HomeMy WebLinkAboutPermit D06-202 - Upland Distribution - Building 293 - Seismic RetrofitUPLAND DISTRIBUTION
BUILDING 293
1125 ANDOVER PK W
D06 -202
City of Tukwila
Department of Community Development / 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670
Parcel No.: 3523049102
Address: 1125 ANDOVER PK W TUKW
Suite No:
Tenant:
Name: UPLAND DISTRIBUTION • BLDG 293
Address: 1125 ANDOVER PK W, TUKWILA WA
Contact Person:
Name: HEATHER LEAMAN
Address: 603 STEWART ST #707, SEATTLE WA
Value of Construction: $44,220.00
Type of Fire Protection: SPRINKLERS
Type of Construction: IIB
Public Works Activities:
Channelization / Striping: N
Curb Cut / Access / Sidewalk / CSS: N
doc: Devperm
DEVELOPMENT PERMIT
Owner:
Name: TWO NINE THREE & FOUR LTD Phone:
Address: 1325 4TH AVE SUITE 1940, SEATTLE WA
DESCRIPTION OF WORK:
VOLUNTARY SEISMIC RETROFIT OF WALL ANCHORAGE AND CONTINUITY TIES.
Water Main Extension: N Private: Public:
Water Meter: N
** Continued Next Page **
Permit Number: D06 -202
Issue Date: 07/06/2006
Permit Expires On: 01/02/2007
Phone: 206 624 -3210
Contractor:
Name: SAUNDERS CONSTRUCTION INC Phone: 949 646 -0034
Address: 1760 MONROVIA AV UNIT A -1, COSTA MESA CA
Contractor License No: SAUNDCI953ND Expiration Date:08 /04/2007
Fees Collected: $1,217.88
Uniform Building Code Edition:
Occupancy per UBC: 0011
Fire Loop Hydrant: N Number: 0 Size (Inches): 0
Flood Control Zone: N
Hauling: N Start Time: End Time:
Land Altering: N Volumes: Cut 0 c.y. Fill 0 c.y.
Landscape Irrigation: N
Moving Oversize Load: N Start Time: End Time:
Sanitary Side Sewer: N
Sewer Main Extension: N Private: Public:
Storm Drainage: N
Street Use: N Profit: N Non - Profit: N
006 -202 Printed: 07 -06 -2006
City of Tukwila
Department of Community Development / 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670
Permit Center Authorized Signature: Mk VIA
Date: (c+
I hereby certify that I have read and e ine th s permit and know the same to be true and correct. All provisions of law and
ordinances governing this work will be mpli ith, whether specified herein or not.
The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws
regulating construction or the performance of work. I am authorized to sign and obtain this development permit.
Signature:
Print Name:
doc: Devperm
0fin OE
Jo ANN k Mrn I / MT PRvP M6IZ •
Date:
7-6-06
This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is
suspended or abandoned for a period of 180 days from the last inspection.
006 -202 Printed: 07 -06 -2006
City oh-'Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206 -431 -3670
Fax: 206 -431 -3665
Web site: ci.tukwila.wa.us
Parcel No.: 3523049102
Address: 1125 ANDOVER PK W TUKW
Suite No:
Tenant: UPLAND DISTRIBUTION - BLDG 293
1: ***BUILDING DEPARTMENT CONDITIONS***
PERMIT CONDITIONS
Steven M. Mullet, Mayor
Steve Lancaster, Director
Permit Number: D06 -202
Status: ISSUED
Applied Date: 05/31/2006
Issue Date: 07/06/2006
2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the
Building Official.
3: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to
start of any construction. These documents shall be maintained and made available until final inspection approval is
granted.
4: The special Inspections and verifications for concrete construction shall be required.
5: The special inspections for steel elements of buildings and structures shall be required. All welding shall be done by
a Washington Association of Building Official Certified welder.
6: Installation of high- strength bolts shall be periodically inspected in accordance with AISC specifications.
7: The special inspection of bolts to be installed in concrete prior to and during placement of concrete.
8: When special inspection is required, either the owner or the registered design professional in responsible charge,
shall employ a special inspection agency and notify the Building Official of the appointment prior to the first
building inspection. The special inspector shall furnish inspection reports to the Building Official in a timely manner.
9: A final report documenting required special inspections and correction of any discrepancies noted in the inspections
shall be submitted to the Building Official. The final inspection report shall be prepared by the approved special
inspection agency and shall be submitted to the Building Official prior to and as a condition of final inspection
approval.
10: All construction shall be done in conformance with the approved plans and the requirements of the International
Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code.
11: All electrical work shall be inspected and approved under a separate permit issued by the Washington State Department
of Labor and Industries (206/248- 6630).
12: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of,
any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits
presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila
shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the
Building Official from requiring the correction of errors in the construction documents and other data.
13: ***FIRE DEPARTMENT CONDITIONS***
14: The attached set of building plans have been reviewed by the Fire Prevention Bureau and are acceptable with the
following concerns:
15: Maintain existing sprinkler system piping, bracing and coverage. New brackets, beams, etc. must not obstruct sprinkler
doc: Conditions
D06 -202 Printed: 07 -06 -2006
head discharge in any way.
doc: Conditions
City chsTukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206 -431 -3670
Fax: 206 -431 -3665
Web site: ci.tukwila.wa.us
* *continued on next page **
Steven M. Mullet, Mayor
Steve Lancaster, Director
16: All new sprinkler systems and all modifications to existing sprinkler systems shall have fire department review and
approval of drawings prior to installation or modification. New sprinkler systems and all modifications to sprinkler
systems involving more than 50 heads shall have the written approval of the W.S.R.B., Factory Mutual, Industrial Risk
Insurers Kemper or any other representative designated and /or recognized by the City of Tukwila, prior to submittal to
the Tukwila Fire Prevention Bureau. No sprinkler work shall commence without approved drawings. (City Ordinance #2050)
17: Any overlooked hazardous condition and /or violation of the adopted Fire or Building Codes does not imply approval of
such condition or violation.
18: These plans were reviewed by Inspector 511. If you have any questions, please call Tukwila Fire Prevention Bureau at
(206)575 -4407.
006 -202 Printed: 07 -06 -2006
City &Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206 -431 -3670
Fax: 206 -431 -3665
Web site: ci.tukwila.wa.us
Steven M. Mullet, Mayor
Steve Lancaster, Director
I hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and ordinances
governing this work will be complied with, whether specified herein or not.
The granting of this permit does not presume to give authority to violate or cancel the provision of any other work or local laws
regulating construction or the performance of work.
Signature:
Om" a
Print Name: v .10 ANN A MOW, i�T PI.oP MGR
doc: Conditions
Date: 1
006 -202 Printed: 07 -06 -2006
CITY OF TUKWIL
Community Development Department
Public Works Department
Permit Center
6300 Southcenter Blvd., Suite 100
Tukwila, WA 98188
http:llwww. ci.tukwila. wa. us
Building Permit No. a
Mechanical Permit No.
Plumbing/Gas Permit No.
Public Works Permit No.
Project No.
or oiiceuseo
Applications and plans must be complete in order to be accepted for plan review.
