Loading...
HomeMy WebLinkAboutPermit 90-01-R - LINARDIC - NORTH HILL OFFICE BUILDING REZONE90-01-R REZONE ZONING CODE AMENDMENT COMPREHENSIVE PLAN AMENDMENT COMPREHENSIVE LAND USE PLAN AMENDMENT 5900 SOUTHCENTER BOULEVARD 90-01-CPA EPIC-21-90 NORTH HILL OFFICE BUILDING 'February 26, 1992 Leon Grundstein 750 6th Street South, Suite 200 Kirkland, WA 98033 SUBJECT: North Hill Office Building, 5900 Southcenter Blvd. Utility Permit Application (PC No. 89 -399) Dear Mr. Grundstein: The Public Works Department has reviewed and hereby approves the site plan for the subject development with a few changes as noted on the enclosed plan. Please contact Denise Millard, Permit Coordinator, at 431 -3672 to have the following permits prepared for pickup: City of Tukwila 1 W. Rants, Mayor Department of Public Works Channelization /Striping /Signing Permit (Permit Fee = $25.00) This covers the work associated with the raised median on Southcenter Boulevard. 2. Curb Cut /Access /Sidewalk Permit (Permit Fee = $25.00) This permit will cover the sidewalk and driveway work associated with water main construction. Sidewalk shall be removed to the nearest joint and driveway replacement shall meet commercial City Standards. For the easternmost 'driveway, a maximum width of 14' will be permitted. 3. Fire Loop /Hydrant Permit (Permit Fee = $25.00) 4. Land Altering Permit (Permit Fee = $183.00) This fee was calculated using 4,730 cubic yards as the total measure of land altering activity. Ross A. Earnst, P. E., Director 6300 Southcenter Boulevard; Suite #100. • Tukwila, Washington 98188 • Phone: (206) 433-0179 • Fax (206) 431-3665 We do not have a current copy of your Landscape and Landscape Irrigation Plans in our files. Public Works reviews these plans prior to approving the Landscape Irrigation Permit which is required on this project. Please complete the enclosed Non - Residential Sewer Use Certification and Business Declaration Forms, forward the originals to METRO and return copies for our files. Also, enclosed are blank water meter permit forms. Please fill out the complete Bill of Sale - sides, have them notarized and return to Arline McCready, that these permits can be.completed for issuance. You are referred to other City agencies, including the Fire Department and the Building and Planning Divisions, for other requirements and approvals which may affect the commencement of this. work. The above permits are being issued in accordance with the work shown on the enclosed approved plan. Any deviations from this plan should be submitted for additional review and approval prior to construction. If you have any questions or need clarification on any issue, please call me at 433 -0179. Sincerely, John A. Piero g'( P.E. Associate Eng neer Public Works Department Enclosures a/s JP /amc:10:off ice xc: METRO Utility Accountant City Utilities Inspector (w /copy of approved plan) Permit Coordinator Development 'File: North Hill Office Building Read File This consists of 2,480 cubic yards of cut and ' 2,250 cubic yards of fill (according. to conversation with Steve Friedman). Excavated material used as fill on the site is counted .based on the total of both. The permit fee breaks down as follows: Plan Review Fee = $ 30.00 Grading Permit Fee = 153.00 Total $183.00 5. Hauling Permit (Permit Fee = $25.00) The following documents shall be provided prior to any hauling activity: A. A. copy of the Certificate of Insurance coverage (minimum of $1,000,000) naming the City of Tukwila as insured. B. A $2,000 bond made out to the City for possible property damages caused by activities. C. A map which shows the haul route. 6. Sanitary Side Sewer Permit (Permit Fee = $170.00) This fee breaks down as follows: Inspection Fee = $ 20.00 Regular Connection Charge = 150.00 Total $170.00 There are no special connection charges due to prior participation in L.I.D. No. 29. 7. Sewer Main (Public) Extension Permit (Permit Fee = $25.00) 8. Storm Drainage Permit (Permit Fee = $25.00) 9. Water Main (Public) Extension Permit (Permit Fee = $25.00) 10. Water Meter, 1 1/2" (Exempt - Water Only) Permit (Permit Fee = $625.00) 11. Water Meter, 1 1/2" (Permanent) Permit (Permit Fee = $625.00) There are no special connection charges associated with this new water service. CITY OF TUKWILA l ilrgl51)1• T!!CI. \TE 1017.11 1'. 4lip. '('1 'h'll' /LA, II';I 'I//.\'GTo,\' 0818; MINUTES PLANNING COMMISSION /BAR OCTOBER 25, 1990 a 12061433.1Mw Grr�• 1.. I 'anbr a n. 1/au,, The meeting was called to order at 6:20 P.M. by Jim Haggerton, Chairman. Members present were Messrs. Haggerton, Hamilton, Kirsop, Malina, Gomez, and Flesher. Mr. Knudson was excused. Representing the staff were Moira Bradshaw, Darren Wilson, Sylvia Appleton, and City Attorney, John Colgrove. With regard to the minutes of September 27, 1990, Mr. Flesher noted he thought the Larry's Market project was passed by a vote of 3 -2 with Messrs. Flesher and Knudson opposed. Subject to that change, Mr. Hamilton moved to approve the minutes of the September 27, 1990 and October 4, 1990 meetings. Mr. Flesher seconded the motion; motion passed unanimously. Moira noted that the City Attorney had read through the document and made notes on the draft yellow copy (here in -after referred to as draft) regarding recommended changes. They also reviewed policy issues which the Planning Commission may want to discuss. She referred to a memo from herself to the Planning Commission, dated October 18, 1990. In reviewing item number one of the memo, Moira stated that a "Findings" section had been developed which would be included in the ordinance, but would not be codified. It would provide the legal basis if there was any misunderstanding as to the intent of the legislation. MR. HAMILTON MOVED TO APPROVE THE "FINDINGS" SECTION, TO BE ADDED TO THE ORDINANCE. MR. FLESHER SECONDED THE MOTION; MOTION PASSED UNANIMOUSLY. With regard to item number two of the memorandum, the draft makes references to parcel, tract, property, etc., and applicant, developer, owner, etc. For clarification and consistency, John Colgrove suggested that, where possible, one word be used to describe a legal lot of record and an applicant. The Planning Commissioners agreed to use "Legal Lot of Record" in place of "parcel" and to use "applicant" or "owner" in place of "developer ", where applicable throughout the ordinance. They also agreed to add a definition of "applicant" in the definition section utilizing King County's recent SAO definition section. Planning Commission /BAR Page 2 October 25, 1990 Item number three of the memo deals with buffer distances. Moira referred to another memo dated October 25, 1990, which offers revised language for Section 18.45.040 "SENSITIVE AREA BUFFERS ". MR. HAMILTON MOVED TO APPROVE THE SECOND "A" AND SECTION "B ", THAT A 100 FOOT BUFFER WOULD TRIGGER THE REQUIREMENT OF A STUDY. MR. KIRSOP SECONDED THE MOTION; MOTION PASSED BY A VOTE OF 5 -1, WITH MR. MALINA OPPOSED. Moira stated that for item four of the memo, a permit is not required for all developments which may impact sensitive areas. Therefore, use or development has been substituted for permit where mentioned in the ordinance. With regard to item number five of the memo: MR. HAMILTON MOVED TO REMOVE THE SECOND SENTENCE OF ITEM NUMBER ONE, SECTION 18.45.080, USES AND STANDARDS, PAGE 7 AND MARE IT ITS OWN SECTION; NUMBERING IT 3. AND ENTITLING IT "A REASONABLE USE EXCEPTION ". THUS, RE- NUMBERING THE FOLLOWING SECTIONS ACCORDINGLY. MR. MALINA SECONDED THE MOTION; MOTION PASSED UNANIMOUSLY. In addition, under the same section: MR. HAMILTON MOVED TO MOVE ITEM "D" OF SECTION 1. AND MARE IT ITEM "C" OF SECTION 2. BELOW IT. MR. FLESHER SECONDED THE MOTION; MOTION PASSED UNANIMOUSLY. In that same section: MR. HAMILTON MOVED TO ADD THE WORDS "MAINTENANCE AND REPAIR OF" IN FRONT OF ITEM 1.E. MR. FLESHER SECONDED THE MOTION; MOTION PASSED UNANIMOUSLY. With regard to item number six of the memo: MR. HAMILTON MOVED TO ADD "COMPENSATORY MITIGATION" TO THE DEFINITION SECTION, AND ADD IT THROUGHOUT THE ORDINANCE WHERE APPLICABLE. MR. KIRSOP SECONDED THE MOTION; MOTION PASSED UNANIMOUSLY. With regard to item number seven of the memo: MR. FLESHER MOVED TO APPROVE ITEM SEVEN OF THE MEMO WHICH RECOMMENDS THE USE OF "SENSITIVE AREA STUDY" WHEN REFERRING TO A STUDY THROUGHOUT THE ORDINANCE. MR. HAMILTON SECONDED THE MOTION; MOTION PASSED UNANIMOUSLY. With regard to item number eight of the memo, the Planning Commission agreed by consensus to ignore number eight and leave the draft as is. MR. HAMILTON MOVED TO MARE "DENSITY CREDITS" ITS OWN SECTION AND CHANGE THE TITLE OF THE GRAPH FROM "DEVELOPMENT FACTOR" TO "DENSITY CREDITS ". MR. FLESHER SECONDED THE MOTION; MOTION PASSED UNANIMOUSLY. Planning Commission /BAR Page 3 October 25, 1990 MR. HAMILTON MOVED TO HAVE THE CITY COUNCIL SET AN APPROPRIATE FEE FOR AN APPLICANT TO APPLY FOR A REASONABLE USE EXCEPTION. MR. FLESHER SECONDED THE MOTION; MOTION PASSED UNANIMOUSLY. With regard to item number eleven of the memo: MR. HAMILTON MOVED THAT A SENTENCE BE ADDED TO SECTION 18.45.130 WHICH WOULD READ SOMETHING LIKE "THE DCD DIRECTOR MAY REQUIRE THE BUFFER LINE BE POSTED WITH THE FOLLOWING SIGNS AND WILL DETERMINE THE SIZE OF THE SIGNS ". MR. KIRSOP SECONDED THE MOTION; MOTION PASSED UNANIMOUSLY. With regard to item number twelve of the memo: MR. HAMILTON MOVED TO APPROVE ITEM NUMBER TWELVE AS WRITTEN. MR. FLESHER SECONDED THE MOTION; MOTION PASSED UNANIMOUSLY. With regard to item number thirteen of the memo: MR. MALINA MOVED TO APPROVE ITEM THIRTEEN AS WRITTEN AND TO INCLUDE IT UNDER SECTION 18.45, PAGE 4, OF THE ORDINANCE ENTITLED "INTERPRETATION ". MR. GOMEZ SECONDED THE MOTION; MOTION PASSED UNANIMOUSLY. MR. HAMILTON MOVED TO APPROVE THE ENTIRE DRAFT SUBJECT TO THOSE CHANGES MADE THIS EVENING, AS WELL AS, THOSE PENCILED IN, GRAMMATICAL CHANGES. MR. KIRSOP SECONDED THE MOTION; MOTION PASSED 4 -1, WITH MR. MALINA OPPOSED. The Planning Commission's SAO meeting was adjourned at 8:30 P.M. Mr. Kirsop was excused from the BAR meeting. The Board of Architectural Review meeting began at 8:40 P.M. 90 - 8 - DR: Dondero Motel Darren Wilson reviewed the staff report. He reminded the Board that this was a continuation from the September 27, 1990 public hearing. Since that meeting, additional material has been submitted by the applicant. They submitted an irrigation plan, which the Board had previously requested. Public Works still needed to review the irrigation plan. The applicant has also submitted a letter from the landscape architect, indicating the replacement of the vegetation and larger street trees on South 146th and along the west side of the development. Darren handed the Board a revised packet for the signage. The signage will consist of a free - standing sign and a wall sign. At this time, the applicant has not provided a name for the motel, therefore, the signs do not indicate the name. The wall sign will be located on the west side of the motel. The applicant meets the City Sign Code requirements for both signs. The colors of the signs will consist of an opaque blue, bordered with white. In conclusion, the staff would recommend the approval of the signage package as Planning Commission /BAR October 25, 1990 submitted. Mr. Flesher asked if any landscape plan. Darren stated that no other mentioned above. Page 4 other changes had been made to the changes had been made other than those Michael Mohn, Consultant with "Pannell, Kerr, Forster ": He stated that hotel /motel business's success or failure is dependent on a number of factors, only one of them being location. The primary consideration is the market strength. The Sea - Tac /Tukwila area has strong market strength. We've got a market which has the ability to sustain properties which have no frontage at all and no significant signage on Pacific Ave. The potential for success is very good. He noted that these comments were not an opinion as to the feasibility of the project, this is an opinion with regards to market strength. Mr. Malina asked if the recommendations and conditions from the last meeting were still binding. Darren noted that they were, as a decision by the BAR had not yet been made. He also noted that the dumpster area is adequate to accommodate a recycling program. Mr. Haggerton asked if the BAR would have any say as to what name will be used for the motel, and what will be written on the signs. Moira noted that the Sign Code does not cover content, only size and location. Mr. Haggerton closed the public hearing at 8:55 P.M. Mr. Haggerton stated that since he missed the public hearing on this project, he would be voting on it only if a tie - breaker is needed. Moira clarified that there was no name for the motel as yet because the motel is being built to sell to a larger franchise. MR. HAMILTON MOVED TO APPROVE THE PROJECT, BASED ON THE STAFF'S FINDINGS, CONCLUSIONS, AND CONDITIONS; WITH THE PROVISO THAT THE FINAL SIGN DESIGNS WILL BE BROUGHT BACK TO THE B.A.R. MR. MALINA SECONDED THE MOTION; MOTION PASSED UNANIMOUSLY. 