Loading...
HomeMy WebLinkAboutPermit D06-220 - Industrial Casters - Storage RacksINDUSTRIAL CASTERS 1085 ANDOVER PK E D06 -220 City of Tukwila Department of Community Development / 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670 Parcel No.: 2623049106 Address: 1085 ANDOVER PK E TUKW Suite No: Tenant: Name: INDUSTRIAL CASTERS Address: 1085 ANDOVER PK E, TUKWILA WA Owner: Name: SECURITY CAPITAL INDUSTRIAL Phone: Address C/O DELOfTTE & TOUCHE LLP, 2235 FARADAY AVE STE 0 Contact Person: Name: PAULA SMITH Phone: 253 804 -0404 Address: 411 WEST VALLEY HY, TUKWILA WA Contractor: Name: CEDAR RECYCLING INC Phone: (253)804 -0404 Address: 411 W VALLEY HWY S, PACIFIC WA Contractor License No: CEDARRI981CM Expiration Date:02/14 /2008 DESCRIPTION OF WORK: INSTALL AND ANCHOR 18 BAYS OF PALLET RACKING Value of Construction: $0.00 Fees Collected: $260.48 Type of Fire Protection: Uniform Building Code Edition: Type of Construction: VB Occupancy per UBC: 0011 Public Works Activities: Channelization / Striping: N Curb Cut / Access / Sidewalk / CSS: N DEVELOPMENT PERMIT Permit Number: D06 -220 Issue Date: 06/29/2006 Permit Expires On: 12/26/2006 Fire Loop Hydrant: N Number: 0 Size (Inches): 0 Flood Control Zone: N Hauling: N Start lime: End Time: Land Altering: 14 Volumes: Cut 0 c.y. Fill 0 c.y. Landscape Irrigation: N Moving Oversize Load: 14 Start Time: End Time: Sanitary Side Sewer: N Sewer Main Extension: 14 Private: Public: Storm Drainage: N Street Use: N Profit: N Non - Profit: N Water Main Extension: 14 Private: Public: Water Meter: 14 doc: Devperm ** Continued Next Page ** 006 -220 Printed: 06 -29 -2006 Print Name: doc Devperm City of Tukwila Department of Community Development / 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670 Permit Center Authorized Signature: VIA d/1,` N\//1Ao)nA.tQ Date: ru(71 kp I hereby certify that I have read and min t is permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be o•mpli ith, whether specified herein or not. P OJ.t1 , , The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this development permit. Signature: Date: G1 94G This permit shall become null and void if the work Is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. D06 -220 Printed: 06-29-2006 Parcel No.: 2623049106 Address: 1085 ANDOVER PK E TUKW Suite No: Tenant: INDUSTRIAL CASTERS 1: ** *BUILDING DEPARTMENT CONDITIONS * ** 4: Installation of high - strength bolts shall be periodically Inspected In accordance with AISC specifications. 9: ** *FIRE DEPARTMENT CONDITIONS * ** City &'Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Fax: 206 431 - 3665 Web site: ci.tukwila.wa.us PERMIT CONDITIONS Steven M. Mullet, Mayor Steve Lancaster, Director Permit Number: D06 -220 Status: ISSUED Applied Date: 06/09/2006 Issue Date: 06/29/2006 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All permits, inspection records, and approved plans shall be at the Job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 5: When special inspection is required, either the owner or the registered design professional in responsible charge, shall employ a special inspection agency and notify the Building Official of the appointment prior to the first building inspection. The special inspector shall furnish inspection reports to the Building Official in a timely manner. 6: A final report documenting required special inspections and correction of any discrepancies noted in the inspections shall be submitted to the Building Official. The final Inspection report shall be prepared by the approved special inspection agency and shall be submitted to the Building Official prior to and as a condition of final inspection approval. 7: All construction shall be done in conformance with the approved plans and the requirements of the Intemational Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. 8: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 10: The attached set of building plans have been reviewed by the Fire Prevention Bureau and are acceptable with the following concerns: 11: The total number of fire extinguishers required for an ordinary hazard occupancy with Class A fire hazards is calculated at one extinguisher for each 1,500 sq. ft. of area. The extinguisher(s) should be of the "All Purpose" (2A, 20B:C) dry chemical type. Travel distance to any fire extinguisher must be 75' or less. (IFC 906.3) (NFPA 10, 3 -2.1) 12: Portable fire extinguishers, not housed in cabinets, shall be installed on the hangers or brackets supplied. Hangers or brackets shall be securely anchored to the mounting surface in accordance with the manufacturer's installation Instructions. Portable fire extinguishers having a gross weight not exceeding 40 pounds (18 kg) shall be installed so that