Loading...
HomeMy WebLinkAboutPermit 81-23-SUB - BEL CREST HEIGHTS - SUBDIVISION81-23-SUB 54TH AVENUE SOUTH 79-22-SUB BELCREST HEIGHTS SUBDIVISION BEL CREST HEIGHTS SUBDIVISION LAND DIVISION AGENDA ITEM . CITY OF TUKWILA PLANNING DIVISION PLANNING COMMISSION STAFF REPORT FINDINGS 1. The proposed subdivison includes 5.5+ acres of land. The prelim- inary plat, as shown by the ap- plicants, includes 19 residential lots. Preliminary Plat: Bel Crest Heights INTRODUCTION Earl W'estlund and Robert C. Christen- sen, joint property owners, have sub- mitted an application for preliminary plat of Bel Crest Heights, a 19 -lot subdivision of approximately 5.5 acres of land in I'1d1icken Heights, (SEE, Exhibit A). The subject proper- ty is the site of a previously approved!., preliminary plat • of the same name which expired in 1980,• (SEE, File No. 79-22 - SUB) . i .. ? + _' i ca r 04) .W 1 C4) ■ i C-M `` - ci :1 SITE 2. Existing zoning of the site is R- 1 -9.6; (minimum lot size 9600 sq. ft.). The smallest lot proposed is 9,601 sq. ft.; the average lot size is 11,090 sq. ft. 3. As shown on the preliminary plat application, the subject site slopes steeply upward from 54th Avenue South to a plateau or bench near the 'property's eastern boundary. In certain areas, slopes on the site ex- ceed 20 percent. The steepest slopes appear to be near the dog -leg in the proposed cul -de -sac street. 4. The "Tukwila Data Inventory" indicates that the general area of the plat has poor stability, owing to the underlying, weakly consolidated glacial fill deposits. As noted in the application's environmental checklist (FIle No. EPIC- 167 -81), "an examination of the existing roadway (54th Ave.) indicates that two major slides have occurred in front of the plat in recent years." 5. Vegetation on the site is predominantly deciduous trees with interspersed, second- growth conifers. N. Page -2- P .anning Co„m ' ssion +.. Bel Crest Heights 6. Applicable policies contained in the City of Tukwila Comprehensive Land Use Policy Plan state: NATURAL E\VIRC: MENT - Discourage development on slopes in excess of 20 percent. - In areas where the stability of slopes is questionable, allow develop- ment only after a qualified professional can demonstrate that slopes will be stable even after site modification. RESIDENCE - Assure a diversified supply of housing in the planning area. - Maintain a suitable, livable housing supply in the planning area. GENERAL GOALS - Preserve the pleasantness and integrity of viable single - family areas. 7. Access to the proposed plat is via 54th Avenue South, a substandard city street of approximately 16 -feet in width near the front of the plat. Access within the plat is provided by a proposed 40' - ti,-ide cul -de -sac street and a private access road called "Tract A ". S. Sanitary sewer service is available to the plat from Val Vue Sewer Dis- trict. According to the sewer district, the available service is capable of handling the additional lots. 9. The Public Works Department has requested a resubmittal of the Envir- onmental Checklist to include a review of prior stipulations for previous preliminary plat. Discussions with the Public Works Department indicate that they are concerned primarily-with the adequacy of 54th Avenue South, the stability of soils beneath existing and proposed road- ways, and the adequacy of water and storm•drainage utilities. 10. The Police Department has submitted comments regarding the adequacy of roadway : and access for the proposed plat. 11. The Fire.: Department has requested that essential information be pro- vided regarding the proposed plat. The Fire Department is concerned primarily about the gradient of the proposed roadway, availability of water, and the turning radius of the proposed street. CONCLUSIONS 1. The proposed lot sizes meet or exceed the minimum lot size requirements of the zoning ordinance. 2. According to the policies of the Comprehensive Plan, it is generally not desirable to develop on slopes in excess of 20 percent due to the problems Page -3- Planning Commission ar Bel Crest Heights of construction, access, and the degree to which grading activities disturb natural landform and existing vegetation. Therefore, in order to mitigate undesirable impacts, lot sizes should be increased where slope gradients are the steepest leaving certain steep areas as open space /natural. 3. Plan policies also suggest that development avoid slide -prone areas or areas of questionable soil stability until a qualified soils engineer demonstrates that slopes can be suitably stabilized. No such soils analysis /report has been completed on the subject site. 4. Access to the plat and within the plat appears to be a problem. 54th Avenue S. is a substandard roadway with possible sliding problems, and the proposed cul -de -sac street exceeds a 15 percent grade. In order for anticipated traffic to be properly and safely accommodated, an upgrading of the overall transportation network in the general vicinity will have to made. 5. According to comments of the Fire and Public Works Department, there may be difficulties in providing sufficient water volume and pressure to the plat. At the time of this writing, information was not available to either verify or refute this concern. STAFF RECO,M \■ATION The Planning staff has a number of concerns and problems with the proposed preliminary plat of Bel Crest Heights, notwithstanding the fact that a similar application was approved with conditions by the Planning Commis- sion on the same site approximately two years ago. These concerns involve soil stability, access and traffic improvements, proposed roadway gradients, utilities, and lot size/boundaries. Staff also feels that alternative alignments of the cul -de -sac street within the plat may result in less severe roadway grades and more advantageous lot orientation. Therefore, staff recommends that the Planning Commission table action on the preliminary plat of Bel Crest Heights in order that the following may be accomplished: 1. A traffic analysis shall be provided which demonstrates how safe traffic flows will be accomplished from S3rd Avenue South north to Slade Way along S. 166th Street and 54th Avenue South. Selection of the traffic engineer shall be made with the approval of the Public Works Department. 2. A soils and hydraulic analysis shall be required for the roadway system and the area of the plat in general. Such analysis shall include any recommended structural solutions for stabilization of the subgrade of the roadway system and shall demonstrate slope stability after site modification. 3. The applicant shall demonstrate how water service is extended to the plat and shall ensure sufficient pressure for fire protection. 1 Page -4- Planning Commission 1 :: Bel Crest Heights 4. The applicant is enc proposed cul -de -sac gradient and to miti with construction of 5. The applicant is enc lot sizes to minimiz more). If the Planning Commission preliminary plat and would the details of a more expli nary plat approval subject to submittal of the plat to the Commission, staff would of the recommendation of pr 1. Prior to submittal t• the City Council, a traffic analysis shall be provided which demo .trates how safe traffic flows will be accomplished from 55rd'Avenue S. orth to Slade Way along S. 166th Street and 54th Avenue S. Selection •f the traffic engineer shall be made with the approval of the Publ' c Works Department. 