90 -1 -R - NORTH HILLS: Darren Wilson reviewed the staff report. The applicant is seeking a rezone from P0, Professional Office, to Cl, Neighborhood Retail. Planning Commission /BAR Page 5 October 25, 1990 Mr. Wilson stated that there had been a previous rezone in 1984 from RMH (High Density Residential) to Professional Office. Both the Planning Commission and City Council approved this rezone. There have been three different developers which have proposed office developments on the site. On July 5, 1990 the BAR approved a building design, to be built on the property. A waiver from the SAO moratorium was received for the rezone process. (Darren handed out the Comprehensive Plan Map - attachment of the staff report). Southcenter Blvd. from the S -Line Bridge to Interurban, has been redesignated from collector arterial to principal arterial. The rezone from PO to Cl is consistent with the businesses in the area. The rezone complies with the Comprehensive Land Use map designation for commercial. The request is supported by Policies One, Two, and Eight of the Comprehensive Land Use Policy Plan. In conclusion, the staff recommends the Planning Commission adopt the findings and conclusions of the staff report and recommend approval to the City Council for a rezone. Steven Freeman, 750 6th Street, Kirkland: He stated that the character and marketability of the site determine that the only thing that would work there would be a single level building. Although the building was approved for office use, it is acceptable for retail and would only require internal modifications. Mr. Hamilton asked if the parking requirements were the same for PO and Cl. Moira stated that the parking requirements were the same for PO and Cl. Mr. Hamilton asked how that would be policed. Moira stated that a tenant improvement or business license would not be approved if it did not meet the parking requirements. Mr. Haggerton asked the types of tenants they were looking to lease to. Mr. Freeman gave examples such as video rental, dry cleaner pick up, things that would be compatible with a multi - family use. Mr. Malina asked about the screening of mechanical equipment on the roof top. Mr. Freeman noted that it was determined at the BAR meeting for the building, that a pitched gable would be used for a roof design, and the equipment would sit below this. One of the conditions of the Planning Commission /BAR Page 6 October 25, 1990 BAR was that there would be no additional mechanical units. Mr. Malina asked if a retail tenant were to lease the space, which in turn would cause a change in the parking design, would that design change have to come before the BAR. Moira responded that it would be up to staff, depending on the extent of the design change. Mr. Malina asked how the fire entrance and turn - around would be affected if the parking situation were to change. Moira stated that the Fire Department would have to approve any change if it were substantial. Mr. Malina asked if the BAR could make a recommendation of a fenced in area that would require them to put in a feasible area for a recycling program rather than one large dumpster. Moira said that the BAR could pose a condition that all refuse disposal areas be screened appropriately. If and when the City adopts a recycling program, that condition could come into play. Ed Linardic, 1836 Westlake Ave. N., Suite 204, Seattle: There is one basic ramp which brings people up to the building, and one sidewalk. We are not changing the way people get into the building. The building design which was approved in July will not change at all. Mr. Haggerton closed the public hearing at 9:55 P.M. Mr. Malina asked if Public Works has had any input as to traffic implications from changing from a PO to a Cl zoning. Darren noted that the applicant had provided a traffic analysis and Public Works didn't see a significant change. MR. MALINA MOVED TO RECOMMEND APPROVAL OF THE REZONE BASED ON THE STAFF REPORT'S FINDINGS AND CONCLUSIONS. MR. FLESHER SECONDED THE MOTION; MOTION PASSED UNANIMOUSLY. During the Director's Report, the Planning Commission agreed to meet at 6:00 P.M. on December 13, 1990 for a workshop regarding Multi- Family Standards. Mr. Haggerton adjourned the BAR meeting and re- opened the Planning Commission's workshop on the SAO. Planning Commission /BAR October 25, 1990 Mr. Haggerton adjourned the meeting. Respectfully Submitted, Sylvia Appleton Page 7 For the record, Jack Flesher wanted his concern with Section 18.06.185, page 2 of the draft noted. MR. HAMILTON MOVED TO LEAVE THE WORDS, "A PREVALENCE OF IN THE ORDINANCE, WHERE IT HAD PREVIOUSLY BEEN DELETED, FROM SECTION 18.06.938, PAGE 2. MR. FLESHER SECONDED THE MOTION; MOTION PASSED UNANIMOUSLY. COMPREHENSIVE LAND USE PLAN AMENDMENT COMPREHENSIVE PLAN AMENDMENT CITY OF TUKWILA 6200 SOUTHCENTER BOULEVARD. TUKWILA, WASHINGTON 98188 HEARING DATE: FILE NUMBER: APPLICANT: REQUEST: LOCATION: ACREAGE: COMPREHENSIVE PLAN DESIGNATION: ZONING DISTRICT: SERA DETERMINATION: ATTACHMENTS: STAFF'REPORT TO THE PLANNING COMMISSION Prepared OCTOBER 19, 1990 PHONE # (2061 433.1800 Cary L. VanDuscn. Mayor October 25, 1990 90 -1 -R North Hills Office Building Ed Linardic Rezone from P -0 (Professional Office) to C -1 (Neighborhood Retail) 5900 Southcenter Blvd. 1.75 Acres Commercial P -0 Professional Office MDNS Issued on October 1, 1990 A. B. C . D. Ordinance and Findings & Conclusions from 84 -11 -R NorthHills Office Rezone Vicinity Comprehensive Land Use Map (to be submitted at meeting) Vicinity Zoning Map Site Plan Staff Report 90 -1 -R page 2 VICINITY /SITE INFORMATION BACKGROUND FINDINGS 1. Existing Development: There are no existing structures on the property. 2. Surrounding Land Use: To the west is the Arco service station /Mini -Mart, to the east is vacant land, to the north above the site is the North Hills Apartments and to the south is Southcenter Boulevard, I -405 and the Southcenter Mall. 3. Terrain: Due to previous grading activities, the site contains two "separate level benches" stepping up the hill with the northern portion of the site containing the steep slopes and remaining vegetation. 4. Vegetation: Previous grading activities on the site have stripped the vegetation except for the northern portions of the site which contains steep slopes with an average grade of 13.5 percent. 5. Access: This site has direct access from Southcenter Boulevard. The access is shared with the North Hills Apartment residence and the AM /PM Mini -Mart. On April 26, 1984, a request for a Rezone (file no. 84 -11 -R) for this property was requested by Don Moody, President of Western Pacific Properties. He requested a rezone from RMH (High Density Residence) to P -0 (Professional Office). The Planning Commission recommended approval and the City Council approved the request. Attachment A contains the Ordinance and the Findings and Conclusions from the rezone decision. Since 1984, there has been three different design proposals for this site. The last project was approved by the Board of Architectural Review on July 5, 1990 for an office building. Attachment D, reflects the approved site plan. On June 18, 1990, the City Council approved the applicants request for a waiver from the sensitive areas moratorium so that the rezone request could be processed. Staff Report 90 -1 -R Page 3 REZONE CRITERIA The burden of proof in demonstrating that the change is appropriate lies solely upon the proponent. Generally, the more dramatic the change, the greater will be the burden of showing that the proposed change is in conformance with the Comprehensive Plan as implemented by the Zoning Ordinance. The proponent must show in a clear and precise manner why the rezone application should be granted. The 3 rezone criteria contained in the Zoning Code and 3 criteria based upon case law are shown below in bold, along with applicant and staff discussion of relevant facts. TNC 18.84.030 (1) The use change in zoning requested shall be in conformity with the adopted Comprehensive Land Use Policy Plan, the provisions of this title, and the public interest; Applicant's Response "While perhaps not unforeseen, rapid multi - family growth in the immediate area of our proposal has created a need for adjacent public services." Staff's Response The Comprehensive Land Use Plan designates the property as Commercial. The request is to rezone the property from P -O (Professional Office) to C -1 (Neighborhood Retail.) Policy #1 of the Comprehensive Plan states: Policy 1. Encourage the grouping of uses which will mutually and economically benefit each other or provide necessary services. "Most business land uses, when grouped, complement one another since the cliental drawn to one will generally frequent others. Advantages are also present for the grouping of warehouse or industrial areas. This policy is intended to encourage this planned grouping of complementary uses and thereby maximize the drawing power or reputation of each grouping. This concept could minimize business failures and promote prosperity in the business community." (page 60) Policy #2 of the Comprehensive Plan states: Policy 2. Allow for the location of new commercial and industrial areas and the expansion of existing ones when this expansion is compatible with surrounding land use and not detrimental to the public welfare. Staff Report 90 -1 -R Page 4 "Just as the City strives to provide land for the location of new business, so should it provide the opportunity for existing businesses to expand. Due to Tukwila's location, transportation systems, level land and local services, the City is an attractive area for the location of commerce and industry. The City has vacant lands that can accommodate additional location of new business or the relocation or expansion of local businesses." (page 60) Policy #8 of the Comprehensive Plan states: Policy 8. Encourage a diversity of business uses to promote maximum occupancy. "As the economy fluctuates, various segments of the business community are helped or hindered more than others. This policy encourages diversity of business uses to promote maximum occupancy in order to avoid vacant non - productive building. Vacant buildings slow down the flow of property tax collections and adversely affect the City and property owner's ability to do financial planning." (page 62) The polices encourage the grouping of uses which will mutually and economically benefit each other or provide necessary services. This area functions as a self contained commercial node, the rezone request would enlarge a relatively small regional and neighborhood retail site. TMC 18.84.030 (2) The use or change in zoning requested in the zoning map or this title for the establishment of commercial, industrial, or residential use shall be supported by an architectural site plan showing the proposed development and its relationship to surrounding area as set forth in the application form; Applicant's Response "Please see attached site plan." Staff's Response The proposed 9,640 square foot, 1 -story building received Board of Architectural Review approval with conditions on July 5, 1990. (Attachment D) TMC 18.84.030 (3) When the request is not in agreement with the Comprehensive Land Use Policy Plan, the applicant shall provide evidence to the City Council's satisfaction that there is an additional need for the requested land classification. Staff Report 90 -1 -R page 5 Applicant's Response "Following per City of Tukwila Comprehensive Land Use Policy Plan; Goal 1; It would seem in the best interest of public welfare to offer public services in the form of general retail /commercial easily accessible (within walking distance) to a multi - family core. Goal 5; In response to extreme topography, we have recessed our building into the sites hillside. Goal 6; With the viable Dennys and Arco developments to the west, our proposal follows a local land use pattern that is balanced in supplying a demand. Goal 8; Please see Goal 6 response above in commercial development, effective location with efficient user access will determine whether a business will succeed or fail. Dennys and Arco remain very viable businesses." Staff's Response The request is in conformance with the Comprehensive Land Use Policy Plan Map designation of Commercial. However the applicant has not provided evidence as to the need for additional land to be zoned C -1. (4) Significant changes have occurred in the character, conditions or surrounding neighborhood that justify or otherwise substantiate the proposed rezone. Applicant's Response "Rapid multi - family growth in the immediate region has created a need for adjacent public services, in the interest of viable business practice which in turn will serve the public welfare. We are proposing an attractive, well scaled 9,640 square foot commercial structure." Staff's Response In 1986, then adjacent site did receive a Comprehensive Plan Map change from High Density Residential to Office and a rezone from R -4 (Low Apartments) to PO (Professional Office). The site of the rezone (File numbers 86 -65 -CPA and 86 -66 -R: Kato) fronts on 62nd Avenue South, is located above the subject site and remains developed with a single family home. The road classification for Southcenter Boulevard from the "S" line bridge to Interurban Avenue S. has changed form collector arterial to principal arterial. (5) The proposed rezone is in the best interest of the public health, safety, and welfare as compared to the hardship, such as diminution of property value, imposed on the individual property owner. Staff's Response Staff Report 90 -1 -R page 6 Applicant's Response "Please see #1 above. Our proposal serves the public welfare in answering a need. Office demand has leveled off, therefore, the only hardship in this case would be returning to a larger office structure." The request for C -i from P -0 is consistent with the Comprehensive Land Use Policy Plan Map designation. The C -1 (Neighborhood Retail) would be an extension of the existing adjacent zoning. The subject site is also compatible topographically and visually with the adjacent commercial development. (6) The unimproved subject property is unsuitable for the purpose for which it has been zoned, considered in the context of the length of time the property has remained unimproved and land development in the surrounding area. Applicant's Response "Please see #1 above Re: Land Development, and item #2 above Re: Office Use. Additionally, this particular site is small and steep, much better suited to commercial use requiring glazing on the street side only, versus office which typically requires glazing on all sides." Staff's Response The topography of this parcel separates it from the adjacent office and residential areas. The commercial business node along Southcenter Boulevard is adjacent to the subject site which shares the same driveway or access to Arco -Mini Mart. This parcel has been zoned P -O (Professional Office) since 1984. All sites within the P -0 districts along Southcenter Boulevard are fully developed with the exception of the subject site and the 1986 Kato rezone site. CONCLUSIONS Staff conclusions are summarized below under the six criteria. 