Loading...
HomeMy WebLinkAboutPermit 5605 - Fairway Center - Grade and FillBUILDINI PERMIT (POST WITH INSPECTION CARD AND PLANS IN A CONSPICUOUS LOCATION) CITY OF TUKWILA Department of Community Development - Building Division 6200 Southcenter Boulevard, Tukwila WA 98188 (206) 433 -1849 BUILDING ` PERMIT NO. J6(}5 DATE ISSUED: 5-/- '9 FEES DESCRIPTION AMOUNT RCPT # DATE BUILDING PERMIT FEE 153.00 X17 5-211-4 PLAN CHECK FEE 30.00 ARCHITECT Bush Roed & Hitchings BUILDING SURCHARGE 3.50 ZIP 98102 SQUARE FEET OCC. LOAD ENERGY SURCHARGE OCC. LOAD SQUARE FEET OCC. LOAD TOTAL SQUARE FEET OTHER: TOTAL • 186.50 14220 Interurban Av S i'ROJECTNAME/TENANT Fairway Center ASSESSOR ACCOUNT# 33b59U- 1881 -06 000280 - 0001 -00 TYPE OF ❑ New Building U Addition L] Tenant Improvement (commercial) Li Demolition (building) L Grading/Fill WORK: ❑ Rack Storage ❑ Reroof ❑ Remodel (residential) ❑ Other 5,000 cubic yards surcharge DESCRIBE WORK TO BE DONE: PROPERTY OWNER Jerry Knudson PHONE 246 -9456 ADDRESS 6421 So. 143 P1, Tukwila, WA ZIP 98168 CONTRACTOR Foushee & Associates Co. PHONE 453 -8960 ADDRESS PO Box 68, Bellevue, WA ZIP WA. ST. CONTRACTOR'S LICENSE # FOUSHAC1580D EXP. DATE ARCHITECT Bush Roed & Hitchings PHONE 323 -4144 ADDRESS 2009 Minor Ave. E., Seattle, WA ZIP 98102 USE 4 SETBACKS: N - S - E - W - / / CODE COMPLIANCE / / / Approval of this grade /fill permit is not an approval of the foundation design method or its proposed soils preparation procedure. Additional conditions /requirements are noted on plans. Flpp/i SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD TOTAL SQUARE FEET TOTAL OCC. LOAD ---. TOTAL TYPE OF CONSTRUCTION: N/A UBC EDITION (year) 85 SETBACKS: N - S - E - W - FIRE PROTECTION: ❑Sprinklers ❑Detectors ®N /A UTILITY PERMITS REQUIRED? (through [ Yes I-1 L.2.) Public Works) ZONING: M_1 BAR /LAND USE CONDITIONS ❑Yes 0 N t� SIGNATURE: A4( CONDITIONS (other than those noted on or attached to permiVplans): Approval of this grade /fill permit is not an approval of the foundation design method or its proposed soils preparation procedure. Additional conditions /requirements are noted on plans. APPROVED FOR / BUILDING OFFICIAL DATE: F -z ~ �?ci ISSUANCE BY: y 0L ' N\ 4/. (.I I hereby certify hat I have readnd examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating con uction or the • : rformance or work. I am authorized to sign for and obtain this building permit. t� SIGNATURE: A4( DATE: -C--'a a 9 PRINT NAME: ,DAR /./.- 2bNO(-f}"N COMPANY: i/lg , 6e776.S This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. DATE ISSUED: CERTIFICATE OF OCCUPANCY NO. udlJ BUILQIN'i PERMIT (POST WITH INSPEC ..ON CARD AND PLANS \/ IN A CONSPICUOUS LOCATION) CITY OF TUKWILA Department of Community Development - Building Division 6200 Southcenter Boulevard, Tukwila WA 98188 (206) 433 -1849 BUILDING PERMIT NO. 52, (6 DATE .ISSUED: FEES DESCRIPTION AMOUNT RCPT # DATE BUILDING PERMIT FEE 153.00 c%? 3 6-21.-/-K. PLAN CHECK FEE 30.00 ARCHITECT Bush Roed & Hitchings BUILDING SURCHARGE 3.50 ZIP 98102 SQUARE FEET ENERGY SURCHARGE - SQUARE FEET OCC. LOAD SQUARE FEET OTHER: TOTAL SQUARE FEET TOTAL OCC. LOAD TOTAL - . 186.50 D1/ PROJECT F INF ORMA [ION A 14220 Interurban Av S sul PROJECTNAME/TENANT Fairway Center TYPE OF 0 New Building Addition 21 Tenant Improvement (commercial) U Demolition (building) WORK: 0 Rack Storage 0 Reroof 0 Remodel (residential) 0 Other DESCRIBE WORK TO BE DONE: 5,000 cubic yards surcharge v u 25,000 ASSESSOR ACCOUNT# :i36590- 1881 -06 0001 -00 Grading/Fill PROPERTY OWNER Jerry Knudson PHONE 246 -9456 ADDRESS 6421 So. 143 P1 , Tukwila, WA ZIP 98168 CONTRACTOR Foushee & Associates Co. PHONE 453 -8960 ADDRESS PO Box 68, Bellevue, WA ZIP WA. ST. CONTRACTOR'S LICENSE # FOUSHAC1580D EXP. DATE ARCHITECT Bush Roed & Hitchings PHONE 323 -4144 ADDRESS 2009 Minor Ave. E., Seattle, WA ZIP 98102 USE -0 / / CODE COMET IANCE CONDITIONS (other than those noted on or attached to permit/plans): Approval of this grade /fill permit is not an approval of the foundation design method or its proposed soils Preparation procedure. Additional conditions /requirements are noted on plans. FLOOR _L- W. SQUARE * FEET OCC. LOAD SQUARE FEET OCC. LOAD _ SQUARE FEET OCC. LOAD - SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD TOTAL SQUARE FEET TOTAL OCC. LOAD , i TOTAL _ TYPE OF CONSTRUCTION: N/A UBC EDITION (year) 85 SETBACKS: N - S - E - W - FIRE PROTECTION: O ® Sprinkiers 0 Detectors N /A UTILITY PERMITS REQUIRED? (through C� Yes O N o Public Works) ZONING: M_ 1 BAR /LAND USE CONDITIONS0Yes O No PRINT NAME: jOAR 4.4. .,-)/V0i,/ A/ CONDITIONS (other than those noted on or attached to permit/plans): Approval of this grade /fill permit is not an approval of the foundation design method or its proposed soils Preparation procedure. Additional conditions /requirements are noted on plans. hauling dirt to or from site. ISSUANCE BY FOR --0 L'' T y > ;,i.ee' (t OFF C AL DATE: 1'3 - 2 �' "E l I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating con uction or the At rtormance or work. I am authorized to sign for and obtain this building permit. STGNATURE: /J� • i DATE: -5------c9 y cr9 PRINT NAME: jOAR 4.4. .,-)/V0i,/ A/ COMPANY: /97 , Aeed‘t 6-C This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. CERTIFICATE OF OCCUPANCY NO. DATE ISSUED: aftikatiOrif '14.:Mttlen CITY OF TUKWILA Building Dr tment 6300'Southk er Boulevard Tukwila, WA 98188 (206) 431-3670 INSPECTION RECORD PERMIT # ,..S" Date 4- Type of Inspection Golva 110-1=:.:74/,/ o.drAe Date Wanted —2_--', a.m. p.m Site Address /17" 2 2...0 ,25,. /-- g 4084 40.1, 24,..de .57ek Project /3,4,6. 1,,,i4r >y c "gr.& Requestor Phone # Special Instructions Inspection Results/Comment: e 4- Date 6 - CITY OF TUKWILA Building Division 626300 Soutlenter Boulevard Tukwila, Washington 98188 (206) 433 -1849 INSPECTI N RECORD PERMIT # Date 61 // 6jec ”. Date Wanted p.n Project / Ayk,17, G/44. /AEG^ Phone .# /it/ r it/ Type of Inspection IP0.5/ '#t.) Site Address /1/A ?e) 2 T4fr P'4/ielli Requestor C, - 4 /%4./ Special Instructions A77,57 S�Gy t,U�oY� ''rL/S/„ L Ins'ectio Results /Comments: 2113 -af 6.4 L-1.1 1114 .4 iL. J. i MaEI Allff-WATAIWMW .` APJWILMWANANNBE .�%OR � _ / FASM a .ILL �I a _44 ` // -4/ Inspector Date 4 / /7A'r CITY OF TUKWILA 84ilding Division 6200 Souu!center Boulevard Tukwila, Washington 98188 (206) 433 -1849 INSPE CT4J I -N a RECORD PERMIT ORD PERMIT # Date /469 Type of Inspection 6-74914: - "% iJrti Site Add re s s / 1/A 2 a 77,v7):4!)-40".05,04.• Requestor Special Instructions CAW Date Wanted -61 a.m. p.m. Project 2,0 c, n/Th54-' Phone # Inspection Results /Comments: 6- ).- 1,19,'1/( -- /5 2,' ,9 44/V rv/A -/ �/" 5r c /9L)./ids h'iy' l3.2) L tvi 5. `%e/ / /7/ii% /714-.1 ii 'S�G/itJ dt/ %11/1- /1'G�//,'A " 5 /74' fr-!J / eLe /'// $;91. L /.2 44ptei, /'I1/ /si,,1 1/1' r,��u. �. i, 1,�.. /"-.y, �i u/n/ '' 7-W/1 .9/1-A! IA// L 41 ,4 »I# w/ M, /4 rod 4e1,014( 1''/% • '" r1/tf2r,�' ,��,,,� ,,7"', G ty,,fr GT /0011.1 ,,91'', /t ti'T' /��.?e Inspector ,.�. r c..,. --.. Date 61, 1 GEOTECH CONSULTANTS T0: 13256 N.E. 20th St. (Northup Way), Suite 16 °.��tt-3.2-7- Bellevue, WA 98005 0B+ngtee,- 98x33 -- (206) 747-561 A �, "' 206--75.5-91x74- (006) 343 -7959 DEC -41989 City of Tukwila Planning Department 6200 Southcenter Boulevard Tukwila, Washington 98188 ATTENTION: Quality Control DATE r......_ t'..1\71 86335. _ f'. ..... j JOB NO.: PROJECT: WE ARE SENDING YOU: ❑ Attached ❑ Via FAX To a Field Reports ❑ Reports ❑ Preliminary Drafts ❑ Test Results 5 November 1989 Fairway Center Interurban Transmitting Pages Including This Page Copies Date Description 1 Nov 1989 14,15,16,17 Daily Field Repnrt•R THESE ARE TRANSMITTED FOR YOUR: ® Information ❑ Files ❑ Approval ❑ Review and Comments ❑ Signature ❑ Distribution ❑ 0 REMARKS: CC: Signed: DRW:mk GEOTELI r CONSULTANTS 12061 747•5(1R 1206) 343•7959 13256 N.E. 20th St. (Northup Way), Suite 16 Bellevue, WA 98005 DAILY FIELD REPORT TRAVEL/PREP TIME JOB NO. ge30 TIME ON SITE 2; 3o MILES TIME OFF SITE 1' WEATHER ost - e oo / PAGE / OF VISITORS J09 OCATION CWd1/2 cote / 1.eyur44.�.so So /4/3"( 7fki /i,�. GENERAL NTRACTOR vasAie� eats - ADING T G CONTRACTOR NT /OWNER /� GE ERAL. ONTRACTOR'S SUPT. u 54J 4C/1r -er /WO el PERMIT NUMBER GRADING FOREMAN DATE '/VAr9 DAY OF WEEK HRS. CHARGED vim/ (94 .—)4:7-C14- - 7 Z . t e. (>4".2.--4,4-21 ) -2-e , `c.-G 4 �/tete : , ""e- '• j .%'%'Z e.44,•.4. 2 " i ���j-,,.,s ,,[ in,,,I 22 _�_, !/ /Cie -- / o* it 'L.40424,,,e QJ -1-e- ._e:e-vl...44 --G�. e ..t.� 3 / _.Ei C '•r✓: f?' },�.e :' =x..:.sv i 1.7(/ 4://'" .l_ :.� n ..e,o-c % , I/.? u),-16. •• _-1- n e &.e.. `*.46 ....■4e.A.