Applications will not be accepted through the mail or by fax.
* *Please Print**
SITE LOCATION
King Co Assessor's Tax No.: i4 2 41 I o2.
Site Address: I t Z5 At4(7(fl- WRY vagiel"
Suite Number: Floor.
Tenant Name: tAIIIG( (.Jt 24 �J . 4'Mt 1, ra1tOFf T' New Tenant: ❑ Yes K No
Property Owners Name: A407 TRPn-'1 t Ccr- Ptizh"lufk
Mailing Address: "2-12-1 tztA j;wiA,-1 (FLU- LlI (o rl A -wL
City
w State
CONTACT PERSON
Name: titall*Es LattkAa.1
Day Telephone:ne
Mailing Address:
I fI City State Z..
E-Mail Address: ( L & r Y, - Fax Number: SC (Q 2`r 2 2 7-1
GENERAL CONTRACTOR INFORMATION -
(Contractor Information for Mechanical (pg 4) for Plumbing and Gas Piping (pg 5) ) - -
Company Name: "1
Mailing Address:
City State Zip
Contact Person: Day Telephone:
E - Mail Address: Fax Number:
Contractor Registration Number: Expiration Date:
ARCHITECT OF RECORD - All plans must be wet stamped by Architect of Record
Company Name:
Mailing Address:
City
Contact Person: Day Telephone:
E -Mail Address: Fax Number:
ENGINEER OF RECORD - All plans must be wet stamped by Engineer of Record
�
Company Name: J �4 Pi� PX.{
Mailing Address:
Contact Person:
E -Mail Address: Fax Number:
Q: ApplicationsWomu- Applications On LineV -2006- Permit Application.doc
Revised: 4-2006
bh
State
Zip
vir
falai
ty State Zip
_11-1111a
Day Telephone:
`fe 2.449 0
Page 1 of6
BUILDING PERMIT INFORI iTION - 206 -431 -3670
Valuation of Project (contractor's bid price): $ ` tige7
Scope of Work (please provide detailed information):
Existing Building Valuation: $
Will there be new rack storage? ❑ .. YesNo (If yes, a separate permit and plan submittal will be required)
Provide All Building Areas in Square Footage Below
PLANNING DIVISION;
Single - family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches)
*For an Accessory dwelling, provide the following:
Lot Area (sq ft): Floor area of principal dwelling: Floor area for accessory dwelling:
*Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence.
Number of Parking Stalls Provided: Standard: Compact: Handicap:
Will there be a change in use? ❑....Yes ❑ ..No If "yes ", explain:
FIRE PROTECTION/HAZARDOUS MATERIALS:
g Sprinklers El „Automatic Fire Alarm ❑..None
Will there be storage or use of flammable, combustible or hazardous materials in the building? El .. Yes ' . No
If "yes", attach list of materials and storage locations on a separate 8 -1/2 x 11 paper indicating quantities and Material Safety Data Sheets.
Q: ApplicationsWorms- Applications On Linc3-2006 - Permit Application-dm
Revised: 4 -2006
bb
❑ ..Other (specify)
SEPTIC SYSTEM:
❑ On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health
Department.
Page 2 of 6
Existing
Interior
Remodel
Addition to
Existing
Structure
New
Type of
Construction
per IBC
Type of
Occupancy per
IBC
1 Floor
II _ k t
.--
r'' Floor
3 Floor
Floors thin
Basement
Accessory Structure*
Attached Garage
Detached Garage
Attached Carport
Detached Carport
Covered Deck
Uncovered Deck
BUILDING PERMIT INFORI iTION - 206 -431 -3670
Valuation of Project (contractor's bid price): $ ` tige7
Scope of Work (please provide detailed information):
Existing Building Valuation: $
Will there be new rack storage? ❑ .. YesNo (If yes, a separate permit and plan submittal will be required)
Provide All Building Areas in Square Footage Below
PLANNING DIVISION;
Single - family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches)
*For an Accessory dwelling, provide the following:
Lot Area (sq ft): Floor area of principal dwelling: Floor area for accessory dwelling:
*Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence.
Number of Parking Stalls Provided: Standard: Compact: Handicap:
Will there be a change in use? ❑....Yes ❑ ..No If "yes ", explain:
FIRE PROTECTION/HAZARDOUS MATERIALS:
g Sprinklers El „Automatic Fire Alarm ❑..None
Will there be storage or use of flammable, combustible or hazardous materials in the building? El .. Yes ' . No
If "yes", attach list of materials and storage locations on a separate 8 -1/2 x 11 paper indicating quantities and Material Safety Data Sheets.
Q: ApplicationsWorms- Applications On Linc3-2006 - Permit Application-dm
Revised: 4 -2006
bb
❑ ..Other (specify)
SEPTIC SYSTEM:
❑ On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health
Department.
Page 2 of 6
PUBLIC WORKS PERMIT I1RMATION — 206 -433 -0179
Scope of Work (please provide detailed information):
Water District
❑ ...Tukwila ❑... Water District #125
❑ ...Water Availability Provided
Submitted with Application (mark boxes which apply):
❑ ...Civil Plans (Maximum Paper Size — 22" x 34 ")
❑ ...Technical Information Report (Storm Drainage)
❑ ...Bond ❑ .. Insurance ❑ .. Easement(s)
Proposed Activities (mark boxes that apply):
❑ ...Right -of -way Use - Nonprofit for less than 72 hours
❑ ...Right -of -way Use - No Disturbance
❑ ...Construction/Excavation/Fill - Right -of -way
Non Right -of -way
❑ ...Total Cut
❑ ...Total Fill
❑ ...Permanent Water Meter Size...
❑ ...Temporary Water Meter Size
❑ ...Water Only Meter Size
cubic yards
cubic yards
❑ ...Sewer Main Extension Public _ Private
❑ ...Water Main Extension Public _ Private
Q: Npplications\Fonns- Applications On Line 3 -2006 - Permit Application.dac
Reviscd: 4 -2006
bh
Vlobc
Call before you Dig: 1- 800 -424 -5555
Please refer to Public Works Bulletin #1 for fees and estimate sheet.
Sewer District
❑ ...Tukwila ❑...ValVue
❑ ...Sewer Use Certificate 0... Sewer Availability Provided ❑ .. Approved Septic Plans Provided
❑ ...Sanitary Side Sewer ❑ .. Abandon Septic Tank
❑ ...Cap or Remove Utilities ❑ .. Curb Cut
❑ ...Frontage improvements ❑ .. Pavement Cut
❑ ...Traffic Control ❑ .. Looped Fire Line
❑ ...Backflow Prevention - Fire Protection "
Irrigation
Domestic Water
❑ .. Highline
❑ .. Renton
❑ .. Renton ❑ .. Seattle
❑ .. Geotechnical Report
❑ .. Maintenance Agreement(s)
❑ .. Right-of-way Use - Profit for less than 72 hours
❑ .. Right -of -way Use — Potential Disturbance
❑ .. Work in Flood Zone
❑ .. Storm Drainage
❑ .. Grease Interceptor
❑ .. Channelization
❑ .. Trench Excavation
❑ .. Utility Undergrounding
❑ ...Deduct Water Meter Size
❑...Traffic Impact Analysis
❑...Hold Harmless — (SAO)
❑...Hold Harmless — (ROW)
FINANCE INFORMATION
Fire Line Size at Property Line Number of Public Fire Hydrant(s)
❑ ...Water ❑ ...Sewer 0 ...Sewage Treatment
Monthly Service Billing to:
Name: Day Telephone:
Mailing Address:
City State Zip
Water Meter RefundBilling_
Name: Day Telephone:
Mailing Address:
City State Zip
Page 3 of 6
PERMIT APPLICATION NOS — Applicable to all permits in this application
Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject
to possible revision by the Permit Center to comply with current fee schedules.
Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation.
Building and Mechanical Permit
The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be
requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition).
Plumbinp Permit
The Building Official may grant one extension of time for an additional period not exceeding 180 days. The extension shall be requested
in writing and justifiable cause demonstrated. Section 103.4.3 Uniform Plumbing code (current edition).
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER
PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I M4 AUTHORIZED TO APPLY FOR THIS PERMIT.
BUILDING
Signature: }{� , y
Print Name: t 1'
n 1 - 1
Date Application Accepted:
o4' k,
Q:UpplicntiondPonnsApplicntions On LineV -2006 - Permit APPlicntion.doc
Revised: 4-2006
bh
Date:
Day Telephone: 204 6; 21 2 Min
Mailing Address: (e0 elW i1 i ? ,-- °p r f7 I
City State Zip
Date Application Expires:
+tt3
Staff Initials:
Page 6 of 6
RECEIPT NO: R06 -00978
Payment Date: 07/06/2006
User ID: 1165 Total Payment: 2,767.88
Initials: JEM
Payee: AMB ALLIANCE FUND III, LLC
SET ID: 0706 SET NAME: SEISMIC RETROFITS
SET TRANSACTIONS:
Set Member Amount
D06 -200
D06 -201
D06 -202
D06 -203
TOTAL:
TRANSACTION LIST:
Type Method Description
Payment Check 0200136
ACCOUNT ITEM LIST:
Description
614.68
602.16
739.88
811.16
2,767.88
BUILDING - NONRES
STATE BUILDING SURCHARGE
City of Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206 -431 -3670
Fax: 206 -431 -3665
SET RECEIPT
TOTAL:
Amount
2,767.88
2,767.88
Account Code Current Pmts
000/322.100 2,749.88
000/386.904 18.00
TOTAL: 2,767.88
7135 07/07 9710 TOTAL 2767.88
Steven M. Mullet, Manor
Steve Lancaster, Director
RECEIPT NO: R06 -00769
Initials: JEM
Payee: R. 3. HALLISSEY CO, INC.
SET ID: 053106
SET TRANSACTIONS:
Set Member Amount
D06 -200 396.62
006 -201 388.48
D06 -202 478.00
006 -203 524.33
TOTAL: 1,787.43
City of Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206 -431 -3670
Fax: 206 -431 -3665
SET RECEIPT
Copy Reprinted on 05 -31 -2006 at 15:20:46 05/31/2006
Payment Date: 05/31/2006
User ID: 1165 Total Payment:1,787.43
SET NAME: SEISMIC RETROFIT
TRANSACTION LIST:
Type Method Description Amount
Payment Check 7129 1,787.43
TOTAL: 1,787.43
ACCOUNT ITEM LIST:
Description Account Code Current Pmts
PLAN CHECK - NONRES 000/345.830 1,787.43
TOTAL: 1,787.43
5976 06/01 9716 TOTAL 1787.43
Steven M. Mullet, Mayor
Steve Lancaster, Director
Project:
2/ )Z 44/D .Zit//'' .
Type of Inspection:
/-', 4v /9
V
Address: )12
Date Called:
Special Instructions:
Date Wan[ / _p
alp,
��
Requ
Phone No:
3
INSPECTION RECORD
Rain a copy with permit
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila, WA 98188
INSPECTION NO.
Approved per applicable codes.
PERMIT NO.
(206)431 -3
El Corrections required prior to approval.
COMMENTS:
- i / -, ?/4it7 /it%!o - 74,9,e-do c/
/9rjr i o /*Xi //t / 'i/a�
Date:
/2- - /2 -
(f nspe or:
(\ )/ 7 / 1 t �u . ta. j A
$ 8.00 REINSPECTION EE REQUIRED Prior to inspection, fee must be
l aid at 6300 Southcente+ Blvd., Suite 100. Call to sechedule reinspection.
Receipt No.:
(Date:
Project:
7 > 0 ,��/�s,4 z y z
Type of Inspection: \J
4- 7r57 ,l-=•-7 -�
Address: -
/125 .9
Date Called:
Special Instructions:
Date Wanted:
/ � �.m.
,2 `j. -, --° M .nr:
Requester:
Phone No:
INSPECTION NO. PERMIT NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)43
Approved per applicable codes.
COMMENTS:
�Q. pA,4 L, 11C11.-
ll S c 4nL & r •
<t
5
-e s
/ w iv lea Ccc
5 5 r ///2
le 44 A
#4
i7o 4,
ri $58.00 VEE REQUIRED. Prior to inspection, fee must be
paid at 6300 Southcenter Blvd., Suite 100. Call to sechedule reinspection.
Receipt No.:
'Date:
INSPECTION RECORD
Retain a copy with permit
2:!:! ?
Corrections required prior to approval.
Project:P L, tok N6 ;
ll�� P
y jypeoflnsperie. _ e
- 0 \,
Address: R ,j
Date Calle
SIJeaafI t3dttLI&"Y; t
P
Q e l�-ro ' OP C I "
''li
vJ
Date Wanted:
�,rM
Requester:
Phone No:
eat el t0'141
I
INSPECTION NO.
INSPECTION RECORD (C,'Z0
Retain a copy with permit '"�
PERMI NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila, WA 98188 (2 6)43
-3670
Approved per applicable codes. El Corrections required prior to approval.
COMMENTS:
6 +-d-e — N
r:
Date:
? — r r
00 REINSPECTION FEE QUIRED. Prior inspection, fee must be
at 6300 Southcenter Blvd., Suite 100. Call to sechedule reinspection.
Rec No.: (Date:
COMMENTS:
Sprinklers:
Fire Alarm:
Type of Inspection:
FA F,k) eac_
FA
r
ANAL. N o* iv cede
_v. fs
Contact Person:
G-le i.. i) P Ry
Special Instructions:
Np
Fit t,Jo,e e ta(4 e.
t i_ , ___
iati
Niae-et
8 4-`( ) ut..
:t_ ,Jt Cm 1Pfj
Project:
Slq VI 7, 5
Sprinklers:
Fire Alarm:
Type of Inspection:
FA F,k) eac_
Address 0.301
Suite #:
1 -
_v. fs
Contact Person:
G-le i.. i) P Ry
Special Instructions:
Phone No.:
26 6 /73 -L/983
Needs Shift Inspection:
Sprinklers:
Fire Alarm:
Hood & Duct:
Monitor:
Pre -Fire:
Permits:
Occupancy Type:
INSPECITON NUMBER
INSPECTION RECORD
Retain a copy with permit
D r — 2c �
PERMIT NUMBERS
CITY OF TUKWILA FIRE DEPARTMENT
444 Andover Park East, Tukwila, Wa. 98188 206 - 575 -4407
Approved per applicable codes.
