HomeMy WebLinkAboutPermit 90-02-CUP - NDT - DESTAR BUILDING CONDITIONAL USE90-2-cup 15425 53rd avenue south
Permit 90-02-CUP - NDT - DESTAR BUILDING CONDITIONAL USE
epic-19-90
withdrawn
August 6, 1990
CITY OF TUKWILA
6200 SOUTHCENTER BOULEVARD, TUKWILA, WASHINGTON 98188
Levan Phelps
NDT Engineering Corporation
1108 Industry Drive
Tukwila, Wa. 98188
RE: CONDITIONAL USE PERMIT 90- 2- CUP,EPIC -19 -90
Dear' Mr. Phelps:
This letter is a follow -up to our telephone conversation on
Monday, August 6, 1990 concerning NDT Engineering Corporation. As
you requested, I will withdraw your conditional: use permit and
environmental checklist. Unfortunately no refunds will be issued
because of the amount of staff time used on both reviews.
Should you have any questions regarding these matters, please
contact me at 431 -3670.
Thank You
Darren Wilson
Assistant Planner
•
cc: J. Pace, Senior Planner
L. Anderson, City Attorney
PHONE # (206) 433.1800
Gary I.. VanDusen, Mayor
LEVEL 1 ENVIRONMENTAL
SITE ASSESSMENT REPORT
15425 53RD AVENUE SOUTH
TUKWILA, WASHINGTON 98188
[Xi MEM.
JUL 101990
CITY OF TUKWILA
PLANNING DEPT.
SRH
GROUP
LEVEL 1 ENVIRONMENTAL
SITE ASSESSMENT REPORT
15425 53rd Avenue South
To 'I L A, Washington 98661
July 6, 1990
Prepared For:
NDT Engineering. Corporation
1108 Industry Drive
Seattle, Washington 98188
Prepared By:
SRH Environmental Management
12245 NE Whitaker Way
Portland, Oregon 97230
(503) 252 -8316
SRH PN: 1 -2360
EXECUTIVE SUMMARY
SRH Environmental Management performed a Level 1 Environmental Site Assessment of
the property located at 15425 53rd Avenue South in Tukwila, Washington. The field
inspection, completed on June 22, 1990, consisted of a walk- through inspection of the
interior and exterior areas of the property and a magnetometer scan of exterior areas to
identify evidence of the presence of buried metal debris. A review of pertinent readily
available records of local, state, and federal agencies, historical reviews, interviews, and
a review of aerial photographs of the subject property were also conducted.
The interior of the building is now and formerly has been used as tenant - leased office
space. Aerial photo review, interviews, and other related records searches did not
produce evidence of any chemical misuse, unlawful dumping or landfilling, or other
sources of contamination to the subject property.
The environmental records review indicated that there are no sites listed on state or
federal inventories of known or suspected contaminated properties in the immediate
vicinity of the subject property.
No evidence of spills or other releases of hazardous materials was observed, and no
visual or olfactory indications of contamination were noted. No evidence of underground
tanks, drums, or other large buried metallic debris was identified by the magnetometer
survey.
A preliminary asbestos assessment was also conducted to identify exposed potentially
friable asbestos- containing building materials. No exposed friable asbestos - containing
material was observed.
The results of this investigation represent a review of current conditions. The subject
property appeared to be well maintained and in good condition. Based on this
investigation, the overall risk of environmental contamination at the subject site is
considered to be low.
No further environmental investigation or remediation is recommended at this time.
INTRODUCTION
A Level 1 Environmental Site Assessment is intended to determine whether there is a
potential for significant environmental contamination based on readily available information
about the site and a walk- through inspection. If this potential does exist, the Level 1
report indicates what additional activity is necessary to confirm evidence of significant
environmental contamination.
This report presents the results of a Level 1 Environmental Site Assessment of the
property located at 15425 53rd Avenue South in Tukwila, Washington. SRH
Environmental Management was retained by NDT Engineering Corporation to perform the
assessment in order to determine if a potential for significant contamination exists for the
subject property.
This assessment consisted of a visual and olfactory inspection of the site, interviews, a
historical review, and a review of the pertinent records of local, state, and federal
agencies. A magnetometer survey of the subject property was also conducted to locate
evidence of buried metallic items indicative of underground metal tanks or buried drums.
A copy of the complete Scope of Services agreement for this investigation is presented
in Appendix A.
The results of the investigations are described below.
FACILITY DESCRIPTION
The subject property is rectangular in shape and covers approximately one -half acre. The
subject property is located on the south side of South Center Boulevard, just west of
South 53rd Avenue in Tukwila, Washington.
The subject property includes a single L- shaped building, located on the western portion
of the property. The building covers approximately 45 percent of the property, with the
remaining property being asphalt parking area. The building was reportedly constructed
in 1980/1981.
The eastern portion of the building, currently occupied by Grid Computer Systems, is
used as office /showroom space. Remaining building space is vacant.
Figure 1 shows the location of the site. Figure 2 is a site map of the subject property.
Photographs of the site are presented in Appendix B.
2
t, 1.1 t M l
� F «
LI,
t 1.I. . 1II - I
DATE 6
6-27-90 S
SCALE
S R H SRH Environmental Management S
PROJECT NO. 1
1-2360 (
NA
DRAWN BY
SMS 1
15425 53RD AVENUE SOUTH F
FIGURE
APPROVED BY )
) ,(, S
2 .
DUMPSTER
TRANSFORMER
PUGET SOUND MORTGAGE SERVICING
BUILDING
ASPHALT PARKING AREA
DUMPSTER
SOUTH CENTER BLVD.
DICTA PHONE
A NEW BEGINNING
HISTORICAL REVIEW
Purpose and Scope. A historical review of the subject property is conducted in order to
ascertain whether evidence exists that prior usage may have contributed a potential risk
for environmental contamination.
The review includes examination of readily available aerial photographs taken over a
period of years, ownership records, and building and utility permits, when available.
Interviews with neighbors, present and former tenants, and owners are conducted,
whenever possible, to obtain undocumented data.
Review. Aerial photographs for the years 1936, 1946, 1960, 1969, 1974, 1985, and 1989
were reviewed.
o The 1939 photograph showed the property as undeveloped vacant land.
Surrounding properties appeared to be undeveloped or of agricultural land usage.
o The 1946 photograph showed one structure, which appears to be a house, located
on the southwestern portion of the property. Surrounding properties appeared to
still be undeveloped or of agricultural land usage.
o The 1960 photograph revealed no significant changes to the subject property.
o The 1969 photograph revealed no significant changes to the subject property.
