2 May 1979
Mr. Tom Croonquist
Alfred H. Croonquist A.J.A. Associates, Architects
2820 Seattle First National Bank Building
Seattle, Washington 98154
RE: Development Plans - McCann Project #464
Dear Mr. Croonquist:
The Tukwila Planning Commission at its regular April meeting, completed
review of the above - referenced project.
The Commission, carrying out its obligations under section 18.60.035 of
the Tukwila Municipal Code, approved the development plans subject to the
following condition:
RJB /ckh
That landscape plans be reviewed and approved by the Board of
Architectural Review prior to the issuance of a certificate of
occupancy.
Should you have any questions, please call.
Sincerely,
elt4.
Roger J. Blaylock
Assistant Planner
cc: Ping. Sup.
Planning Commission Minutes
26 April 1979
Page 5
Roger Blaylock said they should not be approved in this site plan. They will
have to be approved by the sign code. He said the curb cuts will have to be
reviewed by the Public Works Department. Mr. Sowinski noted the trees are spaced
40 feet apart. Roger Blaylock said the Segale landscaping has been 40 feet
apart for trees. Mrs. Avery said in walking the area she thought 30 feet spacing
would be much too close. She said the trees are over the sidewalks and she likes
the way they are planted. They are quite large trees and if they were 30 feet
apart they would be too close.
MOVED BY RICHARDS, SECONDED BY SOWINSKI, THAT THE PLANNING COMMISSION APPROVE THE
DEVELOPMENT PLANS WITH THE FOLLOWING CONDITIONS: (1) THAT THE TREES BE RELOCATED
TO THE BACKSIDE OF THE SIDEWALK. (2) THAT IN THE CASE OF A TRAFFIC PROBLEM ON
PUBLIC RIGHT -OF -WAY RESULTING FROM THE QUEING OF AUTOMOBILES FOR THE DRIVE -IN
TELLER, THE DEVELOPER WILL PROVIDE AN ADDITIONAL DRIVE -IN TELLER WINDOW AND QUEING
LANE, IF DETERMINED BY THE DEPARTMENT OF PUBLIC WORKS AS A POSSIBLE SOLUTION.
(3) THAT A DETAILED LANDSCAPE PLAN BE APPROVED BY THE BOARD OF ARCHITECTURAL
REVIEW PRIOR TO OCCUPANCY, (4) THAT THE SIGNS SHOWN ON THE SITE PLAN ARE NOT
APPROVED WITH THE SITE PLAN AND REQUIRE SEPARATE APPROVAL AS REQUIRED BY T.M.C.
MOTION CARRIED.
DEVELOPMENT PLANS: McCann Proj t #464
Roger Blaylock, Assistant Plan er, said 's project had been tabled from the
last meeting of the Planning Commiss n. Some modifications have been made in
the plans. Mr. Blaylock read the Staff Report, including the findings, conclusions,
and recommendation. He indicated the area on the wall map.
MOVED BY SOWINSKI, SECONDED BY MRS. AVERY, THAT THE PLANNING COMMISSION APPROVE THE
DEVELOPMENT PLANS SUBJECT TO THE FOLLOWING CONDITION: (1) THAT LANDSCAPE PLANS
BE REVIEWED AND APPROVED BY THE BOARD OF ARCHITECTURAL REVIEW PRIOR TO THE
ISSUANCE OF A CERTIFICATE OF OCCUPANCY. MOTION CARRIED.
DEVELOPMENT PLANS: McCann Projects #425 and #426
Roger Blaylock, Assistant Planner, read the Staff Report. Ed Hunt, representing
McCann Construction, said these projects are similar and the building would have
six to seven tenants. Roger Blaylock said he was sure a fire lane will be
required.
MOVED BY SOWINSKI, SECONDED BY ORICCO, THAT THE PLANNING COMMISSION APPROVE THE
DEVELOPMENT PLANS FOR McCANN PROJECTS #425 AND #426 AS SUBMITTED SUBJECT TO THE
FOLLOWING CONDITIONS: (1) THAT DETAILED LANDSCAPING PLANS BE APPROVED BY THE
PLANNING COMMISSION PRIOR TO THE ISSUANCE OF AN OCCUPANCY PERMIT. (2) THAT THE
REQUIRED NUMBER OF PARKING SPACES FOR EACH BUILDING BE USEABLE. THE PLANNING
DIVISION IS GIVEN THE AUTHORITY TO ADJUST THE LOCATION OF THE PARKING BETWEEN
THE BUILDING DEPENDING UPON INDIVIDUAL TENANT IMPROVEMENTS. MOTION CARRIED.