2. Prior to submittal t• the City Council, a soils and hydraulic analy- sis shall be required for the roadway system and the area of the plat in general. Such - alysis shall include any recommended structural solutions for stabi ization of the subgrade of the roadway system and shall demonstrate s ope stability after site modification. 3. Prior to submittal strate how water se sufficient pressure 4. The proposed cul -de structed pursuant t 5. All proposed reside conform to the "Res attached as Exhibit 6. Prior to submittal drainage plan shall review. 7. There shall be no inches in diameter or greater, (measur required public imp uraged to study alternative alignments of the treet in order to reduce the steepness of the ate the extent of grading activities associated the access street. uraged to study alternative platting and varying disturbance of steep slope areas (i.e. 20% or enerally approves of the concept of the proposed oose to let the City Council wrestle with it application, the Commission may grant prelimi- o the above details being accomplished prior the City Council. Should this be the desire of recommend that the following conditions be part liminary plat approval: o the City Council, the applicant shall demon - ce is extended to the plat and shall ensure for fire protection. sac street and private access road shall be con - standards of the Public Works Department. tial lots in excess of 15 percent slope shall dential Density Guidelines for Sloping Ground," B. o the City Council, a detailed surface water be submitted to the Public Works Department for ecessary removal of existing trees (conifers 4 ✓ greater, deciduous trees 8 inches in diamter 2 teet from the ground) during construction of ovements. S1HJ1311 163110 13(1 40 1Vld A11V11IWi1311d '11r1.N• •1•I1.1 •,• 1• 9441 41) 111 . nrr r• w.. •••44 yr+1 r I .• V•••'••• . MtMw .1 . / 11 • V 11 ' • 1••••• NN M1 I.4 4I N'-' rl • _ •• �- •,r.wl NN .... w •1 ••••••• •• 4 ••••••• • I ••••• •••••• •••••• • 1 •••• • •1 •r + , •• ••• •wl .,•••• ••• •I 444 44 4 :. •r w1 . • ... y141 ••I•IIM r 155. . 1 N lr, 1.'11, ... 1 -N ••44 •.r. M o.0• .._ w... 1. 1 . . 1. •I I ..N ..1.11..... 4 . 0 MI • .11.11..1.w • -..1 .. aw•NI •1.1 •. w,_N■ 4 YlM •4, w1 1 1r. •M '•.., ,'' ; .. w ,� -• 411 1•_.11.1•.1 •,.r •_...w •• w,l ..r wl •w •;..•. • ..I. .• • • • 1 5..11 4 .4 4... ha_.1 41 1. 4441 .N 4 N_ N. l• 1111141 • 1111•14 .4rr••• r • I •w•. •IJ,•• •••■ry 1. 5 a•.1 •1 11 1.1.. Ir! M MI w•_ y.... 4 ••• .. •w. ••..1 •r. -1:: r.y~..A1 r. - IrNw1.: Y ,u.• i 5 L •" I..N ■ ..ri • ...•. MM .. ••.I •..... w • i .. a M : . ........ .1•..•.. •... ._w1 14''41 4 •N. 11 ....WIN M 0I4 101h. ..l St es r.. ,.. 11..1'... r 1 ...••1 .3 / ••• •• ••11 ••• •• YI• •••• .rl l�.•N /• .001 .... • 1•.• w. 1. 1•..•1.4 • •.rl• 4r. •r... 041.4.. ,• 4,44 .14.14. 0.....r 01 401.4.. ! lolJdla7e7d ivill PQ •• y y N,••• 1444 .ti. ... 'K r. .L 4 44.1.1 • •••. •.d••.• .y.q Ir4• ..•..IwN 141 J••••■•• •. •4••••••• •341 •r r•1•.■ (w.I n o 1. 41111'.1/ • •*1 • •••1i 111.14 • 44. .._I5.....g. •••• .4. 044S • •rv_.••4I. •4/r M�•.N..•' �.,yl.,•4 ••• '6 44. 40040 04••••• 004044111 •4.44404 11.,•11 /W. loots ' 14 154 t)f 1.4 1 1111 1 ••.11114• M M•..r14 • •.14/Y11 /•I•./ L . ;,'":=,;' 0 0 a 0 0 1 M •w• ONf111S3M 'V 1LIV3 Le 1•4 .••I.// • wia ssaa•u 4• 1 -•,. .a -1A vs3nN3wvcc le . ___n _ _,... 1 -1 - S • I 04 _ N • Q ❑ • Q N , _ ra le Ej M h.l• 9 m maw ........ 5.11...... Pia' J� 1 � Y A 1 !""a .•. - 9 ti *"" jg I lil :villa' I e ff I i • -1.__ - - -i � �j - �I� • ICI • 1 1 e • - e 0 4. 1 [7: 0 A � M -- Ir r .J `.• =. /� •• ±.! _ . _ _ „.• rnr»iirnrrT�rrrrJrrrlrN 0 - 15% 16 - 20. 21 - 25% 26 - 30% 31.- 40t The following table represents the guidelines for lot•area and lot 3th•used by the Subdivision Technical Committee when reviewing division Applications IAN the King County Comprehensive Plan.• cations may be approved on the basis of evidence, 4e .g. • torts, acidic data, etc.), xiinun Slope . of . Hininum Reled** Minimum MAX. • KC ilding Site" Lot Area' (Minus • Req'd Lot . Units .Coup. ea t Roads & Utilities) Width Per Plan • - Graduated- Acre Po1ic 41% - Over* ** • 121-' 14er B RESIDENTIA., CNSITY GUIDELINES FOR Si. IKG GROUND • • • 1 (in square feet) 7,200 60'• 5/A D - 11 D-5 8,000 - 15,000 • 70' 3/A SS -3 D -5 15,500 - 20,000 80' 2.5/A SS -2 20,500 - 35,000 100' 2/A D -9 • 35, 500 - Ovcr 135' ` .1/1� • • . D - soils No Development SS- The slope of the Building Site Area is measured perpendicular to the pographic lines a- ti.- s;.rrr-cr, -t- re-- pr- e- ? -ireit ry=p -1 t— d:aun- to•- a- s -cale -of -at L 4 ` - 1-00 -aridr &t --1nte v 1s -o-f- not -. ore -. the .a- •4.s:-- in-eleve- - :.-3:: . Thi 1i1ding Site Area :,of a'. lot is considered to be an, ^x� L2 a eet w hich includes the area . of house, pat {of and drivew, .eared yard areas, + etc. • ` ' • • • • 1%11 lots must first tweet minimum area require.menta of the applicabl Ina diztrict. Required area in excess of the zone requirement may be :signed to the lot, or 1 may be 4esigncd to permanently dedicated open Dace if the additional open cpaae lies adjacent to'the lot requiring y and effectively minimizes the impact of lot vel o; sent -on the slop t In general, land of this slope ehould be placed In open space, or c- t in tracts of 5 acres or Moro for uses a$ Forest-Recrcation propert BEL CREST HEICiTS AWHALT CURB •_ __YJ- _J•M -_ IL Tr. • IC a 1 r ® 1 / __ / 1 / *11(11, .• ••• *1'51131„ 141 10 M ITI 011 J 10 Id f1 L _____ .. p r� \ 1 J _ te Y it 324 AVENUE SO. 1 m -- ®i ® , f 1 w • 1 g 15 144 1/ •• O L / 47. 4 _ 4;37.4 7.4. ® I: McMOICKlN IInIQNTS DIM [M7111 ialKn 5.. ` r te 10•1. /Ill 81 I N --47 Z ® �I I/4 N y 2 ▪ L r�- 0 - -- 334 IVENUESO. � -0 r .. �.�.1... •5..1 SION NO. 1 5 1.01.001 Ms Clre .* - .0 1 0•1A o .r/f/ 00111,11 • Wit 4401011 a 1/.f1as 11811 1.111 Ulf N / 11.00.00, 101011000 WOO 11111+ (/M) 111• 4•41 o • WON OM 1101004 VOWS esos0 .f 1100*IS• see *.r r.. r•tgil +rwr..•l K 91.11 1ta1wl • 5..r. l..1 9011. p Aw•w.(w r4401 • 4•1•11 p twee 4.44r: MOO 044 WO.) o }rY• •01110 f \PP 10041131• p 44044•r 14 31.1/11151. •/m .o.or. O /M0.0 1515...1.4.01. 0 .511105. Popper .4 w . o 144. .•. w.1K 1411‘K. LEYAL OtKQIVfION tetIsait, St t.1 amt 1w• as11. 1f 101t51 N. 11.1111 (IOWA. •••0 • Ntt, 11.. tots a.I.,•.1 1 .1014.0111t`N t Iry 1* 1t1.E 4 7 1 t/ geld 001 *5 11/ r•. r1r .1tt 01.11 Lt het; • *goo ro te t t Irt* g 1. 1 M N W I5.[ 11 51 •1111 NS 05.IMtw: toeing 0.1. m1w.1 11 1 tes 01• 11•)1 tt111. 1 . 10• 1.t grtt0.11 3 1 1.1 11 .111. Mote 151 u.. 0.111.511 .91 •N• wt• 11 1.11: Mote .14* 0 1 1 w 1 1 .1110 1wt Y t0 011 SKI I( 11111111110; G: IMO 1 woe 1 .1 1 1.1 , . • 35.133 •0 r0 I. Mt if 1911 twl I. Net •0.011 (Nt1. 101 .t trot 71. Out 7. 000M r, ►It. 1..r 1. 00.1 t1 1r .1.•m /M I t. K[11 1,1 tlm Mm lot: •/ [1[111 10 lot et 111 bit i. 1111 111.01,1 Wit+ U r. N, 10,t? 0 A 0.011/ . Weans 4 1 s a w O 111154 051M 05. 41t$ Ur• (1 I *1111/ KO N 1/ wcu.w 113014. / Mt ...110 11 W r.lrwIt loot.. tl N.t11. U. I.a.M n 1ww. 1 00. 101. 0.1 • 1. 151 6..N. 001010. 060110 w 141101: /eyrie, .. 0.11 W w11 eon. ono et old 03110; te.a 111./ 111 tl...t sale ��r y ▪ tl.11 0 wtl .0 M 1.t; , 100. rte .011 Not Kt Not N 00 1011 1.1110 M 1011101.1 11 Nlt On r tome mete .