its top is not more than 5 feet (1524 mm) above the floor. Hand -held portable fire extinguishers having a gross doc: Conditions D06 -220 Printed: 06 -29 -2006 City Tukwila 15: ** *MEANS OF EGRESS * ** - IFC Chapter 10 Department of Community Development 6300 Southcenter Boulevard, Suite # 100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: ci.tukwila.wa.us Steven M. Mullet, Mayor Steve Lancaster, Director weight exceeding 40 pounds (18 kg) shall be installed so that its top is not more than 3.5 feet (1067 mm) above the floor. The clearance between the floor and the bottom of the installed hand -held extinguishers shall not be less than 4 inches (102 mm). (IFC 906.7 and IFC 906.9) 13: Fire extinguishers shall not be obstructed or obscured from view. In rooms or areas in which visual obstruction cannot be completely avoided, means shall be provided to indicate the locations of the extinguishers. (IFC 906.6) 14: Extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed Indicates the need for placement away from normal paths of travel. (IFC 906.5) 16: No point in a building may exceed the maximum exit access travel distance listed in Chapter 10, section 1015, Table 1015.1 of the International Fire Code and International Building Code. 17: Exit hardware and marking shall meet the requirements of the International Fire Code. (IFC Chapter 10) 18: Exits and exit access doors shall be marked by an approved exit sign readily visible from any direction of egress travel. Access to exits shall be marked by readily visible exit signs In cases where the exit or the path of egress travel is not Immediately visible to the occupants. Exit sign placement shall be such that no point in an exit access corridor is more than 100 feet (30,480 mm) or the listed viewing distance for the sign, whichever is less, from the nearest visible exit sign. (IFC 1011.1) 19: Every exit sign and directional exit sign shall have plainly legible letters not less than 6 inches (152 mm) high with the principal strokes of the letters not less than 0.75 inch (19.1 mm) wide. The word "EXIT' shall have letters having a width not less than 2 inches (51 mm) wide except the letter "I ", and the minimum spacing between letters shall not be Tess than 0.375 inch (9.5 mm). Signs larger than the minimum established in section 1011.5.1 of the International Fire Code shall have letter widths, strokes and spacing in proportion to their height. The word "EXIT' shall be In high contrast with the background and shall be clearly discernible when the exit sign illumination means is or is not energized. If an arrow is provided as part of the exit sign, the construction shall be such that the arrow direction cannot be readily changed. (IFC 1011.5.1) 20: ** *SPRINKLER SYSTEMS * ** - IFC Chapter 9 - NFPA 13 and 25 21: All new sprinkler systems and all modifications to existing sprinkler systems shall have fire department review and approval of drawings prior to installation or modification. New sprinkler systems and all modifications to sprinkler systems involving more than 50 heads shall have the written approval of the W.S.R.B., Factory Mutual, Industrial Risk Insurers Kemper or any other representative designated and /or recognized by the City of Tukwila, prior to submittal to the Tukwila Fire Prevention Bureau. No sprinkler work shall commence without approved drawings. (City Ordinance #2050) 22: All sprinkler system plans, calculations and the contractors Materials and Test Certificates submitted to the Tukwila Fire Prevention Bureau must be stamped with the appropriate level of competency seal. (WAC 212 -80) 23: ** *STORAGE PRACTICES * ** - IFC 24: Maintain minimum 6" longitudinal flue space between back -to -back racks. (NFPA 13- 12.3.1.14.1) 25: Where storage height exceeds 15 feet and ceiling sprinklers only are Installed, fire protection by one of the following doc: Conditions D06 -220 Printed: 06 -29 -2006 City dr Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 - 431 -3665 Web site: ct.tukwila.wa.us * *continued on next page ** Steven M. Mullet, Mayor Steve Lancaster, Director methods is required for steel building columns located within racks: (a) one -hour fire proofing, (b) sidewall sprinkler at the 15 foot elevation of the column, (c) ceiling sprinkler density minimums as determined by the Tukwila Fire Prevention Bureau. (NFPA 13) 26: Nominal 6" transverse flue spaces between loads and at rack uprights shall be maintained in single row, double row, and multiple row racks. Random variations in the width of flue spaces or In their vertical alignment shall be permitted. (NFPA 13- 12.3.1.13) 27: Any overlooked hazardous condition and /or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. 