-6 ./.../..,,-, .o-- ge-:Xerdi7 are- sle;eic.,,,Z-1.,, e- Zep.A.:. ....../zio.(j. ,-.:At-e) eA-,e:40,4-e) .024.--,06- ----1.--* "24,--fr-).. / x 4 4 . __-,1.e..a: _.v.,71,1: , ,,,zzt.6 4 74- a4.44---.1., ,t g -G,.e. ,410.--7/ �.r�r' - •e4r ,ede --r ..2 .r• .e'er.,. -i m 0' .,_ t Ie " fi r �` . _ ` _ ., ,7 ,. L 44e40" 4 , / L 0 •D / . &, Zee, rt _e„I' !` 4eie: r ..,e , ( `' ,.,e _,.et)c -A: 1 ei.4. .4,° _ f :., arse ;'/% KZ.ee r NEXT SITE VISIT: COPY T0: / BIGNA BE: 3r...4U 1 rA.,M. CONSULTANTS ..1,, 1` TRAVEL/22P. TIME JOB NO. TIME ON SITE ..3An' MILES .3 g mod, :OAP 120(» 747-5618 13256 N.E. 20th St. (Northup Way), Suite 16 12061 343-7959 Bellevue, WA 98005 DAILY FIELD REPORT TIME OFF SITE 3 ,',9.0 PAGE / OF / WEATHER VISITORS JOB CATION me itithi% 0/dri lefert4,- -7;7er 40-40,740, /4i CLIgT/OWNER -Le R-parr75 PERMIT NUMBER GENERAL CONTR CTOR 1;i1.306 e.... Avf.s17 GENERAL CONTRACTORS SUPT. ,-.4.94 A Atewsr 4.1 DATE ////-5/1, DAY OF WEEK bl' a D, GRADING CONTRACTOR ..- a GRADING FOREMAN HRS. CHARGED d.,A__Zif,-- "iittee-e,"-- .-...(.4 ,31;ee-edof -..j:Ze4.1.e. ca,ee.t. _deet,e--- - 74400ee-• egizedioe,' ' ../.._", -1,.. . .. — —.41 / -. in- ,......, ......i. 4— ' ..../4 Aid d' .-- - fri ....." 40'.../ At 2/ - e" . ... / 41.■ -.am, . -4.4 w . . . 1 . . . • ....)1•••.' .....teee__-• el° ele-fr 1:7 - .. fedi ,I€010040-, ...el,* 1 1Ze 4fitlec:2 __ed--otogele.„ .---- „Afa, -e., 1 • .-..)--. /.. / -0..., • , .1..rol ' "' O.—. - .1. -.......4 .../ e - or... ., - ,.;4._' W' a&:°11M ..1111MIErir- _.t , N4''eeStt-10.) ./ . , . ' / 41-0...4e .a &I.,--,v . city-404e- e,e,„.. Ar it .m440 e...-..d- .." 1<-.,• NEXT SITE VISIT: // AO COPY TO: Aly SIGN • : _I -ai■Lal. GEOTELH TRAVEy PREP. TIME CONSULTANTS /IL TIME ON SITE /DOD TIME OFF SITE 121sT WEATHER . JOB t LOCATION / D,C � —' d r/ //e.../ LIENT /OWNER ee a►7 e r -7;11 e 441 •, E 50 /V3 r r 13r0 1 NE"9 " . ti GENERAL CONTRACTOR GENERAL .CONTRACTORS SUPT. Nei 4 /ej� .e in • er GRADING CONTRACTOR GRADING /FOREMAN (206) 747.5618 13256 N.E. 20th St. (Northup Way), Suite 16 (206) 343.7950 Bellevue, WA 98005 DAILY FIELD REPORT To us h e ons-t; So ale JOB NO. 99363 MILES PAGE OF VISITORS PERMIT NUMBER DATE 4/6/3'9 DAY OF WEEK T4ars. HRS.9 ROED /41 ./ _ . I - . . .- /GX / ._ . a. _t ■._ . _ — -o-r. t _ . •( .: n - 4..e..c - . • . z. e ...... 1- ‘e.,€„e4,ev id.„-€.66. ___.\,41_.-6-e4y-e. 4r- i4,,,,g , 010.,.. .tip, ..I ✓t..... I /, / Ae"(A / NL %T SITE VISIT: • / COZY TO: 44de.:4 SIGNAjl I GEOTELH CONSULTANTS a 1206) 747-5618 1306) 343.71)59 13256 N.E. 20th St. (Northup Way), Suite 16 Bellevue, WA 98005 DAILY FIELD REPORT T �� /PREP. TIME / TIME ON SITE /:S" TIME OFF SITE i /J JOB NO. MILES 38 PAGE / OF WEATHER VISITORS JOB LOCATION ; /Yffi Q c GENERAL CON �IACTOR e,lei— Ty, era ' ,ha., jPI;M 1e/( GENERA/ CO CONTRACTORS ;UPT. GRADII/NNGG F4R � / CLIENT /OWNER ORADIACTOR PERMIT NUMBER DATE /! /'89 DAY OF WEEK HRS. CHARGED (47)1 14.1--- ,-4,,e,te---' ..12.21.1----XX-rae,41:1 a../ f,..0t-../ te*.e.-.4.--1 v.=riv'a4-c,--."- *he/ . .1-e#.4 1 • ' /L�A•Gr� �'yl.•iT /et Jae 14 --e,p, _, - 5 Kit?- //t� �. .,,•fiee 0 (.•Gyj,(iC.m•ree;; ;. '✓4'71• /, •i .0w 1... .-- riel -te' , f ' s%K: .._ . ✓i _ i • 1 - Al - •- /• - -- - - G -C..., _ .- /. _•,i... ! . _.4e�Q 1..4. --, �_,(.. - a <� ^ r -•'r & (.e4 4.4- [_ C. I(.. • ?.ESE../ „ "L 0.-e64../ 7 4-0-0,4. 1 ' I ,e_. _.4..,__,_,..e /._,.. ,-,-)e-eer.614,6•7 4)30.1-4,trz- ,,,.- NET SITE VISIT: r e /4',/ // COPY TO: SIGN URE:f//3 Project: Client: Contractor: Weather: BOSS TESTING, INCORPORATED Fairway Center LABORATORY TEST REPORT ous e- ociates Foushee & Associates Cloudy Product: Concrete Producer: Miles Sample Temp: 74 F Slump: 4 1/4" Mix Proportions: Coarse Agg : 7/8-1820 Fine Agg. : 1480 Water : 33 gal Mix Design # 08 Job # Permi Date Cement: 470 WRA A/E Admix: Date Received: 8 -18 -89 TW G 3 11989 Ticket #: 00111728 Entrained Air: Type: Std Design f'c: 3000 Placement Location & Notes: Set 1 Building B slab on grade. from C•to.D, 1 to 11.5 and A.8 to B, 1.6 to 11.5 Sample Date Number Lab # Date Made Tested 12a 2604 12b 2605 12c 2606 8 -17 -89 8 -24 -89 8-17-89 9 -14 -89 8 -17 -89 9 -14 -89 Age 7 28 28 Load /lbs Size 108,000 Strength PSI 6x12 3820 6x12 6x12 INSPECTOR: Mike Mattox SIGNED: 19015 36TH AVE. WEST LYNNWOOD, WASHINGTON 98036 (206) 778 -4402 FAX (206) 775 -9175 Project: Client: Contractor: Weather: BOSS TESTING, INCORPORATED LABORATORY TEST REPORT Foushee & Associates Foushee & Associates Cloudy Product: Concrete Producer: Miles Sample Temp: 79 F Slump: 6" Mix Proportions: Coarse Agg : 7/8 -1820 Fine Agg. : 1480 Water : 33 gal Mix Design # 08 n6 Job # -. 50 08989 Perm t : (005 Date Made: 8 -17 -89 Cement: 470 WRA : A/E Admix: Date Received: 8 -18 -89 Placement Location & Notes: Set 2 Slab on grade from C.0 to D.0, B.0, 1.6 to 11.5 Sample Number Lab # Date Made 13a 2607 13b 2608 13c 2609 8 -17 -89 8 -17 -89 8 -17 -89 Date Tested 8 -24 -89 9 -14 -89 9 -14 -89 Ticket #: Entrained Air: Type: Std Design f'c: 3000 to 11.5 and A.8 to Age Load /lbs Size 7 88,000 6x12 28 6x12 28 6x12 Strength PSI. 3110 INSPECTOR: Mike Mattox SIGNED: 19015 36TH AVE. WEST . LYNNWOOD, WASHINGTON 98036 (206) 778 -4402 FAX (206) 775 -9175 BOSS TESTING, INCORPORATED :FAIRWAY CENTER:) Foushee & Associates Page 9. JOB # 08989 8 -24 -89 INSPECTION REPORTS P-eY m ik 5 603 AUG 291989 I • Arrived on project site at 6:00 a.m. for inspection and observation of concrete placement for Building B slab on grade. Prior to concrete being placed for areas grid W to W.75, X.5 to Y.25 G thru J, and grid A to A.75 1 thru 11.5 vapor barrier, steel reinforcing, size, grade and spacing meets specifications. Concrete was supplied by Miles Pre -Mix for 215 yards which was placed by Brundage /Bone 180' boom and mechanically screeded, vibrated and mag floated by LaRusso Concrete finishers, for the above areas listed. Made two sets of cylinders: Set 1 at 85 yards, slump was 4" and temperature was 75 degrees. Set 2 at 175 yards, slump was 4" and concrete temperature was 78 degrees. Maintained a 4" slump throughout the entire 215 yards. INSPECTOR: Jeff Medearis 19016 36TH AVE. WEST LYNNWOOD, WASHINGTON 98036 (206) 778 -4402 FAX (206) 775-9175 .r C GEOTECH 13256 N.G. 20th St. (Northup Way), Suite 16 P0. Box 327 CONSULTANTS Bellevue, WA 98005 (206) 747-5618 ('06)343 -7959 TO: City of Tukwila'-. DATE: 10 August 1989 Building Planning Department 6200 Southcenter Boulevard Tukwila, Washington 98188 PROJECT: Fairway Center JOB NO.: JN 88383 Burlington, WA 98233 206- 755 -9671 ATTENTION: WE ARE SENDING YOU: ❑ Field Reports ❑ Reports Permit No. FIC 051 89 Attached ❑ Via FAX To Transmitting Pages Including This Page ❑ Preliminary Drafts ❑ Test Results Copies Date Description 1 ea 6/15- 7/7/89 Daily Field Reports 1 ea 7/18 - 8/3/89 Density Test Field Report THESE ARE TRANSMITTED FOR YOUR: (J Information ❑ Files ❑ Approval ❑ Review and Comments ❑ Signature ❑ Distribution 0 0 REMARKS: anf OF SIMLA CC: AUG 11 1989 NaImMIS 1, Signed: ,� GEOTEtH CONSULTANTS (206) 747 -5618 13256 N.E. 20th St. (Northup Way), Suite 16 (206) 343.7959 Bellevue, WA 98005 DAILY FIELD REPORT TRAVEL /PREP. TIME ,v JOB NO. 88 TIME ON SITE MILES TIME OFF SITE ll ih WEATHER PAGE OF VISITOR S SuAJA1V , min 714 JOB LOCATION CLIENT /OWNER PERMIT NUMBER Ft/2.14),4-y /' P2v77 -e - /N N RBA y 4V' _ PAIRL PR6PERT/e.i. GENERAL CONTRACTOR GENERAL CONTRACTORS SUPT. GRADING CONTRACTOR 5/11V77:10,1 J4 7720 r k_/AV., DATE 7 GRADING FOREMAN DAY OF WEEK HRS. CHARGED i% ON Site. 40 tfiarIg .- ord10/7 -e. r/,irir. i7 '4/nrn ire 451-■ /lt,r j /3. -rr-r;rkhert" iv�n7 d /iaV 1)7..1- Oil 50' r/! re J- 2 rated 407 er 7 I ( U rrton-Hy r- )OVnr'7C` .V!J . L k 51rie_ Pre4enHy ,4ij �4) 4ho1 .1-1 .35 �..,-.� ;ri e.A..)fr./ ,-) ell , .5.6 /1Hi Pr0/.1 et ►•?/.I( T arm tfirr, gn nn /Mr-HI t)(11. )-/ -P/ yht - e,rfr "T J ;i1' rj /S ph. 5ro nt -y r �harn i5 �� #'f 0v ; he. r2,5 an1-rt / pa �t'Yo Prvce•f45 CO 5urr1 .i e Opp e..5 ,/t} mod. l,•.r ,... . • • 72,4* A - B a 25 &1 1.4 b • Valc b -I D. 11 II D 3 a, I3 , (.l 1'I. //I ere/ /. .c.. . / / I- /II' /n % Jlri. ! • k /• • 01 • * is, • • / (Ai .54 1--iz/1 017,-1 !s h.. /0, (inn /pridrr ) ih 11 w i 4 ri el ck Jurnpla? RECEIVED Cf• OFA AUG 11 1989 NUM impg NEXT SITE VISIT: J Lao re COPY T0: yi 5�� 1SIGNATUR[i `� J�� �Q `.rr4 . GEOTE €H CONSULTANTS 1206) 747-5618 1206)343.7959 13256 N.E. 20th St. (Northup Way), Suite 16 Bellevue, WA 98005 DAILY FIELD REPORT TRAVEL /PREP. TIME I.0 JOB N0. P,E3 383 TIME ON SITE I�;4� TIME OFF SITE MILES L', I) PAGE OF JOB LOCATION • '7kgLC (i4 �Al2ct,�v c? NT 2. i/'n? ulersAM Ave GENERAL. CON{{RACTOR GENERAL CONTRACTOR'S SUPT. WEATHER "Fa u•h r• el R- ,nr laic -S GRADING CONTRACTOR San ,-7 a / l'Lktk ini GRADING FOREMAN ,Y+ 1,1 S or, ^, LIENT/ WNER VISITORS 71412e. P26 PeR?ies 1-11i h AkV rncl PERMIT NUMBER DATE DAY OF WEEK 7 i( ( r'5 HRS. CHARGED 0)1 5.11- ob5rr v of n . � pr,Q r ot, s t. 5� �_rr-/4 a re a 4,, .Stl.