Loading...
HomeMy WebLinkAboutPermit D09-050 - SAVVIS - ROOFSAVVIS 12301 TUKWILA INTERNATIONAL BL D09 -050 Contact Person: Name: COLIN MADSEN Address: 8625 MARTIN WAY E , LACEY WA 98516 Phone: 360 - 456 -2821 Contractor: Name: MADSEN ROOFING INC Address: 8625 MARTIN WAY E , LACEY WA 98516 Phone: 360 - 456 -2821 Contractor License No: MADSERI147JD Value of Construction: Type of Fire Protection: Type of Construction: doc: IBC -10/06 Cityllif Tukwila • Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us DEVELOPMENT PERMIT Parcel No.: 0923049367 Permit Number: D09 -050 Address: 12301 TUKWILA INTERNATIONAL BL TUKW Issue Date: 04/23/2009 Suite No: Permit Expires On: 10/20/2009 Tenant: Name: SAVVIS Address: 12301 TUKVVILA INTERNATIONAL BL , TUKWILA WA Owner: Name: INTERNATIONAL GATEWAY WEST Address: 12201 TUKWILA INTERNATIONAL BLVD , SEATTLE WA 98168 Phone: DESCRIPTION OF WORK: INSTALL NEW SINGLE PLY ROOFING MEMBRANE OVER EXISTING SINGLE LAYER BUILT -UP ROOF AND RIGID INSULATION $298,000.00 * *continued on next page ** Expiration Date: 05/01/2010 Fees Collected: $4,888.60 International Building Code Edition: 2006 Occupancy per IBC: 0008 D09 -050 Printed: 04 -23 -2009 Public Works Activities: Channelization / Striping: N Curb Cut / Access / Sidewalk / CSS: N Fire Loop Hydrant: N Number: 0 Size (Inches): 0 Flood Control Zone: Hauling: N Start Time: End Time: Land Altering: Volumes: Cut 0 c.y. Fill 0 c.y. Landscape Irrigation: Moving Oversize Load: Start Time: End Time: Sanitary Side Sewer: Sewer Main Extension: Private: Public: Storm Drainage: Street Use: Profit: N Non - Profit: N Water Main Extension: Private: Public: Water Meter: N Permit Center Authorized Signature: I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. Signature: Print Name: doc: IBC -10/06 The granting of this permit es presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the perf : c= of work. I : m authorized to sign and obtain this development p -rmit. City alITukwila • Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /ww'i'.ci. tukll'ila.11'a. us Permit Number: D09 -050 Issue Date: 04/23/2009 Permit Expires On: 10/20/2009 Date: Date: This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. D09 -050 Printed: 04 -23 -2009 1: ** *BUILDING DEPARTMENT CONDITIONS * ** • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us PERMIT CONDITIONS Parcel No.: 0923049367 Permit Number: D09 -050 Address: 12301 TUKWILA INTERNATIONAL BL TUKW Status: ISSUED Suite No: Applied Date: 04/08/2009 Tenant: SAVVIS Issue Date: 04/23/2009 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 4: All construction shall be done in conformance with the approved plans and the requirements of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. 5: Prior to final inspection for this building permit, a copy of the roof membrane manufacturer's warranty certificate shall be provided to the building inspector. 6: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. doc: Cond -10/06 * * continued on next page ** D09 -050 Printed: 04 -23 -2009 Signature: Print Name: • • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us I hereby certify that I have read these conditions and will comply with them as outlined. All provisions this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any construction or the performance of work. ( .(A ll 14 sic , doc: Cond -10/06 D09 -050 Date: of law and ordinances governing other work or local laws regulating Printed: 04 -23 -2009 CITY OF TUKWI Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.ci.tukwila.wa.us Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *Please Print ** SITE LOCATION King Co Assessor's Tax No.: Site Address: 1 23 k "T■.11G -ICJ 1 1. '21.1lF t It Y"Il_ tz3-1J6uite Number: Tenant Name: SAL)t \S New Tenant: ❑ Yes ,J;]o Property Owners Name: t tJ EffZN.pT■ cal l... G►°t -t C-plt.t u, S 1 C Mailing Address: 12.2.0 1 T A I_,,J1 l l\ 1 t.'1(: 1J)A t l D '(l 1 3 W 17 btte. fAti 9 5l 68 State Zip CONTACT PERSON - who do we contact when your permit is ready to be issued Name: Wu Al M�rI�SF Mailing Address: 8(3.2 .5 M fy¢"T1 1 x`11 E E -Mail Address: Cal lin mariSf v )v1�X�'1 - C.Oyn GENERAL CONTRACTOR INFORMATION - (Contractor Information for Mechanical (pg 4) for Plumbing and Gas Piping (pg 5)) Company Name: MP►RSE W�f 1 1 t•C 8 Mailing Address: 2 M Pd11Z7 l l (/7P l E . Contact Person: . 11A V �S E -Mail Address: 54r'� v✓YndSe n v'o` 1 n em v� Contractor Registration Number: MA/3SF R-) ti-f/ I> � Building Permit No. Dog - o Mechanical Permit No. Plumbing/Gas Permit No. Public Works Permit No. Project No. (For office use only) City ARCHITECT OF RECORD - All plans must be wet stamped by Architect of Record oq).w'4 -giel Floor: Day Telephone: (3 6o), 6 - 2?' 2-1 ugc-N (.3A 19)6i () City JJ State Zip Fax Number: (,AbO) Lt 6 UPC� A L�S I°� ` lbskc+ City State Zip Day Telephone: (3(,? ) ( 4% - 2'B2- Fax Number: (36 - 6 -- 355 I FS Expiration Date: 11 A 1 t 14.Z Company Name: Mailing Address: City Contact Person: Day Telephone: E -Mail Address: Fax Number: State Zip ENGINEER OF RECORD - All plans must be wet stamped by Engineer of Record Company Name: Mailing Address: City Contact Person: Day Telephone: E -Mail Address: Fax Number: H:\ApplitmionsWorrms-Applications On Line\2009 Applications\I -2009 - Permit Application.doc Revised: 1 -2009 bb State Zip Page 1 of 6 BUILDING PERMIT INFOON - 206 -431 -3670 • p Valuation of Project (contractor's bid price): $ 2-q0$b oa Existing Building Valuation: $ Scope of Work (please provide detailed information): 1 S1 W:L / - P vow( 6iFl--1Ksu- (Alta f X (S [Ai) /3u r r_7 -(4P wF "7.10 24G1n �.3SuC 7 fltJ. r/ Will there be new rack storage? ❑ Yes Provide All Building Areas in Square Footage Below PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling: 'Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? ❑ Yes ❑ No If `yes ", explain: FIRE PROTECTION /IIAZARDOUS MATERIALS: ❑ Sprinklers ❑ Automatic Fire Alarm 0.. No If yes, a separate permit and plan submittal will be required. ❑ None ❑ Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes ❑ No If `yes', attach list of materials and storage locations on a separate 8 -1 /2 "x 11" paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM ❑ On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. HAApplicationsWonns- Applications On line\2009 Applications \ 1-2009 - Permit Application.doc Revised: 1 -2009 bit Page 2 of 6 Existing Interior Remodel Addition to Existing Structure New Type of Construction per IBC Type of Occupancy per IBC l Floor 2' Floor 3 Floor Floors thru Basement Accessory Structure* Attached Garage Detached Garage Attached Carport Detached Carport Covered Deck Uncovered Deck BUILDING PERMIT INFOON - 206 -431 -3670 • p Valuation of Project (contractor's bid price): $ 2-q0$b oa Existing Building Valuation: $ Scope of Work (please provide detailed information): 1 S1 W:L / - P vow( 6iFl--1Ksu- (Alta f X (S [Ai) /3u r r_7 -(4P wF "7.10 24G1n �.3SuC 7 fltJ. r/ Will there be new rack storage? ❑ Yes Provide All Building Areas in Square Footage Below PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling: 'Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? ❑ Yes ❑ No If `yes ", explain: FIRE PROTECTION /IIAZARDOUS MATERIALS: ❑ Sprinklers ❑ Automatic Fire Alarm 0.. No If yes, a separate permit and plan submittal will be required. ❑ None ❑ Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes ❑ No If `yes', attach list of materials and storage locations on a separate 8 -1 /2 "x 11" paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM ❑ On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. HAApplicationsWonns- Applications On line\2009 Applications \ 1-2009 - Permit Application.doc Revised: 1 -2009 bit Page 2 of 6 PERMIT APPLICATION NOTES — Applicable to all permits in this application Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. Building and Mechanical Permit The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). Plumbing Permit The Building Official may grant one extension of time for an additional period not exceeding 180 days. The extension shall be requested in writing and justifiable cause demonstrated. Section 103.4.3 Uniform Plumbing Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND 1 AM AUTHORIZED TO APPLY FOR THIS PERMIT. 1■4 wmSEI — BUILDING OW R A . ORI Signature: Print Name: Mailing Address: 8625 MgA2�1' Date Application Accepted: H:Wpphcat ions \Forms - Application On Line 12009 Applications \I -2009 - Pemw Application.doc Revised: 1 -2009 bh Day Telephone: City 4-17 87o (36.b)LeS6 - 2$2- 1 (A)(v 98Sl c. State Date: Date Application Expires: 11-0 - Staff Initials: Zip Page6of6 Payee: MADSEN ROOFING BUILDING - NONRES PLAN CHECK - NONRES STATE BUILDING SURCHARGE • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us TRANSACTION LIST: Type Method Descriptio Amount Payment Check 13368 4,888.60 Authorization No. 000/322.100 000/345.830 640.237.114 RECEIPT ACCOUNT ITEM LIST: Description Account Code Current Pmts 2,960.06 1,924.04 4.50 Total: $4,888.60 Parcel No.: 0923049367 Permit Number: D09 -050 Address: 12301 TUKWILA INTERNATIONAL BL TUKW Status: PENDING Suite No: Applied Date: 04/08/2009 Applicant: SAVVIS Issue Date: Receipt No.: R09 -00543 Payment Amount: $4,888.60 Initials: WER Payment Date: 04/08/2009 02:17 PM User ID: 1655 Balance: $0.00 PAYMENT RECEIVE doc: Receipt -06 Printed: 04 -08 -2009 COMMENTS: Type of Inspection: �IrJti L ? r Al ; 4 ( Ie /r - /Am L, Address: 1 76 1 T1 .l Date Called: r ide Special Instructions: 0 36202 -a ( Date l anted� m d ,JorC StE. c• ANziJ 4 ues N/wrtR 4 Requester: hit S. I S n rrJ-kri ' c •+,4 fi,( / — — 20 _ 05 9 21 Project: 5AUVIS Type of Inspection: �IrJti L \ Address: 1 76 1 T1 .l Date Called: Special Instructions: 0 36202 -a ( Date l anted� m d tn: Requester: Phone No: 3e0 - H5 (- 2 9 21 1 INSPECTION NO. INSPECTION RECORD Retain a copy with permit D oi -05 PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -36 Approved per applicable codes. EI Corrections required prior to approval. Date: /0— i— 0/ ❑ $(, .00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: Project- J 4 ec/ /� Type of Inspection: J r",.-49 – /1P /l -r Address: / 2 / 7T2 6 Date Called: Special Instructions: / - Date Wanted: 1/— L7 —el CrjV: p.m. Requester: Phone No: _ 34n 415 Zez/ 4k p '9 -a 6 INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 Approved per applicable codes. Corrections required prior to approval. COMMENTS: Dat -27 ❑ $60.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: 'Date: Sika Sarnafil World Class Roofing and Waterproofing 15 Year System Warranty Warranty Serial No.: 0188510209- 196609.1 SIKAPLAN ROOFING WARRANTY FOR COMMERCIAL BUILDING Building Owner. International Gateway West LLC. Building Name: Sabey - Building A Building Address: 12301 Tukwila Intemational Boulevard 4th Floor Seattle, WA 98168 Applicator. Madsen Roofing Company, 8625 Martin Way East, Olympia, WA 98516 Telephone: (360) 456 -2821 Date of Substantial Completion: 7/20/2009 Date of Inspection: 7/2/2009 By: Steven Shaver Building /Area Name: Sabey - Building A Used As: COMMERCIAL - OFFICE Area Warranted: 31,000 sq. ft. Sika Sarnafil Inc. ( "Sika Sarnafil "), warrants to the owner of the building described above ("Owner"), that subject to the terms, conditions, and limitations stated herein, Sika Sarnafil will repair leaks originating from the Sikaplan Roofing Membrane, Sarnatherm Insulation or Sika Sarnafil Roofing Accessories installed according to Sika Sarnafil's Technical instructions by a Sika Sarnafil Authorized Roofing Applicator for a period of 15 (fifteen) years commencing with the date of substantial completion of the installation of the Roofing Membrane. TERMS, CONDITIONS, LIMITATIONS 1. Owner shall notify Sika Sarnafil on the first business day immediately following the discovery of each leak in the Roofing System and confirm in writing within one week. 2. If on Sika Sarnafil's inspection, Sika Sarnafil determines that the leak is caused by a defect in the Sikaplan Roofing Membrane, Sarnatherm Insulation or Accessory provided by Sika Sarnafil to the Applicator for this building or from a defect in the Sika Sarnafil Authorized Applicator's workmanship applied to that Sikaplan Membrane, except as provided in the following paragraph three (3) Owner's remedies and Sika Sarnafil's liability shall be limited to Sika Sarnafil's repair of the Roofing Membrane, Sarnatherm Insulation or Accessory. 3. This warranty does not apply and may be null and void if any of the following occur. (a) The Roofing Membrane or Accessory is damaged by a natural disaster including, but not limited to, earthquake, lightning, hail, windstorm in excess of gale force, hurricane, or tornado, or: (b) The Roofing Membrane or Accessory is damaged by any act of negligence, accident, or misuse including, but not limited to, vandalism, falling objects, civil disobedience, or act of war, or: (c) A deficient pre - existing condition or equipment is causing water entry, or: (d) There are any alterations or repairs made on or through the completed roof, or objects such as but not limited to fixtures, equipment, or structures are placed on or attached to the completed roof without first obtaining written authorization from Sika Sarnafil, or: (e) Failure by the Owner or his lessee to use reasonable care in maintaining the roof as described in the Owner's Guide provided with this warranty, including that of sealants and caulking, or: (f) A significant change in the use of the building by the Owner or his lessee expected by Sika Samafil to effect the Roofing Membrane as originally installed, or: (g) Loss of integrity of the building envelope and, or structure including, but not limited to partial or complete loss of roof decking, wall siding, windows, doors or other envelope components or from roof damage by wind blown objects, or: (h) Should building be a freezer or cooler: condensation accumulates in the roof assembly due to incorrect design or due to a reduction in the vapor barrier effectiveness, or: (i) The Owner fails to comply with every term and condition stated herein. 4. During the period of this warranty, Sika Sarnafil, its agents and employees, shall have free access to the roof during regular business hours. 5. Should the Roofing Membrane be concealed, the cost of exposure of the Roofing Membrane for purposes of Sika Sarnafil's investigation and /or repair, such as removal and replacement of any paving or overburden, shall be the Owner's responsibility. 6. Sika Sarnafil shall have no obligation under this warranty until all invoices for materials, installation, and services have been paid for in full. 7. Sika Sarnafil's failure at any time to enforce any of the terms or conditions stated herein shall not be construed to be a waiver of such provision. 8. This warranty is extended solely and exclusively to the owner of the Building at the time the Sarnafil Roofing System is installed. It does not extend nor is it otherwise assignable or transferable to any other party unless approved in advance and in writing by Sika Sarnafil and the costs to process the transfer and to inspect and repair the Sika Sarnafil Roofing System, if necessary, are paid for by the original owner. 9. The Owner and Sika Sarnafil hereby agree that any and all claims (contractual, statutory, common law or otherwise), disputes, or suits that in any way, directly or indirectly, arise out of or relate to this Warranty, or the alleged breach thereof, or to any contracts between the owner and Sika Sarnafil, or the alleged breach thereof, or to the design, manufacture, sale, distribution, installation, and /or inspection of the Sika Sarnafil Roofing System, shall first be submitted to non - binding mediation before a neutral mediator jointly selected by the parties or, in the absence of agreement, as designated by the American Arbitration Association. In the absence of resolution by mediation, all such claims shall be settled by arbitration by the American Arbitration Association in accordance with the Construction Industry Arbitration Rules. Any such mediation and /or arbitration shall take place in Boston, Massachusetts. This Warranty, and any claims, disputes or suits between the parties hereto shall be governed by, and construed and enforced in accordance with, the laws of the Commonwealth of Massachusetts. 10. THIS WARRANTY IS GIVEN IN LIEU OF ALL OTHER WARRANTIES, EXPRESS OR IMPLIED, INCLUDING ANY WARRANTY OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. THERE ARE NO WARRANTIES THAT EXTEND BEYOND THE DESCRIPTION ON THE FACE HEREOF. THE REMEDIES STATED HEREIN ARE EXCLUSIVE REMEDIES AND SIKA SARNAFIL SHALL NOT BE RESPONSIBLE OR LIABLE FOR ANY INDIRECT, CONSEQUENTIAL OR INCIDENTAL DAMAGES INCLUDING THE PRESENCE OF MOLDS, FUNGI, BACTERIA, SPORES, MYCOTOXINS OR THE LIKE OR FURTHER LOSS OF ANY KIND WHATSOEVER, INCLUDING BUT NOT LIMITED TO, DAMAGE TO THE BUILDING ON WHICH THE COMPONENTS OF THE ROOF ARE SITUATED, DAMAGE TO THE CONTENTS THEREOF, LOSS OF USE OF THE BUILDING OR ANY COMPONENT PART THEREOF, OR DAMAGE TO ANY OTHER PROPERTY OR PERSONS. NO REPRESENTATIVE OF SIKA SARNAFIL HAS AUTHORITY TO MAKE ANY REPRESENTATIONS OR PROMISES EXCEPT AS STATED HEREIN. Authorized Signature: Issued By: Brian Whelan This Warranty Is Effective From: 7 /20/2009 Title: Senior Vice President Date: 9/28/2009 ® Sika Samafll, A Division of Sika Corporation, 100 Dan Road, Canton, MA 02021 Tel.. 800 -451 -2502, Fax. 781- 828 -5365, www.sikacorp.com arnafi Page 1 of 1 Through: 7/19/2024 TGFU.R8992 - Roofing Systems AN ONLINE CERTIFICATIONS DIRECTORY See General Information for Roofing Systems SIKA SARNAFIL INC CANTON COMMERCE CENTER 100 DAN RD CANTON, MA 02021 USA 1. Deck: NC 1. Deck: NC 2. Deleted. 3. Deck: C -15/32 a. Perlite b. Fiberboard CORRECTION LTR# TGFU.R8992 Roofing Systems Roofing Systems MAINTENANCE AND REPAIR SYSTEMS Class A, B, C Indine: 3/4 OCD Home Quick Guide Contact Us UL. com FILE COPY Permit No. ASPHALT FELT SYSTEMS WITH HOT ROOFING ASPHALT Class A Indine: 3 Incline: 2 http: // database. ul. com /cgi-bin/XYV /ternplate/LIS... Ion= versionlessss& parent _id= 10739935978tsequence =1 (1 of 22)12/10/2009 4:50:51 PM] ..1 w...l....f...... Page Bottom Insulation: — " Samatherm I ", uniform thickness or tapered foamed plastic, 8.2 in. max, or Johns Manville "Barrier Board Plus, Plus -A, -D or -M ", uniform thickness or tapered composite, 1.5 to 4.1 in., with "Samatherm I" or "Samatherm II ", uniform thickness or tapered, 8.2 in. max, mechanically fastened or hot mopped. Ply Sheets: — Four layers Type 15 perforated asphalt organic felt, hot mopped. Surfacing: — Gravel or slag. R8992 Existing Roof System: — Class A, B or C (gravel may be removed) to retain the existing Classification covered with: Insulation: — " Samatherm I" (tapered or uniform thickness), mechanically fastened. Membrane: — "G410 ", "G410 /Felt ", "G410 -14 ", "G410 -14 /Felt ", "G410 -15 ", "G410 -15 /Felt ", "G410 -18 ", "G410 -18 /Felt ", "G410 -20 ", "G410 -20 /Felt" or "G410 -24" (PVC), secured with "Samacol 2170" adhesive at 1 -1/2 gal /sq., "S327" mechanically fastened. Existing Roof System: — Insulated or noninsulated cap sheet, Class A, B or C system to retain the existing Classification is covered with: Insulation (Optional): — One of the following, any thickness: RECEIVED M O � O APR 2 0 2009 � PERMIT CENTER TGFU.R8992 - Roofing Systems c. Rmax Multi-Max or "Thermaroof Pius" d. Firestone "Iso 95 +GL ", "Iso 95 +GW" e. Apache Products "Apache Pyrox", "Apache White Line" or "Apache Tapered Pyrox" f. Johns Manville "ISO 1" g. "Samatherm I" or "Sarnatherm II" h. Atlas Roofing "ACFoam II" i. " Samatherm a" j. " Sarnatherm Perlite Composite ", "Tapered Samatherm Perlite Composite ", " Samatherm Woodfiber Composite ", "Tapered Sarnatherm Woodfiber Composite" or "Samatherm Nailboard" Membrane: — "G410 ", "G410 /Felt ", "G410 -14 ", "G410 -14 /Felt", "G410 -15 ", "G410 -18 ", "G410 -18 /Felt ", "G410 -20 ", "G410- 20 /Felt ", "G410 -24 ", "S327 ", "S327 /Felt ", "S327 -14 ", "S327 -14 /Felt ", "S327 -15 ", "S327 -18 ", "5327 -18 /Felt ", "S327 -20 ", "S327 -20 /Felt ", "S327 -24" (PVC). 