HomeMy WebLinkAboutPermit 87-01-SUB - WILSEY & HAM - GATEWAY CORPORATE CENTER SUBDIVISION
interurban avenue south and gateway drive
Permit 87-01-SUB - WILSEY & HAM - GATEWAY CORPORATE CENTER SUBDIVISION
LAND DIVISION
APPLICANT: Wilsey & Ham
City of Tukwila
PLANNING DEPARTMENT
6200 Southcenter Boulevard
Tukwila, Washington 98188
(206) 433 -1849
NOTICE OF DECISION
REQUEST: Preliminary Plat approval for eight -lot commercial /industrial subdivision.
LOCATION: Lots 1, 2, 3 and 4 of Tukwila Short Plat 85 -32 -SS
The City Council conducted a review of the above request on March 21, 1988, and
found that the request should be approved with conditions (see Attachment).
The City Council adopted the Findings and Conclusions contained in the Staff
Report dated February 17, 1988.
The action of the City Council on all matters shall be final and conclusive
unless, within ten days from the date of the Council's action, an applicant or
an aggrieved party makes an application to the Superior Court of King County for
a writ of certiorari, a writ of prohibition, or a writ of mandamus.
Moira Carr Bradshaw
Associate Planner
DATE: March 22, 1988
.
1. "56 -foot easement for future right-of-way" rather than 61 foot area building
setback.
2. Compliance with UBC 5.505, 506 and Table 5C per Attachment C.
3. The owner to show suitable access to Lot 8, subject to City of Tukwila's
4. Assignment of access to City of Tukwila of the City Light property to
connect the two public rights -of -way.
5. Revision of plat to show fence behind Lot 4.
Preliminary Plat approval will expire and be null and void one (1) year from
WAC 197 -11 -970
DETERMINATION OF NONSIGNIFICANCE
Description of Proposal Gateway Corporate Genter- an Eight Lot Commercial
Industrial Subdivision
Proponent
Location of Proposal, including street address, if any LOTS 1, 2, 3 AND 4 OF
RR- 32 -SS, !MATED BETWEEN INTERURBAN AVENUE, 48TH AVENUE SOUTH, THE 42ND
AVFNIIF SOUTH RRIDGE. AND THE DUWAMISH RIVER.
Lead Agency: City of Tukwila File No. EPIC -32 -87
The lead agency for this proposal has determined that it does not have a probable
significant adverse impact on the environment. An environmental impact statement
(EIS) is not required under RCW 43.21C.030(2)(c). This decision was made after
review of a completed environmental checklist and other information on file with the
lead agency. This information is available to the public on request.
[l There is no comment period for this DNS
Q This DNS is issued under 197 -11- 340(2). Comments must be submitted by
FEBRUARY 25, 1988 . The lead agency will not act on this
proposal for 15 days from the date below.
Responsible Official Rick Beeler
Kaiser Gateway Associates
Position /Title Planning Director
FM.DNS
Phone 433 -1846
Address , _ 6200 Southcenter Boulevar
Date Signature
You may appeal this determination to the City Clerk at City Hall, 6200 Southcenter
Boulevard, Tukwila, WA 98188 no later than 10 days from the above date by written
appeal stating the basis of the appeal for specific factual objections. You may be
required to bear some of the expenses for an appeal.
Copies of the procedures for SEPA appeals are available with the City Clerk and
Planning Department.
City of Tukwila
PLANNING DEPARTMENT
6200 Southcenter Boulevard
Tukwila, Washington 98188
(206) 433 -1849
CITY OF TUKWILA
PLANNING COMMISSION
FEBRUARY 25, 1988
The meeting was called to order at 8:05 p.m. by Mr. Coplen,
Chairman. Members present were Messrs. Coplen, Larson, Kirsop,
Knudson, Hamilton and Haggerton.
Representing the staff were Moira Bradshaw, Rebecca Fox and
Joanne Johnson.
MINUTES
MR. HAMILTON MOVED TO ADOPT THE MINUTES OF THE JANUARY 28, 1988
MEETING AS CORRECTED. MR. LARSON SECONDED THE MOTION WHICH
PASSED UNANIMOUSLY.
Mr. Coplen directed the staff to write a letter expressing
appreciation for the years of service Mr. Sowinski put in with
the City.
88 -1 -DR: BUILDING 447 Request for
parking spaces to an existing parking
shoreline zone.
Rebecca Fox, Planner, reviewed the
approval.