-: -h n r %YY,c'.kho7r • %1 5 le . Lei e freak' Are a. -d if7rY YAPN1fIV Pd 51.[4-[hr! f e an n ,1,411 rr7 �Iv1r' _ f iu7t'r-i5 )I1rr1 en Id Shy 11-7 w/ a( /16r4 Ad6r, Lpi st bcc u 1:1Yl I rPQ ahiu �- 2 � by 3a int; ;1-2.3 J n7r,V-c' / 1t1 n c°n%rr c Li 1� het n4. 1),,e . Irl 21.) Pool- maXimi.im (IV; aqi) /s he-oi 7A" mr.Urc! /)1, ,e?n &VT of 5a rrharyr� n pp r-5 �, e. pt'o<«citn9 f (GYn me nd REC MED CITY O,n A 1 NEXT SITE VISIT: COPY TO: 'SIGNATURE: f.‘ GEOTE6 CONSULTANTS • (206) 747-5618 13256 N.E. 20th St. (Northup Way), Suite 16 (206) 343-7959 Bellevue, WA 98005 DAILY FIELD REPORT TRAVEL/PREP. TIME /10 JOB 110. 8S3a.3 TIME ON SITE Z: MILES TIME OFF SITE Z:415 PAGE OF WEATHER VISITORS ClitgaitAbr JOB LOCATION AftiemooPy Cextrze - Ukil ;ICA CLIENT/OWNER &M ' MhErLigel AN 4V e 3 "5 Rend sr &lee Pt-ppm-its:5 GENERAL CONTRACTOR GENERAL CONTRACTORS SUPT. fOji6HeZ' Af5secripnx3 GRADING CONTRACTOR 1iArn41■114 TeitLemiA 11) Mt/4H Ar.-kalZMAW GRADING FOREMAN PERMIT NUMBER r--ZZ -01 -81 DATE DAY OF WEEK C,/I/6. ThurA HRS. CHARGED 1 Y2, ()Mery Ad fihy# LlkL,e aire_h 83.1 &peed-- end tP bti di .. 1,0-r-har e, wad Asw. _ 11 I-m.4211e ciimltsien5 of 71w, I surchanere is /26 4 Ly 50 AY'. 6/4p r.s aftel eicirnei he end Nie hi;41cli Hei Id Id feet or mpre. .Sure,ha 40 hob beer, pd ctak-cny 71 Aurriar pvi. Cbrrim eke- iva.y brn hs6v/r1 fl#1 !VOWED COY OF TUKNIA 446-1-4-1989 IINALONS arr. ro tO o m a Y W PI W0 u. . o PERMIT NO. JOB LOCATION ...bwe.cc_J Ate CI-1Z . s-s T -� �'C l� • l'- - 4 a W O C ta u REMARKS. 1 • V..1 w =r DATE n_?7QC1G84 GAUGE 2 GENERAL CONTRACTOR'S SUPT. ` GRADING FORMAN PERCENT COMPACTION � 0 d 9 1 l' V - c°r. r 0 0 oN' d �. g M)LES 1S WEATHER cCtE-,T - Cc. o L u 6 o O ' oW r COPY TO'Il 11 OPTIMUM MOISTURE GENERAL CONTRACTOR 1GRAOING CONTRACTOR ' W h N K W TEST DRY DENSITY /PCF -- 6 o- Ce IS I (TRAVEL /PRfp.+ TIME `YH 0 W o O Z ''' W a TIME OFF SITE 1545 PERCENT MOISTURE u, r 1p i3O 0 - fe. ti V' r -; . t r . SOIL TY PE D COUNTS. DENSITY / MOISTURE ELEVATION y LOCATION TP Q p p O P Si O .:1` 0 li..:,..,6 i3 $ 0 � 1 " 4 11 0 4.01 4 oF- _-� , �?�� A 1 =-4,1fGEOTECH CONSULTANTS 13240 N.E. 20th St. (Northup Way). Suite 12 Bellevue. WA 98005 DENSITY TEST FIELD REPORT en o N in rr In r ao q~ 4,2. -- 4\ . Lea REMARKS ga TT a : • ' iii ►►►►���; PERCENT COMPACTION r° K° IUE 5 r' r r Milil • 1. CLI ENT /OWNER MAX. DRY DENSITY /PCF MI OPTIMUM MOISTURE UIN W H s TEST DRY DE NSITY /PCF ej c: 3: r i EP' iNi r � ^d' r • PERCENT MOISTURE I tQ te 'C1" 'd' + SOIL TYPE ct 1 STANDARD COUNTS DENSITY / MOISTURE LOCATION (ELEVATION u- Q 9 to ip 4 0 , . cp 41 0 II - 2 . .1 1111 1 : s - r i ..JN\.,�I EN /2.. C [ it 3c$ yvoi7 , d 1 , I 4, 1 J ! I 1 1 k y tl r 4:; ,‘ a u. re .4. GEOTECH CONSULTANTS 13240 N.E. 20th St. (Northup Way), Sulte 12 Bellevue, WA 98005 DENSITY TEST FIELD REPORT ° 2 ,s4 ✓ N N 1n n . { Q 1' W } �t 3 J LL Q v PERMIT NO. JOB LOCATION cdt- QlkJ.to ■,,a - T-A -sue <.wC- w t L.A ' W ^ I1V`J a O W D K 4 (. N 2 x REMARKS 111�lILLJ�� �! tii 2 of 1 1 I fr I u GiN V V-.• "4 -z _ J • 4 yr z m 0 DATE MEM GENERAL CONTRACTOR'S SUPT. I-aU& GRADING FORMAN PERCENT COMPACTION \ O \ 4 O h )- d O U J WEATHER q►Q - !/l1 r''t CLI ENT /OWNER MAX. DRY 9ENSITY /PCF P 1 OPTIMUM MOISTURE 'GENERAL CONTRACTOR Orr-Al t GRADING CONTRACTOR .- N x tia z TEST DRY DENSITY /PCF mck % } 16 ....0 'TRAVEL /PREP TIME TIME ON SITE TIME OFF SITE PERCENT MOISTURE V k.0 W J_ a O )- N H v ti' 1 i t STANDARD COUNTS: DENSITY / MOISTURE ELEVATION ♦f / J LOCATION luU^'nnj ^I 5 p G4 o ID Lf`r�JL pp GEOTECH CONSULTANTS 13240 N.E. 20th St. (Northup Way), Stine 12 Bellevue, WA 98005 DENSITY TEST FIELD REPORT too W Z te ( n m Y W ` ! j W O' �-} Q o = ! W a W O W Q a HRS. CHARGED Y:2 REMARKS -n ~ �' p \ I ,• • oh n 1. •1 Xii • , I •� %, 1 '' 4 i "• .• ■1 Y I q , ~ i •. ., crei a GAUGE GENERAL CONTRACTOR'S SUPT. GRADING FORMAN PERCENT COMPACTION a a (0 4 o ) r -. tr V y W J I CC d�' 4 _ II W —� U IER OPTIMUM MOISTURE GRADING CONTRACTOR NEIL .1`.iITE VISIT' Q W 3 TEST DRY OE NSITY /PCF. ,� "� '� rRAvEL /PREP TIME I/ Q TIME ON SITE 35 TIME OFF SITE 4 PERCENT MOISTURE 44 Q1 p r il) 0 if ,P ^ •0 • r y� / ii A GENERAL CONTRACTOR �� �� E ...IT _.., cn �-6 z 0 > J w e• \, !I� 1 1 -1, ' LOCATION -6 ' L\ -2 � 4 �' ( ci 4 u. 0 -2 �f ,1 t ' ) / a -1 0 .-f Ni p P c iii i d 1�I r _.. GEOTECH CONSULTANTS 13240 N.E. 20th St. (Northup Way). Suite 12 Bellevue. WA 98005 )ENSITY TEST FIELD REPORT cn Z 1- ( Ci ‘`.\ -.4 '4 r k v ; 1-.../ 1-.../ a (206) 343 -7959 €. GEOTECH 13256 N.E. 20th St. (Northup Way), Suite 16 CONSULTANTS Bellevue, WA 98005 (206) 747-5618 TO: DJB Acquisitions c/o Jobtrack, Inc. 5025 California S.W. Seattie, Washington 98136 ATTENTION: WE ARE SENDING YOU: ❑ Field Reports ❑ Reports DATE: 10 August 1989 JOB NO.: JN 87254 PROJECT: Ivy Hills P.O. Box 327 Burlington, WA 98233 206.755 -9671 k] Attached L7 VIa FAX To Transmitting Pages Ineluding This Page 0 ❑ Preliminary Drafts ❑ Test Results Copies Date Description lea 5/11- 7/6/89 Daily Field Reports THESE ARE TRANSMITTED FOR YOUR: Information ❑ Files ❑ Approval ❑ Review and Comments ❑ Signature ❑ Distribution 0 0 REMARKS: cc: City;;o1r, Tukwila BuildingYPlanning'Departient Signed: ink RECE VED CITY OF =MLA AUG 11 1989 SWIM gin :' :). E G OT EH CONSULTANTS (206) 747.5618 (206) 343.7959 13256 N.E. 20th St. (Northup Way), Suite 16 Bellevue, WA 98005 DAILY FIELD REPORT • TRAVEL / PREP. TIME Ifr- He- JOB N0. 87? TIME ON SITE 11.30 MILES 3✓ TIME OFF SITE JOB LOCATION I V 1.1111] ► I N fE 4 t1R, P N IW' .fut_w i t." GE ERAL CONTRACTOR . n, .APuCTIQN GRADING CONTRACTOR _111.50 WEATHER GLe e. SuNN'j 163 CLIENT /OWNE• 1'J H1U-5 AS5or: GENERAL CONTRACTORS SUPT. L� oN twH uCe5►c GRADING FOREMAN PAGE OF VISITORS PERMIT NUMOER DATE DAY OF WEEK HRS. CHARGED 2k' ON &.11 a Lgj.ris II U('',. 4U / 5erYG procr 4, 1nrT• lo4 V15►t. Ob4erved era tol5Fac a ba ckGt ll bel/)t) 5\ab ivy F-riOit+ric19 U - 1 (..1.2 A pproYi ncvkItj +too. (Cek 6) rri44')■e(y Oro r, a,411d tot, Inc rI-) crra Ir1 I Tee) 1,■0 level �l 1 b } h bu►ldlrio. G j o n d ' I A C h - c +Inc twr ,cc ht.(-4 1)ec.orr') S r1 I4 a4 r4 "4, r I M i 4 r. A ., h. •- . I .. I a.e e 01 . ./. F • :I x•00' I Ain • i .. Y1a • C .• • A. •1•1 A f. CI 7 4 has Ipecn odrr unirl -6 Sup r4 +I c . Iah, r ,re3 rd t rcppd pip e jbc•A hcth hr ?n -rc1 air 5 -clown pinr. 0/ ..► • • _:i .. Ar. • e 1A. • it 0 0 " tLe. ■ • r)... L. r•_ finch nol eYeerd 4 Per_i- in he•hta DratinclrG r11k -ch h45 y n ('auereA Luli-h I . i. o. • 0 • r en. . 1 t. •. .. • .1 IN • I • a s 1 •I • I. .•I •W 1. 11 D . 1''? . I • . di inl i .I • 4, . ., a •v- ►, I) .. r(" • (o AI (h ACC ule1(r) . 1)rhtnn•t. dlIA) 0ppear. .6 rave beer or3n- 711-url-rc 0rcord- vIr iv rYcl)rn mcr►du4 any RECEIVED CITY OF 1I1014ILA 11 1989 AUG Minion UM NEXT SITE VISIT: COPT T0: 1_ ll�l 1$IGNATUNE:J0j_ 4 GEOTEGI CONSULTANTS (206) 747-5618 13256 N.E. 20th St. (Northup Way), Suite 16 (206) 343.7959 Bellevue, WA 98005 DAILY FIELD REPORT TRAVEL /PREP' TIME 5 TIME 11 SITE TIME OFF SITE /I 3a JOB NOi .2.51/ MILES 35 PAGE WEATHER I/'fi1_GA Ste' VISITORS / OF JOB LOCATION GENERAL7CONTRACTOR E . C s nu c rhAd CLIENT /OWNER in/ 7 //pu.s /a ssoc.. GENERAL CONTRAITOR`S SUPT. C,e,o W���eS�l�.e. GRADING CONTRACTOR GRADING FOREMAN PERMIT NUMBER DATE DAY OF WEEK 7x. MRS. CHARGED /- 75" () 71r4 4"Z. 77 AI& S aAl 73. 2 Soe471.41 - P_4/.6 ,o 4c/iLi,,x, 61-1 P Porco „ce,L; 60/4.-L v / 5i e'TAI€LrL .e_.y4.'2 / nJ 6 wte. 'ao CA A-).5-1-7,4 N 7 el Zl / � .A)..b Ci C�l� °'d !!77 / J D / �12.c i 6AJ ! -PEE j 77 Al 77.✓J L. ,/ 2 t ca, l /tottr- i a't4 CA) ..v7.1 or- 7 tn. 4. 5"r/Lit GYM %2.4 L 72 eruiLe/164.177 h 'ii�e -77. A^e.,l ,f;er ./6f 1-3P.7m GJ end itea 7744_ c2_4,,,, Z.k / 577.46 _ S?-,41/ L, % 1&4fti.1'4 ' co, -r r/..o e0/e.I¢,�S -0-4L 774Q Po S.e r_A ear 77'-& £CGs -, ! , Y , _ ' ' - ,7 ' e.„.• / 4_4_ 44 v-4 ,4',,..e., / ..,L/ L✓ / 71t ceJ ! Al 6 (.d Lki CAIA4 /DA C.. 11:U / 4 7 G.L — ,7(4-41 r r `-t- '" /u / .... s C�IY 1 F , • 'r. laPr ✓`/ o/ L. NEXT SITE VISIT: dN C4LL a COPY TO:� �J • / //1 c ci / / SIONATU n/& / < . i%)0.6451 / 6i GEOTECT. CONSULTANTS (206) 747 -561H (206) 343 -7959 13240 N.E. 20th St. (Northup Way). Suite 12 Bellevue. WA 98005 DAILY FIELD REPORT GENERAL CONT� �� R it GENERALF C NTRACTOR'S SUPT . TRAVEL/ PRR'EP. ir, 1` rO! JOB NNO..2 4 TIME 9t4 SITE TIME OFF SITE MILES 3 't" PAGE OF / WEATHER VISITORS ASP CLIENT/ -WNER REPORT SEQ. N0. D. & (o0N) 57eit ni i GRADING CONTRACTOR Leiner, Gvh i1 5 dp GRADING FOREMAN DATE DAY OO+FJ(�WEEK i7 � CHARGED /3eh, r ; c d L- 3 : S e e . /NJ/ II, i r '9 Fuld ad in add: li.o'n d }) frrJic.ir it'Cdrryn 0 a no /LP kue rec qui 1'»e d I' 11 • AL dfa, lo. e cic a rj ,t uiy #e4 .4 [ A 4 I 4 I' _ :. �� • i_ I L %.M/L• L ,. • e/ . ; L / A L' L 1 4 AO sur/ cst_ _Mtn tb do pl,e631■.c AtIO c_ P10 aure h12,2 plow d iris rct l(/rRlL '[1[11Jt S ale t ace . 