City of Tukwila
Department of Community Development Steve Lancaster, Director
STAFF REPORT TO THE DIRECTOR
DEPARTMENT OF COMMUNITY DEVELOPMENT .
Prepared July 31, 1997
Fort Dent Three
L96 -0084 - Shoreline Substantial Development Permit
John C. Radovich Development Corporation
John C. Radovich Development Corporation
To build a two - story, 40,000 square foot office building with
associated parking, utilities, landscaping, and amenities.
Flood Control Permit
Storm Drainage Permit
Land Altering
Design Review (90- 12 -DR), approved November 1990
SEPA (EPIC #23 -90), approved November 1990
6860 Fort Dent Way, Tukwila
99,760 Square Feet (2.29 Acres)
Regional Commercial Mixed Use
Regional Commercial Mixed Use (RCMU)
Alexa Berlow
John W. Rants, Mayor
6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • (206) 431-3670 • Fax (206) 431-3665
Staff Report to the
Director , Department of Community Development
Attachments:
A. Full Set of Plans
B. Photographic Rendering
C. Shoreline Substantial Development Permit Application
D. Geotechnical Report (revised)
E. Exterior Lighting Specifications
• L96 -0084 Shoreline Permit
Fort Dent Three
Staff Report to the �' L96 -0084 Shoreline Permit
Director , Department of Community Development Fort Dent Three
FINDINGS
Background
Shoreline master permits were submitted for Fort Dent Three in 1988 and 1990, and
withdrawn in 1991. In November 1990, a design review proposal for Fort Dent Three
(90- 12 -DR) was approved by the Board of Architectural Review with the condition that
access and amenities from the building to the shoreline be provided. A Mitigated
Determination of Non - Significance (MDNS) (EPIC- 23 -90) was also approved at this
time.
The proposed development meets current minimum requirements of the Regional
Commercial Mixed -Use (RCMU) zoning district. See Applicant's Cover Letter, dated
December 20, 1996 confirming minimal changes to building modifications in current
shoreline permit application.
A Trail Easement Agreement runs with the land adjacent to the river that holds the City
responsible for maintaining the trail, from the edge of the private property to the water.
Shoreline Substantial Development Permit (18.44.80)
Any substantial development within 200 feet of any shoreline must receive a shoreline substantial
development permit prior to issuance of any local permits by the City.
The proposed Fort Dent Three Office Park is located adjacent to the Green River. A
landscape plan, required under 18.44.080, is attached to show specific measures taken to
meet shoreline regulations for the river environment (18.44.130). Criteria to meet both
general and specific shoreline regulations follow.
General Shoreline Regulations (18.44.110)
1. The use is in conformance with the underlying district
The proposed office park meets basic development standards of the Regional Commercial
Mixed -Use (RCMU) zoning district. The project complies with the following items of
municipal and county shoreline policies and regulations:
Tukwila Comprehensive Plan Shoreline Design Policies:
A -1. The development minimizes impacts on wildlife and significant vegetation, sandbars,
wetlands, watercourses, and other important habitat features are maintained through the
proper location, construction, and management of shoreline uses;
A -2. The development protects riverbank vegetation and, where feasible, restores
degraded riverbanks
A -4. Streets, flood control, surface water drainage and sewer system projects,
clearing /grading activities and landscaping are designed, located, and managed in a
3
Staff Report to the L96 -0084 Shoreline Permit
Director , Department of Community Development Fort Dent Three
manner that minimizes water pollution, provides erosion control, and protects water
quality
A -5. The proposed development does not appear to cause significant adverse impacts on
flooding, erosion, and natural resources in determining and considering the visual impact
a commerciaUindustrial development will have on the surrounding area, within and
outside of Tukwila's jurisdiction.
A -6. Capital improvement projects and private development are designed, located, and
managed in a manner which does not endanger public health, safety, welfare, or capacity
of river to provide long -term community benefits.