Discussion ensued on the proposal.
design review to add 32
lot located within the
staff report recommending
Dick Reeves, Wilsey and Ham, 1980 - 112th Avenue N.E., Bellevue,
WA., 98004, represented the property owners adjacent to the
subject property. He generally concurred with the staff report.
MR. LARSON MOVED AND MR. KNUDSON SECONDED A MOTION TO APPROVE THE
REQUEST INCLUDING RECOMMENDATIONS 1 AND 2, BASED ON THE STAFF'S
F:.NDINGS AND CONCLUSIONS. THE CONDITIONS READ AS FOLLOWS:
1. An additional landscape island.
2. Two additional trees be provided per Attachment B.
THE MOTION WAS UNANIMOUSLY APPROVED.
PLANNING COMMISSION
February 25, 1988
Page 2
87 -1 -SUB - GATEWAY CORPORATE CENTER Request for preliminary plat
approval for eight -lot commercial /industrial 36.4 -acre subdivi-
sion.
Moira Carr Bradshaw, Planner, reviewed the staff report, entering
it into the record as Exhibit 1. She pointed out the staff's
recommendation of approval with conditions and noted that
modifications to the conditions had been agreed upon by staff
with the applicant.
Randy Blair, Wilsey and Ham, 1980 - 112th Avenue N.E., Bellevue,
WA., 98004, represented the applicant and stated he concurred
with the staff report.
Discussion ensued on the proposal.
MR. LARSON MOVED AND MR. KNUDSON SECONDED A TO RECOMMEND
APPROVAL OF THE REQUEST AND ACCEPT THE STAFF'S RECOMMENDATIONS
WITH THE FOLLOWING CHANGES: CONDITION #1 CHANGED FROM 61 FOOT
EASEMENT TO 56 FEET; CONDITION #3 BE CHANGED FOR THE OWNER TO
SHOW ACCESS TO LOT 8 SUBJECT TO CITY OF TUKWILA'S APPROVAL PRIOR
TO FINAL PLAT APPROVAL; CONDITION #4 FROM "DEDICATION" TO "ASSI-
GNMENT" OF ACCESS; ELIMINATE CONDITION #5; AND ACCEPT THE STAFF'S
FINDINGS AND CONCLUSIONS. MOTION WAS UNANIMOUSLY APPROVED.
THE APPROVED CONDITIONS READ AS FOLLOWS:
1. "56 -foot easement for future right -of -way" rather than 61 foot
area building setback.
2. Compliance with UBC 5.505, 506 and Table 5C per Attachment C.
3. The owner to show suitable access to Lot 8, subject to City of
Tukwila's approval prior to final plat approval.
4. Assignment of access to City of Tukwila of the City - Light .
property to connect the two public rights -of -way.
5. Revision of plat to show fence behind Lot 4.
DIRECTOR'S REPORT
Moira Bradshaw reported on the Adult Business Ordinance and Sea -
Tac Incorporation proposal. She noted that a special Planning
Commission meeting on Fire District #1 Annexation DEIS needs to
be held on March 31, 1988. The APA Conference will be held in
April and any interested Commissioner should contact the Planning
. Department.
LOCATION:
City of Tukwila
PLANNING DEPARTMENT
6200 Southcenter Boulevard
Tukwila, Washington 98188
(206) 433 -1849
STAFF REPORT
to the Planning Commission
Prepared February 17, 1988
HEARING DATE: February 25, 1988
FILE NUMBER: 87 -1 -SUB: Gateway Corporate Center Subdivision
APPLICANT: Kaiser Gateway Associates
REQUEST: Eight -lot commercial /industrial subdivision
with dedication of circular road
ACREAGE: 36.40 acres
COMPREHENSIVE
PLAN DESIGNATION: Light Industrial
ZONING DISTRICT: M -1, Light Industrial
ATTACHMENTS: (A) 85- 32 -SS, Short Plat
(B) Preliminary Plat
(C) Proposed Amendments to Plat
(D) Flood Map of Property
Lots 1, 2, 3 and 4 of Tukwila Short Plat 85- 32 -SS,
bounded by the Duwamish River, 48th Avenue, Interurban
and 42nd Avenue Bridge.
SEPA
DETERMINATION: Determination of Non - significance issued February 10, 1988
STAFF REPORT to the
Planning Commission
VICINITY /SITE INFORMATION
BACKGROUND
FINDINGS
87 -1 -SUB: Kaiser Gateway Associates
Page 2
1. Project Description: Subdivision of existing four lots into eight lots with
dedication of a circular road called Gateway Drive.