1. The rezone request conforms with the adopted Comprehensive Land Use Policy Plan Map which designates the site as Commercial. 2. The applicant has provided a site plan, approved by the Board of Architectural Review on July 5, 1990. Staff Report 90 -1 -R page 7 3. The request is in conformance with Policy #1 (page. 60) of the Comprehensive Land Use Policy Plan since the rezone will be an expansion of the neighboring commercial zoning district. The new commercial site will provide economic opportunities that could mutually benefit the existing business and the new business will benefit from the neighboring ones. This request also complies with Policy #2 (page 60) of the Comprehensive Land Use Policy Plan because the expansion of the existing commercial area is compatible with the surrounding land uses•and will not be considered detrimental to the public welfare. 4. The request is in conformance with the Comprehensive Land Use Policy #8 (page 62) the C -1 zone will allow a greater diversity of businesses on the site either commercial or office because of Tukwila's cascade zoning. This will promote maximum occupancy of the new building , the ability for expansion of new businesses, and the expansion of relatively small commercial area. 5. The request would allow opportunity for business diversification due to the cascading nature of the City's zoning Code and would be an expansion of an existing Commercial area. 6. The parcel is physically separated by the steep slopes from the residential development to the north and office development to the east. The site is suitable for which it is zoned, the site has remained undeveloped for a relatively short time as P0. RECOMMENDATIONS The Planning Staff recommends that the Planning Commission adopt the findings & Conclusions of the staff report and recommend approval of the request from PO to C -1. LCM /clh 8501110391 CITY OF TUKWII WASHINGTON ATTACHMENT A ORDINANCE NO 1.739 AN ORDINANCE OF THE CITY OF TUKWILA, WASHING- TON, AMENDING THE OFFICIAL ZONING MAP ADOPTED PURSUANT TO SECTION 18.08.030 OF THE TUKWILA MUNICIPAL CODE BY RECLASSIFYING CERTAIN PROP- ERTY WITHIN THE CITY KNOWN AS THE NORTH HILL REZONE PROPERTY FROM HIGH DENSITY MULTIPLE RESIDENCE (RMH) TO PROFESSIONAL OFFICE (P -0). 407.91 B WHEREAS, the Tukwila Planning Commission conducted a public hearing for the purpose of considering a proposal to revise the zoning classification of certain property from high density multiple residence (RMH) to professional office (P -0) known as the North Hill Rezone, City File No. 84 -11 -R, and at the conclusion of said hearing and after deliberations upon the proposed rezone the Planning Commission forwarded its recommendation to the City Council, and WHEREAS, the City Council also conducted a public hearing on the proposed zoning map amendment which was held on November 26, 1984, and at the conclusion of said hearing having determined that the proposed zoning map amendment should be made, and WHEREAS, the City's Responsible Official has determined that the proposed zoning map amendment will not result in signi- ficant impacts upon the environment and a final declaration of nonsignificance has been issued, now, therefore, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, DO ORDAIN AS FOLLOWS: Section 1. The City's' official zoning map adopted pur- suant to Section 18.08.030 of the Municipal Code is hereby amended by revising the zoning classification of certain property within the City described on Exhibit A, attached hereto and incor- porated herein by this reference as if set forth in full, commonly known as the North Hill Property, City File No. 84 -11 -R, from high density multiple residence (RMH) to professional office (P -0). Section 2. The findings and conclusions of the City Council with respect to the zoning map amendment implemented by this ordinance are attached as Exhibit B and are incorporated herein as if set forth in full. Section 3. The City Planning Director is hereby instructed to revise the City's official zoning map in accordance.. with Section 1 of this ordinance. Section 4. This ordinance shall be in full force and effect five (5) days after passage and publication as provided by law. PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a regular meeting thereof this 17th day of December , 1984. ATTEST /AUTHENTICATED: CITY 'CLERK, MAXINE ANDERSON APPROVED AS TO FORM: OFFICE OP' THE CITY ATTORNEY: BY FILED ITH THE CITY CLERK: 5/9/84 PASSED BY THE CITY COUNCIL: 12/17/84 PUBLISHED: 12/26/84 EFFECTIVE DATE: 12/_31_/84 ORDINANCE NO. 1339 V APPROVED: Y L. VAN DUSEN EXHIBIT A TO ORDINANCE 1339 THAT PORTION OF LOT 11 OF INTERURBAN ADDITION TO SEATTLE, AS PER VOLUME 10 OF PLATS, PAGE 55, RECORDS OF KING COUNTY, LYING NORTH OF THE NORTHERLY LINE OF PRIMARY STATE HIGHWAY ROUTE 1, AS CONVEYED TO THE STATE OF WASHINGTON, BY DEED RECORDED UNDER RECORDING NO. 5473599; EXCEPT THE EAST 450.86 FEET AND THE NORTH 255.03 FEET THEREOF; SUBJECT TO AND TOGETHER WITH EASEMENTS AS RECORDED IN KING CO. A.F. #6007217 AND #7502130412, RESTRICTIONS AND RESERVATIONS OF RECORD, IF ANY. SITUATE° IN THE CITY OF TUKWILA, COUNTY OF KING, STATE OF WA. CO EXHIBIT B TO ORDINANCE NO. 1339 Findings & Conclusions of Tukwila City Council Concerning the North Hill Associates Rezone I. FINDINGS A. Western Pacific Properties is proposing to develop a three story office building consisting of approximately 14,500 square feet on the vacant property immediately east of the • existing Arco AM -PM Mini Mart at approximately 5900 South - center Blvd. Currently, the property is being utilized for an informal parking lot. In order to accomplish the proposal the applicant is requesting rezoning of the property from the existing zoning of High Density Multiple Residence (RMH) to the Professional Office (P -0) zoning classification. The ,4 property which is the subject of the rezone request consists 09 of approximately .87 acre of a 1.94 acre parcel owned by CI the applicant. • B. Board of Architectural Review of the specific design of the G building and site plan will occur subsequent to the final U5 action on the rezone. C. The Comprehensive Land Use Plan Map designate the subject property "Commercial" without specific development considera- tions. D. A Final Declaration of Nonsignificance was issued for the proposal. E. The property adjacent to the subject property on the west is zoned Local Retail (C -1) and is designated "Commercial" with- out special development considerations by the Comprehensive Land Use Plan Map. The property immediately to the north of the subject property is zoned Multiple Residence High Density (RMH) and is designated by the Comprehensive Land Use Plan map as high density residential without special development considerations. This property is also owned by the appli- cant. The property to the east of the subject property is also designated high density residential without special development considerations._ The present zoning of this prop - erty is Low Density Apartments (R -4). The subject property is bordered on the south by Southcenter Boulevard which is adjacent to the 1 -405 freeway. F. An Arco Mini Mart has been constructed on the property adja- cent to the subject property on the west. Other adjacent properties are undeveloped. An office building development is located to the east of the easterly abutting property. G. A hillside and retaining wall are located at the northern end of the subject property. The remainder of the subject property was excavated some time ago and is presently rela- tively flat. II. CONCLUSIONS A. The proposed zoning reclassification is in conformity with the City's Comprehensive Land Use Policy Plan, the provisions of Title 18 of the Tukwila Municipal Code and in general will serve the public interest. Specifically, the proposed reclassification is consistent with the following goals and • policies of the Comprehensive Land Use Policy Plan: • • A.4 r• itt 1. General Goals: Goals 1, 5 and 6 (pages 12 and 13). 2. Natural Environment: Goals 1, 2 and 3 (page 15); Objec- tive 1, Policies 1 and 3 (page 24); Objective 3 (page 25); Policies 1, 2, 3 and 4 (page 26); Objective 6 (page 28); Policy 1 (page 29); Objective 8 (page 30). 3. Open Space: Goal 1 (page 16); Policy 1 (page 34). 4. Commerce /Industry: Goals 1, 2 and 3 (page 18); Objec- tive 1, Policies 1 and 2 (page 60); Objective 3, Policies 1 and 2 (page 64); Objective 4 (page 65); Policies 1, 2 and 3 (page 65); Objective 6, Policies 1 and 3 (page 67). B. The proposed zoning reclassification has been supported by submittal of architectural site plans showing proposed devel- opment and its relationship to surrounding areas. The pro- posed development is consistent and compa; with surround- ing zoning and development, including the multi - family devel- opment to the north, as a result of natural separation pro- vided by the hillside to the north of the property, scale of the proposed development, access points and proposed land- scaping. C. The proposed reclassification is compatible with the City's Comprehensive Land Use Policy Plan. The applicant is there- fore not required to demonstrate need for the request pur- suant to Section 18.84.030(3) of the Tukwila Municipal Code. • D. The proposed office development will result in less traffic impact than multi - family development under the existing zoning. - 2 May 29, 1984 7:0O P.M. CALL TO ORDER and PLEDGE OF ALLEGIANCE ROLL. CALL OFFICIALS IN ATTENDANCE REPORTS Mayor Dwayne Traynor Civil Service Com. Proclamations: Recreation & Parks Month and ABWA Education Month Grady Way Bridge Bids Amend Agenda, Highline Incorporation Urban Design Study, Phase I PUBLIC HEARING Western Pacific Property Rezone Request TUKWILA CITY COUNCIL COMMITTEE OF THE WHOLE Tukwila City Hall Council Chambers MINUTES Council Prs.Phelpscalled the Committee of the Whole Meeting to order and led the audience in the Pledge of Allegiance. LIONEL C. BOHRER, MABEL J. HARRIS, DORIS E. PHELPS, Council President, JOE H. DUFFIE, EDGAR D. BAUCH, WENDY A. MORGAN, CHARLES E. SIMPSON. JIM HANEY, City Attorney; MAXINE ANDERSON, City Clerk; BRAD COLLINS, Planning Director; PATRICK LOWERY, Crime Prevention Officer; D0N MORRTSON, City Administrator; DON WILLIAMS, Parks and Recreation Director. Mayor Van Dusen administered the oath of office to Dwayne Traynor who will replace Steve Phelps as a member of the Civil Service Commission. Mayor Van Dusen read two proclamations, one declaring June as "Recreation and Parks Month" in the City of Tukwila and the other proclaiming May, 1984, as "ABWA Education Month" in Tukwila. Washington State officials estimated the cost of Grady Way Bridge Construction to be 6.1 million dollars. The low bidder bid 4.8 million dollars. Under this proposal, the City's share will be $500,000. MOVED BY BOHRER, SECONDED BY SIMPSON, THAT ITEM 7C, HIGHLINE INCORPORATION, BE ADDED TO THE AGENDA. MOTION CARRIED. Brad Collins, Planning Director, reported that the con- sultants have met with the Planning Commission and the Economic Development Committee of the Chamber of Commerce and discussed Phase I of the Urban Design Study. The consultants are continuing to analyze the information and will have the draft ready for staff the first part of June. It should beon the Council agenda for June 11. Council Member Morgan asked to have a summary of the Urban Design Study process given to the Community Affairs Committee. Council President Phelps declared the Public Hearing on the Western Pacific Property rezone request open and asked for any comments. Brad Collins reported that the Planning Commission, at their April 26, 1984, meeting recommended approval by the City Council of the subject rezone. Upon advise of the City Attorney, the Planning Commission adopted Findings and Conclusions. The conclusions state: (1) The proposed pro- fessional office zoning classification is consistent with the Comprehensive Land Use'Policy Plan; (2) The scale of the pro- posal and location of the property clearly establishes the desireable relationship of the development to the surrounding multiple family zoning; (3) The request is compatible with the Comprehensive Plan. Mr. Don Moody, President of Western Pacific Properties, 514 10th Avenue West, Kirkland, Wash., offered to answer questions for Council. Mr. Moody noted the access to the property is more than 200 feet from the S -Line Bridge (over TUKWILA CITY COUNCIL, COMMITTEE OF THE WHOLE May 29, 1984 ?age 2 PUBLIC HEARING - Cont. Western Pacific 1-405 to Southcenter). The access was put here in case the Properties Rezone adjacent property needed access and the entrance on the west Request is to the Arco Station. This would spread the traffic entering onto Southcenter Blvd. The building would be 15,000 square feet. Councilman Bohrer asked to have a staff analysis of the access and its relationship to the adjacent piece of property when it comes back to Council. He asked about access to the northern portion of the property. Mr. Moody said that there is an access on the east side, however, it is not ideal and they would have to come before the City before they could develop the property. At this time, there are no plans to develop that property. A pro- fessional office building creates the least impact,isthe most positive image for the City and is realistic from an economic standpoint for the developers. Council President Phelps asked about the drainage. Mr. Moody said they know they have to meet all drainage requirements before they can get a building permit. He said that they have planned for a reasonable amount of on -site parking and did not want to mix the building parking with the Arco Station or Denny's Restaurant. Councilman Duffie expressed concern about the additional traffic this would create. Mr. Moody said there would be 37 cars in total. Usually traffic from a building like this would leave over a period of time. A professional office building would blend better with the traffic in the area than a multi - family development which the property is now zoned for. Council President Phelps said the drainage problem concerns her and also the cut into the north slope. Mr. Moody said the complex is designed to not go into the toe of the slope. Mr. Collins clarified that the Planning Commission recommen- dation is to rezone back to the 175 foot line. Staff, in reviewing the traffic and the access questions, are requiring that an analysis be completed prior to building permit review. A variance has been granted on the front yard landscaping requirement for this property. Council President Phelps said the option of opening up the westerly portion of the parking lot to allow traffic to go east or west should be considered as part of the traffic analysis. There being no further comment, Council President Phelps closed the Public Hearing. MOVED BY BAUCH, SECONDED BY DUFFIE, THAT AN ORDINANCE BE PREPARED CONSIDERING THIS REZONE AND THAT IT BE ON AN AGENDA APPROVED BY THE COUNCIL PRESIDENT.