4. Deck: C - 15/32 Indine: 2 Existing Roof System: — Insulated or noninsulated cap sheet, Class A, B or C System to retain the existing Classification is covered with: Insulation (Optional): — One of the following, any thickness: a. Perlite b. Fiberboard c. Rmax Multi-Max or "Thermaroof Plus" d. Firestone "Iso 95 +GL ", "Iso 95 +GW" e. Apache Products "Apache Pyrox", "Apache White Line" or "Apache Tapered Pyrox" f. Johns Manville "ISO 1" g. "Samatherm I "or "Sarnatherm II" h. Atlas Roofing "ACFoam II" i. " Samatherm a" j. " Sarnatherm Perlite Composite ", "Tapered Samatherm Perlite Composite ", " Samatherm Woodfiber Composite ", "Tapered Sarnatherm Woodfiber Composite" or "Samatherm Nailboard" Membrane: — "G410 ", "G410 /Felt ", "G410 -14 ", "G410 -14 /Felt ", "G410 -15 ", "G410 -15 /Felt ", "G410 -18 ", "G410-18 /Felt ", "G410 -20 ", "G410 -20 /Felt" or "G410 -24" (PVC), fully adhered with "Samacol 2170" adhesive at 1.5 to 2.5 gal /sq, "Samacol V949" at 1.5 to 2.5 gal /sq or "Sarnacol 2121" adhesive at 1.75 gal /sq., "S327" mechanically fastened. 5. Deck: C - 15/32 Indine: 2 Existing Roof System: — Insulated or noninsulated combination hot and cold Class A, B or C system to retain the existing Classification is covered with: Membrane: — "G410 ", "G410 /Felt ", "G410 -14 ", "G410 -14 /Felt", "G410 -15 ", "G410 -15 /Felt ", "G410 -18 ", "G410 -18 /Felt ", "G410 -20 ", "G410 -20 /Felt" or "G410 -24" (PVC), fully adhered with "Samacol 2170" adhesive at 1.5 to 2.5 gal/ per sq., "S327" mechanically fastened. http: / /database.ul.com/cgi- bin/ XYV /telnplate/LUS...lon= versbntess& parent_id= 10739935978sequence =1 (2 of 22) [2/10/2009 4:50:51 PM) T(U.R8992 - Roofing Systems 6. Deck: C -15/32 Indine: 1/2 Existing Roof System: — Class A gravel surfaced B -U -R (gravel to remain intact). Insulation: — Polystyrene /perlite or polystyrene /wood fiber (perlite 3/4 in. min thickness or 1/2 in min USG Interiors "Micore ML 180 ", Hubert wood fiber, Georgia- Pacific Sturdi -top or Wood Fiber Industries "Structodeck ", Celotex wood fiber, Temple - Inland "Fiber Base" or other wood fiber at 1 in. min thickness). The polystyrene is to be 3 in. max thickness. Membrane: — "G410 ", "G410 /Felt ", "G410 -14 ", "G410 -14 /Felt ", "G410 -15 ", "G410 -15 /Felt ", "G410 -18 ", "G410 -18 /Felt ", "G410 -20 ", "G410 -20 /Felt ", "G410 -24" (PVC), fully adhered with "Samacol 2170" adhesive at 1.5 to 2.5 gal /sq, "Sarnacol 2121" adhesive at 1.75 gal /sq or "S327 ", "S327 /Felt ", "S327 -14 ", "S327 -14 /felt ", "S327 -15 "„ "S327 -15 /Felt", "S327 -18 ", "S327 -20 ", "S327 -24" (PVC), mechanically fastened. 7. Deck: C -15/32 Indine: 1/2 Existing Roof System: — Class A gravel surfaced B -U -R (gravel to remain intact). Insulation: — One of the following, any thickness: a. Perlite b. Fiberboard c. Rmax Multi-Max or'Thermaroof Plus" d. Firestone "Iso 95 +GL ", "Iso 95 +GW" e. Apache Products "Apache Pyrox", "Apache White Line" or "Apache Tapered Pyrox" f. Johns Manville "ISO 1" g. "Samatherm I "or "Sarnatherm I1" h. Atlas Roofing "ACFoam II" i. "Samatherm a" j. "Sarnatherm Perlite Composite ", 'Tapered Samatherm Perlite Composite ", " Sarnatherm Woodfiber Composite ", "Tapered Sarnatherm Woodfiber Composite" or " Sarnatherm Nailboard" Membrane: — "G410 ", "G410 /Felt ", "G410 -14 ", "G410 -14 /Felt ", "G410 -15 ", "G410 -15 /Felt ", "G410 -18 ", "G410 -18 /Felt ", "G410 -20 ", "G410 -20 /Felt" or "G410 -24" (PVC), fully adhered with "Samacol 2170" adhesive at 1.5 to 2.5 gal /sq, "Sarnacol 2121" adhesive at 1.75 gal /sq or "S327 ", "S327 /Felt ", "S327 -14 ", "S327 -14 /Felt ", "S327 -15 ", "S327 -15 /Felt ", "S327 -18 ", "S327 -20" or "S327 -24" (PVC), mechanically fastened. 8. Deck: C -15/32 Indine: 1 -1/2 Existing Roof System: — Insulated or noninsulated cap sheet, Class A, B or C system to retain the existing Classification is covered with: Insulation (Optional): — One of the following, any thickness: Celotex - "Top RII ", "Hy -Tec ", "Hy -Tec II" or "Hy -Therm AP ". Membrane: — "G410 ", "G410 /Felt ", "G410 -14 ", "G410 -14 /Felt ", "G410 -15 ", "G410 -18 ", "G410 -18 /Felt ", "G410 -20 ", "G410- 20 /Felt ", "G410 -24 ", "S327 ", "S327 /Felt ", "S327 -14 ", "S327 -14 /Felt ", "S327 -15 ", "S327 -18 ", "S327 -18 /Felt ", "S327 -20 ", "5327 -20 /Felt ", "S327 -24" (PVC) . 9. Deck: C -15/32 Indine: 1 -1/2 Existing Roof System: — Insulated or noninsulated cap sheet, Class A, B or C System to retain the existing Classification is covered with: Insulation (Optional): — One of the following, any thickness: http: // database. ui .com /cgi- bin/XW /template/LLS... ion= versionless& parent_ id= 1073993597&sequence =1 (3 of 22) [2/10/2009 4:50:51 PM) T(FU.R8992 - Roofing Systems Celotex "Top RII ", "Hy -Tec ", "Hy -Tec II" or "Hy -Therm AP ". Membrane: — "G410 ", "G410 /Felt ", "G410-14 ", "G410 -14 /Felt ", "G410 -15 ", "G410 -15 /Felt ", "G410 -18 ", "G410 -18 /Felt ", "G410 -20 ", "G410 -20 /Felt" or "G410 -24" (PVC), fully adhered with "Samacol 2170" adhesive at 1.5 to 2.5 gal /sq or "Samacol 2121" adhesive at 1.75 gal /sq., "S327" mechanically fastened. 10. Deck: C -15/32 Indine: 1/4 Existing Roof System: — Class A gravel surfaced B -U -R (gravel to remain intact). Insulation: — One of the following, any thickness: Celotex "Top RII ", "Hy- Tec ", "Hy -Tec II" or "Hy -Therm AP ". Membrane: — "G410 ", "G410 /Felt ", "G410 -14 ", "G410 -14 /Felt ", "G410 -15 ", "G410 -15 /Felt ", "G410 -18 ", "G410 -18 /Felt ", "G410 -20 ", "G410 -20 /Felt ", "G410 -24" (PVC), fully adhered with "Samacol 2170" adhesive at 1.5 to 2.5 gal /sq or "Sarnacol 2121" adhesive at 1.75 gal /sq., "S327" mechanically fastened. 11. Deck: C -15/32 Incline: 1 -1/2 Existing Roof System: — Insulated or noninsulated cap sheet, Class A, B or C system to retain the existing Classification is covered with: Insulation (Optional): — One of the following, any thickness: "Samatherm ", 'Tapered Samatherm ", "Sarnatherm Perlite Composite ", "Tapered Samatherm Perlite Composite ", "Samatherm Woodfiber Composite ", "Tapered Sarnatherm Woodfiber Composite" or "Samatherm Nailboard ". Membrane: — "G410 ", "G410 /Felt ", "G410 -14 ", "G410 -14 /Felt ", "G410 -15 ", "G410 -18 ", "G410 -18 /Felt ", "G410 -20 ", "G410- 20 /Felt ", "G410 -24 ", "S327 ", "S327 /Felt ", "S327 -14 ", "S327 -14 /Felt", "S327 -15 ", "S327 -18 ", "S327 -18 /Felt ", "S327 -20 ", "S327 -20 /Felt ", "S327 -24" (PVC). 12. Deck: C -15/32 Incline: 1 -1/2 Existing Roof System: — Insulated or noninsulated cap sheet, Class A, B or C System to retain the existing Classification is covered with: Insulation (Optional): — One of the following, any thickness: "Samatherm ", "Tapered Samatherm ", "Sarnatherm Perlite Composite ", "Tapered Samatherm Perlite Composite ", "Samatherm Woodfiber Composite ", "Tapered Samatherm Woodfiber Composite" or "Samatherm Nailboard ". Membrane: — "G410 ", "G410 /Felt ", "G410-14 ", "G410 -14 /Felt ", "G410 -15 ", "G410 -15 /Felt ", "G410 -18 ", "G410 -18 /Felt ", "G410 -20 ", "G410 -20 /Felt" or "G410 -24" (PVC), fully adhered with "Samacol 2170" adhesive at 1.5 to 2.5 gal /sq, "Sarnacol V949" at 1.5 to 2.5 gal /sq or "Sarnacol 2121" adhesive at 1.75 gal /sq., "S327" mechanically fastened. 1. Deck: C -15/32 Incline: 2 Class B Existing Class B Roof System — as follows to retain the existing Classification: Insulation (Optional): — One or more layers glass fiber, polyisocyanurate, perlite/polyisocyanurate composite polyurethane or perlite/polyurethane composite, 6.5 in. max. Ply Sheet: — Three layers Type G1 GAF "Gafglas Ply 4" or "Gafglas Ply 3 ", hot mopped. Surfacing: — Grundy "Fibered Aluminum Coating" 1 -1/2 gal /sq. covered with: Membrane: — "G410 ", "G410 /Felt ", "G410 -14 ", "G410 -14 /Felt ", "G410 -15 ", "G410 -18 ", "G410 -18 /Felt ", "G410 -20 ", "G410- 24", "S327 ", "S327 /Felt ", "S327 -14 ", "S327 -14 /Felt ", "S327 -15 ", "S327 -18 ", "S327 -18 /Felt ", "S327 -20 ", "S327 -20 /Felt" or "S327 -24" (PVC). 2. Deck: C1 -1/2 TG Indine: No Limitations Existing Roof: — Class A shingles Barrier Board: — 3/8 in. min gypsum board, mechanically fastened. Membrane: — 5327 (PVC). All PVC seams are hot air welded. SINGLE PLY MEMBRANE SYSTEMS http: / /database.ul.com/cgi- bin /XYV /template/LIS... ion= versionless &parent_id= 1073993597&sequence =1 (4 of 22) [2/10/2009 4:50:51 PM] TGRJ.R8992 - Roofing Systems For NC decks, insulation shall be mechanically fastened, adhered with "Samacol LR 2001" adhesive at approx. 175 ft per gal. or adhered with hot asphalt. The following classified membranes may be produced in thicknesses of 45 mils to 96 mils for the G410, G442, S327 membrane families, and in thicknesses of 45 mils to 120 mils for G476. The following are altemate designations for Samafil membranes: 1. "G410 " 2. "G410- Felt " 3. "S327 " 4. "S327 -15" 5. "G410 -15" 6. "S327 /Felt" 7. "G476 -12 ", "G476 -15" or "G476 -20" 8. "G476 -24" or "G476 -30" 9. "G476 -12 /Felt ", "G476 -15 /Felt" or "G476 -20 /Felt ". 10. "G410 -18" 11. "G410 -20" 12. "G410 -24" 13. "S327 -18" 14. "S327 -20" 15. "S327 -24" 16. "G410 -18 /Felt" 17. "G410 -20 /Felt" 18. "S327 -18 /Felt" 19. "S327 -20 /Felt" 20. "G410 -14" (Samafil colors). 21. "G410 -14 /Felt" (Sarnafil colors). 22. "S327 -14 ", "S327L -14 ", "S327 -14E" or "S327 -14EL" (Sarnafil colors). 23. "S327 -14 /Felt" (Samafil colors). 24. "S327 -15 /Felt" 25. "G410 -15 /Felt" 26. 'TG66 -12 ", "TG66-15" or "TG66 -18" http : / /database.ul.com/cgi- bin/XYV /template /US... ion= versionless &parent_id= 1073993597&sequence =1 (5 of 22) [2/10/2009 4:50:51 PM] TGRJ.R8992 - Roofing Systems 27. "Sikaplan 45" (45 mil) 28. "G476 -15 SA" 1. Deck: NC Indine: 2 Class A - Ballasted Insulation: — Polystyrene (any thickness), glass fiber, perlite /polyurethane composite, perlite, polyurethane or wood fiber, any thickness, laid loosely. Membrane: — One or more of the following, laid loosely or mechanically fastened: "G410" or "G410 -14" or "G410 -14 /Felt" or "G410 -15" or "G410 -15 /Felt" or "G410 -18" or "G410-18 /Felt" or "G410 -20" or "G410 -20 /Felt" or "G410 -24" (PVC) or "S327" or "S327 /Felt" or "S327 -14" or "S327 -14 /Felt" or "S327 -15" or "S327 -15 /Felt" or "S327 -18" or "S327 -20" or "S327- 24" (PVC) or "S330 -12" or "S330 -15" or "S330 -18" or "S330 -20" (PVC) or "TG66 -12" or "TG66 -15" or 'TG66 -18" (FPO) Surfacing: — River bottom stone, 3/4 to 1 -1/2 in. diameter, 1000-lb/sq. 2. Deck: NC Indine: 1 Insulation: — Periite, glass fiber or polyisocyanurate 3/4 in. minimum Membrane: — One or more of the following, laid loosely or mechanically fastened: "G410" or "G410 -14" or "G410 -14 /Felt" or "G410 -15" or "G410 -15 /Felt" or "G410 -18" or "G410 -18 /Felt" or "G410 -20" or "G410 -20 /Felt" or "G410 -24" (PVC) or "S327" or "S327 /Felt" or "S327 -14" or "S327 -14 /Felt" or "S327 -15" or "S327 -15 /Felt" or "S327 -18" or "S327 -20" or "S327- 24" (PVC) or "S330 -12" or "S330 -15" or "S330 -18" or "S330 -20" (PVC) or "TG66 -12" or "TG66-15" or 'TG66 -18" (FPO). Surfacing: — River bottom stone, 3/4 to 1 -1/2 in. diameter, 1000-lb/sq. 3. Deck: NC Indine: 2 Membrane: — One or more of the following, laid loosely or mechanically fastened: "G410" or "G410 -14" or "G410 -14 /Felt" or "G410 -15" or "G410 -15 /Felt" or "G410 -18" or "G410 -18 /Felt" or "G410 -20" or "G410 -20 /Felt" or "G410 -24" (PVC) or "S327" or "S327 /Felt" or "S327 -14" or "S327 -14 /Felt" or "S327 -15" or "S327 -15 /Felt" or "S327 -18" or "S327 -20" or "5327- 24" (PVC) or "S330 -12" or "S330 -15" or "S330 -18" or "S330 -20" (PVC) or "TG66 -12" or "TG66 -15" or 'TG66 -18" (FPO) Slip Sheet (Optional): — Dry inorganic glass fiber mat. Insulation: — Dow Chemicals USA, Styrofoam RM, PD, SM, TG, Grayboard or Styrorib (plastic), any thickness. http: / /database.ul.com/cgi- bin /XYV /template/US... ion= versionless &parent_id= 1073993597&sequence =l (6 of 22) [2/10/2009 4:50:51 PM] TGFU.R8992 - Roofing Systems As an alternate, the membrane may be loose laid over the insulation. Scrim (Optional): — "Fabrene ", "Intemational Paper D689" or "Rufon Polypropylene Scrim ", 2 oz/yd or "Sarnabarrier," 1.5 oz/yd. Surfacing: — Crushed stone, river bottom stone (3/4 to 1 -3/4 in. diam), 900 Ibs /sq, concrete blocks 10 Ib /sq min, spread not more than 1/8 in. apart, or Styrofoam panels surfaced with 3/8 in. min concrete mortar butted together. 4. Deck: NC Indine: 2 Insulation: — "Samatherm I," uniform thickness or tapered foamed plastic, any thickness or Johns Manville "Barrier Board Pius, Plus -A, -D or -M," uniform thickness or tapered composite . "Samatherm a ", "Samatherm I" or "Samatherm II," uniform thickness or tapered, any thickness or "Sarnatherm," "Tapered Samatherm," "Samatherm Perlite Composite," 'Tapered Sarnatherm Periite Composite," "Samatherm Woodfiber Composite," "Tapered Sarnatherm Woodfiber Composite" or "Sarnatherm Nailboard" or "Samatherm Foil," any thickness laid loosely or mechanically fastened. Membrane: — One or more of the following, laid loosely or mechanically fastened: "G410" or "G410 -14" or "G410 -14 /Felt" or "G41.0 -15" or "G410 -15 /Felt" or "G410 -18" or "G410 -18 /Felt" or "G410 -20" or "G410 -20 /Felt" or "G410 -24" (PVC) or "S327" or "S327 /Felt" or "S327 -14" or "S327 -14 /Felt" or "S327 -15" or "S327 -15 /Felt" or "S327 -18" or "S327- 20" or "S327 -24" (PVC) or "S330 -12" or "S330 -15" or "S330 -18" or "S330 -20" (PVC) or 'TG66 -12" or "TG66 -15" or 'TG66 -18" (FPO) Surfacing: — River bottom stone (3/4 to 1 -1/2 in. diameter) at 1000 lb/sq. 5. Deck: C -15/32 .Indine: 2 Slip Sheet: — Polypropylene felt or polyester felt (not UL Classified). Membrane: — One or more of the following, laid loosely or mechanically fastened: "G410" or "G410 -14" or "G410 -14 /Felt" or "G410 -15" or "G410 -15 /Felt" or "G410 -18" or "G410 -18 /Felt" or "G410 -20" or "G410 -20 /Felt" or "G410 -24" (PVC) or "S327" or "S327 /Felt" or "S327 -14" or "S327 -14 /Felt" or "S327 -15" or "S327 -15 /Felt" or "S327 -18" or "S327- 20" or "S327 -24" (PVC) or "S330 -12" or "S330 -15" or "S330 -18" or "S330 -20" (PVC) or "TG66 -12" or "TG66-15" or 'TG66 -18" (FPO) Surfacing: — Concrete blocks minimum 10- Ib /ft. spread not more than 1/4 in. apart or river bottom stone (3/4- 1 -3/4 -in. diameter) 1200 Ibs/sq. river bottom stone (3/4- 1 -1/2 in. diameter) at 1000-lb/sq. Class A - Fully Adhered 1. Deck: NC Indine: 1 Insulation: — Glass fiber, wood fiber or perlite any combination, any thickness, mechanically fastened with metal insulation anchors. Membrane: — "G410 ", "G410- Felt ", "G410 -14 ", "G410 -14 /Felt ", "G410 -15 ", "G410 -18 ", "G410 -18 /Felt ", "G410 -20 ", "G410 -20 /Felt" or "G410 -24" (PVC), secured with "Sarnacol 2170" at 1 -1/2 to 2 -1/2 gal /sq. 2. Deck: NC Indine: 1 -1/2 Insulation: — Rmax "Ply -1 ", any thickness, mechanically fastened with metal insulation anchors. Membrane: — "G410 ", "G410 -14 ", "G410 -15 ", "G410 -18 ", "G410 -20" or "G410 -24" (PVC), secured with " Sarnacol 2170" at 1 -1/2 - 2 -1/2 gal /sq. http: / /database.ul.comlcgi- bin /XYV /tempiate/LIS... ion= versionless& parent_id= 10739935978sequence =1 (7 of 22) [2/10/2009 4:50:51 PM] TGFU.R8992 - Roofing Systems 3. Deck: NC Indine: 1 Insulation: — Cellular concrete, gypsum concrete, vermiculite concrete, perlite concrete or structural concrete. Membrane: — "G- 410 ", "G -410 Felt ", "G410 -14 ", "G410 -14 /Felt ", "G410 -15 ", "G410 -15 /Felt ", "G410 -18 ", "G410 -18 /Felt ", "G410 -20 ", "G410 -20 /Felt ", "G410 -24" (PVC), secured with "Sarnacol 2170" at 1 -1/2 to 2 -1/2 gal /sq or "Samacol 2121" adhesive at 1 -3/4 to 2 -1/4 gal /sq. 4. Deck: NC Indine: 2 Insulation: — Cellular concrete, structural concrete, perlite concrete, gypsum concrete or vermiculite concrete. Vapor Barrier: — "Vapor Stop 298" (not Classified), laid loosely with laps sealed according to the manufacturer's instructions. Insulation: — Rmax "Ply -1" (foil faced) 2 -1/2 in. max, mechanically fastened with metal insulation anchors. Membrane: — "G410 ", "G410 -14 ", "G410 -15 ", "G410 -18 ", "G410 -20" or "G410 -24" (PVC), secured with "Samacol 2170" at 1 -1/2 - 2 -1/2 gal /sq or "Samacol 2121" adhesive at 1.75 gal /sq. 5. Deck: NC Indine: 2 insulation: — Johns Manville "ENRGY -I ", any thickness. Membrane: — "G- 410 ", "G -410 Felt ", "G410 -14 ", "G410 -14 /Felt ", "G410 -15 ", "G410 -15 /Felt ", "G410 -18 ", "G410 -18 /Felt ", "G410 -20 ", "G410 -20 /Felt" or "G410 -24" (PVC), secured with "Samacol 2121" adhesive at 1.75 gal /sq. 6. Deck: NC Indine: 1 Insulation: — Wood fiberboard, 0.5 in. min. Membrane: — "G- 410 ", "G -410 Felt ", "G410 -14 ", "G410 -14 /Felt ", "G410 -15 ", "G410 -15 /Felt ", "G410 -18 ", "G410 -18 /Felt ", "G410 -20 ", "G410 -20 /Felt" or "G410 -24" (PVC), secured with "Samacol 2121" adhesive at 2.25 gal /sq. 7. Deck: NC Indine: 2 Vapor Barrier (Optional): — Polyethylene, Kraft or Samavap PVC film (not Classified). Insulation: — One of the following or combinations, mechanically fastened or hot mopped in place (any thickness): a. Perlite b. Fiberboard c. Rmax Multi-Max or 'Thermaroof Pius" d. Firestone "Iso 95 +GL ", "Iso 95 +GW" e. Apache Products "Apache Pyrox", "Apache White Line," or "Apache Tapered Pyrox" f. Johns Manville "ISO I" g. "Samatherm I "or "Samatherm II" h. Atlas Roofing "ACFoam II" i. "Samatherm a" j. "Sarnatherm Perlite Composite ", "Tapered Samatherm Perlite Composite ", "Samatherm Woodfiber Composite ", "Tapered Samatherm Woodfiber Composite" or "Samatherm Nailboard" Membrane: — "G410 ", "G410 /Felt ", "G410 -14 ", "G410 -14 /Felt ", "G410 -15 ", "G410 -15 /Felt ", "G410 -18 ", "G410 -18 /Felt ", "G410 -20 ", "G410 -24 ", "S327 ", "S327 /Felt ", "S327 -14 ", "S327 -14 /Felt ", "S327 -15 ", "S327 -15/ Felt ", "S327 -18 ", "S327 -18 /Felt ", "S327 -20 ", "S327 -20 /Felt" or "S327 -24" (PVC), fully adhered with Sarnacol 2121 at 1 -3/4 to 2 -1/4 gal /100 sq ft, or "Samacol 2170" at 1 -1/2 to 2 -1/2 gal /100 sq ft. 8. Deleted. 9. Deleted. 10. Deck: NC Indine: 3/4 Insulation: — "Samatherm I," uniform thickness or tapered foamed plastic, 8.2 in. max or Johns Manville "Barrier Board Pius -M ", uniform thickness or tapered composite, any thickness, mechanically fastened. Membrane: — Either "G- 410 ", "G410 -14 ", "G410 -15 ", "G410 -18 ", "G410 -20" or "G410 -24" (PVC), adhered with Sarnafil "Samacol 2170" at 1 -1/2 to 2 -1/2 gal /sq. 11. Deck: NC Indine: 1/2 Insulation: — "Samatherm I ", uniform thickness or tapered foamed plastic, 0.9 in. min, no max, or Johns Manville "Barrier Board Plus or Plus -M ", any thickness, no max, mechanically fastened. http: / /database.ul.com/cgi- bin/ XYV /template/LIS...lon= versionlesss & parent _Id= 1073993597&sequence =1 (8 of 22) [2/10/2009 4:50:51 PM) TCU.R8992 - Roofing Systems Membrane: — "G- 410 ", "G410 -14 ", "G410 -15 ", "G410 -18 ", "G410 -20" or "G410 -24" (PVC), adhered with Samafil "Samacol 2170" or "Samacol V949" adhesive at 1 -1/2 to 2 -1/2 gal /sq. 12. Deck: C -15/32 Indine: 2 Barrier Board: — 1/2 in. min thickness gypsum board or 1/4 in. G -P Gypsum DensDeck®, mechanically fastened with insulation fasteners (6 in. offset of the gypsum board joints from the plywood joints). Vapor Barrier (Optional): — Polyethylene or Kraft (not Classified) or G1 and G2. Insulation: — One of the following or combinations, mechanically fastened or hot mopped in place any thickness): a. Perlite b. Fiberboard c. Rmax Multi-Max or "Thermaroof Plus" d. Firestone "Iso 95 +GL ", "Iso 95 +GW" e. Apache Products "Apache Pyrox", "Apache White Line ", "Apache Tapered Pyrox" f. Johns Manville "ISO 1" g. "Samatherm I "or "SarnaTherm II" h. Atlas Roofing "ACFoam II" i. "Samatherm a" j. "Sarnatherm Perlite Composite ", "Tapered Samatherm Perlite Composite ", "Samatherm Woodfiber Composite ", "Tapered Samatherm Woodfiber Composite" or "Samatherm Nailboard" Membrane: — "G327 -15 ", "G327 -15 /Felt ", "G410 ", "G410 /Felt ", "G410 -14 ", "G410 -14 /Felt ", "G410 -15 ", "G410 -15 /Felt ", "G410 -18 ", "G410 -18 /Felt ", "G410 -20 ", "G410 -20 /Felt ", "G410 -24 ", "S327 ", "S327 /Felt ", "S327 -14 ", "S327 -14 /Felt ", "S327 -18 ", "S327 -18 /Felt ", "S327 -20 ", "S327 -20 /Felt" or "S327 -24" (PVC), fully adhered with "Samacol 2121" at 1 -3/4 to 2 -1/4 gal /100 sq ft or " Samacol 2170" at 1 -1/2 to 2 -1/2 gal 100 sq ft. 13. Deck: Structural Cement Fiber Unit Indine: 2 Vapor Barrier (Optional): — G1 or G2 base sheet. Insulation (Optional): — One of the following or combinations, mechanically fastened or hot mopped in place any thickness: a. Perlite b. Fiberboard c. Rmax Multi-Max or ' Thermaroof Plus" d. Firestone "Iso 95 +GL ", "Iso 90 +GW" e. Apache Products "Apache AP" or "Apache White Line" f. Johns Manville "ISO 1" g. "Samatherm I "or "Samatherm II" h. Atlas Roofing " ACFoam II ". i. "Samatherm a" j. " Sarnatherm Perlite Composite ", "Tapered Samatherm Perlite Composite ", "Samatherm Woodfiber Composite ", "Tapered Samatherm Woodfiber Composite" or "Samatherm Nailboard" Membrane: — "G410 ", "G410 /Felt ", "G410 -14 ", "G410 -14 /Felt ", "G410 -15 ", "G410 -15 /Felt ", "G410 -18 ", http: // database. ul. com /cgi- bin/XYV /template/LLS... ion= versionless& parent _Id= 1073993597&sequence =1 (9 of 22) [2/10/2009 4:50:51 PM] TGRJ.R8992 - Roofing Systems "G410 -18 /Felt ", "G410 -20 ", "G410 -20 /Felt ", "G410 -24 ", "S327 ", "S327 /Felt ", "S327 -14 ", "S327 -14 /Felt ", "S327- 15", "S327 -15 /Felt ", "S327 -18 ", "S327 -18 /Felt ", "S327 -20 ", "S327 -20 /Felt" or "S327 -24" (PVC), fully adhered with "Sarnacol 2121" at 1 -3/4 to 2 -1/4 gal /100 sq ft or "Samacol 2170" at 1 -1/2 to 2 -1/2 gal 100 sq ft. 14. Deck: NC Indine: 1 -1/2 Vapor Barrier (Optional): — Polyethylene or kraft (Not Classified). Insulation (Optional): — Polystyrene or polyisocyanurate, any thickness Barrier Board: — 1 in. wood fiberboard, 15/32 in. plywood, 7/16 in. oriented strand board or 1/4 in. (min) G -P Gypsum DensDeck ®. Membrane: — "G410 ", "G410 /Felt ", "G410 -14 ", "G410 -14 /Felt ", "G410 -18 ", "G410 -18 /Felt ", "G410 -20 ", "G410 -20 /Felt" or "G410 -24" (PVC), adhered with either "Samacol 2121" at 1 -3/4 to 2 -1/4 gal /sq, "Samacol 2170" at 1 -1/2 to 2 -1/2 gal /sq. at 1 -1/2 to 2 gal /sq. 15. Deck: NC Indine: 3 Vapor Barrier (Optional): — Polyethylene or Kraft (not Classified). Insulation: — One of the following or combinations, mechanically fastened or hot mopped in place, any thickness: a. Perlite b. Fiberboard c. Rmax Multi -Max or "Thermaroof Plus" d. Firestone "Iso 95 +GL ", "Iso 95 +GW" e. Apache Products "Apache Pyrox", "Apache White Line" or "Apache Tapered Pyrox" f. Johns Manville "ISO 1" g. "Samatherm I "or "Samatherm II" h. Atlas Roofing "ACFoam II" i. "Samatherm a" j. "Sarnatherm Perlite Composite ", "Tapered Samatherm Perlite Composite ", "Samatherm Woodfiber Composite ", "Tapered Samatherm Woodfiber Composite" or " Sarnatherm Nailboard" Membrane: — "G410 ". 