•1••Ir wol U1.. Mt; 1551 tot. . Net 11.51 Mt N tr O.N.I7 110 N NO egr55 tgrN: tome w . . growl, 11.. too mow rot 11.11 MI tame w .•11•11 pot 10.11 pp N w IM .IN r WIMP: 1■0 tome wlet .sod lee One IN het 1111111 N 101 N 0/0W 01*0 O wego 1. w 01wwM .111. 6 J 1 i T PL!ASOT N IONT$ Morrow D1e.ir 0 Ariociar,J, 0.11.101 feel..... L 11m EARL A. WESTLUND *1. ...l 11 ' PRELIMINARY PLAT OF BEL CREST HEIGHTS 41144 1 - 2 a Minutes of Planning Com 'sion Meeting 23 July 1981 Page 5 PUBLIC HEARINGS - Contd. C) Application 81 -23 SUB: Bel Crest Preliminary Plat - contd. Mr. Westlund stated his agreement, with regard to site access, that 54th Avenue South is a narrow street and that he would cooperate with the City in implementing its improvement in context with the 6 -Year Street Plan. David Morgan, audience, emphasized the hazards of winter travel on 59th Avenue, and urged attention to negative influences of underground springs in the plat area. Mr. Collins drew attention to the recommendation that drains be installed within the subdivision to handle any ground water encountered during construction. Darlene West, audience, expressed concern about tree preservation add building height restriction. Mr. Westlund replied that Item 7 of the Staff Report addresses the tree preservation issue, and that building height is restricted by the Zoning Code. Ms. West stated her agreement with the intent to provide single - family homes in this area. Mr. Sowinski suggested accessing the plat area through the site to the north rather than by way of 59th Avenue. Mr. Westlund indicated that the property owner is not willing to cooperate at this time. In response to Commissioner Arvidson, Mr. Satterstrom explained that the previously- approved Bel Crest preliminary plat expired prior to finalization and therefore a new application is required. Mr. Westlund added that the previous plat encompassed fifteen (15) lots; the current proposal has nineteen (19). Mr. Arvidson asked if all of the problems identified previously had been resolved. Mr. Collins replied that approval was subject to resolving certain issues with the Public Works, Fire and Water Departments of the City. Mr. Satterstrom explained that the applicable areas of concern are addressed in the seven recommended stipulations. Some of the information needed to satisfy the stipu- lations will be needed prior to Council review, and may require redesign of the final plat. Mr. Arvidson said he thought all Commissioners are in favor of more single - family homes in the City. Mr. James suggested placement of a barrier at the low end of the plat access road. Mr. Collins noted that the roadway may be realigned following more careful review by the Public Works staff. MOVED BY MR. SOWINSKI, WITH MR. JAMES' SECOND, THAT THE PLANNING COMMISSION APPROVE THE PRELIMINARY PLAT OF THE BEL CREST SUBDIVISION, APPLICATION 81 -23 -SUB, SUBJECT TO THE SEVEN (7) STIPULATIONS CONTAINED IN THE STAFF REPORT. MOTION CARRIED. BOARD OF ARCHITECTURAL REVIEW A) Landscape Plan - Schneider /Nilsen Office Plaza: Requesting approval landscaping for a three -story office building on Interurban Avenue. Mr. Collins indicated that the applicant is not present. However, the Board elected to proceed with the discussion. 1• I° 1, 1 ` 1 y II 1 - � . ,-„,or { - 1 W , ' N -.frt., '104 r 52nd AVENUE 30. 1 01 L El 1 ( i r I I C; � J 1 1 ! =! -> " I rL II I T NIOIIT; 7 r -' s I Ii1 1� 10 or Mo w �, ra 4000j ®x o rAwci pr M dire 111 0 11 111 - 1 RCEL +Li �j� i1 � ; o gorimm• opmferimi wAssill■ Wain MAIRSICkkIN MEI HTS DIV 104 M71 7 e ""�` :man 0.1 L u_ Roll] Norton Denali, of As,orirar,, Inr. j.l` IL L 83rd AVENUE S0. I- ' 119••9 ron ..on w., I~ P 1 el SION NO. r . Y II SC•Il r 4441 1 EARL A. WESTLUND 0 O 11104 / anacru • j4 a IL1ia 10 've1tu1/ 7011 0104411 Mr 4II. 196449,401010140 000 1019 (0•1e11.401 p 00.w47.44l• 101001• 4.400 Mo.. 400 •01004.104 I.K 11.1_ (.w +rs r„rnwl •11010 L 11•«. • /.4. 14.7 AMY O "40044100 90111 • .•.al p 44444. 040104011 = 110.1011. O 18111. .«04104 / 10111 0011440• N 0 ..1012.r lR 044401/9• 1407 40.1 O 114804 •044 • 401.1• p 407144 04401111. • of p .4I► 10014 9 410141/. p 40.1 i w • T 41 14411 4 MI .HM /r 44.1 motor of folllr 10. 141414 t1 14.M. 4440 4 401. 1. . 14 449 t4o1s. ). 4o1Nto. 000441 « 9114 «t 44I709 lI w ..1 .44.09 t..r... «14 1111101 14444 1141 .4 out 104 .r «4 4 YI • 4l ' . 4 l 0e . r 044 1.41041 1,11rt1 «t0.Ml 4l40 Ir 011049 1049110 •I 414 011.41190 t om e 4990 4 ..1 04.10 Ml: Moo wet 11 1 , I *40 4. 4 t 1111 10 do •04914 114 lot; Me* /4«04 4411. art «4.14044 to .w l•4 . 10' 40 11 Mlt um. 1071 ..ltr.n Mt4lrtr wla r104.1 10; IMO t•o• alp Let 119 l4 w NOM fot•441 441111. 904040.4911.1• rm. 1. r •9«•.144 9411. 111 t 14.11 *104. goner 44 $0044 10, 11••411. 11 MU. 4T 4 44. • 4 . 04 t. V. 4 «101«1 .t 11 1 w..4 411 4 4 «4419.04« 94•4• ..1 1 IN 111: 4 4.1 wu r'tl•ll «11 Ml « 4 14111 Rol r rails of 1011 ««.4119: 411 , 4.4 1 oat N Mt: 0.444 w44'11 41110.10 /«1410 out 4010 N Or 11014. 4944. n.N «u 4• }4 •040 V«•04 1411 N MO 100"0011041'11 most 4110 Mt 4 Igo 0111 941 r 10110144: 10141 l« ..t to Ml 1.1.04: 4010141 to 01114 110 401 It 104 1«1 10 MI 14A11 1419 tom 41 Intl 11. Slug 4, 11044• 41011. 101•. I, 111 1419 10 14 .411w441 . l NO to n 00 5 t 111 MI Ow• a. 410lw 111 004 ,owl of lr ra lr Ml u..wr.l Oft. 04(4 N, 4.11 I r 10 100110 0 040100 41 1.11 mar 0004 000 or 1*04 04t.(1 41901 N 100410 00014. PREUMINARY PLAT OF BEL CREST HEIGHTS 4/04 0 . 4.4 .0 , -07•4 -.111 PARCEL A PARCEL B ATTACHMENT B LEGAL DESCRIPTION LOT 20 AND THE NORTH 109.08 FEET OF LOT 19 IN BLOCK 2, MC MICKEN HEIGHTS NO.1, AN UNRECORDED PLAT. TRACT 21, BLOCK 2, MC MICKEN HEIGHTS, NO.1, ACCORDING TO THE UNRECORDED PLAT, EXCEPT THE WEST 220 FEET THEREOF, AND EXCEPT THE NORTH 100 FEET OF THE EAST 190 FEET THEREOF. MASTER LAND DEVELOPMENT APPLICATION FORM NOTE: Please write legibly or type all requested information -- incomplete applications will not be accepted for processing. SECTION I. GENERAL DATA 1) APPLICANT'S NAME Earl Westland TELEPHONE: ( 206) 823 -4663 Kirkland, WA. 2) APPLICANT'S ADDRESS 12:43.1, Kings gate Way N.. ZIP: 98033 Earl Westland and 3) PROPERTY (DWNER'S NAME Robert C. Chri StPn¢PnTE�I 9NE; 2 206). 243 -7299 , wA. 4) PROPERTY OWNER'S ADDRESS 16241 - 54th Ave. So. ZIP: 5) LOCATION OF PROJECT: (geographic or legal descrip.) See Attachment "B" - Legal Description Property located on the west side of 54th Ave. between So. 164th Street and So. 166th Street. 6) NAME OF PROJECT(OPTIONAL) Preliminary Plat - Bel -Crest Heights, Tukwila, Washington SECTION II: PROJECT INFORMATION FEES: RCPT. M.F. EPIC. 7) BRIEFLY DESCRIBE THE PROJECT YOU PROPOSE: Owner proposes to subdivide a 5.5 -acre parcel into 19 residential lots fronting on a single cul -de -sac street. 