Loading...
HomeMy WebLinkAboutPermit 87-01-SUB - WILSEY & HAM - GATEWAY CORPORATE CENTER SUBDIVISION interurban avenue south and gateway drive Permit 87-01-SUB - WILSEY & HAM - GATEWAY CORPORATE CENTER SUBDIVISION LAND DIVISION APPLICANT: Wilsey & Ham City of Tukwila PLANNING DEPARTMENT 6200 Southcenter Boulevard Tukwila, Washington 98188 (206) 433 -1849 NOTICE OF DECISION REQUEST: Preliminary Plat approval for eight -lot commercial /industrial subdivision. LOCATION: Lots 1, 2, 3 and 4 of Tukwila Short Plat 85 -32 -SS The City Council conducted a review of the above request on March 21, 1988, and found that the request should be approved with conditions (see Attachment). The City Council adopted the Findings and Conclusions contained in the Staff Report dated February 17, 1988. The action of the City Council on all matters shall be final and conclusive unless, within ten days from the date of the Council's action, an applicant or an aggrieved party makes an application to the Superior Court of King County for a writ of certiorari, a writ of prohibition, or a writ of mandamus. Moira Carr Bradshaw Associate Planner DATE: March 22, 1988 . 1. "56 -foot easement for future right-of-way" rather than 61 foot area building setback. 2. Compliance with UBC 5.505, 506 and Table 5C per Attachment C. 3. The owner to show suitable access to Lot 8, subject to City of Tukwila's 4. Assignment of access to City of Tukwila of the City Light property to connect the two public rights -of -way. 5. Revision of plat to show fence behind Lot 4. Preliminary Plat approval will expire and be null and void one (1) year from WAC 197 -11 -970 DETERMINATION OF NONSIGNIFICANCE Description of Proposal Gateway Corporate Genter- an Eight Lot Commercial Industrial Subdivision Proponent Location of Proposal, including street address, if any LOTS 1, 2, 3 AND 4 OF RR- 32 -SS, !MATED BETWEEN INTERURBAN AVENUE, 48TH AVENUE SOUTH, THE 42ND AVFNIIF SOUTH RRIDGE. AND THE DUWAMISH RIVER. Lead Agency: City of Tukwila File No. EPIC -32 -87 The lead agency for this proposal has determined that it does not have a probable significant adverse impact on the environment. An environmental impact statement (EIS) is not required under RCW 43.21C.030(2)(c). This decision was made after review of a completed environmental checklist and other information on file with the lead agency. This information is available to the public on request. [l There is no comment period for this DNS Q This DNS is issued under 197 -11- 340(2). Comments must be submitted by FEBRUARY 25, 1988 . The lead agency will not act on this proposal for 15 days from the date below. Responsible Official Rick Beeler Kaiser Gateway Associates Position /Title Planning Director FM.DNS Phone 433 -1846 Address , _ 6200 Southcenter Boulevar Date Signature You may appeal this determination to the City Clerk at City Hall, 6200 Southcenter Boulevard, Tukwila, WA 98188 no later than 10 days from the above date by written appeal stating the basis of the appeal for specific factual objections. You may be required to bear some of the expenses for an appeal. Copies of the procedures for SEPA appeals are available with the City Clerk and Planning Department. City of Tukwila PLANNING DEPARTMENT 6200 Southcenter Boulevard Tukwila, Washington 98188 (206) 433 -1849 CITY OF TUKWILA PLANNING COMMISSION FEBRUARY 25, 1988 The meeting was called to order at 8:05 p.m. by Mr. Coplen, Chairman. Members present were Messrs. Coplen, Larson, Kirsop, Knudson, Hamilton and Haggerton. Representing the staff were Moira Bradshaw, Rebecca Fox and Joanne Johnson. MINUTES MR. HAMILTON MOVED TO ADOPT THE MINUTES OF THE JANUARY 28, 1988 MEETING AS CORRECTED. MR. LARSON SECONDED THE MOTION WHICH PASSED UNANIMOUSLY. Mr. Coplen directed the staff to write a letter expressing appreciation for the years of service