16. Deck: NC Indine: 2 Insulation: — Cellular concrete, structural concrete, gypsum concrete, vermiculite concrete or perlite concrete. Barrier: — Granular surfaced asphalt cap sheet or G2 base sheet set in hot asphalt or mechanically attached. Membrane: — "G410 /Felt ", "G410 -14 /Felt ", "G410 -15 /Felt ", "G410 -18 /Felt" or "G410 -20 /Felt ", fully adhered with "Sarnacol 2170" adhesive at 1.5 to 2.5 gal /sq. 17. Deck: C -3 11/16 Indine: 1 Base Sheet: — Type G2, nailed or hot mopped. Insulation: — (3 in. min) Johns Manville "ENRGY 2G ". Membrane: — "G410" (PVC), adhered with "Sarnacol 2170" adhesive at 1.5 to 2.5 gal /sq. 18. Deck: C -15/32 Indine: 2 Vapor Barrier (Optional): — Polyethylene Kraft or PVC (Not Classified). Insulation (Optional): — One or more layers polyisocyanurate, any thickness. Barrier Board: — 1/4 in. thick G -P Gypsum DensDeck® or 1/2 in. thick gypsum board with all joints staggered a min of 6 in. from the plywood joints. Membrane: — "G410 " or "G410 /Felt" adhered with "Samacol 2170" adhesive at a rate of 1 -1/2 to 2 -1/2 gal/ sq. or "Samacol 2121" adhesive at a rate of 1 -3/4 to 2 -1/4 gal /sq. 19. Deck: NC Indine: 1 -1/2 Vapor Barrier (Optional): — Polyethylene, Kraft or Samavap PVC film (not Classified). Insulation: — One of the following or combinations, mechanically fastened or hot mopped in place (any thickness): Celotex "Top RII ", "Hy -Tec ", "Hy -Tec II ", "Hy -Therm AP" . Membrane: — "G410 ", "G410 /Felt ", "G410 -14 ", "G410 -14 /Felt ", "G410 -15 ", "G410 -15 /Felt ", "G410 -18 ", "G410 -18 /Felt ", "G410 -20 ", "G410 -24 ", "S327 ", "5327 /Felt ", "S327 -14 ", "S327 -14 /Felt ", "S327 -15 ", "S327 -15/ http: / /database.ul.com/cgi- bin /XYV/ template /LIS... ion= versionless& parent_id= 1073993597&sequence =1 (10 of 22) [2/10/2009 4:50:51 PM] TC J.R8992 - Roofing Systems Felt ", "S327 -18 ", "S327 -18 /Felt ", "S327 -20 ", "S327 -20 /Felt" or "S327 -24" (PVC), fully adhered with "Sarnacol 2121" at 1 -3/4 to 2 -1/4 gal /100 sq ft, or "Sarnacol 2170" at 1 -1/2 to 2 -1/2 gal /100 sq ft. 20. Deck: C -15/32 Incline: 1 -1/2 Barrier Board: — 5/8 in. min thickness gypsum board or 1/4 in. G -P Gypsum DensDeck ®, mechanically fastened with insulation fasteners (6 in. offset of the gypsum board joints from the plywood joints). Vapor Barrier (Optional): — Polyethylene or Kraft (not Classified) or G1 and G2. Insulation: — One of the following or combinations, mechanically fastened or hot mopped in place (any thickness): Celotex "Top RII ", "Hy-Tec ", "Hy -Tec II ", "Hy -Therm AP" . Membrane: — "G327 -15 ", "G327 -15 /Felt ", "G410 ", "G410 /Felt ", "G410 -14 ", "G410 -14 /Felt ", "G410 -15 ", "G410 -15 /Felt ", "G410 -18 ", "G410 -18 /Felt ", "G410 -20 ", "G410 -20 /Felt ", "G410 -24 ", "S327 ", "S327 /Felt ", "S327 -14 ", "S327 -14 /Felt ", "S327 -18 ", "S327 -18 /Felt ", "S327 -20 ", "S327 -20 /Felt" or "S327 -24" (PVC), fully adhered with "Sarnacol 2121" at 1 -3/4 to 2 -1/4 gal /100 sq ft, or "Sarnacol 2170" at 1 -1/2 to 2 -1/2 gal /100 sq ft. 21. Deck: Structural Cement Fiber Unit Indine: 1 -1/2 Vapor Barrier (Optional): — G1 or G2 base sheet. Insulation (Optional): — One of the following or combinations, mechanically fastened or hot mopped in place (any thickness): Celotex "Top RII ", "Hy- Tec ", "Hy -Tec II" or "Hy -Therm Ultra ". Membrane: — "G410 ", "G410 /Felt ", "G410 -14 ", "G410 -14 /Felt ", "G410 -15 ", "G410 -15 /Felt ", "G410 -18 ", "G410 -18 /Felt ", "G410 -20 ", "G410 -20 /Felt ", "G410 -24 ", "S327 ", "S327 /Felt ", "S327 -14 ", "S327 -14 /Felt ", "S327- 15", "S327 -15 /Felt ", "S327 -18 ", "S327 -18 /Felt ", "S327 -20 ", "S327 -20 /Felt" or "S327 -24" (PVC), fully adhered with "Sarnacol 2121" at 1 -3/4 to 2 -1/4 gal /100 sq ft, or "Sarnacol 2170" at 1 -1/2 to 2 -1/2 gal /100 sq ft. 22. Deck: NC Indine: 2 -1/2 Vapor Barrier (Optional): — Polyethylene or Kraft (not Classified) . Insulation: — One of the following or combinations, mechanically fastened or hot mopped in place (any thickness): Celotex "Top RII ", "Hy- Tec ", "Hy -Tec II ", "Hy -Therm AP" . Membrane: — "G410 ". 23. Deck: C -3 -11/16 Indine: 1/2 Base Sheet: — Type G2, nailed or hot mopped. Insulation: — (3 in. min) Celotex "Hy -Therm AP" . Membrane: — "G410" (PVC), adhered with "Sarnacol 2170" adhesive at 1.5 to 2.5 gal /sq. 24. Deck: C -15/32 Indine: Unlimited Vapor Barrier (Optional): — Polyethylene, polypropylene, karft or PVC (not UL Classified). Insulation (Optional): — One or more layers polyisocyanurate, polystyrene or combinations, any thickness. Barrier Board: — G -P Gypsum DensDeck ®, 1/4 in. min with 6 in. staggered joints, mechanically fastened. Membrane: — "G410 ", "G410 -12 ", "G410 -15 ", "G410 -18 ", "G410 -20 ", "G410 -24" (PVC), adhered with "Sarnacol 2170" adhesive at 2 gal /sq. 25. Deck: Structural Cement Fiber Unit Indine: 2 Vapor Barrier (Optional): — Rosin paper (not UL Classified) and Type 15 or 30 felt, Gi or G2 two to four plies mechanically fastened or hot mopped. Insulation: — One or more layers of one of the following (1/8 in. tapered) any thickness, mechanically fastened or hot mopped inplace: 1. Apache "Pyrox" 2. John Manville "ENRGY" 3. Atlas Roofing "ACFoam II" 4. "Sarna Therm I" 5. "Sarna Therm II" 6. "Sarnatherm a" http: / /database.ul.com/cgi- bin /XYV /template/LIS... ion= versioniess& parent _id= 1073993597&sequence =1(11 of 22) [2/10/2009 4:50:51 PM) TCIU.R8992 - Roofing Systems Membrane: - "G410" or "S327 ", fully adhered with "Samacol 2121" at 1 -3/4 to 2 -1/4 gal.sq or "Sarnacol 2170" at 1- 1/2 to 2 -1/2 gal /sq. 26. Deck: C -15/32 Indine: Unlimited Vapor Barrier (Optional): - Polyethylene, Kraft or PVC (not UL Classified) Insulation: - Any UL Classified Barrier Board: - G P Gypsum Corp. "DensDeck DuraGuardT" Roofboard," or "DensDeck® Roofboard" or " DensDeck Prime® Roofboard," minimum 1/4 -in. thick, mechanically fastened with butt joints in barrier board off -set a minimum of 6 -in. from plywood decks butt joints. Membrane: - "G410 P&S," 48 -mil, 60 -mil and 80 -mil self adhered . 27. Deck: NC Indine: 1 -1/2 Vapor Barrier (Optional): - Polyethylene, Kraft or PVC (not UL Classified) Insulation: - Any thickness Johns Manville International "ENRGY III;" or Hunter Panels "H- Shield;" or Atlas Roofing Corp. "ACFoam II" or "ACFoam III;" "Samatherm ", Tapered Sarnatherm", " Sarnatherm Perlite Composite ", "Tapered Samatherm Perlite Composite", "Samatherm Woodfiber Composite ", "Tapered Sarnatherm Woodfiber Composite" or " Samatherm Nailboard "or Premier Industries "Insulfoam SP" mechanically fastened Membrane: - "G410 P&S," 48 -mil, 60 -mil and 80 -mil self adhered 28. Deck: NC Indine: 1 -1/2 Vapor Barrier (Optional): - Polyethylene, Kraft or Samavap PVC film (not Classified). Insulation: - One of the following or combinations, mechanically fastened or hot mopped in place (any thickness): "Samatherm ", "Tapered Samatherm", " Samatherm Perlite Composite ", "Tapered Sarnatherm Perlite Composite", "Samatherm Woodfiber Composite", "Tapered Samatherm Woodfiber Composite" or "Sarnatherm Nailboard ". Membrane: - "G410 ", "G410 /Felt ", "G410 -14 ", "G410 -14 /Felt", "G410 -15 ", "G410 -15 /Felt ", "G410 -18 ", "G410 -18 /Felt ", "G410 -20 ", "G410 -24 ", "S327 ", "S327 /Felt ", "S327 -14 ", "S327 -14 /Felt", "S327 -15 ", "S327 -15/ Felt ", "S327 -18 ", "S327 -18 /Felt ", "S327 -20 ", "S327 -20 /Felt" or "S327 -24" (PVC), fully adhered with Sarnacol 2121 at 1 -3/4 to 2 -1/4 gal /100 sq ft, or "Samacol 2170" at 1 -1/2 to 2 -1/2 gal /100 sq ft. 29. Deck: NC Indine: 1/2 Insulation: - Johns Manville "ENRGY 3 ", any thickness. Membrane: - "Samafil TPO ", 45 or 60 mil, fully adhered with "CRSI Bonding Adhesive C1006" at 1 gal. /sq. 30. Deck: C -15/32 Indine: 3 Insulation (Optional): - Any UL Classified, any thickness mechanically fastened or adhered with UL Classified insulation adhesive. Barrier Board: - Minimum IA -in. thick G P Gypsum Corp. "DensDeck Prime® Roofboard" or "DensDeck® Roofboard" or "DensDeck DuraGuardTM Roofboard" or USG "Securock" mechanically fastened or adhered with a UL Classified insulation adhesive with all butt joints in the barrier board staggered a minimum of 6 -in. from butt joints in plywood roof deck. Membrane: - Sika Samafil Inc. \'s "Sikaplan 45" (PVC) 45 mil, "S327 -12" (PVC) 48 mil (1.2 mm), "5327- 15" (PVC) 60 mil (1.5 mm), "S327 -18" (PVC) 72 mil (1.8 mm), "S327 -20" (PVC) 80 mil (2.0 mm), or "G410- 12" (PVC) 45 mil (1.2 mm), "G410 -15" (PVC) 60 mil (1.5 mm), "G410 -18" (PVC) 72 mil (1.8 mm), "G410- 20" (PVC) 80 mil (2.0 mm), fully adhered with "PLIODECK PVC" adhesive applied at 150 -ft. /gal. 31. Deck: NC Indine: 3 Barrier Board (Optional): - Minimum 1/4-in. thick G P Gypsum Corp. "DensDeck Prime® Roofboard" or "DensDeck® Roofboard" or "DensDeck DuraGuardTM Roofboard" or USG "Securock" mechanically fastened or adhered with a UL Classified insulation adhesive with all butt joints in the barrier board staggered a minimum of 6 -in. from butt joints in plywood roof deck. Membrane: - Sika Samafil Inc.\'s "Sikaplan 45" (PVC) 45 mil, "S327 -12" (PVC) 48 mil (1.2 mm), "S327- 15" (PVC) 60 mil (1.5 mm), "S327 -18" (PVC) 72 mil (1.8 mm), "S327 -20" (PVC) 80 mil (2.0 mm), or "G410- 12" (PVC) 45 mil (1.2 mm), "G410 -15" (PVC) 60 mil (1.5 mm), "G410 -18" (PVC) 72 mil (1.8 mm), "G410- 20" (PVC) 80 mil (2.0 mm), fully adhered with "PLIODECK PVC" adhesive applied at 150 -ft. /gal. 32. Deck: C -15/32 Indine: 3 Insulation (Optional): - Any UL Classified, any thickness mechanically fastened or adhered with UL Classified insulation adhesive. Base Sheet: - 1 ply Type G2 base sheet, mechanically fastened. Barrier Board: - Minimum IA-in. thick G P Gypsum Corp. " DensDeck Prime® Roofboard" or "DensDeck ® Roofboard" or "DensDeck DuraGuardT" Roofboard" or USG "Securock" mechanically fastened or adhered with a UL Classified insulation adhesive with all butt joints in the barrier board staggered a minimum of 6 -in. from butt joints in plywood roof deck. Membrane: - Sika Samafil Inc. \'s "Sikaplan 45" (PVC) 45 mil, "S327 -12" (PVC) 45 mil (1.2 mm), "5327- 15" (PVC) 60 mil (1.5 mm), "S327 -18" (PVC) 72 mil (1.8 mm), "S327 -20" (PVC) 80 mil (2.0 mm), or "G410- 12" (PVC) 45 mil (1.2 mm), "G410 -15" (PVC) 60 mil (1.5 mm), "G410 -18" (PVC) 72 mil (1.8 mm), "G410- 20" (PVC) 80 mil (2.0 mm), fully adhered with "PLIODECK PVC" adhesive applied at 200 - 250 -ft. /gal. 33. Deck: NC Indine: 2 Vapor Barrier (optional): - Any UL Classified vapor barrier. Insulation (Optional): - Sika Samafil Inc. \'s " Sarnatherm a" or Atlas Roofing Corp. \'s "AC Foam II" or The Dow Chemical Co. \'s "HY -THERM AP" any thickness mechanically fastened or adhered with a UL Classified insulation adhesive. http: // database. ul. com /cgi- bin/XYV /tempiate/LIS... ion= versioniess& parent _id= 10739935978sequence =1(12 of 22) [2/10/2009 4:50:51 P14] TGEU.R8992 - Roofing Systems Membrane: — Sika Samafil IncA's "Sikaplan 45" (PVC) 45 mil, "S327 -12" (PVC) 45 mil (1.2 mm), "S327- 15" (PVC) 60 mil (1.5 mm), "S327 -18" (PVC) 72 mil (1.8 mm), "S327 -20" (PVC) 80 mil (2.0 mm), or "G410- 12" (PVC) 45 mil (1.2 mm), "G410 -15" (PVC) 60 mil (1.5 mm), "G410 -18" (PVC) 72 mil (1.8 mm), "G410- 20" (PVC) 80 mil (2.0 mm), fully adhered with "PLIODECK PVC" adhesive applied at 200 - 250 -ft. /gal. 34. Deck: NC Indine: 1 -1/2 Vapor Barrier (optional): — Any UL Classified vapor barrier. Insulation (Optional): — Sika Samafil IncXs "Samatherm" or " Samatherm Perlite Composite," or "Samatherm Woodfiber composite," or "Samatherm Foil," or "Samatherm Nailboard," or Hunter Panels\' "H- Shield," or "H- Shield -P," or "H- Shield -WF," or "H- Shield -F," or "H- Shield -NB," or "H- Shield -CG," or "H- Shield- DD," or "H- Shield -AGF," or "H- Shield -C" or "H- Shield -DWD," any thickness mechanically fastened or adhered with a UL Classified insulation adhesive. Membrane: — Sika Sarnafil IncA's "Sikaplan 45" (PVC) 45 mil, "S327 -12" (PVC) 45 mil (1.2 mm), "5327- 15" (PVC) 60 mil (1.5 mm), "S327 -18" (PVC) 72 mil (1.8 mm), "S327 -20" (PVC) 80 mil (2.0 mm), or "G410- 12" (PVC) 45 mil (1.2 mm), "G410 -15" (PVC) 60 mil (1.5 mm), "G410 -18" (PVC) 72 mil (1.8 mm), "G410- 20" (PVC) 80 mil (2.0 mm), fully adhered with "PLIODECK PVC" adhesive applied at 200 - 250 -ft. /gal. 35. Deck: NC Indine: 1/2 Insulation (Optional): — Any UL Classified Extruded Polystyrene, any thickness, mechanically fastened or adhered with UL Classified insulation adhesive. Membrane: — "G476 -15 SA" (PVC) 120 mil, self - adhered. 36. Deck: C -15/32 Indine: 1/2 Insulation (Optional): — Any UL Classified Polyisocyanurate, any thickness, mechanically fastened or adhered with UL Classified insulation adhesive. Barrier Board: — G P Gypsum Corp. "DensDeck DuraGuardmi Roofboard," or "DensDeck® Roofboard" or "DensDeck Prime® Roofboard," minimum 1/4 -in. thick, mechanically fastened or adhered with UL Classified insulation adhesive with butt joints in barrier board off -set a minimum of 6 -in. from plywood decks butt joints. Membrane: — "G476 -15 SA" (PVC) 120 mil, self- adhered. Class 8 - Fully Adhered 1. Deck: C -15/32 Indine: Unlimited Vapor Barrier (Optional): — Polyethylene, kraft or PVC (not UL Classified). Insulation (Optional): — One or more layers polyisocyanurate, polystyrene or combinations, any thickness. Barrier: — G -P Gypsum DensDeck®, 1/4 in. min, mechanically fastened. Membrane: — "G410 ", "G410 -12 ", "G410 -14 ", "G410 -15 ", "G410 -20 ", "G410 -24 ", "S327 ", "S327 -12 ", "S327- 14", "S327 -15 ", "S327 -20 ", "S327 -24" adhered with "Samacol 2170" at 1 -1/2 to 2 -1/2 gal /sq. 2. Deck: C -15/32 Indine: Unlimited Vapor Barrier (Optional): — Polyethylene, polypropylene, karft or PVC (not UL Classified). Insulation (Optional): — One or more layers polyisocyanurate, polystyrene or combinations, any thickness. Barrier Board: — G -P Gypsum DensDeck®, 1/4 in. min with 6 in. staggered joints, mechanically fastened. Membrane: — "G410 ", "G410 /Felt ", "G410 -12 ", "G410- 12/Felt ", "G410 -15 ", "G410 -15 /Felt ", "G410 -18 ", "G410 -18 /Felt ", "G410 -20 ", "G410 -20 /Felt", "G410 -24 ", "S327 ", "S327 /Felt ", "S327 -12 ", "S327- 12/Felt ", "S327- 15", "S327 -15 /Felt ", "S327 -20 ", "S327 -20 /Felt ", "S327 -24" (PVC), adhered with "Samacol 2170" adhesive at 2 gal /sq or "Samacol 2121" adhesive at 1.75 gal /sq. 3. Deck: NC Indine: 3/4 Insulation: — Johns Manville "ENRGY 3 ", any thickness. Membrane: — " Samafil TPO ", 45 or 60 mil, fully adhered with "CRSI Bonding Adhesive C1006" at 1 gal. /sq. Class C - Fully Adhered 1. Deck: C (Tectum Deck) 4 in. Incline: 2 -1/2 Separation Sheet: — Type G1, G2 or G3 sheet nailed. Insulation: — Johns Manville "ENRGY -IM ", any thickness, mechanically fastened with metal insulation anchors or hot mopped in place. Membrane: — "G410 ", "G410 -14 ", "G410 -15 ", "G410 -18 ", "G410 -20" or "G410 -24" (PVC), secured with "Sarnacol 2170" at 1 -1/2 to 2 -1/2 gal /sq. Class A - Mechanically Fastened Membrane is secured to the roof deck with metal bars or metal plates and screws in accordance with the manufacturer's recommended installation instructions. 1. Deck: NC Indine: 1 Insulation: — Glass fiber, wood fiber or perlite, any thickness, mechanically fastened with metal insulation anchors. http: // database. ul .coo /cgi- bin/XW /template/LLS... ion= versionless& parent _id= 10739935978sequence =1(13 of 22) [2/10/2009 4:50:51 PM] TG IJ.R8992 - Roofing Systems Membrane: — "G410 ", "G410 -15 ", "S327" or "S327 -15" (PVC). 2. Deck: NC Indine: 1 Insulation: — GAF "Gaftemp ", glass fiber or wood fiber, any combination, 3/4 to 3 -3/4 in., mechanically fastened with metal insulation anchors. Separation Sheet: — "Samafelt 400" or Fortifiber Membrane: — "G410 ", "G410 /Felt ", "G410 -14 ", "G410 -14 /Felt ", "G410 -15 ", "G410 -15 /Felt ", "G410 -18 ", "G410 -18 /Felt ", "G410-20 ", "G410 -20 /Felt ", "G410 -24 ", "S327 ", "S327 /Felt ", "S327 -14 ", "S327 -14 /Felt ", "S327- 15", "S327 -15 /Felt ", "S327 -18 ", "S327 -18 /Felt ", "S327 -20 ", "S327 -20 /Felt" or "S327 -24" (PVC). 3. Deck: NC Indine: 1 Insulation: — Cellular concrete, gypsum concrete, vermiculite concrete, perlite concrete or structural concrete. Membrane: — "G410 ", "G410 /Felt ", "G410 -14 ", "G410 -14 /Felt ", "G410 -15 ", "G410 -18 ", "G410 -18 /Felt ", "G410 -20 ", "G410 -20 /Felt ", "G410 -24 ", "S327 ", "S327 /Felt ", "S327 -14 ", "S327 -15 ", "S327 -18 ", "S327 -18 /Felt ", "S327 -20 ", "S327 -20 /Felt ", "S327 -24" (PVC). 4. Deleted. 5. Deck: NC Indine: 1 1/2 Insulation (Optional): — Polystyrene or polyisocyanurate, any thickness. Barrier Board: — Plywood (0.50 in. min) or 1/4 in. (min) G -P Gypsum DensDeck ®, mechanically fastened with metal insulation anchors. Membrane: — "G410 ", "G410 -14 ", "G410 -15 ", "G410 -18 ", "G410-20 ", "G410 -24 ", "S327 ", "S327 -14 ", "S327- 15", "S327 -18 ", "S327 -20" or "S327 -24" (PVC). 6. Deck: NC Incline: 1 Barrier Board (Optional): — Gypsum board, 5/8 in. min or 1/4 in. (min) G -P Gypsum DensDeck®. Insulation: — Dow Chemical USA RM Styrofoam or E.P.S, any thickness. Barrier Board: — Huebert Fiberboard 1 in. fiberboard. Membrane: — "S327 ", "S327 -14 ", "S327 -15 ", "5327 -18 ", "S327 -20" or "S327 -24" (PVC). 7. Dedc: NC Indine: 1 Insulation: — GAF "Gaftemp ", glass fiber or wood fiber, any thickness, mechanically fastened with metal insulation anchors. Membrane: — "S327 /Felt ", "S327L/Felt ", "S327 -14 ", "S327 -14 /Felt ", "S327 -15 ", "5327 -15 /Felt ", "S327 -18 ", "S327 -18 /Felt ", "S327 -20," "S327 -20 /Felt" or "S327 -24 ". 