2. Existing Development: Proposed Lots 1, 2, 4, 5 and 6 are developed with
commercial industrial buildings. Proposed Lot 7 has received a shoreline
permit and design approval for four office buildings. Lots 3 and 8 remain
undeveloped.
3. Surrounding Land Use: The river separates the subdivision from single -
family homes and agricultural uses in Allentown. Truck terminals and
commercial uses are along the northeast boundary, Tukwila Commerce Park, and
propane storage and sales are along the northwest boundary. The City Light
right -of -way runs along the subject site's south property line separating it
from Interurban Avenue.
4. Terrain: Flat former pasture land.
5. Vegetation: Grasses, blackberries and large shade trees along the riverbank.
6. Access: Interurban Avenue and Gateway Drive (to be dedicated at time of
final plat).
7. Utilities: City of Tukwila water, sewer and storm drainage, Seattle City
Light, Pacific Northwest Bell, Washington Natural Gas, and TCI Cable.
8. Public Facilities: City Light's approximate 100' right -of -way adjacent to
frontage along Interurban Avenue; Riverfront trail.
The subject property was as recently as 1985 a dairy farm. Since then, Kaiser
Gateway Associates began a phased development of the site with commercial/
industrial buildings.
The site was platted in 1985 through the short plat process into four lots (see
Attachment A).
Per Section 17.12.020 of the Subdivision Code, any land which has been divided
under the short plat process within the last five years shall be subdivided in
accordance with the procedures of preliminary and final plat.
STAFF REPORT to the
Planning Commission
DECISION CRITERIA
A. DESIGN STANDARDS FOR SUBDIVISION OF LAND
87 -1 -SUB: Kaiser Gateway Associates
Page 3
The standards for review of the subdivision are contained in the Subdivision
Code Chapter 17: Section 20 - Design Standards for Subdivision of Land, and
Section 28 - Minimum Standards for Commercial /Industrial Subdivision Design.
Please refer to Attachment B.
1. Unsuitable Land
The subject site is relatively flat and borders the Green River. Ac-
cording to the Flood Insurance Rate Map dated August 1981, the area
receives minimal flooding Zone C with only a small portion of area
adjacent to the river within the 100 -year flood boundary Zone A -1 (see
Attachment D).
2. Trees
No significant trees exist on the site except along the river. Develop-
ment along the river has previously been approved through BAR and a
Shoreline Permit. The approved plans show the majority of the trees
being saved.
3. Streams
No streams exist on the site.
4. Compatibility with Existing Land Use and Plan
The subdivision is surrounded by similar uses and development. The
river serves as a buffer for the residential uses on the east side of
its bank.
The street and dedication of the easement for future right -of -way con-
forms with adopted plans for streets in the City. The applicant has
also made provisions for a recreation trail easement adjacent to the
riverbank (see Attachment B).
5. Grading
The applicant has received grading permits prior to conducting any work
on the site.
6. Streets
One leg of Gateway Drive will serve as an extension of South 133rd
Street. The northeast half of Gateway abuts neighboring properties
allowing access to the deep lots located between 48th Avenue South and
Interurban Avenue. Only two intersections are proposed onto Interurban
Avenue and both will be at right angles. One of them will be signal-
ized. The block lengths created are reasonable and within the City's
design standards.
STAFF REPORT to the
Planning Commission
4.�-- ..w«y,.�+.�erryra,,•�.u�n: n:+ i..:: ��� •r�r,:5:u!.�?. ";':`t.,.."hG!I' ;�.�.:. �fi; ":',':
87 -1 -SUB: Kaiser Gateway Associates
Page 4
In order for Gateway Drive to connect with Interurban it must cross over
City Light property. City Light will not allow public dedication of
their property but will allow an access easement to connect the two
public rights -of -way.
B. MINIMUM STANDARDS FOR COMMERCIAL /INDUSTRIAL SUBDIVISION DESIGN
1. Public Right of Way
Gateway Drive is an improved circular drive and will be dedicated to the
City. It intersects at two points with Interurban Avenue with a street
light proposed for the intersection of 133rd Avenue South, Interurban
and Gateway. The proposed right -of -way varies in width of between 56
feet to 61 feet with a pavement width of 48 feet. The right -of -way
standard for local streets is 60 feet with 48 feet of pavement. To the
east of Lot 7 is a 61 -foot building setback dedicated for future public
purposes.