Surrounding properties appear to be of residential land usage. Interstate Highway
5 is present east of the subject property.
o The 1974 photograph revealed no significant changes to the subject property.
o The 1985 photograph revealed the structure currently located on the western
portion of the subject property; asphalt parking area covered the eastern portion.
The house previously identified in the aerial photograph review was either
demolished or removed from the subject property. Surrounding properties appear
to be primarily of commercial land usage or under construction.
o The 1989 photograph revealed the subject property as it appears today. No
significant changes to the subject property were observed.
No areas of obvious potential environmental contamination were observed during the
aerial photograph review.
The City of Tukwila Building Department has record of one building permit for
construction of a warehouse. This permit was issued in 1979 to property owner, Mr.
Aiton Lenhart. No plumbing permits issued to the property addresses were found
during the permit review. No records prior to 1979 were found.
3
Mr. Pat Brodin, Senior Utility Engineer of the City of Tukwila Public Works Department,
reported that the subject property was connected to the city sewer system on July 6,
1979. No sewer permits issued to the subject property prior to 1979 were found. Such
records are not kept prior to 1975.
Ownership records for the subject property were reviewed for the years 1904 to 1990.
Property transfers have generally been between private citizens, with only the following
two transactions involving apparent commercial entities:
o 1980, Ownership of the subject property was transferred to Q estar Development
Corporation;
o 1981, Ownership of the subject property was transferred to CCI Real Estate Equity
Fund.
None of the previous property owners identified in this research were owners who, based
upon the name listed in the title record and our experience, would be expected to have
conducted activities with a significant potential for causing environmental contamination.
Ms. Yvonne Stansberry, associate with Capitol Consultants Inc. (CCI is the current owner
of the subject property), was interviewed. Ms. Stansberry stated that the building is
leased as office and retail space. To her knowledge, former tenants have included
businesses similar to the one currently located on the property, with no large amounts of
chemicals typically having been stored, used, or disposed of on the site. Ms. Stansberry
has been associated with the subject property since 1985.
PROPERTY INSPECTION
General Description of Property
Purpose and Scope. Specific observations of topography, vegetation, and proximity to
thoroughfares and waterways are noted. Surface features such as marshes, swales, and
heavy vegetation can serve as concealment areas for improper disposal and storage of
waste materials. Railroad tracks, roads, and waterways may provide access to the
subject property and opportunity for activities such as improper disposal or storage of
materials that could contribute to environmental contamination of the property.
Waterways can also serve as carriers of contaminants from extraneous sources to the
subject site. Evidence of ground surface disturbances such as irregular depressions or
lack of vegetative cover may indicate the presence of buried items or filled areas of the
property.
Observations. SRH performed the site inspection on June 22, 1990. Weather conditions
during the inspection consisted of clear skies. The temperature was approximately 72°
Fahrenheit. The topography of the subject property was gently sloping downward from
4
north to south across the site. Surface water drainage generally follows this pattern. No
topographical features that would likely contribute to environmental contamination of the
property were observed during the inspection.
Adjacent Properties
Purpose and Scope. The condition of adjacent properties may pose a significant potential
for environmental contamination on the subject property. Lateral migration of surface or
subsurface contaminants from adjoining properties may cause environmental
contamination to the subject property.
The general condition of adjacent properties, as observable from the public right -of -way
and the subject property, is noted. Any activities conducive to creating an adverse
environmental impact to the subject property are recorded. Observations of features
such as large areas of stained soil, areas of stressed or dead vegetation, and apparent
chemical or waste storage areas are made.
The review of adjacent properties is a limited visual review and should not be interpreted
as a comprehensive site evaluation.
Observation. The subject property is situated within an area of commercial land usage.
South Center Boulevard forms the northern boundary of the subject property. Puget
Sound Mortgage Servicing is located north of South Center Boulevard.
A New Beginning, and Dictaphone are located south of the property.
The Rainbow Valley School and the Business Computer Training Institute are located west
of the subject property.
South 53rd Avenue and the Ultra Boutique are located east of the subject property.
Exterior Storage Areas
Purpose and Scope. There can be a potential for contamination associated with storage
areas due to the activities characteristic of such areas. The presence of existing facilities
or evidence of former storage locations can provide insight to past and present activities
on the property that could pose a potential for significant environmental contamination.
Storage areas and locations suggestive of storage areas, such as concrete or asphalt
pads, covered or fenced areas, pits, ponds, or lagoons, are examined for visual and
olfactory evidence of chemical releases. The specific characteristics of these storage
areas are noted.
Observations. No exterior chemical storage areas or evidence of chemical storage areas
were observed.
5
Exterior Waste Disposal Areas
Purpose and Scope. Improper usage of waste disposal areas represents a potential for
significant environmental contamination and would likely require additional investigation.
Designated areas of waste disposal, such as garbage cans or dumpsters, are examined
since these can be sites of improper waste deposition. Areas of stained or off -color soil
surfaces, stressed vegetation, discarded empty containers, and burned residue may also
be indicative of waste disposal. Additionally, remote or obscured areas conducive to
dumping are inspected.
Observations. Several trash dumpsters were located on the subject property. Inspection
of this disposal area showed contents typical of office disposal, consisting of paper and
plastic debris. No other disposal areas were observed.
Off- Property Sources of Surface Contamination
Purpose and Scope. Surface water runon areas, drainage ditches, streams, outfalls,
storage areas on adjacent properties, air emission fallout sources, and railroad tracks are
among items serving as potential sources and /or migration pathways for environmental
contaminants of the ground surface. If evidence of a potential source of surface
contamination is identified, a more detailed investigation of this migration pathway may be
recommended.
Observations. No off - property sources of surface contamination of the subject property
were observed during the field inspection.
Exterior Subsurface Structures
Purpose and Scope. The presence of subsurface structures which collect or contain
liquid and sediment may represent a source of potential environmental contamination.
These sources are evaluated to determine if their presence creates a potential for
significant environmental contamination.
Noted are evidence of underground voids or vaults, aboveground structures indicating
subsurface activity, drains, sumps, clarifiers, wells, pits, ponds, and lagoons.
The presence of USTs and their significance for potential as sources of environmental
contamination is discussed in the Underground Storage Tank section.
Observations. Several parking area storm drain basins were observed. Each of the
drains contained a clear liquid which appeared to be water, with a discontinuous oily
surface sheen typical of parking lot runoff waters.