Mr. Blaylock suggested two or three additional items on the agenda be considered
at this time, although the Staff Reports were not included in the agenda package.
Mr. Sowinski and Mrs. Avery felt it was unfair to consider the items at this time
since the Commissioners did not have the material.
26 April 1979
AGENDA ITEM VI B
FINDINGS:
2.
CITY OF TUKWILA
PLANNING DIVISION
PLANNING COMMISSION
STAFF REPORT
•
DEVELOPMENT PLANS: McCann Proiect #464
Development plans have'been submitted by Alfred H. Croonquist, Architects, for
McCann Project #464. The building space is 25,990 square feet. The 5,000 square
feet of office space will be located in a mezzanine area, while 990 square feet of
office space will be located on the main level.
1. The property is zoned M -2, but limited to M -1 uses.
Thirty -nine (39) parking spaces are provided with a potential of a total
forty -four (44) parking spaces.
8 :00 P.M.
3 The parking stalls are 9 20 feet.
4 The parking lot design calls for varied aisle widths. The aisle on the east
side of the building is thirty (30) feet, while on the northside it is twenty -
four (24) and on the west side it is thirty -four (34) feet.
5. The development plans show a landscaping strip only on the northern property
line along South Glacier Place. The parking lot abuts the eastern property
line. The southern and western property lines are the edge of the rail ease-
ment. Approximately a 100 foot strip along the rail- easement at the northwest
corner of the property is shown to be landscaped. Additional landscaping is
provided on the front of the building by the entrance.
6 Six (6) truck doors are proposed. Five (5) of the truck doors are an unusual
size, 26 feet wide by 14 feet high. These doors result from the specialized
manufacturing requirements of Fire Prevention Systems, the intended occupant.
Three (3) of these doors are located next to the storage yard on the west, while
the other doorsare located, one each on both the south and east sides of the
buiding. A smaller 12' by 14' door is on the east side.
CONCLUSIONS :.
1. The parking meets the required number of spaces per TMC 18.56 plus the design
criteria for dimensions.
2•. The design'. provides maximum utilization of the space on the site. The width
of the truck doors reduces the necessary truck manuevering space outside of
the doors.
Planning Commission
Staff Report
3. The boundaries of the site are not landscaped in a fashion typical to an
industrial park as required in the C -M District. However, the landscaped
areas are intended to blend the development with the other buildings on
South Glacier Place.
RECOMMENDATION:
The staff recommends that the Planning Commission approve the development plans
subject to the following condition:
1. That landscape plans be reviewed and approved by the Board of Architectural
Review prior to the issuance of a Certificate of Occupancy.
Page 2
26 April 1979
AREA PLAN
\ • •oe
LEGEND
RIVER
ABBREVIATIONS
PROJECT 464
SOUTHCENTER SOUTH INDUSTRIAL PARK
TUKWILA WASHINGTON
DRAWING INDEX
GEL CRIPTION
ir PLAN
PI F PL.N , ..erm .GL'.
rL.CGf', PLAN 1 7C1-1 °nUL_7
.exT.nIGrI EIcYATI0N'.4 t?GT+ON
wA :.SCTIOM 4 Gc`TAILh
GBTA
ILt,
LEGAL DESCRIPTION
I
GENERAL NOTES
1...m.. _ �..• r.1..•• arum r •...r •■•••■ •••••• .may
• r
.1.••••• u ••••••••••••• ••••••••••••• .•W •_• ••••w •.•."•••• •.•u
•.
VICINITY MAP
M PRLL,°GT '4.4
onsrece.¢•c s IIJII aysTat -L r:•._ar
v.•.f•1•.1•170 1 11-
'
ALOUD M. CIIOONOUI.i L.A. . • •1IO0•ILf. • salamis
•. • r. . ..1 '711 rft ■f. ...(]MY.f A•
• •._• . • . u•
"
c. trermig -raa7t
L I ®t 'n's1 Ira 3•sa O6L I11y10
ct . ar -Oa/ 1 L 7 cboot "asr+a crow
Ne7: 7 - 71111.