A -7. The development is designed and located to minimize impacts to habitat, vegetation,
access, recreation, historical resources and flood control
A -12. The development reflects high quality site planning, architecture, and landscaping;
and includes setbacks, buffers, height/bulk provisions for open space
A -13. Areas included in the Green River Plan: The development provides public access or
a private natural area in lieu of physical public access.
A16 -a. Access is designed and located approximately in relation to the particular site
conditions and private property concerns
416 -b. Access is designed to be safe and convenient, and includes amenities such as
benches, drinking fountains, and parking lighting
A -17. Where appropriate, the commercial development provides a connection between
concentrations of commercial activity and the trail network
Tukwila Shoreline Master Program:
A -2. Locate commerciaUindustrial development in areas with lore potential for recreation
or other public use.
A -3. Preferences should be given to commercial and industrial development that will
provide an opportunity for a substantial number of people to enjoy the shoreline.
A -4. Determine and consider the visual impact that the commercial/industrial development
will have on the surrounding area
A -5. Encourage provisions for public access, especially visual and pedestrian, as an
integral part of commercial/industrial waterfront development
B1 -b. For non -water dependent economic activities, where permitted, the entire water's
edge should be available for public access, consistent with private property rights.
B -3. A trail system should be developed along the river. Trails should be developed for
linear access through public shoreline areas; access points to and along the river should
be linked by a system of trails; The connection of other trails in the region to the shoreline
trail system should be encouraged and developed. To assist in developing a trail system,
incentives should be offered to property owners for utilizing set back requirements
C -2. Parking facilities should be located upland with provisions for adding pedestrian
access to the shoreline.
D -2. recreational uses should be incorporated with other shoreline activities.
F -1. Determine and consider the visual impact a commercialindustrial development will
have on the surrounding area
F -2. Develop regulations requiring the mnaintenance of a buffer of permanent vegetation
between developed areas and associated water bodies to improve the aesthetic qualities of
the river, retard surface runoff, maintain constant water temperature, and reduce
filtration.
F -3. Promote linear shoreline access, especially pedestrian and norm- motorized types, in the
areas close to population centers. Such areas would also serve as buffers between water
and developed areas.
4
Staff Report to the
L96 -0084 Shoreline Permit
Director , Department of Community Development Fort Dent Three
F -4. Develop regulations for site coverage, building height, setbacks, and density to insure
visual access to water, promote interesting development, and prevent encroachment over
water.
F -8. Outfalls and surface run -offs should be controlled to minimize adverse effects on the
river
A Trail Easement Agreement runs with the land adjacent to the river that holds the
City responsible for maintaining the trail, from the edge of the private property to
the water. In coordination with the Department of Parks and Recreation, the
property owner is responsible for providing appropriate maintenance and safety
measures in the buffer zone.
3. No structures or accessory facilities shall be located over the river unless such structures protects or
promotes the public interest.
Accessory facilities, such as picnic tables and benches will be located in the shoreline
management environment to promote public interest in the use of the riverfront as a
recreational amenity. These amenities will become part of the Green River recreational
trail proposed by the City that will extend to Fort Dent Park, located immediately to the
north of the proposed office development.
4. There shall be no disruption of existing trees or vegetation within the river environment unless
necessary for public safety or flood control, or if allowed as part of an approved shoreline substantial
development permit.
The site currently contains mostly grass vegetation, blackberry bushes, and some trees.
Trees, shrubs, and grass will be added between the parking lot and trail, including
Washington Thorn, Kousa Dogwood, London Plane, Sweet Gum, Rhododendron, New
Zealand Flax, Otto - Luyken Laurel, Snow Lady, and White Flowering Potentilla.
5. No effluent shall be discharged into the Green River which exceeds the water quality classification as
established by the State for the adjacent portion of the river.