6
Magnetometer Survey
Purpose and Scope. A magnetometer is an instrument that can detect the presence of
buried ferromagnetic items such as steel underground storage tanks, metal drums, and
other metal containers. A portable hand -held magnetometer is used to scan accessible
portions of the exterior property. The magnetometer is set to a sensitivity which should
typically allow detection of drum -sized objects at a depth of up to 5 -10 feet.
Positive magnetometer readings indicative of large buried metallic objects may represent
past disposal or landfill areas. Therefore, the existence of unidentified buried items
indicates the potential for environmental contamination of the site. If a positive reading
is noted from an unidentified source, additional investigation may be necessary to
determine the source.
Observations. The perimeter of the property and portions of the asphalt parking area
were traversed on a grid of approximately five feet. Access to some areas was limited
due to parked automobiles, which caused interference readings for the magnetometer.
No readings of the size, shape, strength, or uniformity typical of underground storage
tanks or buried drums were recorded during the magnetometer survey.
Underground Storage Tanks
Purpose and Scope. Underground storage tanks (USTs) are recognized as a major
potential source of environmental contamination. Contamination of soils and /or
groundwater may occur as a result of spills, overfills, or releases from the tank system.
Such contamination would require cleanup, with the cleanup costs potentially being the
responsibility of the property owner.
Underground storage tank systems typically have one vent pipe and one fill pipe
associated with each UST. These are usually visible in the vicinity of the UST and serve
as one of the indicators that a UST is present. Other structures indicative of USTs are
product dispensers or pumps and concrete pads.
Observations. No reports or other evidence which would indicate the presence of USTs
were discovered in the investigation of the subject property.
Transformers
Purpose and Scope. The presence of electrical transformers on or adjacent to the
property is noted to determine the potential for environmental contamination by
polychlorinated biphenyls (PCBs). If transformers are on -site, or within 100 feet of the
subject site, the accessible areas around the transformers and their exteriors are
inspected. Identifying marks are recorded and the owner contacted to determine if the
transformers' dielectric fluid contains PCBs.
7
Observations. Electrical services are provided by Seattle City Light (SCL) who owns,
operates, and maintains the electrical transformers located within 100 feet of the subject
property. Mr. John Hickman, Transformer Engineer for SCL, indicated that SCL has
never purchased any transformers containing PCBs in the dielectric fluid.
BUILDINGS AND STRUCTURES
General Description
Purpose and Scope. A general description of buildings and structures on the property
is given. The location, size, and apparent usage is discussed. Observations on the
general condition of the building as related to potential environmental contamination, such
as staining and cracks, are made. Construction features, such as ceiling and floor
surfaces and lighting fixtures, are noted.
Features and anomalies which may contribute to environmental contamination are noted.
Observations. One approximately 10,000- square -foot, one -story office building is located
on the subject property. The building appeared to be in generally good condition.
Several sections within the building appear to have been recently remodeled. Floor
covering throughout the building was carpet, with the exception of linoleum observed in
the rest room and hallway. The lighting throughout the building was generally fluorescent.
Fluorescent light fixtures have ballasts which may contain polychlorinated biphenyls
(PCBs). The Toxic Substances Control Act (TSCA) generally prohibited the domestic
manufacture of PCBs after 1979. Light fixtures manufactured prior to that date may
contain PCBs.
Current PCB regulations do not require the removal of non - leaking ballasts /capacitors.
EPA does, however, recommend that ballasts in older light fixtures be removed and
disposed of as part of a regular maintenance program. Current EPA established policy
is, that anyone disposing of more than four small capacitors per year must send them to
a permitted chemical waste landfill or approved high temperature incinerator.
Fluorescent light fixtures in good repair which contain PCBs do not ordinarily represent
a significant environmental hazard. However, any leakage of fluid from such fixtures
should be treated with extreme caution and should be cleaned up by qualified personnel.
Based on the construction date of 1980/1981, it is unlikely that fluorescent light fixtures
at this site contain PCBs. Individual fixtures were not inspected in this survey, and it is not
considered necessary at this time.
Interior Storage Areas
Purpose and Scope. Floors of storage areas are examined for staining or rust rings
which may indicate signs of former activities that could present a potential for
8
contamination. Containers of chemicals are examined for content and usage. Trash or
rubbish accumulation is noted.
Observations. Relatively small quantities of cleaning supplies used for common janitorial
purposes were observed in the space occupied by Grid Computer Systems. All
chemicals appeared to be stored in a proper manner. No evidence of improper usage
or disposal was observed.
When used, stored, and disposed of in the manner for which they are intended, small
quantities of chemicals such as those observed on the subject site do not ordinarily
represent a significant environmental contamination risk.
Interior Waste Disposal Areas
Purpose and Scope. Designated waste disposal areas and areas conducive to waste
disposal are examined for stained surfaces, discarded empty containers, and indications
of improper disposal. Rest rooms, drains, exterior doors, and secluded closets are
among the areas examined.
Observations. Interior waste disposal areas were limited to those typical of office usage.
No evidence of improper disposal of large quantities of chemicals was observed.
Former chemical disposal practices, if any, at the subject property are unknown. During
the walk- through inspection of the subject property, no evidence was found to suggest
improper past handling and /or disposal practices.
Interior Discharges
Purpose and Scope. Examples of interior discharge areas are drainage areas, pipe
discharges, and air emission generators. Areas with evidence of potential surface
contamination are noted.
Observations. No potential sources of surface contamination were observed within the
subject site's structures.
Interior Subsurface Structures
Purpose and Scope. Examples of potential indoor sources of subsurface contamination
are similar to those discussed related to exterior areas and include underground voids or
vaults, aboveground structures indicating subsurface activity, drains, sumps, clarifiers,
wells, etc. Evidence of potential subsurface contamination sources is discussed.
Observations. Potential migration pathways for contaminants to the subsurface
environment observed in the interior of the building were limited to plumbing drainage
systems typical of office structures. No interior floor drains were observed. No evidence
of improper disposal of large amounts of chemicals was observed.
9
Asbestos
Purpose and Scope. Construction completed prior to 1980 may include materials which
contain friable asbestos. Friable is defined as material which may easily be crumbled or
pulverized by hand pressure, thus releasing potential airborne asbestos fibers. The
asbestos material is sometimes concealed in areas which can only be inspected by
structural disassembly or other intrusive means.