Word /Inspection Record Form.Doc 1/13/06
Corrections required prior to approval.
$80.00 REINSPECTION FEE REQUIRED. You will receive an invoice from
ity of Tukwila Finance Department. Call to schedule a reinspection.
T.F.D. Form F.P. 113
Inspector: i, / i y
Date: /6 / /c /0/O
Hrs.: /300
Project: n
u P(�xlk b, s . CejLIL
Type of Inspection:
rage_ Ryas-I--
Address: r (a S
Suite #:
r : a N tou eft. PK w
Contact Person:
Ck,c; 5 (Jfr /c,v c, 4
Special Instructions:
A%
Phone No.:
,.)b -a-s►- 0 ►33
Needs Shift Inspection:
iv
Sprinklers: Y
Fire Alarm:
_
A%
Hood & Duct: ,V
Monitor:
6 p j
Pre -Fire:
Permits:
Occupancy Type:
51
•
INSPECTION NUMBER
CITY OF TUKWILA FIRE DEPARTMENT
444 Andover Park East. Tukwila, Wa. 98188 206 -575 -4407
[_Approved per applicable codes.
INSPECTION RECORD
Retain a copy with permit
Word /Inspection Record Form.Doc 1/13/06
bo(o - ,Qo a.
PERMIT NUMBERS
n Corrections required prior to approval.
COMMENTS:
Fiat EiNA 61-4
Inspector: P i 5 / y
Date: a /q /rJ h
Hrs.: . 5
/V' n $80.00 REINSPECTION FEE REQUIRED. You will receive an invoice from
G I the City of Tukwila Finance Department. Call to schedule a reinspection.
T.F.D. Form F:P. 113
c
Voluntary Seismic Retrofit
For
Upland Distribution Center Buildidg
1125 Andover Park West
Tukwila, Washington 98188
`- -
REVIEWED FOR
CODE COMPLIANCE
rc Annonucq )
JUN 1 6 2006
Ci Oftukwlli
RIA D N( MEAN
RECEIVED
CRY OFTUKWILA
MAY 31 2006
PERMIT CENTER
VW 2-02-
J.S. DYER & ASSOCIATES INC.
STRUCTURAL ENGINEERS
Voluntary Seismic Retrofit
for
Upland Distribution Center
Building 293
1125 Andover Park West
Tukwila, Washington 98188
May 4, 2006
JSD # 2006.111.00 phase 05
I ocPUEs W19/ n A
Prepared for
AMB Property Corporation
San Francisco, California
JOB NAME:
Upland Distribution Center
Building 293
JOB NO:
2006.111.00
SHEET NO:
1
ENGINEER:
LW
DATE:
Apr-06
ANALYSIS:
Voluntary Seismic Retrofit
Location
Upland Distribution Center
This spreadsheet summartizes the site-specific information for the Voluntary Seismic Retrofit of a one-story rigid
wall / flexible diaphragm structure in accordance with the 2003 International Building Code (IBC).
IBC Sec. 1615 Site Ground Motion
Latitude =
Longitude =
Soil Profile Type (Class) =
Mapped Spectral Acceleration = Ss =
Mapped Spectral Acceleration = =
Adjusted Mapped Spectral Acceleration = S
Adjusted Mapped Spectral Acceleration = SMI
Design Spectral Acceleration, Sin = 2SMS / 3 =
Design Spectral Acceleration, SDI = 2Sl / 3=
IBC Sec. 1616 Criteria Selection
2006.111.00 Upland Bldg 293-retrofit.Site
J.S. DYER & ASSOCIATES INC.
STRUCTURAL ENGINEERS
u, I:
— '
.• . • • 'Iv; 2.5 1 .
IDDIlend Dr
•
•
t i 2,ob
- Gooslc
Seismic Use Group =
Seismic Design Category =
Importance Factor = = I
Site Information
2
i tik'r
4 10
iiii•0 , g
S
0.469 g
0.886
1.00
, 0
0
Sec. 1616.2
Tables 1616.3(1) and (2)
Table 1604.5
JOB NAME:
Upland Distribution Center
Building 293
JOB NO:
2006.111.00
SHEET NO:
2
ENGINEER:
LW
DATE:
Apr-06
ANALYSIS:
Voluntary Seismic Retrofit
Roof Weight
Roofing:
1/2" Plywood Sheathing:
Pur lins: 4" x 16"(11.0 8/ft) @ 8' oc:
Girders: 6.75" x 31.5" 012 (51.7 #/f1)@ 24' oc
Mechanical / Electrical
Sprinklers:
Suspended Ceiling System:
Miscellaneous:
TOTAL:
IBC Sec. 1607.11.2 Minimum Roof Live Load
For Flat Roofs
2006.111.00 Upland Bldg 293-retrofitRoof
J.S. DYER & ASSOCIATES INC.
STRUCTURAL ENGINEERS
Roof Loads
This spreadsheet calculates the roof loads for the Voluntary Seismic Retrofit of a one-story rigid wall / flexible
diaphragm structure in accordance with the 2003 International Building Code (IBC).
Tributary Area (A.)
0 to 200 ft
200 to 600 ft
over 600 ft
3
psf
psf
psf
psf
psf
psf
psf
psf
psf
Live Load
12
1.2 - 0.001A
20
59.063
JOB NAME:
Upland Distribution Center
Building 293
JOB NO:
2006.111.00
SHEET NO:
.3
ENGINEER:
LW
DATE:
Apr-06
ANALYSIS•
Voluntary Seismic Retrofit
J.S. DYER & ASSOCIATES INC.