8) DO YOU PROPOSE TO DEVELOP THIS PROJECT IN PHASES? [DYES NO 9) PROJECT - a. NET ACRES + c. PARKING SPACES b. GROSS ACRES d. FLOORS OF CONSTRUCTION e. LOT AREA COVERAGE BLDG. - SQ.FT. LANDSCAPE SQ. FT. PAVING SQ. FT. 10) DOES THE AVERAGE SLOPE OF THE SITE EXCEED 10%? n YES ONO 11) EXISTING ZONING R -1 -9.6 & R- 1 -12=. EXISTING CCMP.PLA,N 13) IS THIS SITE DESIGNATED FOR SPECIAL CONSIDERATION AYES ON THE CITY'S ENVIRONMENTAL BASE MAP? NO 14) IF YOU WISH TO HAVE COPIES OF CITY CORRESPONDENCE, STAFF REPORTS, OR OTHER DOCUMENTS SENT TO ADDRESSES OTHER THAN APPLICANT OR PROPERTY OWNER, PLEASE INDICATE BELOW. Horton Dennis & Assoc Inc. a tE: Ken Yoshida ADDREss -6th Ave. So., Seattle, WA 98108 b. NAME: Robert Stanton ADDRESS: As Above OVER ` SECTION III: APPLICANT'S AFFIDAVIT I, Earl : We 1 and , being duly sworn, declare that I am the contract purchaser or oti,ner of tTie property involved in this application and that the foregoing statements and answers herein contained and the information herewith submitted are in all respects true and correct to the best of my knowledge and belief. DATE iSu Ma- q //9( X Subscribed and sworn before me this 9 day of ZSUN'E , 19 %). lic in and r the tate of Washington residing at 'RP'S LL'E V V Signat e of Contract rchaser or owner) SECTION IV:. SUPPORTING MATERIAL REQUIREMENTS TYPE OF APPLICATION X i SUPPORTING MATERIAL ** REZONP ?G SCHEDULE E, 1,2,3,4,5,9 CONDITIONAL USE SCHEDULE C, 2,3,5,9 VARIANCE SCHEDULE F, 3,5,9 COMPREHENSIVE PLAN ANENDMENT SCHEDULE D, 2,3,4,5,9. SHORELINE man'. PERMIT SCHEDULE B, 2,3,4,5,8 WAIVER SCHEDULE A, 3,9,10 SHORT SUBDIVISION 3,4,7 SUBDIVISION 2,3,4,5,9 + ,12 BINDING SITE IMPROVE LENT PLAN 2,3,4,6,9 ARCHITECTURAL REVIEW 9,10 LANDSCAPE REVIEW 11 * *SEE TABLE 1 FOR DESCRIPTION + OPTIONAL AT STAFF'S DIRECTION • Y' • 'n REPORT SOILS AND FOUNDATION INVESTIGATION PROPOSED BEL CREST HEIGHTS SUBDIVISION TUKWILA, WASHINGTON RLAI PROJECT NO. 549-01 ROGER LOWE ASSOCIATES INC. Mr. Mel Hogsett and Mr. Earl Westland c/o Westpack Development Corporation 12431 Kingsgate Way NE Kirkland, Washington 98033 Gentlemen: August 1, 1979 1. An assessment of overall slope stability within the proposed development area. 2. Recommendations for site development, including guidelines for earth- work, such as cut and fill slopes, and erosion protection during construction. 3. General recommendations for foundation support of the proposed residences. Foundation recommendations for specific building sites are not part of this study. 4. Recommendations for drainage control which can be provided to your engineers for design of a storm run -off system. INTRODUCTION This report presents the results of our foundation investigation for the proposed Bel Crest Heights Subdivision in Tukwila, Washington. The site is west of 54th Avenue South, approximately midway between Slade Way and South 166th Street. You provided'to us preliminary drawings of the site showing the layout of the proposed subdivision. Our work was performed by a written authorization dated July 13, 1979. This report was preceeded by a preliminary report to you dated July 25, 1979. The proposed subdivision consists of 20 lots for the development of single - family residences. A proposed road which will dead -end on the site is also planned. The proposed configuration of the lots and streets is shown on the Site Plan, Figure 1. The purpose of our investigation is to assess the effects of prevailing soil and ground water conditions on the proposed development. Specifically, our work includes: Report Soils and Foundation Investigation Proposed Bel Crest Heights Subdivision Tukwila, Washington RLAI Project No. 549 -01 MAIL. P.O. BOX 3885, BELLEVUE, WA. 98009 - 1 ELEPHONE (206) 453 -8383 LOCATION: BENAROYA BUSINESS PARK, BLDG. 4, SUITE 219 - 300 1201h AVE. N.E., BELLEVUE, WA. August 1, 1979 Page 2 Mr. Mel Hogsett 5. General comments concerning construction guidelines for the proposed project which pertain to soil and groundwater conditions. SITE CONDITIONS The proposed subdivision is located on a presently undeveloped parcel of and about six acres in area.. The property slopes moderately downward to the east; the overall slope averages about 10 -12 percent. East of 54th Ave. S., which forms the east boundary of the project, the ground slope steepens sharply and slopes to the alignment of Interstate Highway 5. The site is characterized by three gently sloping bench areas which are separated from each other by areas of somewhat steeper slopes. Our interpretation of these steepened slopes, as seen on aerial photographs provided to us by the Washington State Highway Department, is that the interrupted slope profile is evidence of an ancient landslide. In conversations with Washington State Highway Department personnel familiar with the area, no large scale movement of the slide has taken place in the area of this study that they have recorded or observed. A relatively small slide, occurred in 1972 east of 54th Ave. S. adjacent to the subject property. This slide damaged 54th Ave. S., but apparently extended to only a shallow depth into the fill and /or native soils. Vegetation on the site consists of medium size trees and dense brush. The brush and trees on Lots 3 -16 is very dense and required the use of a small bulldozer to provide access for the backhoe and drilling equipment. Subsurface conditions at the site were explored by excavation of 9 test pits with a tractor - mounted backhoe, and drilling 2 test borings with a truck - mounted hollow -stem auger. The boring and test pit locations are shown on the Site Plan, Figure 1. The borings were drilled to a depth of 25 feet each. Test pit and boring logs are presented in the Appendix, along with an explanation of the field work done. Due to the complex geology typically associated with slide areas, the soil conditions are highly variable. The site is blanketed by loose topsoilwhich is gener- ally underlain by fine sand and silt to the depth of our explorations. On the west end of the site, approximately on Lots 8 -14, the upper 6 -8 feet of soil is silty fine sand. This sand formation is extensively fractured, probably as a result of past landslide disturbance. The fractures have been subsequently filled with sandy silt and silt. Mr. Mel Hoggsett l On the eastern part of the site, the top 6 -8 feet of soil is sandy silt and silt. Fissures were also present, showing evidence of past movement. These fissures were filled with fine grained soils as were the fissures in the sands described on the western portion of the site. In both borings, similar materials were found to a depth of about 17 feet. Below 17 feet, very dense glacial deposits were encountered in both borings. These very dense soils range from silty sand to gravelly sandy silt and silt. At present, no controlled drainage exists on the site. However, a storm drain system does exit from the site onto the existing drainage ditch along 54th Ave. S. The origin of the storm drain system leaving the site is unknown at this time. The drainage facility along 54th Ave. S., consists of an open half -round section of corrugated drain pipe. Some of the joints are not connected and a few sections of the pipe are missing altogether. Water was flowing in the pipe during our field visits. GENERAL CONCLUSIONS AND RECOMMENDATIONS August 1, 1979 Page 3 Based on our interpretation of aerial photographs of the site and on the data from our field investigation, we feel that the site is suitable for the proposed development. As noted above, we observed evidence which we interpret to mean the site lies at least partially within an ancient landslide zone. We also noted that the slide which occurred in 1972 on, and east of, 54th Ave. S. appears to be unrelated to the larger ancient slide. In our opinion, the stability of the ancient landslide will not be adversely affected by the proposed development provided that certain pre- cautions are followed in the design of the project. Basically, the precautions