Loading...
HomeMy WebLinkAboutPermit 86-02-SPE - STRESS MANAGEMENT - SPECIAL PERMISSION5200 SOUTHCENTER BOULEVARD Permit 86-02-SPE - STRESS MANAGEMENT SPECIAL PERMISSION 1909 • February 10, 1986 Bruce Solly P.O. Box 88115 Tukwila, WA 98188 City of Tukwila 6200 Southcenter Boulevard Tukwila Washington 98188 433 -1800 Gary L VanDusan, Mayor Dear Mr. Solly: The Planning Commission approved, with a condition, a cooperative parking agreement for Stress Management at 5200 Southcenter Boulevard at their meeting on February 6, 1986. The condition is as follows: It is understood that this cooperative parking agreement is approved under this application upon finding by the Planning Commission that such action is taken in the public interest. The Commission reserves the right to review this cooperative parking agreement at any time and may require cancellation thereof or modification of its terms upon fin- dings of adverse impacts to public health or safety. There is a ten -day appeal period following the decision of the Planning Commission. If you have any questions, please feel free to contact me at 433 -1848. Sincerely, Moira Carr Bradshaw Assistant Planner cc: Vernon Parks, President, Stress Management Planning Director File /ks (STRESS) (1B) Planning Commissio Meeting Minutes February 6, 1986 Page 5 MR. ORRICO SECONDED THE MOTION, WHICH PASSED UNANIMOUSLY. 2. ADEQUATE LIGHTING TO ENSURE THE SAFETY OF PARK USERS PER THE APPROVAL OF THE PLANNING DEPARTMENT STAFF. D. 86 -1 -DR: Lloyd Hartong, requesting approval of building eleva- tions and a landscape plan for 6412 S. 144th Street. Chairman Knudson excused himself from participating on this item due to his close proximity to the site, and left the room. Mr. Kirsop assumed the chair. Ms. Bradshaw summarized the staff report, and submitted two pictures, Exhibits D and E. MR. MCKENNA MOVED TO APPROVE APPLICATION 86 -1 -DR, LLOYD HARTONG, BASED ON THE FINDINGS AND CONCLUSIONS OF THE STAFF REPORT, WITH THE FOLLOWING CONDITION: 1. INCREASE THE LANDSCAPE MATERIALS ALONG THE FRONT FOUNDATION. MR. LARSON SECONDED THE MOTION, WHICH PASSED UNANIMOUSLY. Mr. Knudson resumed the chair. E. 862'=SPE:: Stress Managements requesting approval of a cooperative parking agreement at 5200 Southcenter Boulevard. Ms. Bradshaw summarized the staff report. MR.. LARSON MOVED TO APPROVE APPLICATION 86- 2 -SPE, STRESS MANAGEMENT, ACCEPTING STAFF'S FINDINGS AND CONCLUSIONS, WITH THE FOLLOWING CONDITION: 1. IT IS UNDERSTOOD THAT THIS COOPERATIVE PARKING AGREEMENT IS APPROVED UNDER THIS APPLICATION UPON FINDING BY THE PLANNING COMMISSION THAT SUCH ACTION IS TAKEN IN THE PUBLIC INTEREST. THE COMMISSION RESERVES THE RIGHT TU REVIEW THIS COOPERATIVE PARKING AGREEMENT ANYTIME AND MAY REQUIRE CANCELLATION THEREOF OR MODIFICATION OF ITS TERMS UPON FINDINGS OF ADVERSE IMPACTS TO PUBLIC SAFETY OR HEALTH. MR. ORRICO SECONDED THE MOTION, WHICH PASSED UNANIMOUSLY. Brad Collins, Planning Director, arrived at the meeting. OTHER BUSINESS MR. COPLEN MOVED TO ELECT MR. KNUDSON AS CHAIRMAN. MR. SOWINSKI SECONDED THE MOTION, WHICH PASSED UNANIMOUSLY. CITY OF TUKWILA PLANNING DIVISION PLANNING COMMISSION STAFF REPORT 86- 2 -SPE: Stress Management AGENDA ITEM INTRODUCTION The applicant, Stress Management, recently requested a tenant improvement at 5200 Southcenter Boulevard, the Parkside Building. The plans for the tenant improve- ment showed two classrooms and a conference room, as well as offices and a recep- tion area. A parking check of Parkside revealed that the additional parking stalls provided on site, above the minimum code requirement for straight office, would be