STRUCTURAL ENGINEERS
Wall Anchorage - Longitudinal Perimeter Walls (Walls 1 and 16)
This spreadsheet performs supporting calculations for out -of -plane wall anchorage for the Voluntary Seismic Retrofit
of a one -story rigid wall / flexible diaphragm structure in accordance with the 2003 International Building Code
Tributary Wall Weight
IBC Sec. 1620.3.1 Anchorage Of Concrete Or Masonry Walls (Strength Design Basis)
Allowable Stress Design Basis
Top - Of - Wall Elevation = h =
Average Diaphragm Elevation = lt =
Bottom -Of -Wall Elevation = h bo1 0 ", ft
Wall Thickness = T = inch
Wall Unit Weight = W = pcf
Tributary Wall Height = H = 13.208 ft
Tributary Wall Weight = W = 1037 #/ft
Importance Factor = I = 1.00
Design Spectral Acceleration = SDS = 0.886
F = 280 #/ft
F = 0.10W 104 #/ft
F = 0.8S = 735 #/ft
F = 735 #/ft
2006.111.00 Upland Bldg 293-retroditlWalts 1 and 16 4
Anchor Spacing = s = L $ f zi ft
EASD F / 1.4 = 525 #/ft
F = sE = 4333 pounds for non - steel elements
F„p =1.4F = 6066 pounds for steel elements
H= (h h +h
W TWH /12
linked from Site
linked from Site
Sec. 1604.8.2
Sec. 1620.2.7
Eq. 16-62
largest (F F Fp3]
JOB NAME:
Upland Distribution Center
Building 293
JOB NO:
2006.111.00
SHEET NO:
q
ENGINEER:
LW
DATE:
Apr -06
ANALYSIS:
Voluntary Seismic Retrofit
Continuity Tie At Wall - Zone 4 Hardware
(2) CT/T2 Paired Units - Model =
Number Of Bolts =
Bolt Diameter =
Rod Diameter =
Number of Paired Assemblies =N =
Wood Member Thickness =
Wood Capacity Each Pair = V =
Steel Capacity Each Pair = V, =
F =F /2N=
Total Wood Capacity = NVw = Fwaod °wow)
Total Steel Capacity = NV, = F,,„ (aaow) =
Wood Capacity Unity Check = F / F,,, °mow) =
Steel Capacity Unity Check = F,,„1/ F (wow) =
Continuity Tie At Wall - Simpson Hardware
(2) Paired Units - Model =
Rod Strength = F„ =
Rod Diameter = d yad =
Number Of Bolts =
Bolt Diameter =
Number of Paired Assemblies =N =
Wood Member Thickness =
Wood Capacity Each Pair = V =
Rod Area = Arad =
Steel Capacity Each Pair = V, _
F, = F /2N=
Total Wood Capacity =NV„ = F„.00d (allow) =
Total Steel Capacity =NV, = F eel ( =
Wood Capacity Unity Check = F / F„ood wk.) =
Steel Capacity Unity Check = F, l / F eed (.11ow) =
2006.111.00 Upland Bldg 293 - retrofit \Walls 1 and 18 5
J.S. DYER & ASSOCIATES INC.
STRUCTURAL ENGINEERS
Wall Anchorage - Longitudinal Perimeter Walls (Walls 1 and 16)
inches
pounds
pounds
2167 pounds
5071 pounds
22503 pounds
0.85 OK
0.27 OK
0.3068
1627
2167
5550
8034
0.78
0.76
inches
inches
psi
inches
inches
inches
pounds
in
pounds
pounds
pounds
pounds
OK
OK
ICBO ER -5302, Table 2
ICBO ER -5302, Table 2
V, = 2(0.33F„)A,od
JOB NAME:
Upland Distribution Center
Building 293
JOB NO:
2006.111.00
SHEET NO: 3
ENGINEER:
LW
DATE:
Apr-06
ANALYSIS:
Voluntary Seismic Retrofit
Increase for Short-Term Loading, Inc =IS
Allowable Tension Loads from Table 6
Tension Capacity of Concrete,
Tension Capacity of Rod Steel,
Allowable Shear Loads from Table 7
Shear Capacity of Concrete,
Shear Capacity of Rod Steel,
Spacing Distance for Full Capacity,
Edge Distance for Full Capacity,
2006,111.00 Upland Bldg 293- retrotit\Hitti 1
J.S. DYER &ASSOCIATES INC.
S T R U C T U R A L E N G I N E E R S
d = 3/4 In
e =A A3tY in
in
Ps =
Vs =
Tc =
Ts =
V c =
Vs =
5.667
f c
ASTM A36
s =?.
t7: Ibs
Ibs
psi
in
in
in
4,932 Ibs
8,455 Ibs
5,522 Ibs
4,355 Ibs
Edge Distance & Spacing for Full Capacity from Table 6
8.500 In
6.500 in
Reduction Factors from Table 4
Min Anchor Spacing Distance Factor, 0.250
Min Anchor Spacing Distance, 2.125 in
Min Anchor Edge Distance Factor, 0.330
Min Anchor Edge Distance, 2.145 in
Tension Capacity Reduction Factors
Based on Anchor Spacing, fn = 0.700
Based on Anchor Edge Distance, fn = 0.600
Shear Capacity Toward Edge Reduction Factors
Based on Anchor Spacing, fv = 0.700
Based on Anchor Edge Distance, Tv = 0.200
Shear Capacity Not Toward Edge Reduction Factors
Based on Anchor Spacing, fv = 0.700
Based on Anchor Edge Distance, fv = 0.600
Calculated Reductions for Concrete Capacity
Tension Capacity Reduction
Based on Spacing, Rt1 =
Based on Edge Distance, Rt2
Reduction, Rt = Rt1 * Rt2 =
Shear Toward Edge Capacity Reduction
Based on Spacing, Ref =
Based on Edge Distance, Re2
Reduction, Re = Re1 • Re2
Shear Not Toward Edge Capacity Reduction
Based on Spacing, Rn1 =
Based on Edge Distance, Rn2 =
Reduction, Rn = Rn1 • Rn2
Adjusted Allowable Loads
Concrete Allowables
Tension, Ptc = Tc • Inc • Rt
V Toward Edge, Vtc = Vc • Inc • Re =
V Not Toward Edge, Vnc = Vc " Inc • Rn =
Rod Steel Allowables
Tension,
Shear,
0.882
1.000
0.882
0.882
1.000
0.882
0.882
1.000
0.882
5,801 Ibs
6,494 Ibs
6,494 Ibs
Pts = Ts • Inc = 11,271 Ibs
Vts = Vs • Inc = 5,805 Ibs
Concrete Tension + Shear Toward Edge Interaction,
Uct = (Ps / Ptc) + (Vs / Vtc) = 0.373 OK
Concrete Tension + Shear Not Toward Edge Interaction,
Ucn = (Ps / Ptc) + (Vs / Vnc) = 0.373 OK
Rod Steel Tension + Shear Interaction,
Us = (Ps / Pts) + (Vs / Vts) = 0.037 OK
Concrete Thickness, Ut = t / e = 1.529 OK
JOB NAME:
Upland Distribution Center
Building 293
JOB NO:
2006.111.00
SHEET NO: (,,
ENGINEER:
LW
DATE:
Apr-06
ANALYSIS:
Voluntary Seismic Retrofit
J.S. DYER & ASSOCIATES INC.