are for care in the design of cut slopes and the drainage of ground and surface water. SITE PREPARATION AND GRADING The majority of the on -site soils include significant silt; these soils are moisture sensitive and very easily disturbed when wet. Therefore, we recommend that the site preparation and grading be carried out only during times of dry weather. We recommend that no fill be placed on any slope steeper than 3H to 1V. The finished slope of any fill embankment should be 3H to 1V, or flatter. Fill areas should be prepared by removing vegetation, by excavation of bench "keys" on sloping areas, and by thorough recompaction of the exposed soil. All fill soils should be conditioned to the proper moisture content and should be installed in lifts Fir. Mel Hogsett August 1, 1979 Page 4 not more than 8" to 12" loose thickness. Each lift should be compacted to at least 90% of the maximum attainable dry density except that the upper 2 feet of fill under paved areas should be compacted to at least 95 %. In this report "maximum dry density" refers to the density attained in the ASTM D -1557 Compaction Test Procedure. We recommend that the completed grading plan be reviewed by a qualified soils engineer. Due to occasional summer rains and the possibility of high ground water levels, the planned access road and adjacent cut slopes should be protected from erosion as soon as possible during and after grading. The road subgrade will not be able to support construction traffic during wet weather. Protection and stability may be achieved by placing a blanket of clean, compacted granular fill over the roadway, or by installing the design pavement. On nearly level portions of the road, the granular fill can consist of pitrun sand and gravel containing less than 5% by weight, of silt and clay (fines passing a No. 200 sieve). On the steeper grades, it may be more desirable to use crushed rock or crushed gravel. The pro- tective blanket should be at least 12 inches thick. This material will also aid in stabilizing the native soil subgrade to enhance the lifetime of the permanent pavement. Unprotected slopes at the site should be kept to a maximum of about 3 feet in height and should be excavated at a slope no steeper than 3 horizontal to 1 vertical. For slopes that will be protected by rockeries, a slope of 12 horizontal to 1 vertical should be cut and the rockery built as soon as possible, preferably immediately following excavation. Our recommendations for rockery construction are presented below. Erosion protection can be accomplished by covering exposed slopes with straw mulch and jute mesh, or with quarry spalls. The appropriate method depends on slope height, slope orientation and exposed soils. Permanent erosion protection can be achieved by hydroseeding. Your landscape architect should be consulted for the proper mixture of grass seed and fertilizer. Surface water should not be permitted to concentrate and flow over slope crests in significant streams unless contained in protective culverts or lined ditches. Ditches adjacent to roadways should be lined with crushed rock (1" to 4" quarry spalls), open culverts, or asphalt paving where the ditch invert slope is steeper than 10`,. Mr. Mel Hogsett FOUNDATION AND SLAB SUPPORT In our opinion, existing soils will provide adequate support for conventional residential foundations and floor slabs. However, due to possible soft areas present at the site and to the potential disturbance caused during site preparation and grading, we recommend that each individual building site be inspected by a qualified soils engineer prior to construction. The site should be inspected for soft soils in the footing areas. Slab and pavement areas should be proofrolled with heavy equip- ment to assure the proper performance of the slab on grade and design pavements. Where soft or loose soils are encountered, they should be removed or replaced with compacted pit run as described in the section on site preparation and grading. DRAINAGE DESIGN August 1, 1979 Page 5 We recommend that all storm water runoff be channeled into a storm water drain system and routed off the site. Water from roof tops, patios and driveways, as well as the on -site roads, should drain into the storm sewer system. In our opinion, the existing storm drain system along 54th Avenue South adjacent to this site is inadequate. The water allowed to escape from this system is the probable cause for the sliding that has taken place along 54th Ave. S. This system should be replaced with a properly designed enclosed storm drain system. As noted previously, shallow groundwater occurs in places on the site. Where these wet zones are encountered during site grading or building construction, we recommend that interceptor drains be installed to collect the water. This runoff should be diverted to the storm sewer system. Footing drains or wall drains should also be discharged to the storm sewer system. The interceptor drains should consist of a perforated pipe installed in a trench about 3 to 4 feet deep. The trench should be backfilled with pea gravel or sand and gravel containing less than 3% silt or clay fines. Coarse "washed drain rock" should not be used for backfill of subdrains. We recommend that perforated rigid metal or plastic (PVC) pipe be. used where the drains are more than 3 feet deep or where even light vehicle traffic will cross the drain. Soft, flexible, corrugated drain pipe crushes easily and is generally unsuitable except in special application. Mr. Mel Hogsett Rockeries August 1, 1979 Page 6 Rockeries are not retaining walls. In general, rockeries are used as facing to prevent erosion and local sloughing on otherwise stable slopes. A properly constructed rockery does offer some resistance to the lateral forces; however, the magnitude of resistance is impossible to predict. Where slope retention is necessary, a retaining structure should be provided. The construction of rockeries is an art, not entirely controllable by engineering methods or standards. Therefore, rockery construction should be done by personnel with proven skill in rockery construction. Even with careful construction occasional failures should be expected. The face of the rockery wall should be sloped no steeper than 1:5 (horizontal to vertical). The rocks should be clean, sound, unweathered ledge rock material with a density of at least 155 lbs. per cubic foot. The lowest course of rocks should be keyed into firm foundation material at least 1' feet below adjacent grade. The rocks should be placed to minimize void space between rocks. To the greatest degree possible, rocks should be placed with faces in contact and with each rock keyed to two or more rocks below it. Point contact should be avoided. The interface between courses of rocks should slope downward into the slope behind the rockery. To support the native soil, and to limit washing of soil through the rockery, a zone extending to 12 inches behind the rockery should be filled, as the rockery is raised, with uniformly graded 4 inch to 1 inch quarry spalls. The space between the quarry spalls and the adjacent soil face should be filled, also, as the rockery is raised, with clean sand and gravel. The wall backfill should be tamped with light weight hand operated compaction equipment to assure uniform compaction. We advise