11.k. 9146u lei (16h 44 &AgAl is pil Ihia__Q /n Mai G 442 Owl pA uide 5 PC/261s. l llama dvl tna iv , 464.44...P44.7* cal skip c e?aJ ne 2.6 c, 9pac LO RECESAM CITY OF 'RJKWItA kuslusa9 • inalINIMPWRIMITAR COPY T0: Slta GEOTEC` CONSULTAN `S J (206 ) 747-5618 (206) 343 -7959 13240 N,E, 30th St. (Northup Way). Suite 12 Bellevue. WA 98005 DAILY FIELD REPORT TRAVEL /PREP. 1' JOB NO. g 7ASy TIME ON SITE MILES TIME OFF SITE PAGE / OF / WEATHER JOB LOCATION y /4- Ii_s GENERAV CONTRACTOR D GRAD NG CON CTir die G ar CLIENT /OWNER 71 /Alb /I•ssochks GENERAL CONTRACTORS SUPT. D VISITORS REPORT 5E0. NO. C!ien 1 ciu;s:1;as a / O c74" .fO b 5 5►a ek / i��L i .t5 OATS SJNIsf DAY OF WEEK MRS. CHARGED 9a/ 3 G 71 f- D',<S ) BJ; id; / v -y gat kid/ !' one Uncles ?nine d AA 140/' �ICP[nrsplPn under 1hrting c rl.n l t el- /j, - ilk r EIr e i . J Nf sal F.0147s 40 Amid' /44-1; do 50 ;%s Gn - s14lt' ate •VelJO Lk for I, c37ei r' ;)J l� row' ilcl <ar.��eTiDn Ca .1 so, 1s aciIirVerl, / 4b l( der! i e. - L- lee %1a b.. t'r, 10 O n a I r O A % i R cap 4..10#^ ✓IQ erns; On c414r01 ne l'7 on 549241. --r p/QC1 - blo41/►orli bl-- ) M1ret_►n 4 A�:1�� 1 0, See „,C a4 lock /$9'l ;441,, 4,4 CITY QF— A 7.. El nunA,i'o" 4r4i^ AUG 1 1989 sumo t gut t.Dfn& t1 1 — Ni0rd5 air.i►, b-p Ai ,c) �p,P. ,,,,,J.4 10. wa 1 / 1 d,a;.. a /Ony S % of lower (eesl wal(, en el urefr4 5iJ, djwu1) . .. l.a � . . . . r NEXT SITE VISIT: COPY T0: BIGNATU E: • FILE COPY i GEOTECHNICAL ENGINEERING STUDY FAIRWAY CENTER INTERURBAN AVENUE SOUTH TUKWILA, WASHINGTON 1MAR 131989 This report represents the results of our geotechnical engineering study of the site of the proposed Fairway Center, an office /retail development, in Tukwila. The site is located at Interurban Avenue South and South 143rd Street. ''The general location of the site is illustrated on the Vicinity Map, Plate 1. Based on preliminary plans furnished to us, we anticipate that the project will consist of two buildings, one a single story, the other having two stories. The first will cover nearly 24,500 square feet and the second nearly 39,000 square feet. We understand that the site grade will be raised by four to six feet. The site plan given to us included the footprint proposed structures and topographic information. SITE CONDITIONS the SURFACE The property is a seven - sided, nearly six -acre tract located just south of the Foster Golf Course. The nearly flat site is bounded on the north by the Green River, on the east by Oak Harbor Freight Lines, the Riverside Inn on the west, and Interurban Avenue South on the south side. South 143rd Street fronts for a short distance on the very southeast corner of the property. The western corner of the site has been used informally to park tractor trailer rigs, while the remainder of the site is overgrown with tall grass and sapling deciduous trees. Older trees and dense underbrush occupy the north edge of the site, along the river bank. SUBSURFACE The subsurface conditions were. explored by five test pits and three borings at the approximate locations shown on Plate 2. The borings were drilled on November 1, 1988, using a truck- Park Properties November 9, 1988 JN 88383 Page 2 mounted hollow stem auger drill. Samples were taken at five (5) foot intervals using a standard penetration sampler. This two - inch outside diameter split spoon sampler is driven into the soil with a one hundred forty (140) pound hammer falling thirty (30) inches. The number of blows required to advance the sampler a given distance is an indication of the soil density or consistency. The test pits were excavated on October 27, 1988 with a rubber -tired backhoe owned and operated by Evans Brothers Excavating. A geotechnical engineer from our staff observed the excavation process, logged the test pits and the test borings, and obtained representative samples of the soils encountered. The Test Pit Logs are attached to this report as Plates 3 through 5, and the Test Boring Logs are attached as Plates 6 through 8. The upper soil unit is medium -dense fill consisting generally of silty, gravelly sand with areas of extensive concrete and asphalt rubble. The fill thickness was found to vary from about six feet to more than thirteen feet. Underlying the fill is loose black sand which becomes medium -dense at twenty - thirty feet. This soil unit was penetrated to the maximum explored depth of thirty -nine feet. The final logs represent our interpretations of the field logs and the results of the laboratory examination and tests of field samples. The stratification lines on the logs represent the approximate boundary between soil types. In.actuality, the transition may be gradual. The relative densities indicated on the test pit logs are interpretative descriptions based on the conditions observed during the excavation. GROUNDWATER No groundwater seepage was observed in any of the test pits, although groundwater was encountered at seventeen feet in two of the borings and twenty -five feet in the third. It should be noted that groundwater levels vary with rainfall and other factors. We anticipate that the groundwater level is controlled by the level of the river and will approximate the level of the river, although there will be a time lag between groundwater levels and the river level. The groundwater level will reflect more of an average river level rather than peak flows. nnmminn.. I.I... I...♦ ••• r •rr.r P. Park Properties November 9, 1988 CONCLUSIONS AND RECOMMENDATIONS JN 88383 Page 3 GENERAL We explored the subsurface conditions of the property with five test pits and three borings. The site was found to have six to more than thirteen feet of fill overlying loose to medium -dense black sands. We interpret the black sands to be fluvial and /or flood plain deposits, although it is also possible that some areas of the loose sand represent a hydraulic fill placed in a former meander loop of the river. Review of historical airphotos, taken as early as 1936, show the site was used almost continuously for farming into the 1970's. We were provided with a copy of a letter from Terra Associates to the Architectural Consultants, Inc., dated February 14, 1986, entitled "River Bank Stability, Proposed Tukwila Mini- storage Complex ". Terra stated that they observed no signs of major bank instability and it was their opinion that the river bank was in a stable configuration. It was their opinion that localized instability is possible but should not affect the proposed building provided surface water is not allowed to flow over the bank. We concur with their opinions. From our analysis of the historical photographs, the river bank shows no significant erosion in the last fifty years. Also, the site is on the inside of the river bend where erosion is unlikely to occur. A casual inspection of the Oak Harbor Freight Line facilities revealed no obvious evidence of differential settlement, however, its foundation system is unknown to us. A similar inspection of the Riverside Inn building found some minor distress in a concrete block wall but no evidence of substantial settlement. It is our opinion that the fill and loose upper native soils, in their present condition, should not be relied upon to support important structures. If some differential settlement can be tolerated and if a risk of some damage due to seismic liquifaction is acceptable, the site soils may be improved in place by several possible methods. If not, deep foundations which transfer structural loads through the fill and into the more dense sand layers will be necessary. Several methods of insitu soil densification could be used including vibroflotation, dynamic compaction or a rolling surcharge. The vibroflotation approach consists of a closely spaced network of densified soil created by vibrating a hollow- Park Properties November 9, 1988 JN 88383 Page 4 stem mandrel into the soil at close spacings and filling the voids with compacted sand or gravel. Dynamic compaction, as the name implies, is a procedure whereby a large weight is dropped from a considerable height over the entire building site. Probably a more practical and efficient method for this site is the rolling surcharge, described in greater detail in subsequent paragraphs. Building performance or perhaps economics may dictate the use of a deep foundation system. Here