HomeMy WebLinkAboutPermit DR-34-79 - SCONZO ASSOCIATES - GRAINGER BUILDING DESIGN REVIEWdr-34-79
505 strander boulevard
grainger building DESIGN REVIEW
REMODEL
SCONZO ASSOCIATES
27 December 1979
Grubb & Ellis, Commercial
Brokerage Company
2031 Third Avenue
Seattle, WA. 98121
Mark Caughey
Assistant Planner
City of Tukwila
Administration
6200 Southcenter Boulevard
Tukwila, Washington 98188 433 -1845
Office of Community Development
Attn: Ernest Patty
Re: Board of Architectural Review Action - Grainger Building REmodel
At its meeting of 20 December 1979, the Board of Architectural Review approved
your application for remodel of the Grainger Building as depicted on Exhibits A
and B of the application, according to the following conditions:
1) That the applicants shall submit for staff approval prior to occu-
pancy of the proposed addition a comprehensive . landscape and irriga-
tion system plan depicting new materials to be added to the addition
area and adjacent to the building, and depicting replacement of any
existing damaged or .diseased plantings.
2) That the applicants shall obtain approval of comprehensive site utility
service and public facility improvement drawings as may be required by
the Public Works Department prior to issuance of a building permit,
including review of the curb -cut at the Southwest corner of the site
for compliance with TMC 18.56.040.
3) Any signing for this development is to be approved under separate
permit process as prescribed in Title 19 of the Tukwila Municipal Code.
4) The existing parking stalls at the S/W corner of the site shall not be
recognized as off-street parking space credit for the development.
We appreciate your participation in the design review process.
MC /mkb
cc: Sconzo Associates
Enclosure: Minutes of Dec. 20, 1979
site plan
W2C,I."" •
a•
'ii li.11... Mk ENO III ••• 11111111111111M1 BM • • ME L..
•
6•Istet,
-ca..,6.(reinaTED)
•
71-4
I\-101" ELEVATION
43C.d.L..as Wei I CP'
E
C.1.4•C
..4.4■11L
II I
imiuuuuuumI
no U1t Pi ill • 1IIf IftI1
mom.
/.677 fit.
MG1•11.
1
EZU111
10
THOMAS 4 900•420
1‘ 11°*6-
P 1 PO SE0
P31.1 I L.131 ODEL-
•11 lam ••• al P.M* ••••/11110•111.•••
27 December 1979
Sconzo Associates
919 124th Ave. N.E.
Bellevue, WA. 98005
Attn: R. Kris Anderson
City of T ukwila
Administration
6200 Southcenter Boulevard
Tukwila, Washington 98188 433 -1845
Office of Community Development
Re: Board of Architectural Review Action - Grainger Building Remodel
At its meeting of 20 December 1979, the Board of Architectural Review approved
your application for remodel of the Grainger Building as depicted on Exhibits A
and B of the application, according to the following conditions:
1) That the applicants shall submit for staff approval prior to occupancy
of the proposed addition a comprehensive landscape and irrigation system
plan depicting new materials to be added to the addition area and adja-
cent to the building, and depicting replacement of any . existing damaged
or diseased plantings.
2) That the applicants shall obtain approval of comprehensive site utility
service and public facility improvement drawings as may be required by
the Public Works Department prior to issuance of a building permit includ-
ing review of the curb -cut at the Southwest corner of the site for com
pliance with TMC 18.56.040.
3) Any signing for this development is to . be approvedunder.separate permit
process as prescribed in Title 19 of the Tukwila Muncipal Code.
4) The existing parking stalls at the S/W corner-of the site shall not be
recognized as off - street parking space credit for the development.
We appreciate your participation in the design review process.
Mark Caughey
Assistant Planner
MC /mkb
Enclosure: Dec. 20, 1979 Minutes
Planning Commission '-
Minutes
MOVED BY MR. ORRICO, WITH MR. JAMES' SECOND, TO APPROVE THE LANDSCAPE AND IRRI-
GATION PLANS FOR SOUTHLAND CORPORATION OFFICE BUILDING AS DEPICTED ON EXHIBITS
L -1 and L -2 OF THE APPLICATION, ACCORDING TO THE FOLLOWING CONDITION:
1) ADDITION OF PLANT MATERIAL, SUBJECT TO STAFF APPROVAL,
ON THE END OF THE CENTER PARKING STALL SYSTEM AT THE
WEST SIDE OF THE SITE.