8. Deck: NC Indine: 2 Vapor Barrier (Optional): — Polyethylene Kraft or Samavap PVC film (not Classified). Insulation: — One of the following or combinations, any thickness, mechanically fastened or hot mopped in place with hot roofing asphalt: a. Perlite b. Fiberboard c. Rmax Multi-Max or 'Thermaroof Pius" d. Firestone "Iso 95 +GL ", "Iso 95 +GW" e. Apache Products "Apache Pyrox", "Apache White Line" or "Apache Tapered Pyrox" f. Johns Manville "ISO 1" g. "Samatherm I "or "Samatherm II" h. Atlas Roofing "ACFoam II" i. "Samatherm a" j. "Samatherm ", Tapered Samatherm ", "Samatherm Perlite Composite ", "Tapered Sarnatherm Perlite Composite ", " Sarnatherm Woodfiber Composite ", "Tapered Samatherm Woodfiber Composite" or "Sarnatherm Nailboard Membrane: — "G410 ", "G410 /Felt ", "G410 -14 ", "G410 -14 /Felt ", "G410 -15 ", "G410 -15 /Felt ", "G410 -18 ", "G410 -18 /Felt ", "G410 -20 ", "G410 -20 /Felt ", "G410 -24 ", "S327 ", "S327 /Felt ", "5327 -14 ", "S327 -14 /Felt ", "S327- 15", "S327 -15 /Felt ", "S327 -18 ", "S327 -20 ", "S327 -24" (PVC), laid loosely. 9. Deleted. 10. Deleted. http: / /database.ui.com/cgi- bin /XYV/ template /US... ion= versionlesss &parent_id= 1073993597&sequence =1 (14 of 22) [2/10/2009 4:50:51 PM] TGRJ.R8992 - Roofing Systems 11. Deck: C -15/32 Indine: 1/2 Barrier Board: — 1/2 in. min thickness gypsum board, mechanically fastened with insulation fasteners (6 in. offset at the gypsum board joints from the plywood joints). Membrane: — "G410 ", "G410 -14 ", "G410-15 ", "G410 -18 ", "G410 -20 ", "G410 -24 ", "G410 -14 /Felt ", "G410 -15/ Felt ", "G410 -18 /Felt ", "G410 -20 /Felt ", "S327 ", "S327 /Felt ", "S327 -14 ", "S327 -14 /Felt ", "S327 -15 ", "S327 -15/ Felt ", "S327 -18 ", "S327 -20 ", "S327 -24" (PVC). 12. Deck: C -15/32 Indine: 2 Barrier Board: — 1/2 in. min thickness gypsum board 1/4 in. G -P Gypsum DensDeck ®, mechanically fastened with insulation fasteners (6 in. offset of the gypsum board joints from the plywood joints). Vapor Barrier (Optional): — Polyethylene or Kraft (not Classified). Insulation: — One of the following or combinations any thickness, mechanically fastened or hot mopped in place: a. Perlite b. Fiberboard c. Rmax Multi -Max or "Thermaroof Plus" d. Firestone "Iso 95 +GL ", Iso 95 +GW" e. Apache Products "Apache Pyrox", "Apache White Line" or "Apache Tapered Pyrox" f. Johns Manville "ISO 1" g. "Samatherm I "or "Sarnatherm II" h. Atlas Roofing "ACFoam II" i. "Samatherm a" j. "Samatherm ", Tapered Samatherm ", "Samatherm Perlite Composite ", "Tapered Sarnatherm Perlite Composite ", " Sarnatherm Woodfiber Composite ", "Tapered Samatherm Woodfiber Composite" or "Sarnatherm Nailboard" Membrane: — "G410 ", "G410 /Felt ", "G410 -14 ", "G410 -14 /Felt ", "G410 -15 ", "G410 -15 /Felt ", "G410 -18 ", "G410 -18 /Felt ", "G410 -20 ", "G410 -20 /Felt ", "G410 -24 ", "S327 ", "S327 /Felt ", "S327 -14 ", "S327 -14 /Felt ", "S327- 15", "S327 -15 /Felt ", "S327 -18 ", "S327 -18 /Felt ", "S327 -20 ", S327 -20 /Felt" or " S327 -24" (PVC). 13. Deleted. 14. Deleted. 15. Deleted. 16. Deck: NC Indine: 1 -1/4 Insulation: — "Samatherm I ", uniform thickness or tapered foamed plastic, or Johns Manville "Barrier Board Plus -M ", uniform thickness or tapered composite, any thickness, mechanically fastened. Membrane: — "S327 ", "S327 -14 ", "S327 -15 ", "S327 -18 ", "S327 -20" or "S327 -24" (PVC), mechanically fastened as per manufacturer's instructions. 17. Deck: NC Indine: 3/4 Insulation: — "Samatherm I ", uniform thickness or tapered foamed plastic, 0.9 in. min, no max, or Johns Manville "Barrier Board Plus -M ", uniform thickness or tapered composite, any thickness, mechanically fastened. Membrane: — "S327 ", "S327 -14 ", "S327 -15 ", "S327 -18 ", "S327 -20" or "S327 -24" (PVC), mechanically fastened. 18. Deck: C -15/32 Indine: 2 Insulation: — Polystyrene, any thickness. Barrier Board: — 5/8 in. gypsum or 1/4 in. (min) G -P Gypsum DensDeck ®, mechanically fastened with 6 in. offset of the gypsum joint from the plywood joints. Membrane: — "G410 ", "G410 /Felt ", "G410 -14 ", "G410 -14 /Felt ", "G410 -15 ", "G410 -15 /Felt ", "G410 -18 ", "G410 -18 /Felt ", "G410 -20 ", "G410 -20 /Felt ", "G410 -24 ", "S327 ", "S327 /Felt ", "S327 -14 ", "S327 -14 /Felt ", "S327- 15", "S327 -15 /Felt ", "S327 -18 ", "S327 -18 /Felt ", "S327 -20 ", "S327 -20 /Felt" or "S327 -24" (PVC). 19. Deck: C -15/32 Indine: 2 Barrier Board: — 1/2 in. gypsum board, mechanically fastened with 6 in. offset of the gypsum joints from the plywood joints. Insulation: — Polystyrene, any thickness. http: // database. ul. com /cgi- bin/XYV /template/LLS... ion= versionless&parent_id= 10739935978sequence =1(15 of 22) [2/10/2009 4:50:51 PM] TGRJ.R8992 - Roofing Systems Barrier Board: — 3/4 in. perlite board. Membrane: — "G410 ", "G410 /Felt ", "G410 -14 ", "G410 -14 /Felt ", "G410 -15 ", "G410 -15 /Felt ", "G410 -18 ", "G410 -18 /Felt ", "G410 -20 ", "G410 -20 /Felt ", "G410 -24 ", "S327 ", "S327 /Felt ", "S327 -14 ", "S327 -14 /Felt ", "S327- 15", "S327 -15 /Felt ", "S327 -18 ", "S327 -18 /Felt ", "S327 -20 ", "S327 -20 /Felt" or "S327 -24" (PVC). 20. Deck: NC Indine: 4 Insulation: — Cellular concrete, gypsum concrete, vermiculite concrete, perlite concrete or structural concrete. Membrane: — "G410" or "S327" (PCV). 21. Deck: C -15/32 Indine: 1/2 Barrier Board: — 1/2 in. gypsum board with joints offset 6 in. from joints in plywood. Insulation (Optional): — Rmax "Multi-Max" or "Thermaroof Plus," Firestone "Iso 95 +GL" or "Iso 95 +GW ", Apache Products "Apache Pyrox" or "Apache White Line ", Johns Manville "ENRGY IM, IA or IG ", Samafil "Sarnatherm I ", "Samatherm II" or "Samatherm Composite ", Atlas Roofing "ACFoam II ", any thickness. Membrane: — "G410 ", "G410 /Felt ", "S327 ", "S327 /Felt ", (PVC) 48 or 60 mil. 22. Deck: C -15/32 Indine: 1/2 Insulation (Optional): — Rmax "Multi-Max" or 'Thermaroof Plus ", Firestone "ISO 95 +GL" or "ISO 95 +GW ", Apache Products "Apache Pyrox" or "Apache White Line ", Johns Manville "ENRGY IM ", "Sarna Therm II" or "Sarna Therm Composite ", Atlas Roofing "ACFoam II ", any thickness. Barrier Board: — 1/2 in. gypsum board. Membrane: — "G410 ", "G410 /Felt ", "S327 ", "S327 /Felt" (PVC), 48 or 60 mil. 23. Deck: C -15/32 Indine: 1/2 Vapor Barrier (Optional): — Polyethylene or Kraft (not Classified). Insulation (Optional): — One of the following or combinations, mechanically fastened any thickness: a. Perlite b. Rmax "Multi -Max" or "Thermaroot Plus" c. Firestone "Iso 95 + GL ", "Iso 95 + GW" d. Apache Products "Apache Pyrox", "Apache White Line" or "Apache Tapered Pyrox" e. Johns Manville " ENRGY 1 " f. "Sarnatherm I "or "Sarnatherm II" g. Atlas Roofing " ACFoam II" i. "Samatherm a" j. "Sarnatherm ", Tapered Samatherm ", "Samatherm Perlite Composite ", "Tapered Sarnatherm Perlite Composite ", "Sarnatherm Woodfiber Composite ", 'Tapered Samatherm Woodfiber Composite" or "Sarnatherm Nailboard" Barrier Board: — Partek Insulation "Paroc Capboard", 3/4 in. min with joints staggered 6 in. from the plywood deck joints, mechanically fastened. Membrane: — "G410 ", "G410-14 ", "G410 -15 ", "G410 -24 ", "S327 ", "S327 -14 ", "S327 -15 ", "S327 -18 ", "S327- 20" (PVC). 24. Deck: C -15/32 Indine: 3 Insulation: — Partec "Paroc Capboard" 3/4 in. with insulation joints staggered 6 in. from the plywood deck joint, mechanically fastened. Membrane: — "G410 ", "G410 -14 ", "G410 -15 ", "G410 -24 ", "S327 ", "S327 -14 ", "S327 -15 ", "S327 -18 ", "S327- 20" (PVC). 25. Deck: C15/32 Indine: No Limitations Insulation (Optional): — Polyisocyanurate, any thickness. Barrier Board: — 1/4 in. min G -P Gypsum DensDeck® with all joints staggered a min of 6 in. from the plywood joints. Membrane: — "S327 ", "S327 -12 ", "S327 -14 ", "S327 -15 ", "S327 -18 ", "S327 -20" or "S327 -24 ". 26. Deck: NC Indine: 2 Vapor Barrier (Optional): — Polyethylene Kraft or Samavap PVC film (not Classified). Insulation (Optional): — UL Classified EPS, any thickness. Insulation: — One of the following or combinations, 1 in. thick min., mechanically fastened. a.Perlite http: // database. ul. com /cgl- bin/XYV /template/LIS... Ion= versionless& parent _id= 1073993597&sequence =1(16 of 22) [2/10/2009 4:50:51 PM] T(U.R8992 - Roofing Systems b.Fiberboard c.Rmax "Multi -Max" or 'Thermaroof Plus" d.Firestone "Iso 95 +GL ", "Iso 95 +GW" e.Apache Products "Apache Pyrox", "Apache White Line" or "Apache Tapered Pyrox" f. Johns Manville "ENRGY 2" or "Barrier Board Plus" g. Johns Manville "ISO 1" h. " Samatherm I "or " Samatherm II" i. Atlas Roofing "ACFoam II" j. " Saratherm a" k.. " Samatherm Perlite Composite ", "Tapered Samatherm Perlite Composite ", " Samatherm Woodfiber Composite ", "Tapered Samatherm Woodfiber Composite" or " Samatherm Nailboard" Membrane: — "G410 ", "G410 /Felt ", "G410 -14 ", "G410 -14 /Felt ", "G410 -15 ", "G410 -15 /Felt ", "G410 -18 ", "G410 -18 /Felt ", "G410 -20 ", "G410 -20 /Felt ", "G410 -24 ", "S327 ", "S327 /Felt ", "S327 -14 ", "S327 -14 /Felt ", "S327- 15", "S327 -15 /Felt ", "S327 -18 ", "S327 -20 ", "S327 -24" (PVC), laid loosely. 27. Deck: NC Indine: 1 -1/2 Vapor Barrier (Optional): — Polyethylene Kraft or Samavap PVC film (not Classified). Insulation: — One of the following or combinations, any thickness, mechanically fastened or hot mopped in place with hot roofing asphalt: Celotex "Top RII ", "Hy -Tec ", "Hy -Tec II" or "Hy -Therm AP ". Membrane: — "G410 ", "G410 /Felt ", "G410 -14 ", "G410 -14 /Felt", "G410 -15 ", "G410 -15 /Felt ", "G410 -18 ", "G410 -18 /Felt ", "G410 -20 ", "G410 -20 /Felt', "G410 -24 ", "S327 ", "S327 /Felt ", "S327 -14 ", "S327 -14 /Felt ", "S327- 15", "S327 -15 /Felt ", "S327 -18 ", "S327 -20 ", "S327 -24" (PVC), laid loosely. 28. Deck: C -15/32 Indine: 1 -1/2 Barrier Board: — 1/2 in. min thickness gypsum board 1/4 in. G -P Gypsum DensDeck®, mechanically fastened with insulation fasteners (6 in. offset of the gypsum board joints from the plywood joints). Vapor Barrier (Optional): — Polyethylene or Kraft (not Classified) . Insulation: — One of the following or combinations, any thickness, mechanically fastened or hot mopped in place: Celotex "Top RII ", "Hy- Tec ", "Hy -Tec II ", "Hy -Therm AP" . Membrane: — "G410 ", "G410 /Felt ", "G410 -14 ", "G410 -14 /Felt ", "G410 -15 ", "G410 -15 /Felt ", "G410 -18 ", "G410 -18 /Felt ", "G410 -20 ", "G410 -20 /Felt ", "G410 -24 ", "S327 ", "S327 /Felt ", "S327 -14 ", "S327 -14 /Felt ", "S327- 15", "S327 -15 /Felt ", "S327 -18 ", "S327 -18 /Felt ", "S327 -20 ", "S327 -20 /Felt" or "S327 -24" (PVC). 29. Deck: C -15/32 Indine: 1/4 Barrier Board: — 1/2 in. gypsum board with joints offset 6 in. from joints in plywood. Insulation (Optional): — Celotex "Top RII ", "Hy- Tec ", "Hy -Tec II ", "Hy -Therm AP" any thickness. Membrane: — "G410 ", "G410 /Felt ", "S327 ", "S327 /Felt" (PVC), 48 or 60 mil. 30. Deck: C -15/32 Indine: 1/4 Vapor Barrier (Optional): — Polyethylene or Kraft (not Classified) . Insulation (Optional): — One of the following or combinations, mechanically fastened any thickness: Celotex "Top RII ", "Hy- Tec ", "Hy -Tec II ", "Hy -Therm AP" . Barrier Board: — Partek Insulations "Paroc Capboard ", 3/4 in. min with joints staggered 6 in. from the plywood deck joints, mechanically fastened. Membrane: — "G410 ", "G410 -14 ", "G410 -15 ", "G410 -24 ", "S327 ", "S327 -14 ", "S327 -15 ", "S327 -18 ", "S327- 20" (PVC). 31. Deck: NC Indine: 1 -1/2 http: / /database.ui.com/cgi- bin /XYV /template/LIS... ion= versionless& parent _id= 1073993597&sequence =1(17 of 22) [2/10/2009 4:50:51 PM] TGZIJ.R8992 - Roofing Systems Vapor Board (Optional): — Polyethylene Kraft or Samavap PVC film (not Classified). Insulation (Optional): — UL Classified EPS, any thickness. Insulation: — One of the following or combinations, 1 in. thick min, mechanically fastened: Celotex "Top RII ", "Hy -Tec ", "Hy -Tec II" or "Hy -Therm AP ". Membrane: — "G410 ", "G410 /Felt ", "G410 -14 ", "G410 -14 /Felt ", "G410 -15 ", "G410 -15 /Felt ", "G410 -18 ", "G410 -18 /Felt ", "G410 -20 ", "G410 -20 /Felt ", "G410 -24 ", "S327 ", "S327 /Felt", "S327 -14 ", "S327 -14 /Felt ", "S327- 15", "S327 -15 /Felt ", "S327 -18 ", "S327 -20 ", "S327 -24" (PVC), laid loosely. 32. Deck: C -15/32 Indine: Unlimited Vapor Barrier (Optional): — Polyethylene, polypropylene, karft or PVC (not UL Classified). Insulation (Optional): — One or more layers polyisocyanurate, polystyrene or combinations, any thickness. Barrier Board: — G -P Gypsum DensDeck®, 1/4 in. min with 6 in. staggered joints, mechanically fastened. Membrane: — "G410 ", "G410 /Felt ", "G410 -12 ", "G410- 12/Felt", "G410 -15 ", "G410 -15 /Felt ", "G410 -18 ", "G410 -18 /Felt ", "G410 -20 ", "G410 -20 /Felt ", "G410 -24 ", "S327 ", "S327 /Felt ", "S327 -12 ", "S327- 12/Felt ", "S327- 15", "S327 -15 /Felt ", "S327 -20 ", "S327 -20 /Felt ", "S327 -24" (PVC). 33. Deck: NC Incline: 1 -1/2 Vapor Barrier (Optional): — Polyethylene Kraft or Samavap PVC film (not Classified). Insulation: — One of the following or combinations, any thickness, mechanically fastened or hot mopped in place with hot roofing asphalt: "Samatherm ", "Tapered Samatherm", " Samatherm Perlite Composite ", "Tapered Sarnatherm Perlite Composite ", " Samatherm Woodfiber Composite ", "Tapered Samatherm Woodfiber Composite" or "Samatherm Nailboard ". Membrane: — "G410 ", "G410 /Felt ", "G410 -14 ", "G410 -14 /Felt ", "G410 -15 ", "G410 -15 /Felt ", "G410 -18 ", "G410 -18 /Felt ", "G410 -20 ", "G410 -20 /Felt ", "G410 -24 ", "S327 ", "S327 /Felt ", "S327 -14 ", "S327 -14 /Felt ", "S327- 15", "S327 -15 /Felt ", "S327 -18 ", "S327 -20 ", "S327 -24" (PVC), laid loosely. 34. Deck: NC Indine: 2 Vapor Barrier (Optional): — Polyethylene Kraft or Samavap PVC film (not Classified). Insulation: — Rmax "Multi- Max ", "Samatherm ", " Samatherm a ", Hunter Panel "H- Shield ", Atlas Roofing "ACFoam II ", any thickness. Membrane: — "Sikaplan 45" (PVC) 45 mil, mechanically fastened. 35. Deck: NC Indine: Unlimited Vapor Barrier (Optional): — Polyethylene Kraft or Samavap PVC film (not Classified). Insulation (Optional): — Any UL Classified, any thickness. Barrier Board: — Minimum 1 ,4-in. thick USG SECUROCKTM Roof Board (Type FRX -G), mechanically fastened. Membrane: — "Sikaplan 45" (PVC) 45 mil, mechanically fastened. 36. Deck: C -15/32 Indine: Unlimited Vapor Barrier (Optional): — Polyethylene Kraft or Samavap PVC film (not Classified). Insulation (Optional): — Any UL Classified, any thickness. Barrier Board: — Minimum 1/4-in. thick G -P Gypsum Corp. "DensDeck Roofboard®" mechanically fastened with all barrier board butt joints staggered a minimum of 6 -in. from plywood deck butt joints, mechanically fastened. Membrane: — "Sikaplan 45" (PVC) 45 mil, mechanically fastened. 37. Deck: C -15/32 Indine: 1 Insulation (Optional): — Any UL Classified, any thickness Barrier Board: — Minimum 1/2 or 5 /8 -in. thick USG SECUROCKTM Roof Board (Type FRX -G) with all barrier board butt joints staggered a minimum of 6 -in. from plywood deck butt joints, mechanically fastened. Membrane: — "Sikaplan 45" (PVC) 45 mil, mechanically fastened. 38. Deck: C -15/32 Indine: 3 Base Sheet: — One ply Type G2, mechanically fastened. Insulation (Optional): — Any UL Classified, any thickness. Barrier Board: — Minimum 1/4-in. thick USG SECUROCKTM Roof Board (Type FRX -G) with all barrier board butt joints staggered a minimum of 6 -in. from plywood deck butt joints, mechanically fastened. Membrane: — "Sikaplan 45" (PVC) 45 mil, mechanically fastened. 39. Deck: C -15/32 Indine: 2 Base Sheet: — One ply Type G2, mechanically fastened. Barrier Board: — Minimum 1 /4 -in. thick USG SECUROCKTM Roof Board (Type FRX -G) with all barrier board butt joints staggered a minimum of 6 -in. from plywood deck butt joints, mechanically fastened. Insulation (Optional): — Rmax "Multi- Max ", "Samatherm ", " Samatherm a ", Hunter Panel "H- Shield ", Atlas Roofing "ACFoam II ", any thickness. Membrane: — "Sikaplan 45" (PVC) 45 mil, mechanically fastened. 40. Deck: C -15/32 Indine: 3 Insulation: — Fiberglass, polyisocyanurate, perlite or wood fiber, UL Classified, any thickness. Barrier Board: — Minimum 3/4-in. thick USG SECUROCKTM Roof Board (Type FRX -G) with all barrier board butt joints staggered a minimum of 6 -in. from plywood deck butt joints, mechanically fastened. Membrane: — "Sikaplan 45" (PVC) 45 mil, mechanically fastened. 41. Deck: C -15/32 Indine: 2 Barrier Board: — Minimum 1/4-in. thick USG SECUROCKTM Roof Board (Type FRX -G) with all barrier board butt http : / /database.ul.comAgi-bin/XYV/ template /LIS... ion= versbrdess& parent_id= 10739935978seguence =1 (18 of 22) [2/10/2009 4:50:51 PM] T(iU.R8992 - Roofing Systems joints staggered a minimum of 6 -in. from plywood deck butt joints, mechanically fastened. Insulation: — Rmax "Multi- Max ", "Samatherm ", " Samatherm a", Hunter Panel "H- Shield ", Atlas Roofing "ACFoam II ", any thickness. Membrane: — "Sikaplan 45" (PVC) 45 mil, mechanically fastened. 42. Deck: C -15/32 Indine: 2 Barrier Board: — Minimum 1 /4 -in. thick G -P Gypsum "DensDeck® Roofboard" or "DensDeck Prime® Roofboard" or "DensDeck DuraGuardTM Roofboard", mechanically fastened with all butt joints staggered a min of 6 in. from the plywood deck joints. Insulation (Optional): — The Dow Chemical Co. "HY -THERM AP" or " Samatherm" or " Samatherm a" or Hunter Panel "H- Shield" or Atlas Roofing Corp. "ACFoam II," any thickness, mechanically fastened. Membrane: — "S327 -15 EEL H RAL 8029" (PVC) 60 mil (1.5 mm), mechanically fastened. 43. Deck: NC Indine: 2 Barrier Board (Optional): — Minimum 1 /4 -in. thick "DensDeck® Roofboard" or "DensDeck Prime® Roofboard" or "DensDeck DuraGuardTM Roofboard," mechanically fastened with all butt joints staggered a min of 6 in. from the plywood deck joints. Insulation (Optional): — The Dow Chemical Co. "HY -THERM AP" or "Samatherm" or "Samatherm a" or Hunter Panel "H- Shield" or Atlas Roofing Corp. "ACFoam II," any thickness. Membrane: — "S327 -15 EEL H RAL 8029" (PVC) 60 mil (1.5 mm), mechanically fastened. 44. Deck: NC Indine: 2 Barrier Board (Optional): — Minimum tk -in. thick "DensDeck® Roofboard" or "DensDeck Prime® Roofboard" or "DensDeck DuraGuardTM Roofboard," mechanically fastened with all butt joints staggered a min of 6 in. from the plywood deck joints. Membrane: —'TS 77 -12E" (TPO) 45 mil (1.2 mm) or 'TS 77 -20E" (TPO) 80 mil (2.0 mm), mechanically fastened. 45. Deck: NC Indine: 3/4 Insulation: — Hunter Panels "H- Shield ", "H-Shield-WF" , any thickness. Membrane: — "Samafil TPO" , 45 or 60 mil. 46. Deck: C -15/32 Indine: Unlimited Insulation (Optional): — Atlas Roofing "ACFoam II ", Apache Products "Apache White Line ", or "Apache Pyrox ", Hunter Panels "H- Shield ", "H- Shield -WF' or Johns Manville "ENRGY 3" or "Barrier Board Plus ", RhoFlex "Isocyanurate GL, GW or HF', Rmax Inc. "Multi- Max -3 ", any thickness. Barrier Board: — 1/2 in. min gypsum board with staggered joints (6 in. offset). Membrane: — "Samafil TPO ", 45 or 60 mil. 47. Deck: NC Indine: 1/2 Insulation: — Johns Manville " ENRGY 3 ", any thickness. Membrane: — "Samafil TPO ", 45 or 60 mil. 48. Deck: C -15/32 Indine: 1/2 Insulation (Optional): — Any UL Classified, any thickness loose laid, mechanically fastened or adhered with UL Classified insulation adhesive. Barrier Board: — G P Gypsum Corp. "DensDeck DuraGuardTM Roofboard," or "DensDeck® Roofboard" or "DensDeck Prime® Roofboard," minimum 1/4 -in. thick, mechanically fastened, loose laid or adhered with UL Classified insulation adhesive with butt joints in barrier board off -set a minimum of 6 -in. from plywood decks butt joints. Separator Mat: — One ply "Samafelt NWP -HD" polypropylene mat, 18 oz/yd maximum, mechanically fastened or loose laid. Membrane: — "G476 -15" (PVC) 60 mil or "G476 -18" (PVC) 72 mil or "G476 -20" (PVC) 80 mil, mechanically fastened. 49. Deck: NC Indine: 1/2 Separator Mat: — One ply "Samafelt NWP -HD" polypropylene mat, 18 oz/yd maximum, mechanically fastened or loose laid. Membrane: — "G476 -15" (PVC) 60 mil or "G476 -18" (PVC) 72 mil or "G476 -20" (PVC) 80 mil, mechanically fastened. Class B - Mechanically Fastened 1. Deck: NC Indine: 1 -1/2 Insulation: — Rmax "Ply -1 ", any thickness. Membrane: — "S327 ", "S327 -14 ", "S327 -15 ", "S327 -18 ", "S327 -20" or "S327 -24" (PVC), mechanically fastened with metal bars and screws. 2. Deleted. 3. Deck: C 1 -1/2 TG Indine: 1/2 Barrier Board: — 5/8 in. min gypsum board, mechanically fastened with insulation fasteners. Membrane: — "G410 ", "G410 -14 ", "G410 -15 ", "G410 -18 ", "G410 -20 ", "G410 -24 ", "S327 ", "S327 -14 ", "S327- 15", "S327 -18 ", "S327 -20" or "S327 -24" (PVC). 