Mr. Sowinski put in with the City. 88 -1 -DR: BUILDING 447 Request for parking spaces to an existing parking shoreline zone. Rebecca Fox, Planner, reviewed the approval. Discussion ensued on the proposal. design review to add 32 lot located within the staff report recommending Dick Reeves, Wilsey and Ham, 1980 - 112th Avenue N.E., Bellevue, WA., 98004, represented the property owners adjacent to the subject property. He generally concurred with the staff report. MR. LARSON MOVED AND MR. KNUDSON SECONDED A MOTION TO APPROVE THE REQUEST INCLUDING RECOMMENDATIONS 1 AND 2, BASED ON THE STAFF'S F:.NDINGS AND CONCLUSIONS. THE CONDITIONS READ AS FOLLOWS: 1. An additional landscape island. 2. Two additional trees be provided per Attachment B. THE MOTION WAS UNANIMOUSLY APPROVED. PLANNING COMMISSION February 25, 1988 Page 2 87 -1 -SUB - GATEWAY CORPORATE CENTER Request for preliminary plat approval for eight -lot commercial /industrial 36.4 -acre subdivi- sion. Moira Carr Bradshaw, Planner, reviewed the staff report, entering it into the record as Exhibit 1. She pointed out the staff's recommendation of approval with conditions and noted that modifications to the conditions had been agreed upon by staff with the applicant. Randy Blair, Wilsey and Ham, 1980 - 112th Avenue N.E., Bellevue, WA., 98004, represented the applicant and stated he concurred with the staff report. Discussion ensued on the proposal. MR. LARSON MOVED AND MR. KNUDSON SECONDED A TO RECOMMEND APPROVAL OF THE REQUEST AND ACCEPT THE STAFF'S RECOMMENDATIONS WITH THE FOLLOWING CHANGES: CONDITION #1 CHANGED FROM 61 FOOT EASEMENT TO 56 FEET; CONDITION #3 BE CHANGED FOR THE OWNER TO SHOW ACCESS TO LOT 8 SUBJECT TO CITY OF TUKWILA'S APPROVAL PRIOR TO FINAL PLAT APPROVAL; CONDITION #4 FROM "DEDICATION" TO "ASSI- GNMENT" OF ACCESS; ELIMINATE CONDITION #5; AND ACCEPT THE STAFF'S FINDINGS AND CONCLUSIONS. MOTION WAS UNANIMOUSLY APPROVED. THE APPROVED CONDITIONS READ AS FOLLOWS: 1. "56 -foot easement for future right -of -way" rather than 61 foot area building setback. 2. Compliance with UBC 5.505, 506 and Table 5C per Attachment C. 3. The owner to show suitable access to Lot 8, subject to City of Tukwila's approval prior to final plat approval. 4. Assignment of access to City of Tukwila of the City - Light . property to connect the two public rights -of -way. 5. Revision of plat to show fence behind Lot 4. DIRECTOR'S REPORT Moira Bradshaw reported on the Adult Business Ordinance and Sea - Tac Incorporation proposal. She noted that a special Planning Commission meeting on Fire District #1 Annexation DEIS needs to be held on March 31, 1988. The APA Conference will be held in April and any interested Commissioner should contact the Planning . Department. LOCATION: City of Tukwila PLANNING DEPARTMENT 6200 Southcenter Boulevard Tukwila, Washington 98188 (206) 433 -1849 STAFF REPORT to the Planning Commission Prepared February 17, 1988 HEARING DATE: February 25, 1988 FILE NUMBER: 87 -1 -SUB: Gateway Corporate Center Subdivision APPLICANT: Kaiser Gateway Associates REQUEST: Eight -lot commercial /industrial subdivision with dedication of circular road ACREAGE: 36.40 acres COMPREHENSIVE PLAN DESIGNATION: Light Industrial ZONING DISTRICT: M -1, Light Industrial ATTACHMENTS: (A) 85- 32 -SS, Short Plat (B) Preliminary Plat (C) Proposed Amendments to Plat (D) Flood Map of Property Lots 1, 2, 3 and 4 of Tukwila Short Plat 85- 32 -SS, bounded by the Duwamish River, 48th Avenue, Interurban and 42nd Avenue Bridge. SEPA DETERMINATION: Determination of Non - significance issued February 10, 1988 STAFF REPORT to the Planning Commission VICINITY /SITE INFORMATION BACKGROUND FINDINGS 87 -1 -SUB: Kaiser Gateway Associates Page 2 1. Project Description: Subdivision of existing four lots into eight lots with dedication of a circular road called Gateway Drive. 