MOTION CARRIED 4 -0.
Page 4
20 December 1979
C. DEVELOPMENT PLAN: Grainger Building Addition/Remodel'
(S.E. Quadrant, Strander Blvd. @ Andover Park East)
Assistant Planner Mark Caughey read the staff report and displayed the project
color board prepared by the applicant's designer.
Ernest Patty was present to represent the applicant.
Mr. Richards questioned the utility of the two existing parking spaces at the
S/W corner of the site. Afterr some debate on the matter, the Commission agreed
not to recognize this area as part of the total off - street parking provided for
the project.
In response to the Chairman's inquiry, Mr. Patty explained that no reduction in
existing landscaping is planned, and that the proposed building addition area of
the site is currently unimproved.
The Commission then discussed the proposed painted concrete exterior finish of
the building addition. Mr. Patty explained the practical difficulties associated
with matching the existing aggregate surfaces. The Commission's consensus was
to accept the designer's solution as presented and allow the metal roof element
shown on Exhibit B to'create a visual unity between the existing and new building
sections.
The Commission discussed staff's concern relative to the alignment of the S/W
curb - opening, and decided to defer resolution of the matter to the public works
staff.
MOVED BY MR. RICHARDS, WITH MR. ORRICO'S SECOND,: TO APPROVE THE GRAINGER BUILDING
REMODEL /ADDITION APPLICATION AS DEPICTED ON EXHIBITS "A" AND "B" THEREOF, SUBJECT
TO THE FOLLOWING CONDITIONS:
1) THAT THE APPLICANTS SHALL SUBMIT FOR STAFF APPROVAL PRIOR TO OCCU-
PANCY OF THE PROPOSED ADDITION A COMPREHENSIVE LANDSCAPE AND IRRI-
GATION SYSTEM PLAN DEPICTING NEW MATERIALS TO BE ADDED TO THE ADDI-
TION AREA AND ADJACENT TO THE BUILDING, AND DEPICTING REPLACEMENT
OF ANY EXISTING DAMAGED OR DISEASED PLANTINGS.
2) THAT THE APPLICANTS SHALL OBTAIN APPROVAL OF COMPREHENSIVE SITE
UTILITY SERVICE AND PUBLIC FACILITY IMPROVEMENT DRAWINGS AS MAY BE
REQUIRED BY THE PUBLIC WORKS DEPARTMENT PRIOR TO ISSUANCE OF A BUILDING
PERMIT, INCLUDING REVIEW OF THE CURB -CUT LOCATION AT THE SOUTHWEST
CORNER OF THE SITE FOR 'CONFORMANCE "WITH. T(40-18:66.4406... :.. •
Planning Commission
Minutes
4
ANY SIGNING FOR THIS DEVELOPMENT. IS TO BE APPROVED UNDER SEPARATE
PERMIT PROCESS AS PRESCRIBED IN TITLE 19 OF,THE TUKWILA MUNICIPAL
CODE.
THE EXISTING .PARKING STALLS AT THE SOUTHWEST, CORNER - OF. THE SITE SHALL w`
NOT BE RECOGNIZED AS OFF-STREET 'PARKING SPACE CREDIT -DEVELOP -
MENT.
MOTION. CARRIED 4-0.
D. "DEVELOPMENT PLAN: .Schneider /Nilsen Office Building
(East Side, Interurban Avenue @ S. 149th St.)
After presentation of the staff report, Project Developer Gary Nilsen and
Designer Steve Leitzke responded to questions from the Commission relative to
the building's exterior materials and landscape concept.
MOVED BY MR. RICHARDS, WITH MR. ORRICO'S SECOND, TO APPROVE DEVELOPMENT PLANS FOR
THE SCHNEIDER /NILSEN OFFICE BUILDING ACCORDING TO EXHIBITS A, B, AND C OF THE
APPLICATION SUBJECT TO THE FOLLOWING CONDITIONS:
1) PRIOR TO ISSUANCE OF BUILDING PERMITS, THE APPLICANTS SHALL OBTAIN
DEPARTMENT OF PUBLIC WORKS APPROVAL OF A UTILITY SERVICE AND PUBLIC
FACILITY IMPROVEMENT DIAGRAM, AND SHALL MODIFY DRIVEWAY OPENINGS AND
PARKING STALL CONFIGURATIONS AS NECESSARY TO INSURE ADEQUATE TRAFFIC
SIGHT DISTANCE AND CIRCULATION SAFETY.