again, several options present themselves. Deep foundations capable of transferring structural loads to the more dense strata of native sand may consist of concrete augercast piers, driven timber piles, or Franki piles. We can provide additional information and design criteria for these systems should a deep foundation system approach be chosen. The use of deep foundations would involve little risk of foundation settlement but would probably be the most costly foundations. Pile or pier depths on the order of forty feet are anticipated. ROLLING SURCHARGE The steps in this procedure would be: (1) Initial clearing of the site and removal of obviously unsuitable material;, (2) placement of a mound of material fifteen feet higher than the planned subgrade, and perhaps sixty feet wide at the base across the first building site; (3) advance the mound across the building site using front -end loaders or bulldozers; and (4) final disposition of the surcharge mound as site grading or remove from site. Advance of the rolling : surcharges mound :ris' made at ' the rate of ten to twenty .feet ..per day: Depending on the amount of material available for use in a rolling surcharge, a number of variations can be considered. For example, should the available material form a mound only one -half or one -third of the way across the building, either two or three (respectively) tracks would be needed. An overlap of ten feet, measured at the top of the mound slope, should be used between adjacent tracks. As an example of the application of a two -track rolling surcharge, approximately twelve hundred (1200) cubic .yards of material would be placed on the building site to form a mound fifteen feet high and sixty feet wide at the base. It would overlap the building line by at least ten feet and the centerline by at least five feet. The mound would be advanced to the opposite end of the building, then shifted to allow it to be returned to the other side of the building site, thereby Park Properties November 9, 1988 JN 88383 Page 5 giving complete coverage to the entire proposed surcharge site. It would then be moved to the second building site and the process repeated. => FOUNDATIONS Following completion of a soil densification program, the proposed structures may be supported on conventional continuous and spread footings bearing on at least two feet of structural fill soils above the existing fill. Fill placed under footings should extend outwards from the edge of the footings at least an amount equal to the depth of fill underneath the footings. Exterior footings should be bottomed at a minimum depth of twelve (12) inches below the lowest adjacent outside finish grade. Footings bearing on structural fill should be designed for a bearing pressure of two thousand (2000) psf. Continuous spread footings should have minimum widths of twenty -four (24) inches. A one -third increase in the above bearing pressures may be used when considering short term wind or seismic loads. For this design criteria, it is anticipated that total settlement of footings founded on structural fill placed over the densified existing soils will be less than two inches, with differential settlements of approximately one inch. Almost all settlement due to dead loads from the building structure should occur during construction. Lateral loads due to wind or seismic forces may be resisted by friction between the foundations and the supporting compacted fill subgrade or by passive earth pressure on the foundations. For the latter, the foundations must be poured ' "neat" against the existing soil or backfilled with a compacted fill meeting the requirements of structural fill. A coefficient of friction of 0.40 may be used between the structural foundation concrete and the supporting subgrade. The passive resistance of the densified existing fill, undisturbed natural soils, and well compacted fill may be taken as equal to the pressure of a fluid having a density of three hundred (300) pounds per cubic foot (pcf) . SLAB -ON -GRADE FLOORS We recommend that concrete slabs be placed over at least one foot of structural fill. Isolation joints should be provided where the slabs intersect columns and walls. Control and expansion joints should also be used to control cracking from expansion and contraction. Saw cuts or preformed strip joints, used to control shrinkage cracking, should extend nnnmrint• nn.tn.lt m 4 SUM, T.ln Park Properties November 9, 1988 JN 88383 Page 6 through the upper one - fourth of the slab. The spacing of control or expansion joints is a function of the amount of steel placed in the. slab. Reducing the water /cement ratio of the concrete and curing of the concrete by preventing evaporation of free water until cement hydration occurs will also reduce shrinkage cracking. A 6 -mil polyethylene plastic vapor barrier should be used under floors likely to receive an impermeable floor finish or where passage of water vapor through the floor is undesirable. Based on American Concrete Institute recommendations, we suggest placing a two to three -inch layer of sand over the vapor barrier to protect the vapor barrier and to allow some moisture loss through the bottom of the slab to reduce warping in the curing process. Sand should be used to aid in the fine grading process of the subgrade to provide uniform support under the slab. PERMANENT RETAINING AND FOUNDATION WALLS Retaining and foundation walls should be designed to resist lateral earth pressures imposed by the soils retained by these structures. Walls that are designed to yield an amount equal to at least 0.002 times the wall height can be designed to resist the lateral earth pressure imposed by an equivalent fluid with a unit weight of thirty -five (35) pounds per cubic foot (pcf) . If walls are to be restrained at the top from free movement, a uniform force of one hundred (100) pounds per square foot (psf) should be added to the equivalent fluid pressure force. For calculating the base resistance to sliding, we recommend using a passive pressure equivalent to that exerted by a fluid having a ' density of three hundred (300) pcf and a coefficient of friction of 0.40. It is assumed that no hydrostatic pressures act behind the wall and that no surcharge slopes or loads will be placed above the walls. If surcharges are to be applied, they should be added to the above lateral pressures. Retaining and foundation walls should be backfilled with compacted free - draining granular soils containing no organics. The wall backfill should contain no more than 5 percent silt or clay and no particles greater than four inches in diameter. The percentage of particles passing the No. 4 sieve should be between 25 and 70 percent. Alternatively, a geotextile drainage product such as Miradrain or Enkadrain may be used. The purpose of this is to assure that the design criteria for the retaining wall is not exceeded because of a build-up of hydrostatic pressure behind the wall. h TIUTT7r1TT rinurelir /inure IT T A %ITO TUfa Park Properties November 9,.1988 SITE DRAINAGE .JN 88383 Page 7 We recommend the use of footing drains at the base of all footings and earth retaining walls. Roof and surface water drains must be kept separate from the foundation drain system. The footing drains should be surrounded by at least six inches of one -inch -minus washed rock. The rock should be wrapped with non -woven geotextile filter fabric (Mirafi 140N, Supac 4NP, or similar materials) . At the highest point, the perforated pipe invert should be at least as low as the bottom of the footing and /or crawl space and it should be sloped for drainage. A typical footing drain detail is attached to this report as Plate 10. EXCAVATIONS AND SLOPES No excavated slopes are anticipated other than for utility trenches, In no case should excavation slopes be steeper or greater than the limits specified in local, state, and national government safety regulations. Temporary cuts up to a height of four feet may be made vertical. For slopes having a height greater than four (4) feet, the cut should have an inclination no steeper than 1:1 (horizontal :vertical) from the top of the slope to the bottom of the excavation. It should be noted that the sands will cave suddenly and without warning. Utility contractors should be especially aware of this potential danger. All permanent cut slopes into native dense soils should be inclined no steeper than 1:1 (horizontal:vertical). Fill slopes should not exceed 2:1 (horizontal:vertical). Water should not be allowed to flow uncontrolled over the top of any slope. Also, all permanently exposed slopes should be seeded with an appropriate species of vegetation to reduce erosion and improve stability of the surficial layer of soil. PAVEMENT AREAS All parking and roadway areas may be supported on native soils or existing fills provided these soils can be compacted to 95 percent density and are stable at the time of, construction. Structural fill and /or fabric may be needed to stabilize soft, wet or unstable areas. We recommend using Supac SNP, manufactured by Phillips Petroleum Company, or a non -woven fabric with equivalent strength and permeability. characteristics. In most instances, twelve (12) inches of granular fill will stabilize the subgrade except for very soft areas where additional fill could be required.f:Tbe. subgrade .,.,..m.,.,.. _....