomeMy WebLinkAboutPermit M09-155 - CORELINKCORELINK 12201 TUKWILA INTERNATIONAL BL M09 -155 Parcel No.: 0923049120 Address: Suite No: Tenant: Name: Address: Owner: Name: Address: 12201 TUKWILA INTERNATIONAL BL TUKW Contact Person: Name: CRIS LEE Address: 7717 DETROIT AV SW , SEATTLE WA Contractor: Name: MACDONALD /MILLER FAC SOL INC Address: PO BOX 47983 , SEATTLE, WA Contractor License No: MACDOFS980RU DESCRIPTION OF WORK: RELOCATE (6) EXISTING SUPPLY DIFFUSERS AND INSTALL (5) NEW AIR TRANSFER GRILLES, MISC DUCTWORK PER PLANS. Value of Mechanical: $3,286.00 Type of Fire Protection: SPRINKLERS Cit3ief Tukwila Furnace: <100K BTU >100K BTU Floor Furnace Suspended/Wall/Floor Mounted Heater Appliance Vent Repair or Addition to Heat/Refrig /Cooling System.... Air Handling Unit <10,000 CFM >10,000 CFM Evaporator Cooler Ventilation Fan connected to single duct Ventilation System Hood and Duct Incinerator: Domestic Commercial/Industrial doc: IMC -10/06 Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Inspection Request Line: 206 - 431 -2451 Web site: http: / /wwwci.tukwila.wa.us MECHANICAL PERMIT CORELINK 12201 TUKVVILA INTERNATIONAL BL, #200 , TUKWILA WA INTERNATIONAL GATEWAY WEST 12201 TUKWILA INTERNATIONAL BLVD , SEATTLE WA Fees Collected: $219.24 International Mechanical Code Edition: 2006 EQUIPMENT TYPE AND OUANTITY 0 0 0 0 0 0 0 0 0 0 0 0 0 0 * *continued on next page ** Permit Number: Issue Date: Permit Expires On: Phone: Phone: 206 - 768 -4266 Phone: 206 - 768 -4180 Expiration Date: 12/31/2010 M09 -155 12/08/2009 06/06/2010 Boiler Compressor: 0 -3 HP /100,000 BTU 0 3 -15 HP /500,000 BTU 0 15 -30 HP /1,000,000 BTU.. 0 30 -50 HP /1,750,000 BTU.. 0 50+ HP /1,750,000 BTU 0 Fire Damper 0 Diffuser 0 Thermostat 0 Wood/Gas Stove 0 Water Heater 0 Emergency Generator 0 Other Mechanical Equipment M09 -155 Printed: 12 -08 -2009 Permit Center Authorized Signature: doc: IMC -10/06 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Inspection Request Line: 206 - 431 -2451 Web site: http: / /www.ci.tukwila.wa.us Permit Number: M09 -155 Issue Date: 12/08/2009 Permit Expires On: 06/06/2010 Date: �c if /05 I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this mechanical permit. Signature: ° �de— ; J Date: /7 Print Name: / P- g�� This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. M09 -155 Printed: 12 -08 -2009 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us PERMIT CONDITIONS Parcel No.: 0923049120 Permit Number: M09 -155 Address: 12201 TUKWILA INTERNATIONAL BL TUKW Status: ISSUED Suite No: Applied Date: 11/20/2009 Tenant: CORELINK Issue Date: 12/08/2009 1: ** *BUILDING DEPARTMENT CONDITIONS * ** 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431- 3670). 4: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 5: All construction shall be done in conformance with the approved plans and the requirements of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. 6: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 7: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206- 431 - 3670). 8: Manufacturers installation instructions shall be available on the job site at the time of inspection. 9: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. doc: Cond -10/06 * *continued on next page ** M09 -155 Printed: 12 -08 -2009 Signature: Print Name: doc: Cond -10106 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us I hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any other work or local laws regulating construction or the performance of work. Date: /z M09 -155 Printed: 12 -08 -2009 Name: CRIS LEE CITY OF TUKWILd Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 htto://www.ci.tukwila.wa.us Site Address: 12201 TUKWILA INTL. BLVD STE# 200 Tenant Name: CORELINK - OFFICE REMODEL Property Owners Name: CORELINK DATA CENTERS Mailing Address: 12201 TUKWILA INTL. BLVD STE #200 E - Mail Address: CHRIS.LEE @MACMILLER.COM Company Name: MACDONALD MILLER Mailing Address: 7717 DETROIT AVE SW Contractor Registration Number: MACDOFS980RU MACDONALD MILLER H:\Applications\Porms- Applications On Line\2009 Applications \1 -2009 - Mechanical Permit Application.doc Revised: 1 -2009 bh MECHANICAL PERMIT APPLICATION Mechanical Permit No. Project No. (For office use only) Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *Please Print ** SITE LOCATION King Co Assessor's Tax No.: i/ l/17O 4 - Suite Number: Floor: New Tenant: ❑ Yes J .. No TUKWILA City CONTACT PERSON - Who do we contact when your permit is ready to be issued Day Telephone: (206) 768 -4266 Mailing Address: 7717 DETROIT AVE SW SEATTLE WA 98106 City SEATTLE WA 98168 Zip State State State Zip Fax Number: MECHANICAL CONTRACTOR INFORMATION WA 98106 City State Zip Contact Person: C HRIS LEE Day Telephone: (206) 768 - 4266 E -Mail Address: CHRIS.LEE @MACMILLER.COM Fax Number: Expiration Date: 12/31/2010 ARCHITECT OF RECORD - All plans must be wet stamped by Architect Company Name: N/A Mailing Address: City Contact Person: Day Telephone: E -Mail Address: Fax Number: Zip ENGINEER OF RECORD — All plans must be wet stamped by Engineer of Record Company Name: Mailing Address: 7717 DETROIT AVE SW SEATTLE WA 98106 City State Zip Contact Person: CHRIS LEE Day Telephone: (206) 768 - 4266 E -Mail Address: Fax Number: Page 1 of 2 Unit e• �'P Qty Unit:Type: • - .. � � Qty.: ..:Unit Type: • Qty - Boiler /Compressor• Qty Furnace <100K BTU Air Handling Unit >10,000 CFM Fire Damper 0 -3 HP /100,000 BTU Furnace >100K BTU Evaporator Cooler Diffuser 11 3 -15 HP /500,000 BTU Floor Furnace Ventilation Fan Connected to Single Duct Thermostat 15 -30 HP /1,000,000 BTU Suspended/Wall/Floor Mounted Heater Ventilation System Wood/Gas Stove 30 -50 HP /1,750,000 BTU Appliance Vent Hood and Duct Emergency Generator 50 +HP /1,750,000 BTU Repair or addition to Heat/Refrig/Cooling System Incinerator — Domestic Other Mechanical Equipment Air Handling Unit <10,000 CFM Incinerator — Comm/Ind Valuation of Project (contractor's bid price): $ 3,286 Scope of Work (please provide detailed information): RELOCATE (6) EXISTING SUPPLY DIFFUSERS AND INSTALL (5) NEW AIR TRANSFER GRILLES. MISC DUCTWORK PER PLANS Use: Residential: New ❑ Replacement ❑ Commercial: New ❑ Replacement Fuel Type: Electric ® Gas ❑ Other: Indicate type of mechanical work being installed and the quantity below: Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING 0 Signature: Print Name: DARLA DOLL Date Application Accepted: Mailing Address: 7717 DETROIT AVE SW 11471 oil , (9k H:\Applications\Forms- Applications On Line\2009 Applications \1 -2009 - Mechanical Permit Application.doc Revised: 1 -2009 bh Day Telephone: (206) 768 -4278 SEATTLE City Date: WA 98106 State Date Application Expires: Staff Initials: Zip Page 2 of 2 Receipt No.: R09 -01865 Payee: MACDONALD MILLER ACCOUNT ITEM LIST: Description MECHANICAL - NONRES PLAN CHECK - NONRES • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: //www.ci.tukwila.wa.us TRANSACTION LIST: Type Method Descriptio Amount Payment Check 2301 219.24 Authorization No. RECEIPT Total: $219.24 Parcel No.: 0923049120 Permit Number: M09 -155 Address: 12201 TUKWILA INTERNATIONAL BL TUKW Status: PENDING Suite No: Applied Date: 11/20/2009 Applicant: CORELINK Issue Date: Payment Amount: $219.24 Initials: BLH Payment Date: 11/20/2009 01:10 PM User ID: ADMIN Balance: $0.00 Account Code Current Pmts 000.322.102.00.00 175.39 000.345.830 43.85 PAYMENT RECEIVED doc: Receiot -06 Printed: 11 -20 -2009 Project: / A� Type of In pectin : ) 4 Address: /SU I Date Called: Special Instructions: - Date Wanted: 4.m. 2 '1,5-09 m. Requester: Phone So C, - 34 - b -fi INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION Y � 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 MENTS: Pe/rill I P* nsp ectcyf Date: c 0 0 REINSPEtTION F REQUIRE Prior to inspection, fee ust be al at 6300 Southcenter tvd., Suit 100. Call to schedule reinspection. J Rect No.: Date: Approved per applicable codes. Corrections required prior to approval. V Project: Type of I pection: Address: _ 7� 3 Date Called: Special Instructions: Date Wanted: lv1— / y-- (,. p.m. Requester: Phone No: 02o4 -3C6- S66/3 CITY OF TUKWILA BUILDING DIVISION neg./5 INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 COMMENTS: Insp . or: 0.00 REINSPECT ON FEE REPIUIRED. Prior to inspection, fee must be aid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. ceipt No.: 'Date: Approved per applicable codes. ❑ Corrections required prior to approval. • Corelink Office Remodel FILE COPY -- mit No. REVIEWED FOR CODE COMPLIANCE APPROVED DEC 0 3 2009 City of Tukwila BUILDING DIVISION TONNE Location Building owner Program user Company Comments By Dataset name Calculation time TRACE® 700 version Location Latitude Longitude Time Zone Elevation Barometric pressure Air density Air specific heat Density - specific heat product Latent heat factor Enthalpy factor Summer design dry bulb Summer design wet bulb Winter design dry bulb Summer clearness number Winter clearness number Summer ground reflectance Winter ground reflectance Carbon Dioxide Level Design simulation period Cooling Toad methodology Heating load methodology 12201 Tukwila Intl Blvd, Tukwila WA Chris Lee MacDonald Miller Facility Solutions MMFS C:1Documents and Settingslleec\My Documents1TRACE 700 Projects1739 -6981 Corelink Office Remodel\CORELINK_OFFICE.TRC 04:02 PM on 11/19/2009 6.2.4 Seattle, Washington 47.0 122.0 8 386 29.5 0.0749 0.2444 1.0988 4,836.9 4.4953 83 65 24 0.95 0.95 0.20 0.20 400 deg deg ft in. Hg lb/cu ft Btu /Ib• °F Btu /h•cfm• °F Btu-min /h•cu ft Ib•min /hr•cu ft °F °F °F ppm January - December CLTD -CLF (ASHRAE TFMI UATD RECEtV: CITY OF TLJ LA NuV 20 2009 PERMIT CSR MD°VLsC HP FC -2 System Checksums By MMFS Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total = => COOLING COIL PEAK Peaked at Time: Outside Air: Space Sens. + Lat. Btu /h Mo /Hr: 7 / 17 OADB/WB/HR: 81 / 63 / 58 CLG SPACE PEAK Mo/Hr: Sum of OADB: Peaks Plenum Net Percent Space Percent Sens. + Lat Total Of Total Sensible Of Total Btu /h Btu /h ( %) Btu /h ( %) o 0 0 0 0 0 o 0 0 0 0 0 0 0 0 0 0 0 11,623 0 11,623 47 11,962 57 427 0 427 2 393 2 1,189 1,011 2,200 9 1,191 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 13,238 1,011 14,249 58 13,546 65 1,809 452 2,261 9 1,809 9 2,677 0 2,677 11 1,297 6 4,014 0 4,014 16 4,014 19 8,499 452 8,952 36 7,120 34 210 -210 0 0 210 1 0 0 1,049 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -158 -158 -1 450 2 0 0 0 0 0 0 0 0 0 0 0 21,948 1,095 24,542 100.00 20,876 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> HEATING COIL PEAK Mo /Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu /h Btu /h ( %) 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 -3,894 -3,894 24.59 -856 -1,589 10.03 0 0 0.00 -919 -919 5.80 0 0 0 -2,093 -2,093 13.21 -7,761 -8,494 53.64 0 0 0.00 0 0 0.00 -1,380 -1,380 8.71 -1,380 -1,380 8.71 -101 0 0.00 0 -6,065 38.30 0 0 0 0 0 0.00 103 -0.65 O 0.00 O 0.00 O 0.00 0 0.00 0 0.00 -9,243 - 15,837 100.00 Main Clg Aux Clg Opt Vent Total COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR ton MBh MBh cfm °F °F gr /Ib Leave DB/WB/HR °F °F gr/lb 2.1 24.5 23.1 950 77.3 60.9 55.0 55.0 51.7 52.9 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 2.1 24.5 Project Name: Corelink Office Remodel Dataset Name: CORELINK_OFFICE.TRC AREAS Gross Total Glass Floor 552 Part 0 Int Door 0 ExFlr 37 Roof 0 Wall 481 Ext Door 0 ft ( %) 0 0 162 34 0 0 Fan Coil TEMPERATURES Cooling SADB 55.0 Ra Plenum 76.2 Return 76.2 Ret/OA 76.8 Fn MtrTD 0.0 Fn BIdTD 0.1 Fn Frict 0.3 Heating 78.9 69.4 69.4 63.7 0.0 0.0 0.0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups AIRFLOWS Cooling 950 950 950 0 110 110 0 O 0 950 991 110 161 0 0 O 0 0 0 Heating 950 950 950 0 120 120 41 0 0 ENGINEERING CKS % OA cfm/ft cfm /ton ft /ton Btu /heft' No. People Cooling 12.6 1.72 464.47 269.90 44.46 6 Heating 12.6 1.72 -28.69 Main Htg Aux Htg Preheat Humidif Opt Vent Total HEATING COIL SELECTION CapacityCoil Airflow Ent MBh cfm °F -15.8 0.0 0.0 0 0.0 0.0 0.0 0.0 -15.8 Lvg °F 950 63.7 78.9 0 0.0 0.0 0 0.0 0.0 0 0.0 0.0 TRACE® 700 v6.2.4 calculated at 04:02 PM on 11/19/2009 Altemative - 1 System Checksums Report Page 1 of 2 HP FC -3 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumld. Ov Sizing Ov /Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> COOLING COIL PEAK Peaked at Time: Outside Air: Space Sens. + Lat. Btu /h Mo/Hr: 7 / 17 OADB/WB /HR: 81 / 63 / 58 CLG SPACE PEAK Mo /Hr: Sum of OADB: Peaks Plenum Net Percent Space Percent Sens. + Lat Total Of Total Sensible Of Total Btu /h Btu /h ( %) Btu /h ( %) o o 0 0 0 0 o o 0 0 0 0 0 0 0 0 0 0 3,743 0 3,743 19 4,073 26 137 0 137 1 104 1 858 533 1,391 7 867 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4,738 533 5,271 27 5,045 32 2,910 727 3,637 19 2,910 19 5,415 0 5,415 28 2,997 19 4,422 0 4,422 23 4,422 28 12,747 727 13,474 69 10,328 66 332 -332 0 0 333 2 0 0 702 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -234 -234 -1 339 2 0 0 0 0 0 0 0 0 0 0 0 17,817 694 19,553 100.00 15,706 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total =_> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> HEATING COIL PEAK Mo /Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu /h Btu /h ( %) 0 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 -1,254 -1,254 9.71 -618 -1,006 7.79 0 0 0.00 - 484 -484 3.75 O 0 0 -690 -690 5.34 -3,046 -3,434 26.60 0 0 0.00 0 0 0.00 - 455 -455 3.52 -455 -455 3.52 -101 0 0.00 0 -9,098 70.47 0 0 0 0 0 0.00 76 -0.59 0 0.00 0 0.00 O 0.00 O 0.00 O 0.00 -3,602 - 12,911 100.00 COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR ton MBh Main Clg 1.6 19.6 Aux Clg 0.0 0.0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 Total 1.6 19.6 MBh cfm °F °F gr/Ib 17.8 715 77.9 62.0 59.1 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 55.0 52.5 55.