Surface storm water will be channeled and collected through an approved bioswale and
conveyance swale to the storm system, already in place at Fort Dent II. The system at
Fort Dent II is connected to the conveyance system in Southcenter Boulevard, via Fort
Dent I, before reaching the Green River. Possible runoff from parking lot areas will be
channeled through the biofiltration swales.
6. All States and federal water quality regulations shall be strictly complied with
Appropriate measures will be taken to comply with all state and federal water quality
regulations.
7. Wildlife habitat in and along the river shall be protected
The Green River serves as a mitigation route for salmon and possibly for trout. In
addition, crow, finches, sparrows, robins, and duck have been observed on or near the
site. No special measures have been proposed to protect this habitat from development in
the shoreline management environment or in the vicinity of the proposed office building.
5 .
Staff Report to the L96 -0084 Shoreline Permit
Director , Department of Community Development Fort Dent Three
8. All perimeters of landfills and other land forms susceptible to erosion shall be provided with
vegetation, retaining walls, or other satisfactory mechanism for erosion prevention.
In 1991, the riverbank was widened and re- vegetated with the development of
Fort Dent II as an erosion control measure. No new riverbank widening is predicted by
the applicant to be necessary with the development of Fort Dent III.
9. All necessary permits shall be obtained from federal, State, County or municipal agencies.
A SEPA was approved as a Mitigated DNS in November 1990; Tukwila Design Review
was approved in November 1990 with conditions to provide access and amenities from
the building to the shoreline; A Tukwila Flood Control Zone Permit and a Tukwila Storm
Drainage Permit were submitted on December 23, 1996. A Land Altering Permit may be
necessary.
10. Dredging for purposes other than for navigational improvements or flood control is prohibited
All dredging occurred as part of the river widening in 1991. Approximately 1,150 cubic
yards of material were removed at the time to create a slope and bench intended to allow
additional flow capacity in the river. No additional materials will be removed.
11. Mining is prohibited along the river shoreline
No mining will occur on the site nor along the river shoreline
12. Solid waste disposal is prohibited along the shoreline
No solid waste disposal will occur along the shoreline
13. No property will be acquired for public use without dedication by or just compensation to the owner
Two separate portions of land adjacent to the trail were dedicated for public use in the
original proposal, approved by the Board of Architectural Review in November 1990.
14. Landfilling is prohibited within the river channel, unless such landfill is determined by the Planning
Commission to protect or promote the public interest.
No new landfill will occur within the river channel.
15. Notwithstanding any provisions of the Code to the contrary, removal of any cottonwood tree within
the river environment, or the low impact environment, which tree is 12 inches or greater in diameter as
measured 4.5 feet above grade, shall be subject to the requirements of TMC Chapter 18.54, Tree
Regulations.
The site is currently spotted with grass, shrubs, and trees.
Specific Shoreline Regulations - River Environment (18.44.130)
1. The river environment shall consist of a 40 foot wide management zone as measured on a horizontal
plane from the mean high water mark, and shall contain no uses or structures other than the following:
a. public and/or private footpaths or trails
b. recreational facilities such as benches, tables, viewpoints, and picnic shelters provided no such facility
exceeds 15 feet in height
6
Staff Report to the L96 -0084 Shoreline Permit
Director , Department of Community Development Fort Dent Three
c. support facilities for pollution control such as runoff ponds and filter systems provided they are at or
below grade
d.. information and directional signs
e. diking or bank stabilization, erosion control, and flood control purposes
f. bridges
g. fire lanes and dike maintenance roads
h. plaza connectors between buildings and dikes not to exceed the height of the dike are permitted for the
purpose of providing and enhancing pedestrian access along the river, and for landscaping purposes
Strong pedestrian ties between the river side entry from the building to the river trail will
be created. A picnic table, benches, and seating in the immediate area of the trail
connection, as well as along the length of the river trail, will be introduced. An, enhanced
landscape plan was approved by the Board of Architectural Review on November 7,
1990. A copy of the landscape plan is attached. See item 2c for further detail on planting.
2. River environment uses shall conform to the following standards:
a. access roads, parking or storage areas, the closest edge of which shall be a minimum of 40 feet from
the mean high water mark
Parking, storage, and access roads are outside the 40 foot river environment management
area. Their distance from range from the mean high water mark of the Green River range
from 50 to 70 feet.