28: These plans were reviewed by Inspector 510. If you have any questions, please call Tukwila Fire Prevention Bureau at (206)575 -4407. doc: Conditions 006 -220 Printed: 06-29-2006 Signature: Print Name: City dir'Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: ct.tukwila.wa.us The granting of this permit does not presume to give authority to violate or cancel the provision of any regulating construction or the performance of work. I hereby certify that I have read these conditions and will comply with them as outlined. All provisions governing this work will be complied with, whether specified herein or not. A /4 doc: Conditions 006-220 Steven M. Mullet, Mayor Steve Lancaster, Director Date: � e. � /o - c of law and ordinances other work or local laws Printed: 06 -29 -2006 CITY OF TUKWI Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http:/Awww. cttukwlla. wa.us Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *Phase Print" SITE LOCATION Site Address: jcmr RAdotl?.f'1. c cask Tenant Name: =fat. 5,4 /� ridt l tv4pr. Property Owners Name: Prellot Mailing Address: t 1777.r Fre,no4_ £*Lz _ Frei+,r CA 9y5 g Gay CONTACT PERSON Name: Paula 5M' to. Mailing Address:1f 1 1 ) d VA I1. Ho E- Mail Address:ajp ®t't / rnrk5 y ic. (OM GENERAL CONTRACTOR INFORMATION - (Contractor Wormatian for Mechanical (pg 4) for Plumbing and Gas Piping (pg 5)) Compan RG&.IL G�•S , . .4 atvt,Sto,n Mailing Address: 9// Veal- 1/4 Ut y / Contact Person: Pau k Sm 3l( E-Mail Address: ulaeR to ray Contractor Registration Number: en QAZ CM W TUKWILA W Building Permit No. t 0 — 2-9--(9 Mechanical Permit No. Plumbing/Gas Permit No. Public Works Permit No. Project No. King Co Assessor's Tax No.: 2( 125, 044 '1 10(Q n4 Ceder gFGyr,linq Zit. AC/ c. 91 V7 ARCHITECT OF RECORD -All plans must be wet stamped by Architect of Record Company Name: Mailing Address: Contact Person: E-Mail Address: ENGINEER OF RECORD - All plans must be wet stamped by Engineer of Record Company Name: ■R c A t . non ' • n Mailing Address: Contact Person: Qgrr DhQriian E-Mail Address: Era l015'7r +� colt Coal QbpdiaYmNtam ..Applia6m. On lined -2006 - Penult Apptiatiaadoe a.,i..d 43006 bh Ineere or Suite Number: Floor: New Tenant: ❑ Yes ❑..No Day Telephone4250 804 0404 At 'fie— City State Zip Fax Number:jfl3 toy —.imp city state Zip Day Telephoner 3.) etc/ — OypV Fax Number: (.24 ?tit/ — a-10a- Expiration Date: 2/ S City Day Telephone: Fax Number: city Day Telephone: (fir Fax Number: (P 1f' ce use on stale Zip State Zip state Zip .QVO- ?7IO as.yo - 381 1 Ago l of 6 BUILDING PERMIT INFORTION — 206- 431 -3670 Valuation of Project (contractor's bid price): $5 2 74.% it Existing Building Valuation: $ n Scope of Work (please provide detailed information) =1\ hk4 It And O (lei^ o t \? ■, as nT pa l lS {moo it; . Will there be new rack storage? is, Yes ❑..No (If yes, a separate permit and plan submittal will be required) Provide All Building Areas in Square Footage Below g N L NIPNGDIVISION: Single - family building footprint (area of the foundation of all structures, plus any decks ova 18 inches and overhangs grater than 18 inches) For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area for accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: FIRE PROTECTION/HAZARDOUS MATERIALS: 0.. Sprinklers ❑..Automatic Fire Alarm Ct Ayramose a ties -2006 - Pa,aityramasaos Rene& 42006 t0 Compact: Handicap: Will there be a change in use? ❑.... Yes ❑..No If `yes ", explain: 0.. None ❑. (specify) Will there be storage or we of flammable, combustible or hazardous materials in the building? 0.. Yes J. No If yes ", attach list of materials and storage locations ma separate 8 - 1/2 x 11 paper indenting qualities arrdMatenol SrfetyData Sheets. SEPTIC SYSTEM: ❑ On-site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. Page 2 of 6 Existing Interior Remodel Addition to Existing Structure New Type of Construction per IBC Type of Occupancy per IBC I" Floor 75 2 Floor 3 Floor Floors than Basement Accessory Structure* Attached Garage Detached Garage Attached Carport Detached Carport Covered Deck Uncovered Deck BUILDING PERMIT INFORTION — 206- 431 -3670 Valuation of Project (contractor's bid price): $5 2 74.% it Existing Building Valuation: $ n Scope of Work (please provide detailed information) =1\ hk4 It And O (lei^ o t \? ■, as nT pa l lS {moo it; . Will there be new rack storage? is, Yes ❑..No (If yes, a separate permit and plan submittal will be required) Provide All Building Areas in Square Footage Below g N L NIPNGDIVISION: Single - family building footprint (area of the foundation of all structures, plus any decks ova 18 inches and overhangs grater than 18 inches) For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area for accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: FIRE PROTECTION/HAZARDOUS MATERIALS: 0.. Sprinklers ❑..Automatic Fire Alarm Ct Ayramose a ties -2006 - Pa,aityramasaos Rene& 42006 t0 Compact: Handicap: Will there be a change in use? ❑.... Yes ❑..No If `yes ", explain: 0.. None ❑. (specify) Will there be storage or we of flammable, combustible or hazardous materials in the building? 