STRUCTURAL ENGINEERS
Wall Anchorage - Transverse Perimeter Walls (Walls A and G)
This spreadsheet performs supporting calculations for out -of -plane wall anchorage for the Voluntary Seismic Retrofit
of a one -story rigid wall / flexible diaphragm structure in accordance with the 2003 International Building Code
Tributary Wall Weight
Allowable Stress Design Basis
Top -Of -Wall Elevation = 11„ p =
Average Diaphragm Elevation = h =
Bottom -Of -Wall Elevation = N =
Wall Thickness = T =
Wall Unit Weight = W =
Tributary Wall Height = H =
Tributary Wall Weight = W =
Anchor Spacing = s =
EnD Fp /
F = sEASD =
Fi sted =1.4F
2006.111.00 Upland Bldg 293- retroffi \Walls A and G 7
ft
it
inch
pcf
13.208 ft
1037 #/ft
IBC Sec. 1620.3.1 Anchorage Of Concrete Or Masonry Walls (Strength Design Basis)
Importance Factor = I = 1.00
Design Spectral Acceleration = Sos = 0.886
F = 280 #/ft
F = 0.10W = 104 #/ft
F = 0.8S = 735 #/ft
F = 735 #/ft
525
ft
H= (h h„) +0.5(h +h
W TWH /12
linked from Site
linked from Site
Sec. 1604.8.2
Sec. 1620.2.7
Eq. 16 -62
largest [F F F
#/ft
pounds for non -steel elements
pounds for steel elements
JOB NAME:
Upland Distribution Center
Building 293
JOB NO:
2006.111.00
SHEET NO: R
ENGINEER:
LW
DATE:
Apr-06
ANALYSIS:
Voluntary Seismic Retrofit
Continuity Tie At Wall - Zone 4 Hardware
(2) CT/T2 Paired Units - Model =
Number Of Bolts
Bolt Diameter - 4- -
Rod Diameter =
Number of Paired Assemblies = N
Wood Member Thickness =
Wood Capacity Each Pair = V„
Steel Capacity Each Pair = V, -
F,.. F / 2N =
Total Wood Capacity = NV w = F (41
Total Steel Capacity = NV, = F =
Wood Capacity Unity Check = F / F„,..d(anow)
Steel Capacity Unity Check = / F ace 0 , 11 .„ 4 =
Continuity Tie At Wall - Simpson Hardware
(2) Paired Units - Model =
Rod Strength = F. =
Rod Diameter = d =
Number Of Bolts =
Bolt Diameter =
Number of Paired Assemblies = N =
Wood Member Thickness =
Wood Capacity Each Pair = V„ =
Rod Area = A„d =
Steel Capacity Each Pair = V, =
F„d = F / 2N =
Total Wood Capacity = NV = F„ (allow)
Total Steel Capacity = NV, = F eta (wow) =
Wood Capacity Unity Check = F / Fd (flow) =
Steel Capacity Unity Check = F / F (aflow) =
2908.111.00 Upland Bldg 293-retrofit‘Walls A and G 6
J.S. DYER & ASSOCIATES INC.
STRUCTURAL ENGINEERS
Wall Anchorage - Transverse Perimeter Walls (Walls A and G)
I inches
j inches
i s
- inches
pounds
pounds
2101 pounds
5071 pounds
22503 pounds
0.83 OK
0.26 OK
psi
inches
inches
inches
pounds
0.3068 in
8034 pounds
2101 pounds
5550 pounds
8034 pounds
0.76 OK
0.73 OK
ICBO ER-5302, Table 2
ICBO ER-5302, Table 2
V, = 2(0.33F.)Arod
JOB NAME:
Upland Distribution Center
Building 293
JOB NO:
2006.111.00
SHEET NO:
8
ENGINEER:
LW
DATE:
Apr -06
ANALYSIS:
Voluntary Seismic Retrofit
Spacing Distance for Full Capacity,
Edge Distance for Full Capacity,
2006.111.00 Upland Bldg 293- retrofit\Hilti 2
J.S. DYER & ASSOCIATES INC
STRUCTURAL ENGINEERS
d = 3/4 in
5.667
ASTM A36
Tc =
Ts =
V c =
Vs =
in
in
in
4,932 Ibs
8,455 lbs
5,522 Ibs
4,355 Ibs
Edge Distance & Spacing for Full Capacity from Table 8
8.500 in
6.500 in
Reduction Factors from Table 4
Min Anchor Spacing Distance Factor, 0.250
Min Anchor Spacing Distance, 2.125 in
Min Anchor Edge Distance Factor, 0.330
Min Anchor Edge Distance, 2.145 in
Tension Capacity Reduction Factors
Based on Anchor Spacing, fn = 0.700
Based on Anchor Edge Distance, fn = 0.600
Shear Capacity Toward Edge Reduction Factors
Based on Anchor Spacing, fv = 0.700
Based on Anchor Edge Distance, fv = 0.200
Shear Capacity Not Toward Edge Reduction Factors
Based on Anchor Spacing, fv = 0.700
Based on Anchor Edge Distance, fv = 0.600
Calculated Reductions for Concrete Capacity
Tension Capacity Reduction
Based on Spacing, Rt1 =
Based on Edge Distance, Rt2 =
Reduction, Rt = Rt1 " Rt2 =
Shear Toward Edge Capacity Reduction
Based on Spacing, Re1 =
Based on Edge Distance, Re2 =
Reduction, Re = Rel • Re2 =
Shear Not Toward Edge Capacity Reduction
Based on Spacing, Rnt =
Based on Edge Distance, Rn2 =
Reduction, Rn = Rn1 • Rn2 =
Adjusted Allowable Loads
Concrete Allowabies
Tension, Ptc = Tc • Inc • Rt =
V Toward Edge, Vtc = Vc • Inc • Re =
V Not Toward Edge, Vnc = Vc • Inc • Rn =
Rod Steel Allowables
Tension,
Shear,
0.882
1.000
0.882
0.882
1.000
0.882
0.882
1.000
0.882
5,801 lbs
6,494 Ibs
6,494 lbs
Pts= Ts• Inc = 11,271 Ibs
Vts = Vs • Inc = 5,805 lbs
Concrete Tension + Shear Toward Edge Interaction,
Uct = (Ps / Ptc) + (Vs / Vtc) = 0.373 OK
Concrete Tension + Shear Not Toward Edge Interaction,
Ucn = (Ps / Ptc) + (Vs / Vnc) = 0.373 OK
Rod Steel Tension + Shear Interaction,
Us = (Ps / Pts) + (Vs / Vts) = 0.037 OK
Concrete Thickness, Ut = t / e = 1.529 OK
JOB NAME:
Upland Distribution Center
Building 293
JOB NO:
2006.111.00
SHEET NO:
<9
ENGINEER:
LW
DATE:
Apr -06
ANALYSIS:
Wall Anchorage to Flexible Diaphragm, Rods
This spreadsheet performs supporting calculations for out -of -plane wall anchorage for the Voluntary Seismic Retrofit
of a one -story rigid wall / flexible diaphragm structure in accordance with the 2003 International Building Code
Tributary Wall Weight
IBC Sec. 1620.3.1 Anchorage Of Concrete Or Masonry Walls (Strength Design Basis)
Allowable Stress Design Basis
Steel Anchor Road Design
Top -Of -Wall Elevation = h, =
Average Diaphragm Elevation = h =
Bottom -Of -Wall Elevation = h bot =
Wall Thickness = T =
Wall Unit Weight = W = 5 +` pcf
Tributary Wall Height = H = 13.25 ft
Tributary Wall Weight = W = 1041 #/ft
Importance Factor = I = 1.00
0.886 .
280 #/ft
104 #/ft
738 #/ft
738 #/ft
Design Spectral Acceleration = S =
F =
F = 0.10W =
F0 = 0.8SDSIEW =
F =
Gross Area of Rod, Ag =
Net Tensile Area of Road, An =
Allowable Stress Increase =
Rod Tension Capacity: Yield Stress, T =
Rod Tension Capacity: Ultimate Tensile Stress, T =
Wall Anchorage Demand, F =
Rod Tension Capcity, T =
Steel Capacity Unity Check = F / Fe ( =
2006.111.00 Upland Bldg 293- retrofiaRods 10
J.S. DYER & ASSOCIATES INC.