completely used by the parking requirements for Stress Management. Because Stress Management is a more intense use than normal office use and because their classrooms and conference areas will be primarily used on weekends and eve- nings, the parking demands for the site would be well served by a cooperative parking agreement. FINDINGS 1. TMC 18.56.070 provides a method for Planning Commission approval of "cooperative parking facilities" in multiple occupancy developments. The total requirements for off street parking shall be at least the sum of the requirements for the uses (operating) at any one time or as deemed necessary by the Planning Commission. 2. Parkside has 33,300 gross square feet of office space which requires eighty - four (84) parking stalls. One hundred (100) stalls are provided, which leaves an excess of sixteen (16) stalls for more intense uses. 3. Stress Management requires eighteen (18) parking spaces for its conference and classrooms, which reduces the overall demand for total office parking to eighty (80) spaces. 4. Parkside is a new two story building with covered parking and is not fully leased. The tenant improvements approved thus far include Southcenter Travel in Suite 10, 2040 square feet; Tukwila Chamber of Commerce, Suite 11, 940 square feet; and Stress Management, Suite 9, 2300 square feet. 5. According to the applicant, "Stress Management Services Ltd. is a company which assists clients in managing stress. The people who come for assistance do so predominately at night or on the weekends." Five to six employees will be working in the office during normal work hours (Exhibit A). 86- 2 -SPE: STRESS MANAGE „, Tukwila Planning Commission January 23, 1986 Page 2 2. Alternative Two: "Greatest sum of the uses" CONCLUSIONS 1. Alternative One: "Full code compliance" Approximately twenty percent of Parkside is currently leased. Full code compliance would preclude any future tenant improvements for conference areas in the remaining eighty percent vacant office building. A tenant improvement for an office with a small accessory conference area is currently pending and cannot be approved due to the parking requirements. As stated in TMC 18.56.070, a cooperative parking agreement must reflect full code compliance for the sum of all tenants open for business at any one time. Because the building is not completely leased, a tenant list of hours of operation is not available. The two existing tenants, the Chamber and Southcenter Travel, both operate during normal work hours. It can reasonably be assumed that future tenants of the space will operate during normal weekday hours and that as office tenants, they will require accessory conference rooms. At this point in the leasing of the building, it is difficult to implement this alternative. In addition, it is unlikely that this criteria could be met since Stress Management operates with an office staff during nor- mal weekday hours and holds classes in the evenings and on weekends. 3. Alternative Three: "Planning Commission discretion" The Planning Commission may, under the language of TMC 18.56.070, reduce parking requirements below the greatest sum of the uses when circumstances so warrant. Stress Management's use of their space is primarily classroom and conference. The heavy parking demand for their business will be during the evening and on weekends then they have indicated that the classes and con- ferences would be held. The eighteen spaces needed for their classes could be cooperatively used during the week, 8:00 a.m. to 5:00 p.m., by the future tenants. Approving a cooperative parking agreement