Loading...
HomeMy WebLinkAboutPermit 73-37-SMP - KING COUNTY - RATOLO LEVEE REVETMENT SHORELINE SUBSTANTIAL DEVELOPMENT73-37-SMP KING COUNTY GREEN RIVER RATOLO LEVEE REVETMENT SHORELINE MANAGEMENT SHORELINE SUBSTANTIAL DEVELOPMENT SHORELINE MANAGEMENT SHORELINE SUBSTANTIAL DEVELOPMENT Frank Todd, Mayor CITY Or TUKWILA 14475 • 59TH AVENUE SOUTH TUKWILA, WASHINGTON 98067 18 April 1973 . RATOLO LEVEE REVETMENT. I. Location and Description of Project The proposed project is located along the left river bank of the Green River in the N.W.4 of Section 36, Town- ship 23 North, Range 4 East, W.M. The project consists of raising approximately 1300 feet of existing levee with pit run gravel an average height of two and one -half feet. The project will affect only the west bank levee of the Green River and will be constructed per plans prepared by King County Department of Public Works, Division.of•Hydraulics. (Plan #H -126, pages 1 and 2, copies of which are on file with this office). II. Purpose Purpose of the project is to provide the necessary flood protection to that land which lies behind the Ratolo levee. Approximately 1300 linear feet of the existing levee is from two to three feet lower in elevation than the remaining portions of the levee. Portions of the levee will be filled to an average elevation of 31.0 feet, allowing for a disc charge of 9000 cubic feet per second in the Green River. III. Environmental Impact of the. Proposed Project That land surrounding the project area is presently zoned for Heavy Industry and is being developed as such with a few exceptions, i.e. the Pacific National Bank Computer Center. 'The proposed project will have no adverse effect on the surrounding land uses, but will in fact be beneficial in that the additional levee height will give added protection to the, existing and future developments. King County maintains NEGATIVE IMPACT DECLARATION' PLANNING DEPARTMENT a river bank maintenance easement for access to said project area. Therefore, access to the construction site will have no adverse environmental effect. Project construction will consist of raising the existing levee with pit run gravel which will enable grass growth on the raised levee. No noticeable adverse environmental effect will be caused by project construction. - 2 - IV. Alternatives to the Proposed Project A. One alternative is to construct a concrete wall atop the existing levee which would depart from the existing landscaping and which would be more costly. . The second alternative would be to do nothing, which will subject the existing developments to flooding from the Green River. V. Basis for Negative Declaration The proposed project and its effects have been reviewed in accordance with the Guidelines for Implementation of the State 'Environmental Policy Act of 1971. The review has led to the following determinations: A. That environmental conditions (physical, social, biological) will not be substantially changed, but will actually protect and enhance existing conditions. . That the beneficial environmental effects will be long -term in nature. C. That no significant adverse environmental effect will be a result of the proposed.pro- ject. D. That there will be