Leo 4.
J 27 C =
WE WPM/
�., N•i s'Y cam- 3115
wri Neel
(9rr•PV 2 ) Wldro
*Valhi - T4141L 71t m+ 111.3.4
v 9, g7 21271d NM.
'
NralINP tiAOM IZIWA
VarIV WMId ilea
*BP* 711x.
\I1rM - M.
.7v1.71110 - b-
.•00p ♦1 .r7NG -QG-
G109p /J11W1
j4/'ore Muir
tJ' .oat; •-- 311 G N
VOW 1/Ola.r/0
(07) 1,10
ewes lYM^• 0714 0114
90i./`R WIMP ilde
.Jk U1 V •
•
s'71
vow an
Isla low
FO! wow
171."11np
•
.1
a. la
or4
go.t •
owe
00
rine. NNW
•
.
sc • w
ow.lo•
Amos
-----
00
MA I Ni =...COSX• ;
.4■1.111 fp • a•O
Sdoi•
021.4
111.41.o■
lOA. MOM
ors.4..1
.1s.soo NANA
MSC. Oil.
OOP( I •
'
• 0 0
V V ••”
ow... woos.
*OP .0 AsOSSISS
•NOMII •a17.7
=.114.4.1.
IR •
MOM. 611.
.11.1•1•4
so • 1 11
IN`: --•• — • L.%
s ti •
1111.11SID 14 C•00 A • •/•••>•1 •■ • .•
.0
0
4..)
.14 4-1
.0 0
-rt
LL.1
C)
C.)
• V f•
'I
;
E5T 5 LE VA'110.-
..10 •
•C.P.1.11 /e; •
Spo• soml...1 gcs.s
FSLIILOING SECTION
.••= z2tme..4vrecT:
o0141•1•111
•••••
S.-. L'• 71.6.•• :./.• • IAA'. TILLL =IL
vim 5-r .L.VAJOP4
1 /1 . • r-0
V
11.i• VIKK - fa< GIIML
• ••
• 0 '
,
6.1":01%4 - E...ev014
EXTE" EL. E.'.rocT.C.14....
•
£1,110 N C•00••••0 4 • • .4.
••• ••..! -
Planning Commission Page 4
Minutes 22 March 1979
Mr. Richards objected again because the plan did not comply with the landscaping
requirement of TMC.
Mr. Crumbaugh stated that this was an oversite of the architect.
Mr. Crumbaugh continued discussing the proposed placement of the sidewalk and land-
scaping along South 180th Street. The method used is to place five feet of land-
scaping on each side of a five foot wide sidewalk. The Planning Commission does
not need to consider the width of the landscape area; it only needs to consider
where the sidewalk is going to be.
Mr. Richards stated that Mr. Crumbaugh was wrong, the developments included the
area of the landscaping.
Mr. Crumbaugh stated that he was not trying to take an advisary position. He con-
tinued stating that in other locations throughout the City public right -of -way is
being used for landscaping.
Planning Commission discussed the site plan in more detail.
Mrs. Avery asked about the location of the drive up window. She expressed her
concern about traffic problems and congestion resulting from a banking facility.
MOTION BY MR. RICHARDS, SECONDED BY MR. ORRICO TO TABLE THE DEVELOPMENT PLANS TO.
THE NEXT REGULAR MEETING TO INCLUDE THE LOCATION OF THE SIDEWALK AND LANDSCAPING
STRIPS THAT WERE PROPOSED IN THE VERBAL PRESENTATION. IT WAS TO ALSO INCLUDE THE
PROPOSED LANDSCAPING ALONG THE SOUTH AND WEST PERIMETERS OF THE SITE AND THAT A
SECOND SET OF PLANS BE SUBMITTED TO SHOW THE TOTAL DEVELOPMENT OF THE SIDEWALK
AND LANDSCAPING ALONG SOUTH 180TH STREET. MOTION CARRIED. MR. JAMES, MR. ORRICO
AND MR. RICHARDS VOTED YES. MRS. AVERY AND MR. SOWINSKI VOTED NO.
