HomeMy WebLinkAboutPermit 5640 - Covia - Tenant Improvement%t 11.111.011111%,4 r i1..i-ii11ii 1
(POST WITH 'NSF-
NS TION CARD AND PLANS
IN A CONSPICUOUS LOCATION)
CITY OF TUKWILA
Department of Community Development - Building Division
6200 Southcenter Boulevard, Tukwila WA 98188
(206) 433 -1849
BUILDING
PERMIT NO.
DATE ISSUED:
7- 6 w
FEES
DESCRIPTION
AMOUNT
RCPT 0
DATE
b -16 -89
BUILDING PERMIT FEE
285.00
022A
PLAN CHECK FEE
1781:137-772T-7-767311-
BUILDING SURCHARGE
• 1
1 '
• - • -:
ENERGY SURCHARGE
292-9220
ADDRESS
111 Queen Anne Ave. N. #400, Seattle, WA
OTHER:
OCC.
LOAD .
ZIP 98109
WA. ST. CONTRACTORS LICENSE #TECTODC 144 BB
TOTAL *
. 471.50
ARCHITECT
Marvin Stein & Associates
16300 Christensen Road, Bldg.
PROJECT NAME/TENANT COV /A
ASSESSOR ACCOUNT N 252304 - 9078 -0
TYPE OF ❑ New Building Addition Tenant Improvement (commercial) U Demolition (building) U Grading/Fill
WORK: 0 Rack Storage 0 Reroof ❑ Remodel (residential) 0 Other
DESCRIBE WORK TO BE DONE:
Office T.I.
PROPERTY OWNER
R. A. Fei chtmei r
/
PHONE
282 -9220
ADDRESS
111 Queen Anne Ave. No. #400, Seattle, WA
( ough
Public Works)
FLOOR+
ZIP 98109
CONTRACTOR
Tecton Development Corp.
'PHONE
SQUARE
FEET
292-9220
ADDRESS
111 Queen Anne Ave. N. #400, Seattle, WA
SQUARE
FEET
OCC.
LOAD .
ZIP 98109
WA. ST. CONTRACTORS LICENSE #TECTODC 144 BB
1st
EXP. DATE 12/31/89
ARCHITECT
Marvin Stein & Associates
PHONE
441 -1449
ADDRESS
2221 Fifth Avenue, Seattle, WA
ZIP 98121
USE 4
OFC / B2
/
CODE
/
/
/
Yes 29 N o
( ough
Public Works)
FLOOR+
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD .
TOTAL
SQUARE FEET
2993
TOTAL
OCC. LOAD
15
1st
2993
TOTAL
TYPE OF CONSTRUCTION: UBC EDITION (yeaq985
SETBACKS: N _ S -
E -
W - •
FIRE PROTECTION:
LwSprinklers 0 Detectors 0 N/A
UTILITY PERMITS REQUIRED
Yes 29 N o
( ough
Public Works)
ZONING: C -M BAR /LAND USE CONDITIONSOYes op No
CONDITIONS (other than those noted on or attached to pormibplans):
API HOVED FOR BUILDING
ISSUANCE BY: �T / 4,(44Y OFFICIAL
DATE: p
7- S-89
7
1 hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions
of taw and ordinances governing this work will be complied with, whether specified herein or not. The granting of
this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws
regulating construction or the performance or work. 1 am authorized to sign for and obtain this building permit.
SIGNATURE: _La., ei,-�...----_
DATE: 7-- -7---
PRINT NAME: ,,, .. D ,_4, s - i
COMPANY: /
This permit shall become null and void if the work is not commenced within 180 days from the date of
issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection.
-.E1 TIF)CATE OF
(!. ,.UPAliCY NO.
} DATE ISSUED:
UV giant