b. the centerline of railroad lead tracks shall be located no closer than 40 feet from the meat high water
nark, except where the railroad lead track is bridging the river
N/A
c. where the riverbank has been reconstructed, it shall be landscaped with suitable plant material
consistent with the flood control measures to include large hardy shade and fruit trees, at maxintunt 30
feet on center such as maple, alder, poplar, cottonwood, sycamore, willow, oak, beech, wahtut, ash and
birch, or other species approved by the Director. ht addition, at least one of the following landscape
materials shall be used:
1. live groundcover at a nnaxitnunn of 18 inches on center
2. natural grasses
3. addition to the existing natural vegetation where appropriate
In 1991, the riverbank was revegetated with blackberry bushes and trees for the river
widening project. In addition, vegetation along the river will be augmented with the
following plant materials: 12 Tupelo, 24 Redtwig Dogwood, 12 Spirea, 16 Warminster
Broom, and 23 Rosa Rugosa. All proposed plant material will have canopy less than 30
feet. Sod is proposed as groundcover (See attached geotechnical report).
d. Facilities such as pumps, pipes, etc. shall be suitably screened with hardy plant material.
No above ground storm detention has been proposed.
e. Utility easements where necessary shall be landscaped with live groundcover or natural grass cover.
See Item C of this section
7
Staff Report to the
Director , Department of Community Development
Conclusion
L96 -0084 Shoreline Permit
Fort Dent Three
1: The impact of glare on habitat in the river environment may be caused by on -site
illumination.
•
2. There is no access easement to the Green River dike for King County flood control
inspection and maintenance.
3. The location and design of information and directional signs have not been specified.
4. The maximum width of the commercial driveways proposed exceeds 35 feet.
Staff recommends approval of the Type II Shoreline Development Permit for the Fort
Dent Three Office Park and associated amenities in the adjacent river environment.
Conditions of the decision are attached to this permit.
C
City of Tukwila
Department of Community Development Steve Lancaster, Director
Date: July 31, 1997
To: Jack Pace
Planning Manager
From: Alexa Berlow
Associate Planner
For: Fort Dent Three Office Park
Received: June 20, 1996
Determination: Adendum to SEPA (MDNS)
Mitigated Determination of Non - Significance
Approved November 1990 ( #EPIC- 23 -90)
Associated Permit(s): Shoreline Substantial Development (File #L96 -0084)
Prepared By: Alexa Berlow
Project Description:
SEPA Amendment for the construction of a two- story, 40,000 square foot office building
with associated parking, utilities, and landscaping.
Proponent:
John C. Radovich Development Company
Location:
6860 Fort Dent Way
MEMORANDUM
John W. Rants, Mayor
6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • (206) 431-3670 • Fax (206) 431-3665
Date prepared:
June 23, 1997
Lead Agency:
City of Tukwila, Department of Community Development
Challenges to Document:
None
Other Agencies of Jurisdiction:
State of Washington - Shoreline Substantial Development Permit
Recommendation:
Amendment to (MDNS) Mitigated Determination of Non - Significance
S..; . A Amendment - EPIC 23 -90
Fort Dent Three Office Park
July 31, 1997
Comments to SEPA Checklist:
Page2, #6:
Construction is expected to take place between Summer 1997 and Winter 1998.
Page 2. #8:
On October 25, 1988, a mitigated DNS was issued on this site for a similar
office building project (88- 3 -SMP) and again in 1990 (90- 6 -SMP). Design
Review (90- 12 -DR) and SEPA (EPIC23 -90) have also been issued for this
development.