Mr. Crumbaugh wanted the record to show that, "I did not come up here to make
an advisary position, I just made some requests at clarification of the staff.
I totally resent what was done to me here tonight. I did not deserve that."
BEVELOPMENT PLANS: McCANN PROJECT #464
Mr. Blaylock informed the Planning Commission that the architect, Tom Croonquist,
had requested that the item be tabled for revisions until the next meeting.
MOTION BY MRS. AVERY, SECONDED BY MR. ORICCO TO TABLE THE DEVELOPMENT PLANS UNTIL
THE NEXT REGULAR MEETING. MOTION CARRIED.
LANDSCAPE PLANS: MORGAN OFFICE BUILDING /6100 SOUTHCENTER BOULEVARD OFFICE BUILDING
The Planning Commission considered both items together. Mr. Blaylock read both
of the staff reports.
Mr. Bruce Morgan stated that he agreed with the staff report.
CITY OF TUKWILA
PLANNING DIVISION
PLANNING COMMISSION
STAFF REPORT
22 March 1979 __. 8:00 P.M.
AGENDA ITEM V D DEVELOPMENT PLANS: McCann Project #464
Development plans have been submitted by Alfred H. Croonquist, Architects, for
McCann Project #464. The building space is 25,000 square feet. The 5,000 square
feet of office space will be located in a mezzanine area.
FACTS:
1. The property is zoned M -2, but limited to M -1 uses.
2. Thirty -six (36) parking spaces are provided with a potential for forty -five
(45) parking sapces for future expansion.
3. A fenced storage yard is proposed north of the building.
4. Landscaping is proposed on the north and east boundaries of the property with
additional landscaping adjacent to the main entrance and offices. Landscaping
is not proposed along the railway easement.
5. The parking lot design calls for aisle twenty -four (24) feet in width and
parking stalls of 9 x 19 feet.
6. Three dock high loading doors are proposed on the north side. There is approxi-
mately 110 feet of truck maneuvering area directly in front of these doors. Two
truck doors are proposed on the west side to service the yard plus the building
is designed to add two rail doors in the future.
CONCLUSIONS:
1. The parking meets the required number of spaces per TMC 18.56 plus the design '
criteria for dimensions.
2. The fence around the storage yard should be site obscuring, which is spelled out
clearly in the covenants of Southcenter South Industrial Park.
3. The site plan is not clear whether the landscaped area on the eastern property
boundary extends to the rail easement or to the railroad spur. This clarifica-
tion can be made at the time review of detailed landscaping plans.
RECOMMENDATION:
The staff recommends that the Planning Commission approve the development plans
Planning Commission
Staff Report
subject to the following condition:
1. That landscape plans be reviewed and approved by the Board of Architectural
Review prior to the issuance of a Certificate of Occupancy. The plans are
to show the landscape treatment of the southeast corner of the property
between the parking lot and railroad easement.
Page 2
22 March 1979
CC U I
OJ
•r- •n
_ o
• i a
X •
C
U
V I
L. I
ritorINMO
r- Y
r'• t.n a i a• «,
® .11." F.+•11
teN _y RIVER
I •
I
Win." I...S I��I114
IIMEs
Ulu? WWI
LEGEND
Vii•- ..-•••
.+. Lr
• 1;10 .. e. irw..,::•M+
3:s
AREA PLAN
DCA l•
I. . 100
. _ .. • hot f Srt'TT/I
wa "I. ". Pf
=Z ..
M•f
yY -l.
fAL(/.t t . ▪ . y.. 1Y. 4.w.,..r I{w • V •
BC= MyME.i LVltYa. i. •. w N. 1 f.1. -llw w...
-t d... C....• TN. i : 1 v
Q IMAM M.P... Y_f
MCEUMMT
ETASTC EMU LAMUMEMAL. PARK
TUIKWIILA WASHINGTON
n s.e r
w 1.•01
O M. fe»
DRAWING INDEX
SHEET
A-1
A•2
A•
A•L"
A.