Actions. A preliminary asbestos assessment was included in this investigation. The
asbestos assessment consisted of visual observation of the accessible structural areas
and exposed materials which most commonly contain asbestos. No samples were
collected, since no exposed, friable materials potentially containing asbestos were
observed. A complete asbestos survey was not performed.
A suspended ceiling tile system is present throughout the office areas within the building.
Based on visual observation, none of the observed tile is suspected to contain asbestos.
Floor coverings, including linoleum, vinyl and asphalt tile, sheet vinyl, backing materials,
and mastics may contain asbestos. Linoleum floor covering was observed in several rest
rooms and hallways within the building. Some floor coverings appear new; all appear in
generally good condition. These types of floor coverings are considered non - friable
potential asbestos - containing materials. Generally, such flooring materials are not
considered friable unless exposed and /or subject to damage.
Findings and conclusions are based upon limited access to all areas. Hidden spaces
between walls and similar conditions may, at times, harbor asbestos - containing materials.
ENVIRONMENTAL RECORDS REVIEW
Washington Department of Ecology (WDOE) records of 1989 list no underground storage
tanks under the name of the subject site or for the site address. Lieutenant Cohler, Fire
Prevention Specialist for the City of Tukwila Fire Department, stated that the fire
department does not keep record of USTs or hazardous material responses.
The WDOE Leaking Underground Storage Tank (LUST) Site List showed no record of
LUSTs adjacent to or for the subject site. Such records were not kept prior to 1989.
The US Environmental Protection Agency's (USEPA) National Priority List (NPL) of
hazardous waste sites, dated July 13, 1989, indicates no sites located within a one -mile
radius of the property.
The USEPA Comprehensive Environmental Response, Compensation, and Liability
10
Information System (CERCLIS) inventory, as of January 9, 1990, of potential hazardous
waste sites under investigation reveals no sited located within one -half mile of the subject
site.
SUMMARY AND CONCLUSIONS
SRH performed a Level 1 Environmental Site Assessment of the property located at 15425
53rd Avenue South in Tukwila, Washington. The assessment consisted of a walk -
through inspection of the exterior and interior areas of the property on June 22, 1990, and
a magnetometer scan of exterior areas to identify evidence of buried metallic objects
indicative of underground storage tanks or buried metal drums. Interviews, as well as a
search of the pertinent records of local, state, and federal agencies, were conducted.
The interior of the building formerly and currently has been used as office tenant - leased
space. No manufacturing facilities are known to have been located on the subject
property.
No evidence of significant environmental contamination of the site was observed during
the physical inspection of the site. No physical evidence of underground storage tanks
or magnetometric activity indicative of buried tanks or drums was found on the site.
Historical reviews did not indicate a potential for significant environmental contamination
of the subject site. A review of local, state, and federal agency records did not reveal any
reference to potential sources of significant environmental contamination of the subject
property.
RECOMMENDATIONS
A preliminary asbestos assessment was also conducted to identify exposed potentially
friable asbestos - containing building materials. No exposed friable asbestos - containing
material was observed.
The results of this investigation represent a review of current conditions, based on
available information, as described above. Based on this investigation, the overall risk of
significant environmental contamination at the subject site is considered to be low.
No recommendations for further environmental investigation or cleanup of the subject site
are made at this time.
11
LIMITATIONS
The conclusions presented in this report are professional opinions based on data
described in this report. They are intended only for the purpose, site location, and project
indicated. The conclusions presented in this report are based on the assumption that site
conditions do not deviate from those observed during our study and as described in this
report. This report is not a definitive study of contamination at the site and should not be
interpreted as such. An evaluation of subsurface soil and groundwater conditions was not
performed as part of this investigation. No sampling or chemical analyses were
performed or assessment of asbestos - containing materials was completed as part of this
study unless explicitly stated.
This report has been prepared for NDT Engineering Corporation, pursuant to an
agreement on May 24, 1990, with SRH Environmental Management, and is accurate to
the best of SRH's knowledge and belief. This report is based, in part, on unverified
information supplied to SRH by third -party sources. While efforts have been made to
substantiate this third -party information, SRH cannot guarantee its completeness or
accuracy.
SRH staff participating in this environmental site assessment are engineers and scientists,
not attorneys. Therefore, it must be clear to all parties that this report does not offer any
legal opinion, representation, or interpretation of environmental laws, rules, regulations,
or policies of federal, state, or local governmental agencies.
12
LIST OF REFERENCES
Site Location: 15425 53rd Avenue South, Tukwila, Washington (King County).
Aerial Photographs:
Source: Walker & Associates
Site Visit:
Year: Comments:
1989 PS89- 9 -10 -89
1985 SKP85
1974 KC84- 3 -20 -74
1969 KC69
1960 KC60,7 -23
1946 A46 -397
1936 K376- 22/23 -23 -4
Inspectors: Ms. Janet M. Cleary
Ms. Deb Varty
Date: June 22, 1990
Maps Used: 1989 Seattle Street Guide.
Regulatory File Source:
Washington Department of Ecology Draft Site List of Potentially Contaminated Properties
(May 1990).
WDOE Underground Storage Tank Registration List (1989).
WDOE Leaking Underground Storage Tank List as of 1990.
USEPA National Priority List, February 1990.
US Environmental Protection Agency (USEPA) CERCLIS inventory List, January 9, 1990.
Past Ownership Review:
interview Record:
Block 3, Brookvale Gardens, King County, Washington
Year: Name:
1981 CCI Real Estate Development Corp.
1980 Qestar Development Corporation
1979 Thomas Aiton
1979 Monty Cook
1979 Davis Alton
1976 Katherine Naylor
1976 Charles Bostwick
1962 State of Washington
1940 Bertha Gramann
;1938 Bertha Gramann
1932 Bertha Gramann
1904 Fred Gramann
Information was obtained by SRH employees from Ticor Title Insurance located in Seattle,
Washington, and is merely intended to be a review of past ownership. This should not
be considered to be a chain -of -title as performed by qualified title professionals.
Name: Relationship:
Lieutenant Cohler Fire Prevention Specialist for the City of Tukwila
Fire Department
Ms. Yvonne Stansberry Associate with Capitol Consultants Inc.
Mr. Pat Brodin Senior . Utility Engineer for the City of Tukwila
Public Works Department
Mr. John Hickman Transformer Engineer for SCL
Original - White
AUTHORIZATION FOR
LEVEL 1 ENVIRONMENTAL PROPERTY ASSESSMENT
SRH Environmental Management
CLIENT: Name NDT Engineering Corp.
