Loading...
HomeMy WebLinkAboutPermit 91-05-SPE - PUGET POWER - POLE REPLACEMENT SENSITIVE AREA WAIVER91-05-spe n of south 180th street west of union pacific tracks puget power CITY OF TUKWILA 6200 SOUTHCENTER BOULEVARD, TUKWILA, WASHINGTON 98188 March 8, 1991 Mr. Joseph Rempe Puget Power & Light Company 620 South Grady Way P.O. Box 329 Renton, Washington 98057 -0329 PHONE M (206) 433.1800 Gary L. VanDusen, Mayor Re: Pole replacement in Puget Power's right -of -way and within City of Tukwila Wetland #12. Dear Joseph: We have reviewed the on -site hazardous condition of the subject power line pole and your letter, dated March 3, 1991, requesting approval from the City to perform the needed utility maintenance. According to the site visit and your letter, one power line pole needs to be replaced because it may constitute a hazard or threat to the safety of people or property. We understand that this work will require the placement of fill in Wetland #12 to allow truck access for the pole replacement operation. The City's Critical Area Sensitive Area Ordinance is not yet adopted; however, City of Tukwila Ordinance No. 1544 established a moratorium on development in sensitive areas. Wetland #12 has been inventoried for its overall value and was rated by a consultant as having a high value rating. Ordinance No. 1550 clarifies and amends Ordinance No. 1544. This ordinance includes Section 3. Specific Conditional Exceptions. Paragraph G of Section 3 explains the exception process for issues that constitute a hazard and the Director of Community Development's obligation to respond to the request for exception. Based upon your meeting with Gary Schulz, Urban Environmentalist, and your request letter, the immediate pole replacement and associated wetland fill is approved. The new wetland fill should consist of 5/8 "- crushed gravel and be placed to minimize impacts to Wetland #12. We will require that both old and new fill removal re- establish approximate original water depths with as little disturbance as possible to surrounding wetland areas. The fill material can be spread out onto your access road. We will also appreciate notification of the planned construction activities to verify the completion of this work. Page 2 Si ck : ler Director of Community Development If you have any questions concerning this letter please feel free to contact me at 431 -3681 Thank you very much for your interest and cooperation. PUGET POWER March 3, 1991 City of Tukwila Department of Planning 6300 Southcenter Boulevard Tukwila, Washington 98188 RE: Replacement of power pole in the PSE right of way. Dear Gentlemen; _ .\ _E LR15.Mm PAR 0 PLANNING 0 h 1991 4 1991 C i CITY 14141/ILA PLANNING DEPT. Puget Power wishes to replace a transmission pole that is within our right of way north of S. 180 St. and west of the Union Pacific Railroad tracks. The existing pole leans towards the railroad tracks and may become a hazard to rail traffic. We understand that the normal permit process for pole replacement does not require your departments approval. However this pole may be in a location that you consider a wetland. On Monday, February 25, 1991 the site was reviewed by Gary Schulz. It was his suggestion that we submit this letter to explain our intentions of how we will address the wetlands issue. The pole is in a location that includes approximately 2 feet of water. This pole is approximately 60 ft. from the right of way maintenance road. Unfortunately we do not have equipment capable of performing the required work from the maintenance road or from the railroad. We propose to fill and an area approximately 15 ft. by 60 ft. in order to reach the pole. After the installation of a new pole we will remove the fill with the exception of the fill immediately around the new pole. We will at the same time remove the fill that was installed to reach an adjacent pole. This pole was replaced during a storm and may have contributed to the damage of the pole in question. It is our intention to approach this job in the spirit of your environmental concerns. If you have any questions concerning this project please call me at 235 -2937. Sincerely, Jos ph Rempe Customer Service Engineer Renton Service Center CC: DC, DL, FILE The Energy Starts Here® Puget Sound Power & Light Company 620 South Grady Way P.O. Sox 329 Renton, WA 98057 -0329 (206) 255 -2464 - -