The City Engineer projects that a future collector will be built between
Interurban Avenue and South 129th Street over the Duwamish River. This
will facilitate traffic not only across the river but I -5 and the rail-
road tracks as well. The standards for collector right -of -way and
pavement are 75 and 60 feet respectively.
2. Improvements
The right -of -way improvements meet Public Works standards with regard
to:
a. grading averages between 1% and 2%.
b. pavement content of asphaltic concrete.
c. permanent concrete curbs and gutters.
d. storm drains with properly sized pipes and catch basins.
e. sidewalks 6 feet in width along one or both sides of street.
f. street lights properly located and installed.
3. Property Corners at Intersections
Lot corners on Lots 1 and 3 have a minimum radii of 50 feet.
4. Railroads
No railroad tracks are proposed within the subdivision.
STAFF REPORT to the
Planning Commission
5. Blocks
r. „��....,..�,...�.+u,«- n�». <x +•ww:s .,7rser...r.;s:..trw,- +.r -ttT; r3:4 a , ^ "cE:•�v : �Y::'t!:S(`r5'a, -+r•: .
87 -1 -SUB: Kaiser Gateway Associates
Page 5
Blocks within the subdivision exceed the minimum of 500 but do not
exceed the maximum of 2,000 feet in length. Block widths fall within
the minimum and maximum standards of 300 and 1,000 feet respectively.
6. Lots
There are no minimum lot size and width requirements in the City's
industrial and commercial zones. The depiction of the buildings on the
lots indicates that 1, 2, 4, 5, 6 and 7 are developed or developable,
The Uniform Building Code's chapter on Requirements Based on Occupancy
requires minimum building setbacks from property lines based on type
of use, type of occupancy of the building, and amount of floor area.
Existing and proposed lot lines for 4, 5, 1 and 2 need to be realigned
to accommodate the existing sizes, or a non - buildable easement provided.
Lot 3 contains 2.79 acres, similar in size to Lot 5, and is configured
so that development appears feasible.
Lot 8 however is only 32.712 square feet with acute angles, an odd
shape, and is landlocked with no access shown. The applicant is in
negotiations with the owners of the parcel on which Suburban Propane
is located, but has been unsuccessful to date in relocating the use
and purchase the property. As Lot 8 is currently proposed an access
easement would be necessary across City Lights property and maximum
development potential would be a 4,000- square foot office /retail build-
ing. Even less building area would be possible if food service is
involved due to parking needs.
Side lot lines are at right angles to streets. Standards for a through
lot state that access should only be to one street. Lot 1 currently
enjoys access into Gateway Drive at both ends of the lot. Lots 4, 5 and
6 are also essentially through lots since there are reciprocal access
easements.
Tract A is a residual parcel due to the curvature of Gateway Drive where
it intersects with Interurban and South 133rd Street. The City approved
a permit to construct an enclosure for a parking area behind the build-
ing on Lot 4. The enclosure is a seven -foot high chain link fence that
appears to extend into Lot 5. This structure has not been shown on the
plat.
STAFF REPORT to the
Planning Commission
CONCLUSIONS
RECOMMENDATIONS
87 -1 -SUB: Kaiser Gateway Associates
Page 6
1. The Public Works Department approved the proposed 56 -foot dedication along
the northeast portion of the drive with the expectation that when the
adjacent properties substantially redevelop, a six -foot sidewalk would be
required. Redevelopment timing is uncertain, however. Dedication of side-
walk to the City is not a requirement of the redevelopment process. The
Public Works Department feels that the proposed street is sufficient.
2. The plat identifies the area necessary for an extension of right -of -way as a
"61 -foot building setback for future public purposes ". The wording should
read "61 -foot easement for future right -of -way" to accurately reflect the
purpose of the area.
3. Realignment of lot line or an easement is needed between Lots 1, 4 and 5 and
2 and 7, to comply with the UBC Chapter 5, Section 505, 506 and Table 5C.
The applicant has provided Attachment C to demonstrate compliance.
4. By allowing Lot 8 - a poorly designed area - to exist, the applicant is
creating a lot which is available for sale. It will be small by comparison
with other parcel sizes and be oddly shaped. In addition, access to Inter-
urban Avenue needs to be obtained from City Light. An access easement
behind the Suburban Propane parcel through Lot 3 is not feasible because of
its narrow twenty -foot width.