would free up parking for pending and subsequent tenant improvements with accessory con- ference areas. Therefore, a cooperative sharing of available parking would seem appropriate. RECOMMENDATION Based upon the above Findings and Conclusions, the Planning Commission may wish to approve a cooperative parking agreement for Stress Management for the eighteen parking stalls needed for their classroom and conference areas subject to the following condition: 1. It is understood that this cooperative parking agreement is approved under this application upon finding by the Planning Commission that such action is 86-2-SPE: STRESS MANAGELT Tukwila Planning Commission January 23, 1986 Page 3 taken in the public interest. The Commission reserves the right to review this cooperative parking agreement annually and may require cancellation thereof or modification of its terms upon findings of adverse impacts to public safety or health. EXHIBITS A - Letter of Request (STRESS) (5A.3) Bruce W. Solly Development Co., Inc. January 7, 1986 Mr. Brad Collins Planning Director City of Tukwila 6200 Southcenter Blvd. Tukwila, Washington 98188 RE: Stress Management /Parkside Dear Mr. Collins, Stress Management Services, Ltd., is a company which assists clients in managing stress. The people who come for this assistance do so predominately at night or on the weekends. During daytime weekday operating hours, Stress Management will have five to six people in the office. = nrS,ly, BWS /ls cc: Vernon Parks . ruce W. Solly, Owner, Parkside Bull ernon Par s, President, Stress Management (71- (41tBfl" A Post Office Box 88715 — Tukwila Branch — Seattle, Washington 98188 — 206 - 241 -9000 City' of Tukwila 6200 Southcenter Boulevard Tukwila Washington 98188 433 -1800 Gary L VanDusan, Mayor CITY OF TUKWILA NOTICE OF PUBLIC HEARING AND MEETING OF THE TUKWILA PLANNING COMMISSION NOTICE IS HEREBY GIVEN that the Tukwila Planning Commission has fixed the 23rd day of January, 1986, at 8:00 p.m., in the City Council Chambers of Tukwila City Hall, 6200 Southcenter Boulevard, Tukwila, Washington, as the time and place for: Public Hearing 85 -49 -CUP: W. Lee Singleton, requesting approval of a truck terminal located at approximately S. 134th Street and 47th Avenue South. 85 -61 -R: McLees Zoning Amendment, requesting an M -1 Light Industrial classification for 4526 S. 135th Street, which is proposed to be annexed to the City of Tukwila. Public Meeting DR- O1 -84: Windmark Homes, requesting approval of plans for 66 multiple family units on a 3.85 acre site on the northerly and southerly sides of Sunwood Boulevard west of 62nd Avenue South and South of the existing Sunwood development. 85 -62 -SPE: Domino's Pizza, requesting approval of a cooperative parking agreement at 15439 53rd Ave. South. 85- 63 -SMP: City of Tukwila, requesting approval of two storm outfalls and a mini -park upstream from Foster Bridge (56th Ave. S.) on the left bank of the Duwamish River. 86 -1 -DR: Lloyd Hartong, requesting approval of building elevations and a landscape plan for 6412 S. 144th Street. 86 -2 -SPE: Stress Management, requesting approval of a cooperative parking agreement at 5200 Southcenter Boulevard. Any and all interested persons are invited to attend. Published: Record Chronicle, January 12, 1986 8510170648 FILED FOR RECORD AT REQUEST OF JOHN G. SLOAN 2200 First Interstate Plate Tacoma, Washington 98402 NOTICE OF TRUSTEE'S SALE I II `1'8'7 NLF.O FOR RfCORO Ai Rfy!ESFON SAFLCO 1111E INS' ;;;t LCM ?ANY 2hIS 4th AVENUE, SEAIRLE, WA 91121 85/10%17 00648 E RECD F 8.00 CASHSL * * *8.00 NOTICE IS HEREBY GIVEN that the undersigned