STRUCTURAL ENGINEERS
Anchor Road Material =
Yield Strength, Fy =
Ultimate Tensile Strength, Fu =
Rod Diameter =
Wall Anchorage - Steel Anchor Rod
24 5, ft ft
�.F�!f1 -tft
1 inch
Anchor Spacing = s =Lkaj ft
E,sD = F / 1.4 = 527 #/ft
F = SE = 4347 pounds
=1.4F — 6085 pounds
ASTM A36
36 ksi
58 ksi
inches
0.442 in
0.334 i
1.33
12.692
12.900
6.085
12.692
0.48
k
k
k
k
OK
H= (k - h +0.5(h
W TWH /12
linked from Site
linked from Site
Sec. 1604.8.2
Sec. 1620.2.7
Eq. 16 -62
largest [F F F
for non -steel elements
for steel elements
JOB NAME:
Upland Distribution Center
Building 293
JOB NO:
2006.111.00
SHEET NO:
I O
ENGINEER:
LW
DATE:
Apr -06
ANALYSIS:
Wall Anchorage to Flexible Diaphragm, Rods
Spacing Distance for Full Capacity, 8.500 In Tension, Pts = Ts • Inc = 11,271 Ibs
Edge Distance for Full Capacity, 6.500 in Shear, Vts = Vs • Inc = 5,805 Ibs
Concrete Tension + Shear Toward Edge Interaction,
Uct = (Ps / Ptc) + (Vs / Vtc) = 0.583 OK
Concrete Tension + Shear Not Toward Edge Interaction,
Ucn = (Ps / Ptc) + (Vs / Vnc) = 0.583 OK
Rod Steel Tension + Shear Interaction,
Us = (Ps / Pts) + (Vs / Vts) = 0.090 OK
Concrete Thickness, Ut = t 1 e = 1.529 OK
JOB NAME:
Upland Distribution Center
Building 293
JOB NO:
2006.111.00
SHEET NO:
t I
ENGINEER:
LW
DATE:
Apr -06
ANALYSIS:
Diaphragm Analysis
Transverse Longitudinal
0.23
0.222
0.950
0.039
0.000
0.039
0.222
C, =
I Transverse
0.222
0.354
0.177
0.222
0.158
Longitudinal
0.222
0.354
0.177
0.222
0.158
F =C
Fp(mex) = 0.4SDSIEW =
Fp(min) = 0.2SDSIEW =
F =
Fp(ASD) = F / 1.4 =
Seismic Lateral Loads For Diaphragm Design
0.23
0.222
0.950
0.039
0.000
0.039
0.222
Transverse
Tributary Wall Weight = W„ =
Roof Length = L =
Roof Unit Weight = U =
Roof Weight = LU = W,„„ 1440
Total Weight =2W + W,pnt = Wp = 3514
Roof Seismic Load = Fp(ASD)Wp= V,p 556
2006.111.00 Upland Bldg 293-retrofit\Diaphragm
g
g
ft
seconds
w,
W,
W,
W
w
2
-02, Sec. 9.5.5 be used.
linked from Site
linked from Site
linked from Site
linked from Site
Table 9.5.2.2
Table 9.5.2.2, footnote g
Table 9.5.5.3.2
code interpretation for diaphragms
Eq. 9.5.5.3.2 -1
Eq. 9.5.5.2 -1.1
Eq. 9.5.5.2 -1.2
Eq. 9.5.5.2 -1.3
Eq. 9.5.5.2 -1.4
Clotho = larger [Cx(minl), CS(SDC E or F)1
Cs(min) < C, < Cs(max)
Eq. 16 -63
F p(min) < Fp < Fp(max)
previously calculated
previously calculated
JOB NAME:
Upland Distribution Center
Building 293
JOB NO:
2006.111.00
SHEET NO:
12Z
ENGINEER:
LW
DATE:
Apr -06
ANALYSIS:
Diaphragm Analysis
+
+
+
+ Diaphragm Analysis
L
DIAPHRAGM PLAN
VW. = V.00rL /2
= V... /W
DIAPHRAGM SHEARS
MW. = V,00r13/8
.,Immnulll = MWX /W
CHORD FORCES
SubDiaphragm Analysis
L
DIAPHRAGM PI AN
VW. = V.mrL /2
b llk.VW. = VW. /W
.,,11111
DIAPHRAGM SHEARS
M.0 = VworL /8
AIIII1n1111i111
T = MW /w
CHORD FORCES
J.S. DYER & ASSOCIATES INC.
STRUCTURAL ENGINEERS
V roo r =
L=
W=
V mxx =
Vmax =
Mmn =
T mm =
V
L=
W=
V max
v �� m
Mmax =
T =
2006.111.00 Upland Bldg 293- retrofiflDiaphragm 13
Diaphragms
#/ft
ft
ft
pounds
4i/ft
ft-#
pounds
21372
668
132237
4132
6672
278
40032
1668
#/ft
ft
ft
pounds
#/ft
ft-#
pounds
Seismic Lateral Load
Diaphragm Length
Diaphragm Depth
Maximum Shear
Maximum Shear
Maximum Moment
Maximum Chord Force
Seismic Lateral Load
Diaphragm Length
Diaphragm Depth
Maximum Shear
Maximum Shear
Maximum Moment
Maximum Chord Force
JOB NAME:
Upland Distribution Center
Building 293
JOB NO:
2006.111.00
SHEET NO: i7
ENGINEER:
LW
DATE:
Apr-06
ANALYSIS•
Diaphragm Continuity Ties
J.S. DYER & ASSOCIATES INC.
STRUCTURAL ENGINEERS
This spreadsheet performs supporting calculations for continuity ties for the Voluntary Seismic Retrofit of a one -story
rigid wall / flexible diaphragm structure in accordance with the 2003 International Building Code (IBC).
IBC Sec. 1616.4.2 Connections
IBC Sec. 1620.2.4 Connections
Dead = D }2 QO ; psf
Live = L s psf
Area = A = < 8tt3, q ft
F = 0.05(D+L)A = 10723 pounds
Design Spectral Acceleration = S =f 0.8861 g
w= DA = 107234 pounds
F = 0 . 1 33Sosw'p = 12636 pounds
F = 0.05w = 5362 pounds
Wall Force
Wall Anchorage Force = F = ` 1 #/ft
Tie Spacing = s = s ft
F = F„s = 25666 pounds
Subdiaphragm Force
Number Subdiaphragms =N =
Edge Reaction = V = 12 [ pounds previously calculated
F =NV = 21372 pounds strength level
Allowable Stress Design Basis
F 10723
Fp2 = 12636
F = 5362
F = 25666
F = 21372
F = 25666
F =F /1.4
F eed =1.4F = 25666
2008.111.00 Upland Bldg 293- retrofinTfe (NS) 14
Continuity Ties - Longitudinal Direction (NS Forces)
18333
pounds
pounds
pounds
pounds
pounds
pounds
pounds
pounds
ASD Basis
roof dead load
roof live load
area tributary to tie
strength level
previously calculated
weight tributary to tie
Eq. 16 -58
Eq. 16 -59
previously calculated
strength level
largest [F Fp2, Fp3, F0, Fps]
for non -steel elements
for steel elements
JOB NAME:
Upland Distribution Center
Building 293
JOB NO:
2006.111.00
SHEET NO:
14
ENGINEER:
LW
DATE:
Apr-06
ANALYSIS•
Diaphragm Continuity Ties
Steel Capacity Unity Check = Fnal / Lei ( = 0.94 OK
2006.111.00 Upland Bldg 293- retrofitttie (NS) 15
d,w.L
'YLLl„111
mow!
tea,.®,
= ,A•.0.