5. The easement across City Light property connecting the two public rights -of-
way, Gateway and Interurban, should be to the City of Tukwila and reviewed
and approved prior to final plat approval.
6. The fence behind Lot 4 needs to be shown on the plat because it is consid-
ered a structure and would encroach on Lot 5. This would not be permitted
and the plat should be revised to accommodate the fence.
The Planning staff recommends approval of the preliminary plat for Gateway
Corporate Center Subdivision subject to the following conditions:
1. "61 -foot easement for future right -of -way" rather than 61 -foot area building
setback.
2. Compliance with UBC 5.505, 506 and Table 5C per Attachment C.
3. An access easement 40 feet in width across City Light property to Interurban
for Lot 8.
4. Dedication of access to City of Tukwila of City Light property to connect
the two public rights -of -way.
STAFF REPORT to the
Planning Commission
5. Consolidation of Tract A with adjacent parcel and recordation in conjunction
with final plat recordation.
6. Revision of plat to show fence behind Lot 4.
(22/87- 1- SUB1,2)
87 -1 -SUB: Kaiser Gateway Associates
Page 7
1
•
1
e
•
•
: O W - 1 4 •
!iglu Av T
li" in
Is
t I /, :// 414 \0
/ ' \ wr
/ lia, :.,10 o
„e C; 1 •
-- eaIP!3
/7 , 9 r
•
•
Om a """ i ■•n'd -- SHORT SUBDIVISION
ti..t.
r•uo ` GATEWAY CORPORATE CENTER
NM
a 1 I, �•„�„ : �UKMILA KING COUNTY •
r
-o
PAW
- - -W3AItl NSIM1�lnp
h1.... F.,Y e.a► n•.e.. PORTION OF SECTIONS 10 G 15. T.23N. R. AE.. M.M.
‘ WASMINGTON
. un.. tt?f)!.vWK•XYi;Y.X.iI'4:�.�v'i33 �:�t�fn'c �i~ui:`��,7'�:�. ..•
-- ANQFfrisp
if hi
1 §i
VaLSE &HAM
Good kW BMW MIS I_.II .
S.
ATTACHMENT A
e ••■•••••■■•
DESCR1PT
a, as/ awls.. •••■ ••••••••••-• aasaav• —.
•• "arm., 70.0... •■• X....,. Or almlavaaral,
SY, V./. ••••••••■ •• •••• • C 7.•••• •••••••■•••••■•
••• •■••■•••• of. e•
7•‘• • ••••••,
maw.. es ...on •
••• 7.•. .■ • ar•
...V.. 0 . •7_ •••■•••• . 67.7747..•••,
•7 we. • •
••07770.73, . • •
NI1
• FS
••....aaS • w•awal •••••••••11 la ••••••• 1•• aglaa ••••••••
V.1•••••• a.. • aftll 1..• • ••• • • .4 ••• •• 70•41.1rtall
• too. pal .7.. 1..0 4 • 7 ••■•1 loge I, ••• 4, • ne•••■••
.•
••• '• •• se •••••••■• '7 -• I .•••••••• •••'
•• ■•••••■•
••••••• ■••1•■■•••••• •
1!
1
;
•
i■
;3/\
\
tzrYaatEs......"
• 112;:miase—m•=`
r
- 72
■
'\ .. ."
•
ami■-
AO
".•
• n'
putzt ram f oa.ccrwic RLIU
(SEATTLE CITY Lawn RON
_ -
L INTERURBAN MEALS
r
VOCINITY
•■••• • _ ••••••
• V.. Oa...
•sim.7.74
■•■•••• 7••••
• •••••• nu.
• • ••• •••••••
• •••
C=.1 r7-7.!
-IL •••
3
tormes••1
to •••••• SAWN
NJ fond
0•77./0.• ..••• far••••• A•41474•1‘,
..ntiel*8•77 *re
,■■••
Erproso/Samp" ••■••"•••• ••••
••.
61.1.r.A0a,7•■ 'ow*
PROM g C.* ' 77:74,77.610.-1
t-•
ract 002 A(5
•9•1••
UJ
• LIJ <
_J
CL
< )•-•
• 0. <
6 51 z
• 0 r
5
1— a-
c_o
1-A7-10.1t-s0-13
I
4:e% !....
• 4 4647 - '111.