2. Existing Development: Proposed Lots 1, 2, 4, 5 and 6 are developed with commercial industrial buildings. Proposed Lot 7 has received a shoreline permit and design approval for four office buildings. Lots 3 and 8 remain undeveloped. 3. Surrounding Land Use: The river separates the subdivision from single - family homes and agricultural uses in Allentown. Truck terminals and commercial uses are along the northeast boundary, Tukwila Commerce Park, and propane storage and sales are along the northwest boundary. The City Light right -of -way runs along the subject site's south property line separating it from Interurban Avenue. 4. Terrain: Flat former pasture land. 5. Vegetation: Grasses, blackberries and large shade trees along the riverbank. 6. Access: Interurban Avenue and Gateway Drive (to be dedicated at time of final plat). 7. Utilities: City of Tukwila water, sewer and storm drainage, Seattle City Light, Pacific Northwest Bell, Washington Natural Gas, and TCI Cable. 8. Public Facilities: City Light's approximate 100' right -of -way adjacent to frontage along Interurban Avenue; Riverfront trail. The subject property was as recently as 1985 a dairy farm. Since then, Kaiser Gateway Associates began a phased development of the site with commercial/ industrial buildings. The site was platted in 1985 through the short plat process into four lots (see Attachment A). Per Section 17.12.020 of the Subdivision Code, any land which has been divided under the short plat process within the last five years shall be subdivided in accordance with the procedures of preliminary and final plat. STAFF REPORT to the Planning Commission DECISION CRITERIA A. DESIGN STANDARDS FOR SUBDIVISION OF LAND 87 -1 -SUB: Kaiser Gateway Associates Page 3 The standards for review of the subdivision are contained in the Subdivision Code Chapter 17: Section 20 - Design Standards for Subdivision of Land, and Section 28 - Minimum Standards for Commercial /Industrial Subdivision Design. Please refer to Attachment B. 1. Unsuitable Land The subject site is relatively flat and borders the Green River. Ac- cording to the Flood Insurance Rate Map dated August 1981, the area receives minimal flooding Zone C with only a small portion of area adjacent to the river within the 100 -year flood boundary Zone A -1 (see Attachment D). 2. Trees No significant trees exist on the site except along the river. Develop- ment along the river has previously been approved through BAR and a Shoreline Permit. The approved plans show the majority of the trees being saved. 3. Streams No streams exist on the site. 4. Compatibility with Existing Land Use and Plan The subdivision is surrounded by similar uses and development. The river serves as a buffer for the residential uses on the east side of its bank. The street and dedication of the easement for future right -of -way con- forms with adopted plans for streets in the City. The applicant has also made provisions for a recreation trail easement adjacent to the riverbank (see Attachment B). 5. Grading The applicant has received grading permits prior to conducting any work on the site. 6. Streets One leg of Gateway Drive will serve as an extension of South 133rd Street. The northeast half of Gateway abuts neighboring properties allowing access to the deep lots located between 48th Avenue South and Interurban Avenue. Only two intersections are proposed onto Interurban Avenue and both will be at right angles. One of them will be signal- ized. The block lengths created are reasonable and within the City's design standards. STAFF REPORT to the Planning Commission 4.�-- ..w«y,.�+.�erryra,,•�.u�n: n:+ i..:: ��� •r�r,:5:u!.�?. ";':`t.,.."hG!I' ;�.