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Corelink Office Remodel Dataset Name: CORELINK_OFFICE.TRC System Checksums By MMFS AREAS Gross Total Glass Floor 888 Part 0 Int Door 0 ExFlr 20 Roof 0 Wall 254 Ext Door 0 ft ( %) 0 0 52 21 0 0 Fan Coil TEMPERATURES Cooling SADB 55.0 Ra Plenum 76.2 Return 76.2 Ret/OA 77.4 Fn MtrTD 0.0 Fn BIdTD 0.1 Fn Frict 0.3 Heating 74.6 69.6 69.6 58.2 0.0 0.0 0.0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups AIRFLOWS Cooling 715 715 715 0 170 170 0 0 715 170 0 0 0 0 Heating 715 715 715 0 180 180 14 0 728 194 0 0 0 0 % OA cfm /ft' cfm /ton ft'/ton Btu /heft' No. People ENGINEERING CKS Cooling Heating 25.2 25.2 0.80 0.80 438.62 544.99 22.02 -14.54 13 Main Htg Aux Htg Preheat Humidif Opt Vent Total HEATING COIL SELECTION CapacityColl Airflow Ent MBh cfm °F -12.9 715 58.2 0.0 0.0 0.0 0.0 -12.9 Lvg °F 74.6 0 0.0 0.0 0 0.0 0.0 0 0.0 0.0 0 0.0 0.0 TRACE® 700 v6.2.4 calculated at 04:02 PM on 11/19/2009 Altemative - 1 System Checksums Report Page 2 of 2 200 Reception per Room Checksums By MMFS Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov /Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total 4,162 COOLING COIL PEAK Peaked at Time: Outside Air: Space Sens. + Lat. Btu /h 0 65 0 0 0 Mo /Hr: 7 / 17 OADB/WB/HR: 81 / 63 / 58 Plenum Sens. + Lat Btu /h 0 0 1,970 72 310 0 0 0 0 0 2,352 219 0 0 0 0 0 219 560 140 893 0 292 0 1,745 140 -65 0 Net Percent Total Of Total Btu /h ( %) 0 0 0 0 0 0 1,970 42 72 2 528 11 0 0 0 0 0 0 0 0 2,571 54 700 15 893 19 292 6 1,885 40 0 0 259 5 0 0 0 0 0 0 -53 -53 -1 81 2 0 0 0 0 0 0 0 0 0 0 0 241 4,743 100.00 CLG SPACE PEAK Mo /Hr: 7 / 17 OADB: 81 Space Sensible Btu /h 0 0 0 1,970 72 310 0 0 0 0 2,352 Percent Of Total ( %) 0 0 0 52 2 8 0 0 0 0 63 560 15 493 13 292 8 1,345 36 65 2 0 0 0 0 0 0 3,762 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total =_> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage Grand Total =� HEATING COIL PEAK Mo /Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu /h Btu /h ( %) 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 -660 -660 15.37 -223 -382 8.88 0 0 0.00 -199 -199 4.63 0 0 0.00 -648 -648 15.10 -1,730 -1,888 43.98 0 0 0.00 0 0 0.00 - 428 -428 9.95 - 428 -428 9.95 -31 0 0.00 0 -2,022 47.08 0 0 0 0 0 0.00 34 -0.78 0 0.00 0 0.00 0 0.00 10 -0.23 0 0.00 0 0.00 -2,189 -4,294 100.00 Main Clg Aux Cig Opt Vent Total COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR ton MBh MBh cfm °F °F gr /Ib 0.4 4.7 4.4 171 77.8 61.9 58.4 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.4 4.7 Leave DB/WB/HR °F °F gr/lb 55.0 52.2 54.5 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Corelink Office Remodel Dataset Name: CORELINK_OFFICE.TRC AREAS Gross Total Glass Floor 171 Part 0 Int Door 0 ExFIr 8 Roof 0 Wall 104 Ext Door 0 ft ( %) 0 0 28 26 0 0 TEMPERATURES Cooling SADB 55.0 Ra Plenum 76.2 Return 76.2 Ret/OA 77.3 Fn MtrTD 0.0 Fn BIdTD 0.1 Fn Frict 0.3 Heating 81.6 69.4 69.4 58.8 0.0 0.0 0.0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups AIRFLOWS Cooling 171 171 171 0 40 40 0 0 171 40 0 0 0 0 Heating 171 171 171 0 40 40 13 0 184 53 0 0 0 0 ENGINEERING CKS % OA cfm /ft' cfm /ton ft' /ton Btu /hrft No. People Cooling 23.4 1.00 433.12 432.60 27.74 2 Heating 23.4 1.00 -25.11 Main Htg Aux Htg Preheat Humidif Opt Vent Total HEATING COIL SELECTION CapacityCoil Airflow Ent MBh cfm °F -4.3 171 58.8 81.6 0.0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 -4.3 Lvg °F 0 0.0 0.0 0 0.0 0.0 TRACE® 700 v6.2.4 calculated at 04:02 PM on 11/19/2009 Altemative - 1 System Checksums Report Page 1 of 8 201 Corridor -sm conference int Room Checksums By MMFS Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond PartitiorVDoor Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total == 3,412 COOLING COIL PEAK Peaked at Time: Outside Air. Space Plenum Sens. + Lat. Sens. + Lat Btu/ Btu /h 0 Mo /Hr: 7 / 14 OADB/WB /HR: 82 / 65 / 67 0 0 0 0 0 0 0 0 1,301 325 1,321 0 677 0 3,299 325 113 -113 0 0 0 Net Percent Total Of Total Btu /h ( %) 0 0 0 0 0 0 0 0 0 0 0 0 O 0 O 0 0 0 0 0 0 0 1,626 38 1,321 31 677 16 3,624 84 0 0 679 16 0 0 0 0 0 0 -59 -59 -1 62 1 0 0 0 0 0 0 0 0 0 0 0 153 4,306 100.00 CLG SPACE PEAK Mo /Hr: 7 / 17 OADB: 81 Space Sensible Btu /h 1,301 743 677 2,721 149 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 O 0 0 0 0 0 0 Percent Of Total ( %) 45 26 24 95 5 0 0 0 2,869 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage Grand Total = > HEATING COIL PEAK Mo /Hr. Heating Design OADB: 24 Space Peak Space Sens Btu /h 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -45 0 0 0 -45 Coil Peak Percent Tot Sens Of Total Btu /h ( %) 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 O 0.00 O 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 -3,033 97.65 0 0 0 0.00 24 -0.76 0 0.00 0 0.00 0 0.00 -97 3.11 O 0.00 O 0.00 -3,106 100.00 Total Capacity ton MBh Main Clg 0.4 4.3 Aux Clg 0.0 0.0 Opt Vent 0.0 0.0 Total 0.4 4.3 COOLING COIL SELECTION Sens Cap. MBh 3.5 0.0 0.0 Coil Airflow Enter DB/WB/HR cfm °F °F gr/lb 131 79.3 63.7 64.8 0 0.0 0.0 0.0 0 0.0 0.0 Leave DB/WB/HR °F °F gr /Ib 55.0 52.5 55.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Corelink Office Remodel Dataset Name: CORELINK_OFFICE.TRC AREAS Gross Total Glass Floor 397 Part 0 Int Door 0 ExFlr 0 Roof 0 Wall 0 Ext Door 0 ft ( %) 0 0 0 0 0 0 TEMPERATURES Cooling SADB 55.0 Ra Plenum 75.9 Return 75.9 Ret/OA 78.9 Fn MtrTD 0.0 Fn BIdTD 0.1 Fn Frict 0.3 Heating 70.3 69.6 69.6 48.7 0.0 0.0 0.0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Retum Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups AIRFLOWS Cooling 131 131 131 0 60 60 0 0 131 60 0 0 0 0 Heating 131 131 131 0 60 60 0 0 131 60 0 0 0 0 % OA cfm /ft' cfm /ton ft' /ton Btu /hrft No. People ENGINEERING CKS Cooling Heating 46.0 46.0 0.33 0.33 363.89 1,106.41 10.85 -7.82 3 Main Htg Aux Htg Preheat Humidif Opt Vent Total HEATING COIL SELECTION CapacityCoil Airflow Ent MBh cfm °F Lvg °F -3.1 131 48.7 70.3 0.0 0 0.0 0.0 -0.9 131 48.7 54.6 0.0 0.0 -3.1 0 0.0 0.0 0 0.0 0.0 TRACE® 700 v6.2.4 calculated at 04:02 PM on 11/19/2009 Altemative - 1 System Checksums Report Page 2 of 8 202 Office per Room Checksums By MMFS Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total = => Peaked at Time: Outside Air: Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total = => COOLING COIL PEAK Space Sens. + Lat. Btu /h Mo /Hr: 7 / 17 OADB/WB/HR: 81 / 63 / 58 Plenum Sens. + Lat Btu/ 0 0 0 3,841 141 238 26 0 0 0 0 4,220 266 CLG SPACE PEAK Mo /Hr: 7 / 17 OADB: 81 Net Percent Space Percent Total Of Total Sensible Of Total Btu /h ( %) Btu /h ( %) 0 0 0 0 O 0 0 0 0 0 0 0 3,841 48 3,841 57 141 2 141 2 504 6 238 4 0 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 4,486 57 4,220 62 429 107 537 7 429 6 892 0 892 11 492 7 1,589 0 1,589 20 1,589 23 2,910 107 3,018 38 2,510 37 50 -50 0 0 50 1 0 0 335 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -53 -53 -1 146 2 0 0 0 0 0 0 0 0 0 0 0 7,180 271 7,932 100.00 6,780 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage Grand Total = > HEATING COIL PEAK Mo /Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu /h Btu /h ( %) 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 -1,287 -1,287 27.14 -171 -364 7.68 0 0 0.00 -242 -242 5.11 0 0 0.00 - 497 -497 10.47 -2,197 -2,390 50.41 0 0 0.00 0 0 0.00 -328 -328 6.91 -328 -328 6.91 -24 0 0.00 0 -2,022 42.64 0 0 0 0 0 0.00 32 -0.67 O 0.00 O 0.00 0 0.00 -34 0.71 0 0.00 0 0.00 -2,548 -4,741 100.00 Total Capacity ton MBh Main Clg 0.7 7.9 Aux Clg 0.0 0.0 Opt Vent 0.0 0.0 Total 0.7 7.9 COOLING COIL SELECTION Sens Cap. MBh 7.5 0.0 0.0 Coil Airflow Enter DB/WB/HR cfm °F °F gr /Ib 309 77.3 61.2 56.1 0 0.0 0.0 0.0 0 0.0 0.0 Leave DB/WB/HR °F °F gr /Ib 55.0 52.1 54.