HomeMy WebLinkAboutPermit DR-04-81 - MCCANN - BUILDING #461 DESIGN REVIEWdr-04-81
18475 olympic avenue south
6501 south glacier street
mccann #461
77-45-ss
dr-02-80
DESIGN REVIEW
MC /blk
xc: Ping. Dir.
McCann Construction
City of Tukwila
6200 Southcenter Boulevard
Tukwila Washington 98188
Frank Todd, Mayor
Alfred Croonquist, Architect
1322 Sixth Avenue
Seattle, WA 98101
Subject: Approval of McCann Projects 427 and( :61
This letter confirms the decision of the Tukwila Board of. Architectural
Review at its meeting of 23 April 1981 approving site plan and architec-
tural details for McCann Project 461, in Southcenter Industrial Park, and
McCann Project 427 (office only) at Andover Park East and Midland Drive.
Stipulations pertaining to the approval actions, described in the enclos:
excerpt from the meeting minutes.
Tukwila Planning Dept.
Mark Caughey
Associate Planner
28 April -1981
MOTION CARRIED 4 -0
Pa -5 Commission
-
{ ^ Plannin
. . 23 April 1981
Mr. Caughey suggested that signing for the one -way loading space should
be specified by the Public Works Director at the time of permit approval.
MOVED BY MRS. AVERY, WITH MR. ORRICO'S SECOND TO APPROVE THE SITE MODIFI-
CATION PROPOSAL FOR THE SCHNEIDER OFFICE BUILDING, AS DEPICTED ON EXHIBIT
"A ", .ACCORDING TO THE FOLLOWING STIPULATION:
1) PRIOR TO EXECUTION OF THE LOADING AREA IMPROVEMENTS, APPLICANTS SHALL
OBTAIN STAFF APPROVAL OF A LANDSCAPE RESTORATION PLAN FOR ALL EXISTING
PLANTED AREAS DISRUPTED BY THE IMPROVEMENT ACTION.
Mr. Orrico left the meeting at 9:44 p.m.; the Chair declared a recess at
9:45 p.m.
C) Fort Dent Office Associates: Requesting approval of site and arch-
itecture for a proposed office building at the easterly terminous of
Southcenter Blvd. adjacent to Fort Dent Park.
Mark Caughey presented the staff report.
Jerry Sheets, representing Fort Dent Office Associates, and Roger Carlson,
Lance Meuller Associates described a solar asimuth reflection study which
anticipates roadway glare conditions and a solution for mitigating such
conditions through strategic location of large trees on site.
Following discussion of the applicant's remarks, the chairman expressed the
Board's consensus of opinion that the applicants may proceed through the
approval process with the reflective -glass concept.
D) Alfred Croonquist, Architects (McCann Project 573/461): Requesting
approval of site and architecture for an industrial building within
the Southcenter South Industrial Park development on West Valley
Highway.
Mark Caughey read the staff report.
Al Croonquist, architect, was present on behalf of the application. In
response to the chair, he stated that the building has not yet been formally -
leased.
Mr. James asked about the amount of truck - movement activity anticipated
with the project. Mr. Croonquist explained that the number of truck doors
may be reduced in favor of office - fronts once a tenant's needs are defined.
Mr. James also expressed concern about storage and handling of hazardous
material within the project, noting that it is difficult to anticpate the
impact of such activity when discussing a speculative building.
AGENDA ITEM
INTRODUCTION
The applicants are requesting ap-
proval of site plan and architec-
tural elevations for an industrial
warehouse building of 75,000+ sq.
ft. with 10,000 sq. ft. of ancil-
lary office space. Design review
is mandated by stipulations of the
Master Shoreline Management Per-
mit approved for Southcenter
South in 1976.
DISCUSSION
Staff has no particular concerns
with this project proposal. We
find as follows:
1) That adequate off - street
parking space is provided.
2) That the scale of the build-
ing and materials employed
are similar to the emerging
architectural character of
Southcenter South.
CI T Y OF TUKWILA
PLANNING DIVISION
PLANNING COMMISSION
STAFF REPORT
• Alfred Croonquist (McCann 573/461)
3) That the 50' shoreline setback requirement of Master Permit 76 -5 -SMP has
been maintained.
RECOMMENDATION
Staff recommends approval of McCann Project 573/461 as depicted an Exhibits A,B,
and C of the application subject to the following condition:
1) Prior to issuance of building permits, the applicant shall furnish on -site
landscaping details for staff approval.
EXH
MF
SOUTHCENTER SOUTH INDUSTRIAL PARK
TUKWILA WASHINGTON
NYE Mb
R L
•~• :
DRAWING INDEX
DQBCRIPTION
LEGAL DESCRIPTION
S LANNING DEPT
Pi
BIT A
VICINITY P
" "" -. H PRDJ EGT • 5
+olli 4bf .AIM IWP11Nfhr1- r►ri 1..
