Loading...
HomeMy WebLinkAboutPermit DR-01-80 - PEOPLE'S BANK - DRIVE THRU DESIGN REVIEWdr-01-80 151 andover park east people's bank drive up facility City of Tukwila DESIGN REVIEW Planning Division 6200 Southcenter Boulevard Tukwila, Washington 98188 433 -1845 Office of Community Development Osterman Associates, Architects 344 Skinner Bldg. Seattle, WA. 98101 Re: People's Bank Drive -Up Facility At its regular meeting of 27 March 1980, the Board of Architectural Review approved your development plan for the above - referenced project. An excerpt of the Board's proceedings on this matter are enclosed. Please contact Building Official AT Pieper (433 -1849) for advice about further processing of your building permit. TUKWILA PLANNING DEPARTMENT MC /mkb• Enclosure Mark Caughey Acting Director 2 April 1980 tes of the regular meeting of 27 March 1980. The re -r meeting of the Planning Commission was convened at 8:1 Chairman op. Commissioners present: Mr. Sowinski, Mrs. Av Mr. Orrico, - Mr. Richards. Staff present: Car • 'ne Berry, Assistant Planner APPROVAL OF MINUTES Minutes of the regular Plannin accepted as presented. MOVED BY MR. SOWINSKI, WITH MR. 0'.' C0'S 28 FEBRUARY 1980. MOTION MOTION CARRIED 5 -0. ( City of Tukwila Planning Division 6200 Southcenter Boulevard Tukwila, Washington 98188 433 -1845 PLANNING COMMISSION Office of Community Development .m. by Mr. James, mmission -eting of 28 February 1980 were COND, TO APPROVE THE MINUTES OF CITY COUNCIL ACTIONS The Amendment to I,•znance 1112, Section 1 and TMC 2.36. 0 relative to resi- dency requir- -.• s for service on the Planning Commission presented. The C. ion was informed of the Council review held on 24 Ma 1980 for the r sion of design guidelines for Tukwila City Center (Chartwel project. Th- ouncil wll hold a regular meeting 7 April 1980 to make a decision •n esolution 656. BOARD OF ARCHITECTURAL REVIEW 1) Development Plan :. People's Bank Drive -up facility; property located at NW corner of Baker Blvd. and Andover Park East. Ms. Berry read the staff .report of 21 March 1980. Discussion followed relative to the possibility of an escape route and tall - vehicle clearance passage. MOVED BY MRS. AVERY, SECONDED BY MR. ORRICO TO APPROVE THE DEVELOPMENT PLAN FOR PEOPLE'S BANK DRIVE -UP FACILITY DEPICTED ON EXHIBITS A, B, AND C SUBJECT TO THE FOLLOWING CONDITIONS: 1) SIGNING CLEARLY INDICATING THE RESTRICTIVE CLEARANCE. C EXPOSED AGE. EOM. SLAB ON CAADE lea MUM le' 0C. 4. PRECAST COIC.CURD • PARKING AREA 2'ASPHALTIC CONC. DMA . ♦• CRUSUEO ROCK ARROW 1.AYeen ti 20' -0" • TAR rL04T O . •'PLANTER 'NEW:BANK BUILDING TYP.III. I NL CDNN . F -1 OCC. AREA. FIRST_FLOM_e_2906 r AREA NIEZZANI11E CL.� 1718 FINISUED FL.f1GV. - 251.5o • DR DATUM. 1OP OF TERRA TI 2V-O REMOVE EOM. CURD. • 20' -O' r. Wen mlc cure a E1ISTING . FELSIN EXISTING PRECAST CONC. CURB .1y0'.PRQPERTY LIfJ R r - PLANTING — .._1LSPACO a l0•-0• — no.