Trustee will on the 10th day of J 1986, at the hour of 9:00 o'clock, a.m., at the Third Avenue entrance of the King County Courthouse, located at 516 Third Avenue in the City of Seattle, State of Washington, sell OD . at public auction to the highest bidder, payable at time of sale, the following described . real property, situated in the County of King, State of Washington, to -wit: CD r- O See Exhibit "A" attached hereto in OD which is subject to that certain Deed of Trust dated July 15, 1980, recorded July 15, 1980, under Auditor's File No. 8007150542, records of King County, Washington, from Qestar Development Corporation, a Washington corporation, as Grantor, to Chicago Title Insurance Company, as Trustee, to secure an obligation in favor of Thomas S. Aiton and Robert Lennart and Patricia Lenhart, his wife, as Beneficiaries, the beneficial interest in which was partially assigned by Thomas S. Acton and Robert and Patricia Lenhart under an Assignment recorded under Auditor's File No. 8204010525. Chicago Title Insurance Company as Trustee, has resigned as Trustee ther.::n(1.r and John E. Sloan has l.avu appointee Trustee under said Deed of Trust. No action commenced by the Beneficiary of the Deed of Trust or the Beneficiary's successor is now pending to seek satisfaction of the obligation in any Court by reason of the Grantor's default on the obligations secured by the Deed of Trust. III The default(s) for which this foreclosure is made is /are as follow: Two Promissory Notes are secured by the above Deed of Trust. A. As of July 15, 1985, all principal and accrued interest became due and payable on the Promissory Note executed by Qestar Development Corporation in favor of Thomas S. Aiton and Robert Lennart and Patricia Lennart, his wife, which Promissory Note is secured by the above Deed of Trust. At present, the principal balance of the Promissory Mote is $178,511.75, plus interest from February 1, 1985, at 12% per annum. B. As of July 1, 1985, all principal and accrued interest became due and payable on the Promissory Note executed by Robert M. Lennart and Patricia L. Lenhart and Thomas S. Aiton to Daniel N. Cook and Nancy L. Cook, Davis M. Seiwerath and Mary Ann Seiwerath, Michael J. Rubel and Trine N. Rubel, Morris A. McCollum. Ferdy J. Kollar and Phyllis A. Kollar, and George B. Jay, which promissory Note is secured by the above Deed of Trust. At present, the principal balance of the Promissory Note is S70,406.02, plus interest from February 1, 1985. at 12%. IV The sum now owing on the obligation in favor of Thomas S. Alton and Robert Lenhart and Patricia Lenhart, his wife, secured by the Deed of Trust is: Principal 8178.511.75, together with interest as provided in the note or Ether instrument secured, from the 1st day of February, 1985, any advances as set forth in Paragraph III above, and such other costs and fees as are due under the note or other instrument secured and as are provir■d by statute. The sum now owing on the obligation in favor of Daniel H. Cook and Nancy L. Cook, Davis M. Seiwerath and Mary Ann Seiwerath, Michael J. Rubel and Trine M. Rubel, Morris A. McCollum, Ferdy J. Kollar and Phyllis A. Kollar. and George B. Jay, secured by the Deed of Trust is: Principal $70,406.02, together with interest as provided in the note or other instrument secured, from the 1st day of February, 1985, any advances Fihnlisep forth in Paragraph III above, and such other costs and fees as are due under tl:e'tnote or ot1jPr instrument secured and as are provided by statute. ' • : The above described real property will be sold to satisfy the expense of sale