Address 1108 Industry DRive
City Seattle State WA Zip 98188
The signing of this Authorization by CLIENT and CONSULTANT (SRH ASSOCIATES, INC.) authorizes
CONSULTANT to carry out and complete the Services described in consideration of the mutual
covenants set forth on both sides of this Authorization.
SERVICES: Services to be provided by CONSULTANT consist of a Level One Environmental Property
Assessment, as enumerated In the Services Request Form (Attachment A).
FEE FOR SERVICES: CONSULTANT'S fee for the Services Identified in the Services Request Form
(Attachment A) shall be as indicated below:
A Time and Materials fee based on personnel and expense rates set forth on the attached
Fee Schedule.
A Time and Materials fee based on personnel and expense rates set forth on the attached
Fee Schedule, with the total not to exceed S
X A lump sum fee of $ 1, 850.00 plus asbestos laboratory analysis.
A lump sum fee of $
Other (specify)
plus expenses billed at cost plus 15 %.
Sucncc. RntrinccnnwRegulatory Affairs
CLIENT and CONSULTANT acknowledge that they are in agreement with the terms and conditions
as set forth on both sides of this Authorization and in the Request for Services (Attachment A) and
the Site Information Form (Attachment B).
APPROVED F
Signet
Name
Title
Date
L.M. Phelp
Client Copy - Canary
A TED F / ` 0:? LTANT:
Signature
Name Ross R. Simmons
Title Vice President
Date May 8, 1990
ATTACHMENTS: A • Request For Services
B • Site Information Form
1 -2360
File Copy - Pink
(Check Standard Services NOT to be performed)
I. HISTORICAL DATA
A Chain of Title
B. Building Permits
C. Plumbing Permits
0. Interviews
E. Aerial Photos
U. PHYSICAL INSPECTION - PROPERTY
A. Topography, Ground Cover
B. Swales, Waterways
C. Roads, Railroad Tracks
0. Other Landmarks
E. Storage, Disposal Areas
F. Containers (drums, tanks)
G. Pits, ponds, lagoons
H. Stained Surfaces
I. Stressed Vegetation
J. Runon /Runoff
K. Drainage Pipes, Ditches
L Drains, Sumps, Separators
M. Wells
N. Evidence of Underground Voids or
Structures
O. Sources of Air Emission Fallout
III. ADJACENT PROPERTIES
A. Suspect Activities
B. Storage, Disposal Areas
C. Containers (drums, tanks)
0. Stained Surfaces
E. Stressed Vegetation
No Optional Services S
Client Signature
Original - White Client Copy - Canary
ATTACHMENT A
LEVEL 1 ENVIRONMENTAL PROPERTY ASSESSMENT
REQUEST FOR SERVICES
CLIENT NAME NDT Engineering Corp.
PROPERTY NAME & ADDRESS 15425 53rd Avenue S.
Tukwila, Washington
This Request For Services identifies the Services to be performed to complete a Level 1 Environmental
Property Assessment for the property identified above (Subject Property). The Services to be performed
will be all those Services Indicated below, as appropriate for the Subject Property.
STANDARD SERVICES. The Services listed below are recommended by SRH to complete The Level 1
Environmental Property Assessment. All of the Standard Services listed, as appropriate for the Subject
Property, will be performed, EXCEPT those specifically declined by checking below.
IV. BUILDINGS & STRUCTURES
A. Size, Use, Condition
B. Storage, Osiposal Areas
C. Processing Equipment
D. Stained, Cracked Surfaces
E. Floor Drains, Sinks, Sumps
F. Electrical Equipment, Lighting
V.
�VL
VII.
TRANSFORMER STATUS
A. PCB or Non -PCB Containing
B. On Subject Property
C. Within 100' of Subject Property
__VIII. RECORDS REVIEW
A. EPA
B. NPL, CERCLIS Lists
C. State Environmental Agency
0. Local Fire Department
E. State Fire Marshall
F. Local Police
IX. FINAL REPORT
OPTIONAL SERVICES. In addition to the Standard Services listed above, the Optional Services indicated
below will be performed as part of the Level 1 Environmental Property Assessment of the Subject Property:
(Check Optional Services to be performed)
X Lim Visual Asbestos Assessment
_ Asbestos Survey
_ Asbestos Air Monitoring
Indoor Air Testing for CO. CO NO
_ Other (specify)
Formaldehyde Air Monitoring
Radon Air Monitoring
_ Indoor Air Quality Evaluation
Date
MAGNETOMETER SURVEY
FIELD AIR MONITORING
SRH Environmental Management
Science, F.nginerrinwRegulatory Aflair%
File Copy - Pink Project Manager's Copy - Gold
RH
G R 0.L■ P
Original - White
HOW DO WE OBTAIN THE FOLLOWING, IF AVAILABLE?
Aerial Photos
Telephone
CONTACT PERSON FOR ACCESS TO SITE:
Name Van Phelps
Telephone 206 -575 -8877
ATTACHMENT B
SITE INFORMATION WORKSHEET
SRH Environmental Management
Science: Engineering/ Regulatory Affairs
The information provided on this form will be relied upon by SRH staff performing the Level 1 Environmental
Property Assessment. Thus, the validity of the final report will be dependent on the accuracy and
completeness of the following Information.
FACILITY NAME: Q17PSt Commerce Center
FACIUTY ADDRESS: 15 425 5 3rd Avenue S.
CITY: Tukwila STATE: WA ZIP:
less than
APPROXIMATE SIZE OF PROPERTY: 1/2 acre APPROXIMATE SIZE OF BUILDINGS: 10 , 0 0 0 S C(. ft.
AGE OF FACILITY /IMPROVEMENTS: 1980 81
GENERAL DESCRIPTION (0 BLDGS, PROPERTY USE, SURROUNDING USES): ,S 7 nrj 1 P story I rP- a i 1
brick w /tile also hot tar roof.
Chain of Title
Plot Map
NAME OF CURRENT PROPERTY OWNER: r t'o1 Consultants
NAME OF CURRENT TENANT: (;ri J1-ems — Business Computers
RELATIONSHIP OF CUENT TO SUBJECT PROPERTY (e.g. owner, purchaser, lender): Purchaser
PURPOSE OF ASSESSMENT (e.g. property sale, construction financing): Property sale
NAME OF LENDER (If any) Seattle First National Bank
MOST KNOWLEDGEABLE PERSON ABOUT SITE: Susan Moore 206 - 358 -2643
Name Title
Client Copy - Canary
nu. Purchaser
CLIENT ACKNOWLEDGE NT: artily than ova' formation is accurate and complete to the best of my knowledge.