I PP411)
'
■
-0 •
Proposed buildinL- 13.16 ACRES --
restriction easement
c.:::) '-, _ _K
.—
-- -1
\ : L_ ./ 1
./ 1 - Il■ \ 1
CIO' 4 OVV Y. • U-E.SM T. (TY0•1"
r I I
'. GATEWAY
'250'
)
Proposed building
restriction easement
Revised Lot Layout and
Proposed Building Restriction
J .. Easements
N 48'13'44 11 117G._ ATTAni-IMPRIT
0
Al 1 n os
3rIN3AV
Higg
ATTACHMENT D
RIVER IMPROVEMENT EASEMENT
This indenture, made this day of
......>...._. ........... ......•...,.�....�....
19 between Kaiser Gateway Associates, Grantors, and the City of Tukwila,
its successors or assigns, Grantee:
WITNESSETH, that first party in consideration of Mutual Benefits and the
benefits which will accrue to the land of Grantor by the exercise of the
rights herein granted to hereby remise, release and forever quit -claim unto
the Grantee, its assignee, an easement and right -of -way for the purposes
hereinafter stated along the westerly bank of the Duwamish River within a
strip of land lying between the Line of 100 year flood elevation (13.2 feet
North American Vertical Datum) and a line which is parallel with, contiguous
to and 30 feet upland (westerly) of the top of the river bank as existing,
constructed or reconstructed on the following described property:
That portion of Lot lying northeasterly of Gateway Drive as recorded
in the Short Subdivision of Gateway Corporate Center, Short Subdivision of
Gateway Corporate Center, Short Plat Number 85- 32 -SS, recorded in Book 52 of
Surveys at page 113 under Auditors File Number 8611179001. Containing
21,150 square feet, more or less.
Said easement and right -of -way are for the following purposes: The
right to enter upon the above described land to construct„ reconstruct,
maintain and repair a river channel and /or other flood control works,
including all appurtenances thereto, together with any enlargement or
reconstruction thereof, and to trim, cut, fell and remove all such trees,
brush and other natural growth and obstructions as are necessary to provide
adequate clearance and to eliminate interference with or hazards to the
structures; and included as an appurtenance to said easement is a reasonable
right to access thereto over any other land owned by the Grantor.
The consideration above mentioned, is accepted as full compensation to
the exercise of the rights above granted.
To have and to hold, all and singular, the said easement and right -of-
way together with appurtenances, unto Grantee, its successors and assigns.
IN WITNESS WHEREOF the Grantor hereunto set his hand, the day and year
above written.
KAISER GATEWAY ASSOCIATES
By
General Partner
By
General Partner
-:
STATE OF
COUNTY OF
STATE OF )
) SS
COUNTY OF )
THIS IS TO CERTIFY that on this day of
19 , before me, the undersigned, a notary public in and for the State of
Washington, duly commissioned and sworn, personally appeared
, to me known to be the
of , a General Partner of Kaiser Gateway Associates, a
California partnership, that executed the within and foregoing instrument,
and acknowledged the said instrument to be the free and voluntary act and
deed of said partnership for the uses and purposes herein mentioned, and on
oath stated that he was authorized to execute said instrument.
WITNESS my hand and official seal the day and year in this certificate first
above written.
)ss.
Notary Public in and for the
State of
residing at
My commission expires:
THIS IS TO CERTIFY that on this day of , 19
before me, the undersigned, a notary public in and for the State of
Washington, duly commissioned and sworn, personally appeared
to me known to be the of , a
General Partner of Kaiser Gateway Associates, a California partnership, that
executed the within and foregoing instrument, and acknowledged the said
instrument to be the free and voluntary act and deed of said partnership for
the uses and purposes herein mentioned, and on oath stated that he was
authorized to execute said instrument.
WITNESS my hand and official seal the day and year in this certificate first
above written.
Notary Public in and for the
State of
residing at
My commission expires
••::: •.. itiij:}'::?:ii'iii`F.`: ry.
PRELIMINARY PLAT AFieLICATION
1. NAME OF PRELIMINARY PLAT:
Gateway Corporate Center
2. IF FINAL SUBDIVISION IS DIFFERENT, GIVE NEW NAME:
3. DATE OF PRELIMINARY PLAT APPROVAL: Not applicable
4. DESCRIBE ANY PROPOSED DEVIATIONS FROM PRELIMINARY PLAT:
Re Subdivision of an existing short subdivision
5. APPLICANT :* Name:
Signature:
6. PROPERTY
OWNER
(29 /SUB.FPAPP)
1980 -112th Ave. N.E., #200
Address: P.O. Box C- 97304, Bellevue, Washington 98009
Phone:
Wilsey & Ham
(206) 454 -3250
* The applicant s the person whom the staff will cont•ct regarding
the application, and to whom all notices and reports shall be sent,
unless otherwise stipulated by applicant.
