HomeMy WebLinkAboutPermit 78-10-L - MCCANN BUILDING #395 - LANDSCAPE REVIEW78-10-l
6725 todd boulevard
mccann building 395
Planning Commission Page 3
Minutes 16 November 1978
?�cCANN PROJECT #395 - LANDSCAPE PLAN
Mr. Blaylock read the staff report and explained the displayed drawings.
Mr. Ed Hunt of A1cCann Construction Company said they will comply with the stipu-
lation in the staff report.
MOTION BY MR. WELSH AND SECONDED BY MR. BOWEN TO APPROVE THE LANDSCAPE PLAN FOR
McCANN PROJECT #395 WITH THE FOLLOWING CONDITION:
1. TREES BORDERING ON OLYMPIC AVENUE AND TODD BOULEVARD BE PLANTED A
MAXIMUM OF 30' APART ON CENTER.
MOTION CARRIED.
McCANN PROJECT #410 - LANDSCAPE PLAN
Mr. Blaylock explained a modification made on the plans by the Public Works
Department that allowed a one -way, angled curb cut on Todd Boulevard. He read
the staff report and explained the displayed drawing.
Chairman Kirsop asked if the conditions mentioned in the staff's recommendation
were acceptable to the owner. Mr. Ed Hunt said they were acceptable.
MOTION BY MR. WELSH AND SECONDED BY MR. JAMES TO APPROVE THE LANDSCAPE PLAN FOR
McCANN PROJECT #410 WITH THE FOLLOWING CONDITIONS:
1. TREES TO BORDER OLYMPIC AVENUE AND TODD BOULEVARD BE PLANTED A MAXIMUM
OF 30' APART ON CENTER.
2. ACCEPTABLE LANDSCAPE TREATMENT OF ALL SITE AREA NOT COVERED BY BUILD-
ING OR PARKING PER COMMISSION PROJECT APPROVAL OF 17 AUGUST 1978. SAID
TREATMENT TO BE APPROVED BY PLANNING STAFF PRIOR TO ISSUANCE OF OCCU-
PANCY PERMIT.
MOTION CARRIED.
SOUTHCENTER OFFICE BUILDING - DEVELOPMENT PLANS
Mr. Blaylock read the staff report and explained the displayed drawings.
Mr. Steve Koehler, developer, stated that he agreed with the staff's recommenda-
tions except for: (1) the access at the northeast corner be limited to right had
turns only and (2) the width and length of parking stalls. He explained that he
is working with the Doubletree representatives to develop a common access entrance.
They preferred the entrance allow left hand turns onto the site from Strander
Boulevard and right hand turns only off the site onto Strander Boulevard. He also
mentioned he felt it was more important to have a wider aisle than long parking
stalls.
There was a discussion regarding the width and length of parking stalls.
(oi?S
1oct4C Vva .
16 November 1978
CITY OF TUKWILA
PLANNING DIVISION
PLANNING COMMISSION
STAFF REPORT
AGENDA ITEM V B : Landscape Plan: McCann Project #395
8:00 P.M.
McCann Construction Company has submitted a landscape plan for Southcenter
South Industrial Park Project #395, drawn by I'Jeedman's Landscaping of Kent,
for review by the Planning Commission.
Project #395 is located at the southeast corner of Olympic Avenue and Todd
Boulevard. The landscape plan indicates that both streets are to be bord-
ered by Norway ;Maples (pictured at 45' on center) with ground cover below.
The interior of the site at the north and west sides of the building are
proposed to contain small planting areas of varied shrubbery. Irrigation
plans accompany the landscaping plan.
Staff recommends approval of the plan with the following conditions:
1. Trees bordering on Olympic Avenue and Todd Boulevard be
planted a maximum of 30' apart on center.
COPIES
DATE
NO.
DESCRIPTION
/ e" d py
�P_R /C drff 7
4 /0 �lJGL 5/26
/ C.6 vy
L >p/UDSCGd Pe
...14 ov �GtJ[ -L s /Z�
I Co
EL /c"-747
L -.,d/V , -
/' .,dN E'EpeJJ&V - r
4
84- x 1/
o
McCann Construction Comp -,y Inc.
950 Andover Park Ease
P. 0. Box 88314
SEATTLE, WASHINGTON 98188
(2061 575 -4 330
TO � 0 P - 7? - }sea.)/L.4
Tv .euJie. Gc%d JN.
GENTLEMEN:
WE ARE SENDING YOU pcsAttached ❑ Under separate cover via
THESE
REMARKS
❑ Shop drawings
❑ Copy of letter
FORM 240-2 - Available from /NCagf Townsend, Masa. 01409
y4] Prints
/❑` Change order
ARE TRANSMITTED as checked below:
,For approval ❑ Approved as submitted
❑ For your use ❑ Approved as noted
❑ As requested ❑ Returned for corrections
❑ For review and comment ❑
❑ FOR BIDS DUE 19
❑ Plans
If enclosures are not as noted, kindly notify us at ones.
ILIEcrrr oEF' 'WEiQa6noTrTa=
DATE
iv Zs /78
ATTENTION
M e. &A y LOC,e
RE:
�• C• &244,0e;&
L „ A21) scAP /.U4 f 2e21c 477 Id
7 4A)s
the following items:
❑ Samples ❑ Specifications
❑ Resubmit copies for approval
❑ Submit copies for distribution
❑ Return corrected prints
❑ PRINTS RETURNED AFTER LOAN TO US
landscape plan
sprinkler plan
1)
VD- 5 flow I,
MWMM 13I4)&• �
landscape plan