no secondary adverse environ- mental effects as a result of the proposed project. In consideration of the foregoing conclusions, it is determined by this office that the Ratolo Levee Revetment is a minor action and the environmental effects are not significant. More particularly, it is felt by this office to be of ,substantial benefit to the surrounding area. chfield g Technici f ry C Plann My dear Mayor Todd: Attention: Mr. Delbert Moss April 12, 1973 The Honorable Mayor Frank Todd City Hall Tukwila, Washington 98067 King County State of Washington John D. Spellman, County Executive Department of Public Works Jean L. DeSpain, Director 900 King County Administration Building Seattle, Washington 98104 Environmental Assessment Summary for Ratolo Revetment Reference is made to our letter to you dated April 5, 1973, and to the meeting held on April 6, 1973, between Mr. Larry Gibbons of my staff and Mr. Gary Crutchfield and Mr. Dick Hanson of your Planning Department concerning the need for a Shoreline Management Permit and Environmental Assessment Summary for raising an existing levee located immediately south of South 180th Street. At the request of your Planning Department, we have prepared the following Environmental Assessment Summary for raising a portion of this levee which we refer to as the Ratolo Levee: Environmental Assessment Summary for Ratolo Levee: 1. LOCATION AND DESCRIPTION OF PROJECT The proposed project is located along the left river bank of the Green River in the NW1 of Section 36, Township 23 North, Range 4 East, W.M. The proposed project would consist of raising approximately 1300 feet of existing levee with pit run gravel an average height of two and one - half feet. (See enclosures B -126, 1 and 2). All material would be placed above the Green River water surface profile for a discharge of 9000 cubic feet per second in the river. 2. PURPOSE Purpose of the project is to provide the necessary flood protection to Andover Industrial Park from the Green River. The Honorable Mayor Todd WBG LRG:lmw Page Two (2) April 12, 1973 3. ENVIRONMENTAL IMPACT OF THE PROPOSED PROJECT The project area is at present heavily industrial zoned and the adjacent land is being developed accordingly. A river bank maintenance easement presently exists which contains the proposed pro- ject area. The existing ground cover consists of grass and a gravelled access road. The proposed project consists of raising the existing levee with pit run gravel which will enable grass growth on the raised levee. Access to the construction site will be along the top of the existing river bank. No affect on the behavior pattern of wildlife species and wildlife breeding, nesting, or feeding grounds is anticipated. Also, air quality will not be affected by this project. 4. ALTERNATES TO THE PROPOSED PROJECT There are two alternates to our proposed project. The first alternative is to do nothing, which will subject the developed Andover Industrial Park to flooding from the Green River. The second alternative is to construct a wall which would depart from the existing landscaping and would be more costly. 