__ Park Properties November 9, 1988 JN 88383 Page 8 should be, evaluated by Geotech Consultants, Inc. . after the site is stripped and cut to grade. The upper twelve (12) inches of pavement subgrade should be compacted to at least 95 percent of' the maximum density. Below this level, a compactive effort of 90 percent would be adequate. All subgrade areas must also be in a stable, non - yielding condition prior to paving. The pavement section for lightly loaded traffic and parking areas should consist of two (2) inches of asphalt concrete (AC) over four (4) inches of crushed rock base (CRB) or three (3) inches of asphalt treated base (ATB). We recommend that heavily loaded areas be provided with three (3) inches of AC over six (6) inches of CRB or four (4) inches of ATB. The heavily loaded areas are those areas such as main driveways and areas with truck traffic, especially where trucks are turning. Where the subbase is composed of silty, water - sensitive soils, and there is irrigated landscaping adjacent to and at an elevation higher than the pavement, we suggest that perimeter drains be installed to intercept the water that would otherwise saturate the pavement subbase. These guidelines are based on our experience in the area and on what has been successful in similar situations. We can provide recommendations based on expected traffic loads and R value tests, if requested. Some maintenance and repair of limited areas can be expected. To provide for a design without the need for any repair would be uneconomical. SITE PREPARATION AND GENERAL EARTHWORK We recommend that the building and pavement areas be stripped and cleared of all surface vegetation, all organic matter and any other deleterious material. Stripped materials should be removed from the site or, if desired, stockpiled for later use in landscaping. The stripped materials should not be mixed with any materials to be used as structural fill. Structural fill is defined as any fill placed under buildings. Geotech Consultants, Inc. should observe site conditions prior» to fill placement. Structural fill under floor slabs and foundations should be placed in horizontal lifts and compacted to a density equal to or greater than 95 percent of the maximum dry density in accordance with ASTM Test Designation D- 1557 -78 (Modified Proctor). The fill materials should be placed at or near the optimum moisture content. Fill under pavements and walks and . behind retaining walls should also be placed in horizontal lifts and compacted to 90 percent of the maximum density except for the top twelve (12) inches which should be compacted to 95 percent of maximum density. The allowable thickness of the fill r C(1TC1"1] (V'M01TT 'TT AWPC TiVI Park Properties November 9, 1988 JN 88383 Page 9 lift will depend on the material type, compaction equipment and the number of passes made by the equipment. In no case should the lifts exceed twelve (12) inches in loose thickness. Grading operations will be difficult if the moisture content of the imported soil exceeds the optimum moisture content. The optimum moisture •content is that moisture content which results in the greatest compacted dry density. The moisture content of fill soils is very important and must be closely controlled during the filling and compaction process. The moisture content must be at or near the optimum moisture content as some soils cannot be consistently compacted to the required density when the moisture is greater than optimum. If grading activities take place during wet weather, or when the soils are wet, site preparation costs may be higher because of delays due to rains. Moisture sensitive soils will be susceptible to excessive softening and "pumping" from construction equipment traffic when the moisture content is greater than the optimum moisture content. During excessively dry weather such as may occur during the summer or early fall months, it may be necessary to add water to achieve optimum moisture content. Ideally, structural fill which is to be placed in wet weather should consist of a granular soil having no more than 5 percent material passing the No. 200 sieve. The percentage of particles passing the 200 sieve should be measured on that portion of the soil passing the three - quarter inch sieve. LIMITATIONS Geological factors such as stratigraphic discontinuities that occur between test pits, test borings and soil exposures, or variations in groundwater conditions are not predictable with a limited exploration program or conventional engineering analysis. Such non - quantifiable risks must be borne by the owners. This report has been prepared for specific application to this project and for the exclusive use of Park Properties and their representatives. Our recommendations and conclusions are based on the site materials observed, selective laboratory testing and engineering analyses. The conclusions and on —n ■•• I.•• •■•■••■•••• T . ••TI. T../. } Park Properties November 9, 1988 JN 88383 Page` 10 recommendations are professional opinions derived in accordance with current standards of practice within the scope of our services and within budget and time constraints. No warranty is expressed or implied. The scope of our services does not include services related to construction safety precautions and our recommendations are not intended to direct the contractor's methods, techniques, sequences or procedures, except as specifically described in our report for consideration in design. The scope of our work did not include a hazardous materials assessment, however, we can provide this service, if requested. We recommend that this report, in its entirety, be included in the project contract documents for the information of the contractor. ADDITIONAL SERVICES It is recommended that Geotech Consultants, Inc. provide a general review of the geotechnical aspects of the final design and specifications to verify that the earthwork and foundation recommendations have been properly interpreted and implemented in the design and in the construction specifications. It is also recommended that Geotech Consultants, Inc. be retained to provide geotechnical consultation, testing, and observation services during construction. This is to confirm that subsurface conditions are consistent with those indicated by our exploration, to evaluate whether earthwork and foundation construction activities.comply with the intent of contract plans and specifications, and to provide recommendations for design changes in the event subsurface conditions differ from those r i::t anticipated prior to the start of construction. tWeA}recommend that a:representative:;,of: our :,firm be pr >: event =,during ,placemen`tot structura'l;l',fill' to observe =the, =:process,. and- to =conduct density? tests in;:`the ::fill. The following plates are attached and complete this report: Plate 1 Plate 2. Plates 3 5 Plates 6 - 8 Vicinity Map Exploration Location Plan Test Pit Logs Test Boring Logs Park Properties November 9, 1988. Plates 9 - 10 Plate 11 JN 88383 Page 11 Grain Size Analysis Footing Drain Detail, Respectfully submitted, GEOTECH CONSULTANTS, INC. Dennis B. Green Geotechnical Engineer James: R. Finley, Jr. P.E. Principal Attachments DBG/JRF:cvb f MINA[ RCS ON ST BANGOR £1T ••3 4k54% 0 N N • COOPER 1j i� St HAZ ''. iWNTAIN `� ;� 1•-�, •'�'� ST 1 f r Wa s h i ngton 5 I IBIN P 124N INC TON AIRPORT. 1 GEOTECH CONSULTANTS VICINITY MAP PROPOSED FAIRWAY CENTER TUKWILA, WASniNGTON GEOTE CONSULTA GREEN RIVER TP -5 8-2 TP- LEGEND TP�-I APPROXIMATE TEST PIT LOCATIONS 8-2 APPROXIMATE BORING LOCATIONS S. /43rd ST. GEOTECH CONSULTANTS SITE EXPLORATION PLAN. FOSTER CENTER TUKWILA, WASHINGTON AfF USCS 0 , 5 I0 15 -T • TEST PIT I Description Devotion: SM • Tan /gray silty gravelly SAND, moist, medium dense, (FILL) Concrete debris and boulders, metal and garbage Test Pit terminated at 10 feet below existing grade. No groundwater seepage encountered during excavation. TEST PIT 2 0° USCS Description 0 10 15 -- • • S Elevation + Gray silty clayey gravelly SAND, moist, medium dense (FILL) asphalt and concrete fragments Black silty SAND fine grained, moist to wet, loose to. medium dense Test Pit terminated at 14 feet below existing grade. No groundwater seepage encountered during excavation. GEOTECH CONSULTANTS TEST PIT LOGS PROPOSED FAIRWAY CENTER TUKWILA, WASHINGTON Job No.