2) A DETAIL DRAWING OF THE PROPOSED TRASH ENCLOSURE SCREEN SHALL BE
PRESENTED FOR APPROVAL BY STAFF AT THE BUILDING PERMIT STAGE OF
APPROVAL.
3) A FINAL DEFINITIVE LANDSCAPE AND IRRIGATION PLAN SHALL BE PRESENTED
FOR STAFF REVIEW AND APPROVAL PRIOR TO ISSUANCE OF AN OCCUPANCY PERMIT.
SUCH PLAN SHALL DE- EMPHASIZE THE HORIZONTAL LINEARITY OF THE SITE AND
BUILDING.
MOTION CARRIED 4 -0.
E. DEVELOPMENT PLAN: Casa Lupita Restaurant
(Parkway Plaza West) (West Side, Southcenter Parkway North of S. 180th St.
Mr. Caughey read the project staff report.
Bob Mesher, Project Architect, stated his agreement with all conditions of the
staff report except that dealing with the delivery area driveway configuration.
After discussing this point, the Commission agreed to allow the site plan to
remain as presented, provided that the service yard gate swing direction is
changed inward.
MOVED BY MR. RICHARDS, WITH MR. JAMES' SECOND TO APPROVE DEVELOPMENT PLANS FOR
THE CASA LUPITA RESTAURANT AS DEPICTED ON EXHIBITS A, B, C, D, AND E.A000RDING
TO THE FOLLOWING CONDITIONS:
20 December 1979
INTRODUCTION
Permits for construction of the Grainger
Building were issued in September 1968.
The applicants now wish to add a 4,100
sq. ft. office addition to the east
side of the structure, which will also
include a 900 sq.ft. + mezzanine for a
total new construction proposal of
5,000 sq.ft.
ANALYSIS
A)
B)
SITE PLAN
1) Parking for the proposed
development is provided in
excess of ordinance minimums,
according to the following
statistics supplied by the designer:
EXISTING BUILDING
ADDITION
ARCHITECTURE
CITY OF TUKWILA
PLANNING DIVISION
Warehouse 6,321 @ 1 /1000
Office
Office
4,825 @ 3.1/1000
5,000 @ 3.1/1000
TOTAL REQUIRED
TOTAL PROVIDED
PLANNING COMMISSION
STAFF REPORT
AG I TEM VI D. . DEVELOPMENT PLANS: GRAINGER BUILDING REMODEL
6 spaces
14 spaces
15 spaces
35 spaces
38 spaces
8:00 P.M.
2) Setbacks, yard area and screening are provided per requirements of the
"C -M" zoning district (TMC 18.32.030).
3) The existing westerly curb -cut is located less than twenty (20) feet
from the south property line as required by TMC 18.56.040; the curb
cut should be realigned as needed to conform to zoning regulations as a
condition of any new building permit.
1) The applicants are attempting to update and unify the exterior elements of
the existing building and proposed addition by use of complementary wall
material te.res and a metal -clad roofing eL ent. The existing building
walls are constructed of panels of large -scale exposed aggregate, Heavy -
textured concrete tilt -up panels to a maximum height'of 24' will enclose the
proposed addition. Mechanical equipment for the additional area will be
located within the building.
2) A color -board will be presented at the public hearing to facilitate
the board's understanding of the designer's approach to synthesizing
the building's overall appearance.
3) Comprehensive approval of the subject development plans have been
granted by the Architectural Control Committee of Andover Industrial
Park.
C) LANDSCAPING
A landscape proposal is not yet available for this project; however, staff
suggests that the applicants consider the addition of suitable planting
materials adjacent to the building to soften its predominant hard surfaces.
RECOMMENDATION
Staff recommends approval of development plans for remodel of the Grainger Building
as depicted on Exhibits A and B of this application according to the following
conditions:
1) That the existing westerly
as necessary to comply wit
rb cut on th
TMC 18.56.
site shall be reconstructed
2) That the applicants shall submit for staff approval pri• to occupancy
of the proposed addition a comprehensive landscape and irri•. ion
system plan depicting new materials to be added to the additio area
and adjacent to the building, and depicting replacement of any e isting
damaged or diseased plantings. cl031
3) That the applicants shall obt in approval of comprehensive site
utility service and public f cility improvement drawings as may 'e
required by the Public Work Department prior to issuance of a
building permi t UC.Lup10 c ca w* cr FOB GOMPUA1)C w(rH
4) T is to be approved under
separate permit process as prescribed in Title 19 of the Tukwila
Muncipal Code.