4. Deck: C 3/4 Sheathing boards Indine: 1/2 http: // database.ul.com/cgi- bin/ XYV /tempiate/LLS...ion= versionless& parent _id= 10739935978sequence =1(19 of 22) [2/10/2009 4:50 :51 PM] T(RU.R8992 - Roofing Systems Barrier Board: — 5/8 in. min gypsum board, mechanically fastened with insulation fasteners (gypsum board joints are paper tape embedded in cementitious compound). Membrane: — "G410 ", "G410 -14 ", "G410 -15 ", "G410 -18 ", "G410 -217, "G410 -24 ", "S327 ", "S327 -14 ", "5327- 15", "S327 -18 ", "S327 -20" or "S327 -24" (PVC). 5. Deleted. 6. Deck: C 1 -1/2 TG Incline: No Limitation Insulation: — One of the following or combinations (1 -inch min thickness): a. Rmax Multi -Max or "Thermaroof Plus" b. Firestone "Iso 95 +GL ", "Iso 95 +GW" c. Apache Products "Apache Pyrox", "Apache White Line" or "Apache Tapered Pyrox" d. Johns Manville "ENRGY 1 -A, 1 -M, or 1G" e. "Sarnatherm I ", "Samatherm II" f. Atlas Roofing ACFoam II g. "Samatherm a" h. "Sarnatherm ", Tapered Samatherm ", "Samatherm Perlite Composite ", 'Tapered Sarnatherm Perlite Composite", " Sarnatherm Woodfiber Composite ", "Tapered Samatherm Woodfiber Composite" or "Samatherm Nailboard" Barrier: — 3/8 inch min gypsum board, mechanically fastened with metal insulation fasteners (6 in. offset gypsum board joints from insulation board joints). Membrane: — "S327 ", "S327 -14 ", "S327 -18 ", "S327 -20" or "S327 -24" (PVC) 7. Deleted. 8. Deck: NC Incline: No Limitation Barrier Board: — 3/8 in. min gypsum board or G -P Gypsum DensDeck ®. Membrane: — "S327 ", "S327 -14 ", "S327 -15 ", "S327 -18 ", "S327 -20" or "S327 -24" (PVC) 9. Deck: 15/32 Indine: No Limitations Barrier Board: — 5/8 in. (min) gypsum board, mechanically fastened with metal insulation fasteners 6 in. offset gypsum board joints from the plywood joints. Membrane: — "S327 ", "S327 -14 ", "S327 -15 ", "S327 -18 ", "S327 -20" or "S327 -24" (PVC) 10. Deleted. 11. Deck: NC Incline: 3 Membrane: — "G410 /felt" or "S327 /felt" (PVC), 48 or 60 mil. 12. Deleted. 13. Deleted. 14. Deck: C -3/8 Indine: No Limitations Insulation: — 3/4 in. (min) perlite with all joints staggered 6 in. min from the plywood joints. Barrier Board: — 1/4 in. G -P Gypsum DensDeck® with all joints staggered 6 in. min from the insulation joints. Membrane: — "S327" (PVC). 15. Deck: C 1 -1/2 TG Indine: 4 -1/2 Insulation: — 'Thermax Top RII ", "Thermax Hy -Tec ", 'Thermax Hy -Tec II ". Barrier: — 3/8 in. min gypsum board, mechanically fastened with metal insulation fasteners (6 in. offset gypsum board joints from insulation board joints). Membrane: — "S327 ", "S327 -14 ", "S327 -18 ", "S327 -20" or "S327 -24" (PVC). 16. Deck: C -2 T &G Indine: 2 Insulation: — Atlas Roofing "ACFoam II" , 2.7 in. thick min. Membrane: — "S327" (PVC). 17. Deck: C -2 T &G Indine: 1 -1/2 Insulation: — Hunter Panels "H- Shield ", "Samatherm ", Tapered Samatherm ", "Samatherm Perlite Composite ", "Tapered Samatherm Perlite Composite ", "Samatherm Woodfiber Composite", "Tapered Sarnatherm Woodfiber Composite" or "Samatherm Nailboard", 2.7 in. thick min. Membrane: — "S327" (PVC). 18. Deck: C -15/32 Indine: Unlimited Barrier Board: — Minimum Vt-in. thick "DensDeck® Roofboard" or "DensDeck Prime® Roofboard" or htt p:// database. ul. com /cgi- bin/XYV /template/LIS... ion= versioniess& parent _id= 10739935978sequence =1(20 of 22) [2/10/2009 4:50:51 PM] TCU.R8992 - Roofing Systems "DensDeck DuraGuardT" Roofboard," mechanically fastened with all butt joints staggered a min of 6 in. from the plywood deck joints. Membrane: — "S327 -15 EEL H RAL 8029" (PVC) 60 mil (1.5 mm), mechanically fastened. 19. Deck: NC Indine: Unlimited Barrier Board (Optional): — Minimum 1 /4 -in. thick "DensDeck@ Roofboard" or "DensDeck Prime@ Roofboard" or "DensDeck DuraGuardTM Roofboard," mechanically fastened with all butt joints staggered a min of 6 in. from the plywood deck joints. Membrane: — "S327 -15 EEL H RAL 8029" (PVC) 60 mil (1.5 mm), mechanically fastened. 20. Deck: C -15/32 Indine: 2 Barrier Board: — Minimum thick "DensDeck@ Roofboard" or "DensDeck Prime@ Roofboard" or "DensDeck DuraGuardTM Roofboard," mechanically fastened with all butt joints staggered a min of 6 in. from the plywood deck joints. Membrane: — "TS 77 -20" (TPO) 80 mil (2.0 mm), mechanically fastened. 21. Deck: NC Indine: 2 Barrier Board (Optional): — Minimum Vs-in. thick "DensDeck@ Roofboard" or "DensDeck Prime@ Roofboard" or "DensDeck DuraGuardT" Roofboard," mechanically fastened with all butt joints staggered a min of 6 in. from the plywood deck joints. Membrane: — "TS 77 -20" (TPO) 80 mil (2.0 mm), mechanically fastened. 1. Deck: C -1 -1/2 T &G Indine: 1 Barrier Board: — 15/32 in. min plywood. Insulation (Optional): — Any thickness: Class C - Mechanically Fastened a. "Sarnatherm I" or "Samatherm II" b. Apache Products "Apache Pyrox" c. Rmax "Multi -Max FA" d. Johns Manville "ENRGY 2 -A" or "2G" e. Atlas Roofing "ACFoam II" f. "Sarnafil a" Membrane: — "S327 ", "S327 -14 ", "S327 -15 ", "S327 -18 ", "S327 -20" or "S327 -24" (PVC). 2. Deck: C -15/32 Indine: 2 Insulation: — One of the following or combinations -one or multiple layers 1.2 in. min thickness with the bottom layer insulation board with the joints staggered 6 in. from the plywood joints. a. "Sarnatherm I" or "Sarnatherm II" b. Apache Products "Apache Pyrox" c. Rmax "Multi -Max FA" d. Johns Manville "ENRGY 2" e. Atlas Roofing "ACFoam II" or "ACFoam III" f. "Sarnafil a" Membrane: — "S327 ", "S327 -14 ", "S327 -15 ", "S327 -18 ", "S327 -24" (PVC). Questions? Notice of Disclaimer http: / /database.ul.com/cgi- bin /XW /template/LIS... ion= versionless& parent _id= 1073993597&sequence =1 (21 of 22) [2/10/2009 4:50:51 PM] Last Updated on 2008 -05 -02 Page Top T(U.R8992 - Roofing Systems The appearance of a company's name or product in this database does not in itself assure that products so identified have been manufactured under UL's Follow -Up Service. Only those products bearing the UL Mark should be considered to be Listed and covered under UL's Follow -Up Service. Always look for the Mark on the product. UL permits the reproduction of the material contained in the Online Certification Directory subject to the following conditions: 1. The Guide Information, Designs and/or Listings (files) must be presented in their entirety and in a non - misleading manner, without any manipulation of the data (or drawings). 2. The statement "Reprinted from the Online Certifications Directory with permission from Underwriters Laboratories Inc." must appear adjacent to the extracted material. In addition, the reprinted material must include a copyright notice in the following format: "Copyright © 2009 Underwriters Laboratories Inc. ®" http: // database. ul. com /cgi- bin/XYV /tempiate/LLS... Ion= versbnless &parent_id= 1073993597&sequence =1(22 of 22) [2/10/2009 4:50:51 PM] Copyright© 2009 Underwriters Laboratories Inc.® Product Data Sheet Edition: 7/2008 Version no.: 0006 Installation: Availability: Maintenance: t O'1 oso FILE COPY Permit Composition: Sikaplan® 60 is a white, 60 mil. nominal, PVC membrane Sikaplan 60 is manufactured with a polyester scrim for reinforcement. Sikaplan 60 meets the cool roofing requirements of Califomia's Title 24, USGBC's LEED® program and Green Globes. The membrane meets initial Energy Sta Reflectivity Requirements with an initial solar reflectance of 0.81 an initial solar emmitance of 0.85 and a SRI of 101. Three year, aged membrane reflectivity testing results are pending. Sikaplan 60 comes in 10 feet x 100 feet rolls weighing approx. 360 Ibs and 5 feet x 100 feet rolls weighing approx. 180 Ibs. Sikaplan 60 membrane is wrapped in a clear protective film and strapped 8 rolls to a wooden pallet. Sikaplan 60 is installed by a Sika Samafil Authorized Applicator. Sikaplan 60 shall be installed to an acceptable substrate with fasteners and plates in the seam overlap in the "Sikaplan Mechanically Attached System ". All seams will be hot -air welded for watertight protection. Sikaplan 60 can be used on flashings on Sikaplan roof assemblies. Sikaplan 60 is available directly from a Sika Samafil Authorized Applica- tor or by contacting your Sika Sarnafil regional office. For office locations please contact Sika Samafil. Upon successful completion of the installed roof by the Sika Samafil Autho- rized Applicator, Sika Samafil will provide a warranty to the building owner via the applicator. Sikaplan 60 requires no maintenance. As a prudent preventative measure, Sika Samafil recommends that the building owner or owner's representative inspect the installed roof system for damage, plugged drains, weathered sealants, etc. at least twice a year and after each storm. RECEIVED APR 0 8 2009 PERMIT CENTER Sarnafil® Technical: Technical Data (as manufactured): Parameters Reinforcing Material Overall Thickness, min. Thickness Over Scrim Breaking Strength, min., Ibf /in. (KN /m) Elongation at Break, min. Machine Direction Cross Direction Seam Strength, min., (% of breaking strength) Retention of Properties After Heat Aging Tensile Strength, min., (% of original) Elongation, min., (% of original) Tearing Strength, min., Ibf (N) Low Temperature Bend, -40 °F (-40 °C) Accelerated Weathering Test (Florescent Light, UV exposure) Cracking (7x magnification) Discoloration (by observation) Crazing (7x magnification) Linear Dimensional Change Weight Change After Immersion in Water Static Puncture Resistance, 33 Ibf (15 kg) Dynamic Puncture Resistance, 14.7 ft-lbf (20 J) Initial Solar Reflectance Emissivity Solar Reflective Index (SRI) Corporate Office Sika Sarnafil A Division of Sika Corporation 100 Dan Road Canton, MA 02021 Tel.: (781) 828 -5400 1- 800 -451 -2504 Fax: (781) 828 -5365 Web: www.sikacorp.com Sika Sarnafil's Technical Representatives are available to advise applica- tors as to the correct installation methods of Sikaplan 60. ASTM Test Method D751 D751 D751 D751 D751 D3045 D751 D751 D1004 D2136 G154 D1204 D570 D5602 D5635 E903 E408, C1371, Other E1980 Email: webmaster.samafil @us.sika.com ASTM D-4434 Spec. Pea ulrement 0.045 (1.14) 200 (35.0) 15% 15% 75 90 90 45.0 (200) Pass 5,000 Hours None Negligible None 0 5% max. t 3.0% max. Pass Pass Tel.: (905) 670 -2222 1-800- 268 -0479 Fax: (905) 670 -5278 Web: www.sika.ca Typical Physical Properties Polyester 0.060 (nominal) 0.026 (avg.) 303 (53.1) 42% 47% 85 95 90 50 (220.0) Pass 10,000 Hours None Negligible None 0.24% 2.5% Pass Pass 0.81 0.85 101 Canada Office Sika Sarnafil A Business Unit of Sika Canada 6820 Davand Drive Mississauga, ON L5T 1J5 Disclaimer: The information, and, in particular, the recommendation relating to the application and end -use of Sika Semafil products, am given in good faith based on Sika Samafil's current knowledge and experience of the products when property stored, handled and applied under normal conditions in accordance with Sika Sarnafil recommendations. In practice, the differences in materials, substrates and actual site conditions am such that no war- ranty in respect of merchantability of fitness fora pardcularpurpose, norany liability arising out of any legal relationship whatsoever, may be Inferred from this Information. The user of the product must determine the product's suitability for the intended application and purpose. Sika Samafi/ reserves the nght to change the properties of its products. The propnetary nghts of third parties must be observed. All orders are accepted subject to our current terms of sale and delivery Users must always refer to the most recent issue of the local Product Data Sheet for the product concerned, copies of which will be supplied on request. FILE COPY Permit No. . _ ,.. a "wow. Avid nmteeinnt Sika Sarnafil's Sikaplan Mechanically- Attached System DO 030 RECEIVED APR 0 8 2009 PERMIT CENTER Sika Sarnafil Roofing Specification Manual Sikaplan Mechanically - Attached - Contents Part 1 - General Conditions 1.01 Description 1 1.02 Quality Assurance 1 1.03 Submittals 1 1.04 Product Delivery, Storage and Handling 2 1.05 Job Conditions 2 1.06 Warranties 4 Part 2 - Products 2.01 General 4 2.02 Membrane 5 2.03 Flashing Materials 5 2.04 Insulation /Overlayment/Recover Board 5 2.05 Attachment Components 6 2.06 Deck Primers 6 2.07 Vapor Barrier 7 2.08 Miscellaneous Accessories 7 2.09 Sealants and Pitch Pocket Fillers 7 2.10 Miscellaneous Fasteners and Anchors 7 Part 3 - Execution 3.01 Pre - Construction Conference 8 3.02 Substrate Condition 8 3.03 Substrate Inspection 8 3.04 Substrate Preparation 8 3.05 Vapor Barrier /Air Barrier Installation (As Required by Designer) 8 3.06 Wood Nailer Installation 10 3.07 Insulation Installation 10 3.08 Separation Layer Installation 10 3.09 Membrane Attachment 11 3.10 Hot -Air Welding of Seam Overlaps 12 3.11 Membrane Flashings 13 3.12 Metal Flashings 13 3.13 Sarnaclad Metal Base Flashings /Edge Metal 14 3.14 Edge -Tite Metal 14 3.15 Anchor -Tite Metal 15 3.16 Walkway Installation 15 3.17 Temporary Cut -Off 15 3.18 Completion 16 3.19 Details 16 5 -08 1 -i Sika Sarnahl Roofin • S • ecification Manual Sika • Ian Mechanicall - Attached - Contents 5 -08 1 -11 Sika Sarnafil Roofing Specification Manual Sikaplan Mechanically - Attached System PART 1 - GENERAL CONDITIONS 1.01 DESCRIPTION A. Scope SECTION 075419.11 SIKAPLAN MECHANICALLY - ATTACHED To install a complete Sika Sarnafil mechanically- attached roofing system including Sikaplan membrane, flashings and other components. B. Related Work The work includes but is not limited to the installation of: 1. Removal of Existing Roofing and Insulation 2. Substrate Preparation 3. Roof Drains 4. Vapor Barrier 5. Wood Blocking 6. Insulation 7. Separation Layers 8. Roof Membrane 9. Fasteners 10. Adhesive for Flashings 11. Roof Membrane Flashings 12. Walkways 13. Metal Flashings 14. Sealants C. Upon successful completion of work the following warranties may be obtained: 1. Sika Sarnafil Warranty 2. Roofing Contractor Warranty 1.02 QUALITY ASSURANCE A. This roofing system shall be applied only by a Roofing Contractor authorized by Sika Sarnafil prior to bid (Sika Sarnafil "Applicator"). B. Upon completion of the installation an inspection may be made by a Technical Representative of Sika Sarnafil to determine that the visible elements of the roofing system have been installed in accordance with the project specification, details and approved changes wherever a Standard or System warranty has been specified. C. There shall be no deviation made from the Project Specification or the approved shop drawings without prior written approval by the Owner, the Owner's Representative and Sika Sarnafil. D. Applicable code /insurance requirements shall be identified by the owner or owner's representative. 1.03 SUBMITTALS A. Shop drawings required by the project specifications shall be accepted by Sika Sarnafil prior to submittal. B. The contractor shall submit written verification from Sika Sarnafil that they are an authorized contractor. C. The contractor shall verify that the specifications for the roofing project are in accordance with Sika Sarnafil. 5-08 1 -1 Sika Sarnafil Roofing Specification Manual Sikaplan Mechanically - Attached System D. Sample copy of Sika Sarnafil's warranty. E. Sample copy of Applicator's warranty. F. Certifications by manufacturers of roofing and insulating materials that all materials supplied comply with all requirements of the identified ASTM and other industry standards or practices. G. Certification from the Applicator that the system specified meets code and insurance requirements as. 1.04 PRODUCT DELIVERY, STORAGE AND HANDLING A. All products delivered to the job site shall be in the original unopened containers or wrappings bearing all seals and approvals. B. Handle all materials to prevent damage. Place all materials on pallets and fully protect from moisture. C. Membrane rolls shall be stored lying down on pallets and fully protected from the weather with clean canvas tarpaulins. Unvented polyethylene tarpaulins are not accepted due to the accumulation of moisture beneath the tarpaulin in certain weather conditions that may affect the ease of membrane weldability. D. As a general rule all adhesives shall be stored at temperatures between 40° F (5° C) and 80° F (27° C). Read instructions contained on adhesive canister for specific storage instructions. E. All flammable materials shall be stored in a cool, dry area away from sparks and open flames. Follow precautions outlined on containers or supplied by material manufacturer /supplier. F. Any materials which the owner's representative and /or Sika Sarnafil determine to be damaged are to be removed from the job site and replaced at no cost to the owner. G. Material Safety Data Sheets (MSDS) shall be available at the job site at all times. 1.05 JOB CONDITIONS [Note to Specifier: If required, select item Z below.] A. Sika Sarnafil materials may be installed under certain adverse weather conditions but only after consultation with Sika Sarnafil, as installation time and system integrity may be affected. B. Only as much of the new roofing as can be made weathertight each day, including all flashing and detail work, shall be installed. All seams shall be heat welded before leaving the job site that day. C. All work shall be scheduled and executed without exposing the interior building areas to the effects of inclement weather. The existing building and its contents shall be protected against all risks. D. All surfaces to receive new insulation, membrane or flashings shall be dry. Should surface moisture occur, the Applicator shall provide the necessary equipment to dry the surface prior to application. E. All new and temporary construction, including equipment and accessories, shall be secured in such a manner as to preclude wind blow -off and subsequent roof or equipment damage. F. Uninterrupted waterstops shall be installed at the end of each day's work and shall be completely removed before proceeding with the next day's work. Waterstops shall not emit dangerous or unsafe fumes and shall not remain in contact with the finished roof as the installation progresses. Contaminated membrane shall be replaced at no cost to the Owner. G. The Applicator is cautioned that certain Sikaplan membranes are incompatible with asphalt, coal tar, heavy oils, roofing cements, creosote and some preservative materials. Such materials shall not remain in contact with Sikaplan membranes. The Applicator shall consult Sika Sarnafil regarding compatibility, precautions and recommendations. 5 -08 1 -2 Sika Sarnafil Roofing Specification Manual Sikaplan Mechanically - Attached System H. Arrange work sequence to avoid use of newly constructed roofing as a walking surface or for equipment movement and storage. Where such access is absolutely required, the Applicator shall provide all necessary protection and barriers to segregate the work area and to prevent damage to adjacent areas. A substantial protection layer consisting of plywood over Sarnafelt or plywood over insulation board shall be provided for all new and existing roof areas that receive rooftop traffic during construction. I. Prior to and during application, all dirt, debris and dust shall be removed from surfaces either by vacuuming, sweeping, blowing with compressed air and /or similar methods. J. The Applicator shall follow all safety regulations as required by OSHA and any other applicable authority having jurisdiction. K. All roofing, insulation, flashings and metal work removed during construction shall be immediately taken off site to a legal dumping area authorized to receive such materials. Hazardous materials, such as materials containing asbestos, are to be removed and disposed of in strict accordance with applicable City, State and Federal requirements. L. All new roofing waste material (i.e., scrap roof membrane, release paper, empty cans of adhesive) shall be immediately removed from the site by the Applicator and properly transported to a legal dumping area authorized to receive such material. M. The Applicator shall take precautions that storage and /or application of materials and /or equipment does not overload the roof deck or building structure. N. Installation of a Sikaplan membrane over coal tar pitch or a resaturated roof requires special consideration to protect the Sikaplan membrane from volatile fumes and materials. Consult Sika Sarnafil for precautions prior to bid. O. Flammable adhesives and deck primers shall not be stored and not be used in the vicinity of open flames, sparks and excessive heat. P. All rooftop contamination that is anticipated or that is occurring shall be reported to Sika Sarnafil to determine the corrective steps to be taken. Q. The Applicator shall verify that all roof drain lines are functioning correctly (not clogged or blocked) before starting work. Applicator shall report any such blockages in writing (letter copy to Sika Sarnafil) to the Owner's Representative for corrective action prior to the installation of the Sika Sarnafil roof system. R. Applicator shall immediately stop work if any unusual or concealed condition is discovered and shall immediately notify Owner of such condition in writing for correction at the Owner's expense (letter copy to Sika Sarnafil). S. Site cleanup, including both interior and exterior building areas that have been affected by construction, shall be completed to the Owner's satisfaction. T. All landscaped areas damaged by construction activities shall be repaired at no cost to the Owner. U. The Applicator shall conduct fastener pullout tests in accordance with the latest version of the SPRI /ANSI Fastener Pullout Standard to help verify condition of the deck/substrate and to confirm expected pullout values. V. The Sikaplan membrane shall not be installed under the following conditions without consulting Sika Sarnafil's Technical Dept. for precautionary steps: 1. The roof assembly permits interior air to pressurize the membrane underside. 