against compaction of this zone; about 907, (ASTM 0 -1557) is appropriate. USE OF THIS REPORT AND WARRANTY We have prepared this report for your use and by your design representatives for this project. The data and report should also be provided to the contractors for their bidding or estimating but not as a warranty of the subsurface conditions. Mr. Mel Hogsett CPC /JWK /pc /cg Attachments 3 copies submitted August 1, 1979 Page 7 When you have finalized the design, we recommend that the final design and specifications be reviewed by our firm to see that our recommendations have been properly interpreted. Within the limitations of the schedule and budget for our work, we warrant that our work has been done in accordance with generally accepted practice in this area. No other warranty, express or implied, is made. The scope of our work did not include services related to construction safety precautions and is not intended to recommend or direct construction means, methods, techniques, sequences or procedures, except as specifically described and then only for consideration in design, not for construction guidance. There are possible variations in subsurface conditions between the explorations and also with time. A contingency for unanticipated conditions should be included in the budget and schedule. Inspection and testing by a qualified soils engineer should be included during construction to confirm the conditions indicated by the explorations, or to provide corrective recommendations adapted to the conditions revealed during the work. The conclusions and recommendations in this report should be applied in their entirety. We are available to review the final design and specifications to see that our recommendations are properly interpreted. If there are any questions concerning this report or if we can provide additional services, please call. Yours very truly; ROGER LOWE ASSOCIATES INC. Jon W. Koloski, Associate Bel Crest Heicih:s Aun., _ i Figure 1 4 Nzg ■5 SCALE IN FEET 8 18 19 15 17 50 0 100 7 16 SLADE WAY 6 II 3 5 20 1 3 4 2 LEGEND 4-1 BORING NUMBER AND LOCATION II 1' TEST PIT NUMBER AND LOCATION ROGER LOWE ASSOCIATES INC. 1 SITE PLAN APPENDIX FIELD EXPLORATION BEL CREST HEIGHTS RENTON, WASHINGTON Subsurface conditions were explored at the site by drilling two borings to a depth of 25 feet and by digging 9 test pits. The borings were drilled using a truck mounted hollow stem auger drill rig. The test pits . were dug using a tractor mounted back hoe. Location of the borings and test pits are shown on the Site Plan, Figure 1. The explorations were observed and continuously logged by one of our representatives who examined and classified the material encountered and obtained representative samples for further examination in our laboratory. The samples were classified in accordance with the Unified System which is described on Plate A -1. The exploration logs modified by laboratory examination of the samples are presented on Plates A -2 through A -7. UNIFIED SOIL CLASSIFICATION SYSTEM MAJOR DIVISIONS LETTER SYMBOL DESCRIPTIONS COARSE GRAINED WIRE THAN SO% OF MATERIAL IS 1.654.F. THIN NJ. 200 SIEVE SIZE GRAVEL AND GRAVELLY SOILS war "%AN 5c % CF 7.1ARSZ. FRAC- TILTo StaLL: EH ql. 4 SIEVE CLEAN GRAVELS It• mu IP (1) rpfs) GW m 1, AF: t "AtA(ILI. 744.4 ... »;. ;117 • y •0 GP w - .RA5Ec ;PA.SLI. :RA(SL- - .4(st virt,..4S, , .1 ,- %S. t1P •s- 'Iii GRAVELS WITH FINES t ATM C IAOLE APAILNE cif rittS) GM sILYy •:PAILS. t;DXL-SAND-SI: ur (70 cLAyry , A , AVILS, SRAvEL-urtD•'.It T SAND AND SANDY SOILS oat THAN SO% OF COARSE FRAc- TIIN ILVA.UZLI •41. 4 SRA CLEAN SANDS (LITTLE CR Pi) VINES) SW 4Li. WO( 7', , AK)S. , :ATAVELLY SAIITS. LIIT.F , ;R Pc FINES SP 3 WCS 74 7.4t05. po;NLY- 4:PA1,4. AAtI.Y LI'llE oP to rmis SANDS WITH FINES LIABLE AMOUNT Cf FITL51 SM SILTY SAtIOT,. %AM- S I I. I m 1 *Tuns SC CLAYEY SVCS. WC-CLAY .41$11-MES FINE GRAINED SOILS MERE THAN 50% a IATERIAL IS WLLER THAN NO. SILTS AND CLAYS LIQUID LIMIT LESS THAN 50 ML ItIOW••IC SILTS. Ahl) VERY FINE ...-cr. L.:W. , ,ILIY .P CLAYEY FINE SANDS (A CLAYEY SILTS WITH SLICNT ftAr.,Tictr, CL ire.RGANIC cutys If . ..:1( — 7 REMY. i LASTV:1 &MELLY •:LAYS. SAti■Y CLAYS. Sit IN CUM, LEAN CLAYS OL , 14,.Atii( , A, v Au) •A-do.tr. .arf .1 LfrW mt...../'.c.i■Y SILTS AND CLAYS LIQUID LIMIT GREATER THAN 50 MH itourat+tc Slt TC. ml"ZA4rliJS OR NAT 0 - ...,,.r....t6 F It& -VC - SILTY WKS CH ITORGANIC CLAYS vs htrei PLASTICITY F AT CLAY.s. 200 SIEVE SIZE OH :714r.4:Itc CLAY-, t'f MEN OM TO HIGH PLASIICITy, OKANIC SILTS HIGHLY ORGANIC SOILS PT A S S WITH .1(*..H NRGANIC rstrTENTS Win t DUAL 504.A 5 Vil:r.A rt. IIIMERL 14 SOIl CLAW(' IcAT tat KEY TO SAMPLE DATA -- -- 25.2 I 91.7 35 BLOWS REQUIRED TO DRIVE .46 1 SAMPLER 12 INCHES WITH DRY DENSITY, (PCF) 140 LB. HAMMERt MAXIMUM \___ STROKE 30 IN. MOISTURE CONTENT, (% OF DRY DENSITY) \ DEPTH OR ELEVATION (FEET) (P INDICATES CHES PUSHED) SAMPLE RECOVERY amuliaml GRAPHIC LOG ■■....../ IR ii .,.,...;.• . , UNDISTURBED — 3 INCH SPLIT DISTURBED HD TUBE SAMPLER TW — 3 INCH THIN WALL SAMPLER NO RECOVERY SPT — 2 INCH SPLIT TUBE SAMPLER C — ROCK CORE B — BULK DISTURBED SM LETTER SYMBOL FOR SOIL TYPE DISTINCT CONTACT BETWEEN SOIL STRATA GRADUAL CHANGE BETWEEN SOIL STRATA BOTTOM OF BORING 00000 4.......■ SAMPLE ROGER LOWE ASSOCIATES IN — 1 UNIFIED SOIL CLASSIFICATION SYSTEM AND KEY TO SAMPLE DATA 5e1 Crest ::ignts Auc;u Plate A DEPTH DRY BLOWS IN MOISTURE DENSITY PER FEET CONTENT (PCF) FOOT 0 10 15— 20— 25 29 11111 44 MI 32 111 75 11111 GRAPHIC LOG *62 mu BORING COMPLETED AT 24.0 FEET ON 7/20/79 NOTE: SEEPAGE OBSERVED AT 10.0 FEET BORING ONE * NOT REPRESENTATIVE — DRIVEN ON A ROCK SOIL DESCRIPTION SM BROWN SILTY SAND (LOOSE, DRY TO DAMP) (TOPSOIL) SM LIGHT BROWN TO GRAY SILTY SAND WITH POCKETS OF SILT AND OCCASIONAL GRAVEL (MEDIUM DENSE, MOIST TO WET)(LOCALLY STAINED REDDISH BROWN) GRADES TO VERY DENSE AT 6.0 FEET 32 11111 POCKET OR LENSE OT SAND AND GRAVEL (MEDIUM DENSE, WET) 22 llnl SM CCASIONAL ORGANIC MATTER (DENSE, WET) LENSES OR POCKETS OF ORGANIC MATTER 10.5 TO 14.0 FEET ML GRAY LAMINATED CLAYEY SILT (HARD, MOIST) LAMINATIONS HORIZONTAL TO SLIGHTLY DIS— TORTED ROCKS AT 22.0 FEET ROGER LOWE R55OCIATES INC. I LOG OF EXPLORATION Bell Crest riai jhts \.. t l . Plate „ -, DEPTH DRY BLOWS IN MOISTURE DENSITY PER FEET CONTENT (PCF) FOOT 0 10- 15- 20^ 25' 30-- 43 t \` 70 Inn 50/4" 0111 49 Hill 25 mu GRAPHIC L OG BORING TWO NOTE: NO SEEPAGE OBSERVED PIEZOMETER INSTALLED AT BOTTOM OF BORING SOIL DESCRIPTION SM BROWN SILTY SAND WITH ROOTS (LOOSE, DRY) ML BROWN SANDY SILT WITH OCCASIONAL GRAVEL (MEDIUM STIFF, DAMP) ML BRAWN SILTY SAND AND SANDY SILT INTERLAYER® (DENSE OR HARD, MOIST) ML GRAY VERY FINE SANDY SILT (MEDIUM DENSE, WET) GRAY SILTY SAND AND SANDY SILT (VERY HARD, ML MOIST)(FILL) SM GRAY SILTY MEDIUM SAND WITH SOME GRAVEL (VERY DENSE, MOIST) BORING COMPLETED AT 26.0 FEET ON 7/20/79 ROGER LOWE RSSOCIATES INC. LOG OF EXPLORATION 5e1 Cr. >t elgrits ( August 1, 1M Plate A -4 • DEPTH BELOW GROUND SURFACE UNIFIED (FEET) SYMBOL 3.5 - 9.0 0 — 1.0 ML 1.0 - 2.o ML 2.o — 8.5 ML 0 - 1.0 SM 1.0 - 2.0 SM 2.o — 5.5 ML 5.5 — 6.5 94 6.5 — 7.5 ML TEST PIT ONE SOIL DESCRIPTION 0 - 3.5 ML GRAY SILTY SAND AND SANDY SILT WITH OCCASIONAL GRAVEL AND PIECES OF WOOD (MEDIUM DENSE OR STIFF, MOIST) ML GRAY TO GRAY BROWN INTERBEDDED CLAYEY SILT AND SILT (HARD, MOIST) TEST PIT COMPLETED AT 