Pk¢(C. S?74c.L5 M ti■ 6,0K • 0 4s *4PPrroc'a PARr' V �r4
Enclosure: Exhibits A & B
..; i.,,I.4...A': , - —,; .; .. ..... , ,...; .,
ILA " .
6 0 I of Tu ila.i . . i ...,:,,,-..,.. _•...,:::,,, - , .
. . _. .
:'‘•!:,•:-;•: . :-,..-
...,
. . , ., '' . T. ''.- '' 7 - ... ";..;T,....':'
t ::.;‘..:;.•
Planning uivIsion ..: : . . -::::;!;-g:-..:,........... .., -:,::.,-.- , -2..•.;
. 7 ;w. 4=04 . ..,.., ' ,.,. ^,74,.;4‘; -,„-,.•
'' ''''''' ';' '...".. ..'., •is! .::„..,.
: - ' ..*,........ ' ' 14';:,-iTt-'.'.
'-• 6200 Southcenter Bouleiard'i ,:-:-.., -.'-'.:';';: '...::- ''.. r.F.: '
;. . . Tukwila, Washington 98188. . 433=1845 :.:.,' -. '.....,
o
. 190 • • . - Office of Community Development
Grubb & Ellis Commercial Brokerage
2031 Third Avenue
Seattle, WA. 98121
Attn: Ernie Patty
Re: Irrigation For the Grainger Building Site
•
TUKWIL.A7PLANNING DEPT.
, •:::;... - .4•••• - •.. • ••
•
•
•
. . : . •..
•
...23 May 1980
Item "B" in my 5 May letter still applies, however.,
•.;
After review of your letter of 8 May 1980, I have re-considered my.corres-
pondence to you of 5 May 1980 and will not require that you install irri-
gation equipment on the east side of your site.. Our city grounds mainte-
nance foreman believes that the mature specimens which you wish to transplant
to this area will be able to survive with hand-watering, and that automatic
equipment really is not imperative.
•
: • - ,
• „;
May 8, 1980
Mr. Mark Caughey
Director - Planning
City of Tukwila
6200 Southcenter Boulevard
Tukwila, Washington 98188
Dear Mark:
With respect to your letter of May 5th, and our subsequent conversation
today; this correspondence will both explain and appeal your statement
as to the necessity of an irrigation system along the east planting
strip.
As you know, the former Grainger Building was long an eye sore of the
Andover Industrial Park. On my own initiative a purchase and upgrading
of the project was instigated. Part of this upgrading was the installation
of an irrigation system in the lawn, and the hiring of a landscape maintenance
crew to maintain the premises. This was all done prior to any conversation
with the City. As to the length of my maintenance contract, I will assure
you, that in as much to my Tenants pay for this service and in as much
as I have no desire to maintain the grounds myself, there will always
be a maintenance program.
Mark, I do not wish to install an unnecessary irrigation system along the
eastern planting strip in as much as the mature platings that will be re-
located to this area have grown steadily and healthfully for the last twelve
years without any regular waterings. Certainly you can speak positively
to this matter at the architectural review cc*mettee.
As the the rest of the project, all landscaping is sprinklered daily and
maintained on a weekly basis. The southeast corner of Strander and Andover
Park East is frankly somewhat of a showplace for the park.
Thank you.
Ernest N. Patty
Wolverine Properties
ENP:cmb
CIiYLri` 'iiA
MAY 1 2 1980
Grubb & Ellis
Commercial Brokerage Co.
2031 Third Avenue
Seattle, WA. 98121
Attn: Ernie Patty
Re: Granger Building - Landscape Plan
Condition 1 of the Board of Architectural Review's 20 December 1979 approval
of your remodel plans requires staff approval of a landscape plan for the
remodel area. The plan prepared by Earth Enterprises and revised 4/28/80
fulfills the intent of said condition with exception of the following:
A) Your December 6, 1979 landscape maintenance contract with Earth
Enterprises does not contain any time -limit clause and may expire
at any time without our knowledge. Therefore, to protect the
city's long -term interest in the maintenance of your site, we shall
require installation of a sub - terranean irrigation system in the
east planting strip adjacent to the railroad right -of -way.