2. Any exterior wall has 10% or more of the surface area comprised of opening doors or windows. 3. The wall /deck intersection permits air entry into the wall flashing area. W. Precautions shall be taken when using Sarnacol adhesives at or near rooftop vents or air intakes. Adhesive odors could enter the building. Coordinate the operation of vents and air intakes in such a 5-08 1 -3 Sika Sarnafil Roofing Specification Manual Sikaplan Mechanically - Attached System manner as to avoid the intake of adhesive odor while ventilating the building. Keep lids on unused cans at all times. X. Protective wear shall be worn when using solvents or adhesives or as required by job conditions. Y. Sikaplan membranes are slippery when wet or covered with snow, frost, or ice. Working on surfaces under these conditions is hazardous. Appropriate safety measures must be implemented prior to working on such surfaces. Always follow OSHA and other relevant fall protection standards when working on roofs. Z. The existing pvc roof membrane is to be recycled by the manufacturer of the replacement membrane. Contractor is responsible for all costs associated with removing the membrane, preparing it and loading it for shipment, according to the manufacturer's published procedures. 1.06 WARRANTIES [Note to Specifier: Select A, B, or C. D and E should always be specified.] A. Sika Sikaplan membrane Warranty Upon successful completion of the work to Sika Sarnafil's satisfaction and receipt of final payment, the Sika Sikaplan membrane Warranty shall be issued. B. Sika Sarnafil Standard Warranty Upon successful completion of the work to Sika Sarnafil's satisfaction and receipt of final payment, the Sika Sarnafil Standard Warranty shall be issued. C. Sika Sarnafil System Warranty (only products purchased from Sika Sarnafil are covered under System Warranty) Upon successful completion of the work to Sika Sarnafil's satisfaction and receipt of final payment, the Sika Sarnafil System Warranty shall be issued. D. Applicator /Roofing Contractor Warranty The Applicator shall supply the Owner with a separate workmanship warranty. In the event any work related to roofing, flashing, or metal is found to be within the Applicator warranty term, defective or otherwise not in accordance with the Contract Documents, the Applicator shall repair that defect at no cost to the Owner. The Applicator's warranty obligation shall run directly to the Owner, and a copy shall be sent to Sika Sarnafil. E. Owner Responsibility Owner shall notify both Sika Sarnafil and the Applicator of any leaks as they occur during the time period when both warranties are in effect. PART 2- PROOUCTS 2.01 GENERAL A. All components of Sika Sarnafi's Sikaplan mechanically- attached roof system shall be manufactured, supplied or accepted by Sika Sarnafil. B. Manufacturer to have a minimum of two years experience recycling their membranes at the end of their service life back into new membrane products. Provide a minimum of five reference projects. C. Condensation or moisture migration into the roof system must be controlled so that it does not compromise the performance of the insulation and other components of the assembly. Moisture vapor tends to migrate from warmer to cooler areas. Air /vapor retarders are used to inhibit or block the flow of 5 -08 1-4 Sika Sarnafil Roofing Specification Manual Sikaplan Mechanically - Attached System warm moist air into the roof system. To determine if an air /vapor barrier is necessary, a design professional with experience with air handling and moisture control should be consulted. Special consideration should be given to construction related moisture. An example is the significant amount of moisture generated when concrete floor slabs are poured after the roof has been installed. Sika Sarnafil is not responsible for damage to the insulation when exposed to construction related moisture. 2.02 MEMBRANE A. Sikaplan polyester reinforced membrane. [Note to Specifier: Various Sikaplan membranes are listed. Generally physical properties such as puncture resistance increase as membrane thickness increases. Select appropriate product.] 1. 5 Sikaplan 45 (1.1 mm), thermoplastic membrane with polyester reinforcement. 2. 5 Sikaplan 60 (1.5 mm), thermoplastic membrane with polyester reinforcement. 3. 10 Sikaplan 45 mil (1.1 mm), thermoplastic membrane with polyester reinforcement. 4. 1o Sikaplan 60 mil (1.5 mm), thermoplastic membrane with polyester reinforcement. B. Typical Physical Properties See product data sheet. 2.03 FLASHING MATERIALS Consult respective product data sheets for additional information. A. Wall /Curb Flashings 1. Sikaplan Membrane flashing 2. Sarnaclad laminated metal flashing 3. Prefabricated flashings B. Perimeter Edge Flashings 1. Edge -Tite Flashing 2. Anchor -Tite Flashing 3. Sarnaclad 4. Non - Typical Edge C. Miscellaneous Flashings 1. Sarnacorners - Universal Prefabricated outside and inside flashing corners made of 0.060 inch (60 mil /1.5 mm) thick membrane that are heat - welded to membrane or Sarnaclad base flashings. 2. Multi- Purpose Sealant A proprietary sealant used at flashing terminations. 3. Sarnacol 2170 Adhesive A solvent -based reactivating -type adhesive used to attach membrane to flashing substrate. 2.04 INSULATION /OVERLAYMENT /RECOVER BOARD Consult respective product data sheets for additional information. A. Sarnatherm Rigid isocyanurate foam insulations with black mat, treated glass, or foil facers. B. DensDeck A siliconized gypsum, fire- tested hardboard with glass -mat facers. C. Securock A fire- tested, homogenous fiber reinforced gypsum roof board. 5-08 1 -5 Sika Sarnafil Roofing Specification Manual Sikaplan Mechanically - Attached System 2.05 ATTACHMENT COMPONENTS Consult respective product data sheets for additional information. A. Sarnaplate Used with various Sarnafasteners to attach insulation boards to roof deck. B. Sarnaplate -HD /CD Used with Sarnafastener -HD or Sarnafastener -CD10 to attach insulation boards to wood or concrete roof decks. C. Sarnaplate - Preassembled Combination of a 3 inch round plate and a #12 fastener used to attach insulation boards to steel or wood roof decks. D. Sarnafastener #12 A #12 corrosion - resistant fastener used with Sarnaplates to attach insulation boards to steel or wood roof decks. E. Sarnafastener -XP A #15, heavy -duty, corrosion - resistant fastener used with Sarnaplate to attach insulation or Sarnadisc, Sarnadisc -XPN, Sarnarail and Sarnabar to attach roof membrane to steel or wood roof decks. F. Sarnafastener - MAXLoad A specially designed, heavy -duty, corrosion - resistant fastener used with the Sarnadisc - MAXLoad or Sarnarail polymeric batten strip to clamp the roof membrane to roof decks. Sarnafastener - MAXLoad may also be used to secure and Sikaplan roof membrane to roof decks. G. Sarnafastener -CD10 A nail -in, corrosion - resistant fastener used with Sarnaplate- HD /CD, Sarnastop or Sarnabar to attach insulation or membrane to normal weight concrete roof deck. H. Sarnadisc 2 -3/8" A 2 -3/8 in. diameter high strength plate used with a Sarnafastener to attach the roof membrane to steel and wood roof decks. Sarnadisc -XPN A high strength linear plate used with a Sarnafastener to attach the roof membrane to steel, wood or concrete roof decks. J. Sarnadisc - MAXLoad A large diameter high strength plate used with the Sarnafastener — MAXLoad to attach the roof membrane to steel and wood roof decks. K. Sarnarail A one inch wide, low profile, polymeric batten strip used with Sarnafastener -XP and Sarnafastener- MAXLoad to clamp Sika Plan roof membrane to the roof deck. L. Sarnabar A heavy -duty, 14 gauge, galvanized, roll- formed steel bar used to attach membrane to the roof deck. K. Sarnacord A 5/32 inch (4 mm) diameter, red - colored, flexible thermoplastic extrusion that is welded to the top surface of the Sikaplan membrane and against the side of the Sarnabar, used to hold the membrane in position. 2.06 DECK PRIMERS A. Sarnavap Self- Adhered Primer 5 -08 1-6 Sika Sarnafil Roofing Specification Manual Sikaplan Mechanically- Attached System A solvent -based primer designed for use with Sarnavap Self- Adhered vapor barrier to prime wood, concrete, lightweight concrete, gypsum boards and decks, and DensDeck® boards prior to the application Sarnavap Self- Adhered vapor barrier. Consult Product Data Sheet for additional information. B. Sarnavap Self- Adhered Primer WB A water -based primer designed for use with Sarnavap Self- Adhered vapor barrier to promote adhesion to most substrates. Particularly recommended when use of solvent -based primer is not advised and /or permitted. Consult Product Data Sheet for additional information. 2.07 VAPOR BARRIER Consult respective product data sheets for additional information. A. Sarnavap -10 A 10 mil (0.25 mm) thick polyethylene vapor barrier /air barrier. B. Sarnavap Self- Adhered A 32 mil (0.8 mm) self- adhesive vapor barrier that can also serve as temporary roof protection. 2.08 MISCELLANEOUS ACCESSORIES A. Multi- Purpose Tape A high performance sealant tape used with metal flashings as a preventive measure against air and wind blown moisture entry. B. Sarnamatic 641 me or 661 220 volt, self - propelled, hot -air welding machine used to seal Sikaplan membrane seams. C. Sarnasolv A high quality solvent cleaner used for the general cleaning of residual asphalt, scuff marks, etc., from the membrane surface. Sarnasolv is also used daily to clean seam areas prior to hot -air welding in tear off or dirty conditions or if the membrane is not welded the same day it is unrolled. 2.09 SEALANTS AND PITCH POCKET FILLERS A. Sarnafil Multi- Purpose Sealant (for termination details). B. Sarnacol 2165 Adhesive (two- component urethane adhesive for pitch pocket toppings). C. Depending on substrates, the following sealants are options for temporary overnight tie -ins: 1. Type III hot asphalt conforming to ASTM D312 (latest revision). 2. Sarnacol 2165 Adhesive. 3. Multiple layers of roofing cement and felt. 4. Spray - applied, water- resistant urethane foam. 5. Mechanical attachment with rigid bars and compressed sealant. 2.10 MISCELLANEOUS FASTENERS AND ANCHORS A. All fasteners, anchors, nails, straps, bars, etc. shall be post - galvanized steel, aluminum or stainless steel. Mixing metal types and methods of contact shall be assembled in such a manner as to avoid galvanic corrosion. Fasteners for attachment of metal to masonry shall be expansion type fasteners with stainless steel pins. All concrete fasteners and anchors shall have a minimum embedment of 1% inch (32 mm) and shall be approved for such use by the fastener manufacturer. All miscellaneous wood fasteners and anchors used for flashings shall have a minimum embedment of 1 inch (25 mm) and shall be approved for such use by the fastener manufacturer. PART 3 - EXECUTION 5 -08 1 -7 • Sika Sarnafil Roofing Specification Manual Sikaplan Mechanically- Attached System 3.01 PRE - CONSTRUCTION CONFERENCE A. The primary contractor shall conduct a pre - roofing conference before any work begins, so all parties involved in the roofing system construction, or who may work on or through the roofing system, understand their obligations with respect to the roofing membrane. 3.02 SUBSTRATE CONDITION A. Applicator shall be responsible for acceptance or provision of proper substrate to receive new roofing materials. B. Applicator shall verify that the work done under related sections meets the following conditions: 1. Roof drains and /or scuppers have been reconditioned and /or replaced and installed properly. 2. Roof curbs, nailers, equipment supports, vents and other roof penetrations are properly secured and prepared to receive new roofing materials. 3. All surfaces are smooth and free of dirt, debris and incompatible materials. 4. All roof surfaces shall be free of water, ice and snow. 3.03 SUBSTRATE INSPECTION A. A dry, clean and smooth substrate shall be prepared to receive Sika Sarnafil's Sikaplan mechanically - attached roof system. B. The substrate shall be clean, smooth, dry, free of flaws, sharp edges, loose and foreign material, oil and grease. Roofing shall not start until all defects have been corrected. C. All roof surfaces shall be free of water, ice and snow. D. Sikaplan shall be applied over compatible and accepted substrates only. E. The existing pvc roof membrane is to be recycled by the manufacturer of the replacement membrane. Contractor is responsible for all costs associated with removing the membrane, preparing it and loading it for shipment, according to the manufacturer's published procedures. 3.04 SUBSTRATE PREPARATION A. For existing gravel surfaces: Gravel shall be removed or leveled. If necessary, accumulations of bitumen or other irregularities shall be scratched and removed so as to produce a flat, smooth surface. Insulation boards shall lay flat from one board to another. B. All areas of wet insulation shall be removed and replaced. C. Surfaces on which the Sikaplan membrane is to be applied shall be compatible, clean, smooth, free of sharp edges, loose and foreign material, oil, grease and bitumen. D. When possible, work shall begin at the high point of the roofing area and proceed to the lowest point. 3.05 VAPOR BARRIER/AIR BARRIER INSTALLATION (AS REQUIRED BY DESIGNER) General Criteria: Interior (inside temperature /relative humidity) and /or exterior conditions may create a need for a vapor barrier. The design professional shall decide whether a vapor barrier is necessary. It is the design professional's responsibility to determine the type and location of a vapor barrier. If sealed properly, a vapor barrier can also act as an air barrier (positive pressure) for roofs intended over air - permeable decks (steel, wood, precast, etc.). When reroofing over the existing asphalt roof, the old roof may be considered to be an adequate vapor barrier /air barrier if the details are properly sealed. A. Sarnavap -10 5 -08 1-8 Sika Sarnafil Roofing Specification Manual Sikaplan Mechanically - Attached System 1. Steel Deck or Wood Deck (New Construction or Reroofing with Removal of Existing Roofing): Sarnavap -10 is loose -laid over suitable substrate. Overlap all edges 4 inches (100 mm) and seal with butyl tape. Extend Sarnavap -10 to perimeter and deck penetrations and seal to provide continuity of the building's air /vapor envelope. Sarnavap -10 must be sealed on the vertical surface at roof penetrations also. B. Sarnavap Self- Adhered 1. Primer Application The substrate must be clean, dry and free of dust, grease or other contaminants. Shake well before using. Apply to clean and dry surfaces with a paint brush, roller or sprayer. Application rates will vary depending on substrate. Sarnavap Self- Adhered vapor barrier must be installed on the same day as the primer application. Acceptable substrates for primer application include wood, concrete, lightweight concrete, gypsum boards and decks, and DensDeck® boards. Drying time is typically 30 minutes to 3 hours. Spraying equipment recommendations: a) Spray tip size: between 20 and 25 mils. b) Pressure: 1300 psi continuous To Install: a) Apply primer to prepared substrate. b) Allow primer to dry completely. c) Install Sarnavap Self- Adhered vapor barrier. Notes: a) Do not install when it is raining, snowing, or on wet/humid surfaces. b) Install Sarnavap Self- Adhered Primer at temperatures 32 °F (0 °C) and above. Average coverage rate is 0.25 to 1.22 gal. /sq. (0.1 to 0.5 Um c) Install Sarnavap Self- Adhered Primer WB at temperatures 41 °F (5 °C) and above. Average coverage rate is 0.25 to 0.75 gal. /sq. (0.1 to 0.3 Um KEEP FROM FREEZING. d) Do not use Sarnavap Self- Adhered Primer WB to seal Sarnavap Self- Adhered vapor barrier membrane joints. e) Sarnavap Self- Adhered Primer WB is not suitable for plastic surfaces. f) Do not use Sarnavap Self- Adhered Primer WB on asphaltic boards. 2. Membrane Application Over Steel, Wood or Concrete Deck (New Construction or Reroofing with Removal of Existing Roofing): Install Sarnavap Self- Adhered over a clean and dry substrate. In concrete applications allow concrete to cure for at least 7 days. Do not install when it is raining, snowing, or on wet/humid surfaces. Install in temperatures 32 °F (0 °C) and above. The use of a primer is required on the following substrates: wood, concrete, lightweight concrete, gypsum boards and decks, and DensDeck® boards. On metal decks use a metal plate (6 x 42 in. - 15 x 106 cm) to support the membrane end lap between metal flutes ensuring a complete end lap seal. a) Begin application at the bottom of the slope. Unroll Sarnavap Self- Adhered onto the substrate without adhering for alignment. Overlap each preceding sheet by 3 in. (75 mm) lengthwise following the reference line and by 6 in. (150 mm) at each end. Stagger end laps by at least 12 in. (300 mm). Do not immediately remove the silicone release sheet. b) Once aligned, peel back a portion of the silicone release sheet and press the membrane onto the substrate for initial adherence. Hold Sarnavap Self- Adhered tight and peel back the release sheet by pulling diagonally. c) Use a 75 Ib. (34 kg) roller to press Sarnavap Self- Adhered down into the substrate including the laps. Finish by aligning the edge of the roller with the lower end of the side laps and rolling up the membrane. Do not cut the membrane to remove air bubbles trapped under the laps. Squeeze out air bubbles by pushing the roller to the edge of the laps. 5 -08 1 -9 Sika Sarnafil Roofin_q Specification Manual Sikaplan Mechanically - Attached System 3.06 WOOD NAILER INSTALLATION A. Install continuous treated wood nailers at the perimeter of the entire roof and around roof projections and penetrations as shown on the Detail Drawings. B. New and existing nailer attachment shall meet the requirements of the current Factory Mutual Loss Prevention Data Sheet 1-49. C. Thickness shall be as required to match substrate and /or insulation height to allow a smooth transition. D. Stainless steel, corrosion resistant, fasteners are required when mechanically attaching any Sika Sarnafil product to wood nailers and wood products treated with ACQ (Alkaline copper Quaternary). When ACQ treated wood is used on steel roof decks or with metal edge detailing, a separation layer must be placed between the metal and ACQ treated wood. 3.07 INSULATION INSTALLATION General Criteria: A. Insulation shall be installed according to insulation manufacturer's instructions. B. Insulation shall be neatly cut to fit around penetrations and projections. C. Install tapered insulation in accordance with insulation manufacturer's shop drawings. D. Install tapered insulation around drains creating a drain sump. E. Do not install more insulation board than can be covered with Sikaplan membrane by the end of the day or the onset of inclement weather. F. Use at least 2 layers of insulation when the total insulation thickness exceeds 2 -1/2 inches (64 mm). Stagger joints at least 12 inches (0.3 m) between layers. G. Mechanical Attachment 1. Insulation shall be mechanically fastened to the deck with approved fasteners and plates at a rate according to the insulation manufacturer's, FM's and Sika Sarnafil's recommendations for fastening rates and patterns. The quantity and locations of the fasteners and plates shall also cause the insulation boards to rest evenly on the roof deck/substrate so that there are no significant and avoidable air spaces between the boards and the substrate. Each insulation board shall be installed tightly against the adjacent boards on all sides. 