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Corelink Office Remodel Dataset Name: CORELINK_OFFICE.TRC AREAS Gross Total Glass ft ( %) Floor 131 Part 0 Int Door 0 ExFIr 10 Roof 0 0 0 Wall 127 54 42 Ext Door 0 0 0 TEMPERATURES Cooling SADB 55.0 Ra Plenum 76.2 Return 76.2 Ret/OA 76.8 Fn MtrTD 0.0 Fn BIdTD 0.1 Fn Frict 0.3 Heating 77.5 69.4 69.4 63.5 0.0 0.0 0.0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups AIRFLOWS Cooling 309 309 309 0 40 40 0 0 309 40 0 0 0 0 Heating 309 309 309 0 40 40 10 0 318 50 0 0 0 0 ENGINEERING CKS % OA cfm /ft' cfm/ton ft' /ton Btu /hr-ft No. People Cooling 13.0 2.36 466.73 198.18 60.55 2 Heating 13.0 2.36 -36.19 Humidif Opt Vent Total HEATING COIL SELECTION CapacityCoil Airflow Ent MBh cfm °F Main Htg -4.7 Aux Htg 0.0 Preheat 0.0 0.0 0.0 -4.7 Lvg °F 309 63.5 77.5 0 0.0 0.0 0 0.0 0.0 0 0.0 0.0 0 0.0 0.0 TRACE® 700 v6.2.4 calculated at 04:02 PM on 11/19/2009 Alternative - 1 System Checksums Report Page 3 of 8 203 Office per Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> COOLING COIL PEAK Peaked at Time: Outside Air: Space Sens. + Lat. Btu /h Mo /Hr: 7 / 17 OADB/WB /HR: 81 / 63 / 58 Plenum Sens. + Lat Btu/h Envelope Loads Skylite Solar 0 0 Skylite Cond 0 0 Roof Cond 0 0 Glass Solar 3,841 0 Glass/Door Gond 141 0 Wall Cond 238 266 Partition/Door 0 Floor 0 Adjacent Floor 0 0 Infiltration 0 Sub Total = => 4,220 266 429 107 446 0 1,077 0 1,952 107 50 -50 0 0 0 CLG SPACE PEAK Mo /Hr: 7 / 18 OADB: 79 Net Percent Space Percent Total Of Total Sensible Of Total Btu /h ( %) Btu /h ( %) 0 0 0 0 O 0 0 0 0 0 0 0 3,841 55 4,180 68 141 2 107 2 504 7 240 4 O 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 4,486 65 4,528 74 537 8 429 7 446 6 66 1 1,077 16 1,077 18 2,059 30 1,572 26 0 0 50 1 278 4 0 0 0 0 0 0 0 0 0 0 0 0 0 -26 -26 0 133 2 0 0 0 0 0 0 0 0 0 0 0 6,222 298 6,930 100.00 6,150 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> HEATING COIL PEAK Mo /Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu /h Btu /h ( %) 0 0 0.00 O 0 0.00 0 0 0.00 0 0 0.00 -1,287 - 1,287 34.55 -171 -364 9.78 0 0 0.00 -242 -242 6.50 O 0 0.00 - 497 -497 13.33 -2,197 - 2,390 64.16 0 0 0.00 0 0 0.00 -328 -328 8.79 -328 -328 8.79 -24 0 0.00 0 -1,011 27.14 0 0 0 0 0 0.00 19 -0.51 0 0.00 0 0.00 0 0.00 -15 0.42 0 0.00 0 0.00 -2,548 -3,725 100.00 Main Clg 0.6 6.9 Aux Clg 0.0 0.0 Opt Vent 0.0 0.0 COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR ton MBh MBh cfm °F °F gr /Ib Total 0.6 6.9 6.6 280 77.0 59.3 48.5 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr /Ib 55.0 50.3 47.4 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Corelink Office Remodel Dataset Name: CORELINK_OFFICE.TRC Room Checksums By MMFS AREAS Gross Total Glass ft' ( %) Floor 131 Part 0 Int Door 0 ExFIr 10 Roof 0 Wall 127 Ext Door 0 0 0 0 0 54 42 TEMPERATURES Cooling SADB 55.0 Ra Plenum 76.2 Return 76.2 Ret/OA 76.6 Fn MtrTD 0.0 Fn BIdTD 0.1 Fn Frict 0.3 Heating 78.3 69.4 69.4 66.2 0.0 0.0 0.0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infli MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups AIRFLOWS Cooling 280 280 280 0 10 10 0 0 280 10 0 0 0 0 Heating 280 280 280 0 20 20 10 0 290 30 0 0 0 0 % OA cfm /ft' cfm /ton ft' /ton Btu /heft' No. People ENGINEERING CKS Cooling Heating 7.1 7.1 2.14 2.14 484.57 226.83 52.90 -28.43 1 Main Htg Aux Htg Preheat Humidif Opt Vent Total HEATING COIL SELECTION CapacityColl Airflow Ent MBh cfm °F -3.7 280 66.2 0.0 0 0.0 0.0 0 0.0 0.0 0.0 0.0 -3.7 Lvg °F 78.3 0.0 0 0.0 0.0 0 0.0 0.0 TRACE® 700 v6.2.4 calculated at 04:02 PM on 11/19/2009 Altemative - 1 System Checksums Report Page 4 of 8 204 Office per Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition Floor Adjacent Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total =_> Grand Total == COOLING COIL PEAK Peaked at Time: Outside Air: Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Space Sens. + Lat. Btu /h Mo /Hr: 7 / 17 OADB/WB/HR: 81 / 63 / 58 Plenum Net Percent Sens. + Lat Total Of Total Btu/h Btu /h ( %) o o 0 0 0 0 0 0 0 0 0 0 1,970 0 1,970 40 72 0 72 1 404 260 663 13 O 0 0 0 0 0 O 0 0 0 0 0 0 2,446 260 2,706 55 390 97 487 10 446 0 446 9 1,056 0 1,056 21 1,892 97 1,989 40 45 -45 0 0 0 0 178 4 0 0 0 0 0 O 0 0 -26 -26 -1 90 2 0 0 0 0 0 0 0 0 0 0 0 4,383 285 4,936 100.00 CLG SPACE PEAK Mo /Hr: 7 / 17 OADB: 81 Space Sensible Btu /h 0 0 0 1,970 72 404 0 0 0 0 2,446 390 246 1,056 1,692 45 0 0 0 Percent Of Total ( %) 0 0 0 47 2 10 0 0 0 0 58 9 6 25 40 1 0 0 0 4,183 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partitior,Door Floor Adjacent Floor Infiltration Sub Total == Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> HEATING COIL PEAK Mo /Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu /h Btu /h ( %) 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 -660 -660 21.45 -291 -479 15.57 0 0 0.00 -236 -236 7.67 0 0 0.00 - 451 -451 14.66 -1,638 -1,826 59.35 0 0 0.00 0 0 0.00 -298 -298 9.67 -298 -298 9.67 -22 0 0.00 0 -1,011 32.86 0 0 0 0 0 0.00 18 -0.60 0 0.00 0 0.00 0 0.00 39 -1.28 0 0.00 0 0.00 -1,957 -3,077 100.00 Main CIg 0.4 4.9 Aux CIg 0.0 0.0 Opt Vent 0.0 0.0 COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR ton MBh MBh cfm °F °F gr/lb Total 0.4 4.9 4.7 190 77.2 61.0 55.3 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr /Ib 55.0 51.8 52.9 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Corelink Office Remodel Dataset Name: CORELINK_OFFICE.TRC Room Checksums By MMFS AREAS Gross Total Glass ft ( %) Floor 119 Part 0 Int Door 0 ExFIr 10 Roof 0 0 0 Wall 124 28 22 Ext Door 0 0 0 TEMPERATURES Cooling SADB 55.0 Ra Plenum 76.2 Return 76.2 Ret/OA 76.7 Fn MtrTD 0.0 Fn BIdTD 0.1 Fn Frict 0.3 Heating 79.4 69.4 69.4 64.7 0.0 0.0 0.0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups AIRFLOWS Cooling 190 190 190 0 20 20 0 0 190 20 0 0 0 0 Heating 190 190 190 0 20 20 9 0 199 29 0 0 0 0 % OA cfm /ft cfm /ton ft /ton Btu /hrft No. People ENGINEERING CKS Cooling Heating 10.5 10.5 1.60 1.60 462.72 289.28 41.48 -25.85 1 Main Htg Aux Htg Preheat Humidif Opt Vent Total HEATING COIL SELECTION CapacityCoil Airflow Ent MBh cfm °F -3.1 190 64.7 0.0 0 0.0 0.0 0.0 0.0 -3.1 Lvg °F 79.4 0.0 O 0.0 0.0 O 0.0 0.0 O 0.0 0.0 TRACE® 700 v6.2.4 calculated at 04:02 PM on 11/19/2009 Alternative - 1 System Checksums Report Page 5 of 8 205 Open office per Room Checksums By MMFS Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total = => Peaked at Time: Outside Air. Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> COOLING COIL PEAK Space Sens. + Lat. Btu /h Mo /Hr. 7 / 17 OADB/WB/HR: 81 / 63 / 58 CLG SPACE PEAK Mo /Hr: 7 / 18 OADB: 79 Plenum Net Percent Space Percent Sens. + Lat Total Of Total Sensible Of Total Btu /h Btu /h ( %) Btu /h ( %) o 0 0 0 0 0 o 0 0 0 0 0 0 0 0 0 0 0 3,743 0 3,743 47 4,073 59 137 0 137 2 104 2 858 533 1,391 17 867 12 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4,738 533 5,271 66 5,045 73 596 149 745 9 596 9 445 0 445 6 66 1 1,164 0 1,164 14 1,164 17 2,205 149 2,354 29 1,826 26 68 -68 0 0 68 1 0 0 290 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -26 -26 0 150 2 0 0 0 0 0 0 0 0 0 0 0 7,011 588 8,038 100.00 6,940 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> HEATING COIL PEAK Mo /Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu /h Btu /h ( %) 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 -1,254 -1,254 26.97 -618 -1,006 21.64 0 0 0.00 - 484 -484 10.42 0 0 0.00 -690 -690 14.84 -3,046 -3,434 73.86 0 0 0.00 0 0 0.00 - 455 -455 9.79 -455 -455 9.79 -21 0 0.00 0 -1,011 21.74 0 0 0 0 0 0.00 13 -0.29 0 0.00 0 0.00 0 0.00 238 -5.11 0 0.00 0 0.00 -3,522 -4,649 100.00 Main CIg Aux CIg Opt Vent Total COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR ton MBh MBh cfm °F °F gr /Ib 0.7 8.0 7.7 316 76.9 59.1 47.6 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.7 8.0 Leave DB/WB/HR °F °F gr/lb 55.0 49.7 45.5 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Corelink Office Remodel Dataset Name: CORELINK_OFFICE.TRC AREAS Gross Total Glass ft ( %) Floor 182 Part 0 Int Door 0 ExFIr 20 Roof 0 0 0 Wall 254 52 21 Ext Door 0 0 0 TEMPERATURES Cooling SADB 55.0 Ra Plenum 76.2 Retum 76.2 Ret/OA 76.5 Fn MtrTD 0.0 Fn BIdTD 0.1 Fn Frict 0.3 Heating 80.2 69.6 69.6 66.8 0.0 0.0 0.0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Retum Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups AIRFLOWS Cooling Heating 316 316 316 316 316 316 0 0 10 20 10 20 0 14 0 0 316 329 10 34 0 0 0 0 0 0 0 0 % OA cfm/ft cfm /ton ft' /ton Btu/hr-ft No. People ENGINEERING CKS Cooling Heating 6.3 6.3 1.74 1.74 471.40 271.69 44.17 -25.55 1 Main Htg Aux Htg Preheat Humidif Opt Vent Total HEATING COIL SELECTION CapacityCoil Airflow Ent MBh cfm °F -4.7 0.0 0.0 0 0.0 0.0 0.0 0.0 -4.7 316 66.8 0 0.0 Lvg °F 80.2 0.0 0 0.0 0.0 0 0.0 0.0 TRACE® 700 v6.2.4 calculated at 04:02 PM on 11/19/2009 Alternative - 1 System Checksums Report Page 6 of 8 206 Office int Envelope Loads Skylite Solar Skylite Cond Roof Cond Gass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total =_> Peaked at Time: Outside Air: Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> COOLING COIL PEAK Space Plenum Sens. + Lat. Sens. + Lat Btu/ Btu /h 505 440 1,116 2,061 44 0 0 0 2,105 Mo /Hr: 7 / 14 OADB/WB/HR: 82 / 65 / 67 0 0 0 0 0 0 0 0 126 0 0 126 -44 0 Net Percent Total Of Total Btu /h ( %) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 631 25 440 18 1,116 45 2,187 88 0 0 286 11 0 0 0 0 0 0 -20 -20 -1 42 2 O 0 0 O 0 0 0 0 0 0 0 62 2,494 100.00 CLG SPACE PEAK Mo /Hr: 7 / 17 OADB: 81 Space Percent Sensible Of Total Btu/ ( %) 505 26 248 13 1,116 58 1,868 97 58 3 0 0 0 0 0 0 1,926 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage Grand Total => HEATING COIL PEAK Mo /Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu /h Btu/ ( %) 0 0 0 0 -18 0 0 0 -18 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 O 0.00 O 0.00 0 0.00 0 0.00 0 0.00 -1,011 95.81 0 0 0 0.00 8 -0.75 0 0.00 0 0.00 0 0.00 -52 4.93 0 0.00 0 0.00 -1,055 100.00 Main Clg Aux Clg Opt Vent Total COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR ton MBh MBh cfm °F °F gr /Ib 0.2 0.0 0.0 2.5 2.2 88 77.8 62.3 60.4 0.0 0.0 0 0.0 0.0 0.0 0.0 0.2 2.5 0.0 0 0.0 0.0 Leave DB/WB/HR °F °F gr /Ib 55.0 52.4 55.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Corelink Office Remodel Dataset Name: CORELINK_OFFICE.TRC Room Checksums By MMFS AREAS Gross Total Glass ft' ( %) Floor 154 Part 0 Int Door 0 ExFir 0 Roof 0 Wall 0 Ext Door 0 O 0 0 0 O 0 TEMPERATURES Cooling SADB 55.0 Ra Plenum 75.9 Return 75.9 Ret/OA 77.4 Fn MtrTD 0.0 Fn BIdTD 0.1 Fn Frict 0.3 Heating 70.2 69.6 69.6 59.2 0.0 0.0 0.0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups AIRFLOWS Cooling 88 88 88 0 20 20 0 0 88 20 0 0 0 0 Heating 88 88 88 0 20 20 0 0 88 20 0 0 0 0 % OA cfm /ft cfm /ton ft' /ton Btu /hrft No. People ENGINEERING CKS Cooling Heating 22.8 22.8 0.57 0.57 421.59 740.89 16.20 -6.85 1 Main Htg Aux Htg Preheat Humidif Opt Vent Total HEATING COIL SELECTION CapacityCoil Airflow Ent MBh cfm °F -1.1 88 59.2 70.2 0.0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 Lvg °F 0 0.0 0.0 0 0.0 0.0 TRACE® 700 v6.2.4 calculated at 04:02 PM on 11/19/2009 Altemative - 1 System Checksums Report Page 7 of 8 207 Large conference int Room Checksums By MMFS Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total = => Peaked at Time: Mo /Hr: Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage COOLING COIL PEAK Outside Air: OADB/WB/HR: Space Sens. + Lat. Btu /h 0 0 0 0 0 0 0 0 0 0 0 Grand Total =_> 5,140 Plenum Sens. + Lat Btu/ 7/14 82/65/67 Net Percent Total Of Total Btu /h ( %) 0 0 0 0 0 0 0 0 0 0 0 508 127 635 11 3,123 0 3,123 53 1,465 0 1,465 25 5,096 127 5,223 88 44 -44 0 0 0 0 682 12 0 0 0 0 0 0 0 0 -79 -79 -1 86 1 0 0 0 0 0 0 0 0 0 0 0 4 5,911 100.00 CLG SPACE PEAK Mo /Hr: 7 / 17 OADB: 81 Space Percent Sensible Of Total Btu/ ( %) 508 1,941 1,465 3,913 99 58 0 0 0 0 0 0 0 0 0 0 0 0 0 13 49 37 1 0 0 0 0 3,971 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total == Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underfir Sup Ht Pkup Supply Air Leakage Grand Total =_> HEATING COIL PEAK Mo /Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 -18 0 0 0 -18 Coil Peak Percent Tot Sens Of Total Btu /h ( %) 0 0.00 O 0.00 0 0.00 0 0.00 O 0.00 0 0.00 O 0.00 O 0.00 O 0.00 O 0.00 O 0.00 0 0 0 0 -4,044 0 0 32 0 0 0 -89 0 0 0.00 0.00 0.00 0 0.00 0.00 98.60 0 0.00 -0.77 0.00 0.00 0.00 2.17 0.00 0.00 -4,101 100.00 Main Clg 0.5 5.9 Aux Cig 0.0 0.0 Opt Vent 0.0 0.0 COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR ton MBh MBh cfm °F °F gr /Ib Total 0.5 5.9 4.6 0.0 0.0 181 0 0 Leave DB/WB/HR °F °F gr/Ib 55.0 53.1 58.1 0.0 0.0 0.0 0.0 0.0 0.0 79.2 64.1 66.9 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Corelink Office Remodel Dataset Name: CORELINK_OFFICE.TRC AREAS Gross Total Glass tF ( %) Floor 155 Part 0 Int Door 0 