5. LONG -TERM PRODUCTIVITY AND IRREVERSIBLE RESOURCE COMMITMENTS The long -term productivity will involve the further development of the land surrounding the project which will be most . likely irreversible. Encls: Plans B -126, 1 &2 (3 sets) Very truly yours, WILLIAM B. GILLESPI Division Engineer Division of Hydraulics Enclosure: Plan (2 sheets) The Honorable Mayor. Frank E. Todd City Hall Tukwila, Washington 98067 Attention: Mr. Gary Crutchfield King County State of Washington John D. Spellman, County Executive Department of Public Works Jean L. DeSpain, Director 900 King County Administration Building Seattle, Washington 98104 April 5, 1973 My dear Mayor Todd: We are proposing to raise approximately 1300 feet of existing levee located south of South 180th Street along the left riverbank of the Green River. We found in reviewing the top of river bank profile in this area that the river bank was low. Thwefore, because of our earlier commitment in this area we plan to raise this levee approximately two and one - half feet to provide the necessary flood protection to the Andover Industrial Park. We are enclosing a set of prints of the proposed project and would appreciate a letter from you stating whether a Shoreline Management permit is required. We would like to start raising this existing levee in April, 1973, if a Shoreline Management permit is not required. Therefore, your earliest response would be appreciated. truly yours, WBG L W rLLIAM B. GI LESPIE LRG :mm Division Engineer Division of Hydraulics .. , • AIO . LE-VE RE\J61R;J , ...0,« mr n. mw. s w-. na*. w,u.. ri.. l+ �wx �N+ n�:+. iawi+ w+ i. �uw+. .•.rw.w...wtiLrx+.•r.N�w�q+.+en, �uW, n+ eh�_ W.:.: a+: w�arwJ�:rr,4�nwi+ :f.?ia..k.1. 1 4147.:,0'41.H .i ..,..' CONSTRUCTION DATA • STATION.. OFFSET. ' B r° A P Au f F ELEV. r frr o A E . x. ELEV. . REMARKS .. lq#30 • .- ..;101+00 .c ..••„,.. •.. , • '.. . 102+00' .,. . toz4o ..• 103+00 , 1 03+80 :: 105400 . tO7tOO • 107458' . i oq -h o o . -110400 II I +oo' :. ti 2 +iii:7: . • (14+00 .; : ,;... .L.,:,, : / bit V* !, 1 lc i ■ -513 - '7. 77E To :i . 7.0 R ',I 6, 0 ,f ,,, • . :, 5.0 : :: 1 " , ' 4, o . •:',',.,.2is ' ,,..- 2:0 ',.- '2.0'; !), :- 21.0 „. 9.o.", .• . •L . 7% s' ••'• 79,9 '. 8.0' ., ,7... : ..; .240! ";:4 '14.5' .:::,',:i 'F : , :.', 0 :.R -TIE To • Et151 ... :: • /..:, ,,. -; '.. -,,' ' .,. .:. ..S1,0 ,. :.:3 i• . ..,..,.30.2.:.,, ..3o. .,.. , 10 . 04i! •.;.: ,30,1r,.„,,. :....-:::. ',... , r 10.15 EicisiING 1 AO :ROCK '•-• : , ' . " ..,, . . ,... „ LO ,,-,,,, 0.: ' t);',.: .!.3 ,. . - ; •-•••• • ',..:.• ....''''?, %, ,...., EtRitiGE• SLOPE-. ■ .,, .. • .-. ' ' • , ' . . ••••:, • :!.-L.: . ; , -, ,. !.•,:,., /,,-..,.`` '';:'' '' ;.k ,,., „ 'i'i '1,::. • '• ': ';-•,,,:: .... - • . . . • • -. . . .. _• ', 90 LT OFF /3K. TAN. . . . ,-. • . .- `'.'• • , • ' . • , .,... :......,,,,,.:.;.„. • ../23ii::: .,...,•... • •)..,,,,...,...,?: f:....4,....: ,•;,.,- !'.. .' . k ‘• 1 - 70 5F ,, :i.". 7 7 :4 %.: -. - '•'''Y'' • 4.! • P' • • • • •• , • , 1 • • 30 I . 0 0) 0 0 0 0 0 0 O 0 O 0 0 ..i. , q- IT ...:?' . .., ...., 0 C -r. \--7 • 0 TOP . BAA. 1 1< --EXISTIr RIVER 8E0 0 LsriNG- R/VER esp_o 6 20 10 — STA. 107400- BEGINNING 'OF JOB TIE TO EXISTINO. BANK • • 4. OFFSET AS TABULATED 1 — 14: MIN. Prr RUN ff, •-• CP. 41 11 NO SCALE FLEXIBLE RULER -302AW IDE 1 oc 6Z Be CZ 9Z CZ VZ CZ ZZ 1•Z 61 91 LI 91 SI 'CI, Z1 11 0 • ' .