2. Fasteners are to be installed consistently in accordance with fastener manufacturer's recommendations. Fasteners are to have minimum penetration into structural deck recommended by the fastener manufacturer and Sika Sarnafil. 3. Use fastener tools with a depth locator and torque - limiting attachment as recommended or supplied by fastener manufacturer to ensure proper installation. 3.08 SEPARATION LAYER INSTALLATION [Note to Specifier: Only needed over non - compatible insulation or substrate]. Approved separation layer shall be installed directly over expanded or extruded polystyrene (unless supplied with a approved, compatible facer). Unfaced polystyrene is incompatible with Sikaplan membranes without a separation layer. A. General Criteria 1. Separation layer shall be installed according to Sika Sarnafil's instructions. 2. Separation layer shall be neatly cut to fit around penetrations and projections. 5 -08 1 -10 Sika Sarnafil Roofing Specification Manual Sikaplan Mechanically - Attached System B. General 3. Do not install more separation layer than can be covered with Sikaplan membrane by the end of the day or the onset of inclement weather. 4. Mechanical Attachment: a) Separation layer shall be mechanically fastened to the deck with approved fasteners and plates at a rate according to Sika Sarnafil's recommendations for fastening rates and patterns. b) Fasteners are to be installed in accordance with fastener manufacturer's recommendations. Fasteners are to have minimum penetration into structural deck recommended by fastener manufacturer and Sika Sarnafil. c) Overlap separation layer edges 4 inches (100 mm) and fasten through the overlaps at 24 inches (0.6 m) on center using Sarnafasteners and Sarnaplates to hold in position. The installation of the separation layer is to be followed immediately by the installation of the Sikaplan membrane. 3.09 MEMBRANE ATTACHMENT A. The surface of the insulation or substrate shall be inspected prior to installation of Sikaplan roof membrane. The substrate shall be clean, dry, free from debris and smooth with no surface roughness or contamination. Broken, delaminated, wet or damaged insulation boards shall be removed and replaced. 1. Sikaplan membrane is to be attached with Sarnafasteners, Sarnarail, or Sarnabar according to Sika Sarnafil's and Factory Mutual's requirements. 2. Membrane overlaps shall be shingled with the flow of water where possible. 3. Sikaplan full -width rolls shall be fastened perpendicular to the direction of the deck where possible. 4. Fasteners shall clamp the Sikaplan membrane tightly to the substrate. 5. Tack welding of Sikaplan full or half -width rolls for purposes of temporary restraint during installation is not permitted. Consult Sika Sarnafil's Technical Department for further information. C. Perimeter and Corner Areas 1. Sarnafasteners and Sarnadiscs, Sarnarails, and Sarnabars are installed along the edge of the membrane on the fastening line at a spacing determined by Sika Sarnafil and the Owner's Representative /Designer. Sarnadisc 2 -3/8" is held back 5/8" (15.8 mm); Sarnadisc and Sarnadisc- XPN are held -back 1 inch (25 mm); Sarnadisc MAXLoad is held -back 1 -1/4 inch (31.8 mm); and Sarnarail is held back 2 -1/2 inch (63.5 mm) from the outer edge of the membrane. The adjacent half -roll is positioned to overlap the fastened edge of the first half -roll by 5 -1/2 inches (140 mm) for Sarnadisc, Sarnadisc -XPN, and Sarnarail; and 7 inches (177.8 mm) for Sarnadisc - MAXLoad in accordance with the overlap lines marked on it's edge. The 5 -1/2 inch (140 mm) overlap will allow the top membrane to extend 2 -1/2 inches (63 mm) past the Sarnadisc and Sarnadisc -XPN; and 2 inches (50.8 mm) past the Sarnarail for heat- welding. The 7 inch (177.8 mm) overlap will allow the top membrane to extend 2 -1/4 inches (57.2 mm) past the Sarnadisc - MAXLoad for heat - welding. In corner areas where perimeter half -rolls intersect, add rows of Sarnafasteners and Sarnadiscs over the top of the half -rolls and weld a coverstrip above them for watertightness. See Detail Drawings. Notes: a) Perimeter area is defined as the outer boundary of the roof. If the roof is broken into different levels, each roof area shall be treated as an individual roof with its outer boundary being treated as a perimeter. Typically, internal expansion joints and firewalls are not considered to be full perimeters. Refer to Factory Mutual's Data Sheet 1 -28 for more information. b) The ridge area is defined as the high point in the roof area formed by two intersecting planes. When the sum of the slopes is a minimum of 4 inches in 12 inches (30 degrees), each side of the ridge shall be treated as a perimeter area. 2. Hot -air weld overlaps according to Sika Sarnafil's requirements. Seam test cuts shall be taken at least 3 times per day. D. Interior Area 1. Sarnafasteners and Sarnadiscs, Sarnarails, or Sarnabars are installed along the edge of the membrane on the fastening line at a spacing determined by Sika Sarnafil and the Owner's 5 -08 1 -11 Sika Sarnafil Roofing Specification Manual Sikaplan Mechanically - Attached System A. General Representative /Designer. Sarnadisc 2 -3/8" is held back 5/8" (15.8 mm); Sarnadisc and Sarnadisc- XPN are held -back 1 inch (25 mm); Sarnadisc - MAXLoad is held back 1 -1/4 inch (31.8 mm); and Sarnarail is held back 2 -1/2 inch (63.5 mm) from the outer edge of the membrane. The adjacent full - roll is positioned to overlap the fastened edge of the first full -roll by 5 -1/2 inches (140 mm) for Sarnadisc, Sarnadisc -XPN and Sarnarail; and 7 inches (177.8 mm) for Sarnadisc - MAXLoad in accordance with the overlap lines marked on it's edge. The 5 -1/2 inch (140 mm) overlap will allow the top membrane to extend 2 -1/2 inches (63 mm) past the Sarnadisc and Sarnadisc -XPN; and 2 inches (50.8 mm) past the Sarnarail for heat - welding. The 7 inch (177.8 mm) overlap will the top membrane to extend 2 -1/4 inches (57.2 mm) past the Sarnadisc - MAXLoad for heat - welding. 2. Hot -air weld overlaps according to Sika Sarnafil's recommendations. Seam test cuts shall be taken at least 3 times per day. E. Securement Around Rooftop Penetrations 1. Around all perimeters, at the base of walls, drains, curbs, vent pipes, or any other roof penetrations, Sarnafasteners and Sarnadiscs, Sarnarail, or Sarnabar shall be installed according to perimeter rate of attachment. Fasteners shall be installed according to the manufacturer's instructions. Fasteners shall be installed using the fastener manufacturers recommended torque- sensitive fastening tools with depth locators. 2. Sikaplan membrane flashings shall extend 2 -1/2 inches (63 mm) past the Sarnadisc, Sarnadisc -XPN, and Sarnabar; 2 -1/4 inches (57.2 mm) past the Sarnadisc - MAXLoad; and 2 inches (50.8 mm) past the Sarnarail and be hot -air welded to the Sikaplan deck membrane. 3.10 HOT -AIR WELDING OF SEAM OVERLAPS 1. All seams shall be hot -air welded. Seam overlaps should be 5 -1/2 inches (140 mm) wide for Sarnadisc and Sarnadisc -XPN, and 7 inches (177.8 mm) wide for Sarnadisc - MAXLoad when automatic machine - welding and 4 inches (100 mm) wide when hand - welding, except for certain details. 2. Welding equipment shall be provided by or approved by Sika Sarnafil. All mechanics intending to use the equipment shall have successfully completed a training course provided by a Sika Sarnafil Technical Representative prior to welding. 3. All membrane to be welded shall be clean and dry. B. Hand - Welding Hand - welded seams shall be completed in two stages. Hot -air welding equipment shall be allowed to warm up for at least one minute prior to welding. 1. The back edge of the seam shall be welded with a narrow but continuous weld to prevent loss of hot air during the final welding. 2. The nozzle shall be inserted into the seam at a 45 degree angle to the edge of the membrane. Once the proper welding temperature has been reached and the membrane begins to "flow," the hand roller is positioned perpendicular to the nozzle and rolled lightly. For straight seams, the 1 -1/2 inch (40 mm) wide nozzle is recommended for use. For corners and compound connections, the 3/4 inch (20 mm) wide nozzle shall be used. C. Machine Welding 1. Machine welded seams are achieved by the use of Sika Sarnafil's automatic welding equipment. When using this equipment, Sika Sarnafil's instructions shall be followed and local codes for electric supply, grounding and over current protection observed. Dedicated circuit house power or a dedicated portable generator is recommended. No other equipment shall be operated simultaneously off the generator. 2. Metal tracks may be used over the deck membrane and under the machine welder to minimize or eliminate wrinkles. 5 -08 1 -12 Sika Sarnafil Roofing Specification Manual Sikaplan Mechanically- Attached System D. Quality Control of Welded Seams 1. The Applicator shall check all welded seams for continuity using a rounded screwdriver. Visible evidence that welding is proceeding correctly is smoke during the welding operation, shiny membrane surfaces, and an uninterrupted flow of dark grey material from the underside of the top membrane. On -site evaluation of welded seams shall be made daily by the Applicator at locations as directed by the Owner's Representative or Sika Sarnafil's representative. One inch (25 mm) wide cross - section samples of welded seams shall be taken at least three times a day. Correct welds display failure from shearing of the membrane prior to separation of the weld. Each test cut shall be patched by the Applicator at no extra cost to the Owner. 3.11 MEMBRANE FLASHINGS All flashings shall be installed concurrently with the roof membrane as the job progresses. No temporary flashings shall be allowed without the prior written approval of the Owner's Representative and Sika Sarnafil. Approval shall only be for specific locations on specific dates. If any water is allowed to enter under the newly completed roofing, the affected area shall be removed and replaced at the Applicator's expense. Flashing shall be adhered to compatible, dry, smooth, and solvent- resistant surfaces. Use caution to ensure adhesive fumes are not drawn into the building. A. Sarnacol Adhesive for Membrane Flashings 1. Over the properly installed and prepared flashing substrate, Sarnacol adhesive shall be applied according to instructions found on the Product Data Sheet. The Sarnacol adhesive shall be applied in smooth, even coats with no gaps, globs or similar inconsistencies. Only an area which can be completely covered in the same day's operations shall be flashed. The bonded sheet shall be pressed firmly in place with a hand roller. 2. No adhesive shall be applied in seam areas that are to be welded. All panels of membrane shall be applied in the same manner, overlapping the edges of the panels as required by welding techniques. B. Install Sarnabar /Sarnacord according to the Detail Drawings with approved fasteners into the structural deck at the base of parapets, walls and curbs. Sarnabars may be required by Sika Sarnafil at the base of all tapered edge strips and at transitions, peaks, and valleys according to Sika Sarnafil's details. C. Sika Sarnafil's requirements and recommendations and the specifications shall be followed. All material submittals shall have been accepted by Sika Sarnafil prior to installation. D. All flashings shall extend a minimum of 8 inches (0.2 m) above roofing level unless otherwise accepted in writing by the Owner's Representative and Sika Sarnafil Technical Department. E. All flashing membranes shall be consistently adhered to substrates. All interior and exterior corners and miters shall be cut and hot -air welded into place. No bitumen shall be in contact with the Sikaplan membrane. F. All flashing membranes shall be mechanically fastened along the counter - flashed top edge with Sarnastop at 6 -8 inches (0.15 -0.20 m) on center. G. Sarnafil flashings shall be terminated according to Sika Sarnafil recommended details. H. All adhered flashings that exceed 30 inches (0.75 m) in height or that of the perimeter Sarnabar spacings shall receive additional securement. Consult Sika Sarnafil Technical Department for securement methods. All mechanically- attached flashings that exceed 18 inches (0.46 m) in height shall receive additional securement. Consult Sika Sarnafil Technical Department for securement methods. 3.12 METAL FLASHINGS A. Metal details, fabrication practices and installation methods shall conform to the applicable requirements of the following: 5-08 1 -13 Sika Sarnafil Roofing Specification Manual Sikaplan Mechanically - Attached System 1. Factory Mutual Loss Prevention Data Sheet 1-49 (latest issue). 2. Sheet Metal and Air Conditioning Contractors National Association, Inc. (SMACNA) - latest issue. B. Metal, other than that provided by Sika Sarnafil, is not covered under the Sika Sarnafil warranty. C. Complete all metal work in conjunction with roofing and flashings so that a watertight condition exists daily. D. Metal shall be installed to provide adequate resistance to bending to allow for normal thermal expansion and contraction. E. Metal joints shall be watertight. F. Metal flashings shall be securely fastened into solid wood blocking. Fasteners shall penetrate the wood nailer a minimum of 1 inch (25 mm). G. Airtight and continuous metal hook strips are required behind metal fascias. Hook strips are to be fastened 12 inches (0.3 m) on center into the wood nailer or masonry wall. H. Counter flashings shall overlap base flashings at least 4 inches (100 mm). I. Hook strips shall extend past wood nailers over wall surfaces by 1% inch (38 mm) minimum and shall be securely sealed from air entry. 3.13 SARNACLAD METAL BASE FLASHINGS /EDGE METAL All fleshings shall be installed concurrently with the roof membrane as the job progresses. No temporary flashings shall be allowed without the prior written approval of the Owner's Representative and Sika Sarnafil. Acceptance shall only be for specific locations on specific dates. If any water is allowed to enter under the newly completed roofing due to incomplete fleshings, the affected area shall be removed and replaced at the Applicator's expense. A. Sarnaclad metal flashings shall be formed and installed per the Detail Drawings. 1. All metal flashings shall be fastened into solid wood nailers with two rows of post galvanized flat head annular ring nails, 4 inches (100 mm) on center staggered. Fasteners shall penetrate the nailer a minimum of 1 inch (25 mm). 2. Metal shall be installed to provide adequate resistance to bending and allow for normal thermal expansion and contraction. B. Adjacent sheets of Sarnaclad shall be spaced % inch (6 mm) apart. The joint shall be covered with 2 inch (50 mm) wide aluminum tape. A 4 inch minimum (100 mm) wide strip of Sarnafil flashing membrane shall be hot -air welded over the joint. Exercise caution at perimeter of roof. Workers shall follow OSHA safety procedures. 3.14 EDGE -TITE METAL A. Position the Sikaplan membrane over the roof edge and down outside face of wall covering wood nailer(s) completely. Allow'/ inch (13 mm) excess membrane. Hot -air weld all seams making sure there are no voids in welds. B. Apply a 3/8 inch (10 mm) bead of Sika Sarnafil sealant to the intersection of the right angle of the clean base rail. Install base rail from right to left as seen from rooftop, lapping joints 1 inch (25 mm). C. Fasten base rail into the side of the nailer 12 inches (0.3 m) on center using #12 x 1 -5/8 inch corrosion - resistant fasteners provided with Edge -Tite. Field cut sections as necessary. A second row of fastening may be required based upon site conditions. Exercise caution at perimeter of roof. Workers shall follow OSHA safety procedures. 5-08 1 -14 Sika Sarnafil Roofin • S • ecification Manual Sika • lan Mechanical) - Attached S stem D. Position spring clips at 6 foot (1.8 m) centers on base rail. Locate spring clips at fascia cover laps and at mid -span of fascia cover. E. Fascia covers are installed from right to left as seen from rooftop. Position fascia cover on top of base rail and overlap preceding panel by 1 inch (25 mm) at notches provided. Snap covers into place. Field cut where necessary. Exercise caution at perimeter of roof. Workers shall follow OSHA safety procedures. 3.15 ANCHOR -TITE METAL A. Position the Sikaplan membrane over the roof edge and down outside face of wall covering wood nailer(s) completely, allowing 1 /2 inch (13 mm) excess membrane. Hot -air weld all seams making sure there are no voids in welds. B. Apply a 3/8 inch (10 mm) bead of Sarnafil sealant to the intersection of the right angle of the clean base rail. Install base rail from right to left as seen from rooftop, lapping joints 1 inch (25 mm). C. Fasten base rail into the side of the nailer at 12 inches (0.3 m) on center using #12 x 1 -5/8 inch corrosion - resistant fasteners provided with Anchor -Tite. Field cut sections as necessary. A second row of fastening may be required based upon site conditions. Exercise caution at perimeter of roof. Workers shall follow OSHA safety procedures. D. Fascia covers are installed from right to left as seen from rooftop. Position fascia cover on top of base rail and overlap preceding panel by 1 inch (25 mm) at notches provided. Snap covers into place. Field cut where necessary. Exercise caution at perimeter of roof. Workers shall follow OSHA safety procedures. 3.16 WALKWAY INSTALLATION A. Sand Coated Walkway Roofing membrane to receive Sand Coated Walkway shall be clean and dry. Place chalk lines on deck sheet to indicate location of Walkway. Clean the deck membrane in areas to be welded. Walkway shall be unrolled and positioned within the chalk lines. Hot -air weld the entire perimeter of the Walkway to the Sarnafil deck sheet. Check all welds with a rounded screwdriver. Re -weld any inconsistencies. Important: Check all existing deck membrane seams that are to be covered by Walkway with rounded screwdriver and reweld any inconsistencies before Walkway installation. Do not run Walkway over Sarnabars. B. Sarnatred Walkway Roofing membrane to receive Sarnatred Walkway shall be clean and dry. Place chalk lines on deck sheet to indicate location of Walkway. Apply a continuous coat of Sarnacol 2170 adhesive to the deck sheet and the back of Walkway in accordance with Sika Sarnafil's technical requirements and press Walkway into place with a water - filled, foam - covered lawn roller. Clean the deck membrane in areas to be welded. Hot -air weld the entire perimeter of the Walkway to the Sarnafil deck sheet. Check all welds with a rounded screwdriver. Re -weld any inconsistencies. Important: Check all existing deck membrane seams that are to be covered by Walkway with rounded screwdriver and reweld any inconsistencies before Walkway installation. Do not run Walkway over Sarnabars. C. Crossgrip Walkway Crossgrip Walkway is installed loose laid on top of completed Sikaplan roof assemblies. Where design windspeeds exceed 94 mph (150 km /h) the walkway must be secured with loops of Sikaplan membrane welded to the field sheet. Unroll and position Crossgrip Walkway within specified areas and cut to desired length. Do not install Crossgrip Walkway directly over Sarnabars. Connecting clips are available for butting two ends together. Important: Check all existing deck membrane seams that are to be covered and reweld any inconsistencies before installation. 