Page 3, #11:
The proposal is to development a 40,379 square foot, Class A office building on
two (2) of a total 5.57 acres, as Phase Three (3) of the Fort Dent Office Park
project.
Summary of Primary Impacts:
L_: A Amendment - EPIC 23 -90
Fort Dent Three Office Park
July 31, 1997
Earth
d. There is no surface indications or history of unstable soils, however, Fort Dent
Two was built on piles. Fort Dent Three will have conventional concrete spread
footings.
g. About 71% of the site will be covered with impervious surfaces after project
construction.
h. Proposed erosion control measures will include filter fabric fences, interceptor
swales, check dams, catch basin protection, and rocked construction.
Air
None
Water
a. Surface
2. A portion of the building, parking lot, and landscaping, along the north
and east sides of the property will be constructed within 200 feet of the
Green River. Work in this area will include extensions of the water,
sanitary sewer, and storm drainage systems.
3. Existing is fill from the development of Fort Dent Two, and last Fall
1996, rainstorms caused some dredging and filling to support pockets of
unstable soil.
c. Water Runoff
1. Storm runoff will be directed to grass lined swales leading to an
underground pipe, connected t� an existing piped storm system to the
south. Runoff will eventually outlet to the river.
Plants
d. An improved landscape plan is proposed, including Redtwig Dogwood, White
Rockrose, Warminster Broom, Escallonia, Forsythia, Spirea and Viburnum
shrubs. Tree species will include Norway Maple, Katsura, Pine, Flowering
Cherry, and Flowering Pear.
Animals
None
Energy/Natural Resources
None
Environmental Health
None
LA Amendment - EPIC 23 -90
Fort Dent Three Office Park
July 31, 1997
Land /Shoreline Uses
a. The site is currently vacant land. The green River and Fort Dent Park lie to the
north and west of the proposed site. The Fort Dent Two office building lies to
the south. Homewood Suites Hotel is to the southeast, and State Farm Insurance
Company has an office building to the south.
b. The property was once used for vegetable farming, more than 30 years ago.
e. The current zoning classification of the site is Regional Commercial Mixed
Use (RCMU).
1. The property will be developed in accordance with City of Tukwila Regional
Commercial Mixed Use zoning regulations.
Housing
None
Aesthetics
a.. The tallest point of the proposed office building would be 33 feet, or 27 feet
exclusive of the HVAC unit and screening. Principal building materials will be
painted drivet or tilt -up concrete, reflective glass, vision glass, and blue colored
accents on the metal panels.
c. Measures to reduce or control aesthetic impacts were addressed and approved
by the Board of Architectural Review at the November 1990 public hearing
(90- 12 -DR).
Light /Glare
The project site will be illuminated, as needed, with low glare lights on 10 to 20
foot standards. Ground mounted up lighting
Recreation
a. Fort Dent Park is adjacent to the office development. The Green River
recreational trail has also been recently developed adjacent to the site.
c. Benches and enhanced landscaping will be added along the Green River
recreational trail.
Historic /Cultural Preservation
None
Transportation
a. Interurban Avenue South and Fort Dent Way serve the subject property.
Access to these streets is from a 20 foot ingress /egress easement on the southerly
property line, shared by Fort Dent Two, Homewood Suites Hotel, and eventually
by Fort Dent Three.
c. 142 parking stalls are proposed for Fort Dent Three. There will be additional
parking available at Fort Dent Two. No stalls will be eliminated.
f. The development of Fort Dent Three would generate an additional 707
vehicular trips per day on the site.
Public Services
None
Utilities
A water extension will be looped around the building, and a new sewer lateral
will be constructed. Sanitary sewer and water are provided by the City of
Tukwila. Electrical service is by Puget Sound Energy and telephone is by US
West. Extensions of the existing services will be constructed to the new building.