�.:. �fi; ":',': 87 -1 -SUB: Kaiser Gateway Associates Page 4 In order for Gateway Drive to connect with Interurban it must cross over City Light property. City Light will not allow public dedication of their property but will allow an access easement to connect the two public rights -of -way. B. MINIMUM STANDARDS FOR COMMERCIAL /INDUSTRIAL SUBDIVISION DESIGN 1. Public Right of Way Gateway Drive is an improved circular drive and will be dedicated to the City. It intersects at two points with Interurban Avenue with a street light proposed for the intersection of 133rd Avenue South, Interurban and Gateway. The proposed right -of -way varies in width of between 56 feet to 61 feet with a pavement width of 48 feet. The right -of -way standard for local streets is 60 feet with 48 feet of pavement. To the east of Lot 7 is a 61 -foot building setback dedicated for future public purposes. The City Engineer projects that a future collector will be built between Interurban Avenue and South 129th Street over the Duwamish River. This will facilitate traffic not only across the river but I -5 and the rail- road tracks as well. The standards for collector right -of -way and pavement are 75 and 60 feet respectively. 2. Improvements The right -of -way improvements meet Public Works standards with regard to: a. grading averages between 1% and 2%. b. pavement content of asphaltic concrete. c. permanent concrete curbs and gutters. d. storm drains with properly sized pipes and catch basins. e. sidewalks 6 feet in width along one or both sides of street. f. street lights properly located and installed. 3. Property Corners at Intersections Lot corners on Lots 1 and 3 have a minimum radii of 50 feet. 4. Railroads No railroad tracks are proposed within the subdivision. STAFF REPORT to the Planning Commission 5. Blocks r. „��....,..�,...�.+u,«- n�». <x +•ww:s .,7rser...r.;s:..trw,- +.r -ttT; r3:4 a , ^ "cE:•�v : �Y::'t!:S(`r5'a, -+r•: . 87 -1 -SUB: Kaiser Gateway Associates Page 5 Blocks within the subdivision exceed the minimum of 500 but do not exceed the maximum of 2,000 feet in length. Block widths fall within the minimum and maximum standards of 300 and 1,000 feet respectively. 6. Lots There are no minimum lot size and width requirements in the City's industrial and commercial zones. The depiction of the buildings on the lots indicates that 1, 2, 4, 5, 6 and 7 are developed or developable, The Uniform Building Code's chapter on Requirements Based on Occupancy requires minimum building setbacks from property lines based on type of use, type of occupancy of the building, and amount of floor area. Existing and proposed lot lines for 4, 5, 1 and 2 need to be realigned to accommodate the existing sizes, or a non - buildable easement provided. Lot 3 contains 2.79 acres, similar in size to Lot 5, and is configured so that development appears feasible. Lot 8 however is only 32.712 square feet with acute angles, an odd shape, and is landlocked with no access shown. The applicant is in negotiations with the owners of the parcel on which Suburban Propane is located, but has been unsuccessful to date in relocating the use and purchase the property. As Lot 8 is currently proposed an access easement would be necessary across City Lights property and maximum development potential would be a 4,000- square foot office /retail build- ing. Even less building area would be possible if food service is involved due to parking needs. Side lot lines are at right angles to streets. Standards for a through lot state that access should only be to one street. Lot 1 currently enjoys access into Gateway Drive at both ends of the lot. Lots 4, 5 and 6 are also essentially through lots since there are reciprocal access easements. Tract A is a residual parcel due to the curvature of Gateway Drive where it intersects with Interurban and South 133rd Street. The City approved a permit to construct an enclosure for a parking area behind the build- ing on Lot 4. The enclosure is a seven -foot high chain