B) The subject landscape plan must also depict plant materials to be
placed against the building in strategic locations approved by staff.
These items must be resolved before final certification of occupancy. As.
always, you may appeal staff's interpretation of these conditions to the
Board of Architectural Review.
MC /mkb
cc: Al Pieper
City of Tukwila
Planning Division
6200 Southcenter Boulevard
Tukwila, Washington 98188 433 - 1845.
• Office of Community Development
TUKWILA ING DEPT.
Mar}e'Caughey
Ac ing Director
5 May 1980
City of Tukwila
6200 Southcenter Boulevard
Tukwila, Washington 98188
. Public Works Department 433 -1850
Mr. Ernest N. Patty
Wolverine Properties #2
Grubb & Ellis Commercial Brokerage Company
2031 3rd Avenue
Seattle, WA 98101
February 21, 1980
Dear Mr. Patty:
The Public Works Department has completed their review of Sheet A -1
for the Graigger.Building and are approved as noted for storm and sanitary .
sewer permits.
By.this review, the Building Department is authorized to release the
building permit.
PRF /jm
cc: Mark Caughey, Assistant Planner
Al Pieper, Building Official
Sincerely,
,p
Phillip R. Fraser
Acting Public Works Director
January 31, 1980
Phil Fraser, Senior Engineer
Public Works Department
City of Tukwila
6200 Southcenter Boulevard
Tukwila, SSA 98188
Dear Mr. Fraser:
With reference to the city's requirements for sidewalks in the Andover
Industrial Park, and more specifically on my property at 505 Strander
Boulevard; I am in accord with your decision to eventually have side-
walks throughout Andover, however, I respectfully request that you
allow me to participate in a comprehensive plan rather than build my
sidewalks now.
This correspondence will confirm my willingness to participate in an
L.I.D. or other comprehensive sidewalk program whereby all sidewalks
are constructed under one program, at such time as your office decides
is appropriate.
Very truly yours,
Ernest N. Patty
Wolverine Properties #2
E[JP : sd
cc: Nark Caughey
Assistant Planner
15 January 1980
City of Tukwila
Planning Division
6200 Southcenter Boulevard
Tukwila, Washington 98188 433 -1845
• Office of Community Development
Sconzo Associates
919124th Avenue Northeast
Bellevue, Washington 98005
Attn: R. Kris Anderson
RE: Grainger Building Remodel
Your plan set for the subject project (dated 4 January 1980) has been reviewed
by this office and found satisfactory subject to notation of conditions imposed
by the Board of Architectural Review. Prior to final release of the plan set
for construction, however, we must receive the following material:
1) Copy of State Flood Control Zone Construction Permit as issued by the
Hydraulics Division, King County Public Works agency.
2) A construction plan for sidewalks on the Strander Boulevard and Andover
Park East frontages of the site. This . requirement is imposed by the Public
Works Department per City Ordinance 1025. We suggest that you contact Phil
Fraser, Acting Public Works Director, 433 -1856, for further information and
resolution of the sidewalk requirements.
Your .• eration is appreciated.
rk Caughey
Assistant Planner
cc: Ernest Patty
(1) Chairman
Charles 0. Baker
(2) Secretary
L. E. Hall
ARCHITECTURAL CONTROL COMMITTEE
Those in attendance were:
A.C.C. Members
Mr. Charles O. Baker
Mr. L. E. Hall
Mr. R. T. Davidson
Mr. R. G. Keever
Also in attendance were:
Andover Industrial Park
Tukwila, Washington
Minutes of Meeting
December 11, 1979
The Architectural Control Committee
meeting at the Sheraton - Renton Inn,
meeting was called to order at 7:40
Charles O. Baker.
Mr. Mark Caughey, City of Tukwila
Mr. Kjell Stoknes, City of Tukwila
Mr. Ernest N. Patty, Grubb & Ellis
Mr. R. Kris Anderson, Sconzo Associates
Mr. Bill Arthur - Puget Western, Inc.
The following matters were discussed:
convened this date at a
Renton, Washington. The
a.m. by Committee Chairman.