9.0 FEET ON 7/19/79 NO SEEPAGE NOTED TEST PIT TWO LIGHT BROWN SILTY SAND WITH SOME ROOTS (VERY LOOSE, DAMP)(TOPSOIL) WEATHERED SILT WITH SOME CLAY (STIFF, DAMP) GRAY BROWN INTERBEDDED CLAYEY SILT AND SILT (HARD, MOIST) TEST PIT COMPLETED AT 8.5 FEET ON 7/19/79 NO SEEPAGE NOTED TEST PIT THREE BROWN SILTY SAND WITH SOME ROOTS (DENSE, DRY) (TOPSOIL) BROWN SILTY SAND AND GRAVEL (MEDIUM DENSE, DRY) GRAY SANDY SILT WITH SOME GRAVELLY LENSES (STIFF, DAMP) GRAY BROWN SILTY GRAVEL AND SAND (MEDIUM DENSE, GRAY SILT (VERY STIFF, DAMP) TEST PIT COMPLETED AT 7.5 FEET ON 7/19/79 NO SEEPAGE NOTED ROGER LOWE ASSOCIATES LOG OF TEST PITS Bel Crest ,ieic:nts ROGER LOWE RSSOCIATES August'`- 1979 riateA TEST PIT FOUR DEPTH BELOW GROUND SURFACE UNIFIED (FEET) SOIL DESCRIPTION 0 — 1.0 SM BROWN SILTY SAND WITH SOME GRAVEL AND ROOTS (MEDIUM STIFF, DAMP) 1.0 - 6.5 SM GRAY SILTY SAND WITH SOME GRAVEL (MEDIUM DENSE, DAMP) (LOCALLY STAINED REDDISH BROWN 6.5 - 8.0 SP GRAY BROWN FINE SAND WITH SOME SILTY SAND (MEDIUM DENSE, MOIST) 8.0 -10.0 ML . GRAY BROWN SILTY WITH SOME CLAY (VERY STIFF, MOIST) 10.0 -10.5 ML GRAY SILT (STIFF, WET) TEST PIT COMPLETED AT 10.5 FEET ON 7/19/79 NO SEEPAGE NOTED TEST PIT FIVE. 0 — 1.0 SM BROWN SILTY SAND WITH SOME ROOTS (MEDIUM STIFF, DRY) 1.0 - 5.0 SM GRAY TO GRAY BROWN SILTY SAND WITH SOME GRAVEL AND STINGERS OF SAND AND SILT 5.0 - 10.0 ML GRAY SILT AND SILTY SAND WITH'TRACE OF GRAVEL (STIFF OR DENSE, DAMP) REDDISH BROWN STAINS PRESENT TEST PIT COMPLETED AT 10.0 FEET ON 7/19/79 NO SEEPAGE NOTED LOG OF TEST PITS Bel Crest Heights DEPTH BELOW GROUND SURFACE UNIFIED (FEET) SYMBOL 0 - 1.0 SM 1.0 - 4.0 SM 4.0 - 8.0 SP 8.0 - 10.0 SM 0 - 1.0 SM 1.0 - 3.5 SP 3.5 - 7.5 SM 7.5 - 9.5 0- 1.0 SM 1.0 - 3.0 SM 3.0 - 11.0 ML ROGER LO "E ASSOCIATES TEST PIT SIX SOIL DESCRIPTION August 1, 1979 Plate A -c BROWN SILTY SAND WITH SOME ROOTS (LOOSE, DRY) (TOPSOIL) GRAY MOTTLED WITH RED STAINS OF SILTY SAND WITH TRACE OF GRAVEL (MEDIUM DENSE, MOIST) GRAY BROWN FINE SAND WITH SILTY AND CLAYEY SAND STRINGERS (MEDIUM DENSE, MOIST) GRAY FINE SANDY SILT (MEDIUM DENSE, WET) TEST PIT COMPLETED AT 10.0 FEET ON 7/19/79 SEEPAGE OBSERVED IN TEST PIT AT 8.0 FEET TEST PIT SEVEN BROWN SILTY SAND (LOOSE, DRY)(TOPSOIL) LIGHT BROWN MEDIUM SAND WITH TRACE OF GRAVEL. (DENSE, DRY TO DAMP) GRAY BROWN FINE SILTY SAND WITH SILT STRINGERS (MEDIUM DENSE, MOIST) GRAY SILT WITH SAND LENSES (STIFF, WET) TEST PIT COMPLETED AT 9.5 FEET ON 7/19/79 NO SEEPAGE NOTED TEST PIT EIGHT BROWN SILTY SAND (LOOSE, DRY)(TOPSOIL) GRAY BROWN SILT (HARD. DAMP) TEST PIT COMPLETED AT 11.0 FEET ON 7/19/79 NO SEEPAGE NOTED LOG OF TEST PITS BROWN SILTY SAND WITH SOME GRAVEL (MEDIUM DENSE, MOIST) Bel Crest Heignts August , 1979 ?late DEPTH BELOW GROUND SURFACE UNIFIED (FEET) SYMBOL 0 - 4.0 SM 4.0 - 8.0 ML 8.0 - 10.0 SM TEST PIT NINE SOIL DESCRIPTION BROWN SILTY SAND (MEDIUr1 DENSE. DAMP) GRAY BROWN SILT (VERY STIFF, MOIST) DARK BROWN GRAY BROWN SILTY SAND WITH SOME GRAVEL (VERY DENSE. MOIST)(TILL) TEST PIT COMPLETED AT 10.0 FEET ON 7/19/79 NO SEEPAGE NOTED ROGER LOWE ASSOCIATES INC. LOG OF. TEST. PITS This certificate provi the 0 . Department of Health an Building & Land Development with information necessary to evaluate development proposals. Do not write an this box number name ❑ Building Permit ❑ Preliminary Plat or PUD ❑ Short Subdivision ❑ Rezone or other APPLICANT'S NAME Ear L (/'t W e S ! L tit (N.L c. (664 T' _ / D r PROPOSED USE ePd' ll (-44 C S t t ',cow l -ej . (.4%-es / t-t / 4C�h e7r ( / C O 73) LOCAT ION 44 T"r A- 0— �, er z // (Attach map & legal description if necessary) # # # # # # # # # # # # # SE WE R AGENCY INFORMATION 1. a. lam) F279 KING COUNTY CERTIFICATE OF SEWER AVAILABILITY Sewer service will be provided by side sewer connection only to I° an existing I size sewer 2 G feet from the site and the sewer system has the capacity to serve the proposed use. OR b. ❑ Sewer service will require an improvement to the sewer system of: ❑ (1) feet of sewer trunk or latteral to reach the site; and/or Title ❑ (2) the construction of a collection system on the site; and /or ❑ (3) other (describe) 2. (Must be completed if 1.b above is checked) Please return to: BUILDING & LAND DEVELOPMENT Edward B. Sand, Manager 450 Administration Building Seattle, Washington 98104 206.344.7900 # # a. The sewer system improvement is in conformance with a County approved sewer comprehensive plan. OR b. El The sewer system improvement will require a sewer comprehensive plan amendment. 3. a. n The proposed project is within the corporate limits of the district, or has been granted Boundary Review Board approval for extension of service outside the district or city. OR b. ❑ Annexation or BRB approval will be necessary to provide service. 4. Service is subject to the following: a. Connection charge: b. Easement(s): c. Other: I hereby certify that the above sewer agency information is true. This certification shall be valid for one year from date of signature. VAL VUE SEWER DISTRICT `T J MATEL ICH Agency Name Signatory Name MANAGER G - /Signature Date ti .PARCEL B Beginning at the west quarter corner of Section 26, Township 23 North, Range 4 East, W.M., in King County, Washington; running thence along the west line of said section, north 0 ° 14'13" west 1200 feet; thence south 89 °2.1'31" east 664 feet to the TRUE POINT OF BEGINNING of this description; running thence north 0 °14'13" west 200 feet; thence south 89 ° 21'31" east 636.08 feet to the west margin of the road; thence along said margin south 0 °09'36" east 200 feet; thence north 89 °21'31" west 635.82 feet to the TRUE PLACE OF BEGINNING; EXCEPT the.west 220.feet thereof; AND EXCEPT, the north 100 feet of this east 190 feet thereof; (Being :know as Tract 21,,Block 2, McMicken Heights, Number 1, according to the unrecorded plat; EXCEP•T. the,west‘ 220_ feet thereof; `'AND EXCEPT the :north 100 feet of the east 190 feet thereof.) `LEGAL Df CRIP1' PARCEL A That portion of the northwest quarter of Section 26, Township 23 North, Range 4 East, W.M., in King County, Washington, described as follows: Beginning at the west quarter corner of said section; thence along the west line of said section, north 0 °14'13" west 890.92 feet; thence south 89 °21'31" east 664 feet to the TRUE POINT. OF BEGINNING of this description; thence north 0 °14'13" west 309.08 feet; thence south 89 ° 21'31" east 635.82 feet to the westerly line of 54th Avenue South; thence along said westerly line south 23 °45'00" west 336.01 feet; thence north 89 °21'31" west 499.21 feet to the TRUE POINT OF BEGINNING; (Also known as Lot 20 and the north 109.08 feet of Lot 19 in Block 2 of McMicken Heights Number 1, an unrecorded plat). fJO _ l,OTy ''ly 16 or 1B TO PROVIDE A MINIMUM of 4 OFF S tRtot PARKtM4. -4PAW, ON eAci4 LOT. (2 OF TNEe7E MAY e6 IN ONcLo40.0 .eARAbs Affidavit of Publication STATE OF WASHINGTON COUNTY OF KING ss. Michele Roe being first duly sworn on oath, deposes and says that sh Cs the Cai of Clerk of THE DAILY RECORD CHRONICLE, a newspaper published six (6) times a week. That said newspaper is a legal newspaper and it is now and has been for more than six months prior to the date of publication referred to, printed and published in the English language continually as a newspaper published four (4) times a week in Kent, King County, Washington, and it is now and during all of said time was printed in an office maintained at the aforesaid place of publication of said newspaper. That the Daily Record Chronicle has been approved as a legal newspaper by order of the Superior Court of the County in which it is published, to -wit, King County, Washington. That the annexed is a NO:ti c e....of... Meeting T1.6ao as it was published in regular issues (and not in supplement form of said newspaper) once each issue for a period of 1 consecutive issues, commencing on the 8 day of Jlal �r± day of ,19 , both dates inclusive, and that such newspaper was regularly distributed to its sub- scribers during all of said period. That the full amount of the fee charged for the foregoing publication is the sum of $ 10 . 