0.. Yes J. No If yes ", attach list of materials and storage locations ma separate 8 - 1/2 x 11 paper indenting qualities arrdMatenol SrfetyData Sheets. SEPTIC SYSTEM: ❑ On-site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. Page 2 of 6 PERMIT APPLICATION NOTES — Applicable to all permits in this application Value of Construction — In all cases, a value of construction amount should be entered by the applicant This figure will be reviewed and is subject to possible revision by the Permit Center to comply with cunent fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. Building and Mechanical Permit The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). Plumbing Permit The Building Official may grant one extension of lime for an additional period not exceeding 180 days. The extension shall be requested in writing and justifiable cause demonstrated. Section 103.43 Uniform Plumbing code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER AUTHORIZED AGENT: Signature: 6/7/CC 6/7/CC � Print Name: 1 k S, ;4 Mailing Address: -ll( tJ i 1r' l Day Telephone: 3 -may - ONO y Fau'A c /J4 41OY7 City State Zip Date Application Expires: ti[oj o 1 Date Application Accepted: !AL' / — t q: W dkmomwam.npremao. Os tiaellaao6 - %mit Mrtiveoadm Ravi.& 44006 bh Staff Initials: Page 6 of 6 1 ACCOUNT ITEM LIST: Description City of Tukwila 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670 Parcel No.: 2623049106 Permit Number: D06-220 Address: 1085 ANDOVER PK E TUKW Status: PENDING Suite No: Applied Date: 06/09/2006 Applicant: INDUSTRIAL CASTERS Issue Date: Receipt No.: R06 -00839 Payment Amount: 260.48 Initials: ]EM Payment Date: 06/09/200610:08 AM User ID: 1165 Balance: $0.00 Payee: CEDAR RECYCLING, INC. TRANSACTION LIST: Type Method Description Amount Payment Check 1496 260.48 BUILDING - NONRES PLAN CHECK - NONRES STATE BUILDING SURCHARGE Account Code Current Pmts 000/322.100 000/345.830 000/386.904 RECEIPT 155.14 100.84 4.50 Total: 260.48 6276 06/09 9716 TOTAL 260.48 doc: Receipt Printed: 06 -09 -2006 Proj�ect L, t:4.52c ./ r i, Type of Inspection: /7a' / )-tie Date Called: Address: Special Ins ructions: Date Wanted: Requester: Phone No: — h L INSPECTION RECORD Retain a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 COMMENTS: Inspector Date: PER (206)431 - 3670 Approved per applicable codes. Corrections required prior to approval. 74'0 i at ISal $58.00 REINSPECTION FE T REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to sechedule reinspection. 'Receipt No.: 'Date: Project: l�4{ (� 1,, jt. altS4riA\ `ke 4 Type of Inspection: \1 SPetts -I ' '62 Date Called: Address: to c' 4 ak �/� !tivor Ptt_t Special Instructions: Date Wanted: . „ '77 I% -0L. p.m. 'equester: Phone No: 20 C - 2u K— I7 5' Approved per applicable codes. Corrections required prior to approval. CO MENTS: rin / 471,2 A i d ' 1 u /, /nj� .. . r ....... at-,..5 , -L ince cm / v INSPECTION RECORD Retain a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 Inspector: El $58.001ZENSPECTION FEE REQUIRED. Prior to Inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to sechedule reinspection. 'Receipt No.: (206)431 -36 'Date: 7-13-6‘ Date: Project: SS OSTa -% R L, Caste - (LS Type of Inspection: IZAc-V - Address: t025 f\ P E Suite #: Contact Person: EA21, GaEss CIF Special Instructions: Phone No.: (110, Z L-14 -3695" Needs Shift Inspection: Sprinklers: Fire Alarm: Hood & Duct: Monitor: Pre -Fire: Permits: Occupancy Type: 1 INSPECTION NUMBER INSPECTION RECORD Retain a copy with permit CITY OF TUKWILA FIRE DEPARTMENT t)6— 720- a PERMIT NUMBERS 206 - 575 -4407 Approved per applicable codes. n Corrections required prior to approval. COMMENTS: Date: fit/ /0,1 Inspector: C.4,,i / 51 Z 0 Hrs.: / $80.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be aid at 444 Andover Park East. Call to schedule reinspection. Receipt No.: f Date: Word /Inspection Record Form.Doc 12/2/05 T.F.D. Form F.P. 85 _, CASCADE SPECTION TESTING LABORATORY, INC. 12919 N.E. 126TH PLACE KIRKLAND, WASHINGTON 98034 (425) EVERETT (425) EIV En7 FIELD REPORT �'ut' - 4 k ILL tar 8 (d ) fi m PREVIOUS ! 1231 P 1 REPORT N0. No. .w i /Z/Q Ca CER NO. 07 i � �} TO 6i. t1.4 PROJEC M ot V s�- i o85' over\ k t.