* Councilman Bohrer asked to have the report on the access to this property and adjacent ones and a copy of the Planning Commission Meetings provided for Council. *MOTION CARRIED. ... % 44, PLANTING PLAN X ri P0TANIC,AL. ' I GON /MON MAN& _ ' PIZUNUS CE/2,A6 /f A 411/POIT: ACC2 fw 9 P (vt/ N/G/;A ' 04 two" 17 � JONY/N/U' G^GtTA QM rA ' I I ( 7L J 7/?ON N//s' FG12Ni■AL 7 2/ NDPON �pP/wI2 •/," M /AJ, is rIZz4■U* - , 'any .GUY�EN , OITO l�uL,'% N', GtlU1 L 21' t A ,4/( t-Ik+Ak `IVY " t7T6 044 d G. 1.1. . // d A rcvrov9`I `(c, OUA- Cd, 4/ ;�/NN/CAINNfC/ . . POTS rt £ e SEe'8 7 -A/'uN - 5E6 1 ° G�N rte✓ , Eu crrtII�A 1 i2Ie .1I i t / �9 PhOriOA : fr • t7;I I .. P1oriNA consultan a ,t04Gt.S 1lriardlc B�Ngn group � I archltfCts ' I . •' *1" M 1 J 1 838''westlake,,ave . n. • 9u1te 11(20 Seattle, wa 98109 i00)283=141 ■Oi PuUUSNID. All *mG ai IttuNviD :TI.L *IoV/ ` AND Lncn f.ATUAL ANO 101AS: DllIc*l'AND AINANCININ1I',:, IIPIISINTID TNI IS?' ANI:ANOINAll. iWIN TNI MOHIfv:'r OCT.!, AIICNITICT UO PRIT.TWOUO/.IMALC If NI/IODUCI0J COPIED. ADAPIID,.DISCLOSID OI pISTi11IUTID TObtNIISI ...SOLD. PuILISHID. OS OfwSNIIN`.USID "'TNOUT TMl,PUIOf1 SNITTIN'CONSIN7 Of AND APPIO•101TI AOCNITICT; : VIWAL'CONTACt IITN Tiff AIOVI DNAIINCI ! N :.; /CIPICATIONS, CONSTITUTI'CONCLUSIVI IVIDINCI.OP7, RCCIRANCI O/ • _ KTIDN/.; "••. .. tI • er ih T' '♦ 4 I T ' , '1. , IE• L" L7'1ti�cC.";»9'd�?E'C:>. ^:S.{6:L �tltltit�t1t1t1t�tltltlt�tlt�tit�tltl�lt�tl�ltit�t��t1= t:����_ �It��...tlt' p /D, INC I 1 • 2 3 ., • 41111111 III I!I II! I!11.1 I!I I!1 II' II III?` r� l l mr�t�mm�m�mmt�ml�t ism; �mvi„ml ,;.�� f �„I �m nmfl ■ L PU it pi! 1 • An " I f 1 ATTACHMENT D L 1 1 9 1 ' 9 IIII'9 lie. 11 1111111�1�i1111 1111 419 111111111111,111411111 1 teal o uuu 1'1 i GRUNSTEIN 5th Ave S. # 200 Land, Wa. 98033 LEON ,,.,,)NORT FiWESTERN (. L � • TM 1. PLANNING DEPT No further information available. A Minnesota Title Company , SUPPLEMENTAL REPORT 1111}1G� r 4� 1�10 NT No. 38851 JUL 17 1990 Your No. Ci Y ur I tLA a supplemental_title report covering cha ages since our report , 19, , at M. lowing information affects the title to the property covered by our preliminary report, but is no sent a complete report to date. Please Note in reference to ]paragraph No 10: No. i Reference: KATO GRUNSTEIN 6th Ave S # 200 ;.and, Wa. 98033 1; LEON SUPPLEMENTAL REPORT NT No. . _. XoRt .No: No. 38851 Reference: is a supplemental title report covering changes since our report , 19 . at M. following informationaffects the title to the property covered by our preliminary report, but is Tic present a complete report to date. =graph No.13= has been emended to read as follows: Matters dependent upon inspei:tion of the premises have been cleared for ALTA Mortgagee's Policy, except as follows: We will reinspect and report on clearance of encroachments and remaining ALTA questions upor. being advised that foundation forms are in place. GRANT OP CASEMENT Dated this ,A7 T' � 4 . day of January, '1574. 1;1 %setae lax Not Required RCA V. $ 4 Co. C ROM By • C, • Nty COURTESY 06 NORTHWESTERN TITLE CQ. , (206} 825.1952 • , KNOW Att MAN OV THESE PRESENCKs Lj hostaurena Industries, xnc.,,ar corporation, the Grantor, for valuable consideration, the receipt of which is hereby acknowledged, does hereby grant' ynto4Ony 6.' Kato and DoUSO 14.' Kate, husband and wife; an easement over and across a parcel of land located in Tract 35 o!: Aro*kval. Garden Tracts, as per plot recorded in Voiumc 10 of Plats on pegs 47. Records of King County, •'� washington, and of the unplatted strip of land sdloining on the East, lying between the East line of said Tract'35 (said Cast lino being also the Cast line of the Southwest 1/4 of Section 23, Township 23 North, Mang* 4 East, N.M.) and the West line of the Interurban Addition A$ per plat recorded in Vole a 10 of Plats, on palls 55. records of said county, deaoribod ass aeginntn4 at the intersection of the West lin. of maid Interurban Addition with the Northerly lino of Primary State Highway No.1. RE as demoribad in King County Superior Court Cause No. 600726; said point being the true point of beginning; thence Northwesterly along said northerly line a distance of 73 foot, thence Northerly a distance of 60 fast on a line ,p*rail.l to the Weat ,line of maid Interurban Addition; thence Southeasterly a di4tanee of 25 feet on a line parallel to the said Northerly Sias of Primary State Highway No. 1 art thence Southerly along the West line of said interurban Addition to the true point of beginning. for purpose of ingress to and egress from contiguous Lands owned by the Orenteea. This easement shell be perpetual in time, shall run with the successors and assigns of the portico., RESTAURANT INDUSTRIES. INC. rotary '3 all t•i IMMO FDA tor R*aard ftwa4.4, A/ 1914 A PM 4 13 • a =ICU** 1gt/0 ccUturr. YjAr 4. • • h • t • L .S TS OF oR; Ro'V ; '' coontY, ,O MAMON 1 • r + • •, thia 8th bay of January, 1974, before met the undersigned, ' a Notary Public: in and for the State of Orogen, duly commissioned and sworn. personally appeared C. Sabsrt•kitman and Arlen Smith to me known to be the President and Secretary, resyectivsiy, of • Restaurant industrial', Inc. its corporation that •xecutod the • foregoing instrument, and acknowledged the said instrument to i be the free and Voluntary act apd desd,et said corporation. for the ulea and purposes therein taentioned,'and on Oath stated this they authorized to execute the said instrument and that the seal affixed.is the corporate zeal of acid corporation. Witness ray, hand and official seal hereto affixed the day and year first ahove written. o esy n an . er a a s s Oregon residing at 1alera My Commission ettpis'* ..a.4.1 , 1! • . r • . • i. Leon Grundstein 7 6th Ave S. #20 Kirkland, WA 98033 Attn: Leon NOr WESTERN • • si, y'' • ".,.; TITL',.. "' A AGro ma litle Compa y 1 . ?SO A,qk wwtiw 700 Third Awnw . Sams* HMaNnptoo 981044449 • 0011125M Z PRELIMINARY COMMITMENT FOR TITLE XNSURANCE Our Order NT038851, Unit: 3 Your Reference: KATO Effective Date: May 1, 1990 at 8 :30:a.m. Policy or Policies to be issued: ALTA Loan Policy X Amount: Later Standard `extended X Premium: Later Tax: Later Rate: Later Proposed Lender: Later TITLE INSURANCE COMPANY OF MINNESOTA agrees to issue on request and on recording of any appropriate documents, its policy or policies as : :applied for, with coverage as indicated, based on this preliminary commitment that title to the property described herein is vested on i:he date shown above in SATOME KATO, who is identical with TONY KATO and DORIS KATO, husband and wife subject only to the exceptions shown herein and to the terms, conditions and exceptions contained .in the policy form. This report and commitment shall have no force or effect except as A lasis - for the coverage specified herein. SEE ATTACHED EXHIBIT "A" FOR LEGAL DESCRIPTION. ( CONTINUED ) Jack Hagen, Title Officer i. Colleen Barnes, Assistant Phone: 625 -0313 and 625 -1952 FAX: 292 -8057 f" For Year: Amount Billed: Amount Paid: Parcel No.: Levy Code: Grantor: Trustee: Beneficiary: Amount: Dated: Recorded: Recording No.: IY A Minnesota Tide Company NORTHWESTERN [MI 1. GENERAL TAXES, PLUS INTEREST AND PENALTY AFTER DELINQUENCY; 1ST HALF DELINQUENT ON MAY 1; 2ND HALF DELINQUENT ON NOVEMBER 1: 1990 $12,225.92 $ 6,112.96 359700- 0202 -09 2380 ASSESSED VALUATION PER KING COUNTY OFFICE OF FINANCE: Land: $268,100.00 Improvements: $675,100.00 2. DEED OF TRUST, AND THE TERMS AND CONDITIONS THEREOF: David Hudesman and Linda Hudesman, his wife Security Title Insurance Company Peoples National Bank of Washington $150,000.00 December 14, 1972 December 29, 1972 7212290083 The address of the lender or the last assignee, as disclosed of record is as follows: 1903 Third Aveune Seattle, Washington 98101 2. LEASE, AND THE TERMS AND CONDITIONS THEREOF: Lessor: Tony Kato and Doris Kato, husband and wife, Landlord Lessee: Vip's Restaurants, Inc., Tenant Disclosed by Memorandum thereof Recorded: February 13, 1975 Recording No.: 7502130412 (Copy attached) Lessee's interest in said lease assigned To: Gencor, Inc., a Washington corporation Recording No.: 8712030050 and 8712030051 Subsequently assigned to: North Hills Joint Venture Partners, a Washington joint venture comprised of Gencor, Inc., a Washington corporation, and North Hills Apartments, Inc., a Washington Corporation by assignment of Lease recorded June 22, 1988, under Recording No. 8806220636. NT038851/813 Page 2 Grantor: Trustee: Beneficiary: Amount: Dated: Recorded: Recording No.: Lessor: Lessee: 4. COMMERCIAL DEED OF TRUST AND SECURITY AGREEMENT WITH ASSIGNMENT OF RENTS, AND THE TERMS AND CONDITIONS THEREOF: Affects this and other property S. FINANCING STATEMENT, AND THE TERMS AND CONDITIONS THEREOF: Secured Party: Key Bank of Puget Sound Debtor: North Hills Joint Venture Partners, a Washington joint venture comprised of Gencor, Inc., a Washington corporation and North Hill Apartments, a Washington corporation Covers: Personal property on real estate described herein Filed: March 27, 1990, in the office of the County Recorder Uniform Commercial Code No.: 9003271407 Affects this and other property 6. CERTIFICATE AND AGREEMENT: Dated: Recorded: Recording No.: (Copy attached) NT038851/813 Page 3 ORTHWESTERN ITLE "' A Minnows no Company North Hills Joint Venture Partners, a Washington joint venture comprised of Gencor, Inc., a Washington corporation and North; Hills Apartments, Inc., a Washington corporation Northwestern Title Company Key Bank of Puget Sound, a Washington banking corporation $1,700,000.00 March 1, 1990 March 27, 1990 9003271406 Satomi Kato, AKA Tony Kato, and Doris Kato, husband and wife North Hills Joint Venture Partners, a Washington general partnership March 1, 1990 March 29, 1990 9003290169 • Assignor: Assigne: Amount: Dated: Recorded: Recording No.: Assignor: Assigne: Amount: Dated: Recorded: Recording No.: Secured Party: Debtor: Covers: Filed: Uniform - Commercial Code No.: NT038851/813 Page 4 ORTHWESTERN ITL E I.4 A Minnesota Tide Company 7. ASSIGNMENT OF RENTS AND /OR LEASES, GIVEN AS SECURITY, AND THE TERMS AND CONDITIONS THEREOF: VIP's Industries, Inc., an Oregon corporation GeLcor, Inc., a Washington corporation Not disclosed December 1, 1987 December 3, 1987 87: 2030052 Affects portion of saic. premises. 8. ASSIGNMENT OF RENTS AND /OR LEASES, GIVEN AS SECURITY, AND THE TERMS AND CONDITIONS THEREOF: VIP's Industries, Inc., an Oregon corporation Ger.cor, Inc., a Washington corporation Nol disclosed December 1, 1987 December 3, 1987 87] 2030053 Affects portion of saic premises. 9. FINANCING STATEMENT, A■D THE TERMS .AND CONDITIONS THEREOF: VIP's Industries, Incorporated Gencor, Inc. Personal property on real estate described hex e in December 3, 1987, in the office of the Co unty Recorder 8712030054 Affects portion of said premises. 10. Pending action in King County Superior Court Cause No.: 89-2-12421-1 Plaintiff: Gencor, Inc., a Washington corporation Defendant: Ostergaard- Robinson Associates, Inc., a Washington corporation; David O. Ostergaard and Jane Doe Ostergaard, husband and wife; and Kent L. Robinson and Jane Doe Robinson, husband and wife., third -party plaintiffs: Geo- Dimensions, Inc., a Washington corporation; Ed Green and Jane Doe Green, his wife; North Hills Joint Venture Partners,' a Washington joint venture comprised of Gencor, Inc., a Washington corporation, and North Hills Apartments, Inc., a Washington corporation; Key Bank of Puget Sound, a Washington banking corporation; and M. A. Segale, Inc., a Washington corporation,' Third -party defendants Being an action for: Money due to Engineering malpractice Attorney for Plaintiff: Robert B. Spitzer Attorney for Defendant: Dale J. Galvin NOTE: Lis Pendens thereof recorded September 19, 1989 $ February 12, 1990 as Recording No. 8909190571 & 9002120667. TITLE RTHWESTERN NOTE: ' Further information will be provided by supplemental report. 11. 