ExFIr 0 Roof 0 Wall 0 Ext Door 0 0 0 0 0 0 0 TEMPERATURES Cooling SADB 55.0 Ra Plenum 75.9 Return 75.9 Ret/OA 78.8 Fn MtrTD 0.0 Fn BIdTD 0.1 Fn Frict 0.3 Heating 70.1 69.6 69.6 49.4 0.0 0.0 0.0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups AIRFLOWS Cooling 181 181 181 0 80 80 0 0 181 80 0 0 0 0 Heating 181 181 181 0 80 80 0 0 181 80 0 0 0 0 % OA cfm /ft cfm/ton ft Btu /hrft No. People ENGINEERING CKS Cooling Heating 44.3 44.3 1.17 1.17 366.81 314.65 38.14 -26.46 8 HEATING COIL SELECTION CapacityCoil Airflow Ent Lvg MBh cfm °F °F Main Htg -4.1 181 49.4 70.1 Aux Htg 0.0 0 0.0 0.0 Preheat -1.0 181 49.4 54.6 Humidif Opt Vent Total 0.0 0.0 -4.1 O 0.0 0.0 O 0.0 0.0 TRACE® 700 v6.2.4 calculated at 04:02 PM on 11/19/2009 Altemative - 1 System Checksums Report Page 8 of 8 * This report does not display heating only systems. Load / Airflow Summary By MMFS Coil Coil Space VAV Floor Cooling Cooling Design Air Minimum Area People Sensible Total Max SA Changes SA ft # Btu /h Btu /h cfm ach/hr cfm VAV Minimum Main Coll Heating Sensible Btu /h Heating Fan Max SA cfm Percent OA Clg Htg System Zone Room " Altei atrve 1 200 Reception per Rm Peak 171 2.0 4,352 4,743 171 6.67 0 0 -4,294 171 23.4 23.4 202 Office per Rm Peak 131 2.0 7,465 7,932 309 15.70 0 0 -4,741 309 13.0 13.0 203 Office per Rm Peak 131 1.0 6,586 6,930 280 14.24 0 0 -3,725 280 7.1 7.1 204 Office per Rm Peak 119 1.0 4,693 4,936 190 10.66 0 0 -3,077 190 10.5 10.5 HP FC -2 Sys Peak 552 6.0 23,096 24,542 950 - 15,837 950 12.6 12.6 HP FC -2 Sys Block 552 6.0 23,096 24,542 950 - 15,837 950 12.6 12.6 201 Corridor -sm conference int Rm Peak 397 3.0 3,515 4,306 131 2.19 0 0 -3,106 131 46.0 46.0 205 Open office per Rm Peak 182 1.0 7,683 8,039 316 11.57 0 0 -4,649 316 6.3 6.3 206 Office int Rm Peak 154 1.0 2,171 2,494 88 3.79 0 0 -1,055 88 22.8 22.8 207 Large conference int Rm Peak 155 8.0 4,640 5,911 181 7.77 0 0 -4,101 181 44.3 44.3 HP FC-3 Sys Peak 888 13.0 18,009 20,750 715 - 12,911 715 25.2 25.2 HP FC-3 Sys Block 888 13.0 17,815 19,553 715 - 12,911 715 25.2 25.2 Project Name: Corelink Office Remodel TRACE® 700 v6.2.4 calculated at 04:02 PM on 11/19/2009 Dataset Name: CORELINK_OFFICE.TRC Load /Airflow Summary Report Page 1 of 1 Public Works Complete - N . ' Comments: APPROVALS OR CORRECTIONS: Documents/routing slip.doc 2-28-02 • PERIM WORD C PY PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: M09 -155 DATE: 11 -20 -09 PROJECT NAME: CORELINK SITE ADDRESS: 12201 TUKWILA INTERNATIONAL BL X Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # Revision # after Permit Issued EPART E S: ' 4 91 A'� 111 ki uilding Division I Fire Prevention /7 n Structural DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Incomplete ❑ Planning Division ❑ Permit Coordinator DUE DATE: 11-24-09 DATE: DATE: Not Applicable n Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES /THURS ROUTING: Please Route Structural Review Required ❑ No further Review Required n REVIEWER'S INITIALS: DUE DATE: 12-22-09 Approved ❑ Approved with Conditions ❑ Not Approved (attach comments) n Notation: REVIEWER'S INITIALS: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: / / / . .. , :r " : "' �. / �i�.'� /� JJ /J � J /r / .. / / /.. ., / , i/ 1,,,, . / // ./ �/,: /., / / /i, /rim , . / / /'. /,� %/r . ,/ ' / � . / /' . / /' / „ ' ;•Nr ;., /,, 'r /.,•. �/; , /// � 070- .;5 / L / r. /.% r / / / / /b , r >:�/. ,, /i47„ /1 / /•/ / • //. A 7 ./ •� rr , ..�. , ter r�' � Y J.r : � r1 1 / • / ':/ / /, �1 /r" r �. /G ,/ / 1 /,.•, //L , �/ i , //, / .f �r •/ /�';� : / /1./ / /• r hr% / /,, :,: .. / ��/ /r /. //.r, 1 . , � / � / / .,,,i /J.i/ ., r 'i • / /... /.,. / . :. % ., jr / /: ,r , / /,% rr,/ / /• /of/ / /:J� /.. • /• fi r./ //., / • / A / / / ;./ 4i / •n /a /i /•i /.• /i 'J; •1�'„ //J "" / r� //. •. /r• /•r / 1/ / .•/ • r/ i•� ••• / r / / /� /,r , ��� � <' /�� ��� { �J/ l,�i,,• /. � � ��1' s/ T'// �l G,, .'./'l//•,'/,,., / „�J /, / / //%�� ,,�� ,� //� � � /,.� o��%/ ��// l;%'%%/ 1�c(/ ljir/ G/./, 5.// �// �•, �% / / % /�/ />j.���i� /�� / /� /��/ ill/ J/ 1//' � /�,.... /1 / / /� /� / � % / /1� /r / /< J / / %��: /� /J/ % !. � /////: � i• � , i / /. G ..� / %�%� % / . / {%7 DESCRIPTION ; SYMBOL : DESCRIPTION SYMBOL BARE SHEETMETAL SIZE 1 I ROUND SHEETMETAL WRAPPED W/ INSULATION (2")I 14/12 120W ® CFM SOUNDLINE SHEETMETAL " 1 LINING) , ( ) SHOEMAKER 903 I CLEANROOM QUALITY DUCTWORK AS NOTED DOUBLE DEFLECTION SIDEWALL DIFFUSER 14/12 SL 14/12 C ©CFM SIZE SHEETMETAL WRAPPED W/ INSULATION (2 ") j I BARE FLAT OVAL SHEETMETAL 14/12 W 1 4/12 BARE ROUND SHEETMETAL I FLAT OVAL FLAT SHEETMETAL W/ INSULATION (2 ") I 120 14/12 - W EXPOSED QUALITY SHEETMETAL I DUCTBOARD (1" FIBERGLASS) I i 14/12 Q 14/12 DB EXAMPLE OF NEW EXAMPLE OF NOT IN CONTRACT (NIC) l 1 4/12 14/12 � EXAMPLE OF DEMO x xx >x xC , FLEX DUCT A< x:<x>0( X EXAMPLE OF EXISTING I FLEX CONNECTOR ! I 1 4/1 2 3 J// ,/ ,. / ,jJ /�, / / /l „J/ /l, � /J� / „ /,, r /..1 ,,, j,J, / J /„ J, ,. / / /ji,/ . J j , , � J / / / / j JJ J J JJ J J /. / / / / , JJ JJ / / / J / / / / j / / � n... n / /' / �� , / / /% 1, / / / � , /, ,� / f ii %' / J //1 / /I /� /r -r , /� / / / ,/ � .J i:�' / / '� /:.,,, r // ,,, / / /,� � i� /,,,i /� ,f �i. /' i. Jl „ /. ,,J�;, /.., ,,, ,,./ r, /,l. J, ,,.,, i i .J 1 / /„ J ' ,� . � r'. / // / . J• /� � / //, rl, /r / / ' i,'.,,., , /a /J /,,,r,� c i„ , , Jl'l. ,/ .., , / i // -r /ib/ J/ � . ;',/,,. / /. / ,r �,1�,// ,br „J. d /, / / // . ., ....,., / ..,,., ,�� , // ,,,�.f�Jr r J � /J ,,,,� � / „Ji, ,,,.,,:,,::ter.,., „ /.:..,,,,,,,,,,,, /, /� /, ,,,., / //, r /,!, //, ,,,J�.r � /... J/ J r SYMBOL MANUFACTURER & MODEL NUMBER SIZE TYPE NOTES SIZE 1 SHOEMAKER 600 AS NOTED SURFACE MT EGGCRATE GRILLE ® CFM SHOEMAKER 903 AS NOTED DOUBLE DEFLECTION SIDEWALL DIFFUSER ©CFM SIZE j EXISTING DIFFUSER OCFM j I I cn O I 0 1- rn co cn rn M a v+ w 0 0 0 E 4 U 0 O 0 C771 i rn a 0 0, 0 0 E 0 z 0 r="" L NOTES: 1. ACTUATOR BY MECHANICAL CONTRACTOR, WIRING BY ELECTRICAL CONTRACTOR 2. INTERLOCK OF SMOKE DAMPER TO FIRE ALARM SYSTEM BY ELECTRICAL CONTRACTOR. 3. CONTROL FROM LOCAL DETECTOR 4. CONTROL FROM DUCT DETECTOR 5. OPEN /CLOSED POSITION INDICATOR 6. DAMPER FAILS OPEN 7. DAMPER FAILS CLOSED': FSD -1 SYMBOL 1 1/2 HOUR FIRE/SMOKE DAMPER: MEDIUM VELOCITY, VERTICAL FSD-2 <OR HORIZONTAL, AIRFOIL BLADE, LEAKAGE CLASS 2, 120V FSD -2 1 ACTUATOR, 2 POSITION, FAIL CLOSED, '165° F FUSABLE LINK, GREENHECK FSD 312 OR EQUAL. 3 HOUR FIRE /SMOKE DAMPER: MEDIUM VELOCITY, VERTICAL - OR HORIZONTAL, AIR FOLD BLADE, LEAKAGE CLASS 1, 120V FSD -4 3 ACTUATOR, 2 POSITION, FAIL CLOSED, 165° F FUSABLE LINK, , GREENHECK FSD 311 OR EQUAL. FSD -5 SD -1 < S > SMOKE DAMPER: GREENHECK SMD 202 OR EQUAL. SD -2 < S) SMOKE DAMPER: GREENHECK SMD 202 OR EQUAL MD -1 O MOTORIZED CONTROL DAMPER -LOW VELOCITY GREENHECK VCD -23 OR EQUAL. MD -2 DESCRIPTION- POWERED 1 1/2 HOUR FIRE/SMOKE DAMPER: LOW VELOCITY, VERTICAL OR HORIZONTAL, 3 -V BLADE,LEAKAGE CLASS 2, 120V ACTUATOR, 2 POSITION, FAIL CLOSED, 165° F FUSABLE LINK, GREENHECK FSD 212 OR EQUAL. 