HomeMy WebLinkAboutPermit DR-13-74 - OLYMPIA BREWERY - DISTRIBUTION CENTER LANDSCAPE REVIEWdr-13-74
230 andover park east
LANDSCAPE REVIEW
Minutes, 27 June 1974 Page 5
Motion by Mr. West, seconded by Mr. Zepp and carried
to approve the proposed sign provided the sign be set-
back from all property lines a distance at least equal
to the overall height of the sign.
BOARD OF ARCHITECTURAL REVIEW:
A. Site Plan Review - McCann Project #247
Staff read Staff comments and recommendation.
Motion by Mr. Link, seconded by Mr. West and carried to
approve the plan subject to the following stipulations:
1. Removal of the two (2) parking spaces
indicated at the northeast corner of
the building.
2. All parking stalls be 9 feet in width and
aisles for 60 degree parking be a minimum
of 15 feet.
3. Approval of detailed landscape plans, to
include that area along the P -17 channel,
prior to issuance of occupancy permit.
B. Site Plan Review - Cabot, Cabot & Forbes (M -3)
Staff noted previously suggested revisions have been
made satisfactorily and recommended approval.
Motion by Mr., Sneva, seconded by Mr. Lamb and carried
to approve the plan subject to approval of detailed
landscape plans, to include that area along the P -17
channel, prior to issuance of occupancy permit.
C. Site Plan Review - Don Koll Andover East Center
Staff noted this site plan is excellent improvement
over previous shopping center plans and recommends
approval.
Motion by Mr. Link, seconded by Mr. Zepp and carried to
approve the plan subject to approval of detailed land-
scape plans prior to issuance of occupancy permit.
D. Site Plan Revision - Olympia Brewery Distribution •
Staff noted the proposed fencing will be adequately
planted with screening landscape. Motion. by Mr. Sneva,.
Minutes, 27 June 1974 Page 6
seconded by Mr. Zepp and carried to approve the plan
revision subject to screening of the easterly portion
of the fence also.
D. Tukwila Long House
Councilman Dan Saul presented schematic plans of an
Indian Long House he hopes to raise the funds with
which to build the facility. Staff noted the require-
ment for a Shoreline Management Permit and need for
landscape setback along Christensen Road.
Motion by Mr. Sneva, seconded by Mr. Zepp and carried
to approve the concept of plans subject to provision
of a landscape area along Christensen Road at least
fifteen (15) feet in depth.
Chairman Mettler noted the City. Council would be
discussing the proposed Duwamish Annexation on Monday
night and all Commissioners are invited to attend.
Motion by Mr. Lamb, seconded by Mr. West and carried to
adjourn the regular meeting to 8:00 p.m., Thursday,
11 July 1974.
Chairman Mettler adjourned the egular meeting to
11 July 1974.
(- G ,y- v Herb rt Lamb, `Secretary
Tukwila Planning Commission
fj
��: ......
—15-14
230 AUNEI2 Pak E
ti:044 PIA 5silami
tV7TRlbUflOM c,�.I
•
site plan
olympia brewery
revised parking