1J PAI.. • OA*A NAfe.1
Wile naoo.awnu.a• uw•ti•cwncn
NI....t.......
. ..,...N..gloat ............. N
site plan
EXHIBIT
FEES:
RCPT.
M.F.
EPIC.
MASTER LAND DEVELOPMENT APPLICATION FORM
McCANN PROJECT 573
NOTE: Please write legibly or type all requested information -- incomplete
applications will not be accepted for processing.
SECTION I. GENERAL DATA Alfred Croonquist Architects
.1) APPLICANT'S NAME Attn: Tom Croonquist TELEPHONE: (206 682 -2690
2) APPLICANT'S ADDRESS 1322 Sixth Ave.,Seattle ZIP: WA 98101
3) PROPERTY OWNER'S GQrporate. Propey rt :Inves / HO ( 212 725 -2150 .
4) PROPERTY OWNER'S ADDRESS 230 Park Ave. #1225 NY(?IP: NY 10169 /VI N: Rich
''Brothers
5) LOCATION OF PROJECT: (geographic or legal descrip.)
Southcenter South Industrial Park --
South Glacier Place
KROLL PAGE:
6) NAME OF PROJECT(OPTIONAL) McCann Project #573
SECTION II: PROJECT INFORMATION
7) BRIEFLY DESCRIBE THE PROJECT YOU PROPOSE: 10,000 sq.ft. office
and 75,300 sq.ft. warehouse distribution facility.
8) DO YOU PROPOSE TO DEVELOP THIS PROJECT IN PHASES? [YES
9) PROJECT DATE Apri 1, 1981
a. NET ACRES 3 . 0 ± c. PARKING SPACES
b. GROSS ACRES
4.5
106
d. FLOORS OF 2
CONSTRUCTION
NO
e. LOT AREA COVERAGE BLDG 80,300 SQ.FT. LANDSCAPE 6,200 sq. FT.
PAVING 82 , 260 Sq. FT. +trees along dike
10) DOES THE AVERAGE SLOPE OF THE SITE EXCEED 10$? DYES ONO
11) EXISTING ZONING M 2 12. EXISTING CCMP.PLAN
13) IS THIS SITE DESIGNATED FOR SPECIAL CONSIDERATION E1YES ONO
ON THE CITY'S ENVIRONMENTAL BASE MAP?
14) IF YOU WISH TO HAVE COPIES OF CITY CORRESPONDENCE, STAFF REPORTS, OR OTHER
DOCUMENTS SENT TO ADDRESSES OTHER THAN APPLICANT OR PROPERTY OWNER, PLEASE
INDICATE BELOW.
a. NAME: McCann Construction ADDRESS: 950 Andover Park East
b. NAME: ADDRESS:
Tukwila, WA 98188 Attn: Rod
Ki rsch
OVER
SECTION III: APPLICANT'S AFFIDAVIT
I, , being duly sworn, declare that I am the
contract purchaser or owner of the property involved in this application and
that the foregoing statements and answers herein contained and the information
herewith submitted are in all respects true and correct to the best of my
knowledge and belief.
Subscribed and sworn before me
this day of
residing a�
42tuAl -AIL --Es'
DATE Mar. 31, 1981
19 a
Notary PUbIlic in for the State of Washington
Agents for McCann Construction
Alfred Croonquist Architects
ture o ontract
SECTION IV: SUPPORTING MATERIAL REQUIREMENTS
NOTE: All applications require certain supporting documents and
information which are described in the following table:
TYPE OF APPLICATION (CHECK BOX(ES)) SUPPORTING INFORMATION REQUIRED
REZONING 1E, 2, 3, 4, 5, 7, 11
CONDITIONAL USE PERMIT 1C, 3, 4, 5, 7, 11
VARIANCE 1F, 4, 7, 11 or 17
COMPREHENSIVE PLAN AMENDMENT 1D, 3, 4, 5, 7, 11, 12
SHORELINE. MG`1T. PERMIT 1B, 3, 4, 5, 7, 10, 11, 13
SHORELINE D1GM T PERMIT REVISION 4, 10, 16
WAIVER 1A, 3, 4, 11, 12, 13
$
SHORT PLAT 4, 5, 9
BINDING SITE IMPROVEMENT PLAN 4, 5, 8
ARCHITECTURAL REVIEW 11, 12, 13
LANDSCAPE REVIEW 14
SUBDIVISION 4, 5, 6, 15
SIGN VARIANCE 4, 6, 16, 17
* *See TABLE 1 for detailed description