SIGNATURE DATE: 5
File Copy - Pink Project Manager's Copy - Gold
H
C R0 U I'
The following replaces and supersedes the clause "3. TIME OF
PAYMENTS" In the Terms and Conditions of the AUTHORIZATION FOR
LEVEL 1 ENVIRONMENTAL PROPERTY ASSESSMENT.
3. TIME OF PAYMENTS: A retainer fee of $ Con _nn '
will be due prior to initiating work on the project. CONSULTANT
will, upon completion of the requested services, submit an invoice
for the balance of the fee for Services or Extra Services actually
completed. Payment of invoiced amount will be due ten days after
date of invoice. CUENT agrees to pay the invoiced amount within
ten days from date of invoice.
L.M. Phelps
Name Name
Title Title
Division of SRI
Associates. Inc.
President
May 24, 1990 May 8, 1990
Date Date
N.E. Whitaker Way
Portland. OR y - _'in
Fax 1 ;03) 2ii -'04M
• 1 ;113) 252-8316
ATTACHMENT C
CONTRACT TERMS AND CONDITIONS
AMENDMENT
I ctIpTED
e6,44-
Signature
Ross R. Simmons
Vice President
SRH Environmental Management
Science Engineering Regulatory .aff:
R. ECEiVED JUN f. 199U
Copy 1 •Original
Copy 2 - Client Copy
DATE
6-27-90
SRH Environmental . Management
12245 N.E. Whitalor. Way Portland. Or. 97230
SCALE
S R H
G R 0 U : P
PROJECT NO.
1- 2 3 6 0
NA
DRAWN BY
SMS
15425 53RD AVENUE SOUTH
TUKWILA. WASHINGTON
SITE PHOTOGRAPHS
FIGURE
APPROVED BY
■
NA
SUBJECT PROPERTY - VIEW FACING WEST
EMIER
CONDITIONAL USE APPL1C Usa
CITY OF T UKWILA
PLANNING DEPT.
1. BRIEFLY DESCRIBE YOUR PROPOSAL: NDT Enginaaring Cnrpnratinn prnpnsas to usa
and assembly use.
2. PROJECT LOCATION: (Give street address or, if vacant, indicate lot(s),
block, and subdivision; or tax lot number, access
street, and nearest intersection)
Qestar Building
15425 53rd AvP Smith Tukwila WA
Quarter: SW Section: 9/
Signature:
(This information may be found on your tax statement.)
3. APPLICANT :* Name: Levan M. Phelps
Address:1108 Industry Drive
AFFIDAVIT OF OWNERSHIP
e
Township: ?/ Range: 4
Tukwila, WA 98188
Phon -88 /
MOP., MN. lo
* The applicant is the pert /n whom the staff will contact regarding
the application, and to whom all notices and reports shall be sent,
unless otherwise stipulated by applicant.
Date: July 6, 1990
4. PROPERTY Name: Levan M, Phelps
OWNER
Address:1108 Industry Drive Tukwila. WA 98188
Phone: 575 -8877
I /WE,Csignature(s)] iI. „.„J�' j4
swear that we a - t e ow -r'r or c. ract purchaser s o
property involved in this application /and that the foregoing
statements and answers contained in this application are true
correct to the best of my /our
knowledge and belief. Date: July 6, 1990
tha
a ^d
5. PRESENT USE OF PROPERTY: See attached sheet
CONDITIONAL USE APPLICATION
Page 2
6. PROPOSED CONDITIONAL USE REQUESTED (from list in TMC 18.64.020): sPP
attached sheet
7. ADJACENT LAND USES: See attached sheet
NORTH:
SOUTH:
EAST:
WEST:
8. DETAILED DESCRIPTION OF PROPOSED USE (for example, describe the manufactur-
ing processes used, wholesale /retail /warehouse functions, outside storage of
goods or equipment or other information which will facilitate understanding
of the activities you proposed to develop on this site):
See attached sheet
9. Will the conditional use be in operation and /or a building to house the use
be started within a year of issuance of the permit?
Yes.
10. Describe the manner in which you believe that your request for a
Conditional Use Permit will satisfy each of the following criteria
as specified in TMC 18.64 030 (attach additional sheets, if necessary).
A. The proposed use will not be materially detrimental to the public
welfare or injurious to the property or improvements in the vicinity
of the proposed use or in the district in which the subject property
is situated.
RESPONSE: See attached sheet
B. The proposed use shall meet or exceed the performance standards that
are required in the district it will occupy.
RESPONSE: See attached sheet
C. The proposed development shall be compatible generally with the sur-
rounding land uses in terms of traffic and pedestrian circulation,
building and site design.
RESPONSE: See attac'hed sheet
RESPONSE: See attached sheet
E. All measures have been taken to minimize the possible adverse impacts
which the proposed use may have on the area in which it is located.
RESPONSE: See attached sheet
CONDITIONAL USE APPLICATION
Page 3
D. The proposed use shall be in keeping with the goals and policies of the
Comprehensive Land Use Policy Plan.
5% Present Use of Property: The property is presently zoned for com-
mercial use. Part of the building is currently vacant, and will be
occupied by NDT Engineering Corporation. The other portion is currently
being used by Grid Systems who will continue to be a tenant for at
least the next 5 years due to a pre- existing tenant contract. Grid
Systems is a wholesale distributor of Tandy computer systems.
6. Proposed Conditional Use Requested: NDT Engineering Corporation
proposes a conditional use of a C -2 District - Regional Retail Business -
area for High Tech Research and Development and Assembly as per
TMC 18.30.040.
7. Adjacent Land Uses:
North: Commercial /Office Building- Parkside Offices
Primary Tenant: Puget Sound Bank Mortgage Servicing
South: Commercial /Retail- Dominos Pizza, Dictaphone (Pitney
Bowes), A New Beginning
East: Commercial /Retail- Ultra- Boutique
West: Parking lot servicing building at south end of lot
Primary Tenants: Rainbow Valley Montessori School
BCTI (Business Computer Training Institute)
8. Detailed Description of Proposed Use: NDT Engineering Corporation
is a small company specializing in Research and Development, Assembly,
and Sales of Electromagnetic Fatigue Crack Detection Equipment for
aircraft structures. The materials used in the assembly of these
probes include slender copper and brass tubings, Acetal and Nylon
plastics, ferrite cores, wire coils (average size:1 /16 to 1 inch),
and a variety of electronic connectors. The coils are inserted into
a shell of copper, brass, or plastic, and are wired directly to a
connector at the opposite end of the probe. The coil is secured with
a small amount of epoxy. The finished probes range in size from 2 to
10 inches in length. The assembly process often requires some light
machining using a small lathe and /or milling machine. The finished
product is polished using a small high speed buffer. Computerized
engravers are used for part marking, and an EDM machine process is
used in the fabrication of specialized reference standards. Research
and product development is an ongoing activity to meet developing
customer requirements and to expand the technology used in this field.