link fence that appears to extend into Lot 5. This structure has not been shown on the plat. STAFF REPORT to the Planning Commission CONCLUSIONS RECOMMENDATIONS 87 -1 -SUB: Kaiser Gateway Associates Page 6 1. The Public Works Department approved the proposed 56 -foot dedication along the northeast portion of the drive with the expectation that when the adjacent properties substantially redevelop, a six -foot sidewalk would be required. Redevelopment timing is uncertain, however. Dedication of side- walk to the City is not a requirement of the redevelopment process. The Public Works Department feels that the proposed street is sufficient. 2. The plat identifies the area necessary for an extension of right -of -way as a "61 -foot building setback for future public purposes ". The wording should read "61 -foot easement for future right -of -way" to accurately reflect the purpose of the area. 3. Realignment of lot line or an easement is needed between Lots 1, 4 and 5 and 2 and 7, to comply with the UBC Chapter 5, Section 505, 506 and Table 5C. The applicant has provided Attachment C to demonstrate compliance. 4. By allowing Lot 8 - a poorly designed area - to exist, the applicant is creating a lot which is available for sale. It will be small by comparison with other parcel sizes and be oddly shaped. In addition, access to Inter- urban Avenue needs to be obtained from City Light. An access easement behind the Suburban Propane parcel through Lot 3 is not feasible because of its narrow twenty -foot width. 5. The easement across City Light property connecting the two public rights -of- way, Gateway and Interurban, should be to the City of Tukwila and reviewed and approved prior to final plat approval. 6. The fence behind Lot 4 needs to be shown on the plat because it is consid- ered a structure and would encroach on Lot 5. This would not be permitted and the plat should be revised to accommodate the fence. The Planning staff recommends approval of the preliminary plat for Gateway Corporate Center Subdivision subject to the following conditions: 1. "61 -foot easement for future right -of -way" rather than 61 -foot area building setback. 2. Compliance with UBC 5.505, 506 and Table 5C per Attachment C. 3. An access easement 40 feet in width across City Light property to Interurban for Lot 8. 4. Dedication of access to City of Tukwila of City Light property to connect the two public rights -of -way. STAFF REPORT to the Planning Commission 5. Consolidation of Tract A with adjacent parcel and recordation in conjunction with final plat recordation. 6. Revision of plat to show fence behind Lot 4. (22/87- 1- SUB1,2) 87 -1 -SUB: Kaiser Gateway Associates Page 7 1 • 1 e • • : O W - 1 4 • !iglu Av T li" in Is t I /, :// 414 \0 / ' \ wr / lia, :.,10 o „e C; 1 • -- eaIP!3 /7 , 9 r • • Om a """ i ■•n'd -- SHORT SUBDIVISION ti..t. r•uo ` GATEWAY CORPORATE CENTER NM a 1 I, �•„�„ : �UKMILA KING COUNTY • r -o PAW - - -W3AItl NSIM1�lnp h1.... F.,Y e.a► n•.e.. PORTION OF SECTIONS 10 G 15. T.23N. R. AE.. M.M. ‘ WASMINGTON . un.. tt?f)!.vWK•XYi;Y.X.iI'4:�.�v'i33 �:�t�fn'c �i~ui:`��,7'�:�. ..• -- ANQFfrisp if hi 1 §i VaLSE &HAM Good kW BMW MIS I_.II . S. ATTACHMENT A e ••■•••••■■• DESCR1PT a, as/ awls.. •••■ ••••••••••-• aasaav• —. •• "arm., 70.0... •■• X....,. Or almlavaaral, SY, V./. ••••••••■ •• •••• • C 7.•••• •••••••■•••••■• ••• •■••■•••• of. e• 7•‘• • ••••••, maw.. es ...on • ••• 7.•. .■ • ar• ...V.. 0 . •7_ •••■•••• . 67.7747..•••, •7 we. • • ••07770.73, . • • NI1 • FS ••....aaS • w•awal •••••••••11 la ••••••• 1•• aglaa •••••••• V.1•••••• a.. • aftll 1..• • ••• • • .4 ••• •• 70•41.1rtall • too. pal .7.. 1..0 4 • 7 ••■•1 loge I, ••• 4, • ne•••■•• .• ••• '• •• se •••••••■• '7 -• I .•••••••• •••' •• ■•••••■• ••••••• ■••1•■■•••••• • 1! 1 ; • i■ ;3/\ \ tzrYaatEs......" • 112;:miase—m•=` r - 72 ■ '\ .. ." • ami■- AO ".