„...„J1 1 , 1 1 1 11111.11,14)41 . 1) . 4W, 1 1 1 ,1 1 1111 . 11110 1 ,111, 1 ,1 1 A 1 . 1 , 11 .4 ligh1 1 441J . ,011,91R111!t11411j . 1.1111IIII . I . U . 14 111 , W,11111 . 111i1,1 , 1,1111i , R114 . 0 , 1 , 11J1,Y . 1111 , .IPII14011 . 1 P rofile OFFSET AS TABULATED ELEVATION AS TABULATE D EK/57/ NE .'o . . . P • tz ▪ .•doi a , • eb'o /r/ ...••■•■■ 0 ci 0 0 I ••• ..••■■■• EL.= • 1. 01 O a 0 • . • . to, I I ExIs11n9 Grade _ I ' a • co 0 WA, Is • • • • Scok W°r3: 1151::: Vert : STA. 119+50 •END OF" 408 - EL30.7 • TIE TO EXISTING. BANK = • 14' IAIN 'N....eb` • • 0 ESA, TYPICAL SECTION STA. 1110.±1507.;i117.1:90 _ L NO. SCALE ELEVATION AS TABULATED • . ' •TOP �.s.uit : if 4 IF THIS MICROFILMED DOCUMENT IS LESS f CLEAR. THAN THIS NOTICE, IT IS puE TO ..THE QUALITY OF THE ORIGINAL DOCUMENT: -"'"',- • " • • f • • • 0 . 4 0 . • ' ,TYPICAL:. SE TION • STA 107.0011050 • imoo-_iv9+;_5o State. Flood Control Permit tt 2 135 ..mAOMMA 'minion= . APPROVED JOB * 45261-185-73_ DATE: DESIGN BY 26 FEB. 73 0 0) -4 BY .1 1 -31-strve * 2 2 SHEET OF SHEETS . SCALE: AS SHOWN RECOMMENDED BY • DRAWN BY CHECKED BY KING •COUNTY'DeiT.'0F 'PUBLIC WORK DIVISION OF HYDRAULICS RATOLO REVETMENT '73 GREEN RIVER- LEFT BANK 13 126-2 ■ ^ ^ • ^,' 1 ,■, •N • `. ^ • , e • •,,- -1 _•^•-,,--., / • I ,, • -roe OF 5LOPE ' 6 . S 17611, St 0 0c e(15.T.tr4c ( ts. 0 a 0 t() 4 0 / 0 (/ Os 0 I cpL (4 4 1 4/ i ( 0 co co 47 (6 1 4 0 tri :.) Tv) 0 mm 1 0 0 0 O tn % FLOW GREEN R.WSR. 0 0 4 •cIr 0111111Mq ,wpizzookooggswq4,,,Nfr , • v.C.4'41 4 i.'74NNIInIrr:f4V4 . I 1 2 STA. 115 +50 END OF JOB TIE TO EXISTING BRIDGE 0 0 CD 0 FLEXIBLE RULER -302 AWflw (.0 0 '0 * a 1 41 0 • 1- 4- , 0 41 TR AVFZ 5E- t■ t• 4 0 .... 0 0 SEE NOTE 5 _ z EXlSTU4 G- -roe- OF EILOPe PLAN SCALE: 1"=50.0' 5 6 OE BZ EJL L2 9Z SZ ez zz te OZ 61 81 LI 91 SI VI 'El Z1 II OLL j1111111111.111,0)11 R 11 1 )01)0)111 . 1 1! 11 9j 1 11 ,1 0 11 4 1 0 11 0 1 7 1 W1 11 4 1 1 [1 , 1 1 1 61)J,.. 1 1 1 00 1 . 1 . 1 14 1 1 [1. it i l l .n 1 . 1 1 1 4[111, 1 461 1 1q11411141111 1 .Atili14 . 1-1)114illlitill.1,11 , 111 . 11 ' FRONT TOP OF LEVEE 0 0 o p • 1b-31-311re STA. 1074-00 BEGINNING OF JOB TIE TO EXISTING BANK EXISTING BACK TOP OF LEVEE BACK TOP OF LEVEE 0 0 0 • 1V1e...1711.1 / 1/ 00 IF THIS MICROFILMED DOCUMENT IS LESS "- CLEAR THAN THIS NOTICE, IT IS DUE TO THE QUALITY OF THE ORIGINAL DOCUMENT 0 c .43 EXISTING NT TOP OF LEVEE STATE FLOOD CONTROL PERMIT NO. 2- 135 NOTE: JOB*45261-185-73 DATE: DESIGN BY: 26 FEB. 73 L.GIBBONS I. REFERENCE FIELD NOTE VOLUME 4 GREEN RIVER 2.77 B. M. — SPIKE IN POW ER POLE- 2' RT OF 5TA. 984- 90 — ELEVATION /5 32.5 7 3. 8.M.— U.S.0 4 G. S. BRASS CAP N N 252 1944 LOCATED IN THE CENTER OF THE TOP OF THE- NORTH END OF .IRE EAST CONCRETE PIER OF THE ORI LL I A BRIDerE — EL.31.463. 4ALL ELEVATIONS REFER TO MEAN SEA LEVEL DATUM. STOP OF BANK RESURVEYED 1 JAN. 73 1 ' 1 BM 1 • \ KING COUNTY ENGINEERING DEPARTMENT DIVISION OF HYDR:. JL' . APP.10Y10 BY: RATOLO REVETMENT '7: GREEN RIVER— LEFT BANK SEC. 35 a 36-T.23-R.4 /. • . ;•-°* '''''''''''''''''''''' • I .•: • 'ONA SHEET I •. 2 s •tr AS SHOWN IITCOMMINDID DRAWN BY B. PLEAS t FTC • r ' • CHK'D BY lB I 2 6- ! ;4•01111414