'LIEN FOR LABOR AND /OR MATERIAL AND THE TERMS AND CONDITIONS THEREOF: Claimed by: Ostergaard - Robinson F, Associates, Inc. Against: Gencor, Inc. In Amount of: $10,514.67 Work Commenced or Material Delivered: June 15, 1987 Work Ceased: February 22, 1989 Recorded: May 17, 1989 Recording No.: 8905171183 12. Unrecorded Leaseholds, if any, rights of vendors and holders of security interests on personal property installed upon said property, and rights of tenants to remove trade fixtures at the expiration of the term. 13, Questions of survey, rights of persons in possession, material, equipment and labor liens. Upon completion of our inspection of the premises, we will report by supplemental the matters disclosed thereby. NOTE 1: Address of Property: To Follow NT038851/813 Page 5 " A IL A Minnesota Title Company • NOTE 3: The language contained in the printed Exclusions from Coverage and Conditions and Stipulations of the policy committed for may be examined by inquiry' at the office which issued the Commitment, and a specimen copy of the insurance policy form (or forms) referred to in this commitment will be furnished promptly upon request. NOTE 4: Investigation should be made to determine if there are any service, installation, maintenance, or connection charges for sewer, water or electricity. NOTE S: In the event this transaction fails,to close, a cancellation fee will be charged for services rendered in accordance with our schedule. NOTE 6: SEE ATTACHED EXHIBIT "B" FOR FURTHER EXCEPTIONS BL /hc 813 NT038851/813 Page 6 NORTHWESTERN 'f ITLE I. All0 A Mku ota !" Company • :r EXHIBIT "A" END OF EXHIBIT "A" NT038851/813 Page 7 TITLE TLE A Minnesom rn. Company That portion of Tract 11. of Interurban Addition to Seattle,. according to plat thereof recorded in Volume 10 of Plats, page 55, records of King County, Washington, described as follows: Beginning .at a point on the West line of said Tract 11, distant South 0 ° 35' West 228 feet from the Northwest corner thereof; thence North 89 ° 52'''East.. parallel with the North line of said Tract 11, a distance of 185 feet, more or less, to .the West line of the East 450.86 feet .of said Tract 11; thence South 0 °08' East along said West line 260 more' or less to the Northerly line of Primary State Highway No. 1, R.R. as conveyed to the State of Washington by deed recorded Auditor's Pile Number 5473599; thence North 70 ° 32'27" West along said Northerly line 198.57 feet more or less to the West line of said Tract 11; thence North 0 East 194.4. feet to the point of beginning. SUBJECT TO and easement for ingress egress and utilities over the West 25 feet thereof; TOGETHER WITH that portion of Tract 11 of INTERURBAN 'ADDITION TO SEATTLE, according to plat thereof recorded in Volume.l0 of Plats., page 55, records of King County, Washington described as follows: Beginning at the Northwest .corner.of said Tract 11; thence South 0 ° 35' West along the West line of said Tract 11, a distance of 228 feet, . thence North 89 ° 52' East parallel with the North line of said Tract 11 a distance of 185 feet, more,..or less, to the West line of the East 450.86 feet of said Tract 11; thence North 0 °08' West along said West line 228 feet to the North line of said Tract 11; thence South .89, West 181.79 feet to the point of. beginning. • TOGETHER WITH an easement for ingress, egress and utilities over that • •portion of the West 25 feet . of said Tract 11, lying South of :the above - described property and - lying,North of State Highway No. 1, R.E. A, RELEASE OF DAMAGE AGREEMENT AND THE TERMS AND CONDITIONS THEREOF: Between: Say :omi Kato, a /k /a Tony Kato And: • The City of Tukwila Dated: December 3, 1972 Recorded: August 15, 1974 Recording No.: 7408150422 Releasing the City of Seattle from all future claims for all damages resulting from the inability of Indemnities to negotiate the Indemnitor's subject driveway during periods of extreme inclement weather with any of Indemnitee's service, rescue and /or firefighting equipment and personnel. Affects a portion and includes other property. B. EASEMENT, AND THE Purpose: Disclosed by: Area Affected: C. EASEMENT, AND THE TERMS AND CONDITIONS THEREOF: Purpose: Disclosed by: Area Affected: Between: And: Dated: Recorded: Recording No.: Affects Parcel B. E. EASEMENT, AND THE Purpose: Disclosed by: Area Affected: NT038851/813 Page 8 ( j4ORTHWESTERN TITLE TERMS AND CONDITIONS THEREOF: .4 A Minnesota Tits Company Ingress, egress and utilities Instruments recorded under King County Recording Nos. 8012160684 and 8012160685 As described therein Ingress, egress and utilities Instrument recorded under King County Recording No.: 8412311478 The West 30 feet of the East 480.86 feet and l ying South of the North 280.00 feet of Tract D. RESTRICTIONS, CONDITIONS AND COVENANTS CONTAINED IN CONCOMITANT ZONING AGREEMENT, AND THE TERMS AND CONDITIONS THEREOF: The City of Tukwila North Hill Associates, a Joint Venture con;::sting of Western Pacific Properties,' Inc., a Washington'corporation and VIP's: Restaurants, Inc., an Oregon corporation April .29, 1985 May 1, 1985 8505010766 TERMS AND CONDITIONS THEREOF: Water, sewer and recreational trail purposes Instrument recorded under King County Recording No.: 8703190468 Portion of said premises F. EASEMENT, AND THE TERMS AND CONDITIONS THEREOF: Purpose: Disclosed by: Area Affected: Fox Parking purposes Instrument recorded under King County Recording No.: 8804110076 The description contained therein is not sufficient to determine its exact location within the property herein described. G. EASEMENT, AND THE TERMS AND CONDITIONS THEREOF: Purpose: Disclosed by: Area Affected: For Parking and Recreational Space Rights Instrument recorded under King County Recording No.: 8807210449 The description contained therein is not sufficient to determine its exact location within the property herein described. Said instrument was amended under King County Recording No. 8810170290. H. EASEMENT, AND THE TERMS AND CONDITIONS THEREOF: Purpose: Disclosed by: Vehicular Access Instrument recorded under King County Recording No.: 8807210450 The description contained therein is not sufficient to determine its exact location witlin the property herein described. I. AGREEMENT FOR CABLE TEL:.?.VISION SERVICE AND EQUIPMENT, TOGETHER WITH A RIGHT OF ENTRY AAD OTHER PROVISIONS: Area Affected: Between: And: Recorded: Recording No.: ( , O TITL RTHWESTERN E TCI Cablevision of Washington, Inc. Gen :or Inc. Sep :ember 27, 1988 880)270333 Affects this and other property. J. EASEMENT, AND THE TERMS AND CONDITIONS THEREOF: Grantee: Purpose: NT038851/813 Page 9 Pugot Sound Power F Light Company, a Washington corporation Undt:rground electric transmission and /or disl:ribution system '" A Minnesoa 7i j. Company Area Affected: Recorded: Recording No.: Recorded: Book: Page: Auditor's No.: Affects: A right -of -way 10 feet in width having 5,feet of such width on: each side of a centerline de:>cribed.as follows: The centerline of Grantee's facilities as constructed or to be constructed, extended, or relocated, lying wi':hin the abovedescribed as follows: March 13, 1989 8903130883 Affects this and other property. Said instrument is a re- recording of instrument recorded 22, 1988 under King County Recording No. 8808221072. K. PROVISIONS CONTAINED IN DEED FROM STATE OF WASHINGTON: Recorded: November 17, 1988 .Recording No.: 8811170199 As follows: The grantee herein, its successors or assigns, shall have no ' right of ingress and egress to, from, and between said SR S and the lands herein conveyed; nor shall the grantee herein, its . successors or assigns, be entitled to. compensation for any loss of light, view, and air occasioned by the location, construction, maintenance, or operation of said highway. The specific details concerning all of which may be found on sheet 6 of that certain plan entitled SR 5, South 178th St. to South 126th St., now of record and on'file in the office of the Secretary of Transportation at Olympia, Washington, bearing rate of approval January 30, 1962. The grantee as part con:;ideration herein does hereby agree to comply with all civil r.ghts and anti - discrimination requirements of RCW Chapter 49.60, a: to the lands herein described. L. A RECORD OF SURVEY AND NATTERS RELATING THERETO. Augvst 10 1983 37 30 8308109001 This and other property END OF EXHIBIT "Jr NT038851/813 Page 10 .11ORTHWESTERN. TITLE '" A Minnesota Trtq'!Comp4nY :1 NORTHWESTERN TI 1 U: A Minoan nu. Ci *w 250 Anti: Building 7Q0 Thin! Avenue Seattle, lashing= 981041849 0 1°P°6: L.r / c" Z ti G$ w s o I( ' • : L a l s , • Q 'ti ( J j- ij allt w; M y �r J ■ • $ y 09 1 00 . 4 ~ • I'•+ '.01 4, • fsi 1t 1; ,.... , � ,••• � � r'.'^ + - ••4,. 1 2 -,. , • Order No. - V13 J Plat. Vol. /() Page s. i sr ,1 • +t. V .,�s _ ��000 �p�1,Q. • 10 I • •— - .. 51 •r. .___. 41111.0. 4 ,I •.Y w 14 i ;$ � S aar � 4 411i 4.4 e NO '\ Dimensions of subject premises are: This sketc does not purport to show all highways, roads or easemt MS affecting said property. No liability is assumed for variations in dmensioni and location, a td is not based upon a survey of the property described ii i this order. It is furnished without charge, solely for the purpose of assisting In locating Ito described premises. The Company assumes no liability for inaccuracies therein. 7 O:�N GRUNSTEIN 750 6th Ave S # 200 Kirkland, Wa. 98033 ATTN: LEON f..ated as of the r AWT-43 »QRTI WESTERN TITLE , W . . .� A Minnesota Title Company SUPPI MENTAL REPORT We will reinspect and report on clearance of encroachments and remaining ALTA questions upor being advised that foundation farms are in place. 16th May ,19. 90 , at 8:30 day of by Nor Investors Tide Company NT No. 38851 Your No. Reference: KATO 0 This is a supplemental title report coveting ohs' uses since our report :7� dated l9...�• at_ M. 6J The following information affects the title toll Le property covered by our preliminary report, but is not intended to r a complete report to date. ():) Paragraph No.13= has been amended to read as follows: . Matters dependent upon inspe of the premises have been cleared for ALTA Mortgagee's Policy, except as follows: No. of LEON GRUNSTEYN ft): 750 6th Ave S. # 200 Kirkland, wa 98033 ATPN: LEON NWT43 )NORTHWESTERN TITLE 4 � • 7 A Minnosoto Title Company SUPPLI ;MENTAL REPORT Cl This is a supplemental title report covering changes since our report dated _ , 19 , at M. C I The following information affects the title to t :e property covered by our preliminary report, but is not intended to represent a complete report to date. (X) Please Note in reference to paragraph No 10: No further information available. Ddted as of the 11th day of May , 19 90 at 8s30 by Nori. hwesten Tick Compwy No. NT No. 38851 Your No. Reference: KATO RELONE APPLICATI6 I JUL 17 1990 1. BRIEFLY DESCRIBE YOUR PROPOSAL: IE2oLi Finam 2. PROJECT LOCATION: (Give street address or, if vacant, indicate lot(s), block, and subdivision; or tax lot number, access street, and nearest intersection) 900 Quarter: 23 Section: 2.3 Township: 4 Range: (This information may be found on your tax statement.) 3. APPLICANT:* Name: 1=d LA"ZoIc- Address: ► 362 t...t . rt. G NA. c1S1 9 OWNER Phon Signature: J .• - Date: 7/I4/4o * The applicant is the person whom the staff will contact regarding the application, and to whom all notices and reports shall be sent, unless otherwise stipulated by applicant. Phone: AFFIDAVIT. OF OWNERSHIP 4. PROPERTY Name: G-W=1.tc.0p..- Address: - 7'o . vq, . l , o33 I /WE,Esignature(s)] swear that we are the owner s or contract purchaser s o th? property involved in this application and that the foregoing statements and answers contained in this application' are true and correct to the best of my /our knowledge and belief. Date: 7/2/9a c. 5. WHAT IS THE CURRENT ZONING OF THE PROPERTY? f?v. 6. WHAT IS THE SIZE OF THE PROPERTY? 7. WHAT ZONING CLASSIFICATION IS REQUESTED? C.--111 I 8. WHAT IS THE COMPREHENSIVE LAND USE MAP DESIGNATION? A=?-49 1-41c41-1 Q .Esir:3. REZONE APPLICATION Page rrr REZONE CRITERIA: The burden of proof in demonstrating that the change is appropriate lies solely upon the proponent. Generally, the more dramatic the change, the greater will be the burden of showing that the proposed change is in conformance with the Comprehensive Plan as implemented by the Zoning Ordinance. The proponent dust show in a clear and precise manner why the rezoning application should be granted. The Planning Commission and City Council will review your proposal using the following criteria. You may attach additional sheets and submit other documentation to support your rezone application. 9. The use or change in zoning requested shall be in conformity with the adopted comprehensive land use policy plan, the provisions of this title, and the public interest; RESPONSE: ii_. E. 5� cor..,c t�12�1 -I SIt/C F=LA+.1 10. The use or change in zoning requested in the zoning map or this title for the establishment of commercial, industrial; or residential use shall be supported by'an architectural site plan slim/Ng the proposed development and its relationship to surrounding areas as set forth in the application form; RESPONSE: 1=L.4EFI 19„4 . 11. When the request is not in agreement with the Comprehensive "Land Use Policy Plan, the applicant shall provide evidence to the City Council's satisfac- tion that there is an additional need for the requested land classification. To respond to this criteria, obtain a Comprehensive Plan Amendment Applica- tion and submit in conjunction with Rezone Application. - bp , • 1 ,R.� .. O - - ? ,b�tv t'Tt✓ -M' ` t3 ,c:.8cysr •2.� REZONE APPLICATION Page 3 RESPONSE: Tal-m, t° PAL P- MG1.t�t�lt=t� r ,dam '. 12. Significant changes have occurred in the character,..conditions or surround- ing neighborhood that justify or':otherwi-se-.substantiate the proposed rezone. .. RESPONSE: 12 1= nA41- GiRp 't-t 11 %4 "1"-tra tnnvtev�` •zeisitc■ 144.5 C €T pG? ��— ^ I.T� 'R -��uG sesavices. 