and the obligation secured by the Deed of Trust as provided by statute. The sale will be made without warranty, express or implied, regarding title, po ion or encumbrances on the 10th day of January, 1986. Since the principal balance is due and payable in full, the sale only may be terminated before the sale by the Grantor or the Grantor's successor -in- interest or the holder of any recorded junior lien or encumbrance, paying the entire principal and inte secured by the Deed of Trust, plus costs, fees, and advances, if any, made pursuant to the terms of the obligation and /or Deed of Trust and curing all other defaults. VI V A written notice of default was transmitted by the Beneficiary or Trustee to the Grantor or the Grantor's successor -in- interest at the following address, Martin Casteneda Real Estate Trust Administrator e5 Seattle, WA 98116 - Patricia L. Lenhart • 3035 63rd, S. W. NI Seattle, WA 98116 OD Thomas S. Aiton 3837 Lake Washington Blvd. North Renton, WA 98056 by both first class and certified sail on the 7th day of August, 1985, proof of which is in the possession of the Trustee: with said written notice of default or the written notice of default was posted in • conspicuous place on the real property described in Paragraph I above, and the Trustee has possession of proof of such service or posting. The Trustee whose name and address are set forth below will provide in writing to any- one requesting it, a statement of all costs and fees due at any tire prior to the sale. The effect of the *ale will he to deprive the Grantor and all those who hold by, through or under the Grantor of all their interest in the above described property. Anyone having any objection to the sale on any grounds whatsoever will be afforded an opportunity to be heard as to those objections if they bring a lawsuit to restrain the sale pursuant to RCw 61.24.130. Failure to bring such • lawsuit may result in a waiver of any proper grounds for invalidating the Trustee's Sale. DATED this 4 th day o f October , 1985 VIII VII Ix Qester Development Corp. 2019 Third Seattle, WA 98121 TRUSTEE/. E. SLOAN 2200 F, t Interstate Plasm Post lice Box 1157 Tacoma, Washington 98401 Telephones (206) 572 -5050 STATE OT WASHINGTON ) es. COUNTY OP PIERCE I certify that 'I know or have satisfactory evidence that JOHN E. SLOAN signed this. instrument and acknowledged it to be his free and voluntary eat for the uses and purposes pat}d, October 4th, 1985 (Seal o! Stamp) /. , (Signature of Notary ic) Legal Assistant My appointment expires *we,. 4-/'✓- A . rri C PCL. A •44$•40-48•I $.ssl 4 4 vs • 0/ !`! ' 1 442 r I • I t I i` 1 C rI � a l b * e B 1I 1, I z ? ' 1 1 VI 4 1.4 0 » I. • 1I I 10 'e ye ^ I , IJ .. r. O :: 95 filr v Zs'Qlf I• I lia 0 Tr h` '' is r 4 . t - 00 17 y ; ,, , i.. 1# , 021 • • ' w . • cot-0e "ge IA* 41 \ CP SN E) - - • ^ • �_ (SSW W:.'1 = �}. i A Meyer \[w NV- t IS- Ise • • 104 3 'Jae• Ie• y4 + (4 k ' � �zf 4It ' 'bell' • wear/ tit 4 442 lot 8 N 39.- Is Ivy Jo i Q el:) VI 75 Sea. 12 • 2!e 7 e � a • V T91C17M "^"10$i' 8 t.,o • 7 1 • • 9 01 `a , lv i, pz 0. • • • v 4 V 1 .7• r•2... aiu w -• u{ wawa• ,wa. rt,.�tns ..•_ _.._. _ - I . .0 w It 0 • a w N • N 7 00 pN V V fl? g' 91.7 a, 71 .7 7 1• 14 43 40 • •0 4 ea e e I • F • • a v <417.58> me a. • Oa 41.73 00 1 . 2 4 4 ma 1 � s$ .RO. e V u • a t ) NOM' .ew. weer Pa .004 s .viii$ r. a *PO Of" Y/ a. i .. ax. J 4 WI ye r / y tile) o N M 1 10 (V V asa se.tmoI! 442 Ent 61U' I.: V r. t' Uk OU oP AJO:3T11JC 11 WaT,70 TOUR' PR4Pr:WY AYT, , "S z; ' 'URA* °'∎ ". O1 ACV:ALT Yi' ?3UR Young Is /2 M Val Al A , 3 1 0 0 N A V • r• A4 001 See. O •s. 43 a \9. S. It rio '.s X9 •eq.a •••......!t7 lie I N • • SR 5 mF Ito -a -547E 2co 5oo1T4 a� z5-Re½ VYWJASMeMT r r faidepi P.3 1." rwit, 4,411. z " •• §, 04frof ".s CV) ) WWI I -- I ;Wk.. 44f t■J ,unhp Jaat's pit-) 414 , 1 2/ , - - ••"*. -- 9 ...