+ 88383 004,, 10 /27/88 owes', t`' `?$v 404 Lacs 0 SM 1 TEST PIT 3 Description fievotion� Gray —brown silty clayey gravelly SAND, moist, medium dense, (FILL) SP: . Orange slightly silty SAND, moist, medium dense r Black silty fine SAND, fine grained, moist, loose to medium dense I0 15 op �lC . was 0 I0 15 M Test Pit terminated at 9 feet below existing grade. No groundwater seepage encountered during excavation. TEST PIT 4 Description E /Ivol /en Gray silty gravelly SAND, moist, medium dense, (FILL) occasional boulders and concrete debris . plastic and asphalt extensive asphalt and concrete fragments Test Pit terminated at 13 feet below existing grade. No groundwater seepage encountered during excavation. GEOTECH CONSULTANTS • TEST PIT LOGS PROPOSED FAIRWAY CENTER TUKWILA, WASHINGTON ✓o0 No., aoto+ Lopped e$, 88383 10/27/88 I DBG �1 0 \1 04' AP 4 44 0 I0 15 [/SCS TEST PIT 5 Description Elevation: S Gray silty gravelly SAND, moist, loose to medium dense (FILL) large rocks and boulders concrete and metal pipe Test Pit terminated at 13 feet below existing grade. No groundwater seepage encountered during excavation. GEOTECH CONSULTANTS el TEST PIT LOGS PROPOSED' FAIRWAY CENTER TUKWILA, WASHINGTON Job Mho o.Hv 1A1A3 _ Wall" itemise DAG I POW/ 1 5 • 1 V u° CO ° 4b c uses BORING 1 Description Elevation: Depth -15.6 I0 15 20 25 30 35 40 19 15 32 1 1 1 1 SM • Mottled gravelly silty clayey SAND, moist, medium dense 'SP. • • • • • Black SAND, fine grained, wet, loose occasional silt layers medium grained dense 39 Test Boring terminated at 39 feet below existing grade. Groundwater seepage encountered at 17 feet while drilling. GEOTECH CONSULTANTS TEST BORING LOG PROPOSED FAIRWAY CENTER TUKWILA, WASHINGTON Job No. + 88383 lOotei 11/1/88 Logged Sp DBG I Prom 6 ° �oF 0� °�'� uscs BORING 2 Elevation: Description Depth 11.7 I0 5.5 15 20 25 30 35 40 24 19 14 22 44 19 38 FF Gray to brown silty gravelly clayey SAND, fine to medium grained, moist, medium dense, (FILL) ML VL • Dark gray sandy SILT, moist, medium dense Black SAND, medium grained, moist; loose 'Sp becomes medium dense • • • becomes dense and saturated .4 becomes medium to coarse grained, saturated Test Boring terminated at 39 feet below existing grade. Groundwater seepage encountered at 25 feet while drilling. GEOTECH CONSULTANTS 39 • TEST BORING LOG PROPOSED FAIRWAY CENTER TUKWILA, WASHINGTON Jot, No.+ Dole 88383 11/1/88 L000ll er+ DEG 1 cP ett USCG BORING 3 Description E /CYO /%on• D,pm 15.3 I0 17.8 15 20 25 30 35 40 '•- 15 15 11 12 19 28 51 S Gray /reddish —brown silty slightly gravelly clayey SAND, moist, medium dense, (FILL) 1 7 SM Brown slightly silty SAND fine grained, moist, medium dense 171 Black SAND, fine to medium grained, saturated, loose becomes medium dense becomes dense with silt layers 39 Test Boring terminated,at 39 feet below existing grade. Groundwater seepage encountered at 17i feet while drilling. GEOTECH CONSULTANTS TEST BORING LOG PROPOSED FARIWAY CENTER `fUKWILA, WASHINGTON .w0 ., a/I, 88NI383 11/1/88 a,V.i ir, 1 Awv DBG 1 8 1 111•1:D•I!A W N Y1 z rc MD R •F MESH - - 1 U S .001 PERCES COARSER BY WEIGHT 0 N M Q h 2 2 0 0 OI 0 0 .00I .002 .002 .003 .004 .006 .00e .01 .02 .03 .04 .06 200 100 80 60 50 40 30 20 16 I0 8 4 1/4 3/11 1/2 3/4 12 ■ NN■■ uNN■ NN■■ N■ ru■■ ■r■u■i ■■■■■■■■A■■■■■■■■■■i■■■■■ 11111111111111 11011 1111111111111111111111111 r ■■■I..■■■•Aa11 IMI MIMM NIONIPTIMIONSI II■INI•T� ,1 l mmomI ■/ l UUIiaJlUU //Ui %■mi/ 11111111111I11lh1111IPilIUiII111111111 ■■■■■■■■■1 ■ i •■■■■ i■ % /i■Nu ■ ■mu■■u■i■m■■■■■■■u ■■ ■■■■ r■ ANiAu■ u■ Nuuu ■■■■u■.■m■■ ■■i■■rm■•■■1■■u■ ■■ MN 1 ;t ; ■ ■ iiIIIIIiiillillINIIIIIMMINIMMIllinilliniiiiiinil IIIIIllllhIIIHhIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIi ■■■■■ NN■■■■■ NN■■■ IN■■ ■I■I■■■■■■■■■■;I■■■■■■■■NNN ■■ ■■ ■ 8 0 p O ti b MI N PERCENT FINER BY WEIGHT 0 .003 .004 .008 .008 .01 .02 .03 .04 06 .08 1 .e e 10 20 30 40 60 eo 100 200 300 0 H 1- W J -J z W N N z Q N w z z 1 1 W 1 w N 0 0 z 4 H W z J W 4 0 0 u m W J m 0 0 2 } N 3- W W D N 0 x W J 0. 4 1 to GRAIN SIZE ANALYSIS PROPOSED FAIRWAY CENTER TUKWILA, WASHINGTON ✓00 No., poH+ Br+ 88383 NOV. 88 I 1 Prod+ !T: LIP' 07.7.1 0 1- N z x u z x a 13. W Z 0 CC W Z N z N a a w W V) .001 0 0 .002 .003 .004 .006 .00e .01 .02 .03 .04 .06 200 100 80 60 50 40 30 20 16 10 8 4 1/4 3/0 1/2 3/4 2 3 4 6 { PERCENT CCOARSER BY WEIGHT 0 0 g 0 0 0 .001 ' 1 I .002 .003 .004 .006 .008 .01 .02 .03 .04 .06 .0e .I .2 0: 1- .3 W .4 2 -J 12 0 0 °a 010 ►- d °v 2 0 PERCENT FINER BY WEIGHT GEOTECH CONSULTANTS 4 8 e 10 20 30 40 60 80 100 200 300 0 w z 1 w z LT. 0 W I W 4 0 0 u W z 4 Q u u 0 4 N 0) -J CD m O U >- w w 0 Qa r w -J a a V) x 0 zQ. CC U) mFw- GRAIN SIZE ANALYSIS PROPOSED FAIRWAY CENTER TUKWILA, WASHINGTON Job No.r 88383 ow. r NOV. 88 Byr JAB 6 Slope bockfi /l away from foundation. WASHED ROCK BACKF /LL See text for requirements, 6 min. NONWOVEN GEOTEXTILE FILTER FABR /C T /GHTL /NE ROOF DRAIN Do not conned fo fooling drain. SLAB • •A, • Y AK` VAPOR BARRIER • • ,•• •, 4 „ min. FREE - ORA /N /NG SAND /GRAVEL . 4” PERFORATED HARD PVC P /PE Invert of /eos/ as /ow as fooling and /or crow/ space. Slope to drain. P /ace weepho /is downward. GEOTECH CONSULTANTS FOOTING DRAIN DETAIL PROPOSED FAIRWAY CENTER TUKWILA, WASHINGTON ✓e0 N.. 88383 am, NOV. 88 N.T.8. MO 0 ( TELEPHONE MEMO RE: _(m Pf2�' 4A PERSON CONTACTED: PERSON CALLING: Py -5-6V DATE : - 22 --�`1 INFORMATION ITEMS: _CAB PCJJ4-. ) 1f " .CJ; -- - G Lat Iftvedilte) r-k!JJ &tiff yeAi taut Cwt J �- .Q., gte.)1e0.1 Gl yt,e3t) -6_Q 01- 46,4 ' LOL.AA _1 -i ,te, CIO.) -() cv .1/ P' �.�a 1_ QlLca.ae.i lA nitt KipA '^I 4C., �.�.'�'�"�rZ�� /WJ r►' \.0 OJJ 4Ji M �s ?r ut,, ) ti Q {.u,, Lu AtuA 4u V oiatialte 1 Caltahtatt4e;046(ti, 17144.) LiUtt uy (122+ ari4ita,&,4 /9.Ada atiliAgAsk •cam I- 1 t_ _ : _..., .. 344, NA-c) "alma cent, a 0.0-yotti.dif Ao_ rt, / / r, ti e ;L , _u f, ;c, ,,. ci-O i`lVtkId a, -- -4j-& 4 .t k',z2 • TELEPHONE MEMO RE: PERSON CONTACTED: PERSON CALLING: DATE: DATE:_______ INFORMATION ITEMS: 1.CLQQ 2LOu t1J ( �q ,tom .iL..A City of Tukwila n n n Date: 3 -1r -S9 File: #&1 -044 Sheet 1 of ORDINANCE COMPLIANCE CHECKLIST Uniform Buildin Code, 19 85 Edition. 1 PROJECT. -1"'41RZWA� -j �i�t�lT�.� C-- �i��4�11,C. FccQ.rnir App. 1 r G 1. OCCUPANCY GROUP. �/Pr 2. TYPE OF CONSTRUCTION• 3. LOCATION ON PROPERTY. 4. BLDG. HT./ NO of STORIES• 5. FLOOR AREA 6. OCCUPANT LOAD. ❑ 7. EXITING REQMTS. DETAILED REQUIREMENTS E 8. OCCUPANCY: A ❑ 9 TYPE OF CONSTRUCTION: 10. ENGINEERING REGS. & REQMTS: AFC'. 00(X$ V ,K, / qR GOilA� W 7DI'5 C 11. COMPLIANCE w/ W.S.E.C. to aTr E ) KOTE 712 COMPLIANCE w/ Chapter 51 -10 W.A.C. I4 /A NOTES: oN prtJ M 6EavE 'CAL Co NSULTARC"c�Dt4 COVt ioN <v C; I ( EtU "dr. 5rre_` V- , BUSH, ROED & HITCHINGS,(r''•C. Civil Engineers /Land Survey& 2009 Minor Avenue East SEATTLE, WASHINGTON 98102 (206) 323 -4144 TO C%17 o4 T :AC a 61.0/0 50, in,( TS 1 v . TTAw�la vJ�4 9158 LCTflT(.. 3 OF UQQKSEIJITEQL DATE 3 -L-- of (�J uU JOB NeB aDe .03 ATTENT. N 13ecky vts - a�ildl,v, 1,,v. RE Fck rw Di Cen4er 1 En) s t o n Cm h v 1 4 5 u ,(-a..Ldvq e., e oi' Z 1 5arks Re ort �l WE ARE SENDING YOU ❑ Attached ❑ Under separate cover via e -tivia ❑ Shop drawings ❑ Copy of letter rints ❑ Change order ❑ Plans ❑ Samples the following items: ❑ Specifications COPIES DATE NO. DESCRIPTION Z 1 En) s t o n Cm h v 1 4 5 u ,(-a..Ldvq e., e oi' Z 1 5arks Re ort �l N.(Mt t. ltGa a THESE ARE TRANSMITTED as checked below: For approval ❑ Approved as submitted ❑ Resubmit copies for approval ❑ For your use ❑ Approved as noted ❑ Submit copies for distribution ❑ As requested ❑ Returned for corrections ❑ Return corrected prints ❑ For review and comment ❑ ❑ FOR BIDS DUE 19 ❑ PRINTS RETURNED AFTER LOAN TO US o. A apraVaL, 'tease ca ,te_ i� Q� have_ ahy question S REMARKS r11 }.�i 1t3 t93Y I � ( COPY TO PRODUCT 2403 Nang/loc.. Gala t We ON T 1 SIGNED: If enclosures are not as noted, kindly notify us at once. limummommEmom ct —ammomm► , r * Building Division 6200 Southcenter Boulevard le-% CITY OF TUKWILA GRADING /FILL /EXCAVATION Tukwila, Washington 98188 ," IP. (206)- 433 -1849 PERMIT APPLICATION CONTROL# '3C(`0( -j1,1 Site Address NE Comer £rae.(urban Ave S 4 6I 43r4 St Suite# Floor# Project Name /Tenant rdk1RuJ a'( cEINTSK. 