HomeMy WebLinkAbout1977 - Right-of-Way Easement - Segale Business Park - 77070800787707080078
RIGHT-OF-WAY EASEMENT
The grantor, MARIO A. SEGALE, a married man dealing
in his separate property and estate, and as a sole proprietorship
doing business as SEGALE BUSINESS PARR, for and in consideration
of ONE DOLLAR ($1.00) and other valuable consideration, receipt
CD of which is hereby acknowledged, conveys and warrants unto CHICAGO,
N MILWAUKEE, ST. PAUL AND PACIFIC RAILROAD COMPANY, a Wisconsin
O corporation: OREGON - WASHINGTON RAILROAD s NAVIGATION COMPANY, an
O Oregon corporation, a,ni its Iessee, UNION PACZrIC RAILROAD CO?1,PANY,
00 a Utah corporation, hereinafter called 'Railroad Companies', an
CD easement for the construction, maintenance and operation of a
t• railroad right -of -way and railroad tracks upon, over and across the
• following described property, situated in Xing County, Washington:
f`
.1 LEGAL DESCRIPTION
Men Exhibit 'A" attad ed refarencacede a art hereof)
ry
The grantor roaervea to himself, and his successors in title
to the described property, the following:
(1) Tho right to install other utilities upon or across
ouch right -of -way, such as water lines, sewer lines and power lines,
provided that all such inotallationa shall be made below the surface
of the ground and so as not to interfere with the track of said
Railroad Companies, or the use of the right- of-way by said Railroad
Companies, or their operations thoreover, all in strict accordance with
the specifications and requirements of said Railroad Companies.
Provided, however, that in connection therewith, the grantor shall
not permit any excavation or trenching to be performed within the
limits of the said right - of-way unlea^ ouch trenching or excavation
is adequately whored and cribbed. Further, said shoring and cribbing
shall be constructed and maintained with such materials, and in such
manner, as to withstand all stresses likely to be encountered, including.
but not by way of limitation, any stresses resulting from vibration
caused by railroad operations at or in the vicinity of such work.
(2) The right to construct public or private streets acroas
the right -of -way hereinabove described, at locations acceptable to
the Railroad Companies, and in accordance with specifications and
raquirements of said Railroad Companies.
(3) The right to relocate and /or to terminate this easement
and right -of -way under and pursuant to the terms of that certain
agreement dated the 16th day of January, 1974, entered into by and
between the parties hereto (which agreement sets forth the terms
and conditions under which railroad service is to be extended into
ley
1
_ aa';' tGAa[ ac�Yfl[,.,4iWfTaHrAlPAtvRat�sii .�xri s•ow�nr
i
e
Segale Business Park in Tukwila, King County, Washington), which
said agreement is incorporated herein by this reference thereto.
IN WITNESS WHEREOF, the grantor has executed this
instrument this ••t" day of , 1977.
STATE OF WASHINGTON )
) sa.
COUNTY OF KING
RICHT -OF -WAY EASEMENT
Page 2
•
M�io a rried man dealing
in his separate property and estate,
d /b /a Segale Business Park.
On this day personally appeared before me MARIO A. SEGALE,
to me known to be the individual described in and who executed the
within and foregoing instrument, and acknowledged that he signed
the same as his free and voluntary act and deed, for the uses and
purposes therein mentioned.
GIVEN under my hand and official seal this "t day
of , 197
Notary Publdc in and for thO State of
Washington, residing at k_._"#
My commission aspires: 1,00;1-7.1
•
1
i
EXHIBIT "A'
J.
LLGAL DESCRIPTION;
A 20.00 foot wide strip of land located within that portion of the
East Half of Section 35, Township 23 North, Range 4 East, M.H., in
Ring County, Washington, lying Southerly of the Southerly line of
Oa South 180th Street, having 10.00 feet of such width on each side
s of the following described centerline:
Q BEGINNING at a monument at the intersection of the centerline of
r- Andover Park West with the centerline of South 100th Street: thence
O South 07 East, 309.00 feet to a point of curve; thence along
ti a curve to the left having • radius of 300.00 feet through o central
angle of 8 an arc distance of 44.12 feet; thence along a
curve to the right whose center bears North 77•23'21" West having a
radius of 572.96 feet through a central angle of 3 an arc
distance of 38.23 feet to the TRUE POINT OF BEGINNING,; thence con-
tinuing along a curve to the right having a radius of 572.96 feet
through a central angle of 0 °25'46" an arc distance of 4.29 feet to
a point of compound curve; thence along a 14' curve to the right
through a central angle of 58'14'17" an arc distance of 415.99 feet;
thence South 75 °0S'56' West 139.64 feet to a point of curve; thence
along a 14• curve to the left through a central angle of 55'41'00"
an arc distance of 397.74 feet; thence South 19.24'56' West, 161.29
feet to a point of curve; thence along • 12' curve to the left
through • central angle of 11'40'00" an arc distance of 97.22 feet;
thence South 7'44'56" West, 261.95 feet to a point of curve; thence
along • 12' curve to the right through • central angle of 13'00' ')0"
an arc distance of 108.33 feet: thence South 20'44'56" West a distance
of 459.00 feet to the terminus at this centerline.
' Sr... . ' � :. , .•• • •.. •