•••••• • • // / • /- 1 1 / 1 _ - , , / eft \ • -••• a t <!".10t_Pri.e*Jr.6 • 4.4.wodro. vow. NA. , *A. pthism 1 SI. Jitio31; V io'-o 1 • itgp • FAA. Gm* #0,geso cNvitot toltPt4h Defium e"Itte &l. 1.4144 widPA (44)%ifs sax 6A+1 t' • • ' At- om. int'4.4 4 ,14.14rJ1 ••f' Wen$ &eh. : eh . serebt. E.Hamsle.1122% 2 Seeli ale COM DATA '1-‘ S .(... occup A. SP , R c lr , ei it . ia 4 1 .0 Ta 44 1 .e 661;4"6 CONSTRUCTIOY TYPE 111EN, • /LI :17Bare 4, COIN rUi TOTAL BUILDING MCA C; 14... 1. . 100° Mille DISTRICT TOTAL LOT AREA • .14•4•17. • Gt;t1 41,44 S PROVIDED.....ledr ND i n n . 114-1 ' .. PA .." °614.4°144' Afl PERCENT Of SITE tonna A. Requireifhydrants per City Ordinates to be operational peter tO . • cortuitIblo building motorists delving to site. tire Her. .. per I.SiO. Guide. Hydrant locatiees Shall be approved by Bite . ...■,••••• D. B a " g t ildresi to be clearly visible for each tenant in Nati.. •... . tenant lase% per City of Tukwila requirements. - x - ..."C,,,:SPrinlr systems $hall cooly with NrPA 13•19K and'be elykWed • Fire' Depareant ewe Jtatv1 ,. „ us• of cceentible liquids per Article 15.• E. fire extinguishers per IOTA 10.1101taMdet. deer • • ,•• Penninent extinguisher by Owner 1".. Tenant oprovenents to have approval Of huilding/Firp•Departseent .prior to construction or occupenCy. • = No occupancy prior to Issuance If Certtfitite of Occupancy.• • ''• • Al., Special, test laboratory impection required for all site wellleg. • ; • high' strenyth bolting and all structeral concrete. '!u i cty c pro des lone for Earthquake 2ene tutselt • , J. •Contras,tor to verify all dimensions.. Do nisi scale drawings. proveti approved ronttortd alarm system per Ordinance when requted or as required by specification. L. Provide' • approved hose stations per Ordinance wharf required. H. MI concrete era in excess of 2.000 psi shall be insetted by P I cOnc b. retesVien the anticipated site temerature wilt b below :Attr during the first 48 hours of curing. , 0. the Co...tractor shall call the engineer for field,. • •-• ,, ,, priorto pourinq . of orecast.panel and over to P. In C l i of f fTed re l ng errori or omissions, the Constrictor notify the Architect and see no repairs without his approval. • 0. Soils ingineer to verify salt bearing prior to pouring of footings. R. soils rimer to inspect and approve building o.d40.nos4 r t4ofx•foratIOLIJ4. S. Soils 1!ngineer to inspect and approve pad price to paving. T. Contractor shall co-ordinate the work of all trades to avoid ' interference between divisions of the wort. U. Cnntra.:tor to provide all wore, services and materials necessary to construct a complete, operating facility. V. The Ccitractor snail apply and secure all occupancy, sewer, store, waterqelectrIcal and other penults ',meet building permit. te shall ;ay all necessary teas and post bonds required. ie. General Contractor dinate With local utility the final location of underground line with on•siteutilittes prior to utility werk• 0. I uture■toilets to comity witn Washington State Barrier free rnde. I, All exposed Insulation shall met F.S. 25 requiremnts. Z. Instal; all. insulation only after rnisture content on •11 renters M. t le ( .r . m.r Verl wi fy with Ar t j be thecied. I TE PL-A1•1 44 IN. 1 „a d2t/Cy .XCHY11(Ai. fewer oturet • Office crating 70' f• 21* outside Cooling 18 u yg. 'outsioe 4414 74$411.14. 