-::-., 'c. -i Ac. 33 ►5 , i1 Iii 41 4 ` / 0210_22_ BLDG. PERMIT NO. OWNER 4 Q / Q WEATHER TEMP. AT AM AT PM --re Le , qc) 1 6 p ENGINEER \ot ATTN ARCHITECT CONTRACTOR (2) INSPECTION PERFORMED RESTEEUCONCRETE - RESTEEL ONLY REST MASONRY - STR,ST/WELDING THER STR ST /BOLTING (3) ITEMS INSPECTED - FOOTINGS _ - AUGER CAST PILES _ - DRILLED PIERS - FOUNDATIONS SLAB COLUMNS WALLS BEAMS S - ( LOCATIONp (AREAS) CS `� -��`� S� tekl.,\`� ilLer < J S\L C SLUMP AIR SUPPLIER MIX NO DESIGN STRENGTH (PC) TOTAL CU. YD. PLACED (INCHE CON NT ( %) SPECIMENS CAST SEE CYLINDER REPORT NO YES NO _ ITEMS INSPECTED WERE IN CONFORMANCE WITH BLDG. DEPT. APPROVED PLANS REMARKS: `V s (� `Q .SICc a Stmt GLcdL.v \Cote & • , A \ C--(44 TEST RESULTS APPLY ONLY TO THE ITEMS HEREIN TESTED. THIS REPORT SHALL NOT BE REPRODUCED EXCEPT IN FULL, WITH- OUT THE WRITTEN APPROVAL OF CASCADE TESTING LABORATORY, INC. REVISED 7105 COPIES INSPECTOR(S), NAME(S) PRINTED INSPECTOR SIGNATURE SIGNED BY REPORT" ICC Evaluation Service, Inc. www.icc- es.org DIVISION: 03— CONCRET Section: 03151 — Concret REPORT HOLDER: HILTI, INC. 5400 SOUTH 122X0 EAST A TULSA, OKLAHOMA 74146 (800) 8794000 www,us.hiltl.com HiItITechEno(olus.hilti.com EVALUATION SUBJECT: KWIK BOLT 3 CONCRETE AND 1.0 EVALUATION SCOPE Compliance with the following CoPTdght 02004 ,�— are zinc-plated. The 'I -. 6. and 3 4- inch- diameter(12.7,15.9, AnchIEVVED �R and 19.1 mm) carbon steel Kwik Bolt 3 anchors are available CODE rnMP11AN with a hot- dipped galvanized plating complying with ASTM A 153. The studs, nuts and washers of the 304 and 316 tainless steel Kwik Bolt 3 anchors are also made from stainless steel. All 304 stainless steel, 316 stainless steel, and hot -dipped galvanized Kwik Bolt 3 anchors use 316 tainless steel wedges. L The stud consists of a high - strength rod threaded at one d. The standard Kwik Boh 3 has a thread length equal to or O �I a s than three bolt diameters, while the Long Thread Kwlk City 0 3 has a thread length greater than three bolt diameters. le. n�)t n� The tapered mandrel has an increasing diameter toward the gg�L anchor base, and is enclosed by a three - section wedge that MASONRY ANCHORS freely moves around the mandrel. In the vertical direction, the wedge movement is restrained by the mandrel taper at the bottom and by a collar at the top of the mandrel. When the anchor nut is tightened, the wedge Is forced against the wall of the predrilled hole to provide anchorage. 4.0 DESIGN AND INSTALLATION T wle n ,cn ENUE JUN 2 7 2006 codes: • 2000 international Building Code (IBC) • 2000 International Residential Code (IRC) • 2002 Accumulative Supplement to the International Codes^' • 1997 Uniform Building Code" (UBC) Properties evaluated: Structural 2.0 USES The Kwik Bolt 3 (KB3) Concrete and Masonry Anchor Is used to resist static and transient seismic and wind tension and shear loads In uncracked, normal- weight concrete, structural lightweight concrete, structural lightweight concrete over metal deck, and grout -filled concrete masonry. The anchor system Is an altemative to cast -in -place anchors described in Sections 1912 and 2107 of the IBC and Sections 1923.1 and 2107.1.5 of the UBC. The anchor systems may also be used where an engineered design Is submitted In accordance with Section R301.1.2 of the IRC. 3.0 DESCRIPTION The Kwik Bolt 3 expansion anchors consist of a stud, wedge, nut, and washer. The stud Is manufactured from carbon or stainless steel material. The carbon steel Kwik Bolt 3 anchors have a 5 pm (0.0002 inch) zinc plating. The anchor is Illustrated In Figure 1 of this report. The wedges for the carbon steel anchors are made from carbon steel, except for all '/cinch (6.4 mm) lengths and the 1/4- inch- by- 12- inch,1- inch- by- 8- inch,1- Inch- by- 9-inch and 1- Inch -by -12 -Inch (19.1 mm by 305 mm, 25 mm by 152 mm, 25 mm by 229 mm, and 25 mm by 305 mm) sizes, which have AISI 316 stainless steel wedges. All carbon steel components FILE COM ESR -1385* Issue September 1, 2004 This report is subject to re- examination in one year. Business/Raglan! Office • 5380 Walaren MI Road, Wttler, California 93601 • (562) 6994543 Regional Office • 900 Montclair Road, Sulfa A, Blmi gham, Alabama 35213 • (206) 5990800 Regional Moe • 4051 West Flournoy Road, Country Club I♦ils, finds 80478 • (706) 798.2305 0 *Revised August 1, 2005 4.1 Design: Minimum embedment depth, edge distance, and spacing requirements are set forth in Tables 1 and 2. Allowable stress design tension and shear loads are as noted In Tables 3 through 14. Tables 4, 7, 8, 9, and 10 also apply to Kwik Bolt 3 anchors Installed in holes drilled with Hilti Matched - Tolerance Diamond Core Bits as noted In the footnotes to each table. Allowable loads for Kwik Bolt 3 anchors subjected to combined shear and tension forces are determined by the following equation: (PPP' + (VIV s 1 where: P, = Applied service tension load (Ibf or N). P, = Allowable service tension load (Ibf or N). V, = Applied service shear bad (Ibf or N). V, = Allowable service shear load (Ibf or N). 