80 which has been paid in full at the rate of per folio of one hundred words for the first insertion and per folio of one hundred words for each subsequent insertion. July , 19... :8.1 V.P.C. Form No. 87 Rev. 7 -79 Subscribed and sworn to before me this 9 ,19 81 , and ending the aerk day of Notary Public in and for the Late of Washington, residing at King County. i urn — Passed by the Legislature, 1955, known as Senate Bill 281, effective June 9th, 1955. — Western Union Telegraph Co. rules for counting words and figures, adopted by the newspapers of the State. � .`ioutncent�r p� "* : •.A 6k1" ~ quCstinp (. K 1IImI i til `. • acres o } ry ; , � {- } � . �O V I R. ,4w y'8�11 , islg l�' ( ,�e;;h ad,�lti -T 1►ny �?e�n l; lerest ris:atelnir$ed to eittetiddr. , 'I ANNING''COIMMPSSION1 3 ''_EIe01v4 hrot ls", y 11984; Westpac Development Corp. 12431 Kingsgate Way Northeast Kirkland, Washington 98033 Attention: Bob Hepworth As on Schedule B, attached hereto. Charge $0.00 Tax $0.00 Total $0.00 CHICAGO T1T1l': JavouuKrii..... SHORr PLAT CERTIFICATE `` SECOND REPORT. In the matter of the plat submitted for your approval, this Com- pany has examined the records of the County Auditor and County Clerk of King County, Washington, and the records of the Clerk of the United States Courts holding terms in said County, and from such examination hereby certifies that the title to the following described land situate in said King County, to -wit: As described on page 2 of Schedule A, attached. VESTED IN: ROBERT C. CHRISTENSEN, as his separate estate EXCEPTIONS: Records examined to June 4, 1981 at 8:00 a.m. CHICAGO TITLE INSURANCE'COMPANY BY Roger 'T Title 628 -5686 Order Number 41846 Certificate for Filing Proposed Plat CHICAGO TITLE INSURANCE C:umkArix Page 2 41846 Beginning at the west quarter corner of Section 26, Township 23 North, Range 4 East, W.M., in King County, Washington; running thence along the west line of said section, north 0 ° 14 1 13" west 1200 feet; thence south 89 ° 21'31" east 664 feet to the true point of beginning of this description; running thence north 0 °14'13" west 200 feet; thence south 89 ° 21'31" east 636.08 feet to the west margin of the road; thence along said margin south 0 ° 09'36" east 200 feet; thence north 89 ° 21'31" west 635.82 feet to the true place of beginning; EXCEPT the west 220 feet thereof. (Being known as Tract 21, Block 2, McMicken Heights, Number 1, according to the unrecorded plat, EXCEPT the west 220 feet thereof.) CHICAGO TITLE INSURANCE COMPANY r .T.A. COMMITMENT SCHEDULE B Page 2 10. Right to enter said premises to make repairs and the right to cut brush and trees which constitute a menace or danger to the electric transmission line located in the street or road adjoining said premises as granted by instrument recorded under Recording Number 2880048. 11. EASEMENT AND THE GRANTEE: PURPOSE: AREA AFFECTED: DATED: RECORDED: RECORDING NUMBER: AFFECTS: 12. GENERAL TAXES: 1ST HALF DELINQUENT NOVEMBER 1. YEAR: AMOUNT BILLED: AMOUNT PAID: AMOUNT DUE: TAX ACCOUNT NUMBER: AFFECTS: 13. GENERAL TAXES: 1ST HALF QUENT NOVEMBER 1. YEAR: AMOUNT BILLED: AMOUNT PAID: AMOUNT DUE: TAX ACCOUNT NUMBER: AFFECTS: 14. ASSESSMENT: AMOUNT: INTEREST: FROM: ANNUAL INSTALLMENTS: INSTALLMENTS PAID: INSTALLMENTS DELINQUENT: NEXT INSTALLMENT DELINQUENT: LEVIED BY: FOR: L.I.D. NUMBER: AFFECTS: 41846 TERMS AND CONDITIONS THEREOF: Owners and future owners Storm sewer drainage line 10 feet wide as constructed October 15, 1959 October 22, 1959 5094325 Parcel B DELINQUENT MAY 1, 2ND HALF (continued) 1981 $504.03 $252.02 $252.01 537920 - 0196 -02 East 212 feet of Parcel B DELINQUENT MAY 1, 2ND HALF DELIN- 1981 $126.01 $0 $126.01 537920 - 0195 -03 Remainder of Parcel B $3,702.45 8 -1/2% November 25, 1975 10 4 1 . November 25, 1981 City of Tukwila Sewers 26 Parcel B AMOUNT: DATED: RECORDED: RECORDING NUMBER: AFFECTS: 16. MORTGAGE AND THE MORTGAGOR: MORTGAGEE: CHICAGO TITLE INSURANCE c:uMr,u x A.L.T.A. COMMITMENT SCHEDULE B Page 3 15. DEED OF TRUST AND THE TERMS AND GRANTOR: TRUSTEE: BENEFICIARY: The amount now secured by said Deed of Trust and the terms upon which the same can be discharged or assumed should be ascertained from the holder of the indebtedness secured. Said Deed of Trust is a re- recording of Deed of Trust recorded under Recording Number 7111300159. AMOUNT: DATED: RECORDED: RECORDING NUMBER: AFFECTS: The amount now secured by said Mortgage and the terms upon which the same can be discharged or assumed should be ascer- tained from the holder of the indebtedness secured. 17. LABOR AND /OR MATERIAL IEN: CLAIMED BY AGAINST: IN AMOUNT OF RECORDED: RECORDING NUMBER: (continued) 41846 CONDITIONS THEREOF: Robert C. Christensen and Pamela S. Christensen, his wife First American Title Insurance Company of California, a corporation Citizens Federal Savings and Loan Association of Seattle $22,500.00 November 23, 1971 December 16, 1971 7112160139 Parcel B TERMS AND CONDITIONS THEREOF: Robert C. Christensen and Pamela S. Christensen, his wife Metropolitan Federal Savings and Loan Association of Seattle $17,901.60 August 8, 1975 August 26, 1975 7508260513 Parcel B 18. JUDGMENT AGAINST: D -186 RT /jb IN FAVOR OF: CHICAGO TITLE INSURANCE COMPANY .L.T.A. COMMITMENT SCHEDULE B Page 4 ENTERED: KING COUNTY JUDGMENT NO: SUPERIOR COURT CAUSE NO: ATTORNEY FOR JUDGMENT CREDITOR: END OF SCHEDULE B 41846 Robert C. Christensen, petitioner Pamela S. Christensen, respondent April 13, 1981 81 -9- 05708 -5 79 -3- 01662 -8 Karen Marie Thompson FOR: Property to husband, subject to lien in favor of the wife in the sum of $14,237.50 payable when the property is sold, traded or exchanged or on the remarriage of Robert C. Christensen or on April 1, 1986, whichever occurs first. Until paid, the lien shall bear interest at 10% per annum on the declining balance. IMPORTANT: This Is not a Plat of Survey. It is furnished as a convenience to locate the land indicated hereon with reference to streets and other land. No liability is assumed by reason of reliance hereon. c 0 0 Z. 0 0 N ct 0 N Nf81.15 '771 L rnie.4.4-freasd 1V4 ifizsts. 1):44 ) 4ML _ 3 ORDER NO 40 4 .4 c 0 0 51, / 7 0 22. 0 1 '2 09.03 )t '3 11 • 0 0 ago Title Insurance Companr 35 44 1.5 ess '3 ea, B zo4w oe (.35. 82 4\ 497. 0.3 203 02 4tie, 00 00. IS o a)/ v tEN At. • c 4 Ali/ • Phone 28-btiee 19 / ' 4 70 5 •Ir/.0...% ...' /2 S ° aN o. 20 21 o co 0 ir5 0 NI 22 0 • 4 51-23-sue 94 AV s 5f-CI 1442-sIAB eel-tge5T +10bilis VICINITY MAP LEGAL DESCRIPTION VICINITY MAP MCMICKEN HEIGHTS DIVISION NO 1 PLEASANT HEIGHTS LEGAL DESCRIPTION BEL CREST HEIGHTS EARL A WESTLUND HORTON DENNIS AND ASSOCIATES PRELIMINARY PLAT