1 F..1 - rt-ia I tsT- PQACT1CM Id\f44 tC14 t t4 TLt t-1 1--11 LL j1 ESN A.r l�l6 , )6V414:31 fit'. FT GEMM tAL. 13. The proposed rezone is in the best interest of the public health, safety, and welfare as compared to the hardship, such as diminution of property value, imposed on the individual property owner. RESPONSE: '1 a ' = ` c t2 AS /Si. . cue. Sl r - tea✓ R)2 L C. tb.s ,a.mS tz,t s►r�a. - P 7 4.4t✓ra6 - '1 - NG — 2. 41 P t Li - r&41 S CASE L%IO -1 t 'z3E TAG C UB-t.1 t l� y 14. The unimproved subject property is unsuitable for the purpose for which it . has been zoned considered in the context of. the. length of time the property has remained unimproved and land development. in. t.he- .surrounding area.. . RESPONSE: t2 T i=)t E.L.c 1,4 4,37 - 1141.S '142 - r s rre t5 Stvut.. -L_ 1:7 �St��1 1,ltuCH 8t 'I'�� St.L t� -tt) 'Cncyl vic-g zt4.- t.15a f1E fl i; et ?-tt.1E1• =KJ - 11-1S STC'' JET Str. . Q.it.''� \2Sc (F.F -tCE t,- tt-61 GH cr.; (29 /REZN.APP1,2) .July 12, 1989 Mr. Leon Grundstein Mr. Walter Smith Gencor, Inc. 11801 Northeast 160th Street, Suite G Bothell, Washington 98011 Re: Tukwila Nort A N 4e Building Dear Messrs. Grundstein and Smith: This letter presents newly developed information requested by the City of Tukwila for inclusion with your permit application documents for your proposed office building. Earlier reports and correspondence from my office relevant to the project are dated June 24, 1987, June 16, 1989, and June 21, 1989. These latest requirements specify that a test boring be made and that the report be expanded in its explanations of groundwater . presence, slope stability, bearing pressure, and backslope incline. These issues were raised in association with the north side of the building. The test boring was drilled at the location shown on attached page five, taken from MGA's Sheet A -1 dated June 9, 1988. This is the approximate most critical temporary cut face location and is' upslope from the approximate high point of the wall. It approximately coincides with Section "A" of Sheet A -I4. A truck- mounted mobil drill B -60 hollow auger was used. Undisturbed samples were obtained at five foot intervals by means of a 3 in OD Dames & Moore type sampler. In brief, sand was found to a depth of 16 feet and sandstone bedrock was found below that. The boring was terminated at 30 feet deep, approximately at proposed first floor elevation, because the hardness of the sandstone essentially precluded further drilling by this method. There were no noted indications of groundwater presence during or immediately following drilling, but a pizzometer was installed at the depth where groundwater could most likely be expected; particulars of pizzometer installation are described on the boring log attached. The driving resistances shown on the log are standard for Dames & Moore equipment, but are not SPT numbers. Groundwater To date, the sand shroud surrounding the pizzometer top remains dry. A small spring emerges from the cut bank north and west of the test boring; the seepage flows several yards down the existing road before it evaporates. Seepage is also emerging from beneath the spoils pile and * JAMES EATON, PE _. • GEOTECHNICAL SERVICES (206) 682 -6942 MI Box 126 • Hobart, WA 98025 I t t .11. . t.!,. t 4 Mr. Leon Grundstein Mr. Walter Smith Page 2 July 12, 1989 Slope Stability and 8ackslope Angle maintaining wet ground in the unfilled area within the proposed building footprint. This is the same seepage which was noted on page three of the 1987 report, though the presence of the new spoils has caused the surface wetting to spread. One can reasonably postulate that development of the North Hill Apartments above has had some effect on springs and shallow groundwater of the lower slopes. Most likely the effect has been of diminution during winter months, but because of. lawn irrigation, the summer effects are uncertain. There is indication that irrigation water has seeped beneath the board fence behind the apartment complex. Any natural or unnatural water which gravitated to the sand /sandstone contact would become a part of the aquifer system that includes the springs. Groundwater and /or springs would be important if a sloped soil mass were saturated in such a way as to become slide prone under the influence of hydrostatic or pore pressure, if it were present in such quantity as to hinder construction, or if its presence were not anticipated in the design of retaining walls or floor slabs. All evidence developed to date suggests that the only groundwater above approximate elevation 80 is the thin perched type along the permeable /impermeable contact, and that it will amount to nothing worse than a nuisance during construction. Typically permeable /impermeable surfaces are warped configurations and saturation is present or detectable only in the trough areas. The reasons that onsite soils are not being used as wall or drain backfill is that collectively they could obstruct natural.subgrade drainage and /or permit dangerously high moisture conditions to develop behind retaining walls. The groundwater becomes effectively free from confinement or hydrostatic pressure buildings at the point where it enters pea gravel behind the walls. This is illustrated schematically on page 3. The sandstone and its weathered variations are vastly superior in strength to any of the glacial or post - glacial soils, and I suggest that maximum advantage be taken of this during construction.. Note that 1987 test pit No. 2 and the recent test boring both fall near Section A of Sheet A -14; the depths to sandstone are 1 ft. and 16 ft., respectively, suggesting that some bedrock will likely be excavated. Where possible, you should cut vertical faces through the sandstone so that slopes through unconsolidated soils can be kept minimal. Implied by this is that the precise temporary cut configuration should be determined as the work is in progress. The recommendations I have provided to your civil and structural engineers, both in writing and verbally, provides for a worst case, no sandstone is excavated. Either natural or long - existing slope faces exist east, north, Mr. Leon Grundstein Mr. Walter Smith Page 3 July 12, 1989 and northwest of the building area and expose the same sand layers which you will excavate. These support varying densities of vegetation and are stable. at 60 to 70° to the horizontal for 20 vertical feet and higher. The type of strength upon which such slopes depend cannot be accurately measured in the laboratory, but where field conditions permit can be calculated from critical height observations. I have recommended a 1:4 temporary cut. The wall will not be poured in place. Note that the 1987 report requires a six -inch granular layer beneath the slab and filter - shrouded granular wall backfill. The cut, drain, and wall are shown schematically below: ye imove I have advised your structural engineers not to exceed 30° backslope for at least IH horizontally behind the wall. Beyond that, steeper permanent slopes would not influence the wall and, the excavation could merge with any now - existing slopes for the permanent case. The 30° figure is intended to be a maximum to which the wall will be designed and for which lateral pressures have been provided. To whatever the "close -in" angle can be kept below 30° even in exchange for steeper more - distant inclines, the greater the stability of the wall beyond that which was designed. Bearing Pressure It will not be possible to pour the entire foundation system on soil of a uniform type. N values for the weathered and slightly weathered sandstone justify bearing pressures in the order of 20 ksf or higher. In recognition that it is desirable to design all footings to the same allowable bearing pressures, I recommended in 1987, that all foundations be designed to 5 ksf to stay within commonly recognized ranges of strength used for the other soil types which are likely to be encountered, i.e., dense sand and hard silt -clay mixture. • Mr. Leon Grundstein Mr. Walter Smith Page 4 July 12, 1989 I explained that to minimize differential settlement between sandstone - supported footings and other ,footings, the others would have to be excavated deeper than specified by code; the bearing surfaces are to be inspected for compliance before they are poured. Yours very ly, ames Eaton, P.E. 71 -3731 JE :ho'r /12 2 Attachments • • �ti .v .. " • t!0 srmx ` ROAO 1 0 ItY . I� L ` � mil" v4/Pg• I e. il . :: ........ ,./N `v. EA ,. v.* ; • 8 • „J ti • • • SPOILS PI LAS ma i • ma 1 to I ta.-. i \\ t 1 to 4 0 9 • • 14' (14 (24 (26 24 (20) 50/4 ") 29' (31) (50/4 ") GENCOR TEST BORING Brown F -M sand ( (7) (8) 16 (22) 16' Yellowish brown weathered F -M graied sandstone 19' (15 (26 (45 Completed July 7, 1989; no indications of groundwater presence by drill cuttings, drilling progress, during sample intervals, or in 'the progress of stemming and backfilling. Sealed with Bentonite below 19 ft. Sand plug 14 -19 ft. Pizometer installed at 18 ft. Sealed with Bentonite above 14.ft. STORM DRAINAGE CALCULATIONS FOR GENCOR NORTH HILL OFFICE BUILDING SOUTHCENTER BOULEVARD TUKWILA, WASHINGTON BY • BUSH, ROED & HYTCHINGS, INC. 2009 MINOR AVENUE EAST SEATTLE, WASHINGTON 98102 (206) 323 -4144 BRH JOB NO. 89176.02 JUNE 22, 1989 Rev tse 6 -2 -43 q X58 D58 . ......... 14 (1o),4-7.61 = 43148 SF. ol.i icres. IMP AtS 35x90 r. 271( GrurukS °*1(34-64° - 4....USE • ‘911 - • - -• •- 270 1° 4 "/SeG (20 . 5 = 1.32 in /kr. Ex = 0f olct I _Oct _0.991 c."CS /Ass..4 = -zs + 4 := 40, 8 •N‘iN _ 2s1.0 0 STD Rfn bRAI E 6e1LcutiliteN5 GE.Mc..0K 1/ ulfe& 1084(o.q91) 0.6S• = 698. F+ \)oL) ene. prtmckeg, 131 144 F-1 OL 0 ci‘c.C.c v " LOCATION • I NCRE- MENTAL AREA A • RUN -OFF COEE C AC • F AC TIME OF CONCEN- TRATION TC RAINFALL INTENSITY . _ I RUN -OFF 4 MAC •I) PIPE COEF. (n) FROM • TO ACRES - • MIN. IN./HR. C.F.S. At e.Z 1 t212) , 012 o.4 0.044 01041 ,o44 ,o gs 3 825 8.65 I. &0 I. - 1) 1,/3 o.o16 0. 151 o,Z10 o,b2.4 01024 oh LE 7 'C Q 4, .o4b C$ 011-k 1 ,011. O 9 0,0 Lk 1 . 12(0 G. g 4 CO 3 315 01 0,221. 0.Z2-1 7. I. es - 0.409 .9.0z4 C5' cB''S. ,OSO 0 "1 o‘0•3* o,26(0 : '7.8 I.BZ. o.46(o •0,o24. MN 7 BIO ,1S1 0.1 0.16 0.550 9.S 165 0.906 0.07) 810 F/L-TR '116N Su) A•L _ • 61 .6 0.0'5 44o;((. CBs' 2 ' 0,2.. ,0 I I 0.561 II. s5 I< < F ' q '0.b5(0 ;o2y C B li z CP' 1' ,o(oO 0 .7 .ocl•Z 0, 0..00 ; . 1 O. ay. ,o7.- • �j L-- i STORM 1)RP■NN PI GALLu1.. 1N-OFF o :AC•I) PIPE COEF. (n) PIPE DIA. SLOPE VELOCITY AT DESIGN Q LENGTH FLOW TIME IN PIPE U.S.W.B. CHART STORM FREQUENCY REMARKS -AAA /5 NO. Re _La__ C.F.S. IN. % F. R S. FT. MIN. QCAP. VcAP. ),01G O, b i4 8 z. v1 1 1 8 2 Z o. ZS 0.99 2.8 ).l5I 0102-4 8 11.8 3. 75 90 o,40 211 7.9 ); Zla db2• ;o. 3 3.49 3 7 0.18 'z , i l 6. d .4v9 0.n7,4 12 TS ' 3.52. (, 0.30 5.30 (,,'7 ,q(06 o102.M- 3 0.5 • I,3S 137 I•.70 15.-7S 3.Z- . . ).906 o.oZif I� 1.0 2.4I z 0.I4 J.9'4 z 4-6 0.0'5 ;(324 I Z 6.7- 2.4/ o.98 •5 z. • 130 - 30 Z122 cis' 3.0', 3.87 • .83(0 . SBC .07-4 i Z 10.59 5 . 21 68 o. Z Z 6.30 >3. O Z • • 1 Pir'F_ sizINC-7 :.ACLU L. AT! ON5 6.28-88 �� June 16, 1989 Mr. Leon Grundstein GENCOR 11801 N.E. 160th Street Suite G Bothell, Washington 98011 Re: Tukwila Office Building Dear Mr. Grundstein: Since my June 24, 1987 geotechnical report for your combined office• and apartment project, you have made revisions in the design of the office and are now in the process of applying for a permit. The test holes dug in 1987 still bracket the building area and the page 3 and 4 recommendations from 1987 are still appropriate so far as the foundation is concerned. However, slight shifting of the building . location and completion of design of certain exterior improvements require that retaining walls be included which were not anticipated in 1987. I had discussions with Messers. Friedman and Smith of your office and with your architect, your structural engineer and your civil engineer and I met with Messers. Friedman and Smith onsite earlier this week. At my request, Mr. Smith drew a series of cross sections to show both existing and future configurations. I have examined the sections and concur with the use of retaining walls as they are shown in permit applications as of this date. Those recommendations for retaining walls on page 7 of the 1987 report are valid with the following additions or comments applicable to the currently proposed building. o Onsite soils are unsuitable for use as wall backfill and for your north wall, I am recommending pea gravel for the full- height wedge against that wall. o Passive resistance will be greater for the sandstone than was recommended for the "other" walls in 1987. Unless your structural engineer wishes to pursue the issue further, exploration and quantification of Pp will not be done at this time. o The high angle bluff near your east property appears stable and has evidently been at its present configuration for several decades or more. That steep face is outside the influence of your JAMES EATON, PE GEOTECHNICAL SERVICES (206) 682 -6942 ' Box 126 • Hobart, WA 98025; building or the retaining walls you now propose. I. understand that the bluff may removed by the neighboring owner to the east or by Gencor in cooperation with the neighbor although for the . purposes of this letter I have assumed that it will remain. ° I am continuing to coordinate with your structural engineer, your civil engineer, your architect, and your structural engineers and will provide them with additional design parameters if needed. I will be out of town for approximately one week beginning June 21, but ' will bein touch with the answering service, 682 -6942, daily should questions arise. Very truly yours, es Eaton JE /dbm /11 71 -3731 SCIENCES June 24, 1987 Mr. Leon Grundstein 11801 Northeast 160th Street, Suite G Bothell, Washington 98011 Re: Tukwila Apartment and Office Project Dear Mr. Grundstein: With your authorization, I have investigated the subsurface conditions as . they relate to proposed construction of 57 apartment units and an office building in Tukwila. We met at the site on 14 May, at which time you showed me several preliminary site plans and the approximate ground limits of the property. I sent you a proposal dated 18 May, and on the same day summarized the proposal to you by telephone and informed you that it was my intention that the office site be included in the scope of work covered by the proposal, although the document did not specifically say so. You gave verbal authorization to proceed on 28 May, and I received your written proposal on 30 May. On 1 June I picked up additional site plans at your office; these provided ground control points from which field measurements could be made. Field access preparation and subsurface exploration were accomplished on 1 and 2 June. This report describes the property the project proposed, the investigative procedures and summarizes conclusions and recommendations applicable to site grading, subgrade drainage, foundation and retaining wall design, and mitigation of earth - related hazards, whether those hazards are the result of development or not. Considering the steepness of terrain, generally favorable conditions were found. Exception is in the vicinity of Building "A "; there a combination of steep terrain, shallow groundwater, and erosion - cavitated sand which require that Building "A" be supported on augercast piles. Surface evidence suggests that there has been a continuing problem of poor surface drainage, sloughage and erosion in that vicinity, especially toward the west end of the property. The pile- supported building will be as secure as those on flatter terrain and more favorable subgrade conditions . and to some minor degree, will bring about improvement of downslope surface flow and sloughage. JAMES EATON, PE GEOTECHNICAL SERVICES (206) 682 -6942 Box 126 • Hobart, WA 98025 I am also advising you that have an.. accurate ;topographic survey made as a :-. logical next step and that you and your architect consider revisions in the site and grading plan. With this letter are three copies of my report Yours very truly EARTH SCIENCE INTRODUCTION The property slopes moderately to steeply to the south and southwest; elevation differential is in the order of 100 feet. It lies north and east of the intersection of Macadam Road and Southcenter Boulevard. Your south property line represents the approximate toe -of -slope and common property line with Denny's Restaurant and the ARCO AM -PM Market. It appears that the lower reaches of the slope were artificially steepened beyond their natural grades at some time in the past. This is especially the case behind the AM -PM market and around the north and east peripheries of the trapezoidal parcel proposed for office development. Page nine of this report was prepared from a 22 May 1987 site plan prepared by Azaria Rousso /Architects and from an 18 June 1986 office site plan prepared by Mithun- Bowman- Enrich Group, P.S. Note that page nine consists of two separate plans, each to different scale; one is of the residential portion and one applies to the office portion. An earlier undated site plan study prepared by Milbrandt Architects was used for its location of the existing apartments to the north. Some of the test locations plotted on page nine were measured from a demolished house which, for field purposes only, was scaled from a 1" =100 partial top sheet which you provided. Presently, the only improvements on the property are the basement floor and walls of the aforementioned house, the driveway which served the house, and . several rockeries along or near the toe of the slope. A variety of trees exist in clusters at various parts of the property. The areas between clusters support a dense growth of blackberry bushes and other brush. Part of that brush, especially in the vicinity of Building "B" and "C ", was removed in preparing access for test equipment. At the time of field work, a spring emerged from the toe -of -slope area immediately north of your proposed office building. It ponded in a small artificially created depression near the northeast corner of that building area. Water was also noted emerging from the south of Building "A" location and north of Denny's. This water appears to originate as spring water from the general area around and north of Building "A ". It appears that shallow groundwater and associated surface drainage has been a problem for the existing apartments to the north since construction there. Several small ditches undermine the perimeter footings and transect the yard areas all directed to an asphaltic-cement lined swale which parallels your common property line.- Some of the small ditches carried water when last observed less than a week ago and it can be presumed that flow varies seasonably, but that it continues to some degree through the summer. As now proposed, the 57 units would be divided among five buildings. The present grading plan shown as before and after contour shows Buildings "A ", "B ", "E ", and part of Building "C" on cut with an apparent net removal of borrow from the. site. The apartment buildings will be of wood frame construction with slabs on grade. The office building will consist of three stories of wood frame construction with a first floor slab on grade. -1- SUBSURFACE CONDITIONS Page nine shows the approximate locations at which 12 test pits were dug using a rubber -tire mounted construction backhoe. Log descriptions of conditions at each location were maintained from direct examination of the freshly exposed strata. With recording of soil descriptions and groundwater conditions, the pits were backfilled in the interest of safety. Summaries of the test pit conditions are presented on pages ten to twelve. The stratigraphically lowest material found and of relevance to development is sandstone bedrock, which was found essentially at the surface of locations one and two, representing the north portion of the office building. The sandstone is fine grained, friable, and varies in color from white to gray . or yellow - brown. It grades increasingly hard with depth, and within a yard of its upper surface it could be further penetrated only by repeated raking with the bucket teeth under the full weight of the backhoe. It appears that the uppermost one to two feet within the general area of the office building have been disturbed or artificially modified in association with unknown past utilization. To the depths explored, the entire residential area and part of the office area are underlain by glacially associated soils. These soils are highly variable across the property, but range from clean sand or gravelly sand in the bank behind the AM -PM market and at locations 9, 10 and 12 to silt or clay hardpan at locations 3, 4, 5, 7, 8, and 12. Most of the test pits exhibited layering of more than one type of glacial soil. Between the extremes of granular and find - grained are loam and mixtures of course and fine - grained soils; some of these mixtures include cobbles and .boulders. In general, the glacially associated soils exhibit moderate to high bearing . strength and good slope stability. Exception is in the very shallow range of depth -- generally less than on yard - -where weathering and root action have diminished the soil's strength and where the granular or partially granular soils are saturated either by surface or subsurface flow. Also in general, . after wasting the topsoil and root - ladened soils, the excavated borrow will be suitable for compaction either on this site or on another. Most of the borrow generated will contain a sufficient fraction of fine - grained soil to place serious seasonal restrictions on compaction and to some degree on fresh cuts. Where there are alternating layers of permeable and highly impermeable soils as on your site, there is potential to accumulate thin layers of saturation either seasonably or at more -or -less random locations. Groundwater was observed at locations 8, 10 and 11. The number 11 location was significant. CONCLUSIONS AND RECOMMENDATIONS Conditions are favorable for conventional footing support of Buildings "B ", "C ", "E ", and the office building. A deep foundation is advised for Building "D" because of the proximity to a steep slope and the highly erosive nature of the soil. Unfavorable soil and hydrologic conditions . were found in the vicinity of Building "A "•, and terrain there appears . steeper than shown by the topographic map. Because of the steep slopes and the erosive nature of the soil, unusual measures should be taken with respect to surface drainage and pressurized utilities. In its present condition, these are risks of falling rocks and accumulations of sediment or sloughage on downslope properties; surface evidence suggests that debris . removal is routine, especially on the Denny's parking lot. Due to the considerable earthwork involved in this project and the potential risk to neighboring properties, especially those downslope, review of appropriate plans and conscientious inspection during construction are imperative aspects of development. Office Building The foundation along the north side of the building will, necessarily, bear on sandstone. At a depth of about two feet below existing grade in that area, the sandstone is sufficiently hard to support conventional spread footing, yet it can be excavated by means of an ordinary construction backhoe or tracked loader. Moving south across the building area, the sandstone gets deeper and it becomes overlain by over - consolidated glacial silt. Considering the relatively high structural loads and the desirability of having all footings bear on generally similar material, 1 recommend that all footings be excavated either into hard sandstone or glacial hardpan; this would require excavating to 4.6 feet at location three. Allowable soil bearing pressures of 5 ksf are advised, subject to inspection of the bearing surfaces. The 5 ksf figure could be increased by one third to accommodate seismic and similar loads. Those areas which are to support slabs must also be graded down to firm native soil, subject to good judgment and common sense. Near the toe of the slope behind the office building, granular glacial deposits rest on relatively impervious silt and sandstone. This permeable /impermeable relationship is the cause of spring emergence in that area. The footing drain should be laid with its invert at least one foot below slab grade; the drain and its granular washed backfill should be . shrouded in filtering fabric, and along the west and north sides of the building the backfill should rise to finished grade. A similar drain should follow the toe -of- the -slope and should parallel the east edge of the parking lot to insure that the paving does not fail because of softening subgrade. A six -inch thick or greater layer of sand or pea gravel should separate the flow slab from natural soils. You or your architect should provide me with a copy of the foundation, grading and drainage plans for review when they are complete. I may advise removal of some of the existing rockeries, the collapse of which could damage the building. You mentioned the possibility of raising grade on the office building parcel using borrow generated from the residential area. If that is done, I recommend that the building still be supported by footings which bear on hard undisturbed natural earth. Fill which is to support paving or any other improvements should be placed and systematically compacted under inspection to assure quality. Topography and Grading, Residential It appears that the contour maps on which the site plans to date have been imposed was constructed from air photos and, in some cases, the contour lines do not accurately describe actual conditions. I recommend that a o d sure y BI Unrductetl -earl -- on-- aftvi —th t— revisions be made in the site and grading plans based on the better information. There might be advantages to making major site plan revisions to avoid situating buildings near the sides of steep bluffs and thereby eliminating the need for drilled or unusual foundations. It appears that Building "D" and at least part of Building "C" are now proposed to rest on structural fill. I recommend that either floor grades be adjusted or that building locations be shifted to place all buildings on cuts. In view of the severe topographic as well as subsurface restrictions at Building "A ", I am assuming that no part of the construction area will be filled and that no significant part of the building area will be cut below existing grade. Adjusting of locations may or may not necessitate additional testing or explanation. From the onset of earthwork, you are advised to contain all construction - related runoff within the property until it is control - released into the public .stormwater system. Generally similar containment applies to the post- construction period. In accordance with usual good construction practice, the areas which are to support improvements of any type must be stripped of organics, topsoil, fills, or soft materials. It appears that there will be some filling in connection with parking lots. No unretained finished fill surface should slope at steeper than 2i :1 and then only if it is compacted to at least 95 percent as defined by ASTM D1557. Compliance with this necessarily requires engineer inspection beginning with the stripped, unfilled surface. Cut slopes through any of the soil types described herein should be secure at 1i:1. Existing slopes steeper than that and falling outside the construction area are to be left as they are. The basement walls of the