3.17 TEMPORARY CUT -OFF 5 -08 1 -15 DRAWING FILE NAME MA -ISO Mechanically- Attached System MA -ISO MA -1 N Sarnafastener & Sarnadisc 2 -3/8" Placement Plan MA -1 N MA -10 Sarnafastener -XP & Sarnadisc -XPN Placement Plan MA -10 MA -1 P 3 -1/2" Maxload Disk Placement Plan MA -1 P MA-1Q Sheet & Fastener Layout Plan at Perimeter Edge MA-1Q MA -1 R Sheet & Fastener Layout Plan at Perimeter Wall MA -1 R Sika Sarnafil Roofing Specification Manual Sikaplan Mechanically - Attached System All flashings shall be installed concurrently with the roof membrane in order to maintain a watertight condition as the work progresses. All temporary waterstops shall be constructed to provide a 100% watertight seal. The stagger of the insulation joints shall be made even by installing partial panels of insulation. The new membrane shall be carried into the waterstop. The waterstop shall be sealed to the deck and /or substrate so that water will not be allowed to travel under the new or existing roofing. The edge of the membrane shall be sealed in a continuous heavy application of sealant as described in Section 2.09. When work resumes, the contaminated membrane shall be cut out. All sealant, contaminated membrane, insulation fillers, etc. shall be removed from the work area and properly disposed of off site. None of these materials shall be used in the new work. If inclement weather occurs while a temporary waterstop is in place, the Applicator shall provide the labor necessary to monitor the situation to maintain a watertight condition. If any water is allowed to enter under the newly - completed roofing, the affected area shall be removed and replaced at the Applicator's expense. 3.18 COMPLETION Prior to demobilization from the site, the work shall be reviewed by the Owner's Representative and the Applicator. All defects noted and non - compliances with the Specifications or the recommendations of Sika Sarnafil shall be itemized in a punch list. These items must be corrected immediately by the Applicator to the satisfaction of the Owner's Representative and Sika Sarnafil prior to demobilization. All Warranties referenced in this Specification shall have been submitted and have been accepted at time of contract award. 3.19 DETAILS See accompanying Sika Sarnafil detail drawings. Refer to the Sika Sarnafil Typical System Details section for additional details. Sika Sarnafil has attempted to obtain information from the manufacturers of other products often used in conjunction with Sika Sarnafil products with respect to the characteristics of such products, as well as their compatibility with Sika Sarnafil's products. In as much as these other products as supplied in the field are subject to possible variation in their productions, and in as much as their specifications and performance characteristics are subject to change without notification by the manufacturers, Sika Sarnafil expressly excludes from its warranty any responsibility for the performance or quality of the products of others used in conjunction with Sika Sarnafil products. Sika Sarnafil provides this specification as a guide only in technical support to architects or roof designers /specifiers. Sika Sarnafil assumes no liability for error in design of or for misuse of this guide specification. The roof designer, engineer, architect or contractor must verify suitability of the specification and details. SIKAPLAN DETAILS 5-08 1 -16 Sika Sarnafil Roofing Specification Manual Sikaplan Mechanically - Attached System METAL DECK MEMBRANE MECHANICALLY ATTACHED -- SARNATHERM INSULATION Sarnafil ® 781.828.5400 sikacorp.com HOT -AIR WELD • •I JOB NAME: AS A SUPPLIER OF MATERIALS ONLY SIKA SARNAFIL DOES NOT ASSUME SCALE: RESPONSIBILITY FOR ERRORS IN DESIGN, ENGINEERING, QUANTITIES, OR DIMENSIONS, THE ARCHITECT. CONTRACTORS, OR OWNERS REPRESENTA- N.T.S. TIVE MUST VERIFY ALL DIMENSIONS, SIZES, AND SUITABILITY OF DETAILS. ( DATE: 1/07 SARNAFASTENER AND SARNADISC FASTENED THROUGH TOP FLUTES AIR / VAPOR BARRIER (AS REQUIRED) FILE NO.: MA -ISO SARNAFASTENER AND SARNAPLATE NOTE: VAPOR BARRIER SHALL BE SEALED AT OVERLAPS AND PENETRATIONS. DRW. NO.: 5 -08 1 -17 • Sika Sarnafil Roofing Specification Manual Sikaplan Mechanically- Attached System V PLAN VIEW SECTION 5 -1/2" N. 2 -1/2" 3 IN. 2 -3 / 8 " 5 /8" & SARNADISC 2 -3/8" PLACEMENT PLAN Sarnafi /® 781- 828 -5400 sikacorp.com AS A SUPPLIER OF MATERIALS ONLY SIKA SARNAFIL DOES NOT ASSUME RESPONSIBILITY FOR ERRORS IN DESIGN, ENGINEERING, QUANTITIES, OR DIMENSIONS, THE ARCHITECT. CONTRACTORS, OR OWNERS REPRESENTA- TIVE MUST VERIFY ALL DIMENSIONS, SIZES, AND SUITABILITY OF DETAILS. NOTE: VAPOR BARRIER SHALL BE SEALED AT OVERLAPS AND PENETRATIONS. JOB NAME: SCALE: N.T.S. 6 INCH LAP LINE AND TOP EDGE OF OVERLAPPED MEMBRANE 3 INCH DISC PLACEMENT LINE SARNAFASTENER AND 2 -3/8 INCH ROUND SARNADISC 1 INCH DISC PLACEMENT LINE - EDGE OF BOTTOM MEMBRANE AIR / VAPOR BARRIER (AS REQUIRED) DATE: 1/07 SUBSTRATE FILE NO.: MA-1N DRW. NO.: 5 -08 1 -18 Sika Sarnafil Roofing Specification Manual Sikaplan Mechanically - Attached System PLAN VIEW SECTION 5 -1 /2" M. 3 I N . ---- \/\ r — V n r 2 -1/2" F � n � 2" 1" T TOT ri TOT A‘vmAx_ Area NOTE: VAPOR BARRIER SHALL BE SEALED AT OVERLAPS AND PENETRATIONS. SARNAFASTENER —XP (Sc SARNADISC —XPN PLACEMENT PLAN Sarnafil ® 781 - 828 -5400 sikacorp.com AS A SUPPLIER OF MATERIALS ONLY SIKA SARNAFIL DOES NOT ASSUME RESPONSIBILITY FOR ERRORS IN DESIGN, ENGINEERING, QUANTITIES, OR DIMENSIONS, THE ARCHITECT. CONTRACTORS, OR OWNERS REPRESENTA- TIVE MUST VERIFY ALL DIMENSIONS, SIZES, AND SUITABILITY OF DETAILS. JOB NAME: SCALE' N.T.S. 6 INCH LAP LINE AND TOP EDGE OF OVERLAPED MEMBRANE 3 INCH DISC PLACEMENT LINE SARNAFASTENER -XP AND SARNADISC -XPN OR SARNAFASTENER -XPS AND SARNADISC -XPS EDGE OF BOTTOM MEMBRANE 1 INCH DISC PLACEMENT LINE AIR / VAPOR BARRIER (AS REQUIRED) DATE • 1/07 FILE NO • SUBSTRATE MA-10 DRW NO• 5-08 1 -19 Sika Sarnafil Roofing Specification Manual Sikaplan Mechanically - Attached System BLUE RED Off INSULATION SECURELY FASTENED- SARNAFASTENER ASTENED - SARNAFASTENER MAXLOAD & SARNADISC MAXLOAD HOT -AIR WELD SARNAFASTENER MAXLOAD & SARNADISC MAXLOAD MEMBRANE MECHANICALLY ATTACHED 3-1/2" MAXLOAD DISC PLACEMENT PLAN Sarnafil® 781 - 828-5400 sikacorp.com 1 2" O.C. (TYP.) END OF MEMBRANE AS A SUPPLIER OF MATERIALS ONLY SIKA SARNAFIL DOES NOT ASSUME RESPONSIBILITY FOR ERRORS IN DESIGN, ENGINEERING, QUANTITIES, OR DIMENSIONS, THE ARCHITECT. CONTRACTORS, OR OWNERS REPRESENTA- TIVE MUST VERIFY ALL DIMENSIONS, SIZES, AND SUITABILITY OF DETAILS. ASSITS1 If 4! JOB NAME: SCALE: N.T.S. 2 -1/4"1 DATE: 1/07 FILE NO.: MA-1P 3" 5 -1/2" 7 „ 3 -1/2" i -{ 1-1/4" SUBSTRATE DRW. NO.: 5-08 1-20 SARNAFIL ACCEPTABLE PERIMETER EDGE DETAIL TREATED WOOD NAILER SECURELY ANCHORED TO THE DECK AS REQUIRED AIR / VAPOR BARRIER (AS REQUIRED) ___ ----1 MEMBRANE MECHANICALLY ATTACHED SARNAFASTENER AND SARNADISC HOT -AIR WELD INSULATION SECURELY FASTENED �� SUBSTRATE � � FIRST ROW OF PERIMETER ATTACHMENT SECOND ROW OF PERIMETER ATTACHMENT i SARNAFASTENER & SARNADISC IN THE OVERLAPS. NOTES: 1) ADDITIONAL PERIMETER HALF SHEETS MAY BE REQUIRED. CONSULT SIKA SARNAFIL TECHNICAL DEPARTMENT. 2) INTERIOR SHEETS ARE TO RUN PERPENDICULAR TO THE DIRECTION OF STEEL AND PLANK DECKS. 3) SHINGLE LAPS WITH FLOW OF WATER WHERE POSSIBLE. 4) NAILERS SHALL BE SECURELY ANCHORED TO THE DECK TO RESIST A FORCE OF 300 POUNDS PER LINEAR FOOT. REFER TO FM DATA SHEET 1 -49. 5) VAPOR BARRIER SHALL BE SEALED AT OVERLAPS AND PENETRATIONS. SHEET & FASTENER LAYOUT PLAN AT PERIMETER EDGE il Sarnafil® 781 - 828 -5400 sikacorp.com JOB NAME: AS A SUPPLIER OF MATERIALS ONLY SIKA SARNAFIL DOES NOT ASSUME RESPONSIBILITY FOR ERRORS IN DESIGN, ENGINEERING, QUANTITIES, OR DIMENSIONS, THE ARCHITECT. CONTRACTORS, OR OWNERS REPRESENTA- TIVE MUST VERIFY ALL DIMENSIONS, SIZES, AND SUITABILITY OF DETAILS. SCALE N.T.S. DATE 1/07 FILE NO - MA -1 Q DRW NO' Sika Sarnafil Roofin • S • ecification Manual 5 -08 Sika • lan Mechanical) - Attached S stem 1 -21 Sika Sarnafil Roofing Specification Manual Sikaplan Mechanically - Attached System ACCEPTABLE PARAPET WALL DETAIL OR WALL FLASHING TERMINATION 1 ' 1V TTTT 1' I f r T Y T T '' • ' • ' • T • '' • ' • '' � 1 1 -1 -7 7' 1 1 �•kW .l l/i•1.1•i•1,1.1.1.1.1.1•l i•����•i i•�•i• i• A i A A A FIRST ROW OF PERIMETER ATTACHMENT NOTES: 1) ADDITIONAL PERIMETER HALF SHEETS MAY BE REQUIRED CONSULT SIKA SARNAFIL TECHNICAL DEPARTMENT. 2) INTERIOR SHEETS ARE TO RUN PERPENDICULAR TO THE DIRECTION OF STEEL AND PLANK DECKS. 3) SHINGLE LAPS WITH FLOW OF WATER WHERE POSSIBLE. 4) CONSULT SIKA SARNAFIL TECHNICAL DEPARTMENT FOR ACCEPTABLE FLASHING SUBSTRATES. 5) VAPOR BARRIER SHALL BE SEALED AT OVERLAPS AND PENETRATIONS. SHEET & FASTENER LAYOUT PLAN AT PERIMETER WALL Sarnafil® 781 - 828.5100 sikacorp.com AS A SUPPLIER OF MATERIALS ONLY SIKA SARNAFIL DOES NOT ASSUME RESPONSIBILITY FOR ERRORS IN DESIGN, ENGINEERING, QUANTITIES, OR DIMENSIONS, THE ARCHITECT. CONTRACTORS, OR OWNERS REPRESENTA- TIVE MUST VERIFY ALL DIMENSIONS, SIZES, AND SUITABILITY OF DETAILS. SARNAFIL FLASHING ADHERED OR MECHANICALLY - ATTACHED TO ACCEPTABLE SUBSTRATE AIR / VAPOR BARRIER (AS REQUIRED) MEMBRANE MECHANICALLY ATTACHED SARNAFASTENER AND SARNADISC SECOND ROW OF PERIMETER ATTACHMENT JOB NAME: SCALE: N.T.S. HOT -AIR WELD DATE: 1/07 INSULATION SECURELY FASTENED SUBSTRATE SARNAFASTENER & SARNADISC IN THE OVERLAPS. FILE NO.: MA-1R DRW. NO.: 5 -08 1 -22 COLIN MADSEN 8625 MARTIN WAY E LACEY WA 98516 City of Tukwila Department of Community Development Jack Pace, Director RE: Permit No. D09 -050 12301 TUKWILA INTERNATIONAL BL TUKW Dear Permit Holder: In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and /or the National Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180 days. Your permit will expire on 10/24/2009. Based on the above, you are hereby advised to: 1) Call the City of Tukwila Inspection Request Line at 206 - 431 -2451 to schedule for the next or final inspection. Each inspection creates a new 180 day period. -or- 2) Submit a written request for permit extension to the Permit Center at least seven (7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit. The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your extension request is granted, you will be notified by mail. In the event you do not call for an inspection and /or receive an extension prior to 10/24/2009, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, Bill Rambo Permit Technician File: Permit File No. D09 -050 Jim Haggerton, Mayor April 17, 2009 Colin Madsen 8625 Martin Way E Lacey, WA 98516 Bill Rambo Permit Technician encl File No. D09 -050 • RE: CORRECTION LETTER #1 Development Permit Application Number D09 -050 Savvis —12301 Tukwila International Bl 1=j-) P:\Pemit Center\Correction Letters\2009\D09 -050 Correction Letter #1.DOC wer • Department of Community Development Dear Mr. Madsen, This letter is to inform you of corrections that must be addressed before your development permit(s) can be approved. All correction requests from each department must be addressed at the same time and reflected on your drawings. I have enclosed comments from the Building Department. At this time the Fire, Planning, and Public Works Departments have no comments. Building Department: Allen Johannessen at 206 433 -7163 if you have questions regarding the attached memo. Jim Haggerton, Mayor Please address the attached comments in an itemized format with applicable revised plans, specifications, and /or other documentation. The City requires that four (4) complete sets of revised plans, specifications and /or other documentation be resubmitted with the appropriate revision block. In order to better expedite your resubmittal, a `Revision Submittal Sheet' must accompany every resubmittal. I have enclosed one for your convenience. I have also enclosed a Non - Residential Sewer Use Certification that must be completed prior to issuance of the permit. Corrections /revisions must be made in person and will not be accepted through the mail or by a messen.er service. If you have any questions, please contact me at (206) 431 -3670. Sincerely, Jack Pace, Director A nn Cnrrthnenfor Rnrr /eucrri Crritn }F 11)1) s T111.4.111. IAA rhin rrtn rn f)12 /DS? o Dh.,n.,. 1/1A A21 2X711 C ... 2/1.G 421 2.Cl.0 Building Division Review Memo Date: April 14, 2009 Project Name: SAVVIS Permit #: D09 -050 Plan Review: Allen Johannessen, Plans Examiner Tukwila Building Division Allen Johannessen, Plan Examiner The Building Division conducted a plan review on the subject permit application. Please address the following comments in an itemized format with revised plans, specifications and /or other applicable documentation. (GENERAL NOTE) PLAN SUBMITTALS: (Min. size 11x17 to maximum size of 24x36; all sheets shall be the same size). (If applicable) Structural Drawings and structural calculations sheets shall be original signed wet stamped, not copied.) 1. The product data sheets provided do not indicate the Classification Type for the roofing materials to be installed. The buildings construction type is classified as IIA construction. Roofing classification shall meet "A" or `B" classification. This product has installation methods and materials specific for Class A, B or C type roofing. Please provide documentation for the specific classification for this roofing and identify which method, within that material classification, shall be used. Information may be provided by a local distributor. (IBC 1501.1) Should there be questions concerning the above requirements, contact the Building Division at 206 -431- 3670. No further comments at this time. ACTIVITY NUMBER: D09 -050 PROJECT NAME: SAVVIS SITE ADDRESS: 12301 Tukwila International BI Original Plan Submittal X Response to Correction Letter # 1 DATE: 04 -20 -09 Response to Incomplete Letter # Revision # After Permit Issued DEPARTMENTS: AlfiC pudding Division Public Works Complete Comments: TUES/THURS ROUTING: Please Route I (WHO ,yam if • PLAN REVIEW /ROUTING SLIP 1ST REVIEWER'S INITIALS: APPROVALS OR CORRECTIONS: Approved Approved with Conditions Notation: REVIEWER'S INITIALS: Documents/routing slip.doc 2 -28 -02 Fire Prevention Structural DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Incomplete Structural Review Required u Permit Center Use Only INCOMPLETE LETTER MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: LETTER OF COMPLETENESS MAILED: DUE DATE: 04 -21 -09 No further Review Required DATE: DUE DATE: 05 -19 -09 Not Approved (attach comments) DATE: Planning Division Permit Coordinator Not Applicable Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: ACTIVITY NUMBER: D09 -050 DATE: 04 -08 -09 PROJECT NAME: SAVVIS SITE ADDRESS: 12301 TUKWILA INTERNATIONAL BL X Original Plan Submittal Response to Correction Letter # Response to Incomplete Letter # Revision # After Permit Issued DEPARTMENTS TS Buiftiing Division Public Works Complete Comments: TUES /THURS ROU G: Please Route REVIEWER'S INITIALS: APPROVALS OR CORRECTIONS: • ifilf PLAN REVIEW /ROUTING SLIP 4 M ' /A- 4401 Fire Prevention Structural Incomplete DETERMINATION OF C9MPLETENESS: (Tues., Thurs.) DUE DATE: 04 -09 -09 Structural Review Required u Permit Center Use Only INCOMPLETE LETTER MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: LETTER OF COMPLETENESS MAILED: No further Review Required DATE: Planning Division Approved n Approved with Conditions Not Approved (attach comments) Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: 4 1 `0 I p Departments issued corrections: Bldg Fire ❑ Ping ❑ PW ❑ Staff Initials: Documents/routing slip.doc 2 -28 -02 Permit Coordinator Not Applicable n DUE DATE: 05 -07 -09 utte,_ Date: / 20 A Project Name: • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite # 100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. \applications\forms - applications on line\revision submittal Created: 8 -13 -2004 Revised: Plan Check/Permit Number: ❑ Response to Incomplete Letter # Response to Correction Letter # ❑ Revision # after Permit is Issued ❑ Revision requested by a City Building Inspector or Plans Examiner l� - (DS 1) Project Address: 12.E l V,I,JI ( � r J"1 ( -2 oV\ L U 2 Contact Person: WLf Ir.� 5�= , Phone Number: NO 98 8 2St 6 Summary of Revision: p120>/ 7)60 hrl v/ c.7S 0 «lssi7 CA7 / 61 t t -lc 71-1 L ROOF fLf 1C1/ ) E1 / -- )1 7 �2F RA--1 i iftelladVEU TY of TUKW1LA APR 2 0 2009 ERMn vtbiWo Sheet Number(s): "Cloud" or highlight all areas of revision including dat ,! revisi i n AP Received at the City of Tukwila Permit Center by: la/5ntered in Permits Plus on l k� )0 19 1 License Name Type Specialty 1 Specialty 2 Effective Date Expiration Date Status NWROORS971M4 NW ROOFING SOLUTIONS LLC CONSTRUCTION CONTRACTOR GENERAL UNUSED 7/24/2003 7/24/2009 ACTIVE MOTTMBP027PA MOTTMAN BUSINESS PARK LLC CONSTRUCTION CONTRACTOR GENERAL UNUSED 10/1/1998 10/1/2009 ACTIVE DLBEAC *066CA D L B EARTHWORK CO CONSTRUCTION CONTRACTOR GENERAL UNUSED 2/1/1994 1/8/2010 ACTIVE FILLOMI111N1 FILLO MECHANICAL INC CONSTRUCTION CONTRACTOR PLUMBING UNUSE 8/21/1989 8/9/2009 ACTIVE BERSCPC148CD BERSCHAUER PHILLIPS CONST CO CONSTRUCTION CONTRACTOR GENERAL UNUSED 2/4/1986 8/9/2010 ACTIVE PBJCOI *160KU P B J CONTRACTING INC CONSTRUCTION CONTRACTOR GENERAL UNUSED 5/31/1984 8/9/2009 ACTIVE HAGENBP993B4 HAGEN BROTHERS PAINTING CONSTRUCTION CONTRACTOR UNUSED PAINTING /WALLCOVERING 1/24/2001 9/30/2001 ARCHIVED BODENE1061P5 BODENHAMER ENTERPRISES INC CONSTRUCTION CONTRACTOR GENERAL UNUSE 10/25/19948/10/1999 ARCHIVED BPGROI *066DW B P GROUP INC CONSTRUCTION CONTRACTOR GENERAL UNUSE 3/16/1994 3/1/1995 ARCHIVED BODENI *088N0 BODENHAMER INC CONSTRUCTION CONTRACTOR GENERAL UNUSED 8/20/1992 8/10/1995 ARCHIVED BERSCPS130JP BERSCHAUER PHILLIPS STRCTS INC CONSTRUCTION CONTRACTOR GENERAL UNUSED 4/17/1987 8/9/1993 ARCHIVED BODENSI160NP BODENHAMER/STEWART INC CONSTRUCTION CONTRACTOR GENERAL UNUSED 8/17/1984 3/10/1993 ARCHIVED BODENI *177R1 BODENHAMER INC CONSTRUCTION CONTRACTOR GENERAL UNUSED 12/21 /1983 3/10/1985 ARCHIVED MADSELR181NL MADSEN-LAMM ROOFINGCONSTRUCTION CO INC CONTRACTOR ROOFING UNUSED 10/3/1983 4/1/1986 ARCHIVED GEORGMR186NL GEORGE MADSEN ROOFING INC CONSTRUCTION CONTRACTOR ROOFING UNUSED 8/13/1982 7/14/1984 ARCHIVED PHILLB *193QL PHILLIPS a BODENHAMER INC CONSTRUCTION CONTRACTOR GENERAL UNUSE 11/13/1981 3/10/1984 ARCHIVED PHILLC *208NF PHILLIPS CONSTRUCTION INC. CONSTRUCTION CONTRACTOR GENERAL UNUSE 8/6/1980 8/9/1988 ARCHIVED HENRYBC214PD HENRY BERSCHAUER CONST CO CONSTRUCTION CONTRACTOR GENERAL UNUSED 10/4/1979 10/4/1987 ARCHIVED BODENI *061P5 BODENHAMER INC CONSTRUCTION GENERAL UNUSED 10/25/199410/19 /2002 EXPIRED Untitled Page • General /Specialty Contractor A business registered as a construction contractor with L &I to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. Business and Licensing Information Name Phone Address Suite /Apt. City State Zip County Business Type Parent Company MADSEN ROOFING INC 3604562821 8625 MARTIN WAY E LACEY WA 985165812 THURSTON Corporation UBI No. Status License No. 600447097 ACTIVE MADSERI147JD License Type CONSTRUCTION CONTRACTOR Effective Date 4/4/1986 Expiration Date 5/1/2010 Suspend Date Specialty 1 ROOFING Specialty 2 UNUSED Other Associated Licenses https://fortress.wa.gov/lni/bbip/Detail.aspx • Page 1 of 3 04/23/2009 .L....... \ A ..... II 1 BLDG A 12301 PROJECT LOCATIO\ 8+61- -SWALL -- L�I0 SWALE > ) BLDG C 12101 SEPTEMBER 7, 2007 SCALE 1 Q n.......1.:..t - r.............. J. 11 .�........J -.\ \ ..:i... ............:i. M • 0 50 100 150 200 250 A /r) /''lrlrlrl 1 1 1 - 7. 01 1 A N/1 \A 1 A IUTr V 1 \A /n^1,1 r r` Site TUKWILA INTERNATIONAL BOULEVARD 400 REVISIONS No changes shall be made to the scope of work without prior approval of Tukwila Building Division. NOTE: Revisions will require a new plan submittal and may include additional plan review fees. FELE COPY Permit No. Plan review approval is subject to errors and omissions. Approval of construction documents does not authorize the violation of any adopted code or ordinance. Receipt of approved Fie . + op and •••, I ons is acknowledged: By . ►s�� Date: City Of Tukwila BUILDING DIVISION BUH_D\.0 A RECEIVED APR 0 8 2009 PERMIT CENTER intergate, A TECHNOLOGY CAMPUS SABEY ARCHITECTURE 12201 TUKWILA INTERNATIONAL BLVD. 4TH. FLOOR SEATTLE, WASHINGTON 98168 (206) 281 -8700 Fax (206) 281-0920 12101 -12301 Tukwila International Blvd. Tukwila, Washington REVIEWED R CODE COMPLII APPR APR 21 2009 ►1- City of Tul twi BUILDING DIVI