'DEC i 8 191.7C'
•
Members:
(3) W. E. Boeing, Jr.
(4) R. T. Davidson
(5) R. G. Keever
(6) W. B. McCurdy
(7) Chairman, Tukwila
Planning Commissio
Grainger Building - Proposed Building Remodel.
Mr. R. Kris Anderson, of Sconzo Associates presented plans for the
building remodel to the A. C. C. The remodeling consists of the
addition of three windows and one door into the building, enlarge-
ment of an existing door into the building, and the addition of a
"handicap ramp" from the parking area to the building sidewalk. Mr.
R. G. Keever moved to approve the building remodel indicated on
Sconzo Associates site plans for the Grainger Building, designated
"A.l ", A.2" and "A.3 ". The plans are dated October 12, 1979. Mr.
R. T. Davidson seconded the motion and it was passed unanimously.
Grainger Building - Proposed Addition to Existing Building.
The proposed addition to the east side of the Grainger Building will
be 42 feet by 99 feet in size, and will have internal access to the
existing structure. Kris Anderson stated that the no new curb cuts
into the Grainger Building site will be required, and that the require-
ment for additional parking will be satisfied by paving previously
unpaved and unlandscaped portions of the site. Mr. Mark Caughey of
the City of Tukwila stated that the proposal by Sconzo Associates meets
parking requirements of the City.
A.C.C. Meeting
Page 2
December 11, 1979
Mr. Anderson stated that the addition will be of "tilt up" construc-
tion with an exterior of concrete,stucco and paint. A metal canopy
to be installed will be a "dark brown" color.
The "office area" of the addition is to be air conditioned.
Mr. Ernest N. Patty, of Grubb & Ellis, stated that a sprinkler has
been installed in the existing landscaping areas along Strander
Boulevard and Andover Park East. In response to a question by the
A.C.C., Mr. Patty stated that the Grainger Building site use does
not encroach upon the adjoining railroad right of way.
Mr. R. G. Keever moved to approve the building addition shown on
the Sconzo Associatess site plans for the Grainger Building desig-
nated "A -1 ", "A -2 ", "A -3" (dated October 12, 1979) subject to the
understanding that (1) the addition will be of concrete tilt up
construction with stucco modules, (2) any roof mounted equipment
installed on the Grainger Building will be screened from ground view,
(3) Landscape designs for the site will be submitted for A. C. C.
approval, (4) tenant signing proposals will be submitted for A. C. C.
approval, and (5) colors used on the exterior of the building will
be of "non- glare" variety approved by the City of Tukwila Office of
Community Development from a "color board" sample.
Mr. R. T. Davidson seconded the motion and it passed unanimously.
Other Matters
Mr.• Baker advised the A. C. C. that the Shasta Beverages sugar tank
has been relocated and that a wall, approximately 18 feet in height,
had been constructed to screen the tank from view from the street.
Decorama
A representative of Fiberchem telephoned Mr. Baker's office to
regigter a complaint over the unsightliness of trash accumulating
on the Decorama property in the area of Decorama's "dumpster ".
Fiberchem's property adjoins Decorama's site. The Secretary of the
A.C.C. will direct a letter to Decorama requesting that Decorama
will comply with the Andover Park covenants which require property
owners within the Park to remove any rubbish which may accumulate
on their property.
Mr. Charles 0. Baker and Bill Arthur of Puget Western, were authorized
by the A.C.C. to inspect the Andover Park Area to determine if other
accumulations of rubbish exist. Messrs. Baker and Arthur will report
their findings at the next regular meeting of the A. C. C. Committee.
The meeting was adjourned at 9:10 a.m.
L. E. Hall, Secre ary
Architectural Control Committed
for
f
girth enterpri ......�:.;
'LANDSCAPE
MAINT MANUAL
3006 west Valley Highway ,No. Auburn Wa.98002
- r tA.,r�,......,..�.,. ....;.�,►nrr..+. v__. .:,. : . �...•■w. r..w.'s+ - .•. .. - ?.1 -�- ,. ...:�
December 6,
, 7
LANDSCAPE MAINTENANCE QUOTATIONS INCLUDE THE FOLLOWING:
1. All Fertilizing per enclosed schedule.
2. All mowing per enclosed schedule.
3. Weed control through chemical and herbicides and by hand
as required.