demolished house must be removed and the basement and surrounding area should be reshaped to a saucer- shaped section to facilitate placement of fill in feather -edged lifts; this, of course, applies only if grade is to be raised above the existing basement floor level. Septic tanks, buried fuel tanks and similar voids if they exist are to be similarly removed, shaped, and filled under inspection. -4- Slope Stability The site is believed stable -with respect to deep or shear -type sliding. That generality applies to the effectively unweathered and nominally weathered soils below the depths of dense roots. With respect to surface raveling, sloughage under adverse'climatic conditions, and erosion, those slopes which are now steeper than about 35° are no more than marginally stable under present conditions. It appears that both sandy sediment and rocks gravitate onto the existing parking lots, particularly the Denny's lot from time to time. The only way in which human activities are seen to contribute is that the toe of the slope appears to have been steepened in association with past commercial development. An asphaltic - cement lined shallow ditch appears to be effective at intercepting surface runoff from neighboring property to the north and to all appearances, the present hydrologic condition is either natural or slightly drier than natural. With implementation of . all recommendations herein, the following objectives will be accomplished: o There will be no slope movement beneath foundations, parking lots, or other artificial surfaces; under natural conditions these soils will be retained, confined, or graded to safe inclines. • With respect to unnatural conditions, these are seen as incursions of surface water from offsite or from breached pressurized underground lines either onsite or offsite to the north. Both categories of water will or would be directed to and confined within subtle swales designed into the asphaltic surfacing, where it would be directed to a relatively harmless location along or near Southcenter Boulevard. The steepest slopes will be unaffected by development, except that they will be slightly desiccated by the upslope artificial surfaces and that hazardous -sized rocks and other materials which might roll or slide toward the south property line would be intercepted by a chain link fence. The slight desiccation would translate to a slight improvement in stability. • During the construction period, runoff from altered surfaces will not be permitted to enter unaltered surfaces. It will either be contained and pumped from temporary basins or sumps within the improved areas or it will be directed to a holding pond on the office building parcel. Underground Utilities Earlier reference was made to unnatural contributions to slope instability, and it was explained that this included accidental breaches of pressurized piping. For practical' purposes this refers to water .lines but could include sewers if they are pressurized and effectively have infinite reservoirs. The imaginable ways in which breaching might occur include, but are not necessarily limited to, faulty materials, faulty workmanship,, seismic induced strain, impact by drilling or excavating equipment, and water hammer or pressure surges caused by human carelessness or-equipment malfunction. Several design alternatives have been considered in designing protection against any of the above mishaps. Those include location of the largest pressurized lines at unusual depth of burial or at plan locations where some of the causal factors could be partially mitigated, using particularly flexible or durable materials, and using concrete or other conduits or barriers. No one would provide protection against all causal conditions. I recommend that the water system be so designed that the soil at depth is protected from both saturation and scouring by an impermeable synthetic barrier in the form of a trench lining and that the force of leaking water be directed to the . surface where it can be contained in subtle open channels in the parking lot and driveway I would expect to coordinate details of design with your civil engineer. Necessarily, the largest diameter lines would have to fall outside or near the edges of paving. Small diameter pipe might be exempt from location restrictions but would confine and channel leakage with the synthetic barrier. Apartment Foundations Building "A" will require an augercast pile foundation. For now I am assuming that this building will be terraced and underlain by crawl space. Terracing the building is not intended to mean terracing the slope. I anticipate that there will be no retaining walls for reasons we discussed. I will coordinate with your structural engineer about lengths, vertical capacities and horizontal design. Depending on the outcome of your topographic survey, other units including "D" will require deep foundations to afford protection against undermining, which might be associated with encroachment of the nearby high angle bluff. To determine the proper foundation type for each building, I recommend that a 20 -foot horizontal distance be maintained between the foundation and daylight, measured through native soil. Judging from existing topographic data, conventional spread footings will be appropriate for most of the buildings. With the . diversity of soil type from point to point, I recommend that all footings be sized to building code specifications or to 2 ksf soil bearing pressure. If, after topographic mapping and revision of the site plan, the 20 -foot condition cannot practicably be met using spread footings, I will provide your architect with parameters for pile design. These would derive capacity from both friction and end bearing; it would be assumed that there was no friction through fill or through erosion or slide susceptible soils. The piles would be in the order of 14 to 16 inches in diameter and would penetrate beyond the depths explored for this project. For either type of foundation, inspection during excavation is essential to verify compliance with the intent of these recommendations and to confirm continuity of soil conditions between and outside the test areas. In general footings will be poured on stripped soil in place. Under some circumstances, it would be acceptable to support footings on compacted fill, and the recommended 2 psf allowable pressure is within generally accepted limits for such fill. It appears that, even after anticipated . site plan revisions, it will not be necessary for any foundations to bear on fill. Retaining Walls All of the soil types found within the residential area are types which would exert lateral wall pressures of magnitudes within a,commonly assumed range for this locality. Silt and silt- containing soils found at various locations across the site would exert pressures well beyond the assumed range if used as backfill. Selectively, the cleanest of onsite spoils . generated would be satisfactory as retaining wall backfill. For walls which are free to deflect sufficiently to assume an active condition, for which the backslope angle does not exceed 20 °, and which the full height backfill is free draining, I recommend that P be taken as 35 pcf. P as 300 psf, and that the coefficient of friction between soil and concrete be taken as 0.5. For the nonyieldable case, p would increase to 55. Neither the 35 nor the 55 figure includes any surcharge load other than the assumed 0-20° backslope angle. Your structural engineer should coordinate with me about other parameters and assumptions. I anticipate that daylight basement walls will be of reinforced concrete and that cantilever timber bulkheads would be more practical in exterior areas. Rockeries, where used, will be limited to 4 feet height by City ordinance . and they, of necessity, will not and cannot be engineered. Property Line Hazards Several unlikely but potential hazards could transcend property lines where the property bounds are in general proximity to steep slopes. In some cases they represent natural hazards, such as gravity movement of earth materials across natural slopes, and in other cases they could include collapse of already existing rockeries along the south edge of your property or the effects of a breach in a water main such as the one that is understood to run parallel to but outside your north property line. , One of the objectives of this report is to provide recommendations for development without creating new hazards. To some degree both natural and . unnatural existing hazards will be reduced by development. The amount of water which percollates into the soil across the property will be greatly reduced, having a positive effect on spontaneous sloughage and superficial slope instability. Plumbing mishaps from upslope properties, if not controlled by the existing asphaltic -lined ditch, would become contained by the paving, curbs, and gutters of this project, designed specifically for such purposes. The fence recommended for protection of the Denny's and ARCO properties would be installed prior to any grading above. Hopefully it can be installed along the edge of existing paving irrespective of whether it coincides with the property line. The fence is not intended as a retaining wall but as a catcher. Debris which assimulates behind the fence must be periodically removed to preserve the effectiveness of the fence. LIMITATIONS AND USE This report was prepared for the exclusive use of the addressee and his design :teams . for use on the specific residential and office projects described herein. It is not public information and is not to . be used by real estate agents, lenders, future owners, or neighboring owners. In case of significant revisions of the types of construction, finished grades, or building locations, the findings and recommendations of this report may be •inappropriate. The undersigned should be consulted about the implications of any revision. Partly in recognition of the potential for creation of hazardous conditions by not strictly .following the intent of the recommendations herein, inspection of all earthwork and related construction is imperative. Another reason for close inspection during construction is that the undersigned assumes no responsibility for work performed at variance with the recommendations . of this report or which is of uncertain compliance; with foundations and earthwork it is usually not possible to determine compliance after the fact. The only express or implied warrant carried by this report . is that the professional efforts in .developing and presenting the information in it . were performed conscientiously, in good faith, and to recognized standards of engineering practice as understood by the engineering comunity in this area and at this time. 24 June 1987 James N. Eaton, PE JNE/rlb TUKWIL A APARTMENT & OFFICE PROJECT DENOTES TEST PIT _1- #1' #2 #3 #4 • 0.5' - 1.2 - White to yellow weathered sandstone (hard) 5.3' Completed and backfilled June 2, 1987; no groundwater encountered; dug with difficulty beyond 4' 1.4' - 1 - .White to yellow weathered 'sandstone (hard) 4.3' Completed and backfilled.June.2, 19871:11o groundw encountered; dug with difficulty beyond 3.5' 2. ONO 4.6' - TEST PIT LOGS Dark brown topsoil and organic matter (soft) Yellow -brown severely .weathered clayey standstone (soft to medium) Brown silt associated' with past excavation and. rockery . construction'(soft) Yellow brown severely weathered clayey sandstone (soft to medium) Brown silty fine to medium sand ( Brown fine to medium sandy silt (stiff .to hard) Gray clayey silt with sandstone inclusions (ha 6.4' - Completed and backfilled June 2, 1987; no groundwater 3.3' Brown loam with fine roots throughout (soft) Brown fine sandy silt with occasional sandstone cobbles .and small boulders . throughout (medium to stiff) #5 #6 #7 0 #8 5.9' - Gray to tan clayey silt (hard) 8.8' - Completed and backfilled June encountered 7.4' 0.9' - 5.6' - SIN 3.0' - Brown fine sandy silt with occasional roots in upper 5', sandstone and .hardrock cobbles and boulders throughout (medium dense) 8.8' Completed and backfilled June 2, 1987; no groundwater encountered. Brown loam topsoil with roots (soft) Brown silt (soft to medium stiff) Brown thinly bedded, silt (hardpan) 5.6' Completed and backfilled June 2, 1987; encountered 0.8' - 2.1' - 0.5' - 1.9' - Brown silty clay_ (hardpan) '.Completed and backfilled. June .encountered Brown slightly organic topsoil with roots (soft) Brown fine to coarse sand (medium dense) Brown loam with fine and course roots throughout. (soft) Brown sandy loan topsoil with roots (soft) Brown fine to medium sand (medium dense) 1987; no groundwater 1987; no .groundwater no groundwater Brown slightly clayey silt (hardpan) 5.6' - Completed and backfilled` June 2, 1987; slight . groundwatei . seepage. from. 1.9 feet -11 #9 #10 #11 #12 0' 0.7' - Brown silty fine to coarse sand with sandstone and hardrock gravel, cobbles and boulders (loose at 0.7' to dense at 4') 5.9' - Completed and backfilled June. 2, 1987; no groundwater encountered Brown sandy loam topsoil with roots (soft) Brown fine to coarse sand (medium dense) Brown fine sand with trace of silt (medium dense) 7.6' - Completed and backfilled June 2, 1987 minor groundwater flow from 4/8' 0.8' 4.8' - 0.4' Brown fine sand with thin silty strimers (medium to dense) 6.8' -. Completed and backfilled June 2, 1987; moderate to severe groundwater flow from 3.5' to 5.5' depths 2.6 4.7' - Brown gravelly loam topsoil with fine roots (soft) Brown sandy loam with roots Brown fine to medium sand (medium dense) Brown thinly bedded silt (hardpan) Brown fine to medium sand (medium dense) 6,3' Completed. and backfilled June 2, 1987.; no .groundwater encountered; surface water across steep :slope in near. vicinity