Loading...
HomeMy WebLinkAboutPermit 79-18-L - SEGALE - PROJECT #971 LANDSCAPE REVIEW79-18-l 6305 south 180th street segale #971-t KS /ckh August 1, 1979 Mr. Cris Crumbaugh M. A. Segale, Inc. P.O. Box 88050 Tukwila, WA 98188 City Tukwila Administration 6200 Southcenter Boulevard Tukwila, Washington 98188 433 -1845 Office of Community Development Kill Stoknes, Director Office of Community Development RE: Landscape Plan for Segale Proj Dear Mr. Crumbaugh: The Planning Commission reviewed the above referenced landscape plans during their regular meeting of July 26, 1979. After reviewing it they approved the landscape plan as submitted. The only condition on it that was all planting areas have an underground irrigation system provided. If you have any questions please call me. Very truly yours, Planning Commission Page 5 Minutes July 26, 1979 Discussion followed, with emphasis on the flow of traffic. Phil Fraser, Office Engineer, suggested the traffic flow be an item of negotiation. Chairman Kirsop remarked that there would be little foot traffic along Tukwila Parkway. MOVED BY MR. WELSH, SECONDED BY MR. SOWINSKI, THAT THE PLANNING COMMISSION APPROVE THE CONSTRUCTION OF DRIVE -IN WINDOWS AND RELATED ITEMS SUBJECT TO THE FOLLOWING CONDITIONS: (1) SCREENING OF ALL ROOF - MOUNTED VENTS. (2) PROVIDE HANDICAPPED PROVISIONS IN PARKING LOT PER CODE. PARKING LOT TO COMPLY WITH MINIMUM PARKING LOT STANDARDS IN THE SEATTLE ZONING CODE. (3) PARKING AND LANDSCAPING REQUIRE- MENTS ON THE NORTH AND WEST SIDE WILL BE ACCOMPLISHED PER AGREEMENT BETWEEN THE PLANNING STAFF AND THE APPLICANT. (4) THE 4,000 SQUARE FOOT PROPOSED CANOPY TO BE SETBACK AT LEAST 50 FEET FROM ANY RIGHT -OF -WAY. (5) TRAFFIC PROBLEMS WILL BE RESOLVED BY MUTUAL AGREEMENT BETWEEN THE APPLICANT AND PUBLIC WORKS DEPARTMENT. CONDITION (6) WILL BE ELIMINATED. (7) THE PLANNING DIVISION STAFF IS TO REVIEW AND APPROVE ANY REVISED SITE PLANS PRIOR TO ISSUANCE OF ANY BUILDING PERMITS, EXCEPT ITEM 5. (8) A LANDSCAPE PLAN IS TO BE APPROVED BY THE PLANNING COMMIS- SION PRIOR TO OCCUPANCY OF THE NEW DRIVE -UP BANK FACILITY. MOTION CARRIED. REVISED PLANS: DOUBLETREE LODGE AND PARKWAY PLACE OFFICE BUILDING: Kjell Stoknes, OCD Director, read the staff report. Mr. Stoknes said staff recommended that the 10 -foot wide area recommended to be developed as sidewalk would be acceptable as 5' sidewalk and 5' landscaping. MOVED BY MR. WELSH, SECONDED BY MRS. AVERY, THAT THE PLANNING COMMISSION ACCEPT THE REVISED PLANS FOR THE DOUBLETREE LODGE AND PARKWAY PLACE OFFICE BUILDING. MOTION CARRIED. �L°AN DSCAPE PLANS: SEGALE PROJECT 791 -T: Kjell Stoknes, OCD Director, read the staff report. Chris Crumbaugh, Segale Company, said an underground irrigation system would be provided in all planting areas. MOVED BY MRS. AVERY, SECONDED BY MR. SOWINSKI, THAT THE PLANNING COMMISSION APPROVE THE LANDSCAPE PLANS FOR SEGALE PROJECT 791 -T WITH THE FOLLOWING CONDITION: (1) AN UNDERGROUND IRRIGATION SYSTEM BE PROVIDED IN ALL PLANTING AREAS. MOTION CARRIED. ADJOURNMENT: 12:30 A.M. MOVED BY MR. WELSH, SECONDED BY MRS. AVERY, THAT THE PLANNING COMMISSION MEETING ADJOURN. MOTION CARRIED. Minutes prepared by: N orma Booher Recording Secretary TUKWILA PLANNING COMMISSION .€.c.et,v, Eileen Avery Secretary segale business park building 791-t prentice nursery and decorating company john vukonich planting plan landscape plan site plan