4.2 Installation Requirements: Kwik Bolt 3 shall be installed in holes drilled into the base material using carbide - tipped masonry drill bits complying with ANSI 6212.15 -1994 or where permitted by the tables, Hilti Matched - Tolerance Diamond Core Bits. The nominal drill bit diameter shall be equal to that of the anchor. The drilled hole shall exceed the depth of anchor embedment by at least one anchor diameter to permit over - driving of anchors and to provide a dust collection area. The anchor shall be hammered Into the predrilled hole until at least six threads are below the fixture surface. The nut shall be tightened against the washer until the torque values specified in Table 1 are attained. igS REPORTe- are not to be construed as representing aesthetics or any other attributes not specificalfr addressed. nor are th 10 be construed as an endorsement of the subject of the report or a recommendation for its are. There is no unmanly by ICC Evaluation Service, Inc., express or implied as to any finding or other matter in this report, or as '0 any product covered by the report. Doi — 220 Page 1 of 9 SETTING DETAILS ANCHOR SIZE 1 1 4 inch '4 Inch 1 /2 Inch '/ Inch '/ Inch 1 Inch Dill bit size = anchor diameter (inches) '/ 3 s 12 ° ° 3 4 Wedge Uearance hole (Inches) ° /,° 7 /1s 17 /1, " Is 13 IS 1 /° Anchor length (min./max.) (Inches) 11/4 4'/, 2'/ 7 2 7 3'/, 10 6 12 6 12 Thread length std./long thread length (Inches) 3 / 4 3 7 /, 5 °/ 1Y 4 1'/ 7 1 /3 6 2 6 Installation: Torque guide values' (ft -Ibt) In concrete Stainless steel Carbon steel: Min. embedment Carbon steel: Std. embedment 6 4 4 20 20 20 40 40 40 85 85 85 150 150 150 200 200 325 Installation: Torque guide values (ft4b) in concrete masonry Carbon steel: Min. Embedment Carbon steel: Std. Embedment 4 4 15 15 25 25 65 65 120 120 — — Min. base material thickness (inches) 3 inches or 1.5 • embedment depth, whichever is greater Page 2 of 9 ESR -1385 4.3 Special Inspection: Special inspection shall be provided In accordance with Section 1704 of the IBC or Section 1701 of the UBC when design loads are based on special inspections being provided during anchor Installation, as set forth in Tables 3 through 14. Special Inspection in accordance with Section 1704 of the IBC shall be provided under the IRC when special inspection Is specified in Tables 3 through 14. The code official shall receive a report, from an approved special Inspector, that Includes the following details: 1. Anchor description, including the anchor product name, nominal anchor and bolt diameters, and anchor length. 2. Hole description, Including verification of drill bit compliance with ANSI 6212.15.1994 or the Hiki specification for matched tolerance diamond core bits, hole depth, and cleanliness. 3. Installation description, including verification of concrete compressive strength by ASTM C 42 methods, and verification of anchor Installation and location (spacing and edge distance) In accordance with Hilti's published Installation instructions and this report. 5.0 CONDITIONS OF USE The Kwik Bolt 3 Concrete and Masonry Anchors described in this report comply with, or are suitable alternatives to what is specified in, those codes listed In Section 1.0 of this report, subject to the following conditions: 5.1 Anchor sizes, dimensions, and Installation shall comply with this report and Hilti's published installation instructions. 5.2 Allowable tension and shear loads shall be as noted in Tables 3 through 14 of this report. 5.3 Calculations and details demonstrating compliance with this report shall be submitted to the code official for approval. 5.4 The use of anchors shall be limited to Installation in uncracked, normal - weight concrete, structural lightweight concrete, structural lightweight concrete over steel deck, and uncracked grout filled masonry concrete. Cracking occurs when / > f , due to service loads or deformations. 5.5 When using the basic load combinations in accordance with IBC Section 1605.3.1 or UBC Section 1612.3.1, allowable loads are not permitted to be increased for wind or earthquake loading. When using the alterative basic load combinations in IBC Section 1605.3.2 or TABLE 1—INSTALLATION SPECIFICATIONS' For 51: 1 inch = 25.4 mm, 1 ft-lbf = 1.356 N -m. Installation torques are applicable for all anchors installations unless noted otherwise in this report. UBC Section 1612.3.2 that include wind or seismic loads, the allowable shear and tension loads for anchors are permitted to be increased by 33V, percent. Alternatively, the basic load combinations may be reduced by a factor of 0.75 when using IBC Section 1605.3.2. 