3365 7o - / 6°' 1- 06:, Valuation of Grading42S,oac Assessors Account# oOo28o - 000+ - oO Property Owner Derr/ KtjAa sc,q Phone Z3/4 L- "Pf S (O Address 6 4 2 . 1 S. 1't 3'a ?lace, u kw%to. W A- Zip ?8I b% , Applicant Palk PcDra( 'heS Phone 328 -%QOO Address 1` 0 Lahr - Sic but 6e.ct*tt.,uj \ Zip 98co2.. Architect /Engineer -gush oracQ 4 J-0%L js Phone 32 3 -q/(44 _ Address 2Or� 9 /')1 fna ( Ave- E_ Zip 98 /02_ Contractor FooSHE _4 Associd4-e5 (o-'Z� License# FOUSHAC 1580 1b Phone 453 -8960 Address E O. B OTC 6S Bell voe., uJ 14 Zip Hauling Co. (c, be ae_ e(rvn,N:Pe& Phone Address Zip Describe the purpose and extent of fill, excavation or grading A-rpraxicnc-4ety SUCc) 4s/ to( v -Lt■vi SvYcLaavgQ o4 butUlk,J h, s Cut (c.u.) Fill (c.u.) pa Two (2) sets of grading /fill /excavation plans must be submitted which meet the application requirements of Section 7006(d), 1985 Uniform Building Code. A soils engineering report and engineering geology report may also be required. An Environmental Checklist is required to be submitted ($100.00 Fee) to the Planning Depart- ment for any grading /fill /excavation 500 cubic yards or more. A Hauling permit is required for any grading /fill /excavation of cubic yards or more. A $2,000 bond, certificate of insurance, route map, and permit fee of $25.00 are required. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT AND THAT I HAVE THE PROPERTY OWNER'S AUTHORIZATION TO DO THIS WORK. Applicant /Authorized Agent (signature) .,-c� a . ea Date 3 - -I3 -87 (print name) ha.)tc9. S_ L1 eIl Contact Person (please print) Iq.i,g- ,5- ae_t i Phone 323 -1//41.1 OFFICE USE ONLY FEES: Grading Permit Fee (000/322.100) $ 1 513,() Q Receipt# Date Paid _- .. .... .... .....Plan Check Fee (000/345.830) _3p, Receipt# Date Paid Other ( ) 3, 0 Receipt# Date Paid 1 � TOTAL /i0 (OWES: $ /93,00 ) Excavation Ordinance #1341: 0 Bond Required: $ ‘2,(Jt 0 Cert. of Ins. Amount $ TbETI1GDATE E IN DATE OUT COMMENTS, /BLDG 3- IW-8cf 3-15-81 Approved for Issuance ,d s• !'1 40 %PLNG 3 -15 "u9 / cSEPA q2A(6( 5-'40 9 Approved (Initials) j -ti Checklist required: ,'Yes No SEPA Determination b, S SEPA F i 1 e #Epic -2c.. R8 Approved (Initials) 0 /PWD E-2.0-61 Hauling Permit Requi r-y: Yes D No i2()(1- ES 1g, 1 '11 r, qz,.� FY I.TIAGOSON SONS 120436 L::::fl iN 2 • EX. GATC.Ae,AIN • �.r• POWER Pcv_e O 1$4. 1-4. O E x. F. N. PRoPe 12.TY LIt4E - --1qIL., e . 'Pc'1 C>QACIe �J- •.JAL Esc. Gc51To1.1.,`ksov TRE;e:6 (O 1 ---- x - FtrJc� S 'L I,uRlen �. �IGIIrla.ly 13.r. auR.1 &.c7 TELL F Aor1E PAVU11 C. 00/ / 40 e 6r .E; ti�►r�. 80' 120✓ Sto ll 2 ET r`� i •1y •••.••• ee 4A11.1.'td1GG. p_IP -i2b_P J 4r 1M Lfr-2:640T c*4ra4 +:)•1`.sIoil) 3.1 .i • , Ts.:' 35 • A��� /�/ ..9q r/'p c D a o� Y \ G N / '. NO 0 g "� j• S�f � �3ti 3e,4f Z Untrair- - ---12■ Nf►4 . P, .tact.sr -a b t l [x�iie 1' OVESZ.Ft oW 0,1PIL.(. AZ6Z( EEEE EEEErE •Tt,TYaA fAe.ate. fi6.Ym[r.lA�. Y FE° 4E-awl-ft t'a >t;" r w u. rest -c0.0 vital wra.w!c- PQ. iT.A.)A4 * Uf[•( vn r -* FAN•tt c. ft�r ,t` TCJE ).1C+t• t A•GKF)t -a.. 1.)1)+ au -vim.. t"6 01. 17000LA• $ t a 4'• 04 v. 4.., 110• dgAOa< cgs 0.41\24L. :I LT e.RL PA ore l €►.3 G fc. DETAIL. No .aw.-t-14-••••111.MOv \/ / 0 0 p,LCT�I 4•E.F.-.Ti. i / / / co g. a e isorl✓ & L.L, 0,1 6:$ 6c -1T-o NA oaS, 511►�v J r�.l cal Duty. A.e. Ta REM1A11,4. cn tads" G RA-OE of TIZGS - - \ Aki e 0 \\ SvC i! �'cb the L f .414 .4r.,t 4B gS ;L ) I i /d , y J ii�l %y 6" Minimum BOr Ft$' {s • _. ,;qG ?...0".9(i)1 MAINTENANCE GRAVEL CORM ENTRANCE THE ENTRANCE SHALL BE MAMI IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOW OF. -)NTO PUBLIC RIGHTS-OF-WAY. THIS MAY REQUIF:E PERIODICEsENC WITH 2 -INCH STONE, AS CONDITIONS DEMAND AND REPAERE Ci,EANOUTr OP ANY STRUCTURES USED TO TRAP SEDIMENT. ALL EES SPILLED, DROPPED, WASHED OR TRACKED FROM VEHICLES ONTy.Vsys OR INTO STORM DRAINS MUST BE REMOVED IMMEDIATELY. ,_- 0 0 .Le_. 1`d.0 \N SE 1/4 SEC. 14 TWN. 23 I:14 E. W.M. 1>b EF5Tc, E3e fat._ vEp I 4= t: 11 1 ' E R A I,` K (Ape 2o-C•)'' rZ •2 O 0 9 N . \\ 'S. -- Nd IN/ `\ `\ 1t 1 I I \\ 0 qt'J, =i 1 Of 1 ,9 1 1 1 I `I IWI II 4• 1� ( 11 II •'I 1 11 i • i J ' fy ^ ^j •�. �S. 143r:1 ST. N IS ST SA FCONTAIN ST 1 LEO 9 9 0' S • $ 114�•,'t- �s O)TN4 ;r 3r• ST ra HN €�l I0 6:0 1 `a[aaur r) N w - S 12')..,.-. es, NS 0 00. le 1 , �� �i• fi 0 T1 .s 1 IS I: 4 S 73_ 5 ,2T.. ST 28"' : r $ 7Wr. •1' • 1i1T 4 CORTI • 124✓ I ?711 ;op:: NG)TON ) f•s I / s �r Ski • 9 q( 3v 90 m U, SITE LACK RIVER;.---72°1-''-'1‘ . ; "- '1r EARL \OCTI 1121.0 1f �x, o° i 0 A 0 S IIi1N'T VICINITY MAP i Lj011T i� --- :'i t �r'rzn •, l C>sALEi7 evt� 1� 1 a c;` 14-1 \4, D 1 T c "N tiEE P I ENE 0 L- 1►---1 Te:.p o� D1Tc.-1-1 \ 1-1' \ FIL'1' -a- F�iSIZtc. FE►JG -� • 2' 0a 6' CS GE Q e.T [NA L_ ) 1 ! tryra�_C `i -rte )•�t.r�r,: 4 -.1 I" U_ _I' // »` S ,4 440 ST > ' --z-c rf • •tlf171010,J.-- 11 €I-us = :_N:._'- (:.cv\y n • STR & er.t_.e 7d.,1% r� 1 7- FRo51o,.1 c :TA.∎�.. JT¢.c) l_ A /.. 1 . c -i (4,0 C.- ,- _ 1. - b . f . T r __ _ 1 /4" TO e3" 4 P.1% - \JATE a. VALV E. S` °rGL , /mot c-, ,BEKI(3-1 ly1Ael<- e- FL,40466. BOLT" o)l 11YI7. EL@. _ 21. VA. G." MATT !_A -YG1 -1 S AS t!�1 -ro P = \ l . `I I 1,-1\/ ER. t?!._.1 gcrtT -o- = Io 1 4,C-co-WA 1 l2'G r•--1 P Lnotice, it is Cue to the quality of the oripineil eocument. _. j grallPFF di 1r- a 41 clt Et 03 4 oN 01 Q cd vi 0 EROSION/SEDIMENTATION CONTROL NOTES I. ALL LIMITS OF CLEARING AND AREAS OF VEGETATION PRESERVATION AS DESCRIBED ON THE PEEN SHALL BE CLEARLY FLAGGED ON TUE FIELD AND OBSERVED DURING CONSTRUCTION, 2. ALL REQUIRED/EEDIMENTATION/ERoSION CONTROL FACILITIES MUST BE CONSTRUCTED AND IN OPERATION PRIOR TO LAND CLEARING AND/OR OTHER CONSTRUCTION TO INSURE THAT SEDIMENT LADEN WATER DOES NOT ENTER THE NATURAL DRAINAGE SYSTEM% ALL EROSION AND SEDIOENT FACILITIES SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIE SUCH TIME THAT CLEARING AND/OR CONSTRUCTION IS COMPLETED AND POTENTIAL FOR ONSITE EROSION HAS PASSED. THE IMPLEMENTATION, MAINTENANCE, REPLACEMENT AND ADDITIONS TO EROSION/SEDIMENTATION CONTEOL SYSTEMS SHALL BE THE RESPONSIB/LITY OP THE PERMITTEE. 3. THE ERIESIoN AND SEDIMENTATION CONTROL SYSTEMS DEPICTED ON THIS DRAWING ARE INTENDED TO BE M/NIMUM REQUIREMENTS TO MEET ANTICIPATED SITE COND/TIONS. AS CONSTRUCT/ON PROGRESSES AND UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE PERMITTEE SHOULD ANTICIPATE THAT MORE EROSION AND SEDIMENTATION CONTROL FACILITIES WILL BE NECESSARY TO INSURE COMPLETE SILTATION CONTROL ON THE PROPOSED SITE. DURING THE COURSE OF CONSTRUCTION, IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE pERMITTEE TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED HY H/S ACTIVITIES AND TO PROVIDE ADDITIONAL FACILITIES, OVER AND ABOVE MINIMUM REQUIREMENTS, AS MAY BE NEEDED TO PROTECT ADVACENT PROPERTIES AND WATER QUALITY OF THE RECEIVING DRAINAGE SYSTEM. 4. APPROVAL OF THIS PLAN IS FOR EROSION/SEDIMENTATION CONTROL ONLY. IT DOES NOT CONSTITUTE AN APPROVAL OF STORM DRAINAGE DESIGN, SIZE NOR LOCATION OF PIPES, RESTRICTORS, CHANNELS OR RETENTION FACILITIES. E. ANY DISTURBED AREA WH/CH HAS BEEN STRIPPED OF VEGETATION AND WHERE NO FURTHER WORK IS ANTICIPATED FOR A PERIOD OF 30 DAYS OR MORE MUST BE IMMEDIATELY STADILIZED WITH MULCHING, GRASS PLANTING OR OTHER APPROVED EROSION CONTROL TREATMENE APPL/CABLE TO THE TIME OF YEAR IN QUESTION. GRASS SEENNG ;LONE WILL RE P.CCEPTABLE ONLY DURING THE MONTHS OF APRIL THROUGH SEPTEMBER INCLUSIVE. SEEDING MAY PROCEED OUTSIDE THE SPECIFIED TIME PERIOD WHENEVER IT IS IN THE INTEREST OF THE PERMITTEE, BUT MUST DE AUGMENTED WITH MULCHING. MEETING, OR OTHER TREATHENT APPROVED BY THE DEPARTMENT. 6. ALL EROSION/SEDIMENTATION CONTROL PONDS WITH A DEAD STORAGE DEPTH EXCEEDING 6 INCHEE MUST HAVE A FENCE WITH A MINIMUM HEIGHT uF 3 FEET. CONSTRUCTION SEQUENCE 1. ATTF.ND PRECONSTRUCTION MEETING. 2. INSTALL CONSTRUCTION ENTRANCE. 3. FLAG CLEARING LIMIT. 1.. PLACE STRAW BALE DAM EXISTING DITCH. S. INSTALL FILTER FENCE AND DIVERSION DITCHES. 6. CONSTRUCT WEST SIDE EROSION CONTROL DITCH $41711 PERFORATED RISER. 7 . CLEAR AND GRUB SUE. 9. GRADE TO SUBGRADE 10. BEGIN ROLLING SURCHARGE. II. MAINTAIN EROSION/SEDINENTATION CONTROL MEASURES DURING ALL GRADING. 12, irioac,,,c00 ..tolercACVTION SHALL BE DONE PER GEOTECH 'CO.NSULTANTS SOIL REPORT-NO. 8338), DATED NOVEXBER, 1928. 3.7117-;-9 C-601-)1,6TION OF 'ME oct-5. • ti»aisppleivower amit4 0AF irwRootitois 6igiocf:/ToFtist 1 0 '44DFNGERMAtt• 12 71 44, 01 0 umm _J oo LIJ Ifa hia CO 0 1 206)323-.1144 FILE COPY I understand that the sub!ect to errors mc! PBy Date. bij Plan Check approvals ornIKiion.; end approval o's any certtra Permit No arts CITY OF TUKWILA APPROVED 1 ILPING 4. VON (: Wer- 0 uri Zm 0 GL •