13ftijoit ' I, &X Wes '• eiwa14* pkk. porn./ 1) Ise,/ : 2 ) 21/again: • 2 ) Mat ei4.4644444 . . 21.H3 . . .111 'l....:. . :irm;,,d. : ri! siiii ' .!:' ),.r !;.! •:;14 . . . roma 0. -..11/...ie..tt s: '..; ., - - • • •• t, .. CITY Of Wiere.4 984 atiVag OCT 251 KA? HMS Mr. 70-g-SFE I - 1 PARCEL B. . .E0Mags - •. ." . • . Alie *nigh gl tini 4i. I. 441 feet of Tweet ii App A. , . • ' ' '.. : 11814 4041 1 1: 11 2 11 :fit! .:414 : 111% .prief a!a.:74713.!:::4•4!:!. - • t t_pertlee t King SugeriorCoort,.... pseal . ' 'OE the Northerly 14• feel ;Yr 2 . per pat reseremi La V.1 $1 •..SO 41 . eagles to the TAW Survey if State itibray feet* .. S.' Soutlii17111117 .2t..te faith 120th it.. tree eighway Engleeer's Etat Y }2.110 thereon', :::iligie::11t a 46. t Witt • Serve d tat rit e 1 7 14 0. Meaty. boles Seetherly of 6 Lester y• Westa:101!:4 Westerly whew yotehghrese lies * estoh ''2iii TrOO[ l i,.. . 01 : EMEND vrris Ow., betimmithat'llee. rallel•with age 40 , diziwasitss.,ffruest Y.Lin. :,.• seamed at right mogles.-1 'said Y•Line Verve, Bed that _line drawn parallel with angle felt Easterly. when seaters. j es, • smiles. from said Y-Line Surely; x .. IllrePTINS pettiest thereof Vino keenly of Sind Avenue South. ,,,,,,, in the City of Tukwila, County of Pint. Store of Ilashingtes. • That portion of Tract 2 of Srookvale Garden ,,,,,, as per plat r•cord* in Volume 10 of Plata. on page 47. rrrrr of Xing County. as follows: Beginning at the intereecticm'of the North line of said tract with that right of way line drawn parallel with and 30 feat Easterly when censured at right angles. Eros said T.Line Survey: • . thence Southerly. along said right of way line. to • point opposite • HES Y 10459 on said E-Line Survey: thence Easterly,.alons the !sitting O.S.N. 1-11 tins right of way line of said Highway to • point opposite NES 1-IT. 140+00 on said folatini B.S.N. 1.0E Line Survey and 70 feet Northerly therefron: thence Northwesterly. along a line the production of which •ntend* to • point opposite t flu Y 11+00 on said V-Line Survey and 40 feet gasterly therefrom, to in ttttttt the West line of the Sea 225 feet of said leap thence Northerly. • along said West line. to the North line of said ttttt thence Unttrly to tha point of beginning; EXCEPT that portion of the above described parcel lying within the North 14D feet of said tract; Situate in the County of Xing. State of Upshington. PARCEL C: That tertian of the Bet 130 feet in obeli of the last 225 feet in width of Tract .2 of BrooLvale Barden Tracts. as per plat neardod In Volker 10 of Plats. an Pale 47 . MOM. of hag Cacti. which lies Northerly of'Ponton's Three Tree Point Ned; EICEPT the North 140 feet thereof; . AM EXCEPT that portico deeded to the State of Washington for P. S. N. No. I. recorded seder Necording No. SS711435; Situate to the County of king, State of Washington. • , • , • , i;!" f. i ) ,1, 1 c) 16THSINCH 1 3 . 4 5 6 7 \ 9 10 11 MANMERWAY 12 III \'.IF THIS MICROFILMED DOCUMENT IS LESS .. 77 IF AN TN NOTICE, IS DUE TO C•7 1 T nnr.timENT It 9 E.' ? flVi 9 DRAwI•r. POO - continued - • • 0.1 SITE PLAN. CNC DATA GENERAL NOTES LEGAL DESCRIPTION .. D ' RA P INA IA 4 I A UTILITIES LC1....2:1, 1 s TAVEL PLAU, ROOF CLA••, DETAILS A-3 FIRST I SECOND (LOP PLANS A-lb AvERASE LUNATION COLtS 0-5 .011 SECTIOsS 1.6 sTAIR SECTIOV.. WAIL% A.: TOILET COOL PLAN. TOILE' ELE.ATIONS SCHEDULES. DETAILS S-I IOuNDATION I PIR17 ILOoR FRA•IING PLAN 5-Z SECOND FLOOR i ROOF FRAMING PLAY 3 S01.--64 pri:AILS LuO 1 5-5 :: AILIN PLAN DET • ROY Nt; S4 PANEL CONNECTrINS I GpacAL NOTES FILE Clip? • • • o ..airctio,crs,...... • . Oat../ • r"'" 0.2- ..... MY Of MU APPROVES Ts, •