A -O
DESCRIPTION
AI IA PLAN . L:63.4 G = \!Fs » NOTE'S
61'5 - ROOF PL.&N , 6 5YM15O1.4
!L.COPL PLAN ♦ 9GH5f,ULE7
EXTePNIOIN EL6VATIGNS4 tSCTIC/N
bBCTIOM 4 OE
CETAIL
LEGAL DESCRIPTION
GENERAL NOTES
L. .---t.. -ML Sup •I .aa•••••• ••11.1.1, ....n y1,.. .mm.r
• ▪ v. m.o..
. W — w. - •... M *m... Ms ..... r. CM. MI*
me - wl maim N. m.w.. . - r...
S.. Ins . - � M .w. --... N .a. sways
4 ..WI .f• r...L -.. 41.t. Iw -r-N ��
.. .L -. -aY .• r.....- 1410• M... .- ...... 1.........• me re.
. •w - ...... . '. r.� .•..■
.... eiss
• .I Cm. MM.. -.... .. ..N A .. «- .r.
Y. w- - Memo ..0 .-Ir -. 1414 1...14 uL RL.
I.. r.r .14.14 - :... Noe is. we «...++. w. - . - ...
.I. v.wW .- ........ ....� 1414....-.. 14 1-.. -....r
VICINITY MAP
M°GAN 4 PRQrrcT E404
szur/ca sm soup, •`l°L'sTftAL. PASt.
11..L WIL.A W*- 1t4Ndp1 4
ALMS a CIOONOUIIT AJi • A1.0011RLAICNMC1I
•1 •14.10.1111/11•61•••••• ••1111111•••••••• • � .
1"."4 -•• -. ft.. 1..• 141.. -.
— a,
1 -1
3
4.'C' • t 7•�^
• .. kgs
S 10 :v•• 1.1V1d dC' J c••• °lts
• Welw. 4 M
C1ej.4 ��� •OLa'T/ L
:Slat
• Gmrrdogld •p•t•tvJC -had.
AI • awl *ad Iv a Agog aas'G rl•t/O
- tOli - -a7D1 _ •11Y t ' IMO Q70272 a•x•ot*atteo%
_.- -• -_ -- - _. -. . _._.. r➢hl-)t•Ldvd
aodys
vet! "Oat- -
ays _ -- suirtsrozirA ) a,t.sa•
O70t'72 ' .. - - rata v -ruoi. aiaTd MCA
L•ar caste walk, 111SnaVi OWN
- .- • vs=iv -w •
-
WOW% - M..
VmU-7rtet e.o..rru -64,-
MtY' Nm 4 • -C:-
WMlie 1NOLMG -SG-
SIGNWIAG 1.1.1'ILL17
V lied 1.1l17vy :0 A
QN:)/ 1G+•itl. •
wG.o Nash n
Cop) Inv •••••,2 .b"''
Q1
i..IA71f /ZN Gijn.11]
VO•ere t/N -v 2=+C
.nry wa
tem t141
1•02 Voul
cnw22
Fl111111,0WS wt 1.7LL7
G1r11415 lcrkrare..9 NOL.L.W160JIW '7 .9
/SWI M WOO
'atoll • O;L • 1, 11 5! f'+•/9c
Nv'1.I ok.)dtd o"' 3l I G
I
•
:.°
h - ..
•
.
_w
M1
s CA1.I • /GI• I.O•
Y ►Nf rAVT •410
� J.AM •ir re Iee�•../.IS
6+1f I/-A1 t061TWACI01
. - Ilwers. TOAUA.-
%T EP.
•
YR.11.11
•
z
M• t v.4,J vs =oJecr + 444
- fJC•YI�A Vl�•i MI N•��OV
*0110 N.CIOONQUISO A.I.A. A AfS0CtAltf, ARC11111CI11
1.SI
011•..•1.. S fl 1we ••••••
• Y•wL 1•.•M.•• •I.w .•de .w•M.. Mw
- r
N- 3
r r
Jj; »911fl9 S Io'9
b1-1a -WI
SOUTH ELEVATIOn
ALFRED H. CROONQUIST A.I:A: i ASSOCIATES, ARCHITECTS'
4540 SEATTLE • EIRST NATIONAL RANH IWILDINO, '. ,;`.432 : , :,
GENERAL INFORMATION
site plan roof plan