5.6 Anchors are not permitted for use in conjunction with fire - resistance -rated construction. Exceptions would be: • Anchors resist wind or seismic loading only. • For other than wind or seismic loading, special consideration Is given to fire exposure conditions. 5.7 Use of carbon steel Kwik Bolt 3 anchors shall be limited to dry, interior locations. Hot - dipped galvanized and stainless steel Kwik Bolt 3 anchors are permitted in exterior exposure or damp environments. 5.5 Since an ICC-ES acceptance criteria for evaluating data to determine the performance of expansion anchors subjected to fatigue or shock loading is unavailable at this time, the use of these anchors under these conditions is beyond the scope of this report. 5.9 Special inspection shall be provided in accordance with Section 4.3 of this report when required by Tables 3 through 14. 5.10 Anchors shall be manufactured by Hilti, Inc., Feldkircherstrasse 100, Schaan, Liechtenstein, undera quality control program with inspections conducted by Underwriters Laboratories Inc. (AA -666). 6.0 EVIDENCE SUBMITTED 6.1 Data in accordance with the ICC-ES Acceptance Criteria for Expansion Anchors in Concrete and Masonry Elements (AC01), dated April 2002, including seismic tests, reduced spacing tests and reduced edge distance tests. 6.2 Quality control manuals. 7.0 IDENTIFICATION The anchors shall be identified in the field by dimensional characteristics and packaging. The packaging label Indicates the manufacturer's name (Hilti, Inc.) and address, the size and type of anchor, the name of the inspection agency (Undenwiters Laboratories Inc.), and the ICC-ES report number (ESR - 1385). A length identification code letter is stamped on the threaded end of the bolt. The length identification system is described in Table 15. DESCRIPTOR ANCHOR 01/03ETE11(14 14 3/2 1/2 54 314 1 Embedment : niimnNnmwYOaq(i1.) 11/8 2 3 154 21/2 312 2114 3112 4304 234 • 512131/4 43(4 612 412 6 9 NORMAL WEIGHT CONCRETE" Spacing required to obWnmaMnun bad s a On.) T aer 21/2 412 5 35/6 55/8 53/4 51/8 77/6 77)8 81/4 9 9118 7316 10314 103/4 101)8 131215 Minimum Hwespacing a spacing g between endows 3 r (b.) Teraina Shade 11/8 2 3 157 212 31/2 21/4 31/2 434 254 • 51/2 31/4 4914 61/2 41/2 6 9 Edge distance b Sin bed C Terrain 2 31/2 37)8 2718 {31611(11 9118 61/8 174 7 7 53/4 83/5 01/4 77)8 10121112 spied nebmam e(h) Sham 3318 93/8 656 4716 4745 474 83/4 6314 63/4 8114 81/4 814 9314 93/4 93/4 1312 13121312 MFiram allowable edge dance Cr (31.) .) Union elon 11/8 2 3 137 212 312 2114 312 4314 234 4 512 3114 43/4 612 412 6 9 Stud 1 Y4 212 21/2 212 334 356 3318 146 4114 4116 474 474 4765 6314 154 63/4 LL SANDUGHIWEIGHTCONCRETE''' Spacing rpliad babWlnrnYn bed 9.I3) Shear Minimum abwatla sprig beawnentlaeSr(in) Tanabe EOgedSsa n4ie0batleh maximum bad CoOnl 111410 EC m CG C OE EC CM EC EC ILM QR �� In CCME r 13 12 sire 4 4 4 E 6 6 8 IyIC I/TE[IEMEIZE %:• 157/8 Minimum allowable edge MWU C r Om) Tnabn' MECH[MT 3 MECIOECECCCCCC 0114 7 10 58 Mew' 2 2 2 2 7 . 27: 27 4 4 41. 47. 47. 5 5 5314 5 8 6 STRIICTURALALL LN311WEIGHT CONCRETE.' 396.4 neied* obbb lwlllwa11 bed 3.(h) T&* 3318 6 456 474 712 73/4 6304 10121012 814 ifi fil 9304 141/4 1412131218 197/5 ear MYin a4abb Wang bMe analdwa 3 -On) 311191111 le Seen 112 25/6 4 2118 3318 458 3 458 63(6 356 534 79/6 4318 634 6561 6 8 12 Edge Aaro nlied baan maximum load Coln) Thelon 258 458 514 3304 57/8 6 51/4 646 8118 634 934 934 758 1114 111/8 1012 14 153/6 stem 412 412 412 612 61/2 612 9 9 9 11 11 11 13 13 13 18 18 18 Mnirmm.rune edge distends Cran) Tom' 112 258 4 21/8 3318 458 3 458 611 355 53/8 738 43/8 83/6 85/6 6 6 12 Sled 2114 2114 2114 31/4 31/4 3114 412 412 412 512 512 512 612 612 612 9 9 9 For St 1 i chw25A mn.1 I N. TABLE 2 ANCHOR SPACING AND EDGE DISTANCE REQUIREMENTS ' Data n 911 ebe aM tale bo6bW apply to Table 14.5.8 and 9 tor normal weight canoe. 'Date in the ebb and 9e tooalel s eppyb Take 6.7,10, arid 131/ abWel twine or all 191Awip4 concrete. 'When using 5 -fora Iaad in tension, -Wuxi allowable bad by 40% 'When using 3 -fora bed In Meer. N duce YOMla bed by 10% 'When using C -fora bad in Union, reduce alwate bed by 20%. a When meg C - be bed in User, rase allowable bed by 50%. 'Fr edge and who/ spacing blew minim= and an values, adawabe bads may baewl burly U poleed between le allowable bad* m flown and an spacings. Gibul and minimum edge detente aed spicing vain may mho be Y)Npdabd for a beanerb between thou bed n T5be2. * Load ndaalom Mil be multiplied when casMaig ab/bneaa nt dole due b C -and S r •o m m 0/ w 2. to BY G. OHANIAN DATE 6 - - 06 SUBJECT " STRUCTURAL CALCULATIONS OF STORAGE RACKS FOR: INDUSTRIAL CASTER 1085 ANDOVER PARK EAST TUKWILA, WA. 98188 PER IBC 2003 EDITION STORAGE RACKS CAPACITY: 4000 # / LEVEL CALCS. 