HomeMy WebLinkAboutTrans 2014-10-13 Item 2B - Update - Annual Overlay and Repair Program / Pavement Maintenance Management ProgramTO: City of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM Mayor Haggerton Transportation Committee FROM: Bob Giberson, Public Works Director BY: David Sorensen, Project Manager DATE: October 10, 2014 SUBJECT: Annual Overlay & Repair Program Pavement Maintenance Management Program Update Report ISSUE Present an update on the City's Pavement Maintenance Management Program. What funding level is required to keep pace with the normal deterioration of roadway pavement? BACKGROUND Tukwila owns, operates, and maintains paved asphalt roadways, thus, making it necessary for Public Works to monitor the condition of each roadway segment in the City. Tukwila uses a pavement monitoring program called PMSPro developed by Pavement Engineers. The PMSPro program relies upon regularly updated data for each street segment that describes the condition of the pavement in terms of deterioration and distress signs such as cracking, rutting, surface wear, humps, bumps, and sags. A map of rehabilitation strategies is shown on Exhibit 1 (Figure 10 of the Report). This information is then used to prioritize maintenance activities, develop a rehabilitation schedule, and plan multi -year budget strategies. Pavement Engineers has examined each street using visual inspection and computerized data entry and measurement to provide an updated roadway condition survey in 2014 for all of Tukwila's streets. The Pavement Condition Rating (PCR) for the entire city is scored as shown on Exhibit 2 (Figure 11 of the Report). The higher the score, the better the condition of the roadway. Portions of the draft report have been attached. ANALYSIS The overall condition of Tukwila's streets is good; however increased funding is needed to maintain the Citywide Pavement Condition Rating at its current level or to improve it. At the current funding level, the repair of city roadways has not kept pace with normal deterioration; i.e. deferred maintenance is growing. Ideally Tukwila should be repairing its roadways at the same rate that they deteriorate. Several questions need to be answered: Question 1: What impact does the current funding level proposed in the 2015 -2016 Biennial Budget have on the condition of the roadways? The current proposed budget provides an effective construction budget of $2,300,000 for 2015 & 2016. This amount does not include contingencies, but it does include construction costs for associated work such as curb ramps, traffic loops, and drainage issues that do not extend pavement life. A modest annual escalation factor increases the proposed budget in future years. Based on the current program report, this funding level does not keep pace with expected pavement deterioration. The program analysis shows that approximately $1,300,000 is needed annually (in paving costs alone) to keep pace with deterioration. Funding would need to be increased to accomplish that level of new pavement in any one construction year. 43 W:1PW EngIPROJECTSIA- RW & RS Projects\Annual Overlay & Repair Programs12015 Overlay & Repair Program \ Program Update for TCITC Info Memo 2014 PMS 10 -10 -14 - sb.docx Response: The proposed budget will provide an average effective construction budget of $1,150,000 per year. The roadways will deteriorate faster than they can be repaired and the backlog of deferred maintenance (number of roadway sections needing repair) will continue to grow. Question 2: What annual funding level would be needed to maintain a non - deteriorating pavement condition rating? Response: The City would need an overlay construction budget of approximately $1,500,000 (not including a contingency). RECOMMENDATION Provide annual funding levels to match the rate of roadway deterioration in order to maintain a consistent pavement condition rating. Updates on the Pavement Maintenance Management Program should be presented to the Transportation Committee every 2 years to monitor progress and appropriate funding levels. Attachments: Page 18, Proposed 2015 CIP Exhibit 1 Map of Rehabilitation Strategies Exhibit 2 Map of Current Pavement Condition Ratings Exhibits 3 6 Budget Comparison Charts W:1PW Eng\PROJECTSIA- RW & RS ProjectslAnnual Overlay & Repair Programs12015 Overlay & Repair Program\Program Update for TC1TC Info Memo 2014 PMS 10- 10 -14- sb.docx 44 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2015 to 2020 PROJECT: Annual Overlay and Repair Program Project No. 91310401 DESCRIPTION: Select, design and construct asphalt and concrete pavement overlays of arterial and residential streets. JUSTIFICATION: Preserve and maintain the street structure in a safe and useable state by resurfacing before failure which also minimizes costs. Some individual sites may be coordinated with water, sewer, and surface water projects. STATUS: Each year various sections of roadway throughout the City are designed and constructed for asphalt overlay. MAINT. IMPACT: Reduces annual maintenance. COMMENT: Ongoing project. Only one year actuals shown in first column. FINANCIAL Through Estimated in $000's 2013 2014 2015 2016 2017 2018 2019 2020 BEYOND TOTAL EXPENSES Design 48 100 125 125 150 150 175 175 175 1,223 Land(R/W) 0 Const. Mgmt. 175 175 175 200 200 225 225 230 1,605 Construction 1,125 1,250 1,260 1,300 1,320 1,325 1,330 1,340 10,250 TOTAL EXPENSES 48 1,400 1,550 1,560 1,650 1,670 1,725 1,730 1,745 13,078 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 City Oper. Revenue 48 1,400 1,550 1,560 1,650 1,670 1,725 1,730 1,745 13,078 TOTAL SOURCES 48 1,400 1,550 1,560 1,650 1,670 1,725 1,730 1,745 13,078 Project Location 2015 - 2020 Capital Improvement Program 18 45 46 Pavement Engineers, Inc. EXHIBIT City of Tukwila 4.q "i Rehabilitation FILL CRACKS PATCH SLURRY SEAL TN OVLY TK OVLY /LOCAL TK OVLY /ART RECONST /LOCAL RECONST /ART )g•»1 —V cePPIANt r» EXHIBIT , City of Tukwila PCR Values masterMap.PE_PCR < 20 Failed 20 - 39 Very Poor 40 - 59 Poor 60 - 79 Fair 80 - 100 Good /Excellent Pavement Engineers, Inc. 12 10 Budget $1,000,000/Year Budget $, Millions EXHIBIT 3 Spent — Deferred 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Year Figure 5a. Budget vs Deferred Maintance 100 80 60 40 20 0 Health of Street Network $1,000,000/Year Budget % Area PCR Range M< 20 1E20 -39 EJ40 -59 X60 -70 11180 -100 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Year Figure 5b. 49 EXHIBIT 4 12 10 8 6 4 2 0 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Year Figure 6a. Budget vs Deferred Maintance Budget $1,300,000/Year Budget $, Millions 100 80 60 40 20 0 Health of Street Network $1,300,000/Year Budget % Area PCR Range 1:1 •< 20 ®20 -39 040 -59 X60 -70 X80 -100 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Year Figure 6b. 50 EXHIBIT 5 12 $, Millions 10 8 6 4 2 0 2014 2015 2016 2017 2018 2019 2020 2021 Budget $1,500,000/Year Budget Year Figure 7a. Budget vs Deferred Maintance 100 80 60 40 20 0 2022 2023 2024 Health of Street Network $1,500,000/Year Budget % Area PCR Range •< 20 020 -39 040 -59 M60 -70 X80 -100 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Year Figure 7b. 51 XHIBIT L Accumlated Budget + Deferred Maintance 100 80 60 40 20 0 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Year $, Millions °Total ($lmil) —Total ($1.3mil) —Total ($1.5m11) Figure 8. 100 80 60 40 20 0 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Average PCR ■$1 mil/Year No$1.3 mil/Year d$1.5 mil/Year Figure 9. 52