4. Insect control per enclosed schedule.
5. Lawn aerification and thatching are not included in this
schedule but will be done as recommended by us and approved
by the owner in early spring.
6. Dead or dying plant,material will be automatically removed
and replaced and invoiced to the owner on a time and mater-
ial basis. This will be done unless directed otherwise by
the owner.
7. The base bid includes weed control in curbs and walkways.
8. The base bid includes all selective pruning, removing dead
or deseased branches and shaping as required throughout the
year.
Irrigation repairs and adjustments will be done as required
and will be billed to the owner at the rate of $27.50 per
hour plus materials. All normal setting of controllers is
included in base bid.
10. Bark mulch appl ications.wi l l be made as required and, invoiced
to the owner.
11. The base bid includes a site visitation by our landscape
maintenance supervisor and check in with the owner once a
week from April 15 through September 30. Site visitations
will be done twice a month during the rest of the . year or
as requested by the owner.
12. Annuals and perennials will be planted at the owners request.
Please contact our office at 852 -0091 with any problems which need
immediate attention. Ask for either Steve Elliott, John Vangen
or Sandra Hasegawa.
(1
LAWN MOWING SCHEDULE
March 15 to April 15
Mow every Fourteen (14) days
April 15 to May 15
Mow every Ten (10) days
May 15 to September 15
Mow .every Seven (7) days
September 15 to October 31
Mow every Fourteen (14) days
October 31 to March 15
Mow every Thirty (30) days
POWER - EDGING SCHEDULE
Edge lawns every Two (2) mowings
LAWN FERTILIZING SCHEDULE
Second week of Apri 1 ':
Use 15-5 -10 fertilizer at a rate of Twelve (12) pounds
per One Thousand (1,000) square feet of lawn.
Third week of May:
Use 15 -510 fertilizer at a rate of Twelve (12) pounds
per One Thousand (1,000) square feet of lawn.
Second week of July:
Use Milorganite fertilizer at a rate of Fifteen (15)
pounds per One Thousand (1,000) square feet of lawn.
Third week of August:
Use Milorganite fertilizer at a rate of Fiftenn (15)
pounds per One Thousand (1,000) square feet of lawn.
Second week of September:
Use 15-5 -10 fertilizer at a rate of Twelve (12) pounds
per One Thousand (1,000) square feet of lawn.
(Note: 15-5-10 fertilizer to have nitrogen derived from
sulfate of amonia.)
(3)
AERIFICATION OF LAWN AREAS
First, aerifying shall be done immediately prior to applicat-
ion of fertilizer in April.
Second, aerifying shall be done immediately prior to applicat-
ion of fertilizer in July.
Note: Aerifying machine to be used shall be a core removing
machine capable of a depth of Two (2) inches.
Do not begin aerifying sodded lawns until Second year.
Do not begin aerifying seeded lawns until Third year.
•
SHRUBS 6 GROUND COVER SCHEDULE
Second week of April:
Use 10 -20 -20 applied at the rate of Twenty (20) pounds
per One .Thousand (1,000) square feet of bed area.
Mid-August:
Use 10 -20 -20 applied at the rate of Ten (10) pounds per
One Thousand (1,000) square feet of bed area.
(Fertilizer formula: (1).. 50% of the Nitrogen shall be
derived from Nitro from "Blue Chip:" (2). Potash shall
be. derived from Sulfate of Potash.)
RHODODENDRON:
Apply 4-8-8 f e r t i l i z e r at a rate of F i f tenn (15 ). pounds
per. One Thousand (1,000) square feet of bed area as blooms
begin to fade.
.(5)
7.
SHRUBS & GROUND COVER WEED CONTROL
Use One (1) pound of Casoron Ten (10) granular per Four
Hundred and Fifty (450) square feet of bed area once each
winter.
Do not apply within Six (6) feet of the edge of sloped
beds.
Do not apply within Three (3) feet of the edge of level
beds.
C
INSECT CONTROL L
Spray for insect control
First spraying in February
Second spraying in April
Third spraying in June
Fourth spraying in August
Where possible, annuals and bedding plants should be. planted
near entrances to provide spring and summer color.
The maintenace program as outline in this manual is necessary,
to keep the landscape in top condition. .A quality landscape
is always a valuable asset to a leased building complex..
If
11
landscape plan wolverine properties
floor plan
granger building remodel
thomas a sconzo
site plan
grainger building remodel