SEPA Adendum Approved By:
�..._ A Amendment - EPIC 23 -90
Fort Dent Three Office Park
July 31, 1997
Date:
July 22, 1991
Mr. Jack Pace
City of Tukwila
6300 Southcenter Boulevard
Tukwila, WA 98188
Subject: Extension Request for #88 -3 -SMP
Dear Jack:
Cordially,
Katie Greif
Development Manager
As we discussed last week, we would like to formally
request that the requirement to start work on Fort Dent
Three be eliminated.
Fort Dent Two, Phase I under SMP #88 -3 was completed in
June of this year. Our permit requires that we begin
construction on Fort Dent Three, Phase 'II by November 21,
1991. Due to current market conditions we are not ready to
proceed with Phase II at this time.
We are willing to fully comply with the completion date of
November 21, 1994 for both projects, but we would like to
request leniency from the City in regards to a start date.
Please call if you have any questions. We will look
forward to your decision.
,Zet_ 7 / Kae.;-/Afe
2/6t-
X- f 7:99 " 6zGf
P 619 fr;
Geti 5
' 2 7 ��� Tr
- 5 -
�l dl Development Company .ek"Ce I/
2000 - 124th Ave. N,E. 8 -103 Bellevue, WA 98005 (206) 454 -6060 //3 .049/1,
j ;2 Gus -e /22uu y, • Get / (, '
//fvf
(eMK, , 4/ew
CITY OF TUKWILA
(200 SOUTHCENTER BOULEVARD. TUKWILA. WASHINGTON 98188
November 20, 1990
Katie Grief, Development Manager
John C. Radovich Development Company
2000 -124th Ave. N.E.
Bellevue, WA 98005
Dear Ms. Grief:
L. Rick Beeler
Director, Department of Community Development
NIInN1i # r2Y'l;) •137.1800
In reference to your letter of November 5, 1990, the City of
Tukwila has approved your request for extension of #88-3-SMP.
Please be advised that the conditions of this extension (per # 89-
9-DR) require that substantial work for both Fort Dent Two and
Three be started by November 21, 1991. All work proposed for these
projects must be completed by November 21, 1994.
Gary 1.. VunDusrn. Mayor
o enJov ,. go
kfri C ///
/Va L/S vv. fib
/
SHORELINE SUBS NTIAL ( EVELOPMENT
C
CONDITIONAL USE OR VARIANCE
PERMIT APPLICATION
FOR STAFF USE ONLY
ile . :Nuns
i
Planner:
Cross- Reference Files : -1,7 -I ,, 2 - .2_ ;'
TYPE OF ACTION:
xQ Substantial Development Permit [I Conditional Use [I Variance
1. NAME OF APPLICANT: John C. Radovich Development Company
Address: 2000 1.24th Avenue NE, B -103
City: Bellevue State: WA Zip: 98005
Telephone: 454 -6060
2. RELATION OF APPLICANT TO PROPERTY: Q Owner Q Purchaser
0 Lessee (] Other
40,379
3. PROPOSED DEVELOPMENT (be specific): To construct a two -story sq. ft.
office building with associated parking, utilities andllandscaping.
4. CURRENT USE OF THE PROPERTY WITH EXISTING IMPROVEMENTS: Vacant Land
5. TOTAL CONSTRUCTION COST AND FAIR MARKET VALUE OF PROPOSED
PROJECT (INCLUDE ADDITIONAL FUTURE DEVELOPMENTS
CONTEMPLATED BUT NOT INCLUDED IN THIS APPLICATION): $ 4,500,000
6. GENERAL LOCATION OF PROPOSED PROJECT: North of Interurban Avenue at the north
end of Southcenter Boulevard and adjacent to previously approved Fort Two
Office Building , within
mw QUARTER of SEC 24 of Township 23 N., Range 4 W.M.,
in Tukwila, King County, Washington, adjacent to the Green River.