-O' . REW DRIVE -IN - Fy n RCOP - N EW. DRIVE -IN TELLER. - FACILITY E {?e_O P_LES: _ NArl.ONAI._P AN T_UK_WILA- . AROCY ER . PARK EbR,fiNc.1 3 -12 -80 OSTERMAN ASSOCIATES AR01ITECTS = ..'J SKINNER !'SLAG. - SEATTLE �_. _ 622—Z44O TIDE EASTERLY 175' OF THE SOUTUERLY 190' OFTRACT 3 ANDOVER INDUSTRIAL PARK NO.2 VOL.TI PAGE G9 RECORDS DFKING COUNTY, WASI1INGTON. --y D n 1 /3 2' - - I =o' -- E m 5T RANTING = 4tcc15t -RO.60 - L1c rS T_PAttK N G 20D-ovER_PARK: eAST, :_P L.__ LTEITE✓ NE -1N_ .ELLER.__ - 'r -- -- _PEOeLES_..f ATl0N — ruKwILA= AN DOVER: - PARK.__ e> cF4 '3= , 21; - 6o IOSTERMAN ASSOCIATES AQQIITECTS 514,0•0-4 ea. S5OTPL - GaZ L�2440.. _ _ ANIIIIrIIIHHIIHIIIHflUUUHL 1 � �i b .. r� �■ 1 1 L' 11111 1 1 1 111 WEST ELEVATION scat -E V14 • I =0 �I - ELEVATION 14- I -o 11 111111111 111 stl: coL.s -.- 'nt Facie - p>A1L ENS _MarcN ExisT_ - __714 E1N- DRIVE •N TELLER :FACILITY.__ _____ PEOPLES THAT ION 5 K TUK WI LA- ANDovER. :PARK_ __6RANC1�_ STER>;1 ASSOCIATES- FATE _�__ = 3-4.4 =sKir ■It∎ii 5l= o6;_SEAVLE- 0.22._=_2440 - City of Tukwila 6200 Southcenter Boulevard Tukwia Wastvglon 98188 MASTER LANE} DEVELOPMENT APPLICATION FORM FEES: RCPT. M.F. EPIC. NOTE: Please write legibly or type all requested information -- incomplete applications will not be accepted for processing. F MAW SECTION I. GENERAL DATA 1) APPLICANT'S NAME Henry Osterman TELEPI NE: eo6) 622 - 2440 2) .APPLICANT'S ADDRESS 3) j Skinner Bldg,. Seattle ZIP: 98101 3) ,PROPERTY OWNER'S NAME Peoples National BankrELEPHONE: ( 206) 344 -3630 4) PROPERTY OWNER'S ADDRESS 4th Ave. Seattle ZIp : 98111 5) :LOCATION OF PROJECT: (geographic or legal descrip.) N. VI. corner Baker Blvd. & Andover Park East, Tukwila. 1XROLL PAGE: 6) NAME OF PROJECT(OPTIONAL) New Drive -in teller facility, Peoples National Bank, Tukwila- Andover Park Branch. C111 OF TUKV A . A SECTION II: PROJECT INFORMATION 7) BRIEFLY DESCRIBE THE PROJECT YOU PROPOSE: Construct 24x29 Ft. roof over 3 drive - in banking lanes, adjacent to existing bank bldg. 8) DO YOU PROPOSE TO DEVELOP THIS PROJECT LN PHASES? 9) PROTECT DATA:Existing bldg. built 1967 a. NET ACRES 3/4 a. NAME: b. NAME: Eins NO c. PARKING SPACES 38 Existing b. GROSS ACRES d. FLOORS OF CONSTRUCTION 1 1/2 Existing e. LOT, AREA COVERAGE BLDG. 2906 SQ.FT. LWISCAPE 6 , 017 SQ. FT. PAVING 23,702 SQ. FT, 10) DOES THE AVERAGE SLOPE OF THE SITE EXCEED 10e? OYES ONO 11) EXISTING ZONING CM 12. EXISTING CCMP.PL.AN Industrial 13) IS THIS SITE DESIGNATED FOR SPECIAL CONSIDERATION OYES 121 NO ON THE CITY'S ENVIRONMENTAL BASE MAP? 14) IF YOU WISH TO HAVE COPIES OF CITY CORRESPONDENCE,•STAFF REPORTS, OR OTHER DOCUMENTS SENT TO ADDRESSES OTHER THAN APPLICANT OR PROPERTY OWNER, PLEASE INDICATE BELOW. ADDRESS: ADDRESS: OVER • SE APPLICANT'S AFFIDAVIT 1, Henry Osterman , being duly sworn, declare that 1 am the contract purchaser or owner -of the property involved in this application and that the foregoing statements and answers herein contained