All sales of the products are done via telephone and telefax machine
rather than on site personal contacts or outside sales. NDT Engineer-
ing Corporation's worldwide customer base includes airlines and air-
craft manufacturers, aircraft overhaul and maintainance centers, and
the U.S. military. The delivery of both raw materials in and finished
product out are done via United Parcel Service and other comparable
delivery services.
{ C
10. A. The assembly and fabrication processes used by NDT Engineering
Corporation doe not produce unusual amounts of trash and garbage,
or release any dangerous chemicals into the environment which
could be detrimental to the public or properties in any way.
All chemicals used, such as Acetone and epoxy potting compounds
and solvents, are used in very small amounts and are consumed
in the assembly and fabrication processes, leaving no chemical
residues or left -overs to be diguarded in any way, ie: dumping
down the drain.
B. The performance standards of the district in question include the
control of noise, pollution, odor, and vibration to the extent
that they will not disturb those around the property being occupied.
NDT Engineering Corporation does not produce a high volume of
any of these parameters, and will not disturb any neighboring
properties or the tenant sharing the same building in any way.
C. The surrounding land use around the property is mainly high
traffic volume generating retail and commercial office buildings.
NDT Engineering Corporation will be generating less traffic
and pedstrian circulation for the area due to the fact that it is
a small (15 employee) high tech assembler whose personel will
arrive in the morning and leave in the afternoon with little or
no traffic movement in between. All supplies used in production
and finished products shipped out are delivered via small delivery
vehicles, such as those used by United Parcel Service.
D. NDT Engineering Corporation will fit perfectly with the goals
and policies of the Comprehensive Land Use Policy. NDT will have
no effect at all upon the environment, open spaces, the residen-
tial population, and /or the transportation and utility concerns
of the City of Tukwila. As regards concerns with commerce and
industry NDT Engineering Corporation will help diversify the
business use in the area by promoting flexibility of land use
within an established business park. NDT shall retain the
aesthetic benefits and landscapimg of the pre- existing facility,
and shall not endanger the environment in any way. Any sign
put up shall be professionally made and of reasonable size to
merely identify the company. The primary intent of the company
is to maintain a professional facility and appearance regarding
both the interior of the building and the exterior maintainance
of the building and all landscaping.
E. NDT Engineering Corporation has taken the time to study how they
will impact the area and environment into which they wish to move.
NDT shall not be adding pollution, noise, or significant amounts
of traffic to the area, and shall continue to monitor these
concerns to assure the continued prosperity of both this business
park and the City of Tukwila in general.
I'M•
68Th ST
N
ZSIINDT
50TH ST
\
!t It
s nit N ST
IV ST
a
5 IUND ST
I TILN
ITOTo ST
;TI.
z1 z Si
Vicinity map showing location of site ( ) and
surrounding prominent landmarks.
2
•MINI; Al IVIC IVPISTN
a.
0.0Jet
• MN I
•
ISp
FAUL
fevIr
.
32v
EA
4 ; ST
K
190TH 51
o
4
= 10 00
8
I /1T 01 A N1
7. ''
{
•
• ,�z. s,• i 4
r
'st 120 40.41H
aEz5rAR. 601%/1 MERE
ILI p .Jo.2.
A Lee
cleJ maw
F./ Ft...
1 0 PIT ELEVAT tOkl
eau
OUT H ELEVAT; 01,4
am.:‘,0 Yana.
!GA' 46.41' FVV
"es
-!
--,..011111111111===1111111Iiii7P
;.0 111911111117
zlt= lemtval- rAtat_
c,1 LEVAflQIJ
ogarElLygiQg
5.41s Vd- e-
4 Wax. *1.
wx.daLb
• kb.. ...eat- NM.. T o,
1 /6%.1 1 -cl
oao.f 2 4.1.1ac.tv.
*MA..
S
ra-e4-1.
•••••
1
a."
-
- PLANT' L I GT o
KEY
V A R. I E TY
SIZZ
1 (
"
T1 CGLIDEN7AL15 PYi2A191 DAL IS - 7'1'eA DAL AgrsolevrrAe
ACER PLATALO,DES 1. AR '.:4-EV 3NID• - CLEVELAND NORWAY MAPLE
OSA1ANThU5 DELAVAYI
3ERPETZIS UCU 0SA - L•:ARTY 3A,RBERMY
COTO`,1 EAS7E CA11116T"!- P-ANT .'_' 011 CENTER FOR Gj17.04.1NDCOVER
PALNEYI C .-- CY EA)
ini-war,;14
• — 4
FU1 IU, AS A105O1ljATt,
e TM S4tUa) •R.
G IST I.M
NG, T•.T,.'4 14a
9OUT• 311•Qr.=
[Ti N6 SCYCwT L'
O.G TN•0Y4NOYT,
EC••T AM0N43T
H2S. 1, 5,4)
20N04 (OtAMT
4' 0.4 11e11E. 00e)
000
ZEg 5•14C10, ��
D
50
SITE PUNT FROM:
11E55 ENINEECS INC.
- eD..rw 10.1
AUtURN,WASN.
DFA0 IN4 1 OF] • J26. Z4Z6-2
SUILDINCT
1200.5
1211.5
It 02 0
t 2nD..(5/.s"T
4•a c. v.)
'1A WA.
: N.
230 „0 5
53.2!
LANDSCAPE SJT1 PLAN
5Ca46: 1 "= 20'
Y1651- TAT p'W /11.
Mats TD er.4'weove
415Q5P wYa.t ,
rec wrrarr•
G r • "`
for 10070.
.LD=Y
AMv.I u.l,r prou srR1ir
t f.Iuee] 3220 R7 -, 40.1
M 1}20501' -4:5.5.0.
= 04 TB -
640011 -4.54.5∎
.5..