• • n' putzt ram f oa.ccrwic RLIU (SEATTLE CITY Lawn RON _ - L INTERURBAN MEALS r VOCINITY •■••• • _ •••••• • V.. Oa... •sim.7.74 ■•■•••• 7•••• • •••••• nu. • • ••• ••••••• • ••• C=.1 r7-7.! -IL ••• 3 tormes••1 to •••••• SAWN NJ fond 0•77./0.• ..••• far••••• A•41474•1‘, ..ntiel*8•77 *re ,■■•• Erproso/Samp" ••■••"•••• •••• ••. 61.1.r.A0a,7•■ 'ow* PROM g C.* ' 77:74,77.610.-1 t-• ract 002 A(5 •9•1•• UJ • LIJ < _J CL < )•-• • 0. < 6 51 z • 0 r 5 1— a- c_o 1-A7-10.1t-s0-13 I 4:e% !.... • 4 4647 - '111. I PP411) ' ■ -0 • Proposed buildinL- 13.16 ACRES -- restriction easement c.:::) '-, _ _K .— -- -1 \ : L_ ./ 1 ./ 1 - Il■ \ 1 CIO' 4 OVV Y. • U-E.SM T. (TY0•1" r I I '. GATEWAY '250' ) Proposed building restriction easement Revised Lot Layout and Proposed Building Restriction J .. Easements N 48'13'44 11 117G._ ATTAni-IMPRIT 0 Al 1 n os 3rIN3AV Higg ATTACHMENT D RIVER IMPROVEMENT EASEMENT This indenture, made this day of ......>...._. ........... ......•...,.�....�.... 19 between Kaiser Gateway Associates, Grantors, and the City of Tukwila, its successors or assigns, Grantee: WITNESSETH, that first party in consideration of Mutual Benefits and the benefits which will accrue to the land of Grantor by the exercise of the rights herein granted to hereby remise, release and forever quit -claim unto the Grantee, its assignee, an easement and right -of -way for the purposes hereinafter stated along the westerly bank of the Duwamish River within a strip of land lying between the Line of 100 year flood elevation (13.2 feet North American Vertical Datum) and a line which is parallel with, contiguous to and 30 feet upland (westerly) of the top of the river bank as existing, constructed or reconstructed on the following described property: That portion of Lot lying northeasterly of Gateway Drive as recorded in the Short Subdivision of Gateway Corporate Center, Short Subdivision of Gateway Corporate Center, Short Plat Number 85- 32 -SS, recorded in Book 52 of Surveys at page 113 under Auditors File Number 8611179001. Containing 21,150 square feet, more or less. Said easement and right -of -way are for the following purposes: The right to enter upon the above described land to construct„ reconstruct, maintain and repair a river channel and /or other flood control works, including all appurtenances thereto, together with any enlargement or reconstruction thereof, and to trim, cut, fell and remove all such trees, brush and other natural growth and obstructions as are necessary to provide adequate clearance and to eliminate interference with or hazards to the structures; and included as an appurtenance to said easement is a reasonable right to access thereto over any other land owned by the Grantor. The consideration above mentioned, is accepted as full compensation to the exercise of the rights above granted. To have and to hold, all and singular, the said easement and right -of- way together with appurtenances, unto Grantee, its successors and assigns. IN WITNESS WHEREOF the Grantor hereunto set his hand, the day and year above written. KAISER GATEWAY ASSOCIATES By General Partner By General Partner -: STATE OF COUNTY OF STATE OF ) ) SS COUNTY OF ) THIS IS TO CERTIFY that on this day of 19 , before me, the undersigned, a notary public in and for the State of Washington, duly commissioned and sworn, personally appeared , to me known to be the of , a General Partner of Kaiser Gateway Associates, a California partnership, that executed the within and foregoing instrument, and acknowledged the said instrument to be the free and voluntary act and deed of said partnership for the uses and purposes herein mentioned, and on oath stated that he was authorized to execute said instrument. WITNESS my hand and official seal the day and year in this certificate first above written. )ss. Notary Public in and