1 THRU 4 DRAWINGS: RD -11002 RAdK DEOI{ N & EN(#INEERINd d0. SHEET NO 1 412 WEST BROADWAY, f UITE #204 =DALE, DA. 91204 JOB NO RD -11002 TE148111)240 -3610 7AX4(616)240 -3613 IEXPIRES 12 -26 -07 ODE MPLIN CE v 0"^nerVp(o JUN 2 7 2006 i ty Of Tukwila RI1tLDtNr ►l1(/tStoN crrvo��KKwT A JUN 0 9 2006 PERMIT CENTER Pat 2w BY G. OHANIAN DATE 6 -6 -06 SUBJECT BEAM 1 3 4' 1^� I =2.56 0 x S =1.11 2 3/4' SEISMIC DESIGN V— Rx1.4, o NG STRESS Q6" k 106' FRONT VIEW Fy =50 KSI. 1 =1 R =6 MOM. CONN. R =4 BRACED S =.85 W= D.L.+ 2 L.L LOAD PER COLUMN x 3x4K —4 3 2 coL. W =.1 D. L 4 LL 4.1 K v _ .85x1x4 1 = 4 K LONGR. 6x1.4 V = .85x1x4.1 _ 62K MKS. 4x1.4 RAdK DEgIcIN & ENdINEERIN(d d0. 412 WE BROADWAY, 0UITE �204 4LENDALE. dA. 91204 TE1(818)240 -9810 FAB:(818)240 -3813 SIDE VIEW IBC 2003, SEC. 2208 4000 # / LEVEL + 25X IMPACT LOAD 2200 ' / BEAM M— 106 "x2.2Ic = 29' 8 S Q = .97<1.11 _ s 384x1xxE — •42" < 180 =.59" x S =1.27 (USGS MAP) S =1.27 (EQ. 16 -38) S = 3x1.27 =.85 (EQ. 16 -40) 1ONGIT. SEISMIC .41 K SHEET NO 2 JOB NO. RD - 11002 By G. OHANIAN DATE 6-6 -06 SUBJECT COLUMN ANALYSIS 3' 1 to x — t ".07' COMBINED STRESS RATIO P M 13 + 20 = . 85<1.33 Pa ax BASE PLATE ANCH. TENSION — 11 K —(4.1 x3") = 0 6" ANCHOR SHEAR = • 21 = 21 K (2) -1/2 "0 HILTI KWIK BOLT 3 ESR -1385 OR EQUAL. (NO INSPECTION REQ'D) DESIGNED FOR 1/2 STRESS MOMENT AT BEAM CONNECTION 7/16"e RIVET A =.1 Fy =79 KS! Va = .1 x79x.4 = 3 K Ma =3Kx4 "x1.33 =16 " CONN. RACK DEigIdN & EN(4INEERINd CO. 412 WE BROADWAY, OOTTE #204 LENDALE, CA. 91204 TEL(818)240 —31310 FAB:(818)240 -3813 Fy =50 KSi A =.73 5, =.68 r =1.2 r =1.1 3 PIN CONN. Jy = 56x1.7 = 79 r 1.2 =- =42 ry 1.2 Max =Se .Fp =20 -K 10 "K Fe— a = 45 ( ) 2 rx F =F y(1 4F, )- 36 KS1 P =F xA = 26 K p P^ —13K ° — 1.92 4.1 K 1 SHEET N0 3 JOB NO RD - 11002 8 "x5 "x3/8" BASE PLATE By G. OHANIAN DATE 6 -6 -06 SUBJECT A OVERTURNING M OT = .62 K x2x156 "x.5x1.15 = 112 " MR = 4.1 "= 164 " NO UPLIFT LOAD TO DIAGONAL P .62 0 = 1.7 K Fy =50 K51 A =.31 r =.48 L= 54" CHECK WEIDS 1/8" WELD 1" LONG EACH SIDE (2" TOTAL) 2x.125x.707x70x.3 = 3.7 K CHECK SLAB 4100 =41 0' 1000 v =24" M= ( , 2 x1000x Z x12 = 1260 "# S 12x5 2 _ 50 6 F 11.7 X51 P = 3.6 K 4.1x144 =590 1260 _ 25 < 1.6 V =87 50 RAdK DEMON & EN(#INEERIN4 do. 412 WET BROADWAY. 0111TE #204 LENDALE, CA. 91204 L•(B TE18)240 -8810 FA%(818)240 -3813 TOP LEVEL LOADING M .21 K x2x156 "= 65 "K MR = 1.5Kx40 "= 60"K UPLIFT = 65"K-60"K = 40" 12K 2 51085 TMP. 1/8 Sfax y r =.o6" SFC. A -A 4100 1 =.06" 1=.06" SHEET NO 4 JOB H0. RD -11002 SFC. B -B 5" CONCRETE SLAB 3000 PSI CONC. 1000 PSF. SOIL ACTIVITY NUMBER: D06 -220 DATE: 06 -09 -06 PROJECT NAME: INDUSTRIAL CASTERS SITE ADDRESS: 1085 ANDOVER PK E X Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # Revision # After Permit Issued DEPARTMENTS: Kith ' fr Bun ding Division Public Works ❑ DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Comments: TUES/THURS ROUTjNG: Please Route Structural Review RequiredStructural Review Required REVIEWER'S INITIALS: APPROVALS OR CORRECTIONS: Approved ❑ Notation: REVIEWER'S INITIALS: Documentsrouting slip.doc 2 -28-02 JERMIT COORD COPY ‘ . PLAN REVIEW /ROUTING SLIP 5t.0 AWc, 6-0 Fire Prevention Structural ❑ Incomplete Approved with Conditions DATE: DATE: Planning Division Permit Coordinator No further Review Required DUE DATE: 06-13 -06 Not Applicable ❑ Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: DUE DATE: 07-11 -06 Not Approved (attach comments) ❑ Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: License Information License CEDARRI981CM Licensee Name CEDAR RECYCLING INC Licensee Type CONSTRUCTION CONTRACTOR UBI 602084893 Ind. Ins. Account Id 84939604 Business Type CORPORATION Address 1 411 W VALLEY HWY S Address 2 City PACIFIC County KING State WA Zip 98047 Phone 2538040404 Status ACTIVE Specialty 1 GENERAL Specialty 2 UNUSED Effective Date 2/14 /2002 Expiration Date 2/14 /2008 Suspend Date Separation Date Parent Company Previous License Next License Associated License Bond Information Bond Bond Company Name Bond Account Number Effective Date Expiration Date Cancel Date Impaired Date Bond Amount Received Date #1 RLI INSURANCE COMPANY SRS1002727 02/13/2002 Until Cancelled 512,000.00 02/14/2002 Business Owner Information Name Role Effective Date Expiration Date ECK, JERALD D PRESIDENT 02/14/2002 Look Up a Contractor, Electrician or Plumber License Detail Page 1 of 2 Washington State Department of Labor and Industries General/Specialty Contractor A business registered as a construction contractor with L &I to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. https: // fortress .wa.gov /lni/bbip /printer.aspx ?License= CEDARRI981 CM 06/29/2006 x x x