and the information herewith submitted are in all respects true and correct to the best of my knowledge and belief. residing at DATE 3/13/ x Subscribed and sworn before me this /3 day of / 41,t_ , 198Q in or the State o� Washington t , 4 , . . gnature ntract rc aser or owner) SECTION TV: SUPPORTING MATERIAL REQUIREMENTS NOTE: All applications require certain supporting documents and information which are described in the'following table: TYPE OF APPLICATION (CHECK BOX(ES)) SUPPORTING INFORMATION REQUIRED" REZONING 1E, 2, 3, 4, 5, 7, 11 CONDITIONAL USE PERMIT 1C, 3, 4, 5, 7, 11 VARIANCE 1F, 4, 7, 11 or 17 COMPREHENSIVE PLAN AMENEt NT 1D, 3, 4, 5, 7, 11, 12 SHORELINE MGtifT. PERMIT 111, 3, 4, 5, 7, 10, 11, 13 SHORELINE MGM T PERMIT REVISION 4, 10, 16 WAIVER 1A, 3, 4, 11, 12, 13 SHORT PLAT 4, 5, 9 BINDING SITE IMPROVEMENT PLAN 4, 5, 8 ARCHITECTURAL REVIEW 11, 12, 13 LANDSCAPE REVIEW 14 SUBDIVISION 4, 5, 6, 15 SIGN VARIANCE 4, 6, 16, 17 * *See TABLE 1 for detailed description COLOR: Kalcolor* No. 5245 - AMBER MATERIAL: ALUMINUM SHEET AND BRAKE MOULDINGS gawneeiTh Anodic Color Coatings Sia Reverse Side For Finished Surface ... ;, �It�ISH��SPECIf,ICATfONS:_ Exposed aluminum sheet and brake mouldings shall be given an anodic treatment by the manufacturer to produce Kalcolor No. 5245 AMBER in accordance with Kaiser Aluminum —i and Chemical Corporation specifications for t „. Kalcolor anodic finishes. *Trademark, Kaiser Aluminum G Chemical Corp. ; (NOTxt Color match will hi within commercial telex• anus which allow for a alight variation sa sey. • from thin color sample.) � . • ...p�tt. weldwood glasweld liu,..nntv..1 • 100`°o Incombustible . Drmensionaily stable High. abrasion resistance High chemlui resistant. low tail Lapels Panted IS Belgium 17P1440 ft I t 1 . • ■•• 1 1 • .• • •: SITE PLA 11 SCALE E. 1 132. 1l ee • eikKeg_ei.vo... - LEGAL DESCRIPTION - T.ILIE.EA5TERLY I7 OFfl4E SOUTHERLY .• AV_ OFTRACT 3 ANDOVER: INDUSTR I AL' . - PARK 't VOL.71 PAGE 68. RECORD5' _OF..KI N.G. CO.UNTY WASHING TON. • NR • Am ' sisr , „ te, • It• TAU,: ".. • k:- . : • - • .:;;LOOKING _ • - • • secod..e. j I ' t •>. . • ' weenlaugniffingews 1111 ,f2 RI A IC*Bitil 10/11 v. Et 14 F-W=GAWILO • FAcJA:40 1. .M651:1:219K— • • • • MEM -1 - .P.MITITC)=.37.L7* • ' - ._"r11311: 6 6 1 6111111111111111gMENCIUM - • 4.14 EST ELEVATION r•-o 111 H ELEVATION : SCALE. te,"- I =0" 044eGh-14. FACIA IAATz14 EXIS1 r ,r1q5T ...F.GURFS • :9 3 : 9 k9 NEW .DRIVE - IN -TELLER FACILITY -PEOPLES NATIONAL AN T.UKW ILA 'il■,NED0VER PARK BRANCH ANDOVER - .TUKWILA WA. DA.T E 3-12-80 ]:;4.44o 344 OSTERMAN ASSOCIATES ARCHITECTs 3449ANNEFIBLOG. 622.2440 514EET • [TrfrilifillifIr -1 TiltifOlikrii I ••:‘, 7 en 6C EIG za 9z 9Z VC CZ I I II II „ . , • . je=m=1 1111 ta oz 61 91 Al 91 91 t 'CI at n 111,11,41141, • i IF THIS MICROFILMED DOCUMENT IS LESS CLEAR THAN THIS NOTICE, IT IS DUE TO THE QUALITY OF THE ORIGINAL DOCUMENT . . " u •; • •