for the State of residing at My commission expires: THIS IS TO CERTIFY that on this day of , 19 before me, the undersigned, a notary public in and for the State of Washington, duly commissioned and sworn, personally appeared to me known to be the of , a General Partner of Kaiser Gateway Associates, a California partnership, that executed the within and foregoing instrument, and acknowledged the said instrument to be the free and voluntary act and deed of said partnership for the uses and purposes herein mentioned, and on oath stated that he was authorized to execute said instrument. WITNESS my hand and official seal the day and year in this certificate first above written. Notary Public in and for the State of residing at My commission expires ••::: •.. itiij:}'::?:ii'iii`F.`: ry. PRELIMINARY PLAT AFieLICATION 1. NAME OF PRELIMINARY PLAT: Gateway Corporate Center 2. IF FINAL SUBDIVISION IS DIFFERENT, GIVE NEW NAME: 3. DATE OF PRELIMINARY PLAT APPROVAL: Not applicable 4. DESCRIBE ANY PROPOSED DEVIATIONS FROM PRELIMINARY PLAT: Re Subdivision of an existing short subdivision 5. APPLICANT :* Name: Signature: 6. PROPERTY OWNER (29 /SUB.FPAPP) 1980 -112th Ave. N.E., #200 Address: P.O. Box C- 97304, Bellevue, Washington 98009 Phone: Wilsey & Ham (206) 454 -3250 * The applicant s the person whom the staff will cont•ct regarding the application, and to whom all notices and reports shall be sent, unless otherwise stipulated by applicant. AFFIDAVIT OF OWNERSHIP Name: Kaiser Gateway Associated Address: 12686 Interurban Ave. S. Phone: Seattle, Washington 98168; 248 -7318 DEC C 2 ,,, 1987 Date: / , 87 rs y .62r.d4-„ Q i,avc . c....divq,4,4 . d'o n rwn;,s I /WE,[signature(s)]4.4! . th ,,.,�„r, VW. ''II swear that we arrs�e j e ow r ( s or contract purchaser(s) of the property involved in this application and that the foregoing statements and answers contained in this application are true and correct to the best of my /our knowledge and belief. Date: �I...c. .2/, /9 tr? i.. �a;.% isY L tC a: Ur uevuuw euuurw�� :+a3;Ya:mil�Lw:Ert:•x6[�xucn d yx w v 4 5. SIZE OF LAND TO BE SUBDIVIDED: 1,585,460 S.F. or 36.40 Acres 6. ZONING: M -1 7. NUMBER OF PROPOSED LOTS: 8. IS ANY OF THE PROPERTY IN FLOOD ZONE "A "? No 9. ARE THERE ANY EXISTING STREAMS, WATER BODIES, MARSHES OR BOGS ON OR WITHIN 100 FEET OF THE SUBJECT PROPERTY? Duwamish River 10. ADJACENT LAND USES: Yes (29 /SUB.PPAPP) .. �... ..�......u...... :v pro,...,.,. o,. o.,.,....,..,.... s..... d....... o. �.,...e.. �, w..................«.. c.. wyz+ wc.. nxawxrxcr:, r-. siwcw+ rixztrri ,t+Ji):Ytla:.aa`�X��:IW.v"�; i.� 11 NORTH: Duwamish River /single - family residences /King. County Park SOUTH: Industrial/Retail/Commercial EAST: Major arterial /State Highway WEST: Distribution, Commercial 11. DO NEIGHBORING PROPERTIES HAVE SUITABLE ACCESS? Y V l , C gION � lJ c `t=''' �P e2 DEC 23 1987 CITY of. t ,LA Pt ANNINr• APPLICATION DATE FILE NUMBER PROJECT NAME ADDRESS APPLICANT FILE CROSS REFERENCE j EPIC-1-87 ACTION . 4/2/87 87 -1 -UCU Q LA . SEATTLE RENDERING WORKS 5795 S. 130TH PLACE SEATTLE RENDERING WORKS 11/23/87 87 -2 -UCU RENTON SAND & GRAVEL :1111 1 :' '.'. '.I. . " p' n,' NTERURBAN AND. GREEN R VER DOUG BUCK FY1t= 81- ta -p(. 12/1/87 87 -3 -UCU CLt j II� aAo� SEATTLE RENDERING WORKS ccKN C;t 5795 S. 130TH PLACE SEATTLE RENDERING WORKS EPIC -30 -87 AtPkc'�d / UNCLASSIFIED USE 1987 fty, 4o . • ON DATE FILE NUMBER PROJECT NAME ADDRESS APPLICANT CROSS REFERENCE ACTION 4/2/87 87 -1 -UCU OUT • SEATTLE RENDERING WORKS 5795 S. 130TH PLACE SEATTLE RENDERING WORKS EPIC-1-87 11/23/87 87 -2 -UCU RENTON SAND & GRAVEL BUUNUbU BY K.K. K.U.W., BRADY WAY, 1N0 B IN Rd RIV � �-u() C P� DOUG BUCK P F S1 la - Dg . 12/1/87 87 -3 -UCU our ti. =' SEATTLE RENDERING WORKS / a=„� 5795 S. 130TH PLACE SEATTLE RENDERING WORKS EPIC -30 -87 APPR 0 eb { UNCLASSIFIED USE 1987 Ik( 4443