3 HOUR FIRE /SMOKE DAMPER: LOW VELOCITY, VERTICAL OR HORIZONTAL, 3V BLADE, LEAKAGE CLASS 2, 120V ACTUATOR, 2 POSITION, FAIL CLOSED, 165° F FUSABLE LINK, GREENHECK FSD 231 OR EQUAL. SMOKE CONTROL MOTORIZED DAMPER: LOW VELOCITY GREENHECK SMD 202 OR EQUAL. 1 1,2 1,2 1 1/2 HOUR TUNNEL CORRIDOR FIRE /SMOKE DAMPER: LOW VELOCITY, 3V BLADE, LEAKAGE CLASS 2, 120V ACTUATOR, 2 POSITION, FAIL CLOSED, 165° F FUSABLE LINK, GREENHECK CFSD 212 -1 OR EQUAL. 1 1/2 HOUR OUT OF WALL FIRE /SMOKE DAMPER: LOW VELOCITY, VERTICAL , 3V BLADE, LEAKAGE CLASS 2, 120V ACTUATOR, 2 POSITION, FAIL CLOSED, 165° F FUSABLE LINK, GREENHECK OF SD 212 OR EQUAL. MOTORIZED CONTROL DAMPER: MEDIUM VELOCITY AIRFOIL BLADES GREENHECK VCD -33 OR EQUAL. SMOKE CONTROL MOTORIZED DAMPER: MEDIUM VELOCITY SCD -2 SC AIRFOIL BLADE, GREENHECK SMD 301 OR EQUAL. NOTES I SYMBOL 1,2 1,2 1,2 1,2 3 1,2 1,2 FD -1 FD -2 FD -3 FD -4 FD -5 FD -4 BDD BAR DESCRIPTION -NON POWERED 1 1/2 HOUR DYNAMIC FIRE DAMPER: CURTAIN STYLE, VERTICAL OR HORIZONTAL 165° F FUSABLE LINK, BLADE IN AIR STREAM, GREENHECK DFD 150 TYPE A OR EQUAL. 1 1/2 HOUR DYNAMIC FIRE DAMPER: CURTAIN STYLE, VERTICAL OR HORIZONTAL, 165° F FUSABLE LINK, BLADE OUT OF AIR STREAM, GREENHECK DFD 150 TYPE B OR EQUAL. 3 HOUR DYNAMIC FIRE DAMPER: CURTAIN STYLE, VERTICAL OR HORIZONTAL, 165° F FUSABLE LINK, BLADE IN AIR STREAM, GREENHECK DFD 350 TYPE A OR EQUAL. 3 HOUR DYNAMIC FIRE DAMPER: CURTAIN STYLE, VERTICAL OR HORIZONTAL, 165° F FUSABLE LINK, BLADE OUT OF AIR STREAM, GREENHECK DFD 350 TYPE B OR EQUAL. 1 1/2 HOUR DYNAMIC FIRE DAMPER: LOW VELOCITY, NARROWLINE, VERTICAL - FOR INSTALLATION BETWEEN 2 TRANSFER GRILLES IN A WALL ASSEMBLY, 165° F FUSABLE LINK, GREENHECK DFD -110 OR EQUAL. CEILING RADIATION DAMPER: GREENHECK CRD -2 OR EQUAL. BACKDRAFT DAMPER: GREENHECK WD 330 (VERT) OR WD -100 (HORIZONTAL) OR EQUAL. BAROMETRIC RELIEF DAMPER: (.05 OPNG PRESSURE SHOWN) RUSKIN CBD2. NO SUBSTITUTE ALLOWED. VOLUME DAMPER: SHOP FABRICATED, W /LOCKING QUADRANT. NOTES 5. R-410A REFRIGERANT. 6. INTEGRAL EXPANSION VALVE. 7. VARIABLE SPEED ECM MOTOR. 8. 9. 10. 40 r / CONTROLLED BY STAND -ALONE LOW - VOLTAGE T STAT PROVIDED AND INSTALLED BY M -M DRIP I•AN UNDER FAN COI! UNIT PROVIDED AND INSTALLED FD RY M -Lul D IN RETURN AIR DUCT. PROVIDED TEcToRiNsTALLE SMOKE DE 208/1 NOTES: 1. POWER WIRING AND DISCONNECT SWITCH BY ELECTRICAL CONTRACTOR. 2. INTERLOCK WITH CU -208. 3. . G HVAC SYSTEM. 4. FIELD ZERO ROUTE OUTSIDE CONDENSATE CONDENSATE NECESSARY. POWER O USED R ST IN PR COOLING ONLY. VENTILATION IS PROVIDED BY THE EXISTING BUILDING UM SS TT 0 S QU OW R Y E.C. REBAL, EXISTING REBAL, EXISTING EXISTING EXISTING 24V 212 1 -10 , UNIT NO. FC -2 FC -3 FC-4 FC -208 AREA SERVED I MFG & MODEL NO. CFM I ESP j HP FL 2 OFFICE TRANE TWE030C140B0 950 FL 2 OFFICE TRANE TWE030C140B0 ; 950 I FL 2 UPS TRANE a 3,000 FL CBX32MV-060 1,725 I F 2 RM 109 LENNOX CBX32MV 060 0.4 / ae! . :9' °,1 I JJ / , // BLOWER IOSA ELECTRICAL RPM; CFM ' VOLT /PH 130 208/1 1 180 I 208/1 1- 160 VAR 0 HEAT I CONTROL FLA VOLT /PH KW STG WT NOTES LBS iii % %%1// % % �J' iii! ja ziJ: % / /,i/ LENNOX SSB060H4 -460 SWITCH BY ELECTRICAL CONTRACTOR. DEG F, WITH SPEED CONTROL KIT, WEATHERPROOF KIT, OUTDOOR FAN MOTOR AND CAPACITOR: 1433, EXCEPTION 9. UNIT HAS AN ARI SEER RATING A MINIMUM 10% GREATER THAN WSEC TABLE 14 -1A UNIT NO. CU -208 CU-4 NOTES: ARI COOL MFG & MODEL NO. TONS 1. POWER WIRING! AND DISCONNEC T 2. FACTORY OPTIONS: - LOW AMBIENT KIT RATED TO ZERO - INTEGRAL CRANKCASE HEATER. 3. R-410A REFRIGERANT. 4. NO ECONOMIZER PER WSEC SECTION ARI SEER j N COMPRESSOR • HP TYPE I EACHRPM 2 -STAGE SCROLL SUC NO. REF I LINE CIRCUITS LIQ ? ELECTRICAL LINE j WT (IN) (IN) I VOLT /PH MCA CONTROL LBS ' NOTES r { 1 -1/8 1/2 460/3 I 12.2 ! 24V j 309 EXISTING,1 -4 EXISTING UNIT NO. HP -2 HP-3 AREA SERVED FL 2 OFFICES FL 2 OFFICES NOM COOL HEAT HSPF/ EER/ MFG & MODEL NO. TONS ! MBH COP SEER TRANE TWR030C100A4 2.5 I 29 1 6.8/3.0 /10 TRANE TWR030C100A4 2.5 I 29 6.8/3.0 /10 ELECTRICAL WT V /PH MCA I MOCP 1 CONTROL LBS NOTES 208/1 ! 18 I 24V 213 I EXISTING, 1,2 208/1 18 24V 213 EXISTING, 1,3 R -22 REFRIGERANT INTERLOCKED WITH INTERLOCKED WITH i % / . //l �z . THESE PLANS ARE SCHEMATIC AND DO NOT SHOW EXACT ROUTING OR EVERY OFFSET WHICH MAY BE REQUIRED. THE HVAC CONTRACTOR IS TO COORDINATE WITH ALL OTHER TRADES AND IS TO VERIFY ALL CLEARANCES BEFORE COMMENCING WORK. 2. MATERIALS, METHODS, AND INSTALLATION SHALL COMPLY WITH THE PROVISIONS OF THE 2006 EDITIONS OF THE INTERNATIONAL MECHANICAL CODE, INTERNATIONAL BUILDING CODE, INTERNATIONAL FIRE CODE AND STATE AND LOCAL CODES AND ORDINANCES. 3. DUCT CONSTRUCTION AND HANGING SHALL COMPLY WITH CHAPTER 6 OF THE 2006 IMC AND WITH CURRENT SMACNA STANDARDS. EARTHQUAKE BRACE ALL DUCTS 28" DIA AND LARGER WHICH ARE SUSPENDED MORE THAN 12" BELOW STRUCTURAL SYSTEM. 4. JOINTS OF MEDIUM AND HIGH VELOCITY DUCT SYSTEMS SHALL BE SEALED WITH GASKETS OR LISTED MASTIC TYPE DUCT SEALANT. DUCTS SHALL BE INSULATED AS INDICATED ON PLANS, , PER 2006 WSEC. - DUCT WRAP, WHERE INDICATED, SHALL BE 1 1/2" 0.75 LB /CU FT FIBERGLASS DUCT INSULATION WITH A FACTORY APPLIED REINFORCED ALUM. FOIL VAPOR BARRIER (R-4.2 MIN.). - SOUND LINING, WHERE INDICATED, SHALL BE 1" 1.5 LB /CU FT FIBERGLASS DUCT LINING COATED TO PREVENT FIBER EROSION AT VELOCITIES UP TO 6000 FPM (R-4.2 MIN.). - DUCT BOARD, WHERE INDICATED, SHALL BE 1" RIGID FRK FACED El 475 FIBERGLASS DUCT BOARD SYSTEM, UL 181 LISTED AS A CLASS 1 AIR DUCT (R -4.3 MIN.). AIR DUCT (R-4.3 MIN.} 6. FLEX DUCTS SHALL CONSIST OF A REINFORCED VAPOR BARRIER, 1 1/2" FIBERGLASS INSULATION, AND NON - PERFORATED INTERIOR LINER WITH WIRE HELIX. DUCT SHALL BE A UL 181 LISTED CLASS 1 AIR DUCT. FLEX DUCTS SHALL ONLY BE USED WHERE SHOWN AND SHALL NOT EXCEED 12' IN LENGTH UNLESS NOTED OTHERWISE. 7. PROVIDE FIRE DAMPERS, SMOKE DAMPERS AND FIRE /SMOKE DAMPERS WHERE INDICATED ON PLANS AND AS REQUIRED BY SECTION 716.5 OF THE 2006 IBC. PROVIDE CEILING O D FIRE DAMPERS WHERE INDICATED ON PLANS AND AS REQUIRED BY SECTION 716.6.2 OF THE 2006 IBC. INSTALL FIRE DAMPERS SMOKE DAMPERS AND F IRE /SMOKE DAMPERS IN ACCORDANCE WITH THE MANUFACTURERS INSTRUCTIONS, THE TERMS OF THEIR LISTING, AND THE REQUIREMENTS OF THE CODE. 8. HVAC EQUIPMENT, VALVES AND DAMPERS SHALL BE LOCATED IN EASILY ACCESSIBLE LOCATIONS. UNLESS SHOWN ON ARCHITECTURAL DRAWINGS, REQUIRED ACCESS PANELS SHALL BE PROVIDED AND INSTALLED BY THE GENERAL CONTRACTOR. MINIMUM ACCESS DOOR SIZE FOR VALVES AND DAMPERS TO BE 18" X 18 ". 9. MOTORS STARTERS NOT LISTED AS BEING PROVIDED IN THE HVAC EQUIPMENT SCHEDULES ARE TO BE PROVIDED AND INSTALLED BY ELECTRICAL CONTRACTOR. 