AFFIDAVIT OF OWNERSHIP
Name: Kaiser Gateway Associated
Address: 12686 Interurban Ave. S.
Phone: Seattle, Washington 98168; 248 -7318
DEC C 2 ,,, 1987
Date: / , 87
rs y .62r.d4-„ Q i,avc . c....divq,4,4 . d'o n rwn;,s
I /WE,[signature(s)]4.4! . th ,,.,�„r, VW.
''II
swear that we arrs�e j e ow r ( s or contract purchaser(s) of the
property involved in this application and that the foregoing
statements and answers contained in this application are true and
correct to the best of my /our
knowledge and belief. Date: �I...c. .2/, /9 tr?
i.. �a;.% isY L tC a: Ur uevuuw euuurw�� :+a3;Ya:mil�Lw:Ert:•x6[�xucn d yx w v
4
5. SIZE OF LAND TO BE SUBDIVIDED:
1,585,460 S.F. or 36.40 Acres
6. ZONING:
M -1
7. NUMBER OF PROPOSED LOTS:
8. IS ANY OF THE PROPERTY IN FLOOD ZONE "A "? No
9. ARE THERE ANY EXISTING STREAMS, WATER BODIES, MARSHES OR BOGS
ON OR WITHIN 100 FEET OF THE SUBJECT PROPERTY?
Duwamish River
10. ADJACENT LAND USES:
Yes
(29 /SUB.PPAPP)
.. �... ..�......u...... :v pro,...,.,. o,. o.,.,....,..,.... s..... d....... o. �.,...e.. �, w..................«.. c.. wyz+ wc.. nxawxrxcr:, r-. siwcw+ rixztrri ,t+Ji):Ytla:.aa`�X��:IW.v"�; i.�
11
NORTH: Duwamish River /single - family residences /King. County Park
SOUTH: Industrial/Retail/Commercial
EAST: Major arterial /State Highway
WEST: Distribution, Commercial
11. DO NEIGHBORING PROPERTIES HAVE SUITABLE ACCESS?
Y V l , C gION
� lJ
c `t=''' �P e2
DEC 23 1987
CITY of. t ,LA
Pt ANNINr•
APPLICATION
DATE
FILE NUMBER
PROJECT NAME
ADDRESS
APPLICANT
FILE
CROSS REFERENCE j
EPIC-1-87
ACTION
.
4/2/87
87 -1 -UCU
Q LA
. SEATTLE RENDERING WORKS
5795 S. 130TH PLACE
SEATTLE RENDERING WORKS
11/23/87
87 -2 -UCU
RENTON SAND & GRAVEL
:1111 1 :' '.'. '.I. . " p' n,'
NTERURBAN AND. GREEN R VER
DOUG BUCK
FY1t= 81- ta -p(.
12/1/87
87 -3 -UCU
CLt j II� aAo�
SEATTLE RENDERING WORKS ccKN C;t
5795 S. 130TH PLACE
SEATTLE RENDERING WORKS
EPIC -30 -87
AtPkc'�d
/
UNCLASSIFIED USE 1987
fty, 4o
. • ON
DATE
FILE NUMBER
PROJECT NAME
ADDRESS
APPLICANT
CROSS REFERENCE
ACTION
4/2/87
87 -1 -UCU
OUT
• SEATTLE RENDERING WORKS
5795 S. 130TH PLACE
SEATTLE RENDERING WORKS
EPIC-1-87
11/23/87
87 -2 -UCU
RENTON SAND & GRAVEL
BUUNUbU BY K.K. K.U.W., BRADY WAY,
1N0 B IN Rd RIV � �-u()
C P�
DOUG BUCK
P F S1 la - Dg .
12/1/87
87 -3 -UCU
our ti. ='
SEATTLE RENDERING WORKS / a=„�
5795 S. 130TH PLACE
SEATTLE RENDERING WORKS
EPIC -30 -87
APPR 0 eb
{
UNCLASSIFIED USE 1987
Ik( 4443