Y„Ow MLCVT f•
ammmunTeooi
MSS
i q.`
K N8 AY
MYM SSW
ICBO ER -5302, Table 2
ICBO ER -5302, Table 2
V,= 2(0.33F„)Arod
JOB NAME:
Upland Distribution Center
Building 293
JOB NO:
2006.111.00
SHEET NO:
t b
ENGINEER:
LW
DATE:
Apr -06
ANALYSIS:
Diaphragm Continuity Ties
F = 0.05w —
F — p — 1855 pounds Eq. 16 -59
Wall Anchorage Force = F — #/ft
Tie Spacing = s = '.?r"#1' ft
F = F = 24888 pounds
Subdiapbragm Force
Number Subdiaphragms = N =
Edge Reaction = Vma =L . r' pounds previously calculated
F NVma = 6672 pounds strength level
F = 3710 pounds
F = 4372 pounds
F = 1855 pounds
F = 24888 pounds
F = 6672 pounds
F = 24888 pounds
F = F / 1.4 = 17777 pounds
F = 1.4F 24888 pounds
ASD Basis
previously calculated
strength level
largest [Fpt, Fp2, Fp3, Fp4, Fps)
for non -steel elements
for steel elements
JOB NAME:
Upland Distribution Center
Building 293
JOB NO:
2006.111.00
SHEET NO:
14,
ENGINEER:
LW
DATE:
Apr-06
ANALYSIS.
Diaphragm Continuity Ties
Continuity Tie At Wall - Zone 4 Hardware
Total Wood Capacity = NV„ = =
Total Steel Capacity = NV, = on .„ ) =
Wood Capacity Unity Check = F / =
Steel Capacity Unity Check = F / Fits (dkw)
Continuity Tie At Wall - Simpson Hardware
(2) Paired Units - Model
Rod Strength = F. =
Rod Diameter = d =
Number Of Bolts =
Bolt Diameter =
Number of Paired Assemblies =N =
Wood Member Thickness =
Wood Capacity Each Pair = V =
Rod Area = A —
Steel Capacity Each Pair = V, =
F F / 2N =
Total Wood Capacity = NV„ = F„,.. dollow) =
Total Steel Capacity = NV, = F m =
Wood Capacity Unity Check = F / F oll
Steel Capacity Unity Check = F / F (slk.) =
2006.111.00 Upland Bldg 293-retrofthTle (EW) 17
J.S. DYER & ASSOCIATES INC.
STRUCTURAL ENGINEERS
Continuity Ties - Transverse Direction (EW Forces)
(2) CT/T2 Paired Units - Model =
Number Of Bolts =
Bolt Diameter =
Rod Diameter =
Number of Paired Assemblies = N =
Wood Member Thickness =
Wood Capacity Each Pair = V„ =
Steel Capacity Each Pair = V, =
I ,
inches
inches
inches
pounds
4 pounds
F = F / 2N = 8889 pounds
23322 pounds
39966 pounds
0.76 OK
0.62 OK
psi
inches
inches
inches
pounds
0.7854 in
27200 pounds
8889 pounds
22160 pounds
27200 pounds
0.80 OK
0.92 OK
ICBO ER-5302, Table 2
ICBO ER-5302, Table 2
V, = 2(0.33FJA,..
DEPARTMENTS:
6
Buircrig Division
Public Works
( nn Wk (c- n -0fv
PERMIT COORD COPY
PLAN REVIEW /ROUTING SLIP
ACTIVITY NUMBER: D06 -202 DATE: 05 -31 -06
PROJECT NAME: BUILDING 293
SITE ADDRESS: 1125 ANDOVER PK W
X Original Plan Submittal
Response to Correction Letter #
Response to Incomplete Letter #
Revision # After Permit Issued
5(t AJAX- (o-(' 6
Fire Prevention
Structural
DETERMINATION OF COMPLETENESS: (Tues., Thurs.)
Complete
Comments:
TUESITHURS ROUTING:
Please Route Wi Structural Review Required
REVIEWER'S INITIALS:
APPROVALS OR CORRECTIONS:
Approved ❑
Notation:
REVIEWER'S INITIALS:
Documents4outing slip.doc
2-28-02
Incomplete ❑
Approved with Conditions
Pla ni g Division
❑ Permit Coordinator
DUE DATE: 06-06-06
Not Applicable ❑
Permit Center Use Only
INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED:
Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials:
No further Review Required
DATE:
DUE DATE: 07-04-06
Not Approved (attach comments) ❑
DATE:
Permit Center Use Only
CORRECTION LETTER MAILED:
Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials:
License Information
License
SAUNDCI953ND
Licensee Name
SAUNDERS CONSTRUCTION INC
Licensee Type
CONSTRUCTION CONTRACTOR
UBI
602518261
Ind. Ins. Account Id
PRESIDENT
Business Type
CORPORATION
Address 1
1760 MONROVIA AVE UNIT A -1
Address 2
City
COSTA MESA
County
OUT OF STATE
State
CA
Zip
92627
Phone
9496460034
Status
ACTIVE
Specialty 1
GENERAL
Specialty 2
UNUSED
Effective Date
8/4/2005
Expiration Date
8/4/2007
Suspend Date
Separation Date
Parent Company
Previous License
Next License
Associated License
Business Owner Information
Name
Role
Effective Date
Expiration Date
CASILLAS, PATRICIA
AGENT
08/04/2005
SAUNDERS, STEVEN
PRESIDENT
08/04/2005
HILL, SUSAN
SECRETARY
08/04/2005
Look Up a Contractor, Electric' nil or Plumber License Detail Page 1 of 2
Washington State Department of Labor and Industries
General/Specialty Contractor
A business registered as a construction contractor with L&I to perform
construction work within the scope of its specialty. A General or Specialty
construction Contractor must maintain a surety bond or assignment of
account and carry general liability insurance.
Bond Information
Bond
Bond
Company
Name
Bond
.Account
Number
Effective
Date
Expiration
Date
Cancel
Date
Impaired
Date
Bond
Amount
Received
Date
DEVELOPERS
SURETY &
Until
https: / /fortress .wa.gov /lni/bbip /printer.aspx ?License= SAUNDCI953ND 07/06/2006
x
x
x
x