7. LIST THE MASTER PROGRAM POLICIES (USE PROGRAM SECTIONS OR
PAGE NUMBERS) WHICH ARE APPLICABLE TO THIS DEVELOPMENT:
IELINE PERMIT APPLICATION
Page 2
Overall Goals: 1.,7 - river trail, 8 - construction of new river bank,
Economic Goals: 1,2 & 4, Policies - 5. Public Access Goals: 3 - Policies
lb,f,2,3a,b,c. Circulation Goals: 1, Policies, -2. Recreations: Policies -
4a. Shoreline Use Goals: 1,2, Policies - 3. Conservation: Policies 3,4,8.
8. LIST ANY OTHER PERMITS FOR THIS PROJECT FROM STATE, FEDERAL OR LOCAL GOVERN-
MENTAL AGENCIES FOR WHICH YOU HAVE APPLIED OR WILL APPLY, INCLUDING THE
NAME OF THE ISSUING AGENCY, WHETHER THE PERMIT HAS BEEN APPLIED FOR (AND
IF SO, THE DATE OF THE APPLICATION), WHETHER THEN APPLICATION WAS APPROVED
OR DENIED AND THE DATE OF SAME, AND THE NUMBER OF THE APPLICATION OR PERMIT:
Board of Architectural Review (Design Review) is being applied for simul-
taneously with this application. City of Tukwila is the issuing agency.
SEPA approval is required from the City of Tukwila and the State Department
of Ecology. Building and Occupancy permits will be obtained from Tukwila.
9. NATURE OF THE EXISTING SHORELINE. DESCRIBE TYPE OF SHORELINE, SUCH AS
STREAM, LAKE, MARSH, FLOOD PLAIN, FLOODWAY, DELTA; TYPE OF BEACH, SUCH AS
EROSION, HIGH BANK, LOW BANK, OR DIKE; MATERIAL SUCH AS SAND, GRAVEL, MUD,
CLAY, ROCK, RIPRAP; AND EXTENT AND TYPE OF BULKHEADING, IF ANY:
(To be completed by local official)
10. IN THE EVENT THAT ANY OF ME PROPOSED BUILDINGS OR STRUCTURES WILL
EXCEED A HEIGHT OF THIRTY -FIVE FEET ABOVE THE AVERAGE GRADE LEVEL,
INDICATE THE APPROXIMATE LOCATION OF AND NUMBER OF RESIDENTIAL
UNITS EXISTING AND POTENTIAL, THAT WILL HAVE AN OBSTRUCTED VIEW:
(To be completed by local official)
11. IF TH,. APPLICATION INVOLVES A CONDITIONAL USE OR VARIANCE, SET FORTH
IN FULL THAT PORTION OF THE MASTER PROGRAM WHICH PROVIDES THAT THE
PROPOSED USE MAY BE A CONDITIONAL USE, OR, IN THE CASE OF A VARIANCE,
FROM WHICH THE VARIANCE IS BEING SOUGHT:
(To be completed by local official)
JRELINE PERMIT APPLICATION
Page 3
12. GIVE A BRIEF NARRATIVE DESCRIPTION OF THE GENERAL NATURE OF THE
IMPROVEMENTS AND LAND USE WITHIN ONE THOUSAND (1,000) FEET IN ALL
DIRECTIONS FROM THE DEVELOPMENT SITE:
Proposed Fort Dent Two Office Building is located to the southi,:,Fort Dent
One is southwest of the Fort Dent Park access Road, State Farm office is
_ . • • . • . • .1 • . - • -
located to the north and northeast. Fort Dent Park is also to the north
and northeast beyond the river.
I HEREBY CERTIFY that I am the above - mentioned applicant for a
permit to construct a substantial development pursuant to the
Shoreline Management Act of 1971, a 4 that to the best of my
knowledge the informal su t ed is tr a nd corre
DATE: ' /3 - 2 SIGNATURE: � . 4' ..0