• 1400 - ..54.1.0.
• 04000 - 1.54 591.
II(. C 9940 Clod LASS v/LYN • i,R b�
UAW 0 e,4D 452 5.551 - 2 4+r ca. v - c JST0il )
�. doJ .7:11111. I' Maas G1r..t. Y.Lw %5
- �f451•
40 9.1111••• T0 4.ZRY gI.T4 i ugh �a S9099 J,.09
- sitt/+5411Wq' 091.4 +1 WW1.. 'TA. 2.,25 5N.
Zama". Toy
3205 5-• 1.0
54'51%■ Tr,l0L - qT. A
N OTC.
EAISTINCI PLANT MATERIAL LGCAT)ONS 1
:"ETEYAIINED BY 3tEASUr_E0EN75 ON THE
41ZC0 ND. LJNFITIM ALL LOCATIONS AND
ADJUST V NEC25SARY.
2APRIL rr79
II IGATI0J LEGEND
aroriu aitwJe 12 0 • 1 6 11 A11 1 wL 44.1 01 so Rat.
HCA. A I' w.tcr 095.T . G!U ALL Was w CeW 4 aTtai
1.5110 F0a•dt.10,0■4...t u/a'i 11,5,63 14 Au ADAtreIL
. et 05.1091 Y/LL'E1,44 S 1 AY AD1IJ1ot. 4
000. IU7rAuL - raw 2WTl. Sl /a1 AUe(ii4 S0 lo e•X.
L ANp6tAPE PLAN
TOM AITON
SEVIS ION :F➢uN Cr 23JAt•L 1979
MN ST
OFFICE BU IL DI
TUIG W I LA , W
a
c
•
13.0°
EATERIOR
Fl.0 DLIC NT
OFfOEE SCALE= 8477 s b
SNorisurAGE.1107. ss•c+.
- race( a 11�i ;.� : 4 a•
001
Du
NI
sl
4
SEWER LINE
r/ ELEv - -�--►� �
Q
Eo1 F
I .60
To
/ /
0
WATERLINE
FL El[V /0.00
F L ELLS 75.00
_5.90
64.00
30.00'
.00'
1.80
25.90 9.0.00
,IyrINL 5101 I°K " O
6o
"W
66' O• A
ITEtAifl. "'
C y
t�RR
f51°[ f t!uReZ.
5 3.11E , kiEph4E SOUTH
9uAes
ERR • Tow 3(1 d11 t' 414 s1.4.0 wait.,
I i e : III'If'�111
1 Fg1ee V / CC ff�0 ' p e°41.f
I 12,0o'
MANNO 'M - 4
0-
METRO plsr 09c 1 GAS LINE • 8
1 - 1
PL cir FL AN . SCALE ■ 1 =22.0
CE6AL DESC RI PTIo4J2 - - - —
— —
—
THAT PORTION of Lot S5 OF IROOkVALE GARPEN TRACTS AS RECORDED 19 Boos( of P4K5,VoLtJ.AF
10, /AG 47.5 RECORDS of Ksib CouNTY, IASHINO Toot, OfsCRI /Cp AS Foi LoWS:
COM /A1EN 1
CINC. Al THE 50THEASr Co9N0Q Lv
Of SAID T 03; THENCE H°RrN o °4 /.0 EAsr A) PIrrANCE
OF 714,20 TO 1 INE pOINT OF /EGHININGIj THENCE CONllwulNG, 00010 O EAST 4 DISTANCE of 142.87;
THCNC r NORTPI T3 8}'30' WE A DISrWCE OF 50.15 FT• TtIENCI N f1' 12' 00' WCSr A p1[TAN€e OF 25041 tr., THiNl1
504TH 0 VEST A DISTANCE of I%. QO FT.; THENCE So'T N 11. 17' Do" EACT A DISTANCE OF 300.00 FT To THE
¶RlIE Poili of BCLINNING.
All SIToATCP 501I WESTQi4RTER Of SEC TION 23, 'TOWNSHIP 23 NORTHj 4 EMC W.N.
KING COUNTY WASNINsum
Eon-wig 6 RAoES sllol,N PARKING- SVACEs
2
I
I
I
Vioo4
its,/
/
a
vo ueisHOw
t r Y V . 3 ' a 4 .
b ;El b X / ( I y. ,21
V9'010_14. y•1 LJ)I'd
%IX ,II
371�3o
l
,zt X ,gl
%4 4c) 4 S
'
PILL. IN, AS APPPAPR.INTE,
trial4 mau prtrim
dhis-riNe
;OUTS. 1
e NO. S(PLANT
' 4,44 • 1. • ovAHoirr, :
ExOpyi.,Ani ON ST
1405. 4) • •
, •
•
•
:ITE PLAN *FROM:
ENj RS, 1NC.
.:Wc1411401.:1.Ami.5 ohr7— . • • A(110R,N ;41A.51 9000A
PAW OF.1 , Jo&
•
VI
• in I-
to u ''* V
et •
F. • . , a .-?: ?; i'... •
41.1 g 411 I' 1 1, „ re
4. ... .. , , if p , , •
. •- al .,,
_ f• •
, 1
ii. 1 • . •
'.1 Vs..... .................
" "...._
1 ■I'm v/ 4,./k•-•
.
—,_N° .
• s.No.4 (nANT
•eteo,C. IN 51041X AM)
•
sa.P...4 AVE, SO.
- • •-•
• • • • .^
tt•. ..•
r1-0.M Occ.:IDENTAL 1 S PYRANII DAL. I s - 1 IDA!. .A1Z4ORVIT •
AcER PLATALoIDES VAR 'CLEVELAND' - ci.EVELIAND
OSMAN DELA VAYI
BERMRIS• vezRucuLosA - WiZTY BAR13eR.R.Y
PLANT tAATER..IAL I_OCATI UN S WERE
PETEZMINED ME5UJMNTS GIN 714E
:4z_o'J NT>, CON•FIAM ALL LOCATION :AND :
NECE5SA'TZY.
2 APRIL 19/9
DATh • • i•
APIPMINIM
4?j, "•*;
•
11111111111111111111111111111111111111111111111111
0 1 2 3L
IF'f.THI.S;HICROFILKO:
CLEAkIHAICTHIS'-,'NOTIdE4'
TH 1 ITY OF THE ORIGINAL DOCUMENT
• ••••••
" • ••,• , • •
•
•
•
! 111 I 11
•
."-
.• „
, •
1 W1
t 4
1.