10. WITHIN 90 DAYS AFTER THE DATE OF SYSTEM ACCEPTANCE, RECORD DRAWINGS OF THE ACTUAL INSTALLATION TO BE, PROVIDED TO THE BUILDING OWNER. RECORD DRAWINGS SHALL INCLUDE AS A MINIMUM THE LOCATION AND PERFORMANCE DATA ON EACH PIECE OF EQUIPMENT, GENERAL CONFIGURATION OF DUCT AND PIPE DISTRIBUTION SYSTEM, INCLUDING SIZES, AND THE TERMINAL AIR AND WATER DESIGN FLOW RATES. 11. OPERATING AND MAINTENANCE MANUALS TO BE PROVIDED TO THE BUILDII•:G OWNER THAT INCLUDE: SUBMITTAL DATA, NAMES AND ADDRESSES OF AT LEAST ONE SERVICE AGENCY, HVAC CONTROLS SYSTEM MAINTENANCE AND CALIBRATION INFORMATION AND A COMPLETE OPERATIONAL NARRATIVE FOR EACH SYSTEM. 12. COMMISSIONING IS REQUIRED ON THIS PROJECT IN ACCORD WITH WASHINGTON STATE ENERGY CODE (WSEC) SECTION 1416 AND WITH LEED NC -2.1 FUNDAMENTAL BUILDING SYSTEMS COMMISSIONING AND ADDITIONAL COMMISSIONING. 13. A COMPLETE REPORT OF TEST PROCEDURES AND RESULTS SHALL BE PREPARED AND FILED WITH THE OWNER 1i �aida ss TITLE PROJECT ENGINEER ACCOUNT MANAGER FIELD FOREMAN REFRIGERATION FOREMAN FITTING FOREMAN AIR BALANCE FIELD FOREMAN FIELD FOREMAN SHEET METAL FOREMAN COMMISSIONING FOREMAN NAME CHRIS LEE STEVE FLINK DARYL ANDERSON DEAN GRASSER JASON ZEMBRYCKI RON LANDBERG LARRY HARBISON DEAN GRASSER KURT KIRCHNER TOM HEAD COMPANY MACDONALD MILLER MACDONALD MILLER MACDONALD MILLER MACDONALD MILLER MACDONALD MILLER MACDONALD MILLER MACDONALD MILLER MACDONALD MILLER MACDONALD MILLER CORELINK PHONE NUMBER 206 - 768 -4266 253 - 680 -3172 206 - 768 -4216 206 - 768 -4270 206 - 768 -3860 206 - 768 -3990 206 - 768 -4294 206 - 768 -4270 206 -407 -2614 206- 962 - 7162 FAX NUMBER 206- 768 -4267 206 - 768 -4217 206- 768 -4271 206 - 768 -3861 206 - 768 -3991 206 - 768 -4295 206 - 768 -4271 206 -407 -2615 RELOCATE (6) DIFFUSERS AND INSTALL (5) AIR TRANSFERS. MODIFY LOW PRESSURE DUCT. AIR BALANCE (2) SPLIT SYSTEM HEAT PUMPS. NAME TITLE TM0.01 SCHEDULES - HVAC DM2.02 2ND FLOOR DEMO PLAN - HVAC TM2.02 2ND FLOOR PLAN - HVAC APN # 0923049120 LEGAL DESCRIPTION: BEGIN NW CORNER OF NE 1/4 OF SE 1/4 TH S 89 -16 -35 E 100 FT TH S 24-13 -53 E 969.61 FT TO POINT OF BEGINNING TH N 65 -46 -07 E 58.17 FT TH N 63 -32-48 E 62.13 FT TH S 22 -47 -01 E 21.44 FT TH N 65 -30 -25 E 199.33 FT TO POINT ON WLY R/W LINE OF PRIMARY STATE HIGHWAY NO 1 (SR 99) SOUTH 118TH ST TO JCT SSH NO 1 -K APPROVED JULY 23, 1957 TH FOLLOWING SAID WLY R/W LINE ALONG ARC OF 2805 FOOT RADIUS NON TANGENT CURVE TO RIGHT, CENTER BEARING S 65 -44 -51 W, THRU C/A OF 1 -16 -30 DISTANCE OF 62.42 FT TH FOLLOWING SAID WLY R/W LINE N 67 -01 -21 E 10 FT TH FOLLOWING SAID WLY RNV LINE ALONG ARC OF 2815 FOOET RADIUS NON TANGENT CURVE TO RIGHT CENTER BEARING S 67 -01 -21 W THRU C/A OF 6 -31 -21 DISTANCE OF 320.45 FT TH S 73 -32-42 W 16.58 FT TH S 71 -35 -51 W 61.96 FT TH N 78 -38 -58 W 7.83 FT TH S 75 -53-44 W 106.07 FT TH N 05 -01 -10 W 18.41 FT TH S 82 -22 -27 W 64.93 FT TH S 63 -55 -24 W 58.16 FT TH N 24 -13 -53 W 334.22 FT TO POINT OF BEGINNING - LOT B OF CITY OF TUKWILA BOUNDARY LINE ADJUSTMENT NO L98 -0033 RECORDING NO 9810059013 12101 TUKWILA INTERNATIONAL BLVD TUKWILA, WA NAME TIT NO SCALE VICINITY MAP REVISIONS No changes shall be made to the scope of work without prior approval of Tukwila Building Division. NOTE: Revisions will require a new plan submittal ' and may include additional plan review fees. FILE CO Permit No. Plan review approval is subject to errors and Approval of co - + coon ► ► ;- } does not authorizo the violation of any adopted code or ore F Receipt of approved Field Copy and .,. < <r{ I is h 4► y edged: BY Date: / City Of'llikwila BUILDING D ON / 1 / J Ole , SEPARATE PERMIT REQUIRED FOR pm • ere alas Piping City of Tukwila BUILDING DIVISION , REVIEWED FOR CODE COMPLIANCE APPROVED DEC 0 3 2009 Crtyo # Tukwila BUILDING DIVISION RECEIVED CITY OF TI 1KWILA NUV ? 0 Luu9 PERMIT CE R i ENGINEER: C LEE SHEET NUMBER: 0 co 0 U co z I I I I I I I I of rn 0 0 w d Ia Co CO O LU 0 0 2 Z 0 w 0 TM0.01 w 0 LAST REVISED: 11 -1 -09 CHECKED BY: DATE PLOTTED: B GEZON.,, 11-19-09 CAD: ISSUE DATE: R VILLANUEVA 11-19-09 DRAWING NUMBER: D -1269- 7396981 -00 Thursday, November 19, 2009 2:07:53 PM CO m 0 z m m z Z m INTERGATE WEST BUILDING B CORELINK OFFICE REMODEL 12201 TUKWILA INT'L BLVD TUKWILA, WA 98168 ° ISSUED FOR CONSTRUCTION co PERMIT /CD SET REVISIONS: 11-19-09 DATE REVISIONS: DATE 1 EXPIRES 7 / 8 / 1 J: \739 \6981 Corelink — Office Remodel SF\ 00 \Eng \Dwg \SHTS \7396981TM0_01.dwg MacDonald - Miller FAcILI FY SOLUTIONS 7717 Detroit Avenue SW, Seattle, WA 98106 Phone: 206 - 763 -9400 Fax: 206- 767 -6773 www.macmiller.com WA Lic No: MACDOFS980RU REVIEWED FOR CODE . P CE APPROVED 1 /8" = 1 , -p„ AC -\ SFD- 0 1000 (TYP 4 6 "x20" 8 "xi 8" SFD -12 -/ 14"0 L am_ SFD -10 AC- I AC -2 EF -1 SFD -1 1 SHEET NOTES SEE DETAIL: FC -5 T 2.9 0 THERMOSTAT SETTINGS FC -4: SET TO 72 DEG F FC -208: SET TO 74 DEG F 10 "4 AC -3 O 30/10 EGGCRATE TRANSFER GRILLE. 02 20/8 SM DUCT AND MANUAL DAMPER WITH 18x8 EGGCRATE SUPPLY GRILLE FACING FLOOR. 03 16/12 SM DUCT AND MANUAL DAMPER WITH (1) 18x8 EGGCRATE SUPPLY GRILLE FACING FLOOR AND (1) 18x8 SIDEWALL SUPPLY DIFFUSER. • 20x20 SIDEWALL SUPPLY DIFFUSER INSTALLED IN ANGLED SHEETMETAL BOX. SFD -4 100 10"o AC -5 00 0 100 SFD -6 AC -6 1 100 16 "o S 10x10 250 (TYP 4) 10 "0 l° `.- SFD -7 AC -10 100 100 AC -9 AC -8 RECEIVED CITY OF TUKWILA NOV ? 0 2009 PERMIT CENTER DEC 0 3 2009 City of Tukwila BUILDING DIVISION ENGINEER: C LEE SHEET NUMBER: • co 0 U ca CO rn' ts- ~ a) 0 ta (A li 0) O > M O O t0 L- O N 0 ti • 0 tia co (D ui Z ® 5 m � I-- w cu) W LL V-- W m <CZZ� (911 J a CL W Ct r Os Z U N i2 CHECKED BY: B GEZON E O U E N E O co 0 O U) LL 2 z 0 J 1< w 0 w 0 LAST REVISED: 11 - 19 -09 DATE PLOTTED: 11 - 1 9 -09 CAD: ISSUE DATE: R VILLANUEVA 11-19-09 DRAWING NUMBER: D -1269- 7396981 -00 DM2.02 c. 3 N O N ro rn M t S 5 3 O c 0 0 E 0 w O C 0 0 W rn ca rn 0 1000 TYP 26 "x20" 18x10 J 1000 SFD -1 2 14"0 1 0x10! 1;;0x'10 SFD -10 SFD -9 1 10x10 12 "d 250 (TYP 4 �- SFD-8 AC 8" 0 o - 10" AC -1 -� 1 8"0 AC -2 10x10 250 10 "0 (TYP 2) 1 FC -7 EF -1 SFD -11 SEE DETAIL: 6 X „ FC -5 10"0 SHEET NOTES O 30/10 EGGCRATE TRANSFER GRILLE. • 20/8 SM DUCT AND MANUAL DAMPER WITH 18x8 EGGCRATE SUPPLY GRILLE FACING FLOOR. 0 THERMOSTAT SE I I INGS FC -4: SET TO 72 DEG F FC -208: SET TO 74 DEG F AC -3 SFD -4 16/12 SM DUCT AND MANUAL DAMPER WITH (1) 18x8 EGGCRATE SUPPLY GRILLE FACING FLOOR AND (1) 18x8 SIDEWALL SUPPLY DIFFUSER. Q 20x20 SIDEWALL SUPPLY DIFFUSER INSTALLED IN ANGLED SHEL I METAL BOX. 100 - AREA OF WORK AC -5 0 100 SFD -6 AC -6 SFD -7 AC -10 AC -9 0 100 0 100 AC -8 RECEIVEa c OF TUKWILA n l I U 0 7.009 PERMIT CENTER REVIEWED FOR CODE , PU APPROVED DEC 0 3 2009 I City of Tukwila BUILDING DIVISION ENGINEER: C LEE CHECKED BY: B GEZON L 8I..... a) _r ®_ rn ti � c Ce Qj O 0) � N s � f6 X O LL 0) i g CO g O U < (0 C c • a > M 0 0 a � z o S 0 U 5 N J co 1 1 1 1 1 1 1 1 I SI Q 0 0 1- w w w 0 DRAWING NUMBER: D- 1269- 7396981 -00 SHEET NUMBER: 0 Z 0 0 L.L 00 0 0 z 0 IL 0 w LAST REVISED: 11 - 19 -09 DATE PLOTTED: 11 - 1 9 -09 CAD: ISSUE DATE: R VILLANUEVA 11-19-09 TM2.02