HomeMy WebLinkAboutPermit 5778 - Star Machinery - ReroofBUILDIIG PERMIT
(POST WITH INS I:CTION CARD AND PLANS
IN A CONSPICUOUS LOCATION)
CITY OF TUKWILA
Department of Community Development - Building Division
6200 Southcenter Boulevard, Tukwila WA 98188
(206) 433 -1849
BUILDING 5-1 --�`�
PERMIT NO.
DATE ISSUED:
FEES
DESCRIPTION
AMOUNT
RCPT •
DATE
10-
CONTRACTOR Kathol Roofing Inc.
BUILDING PERMIT FEE
272.00
,9915
'
le'-'ifl
PLAN CHECK FEE
PHONE
ADDRESS
BUILDING SURCHARGE
4.50
ENERGY SURCHARGE
OTHER: Invest. Fee
272.00
`7
/
TOTAL -
548.50
• 11 • ;:•
P110,11 C Ir1FOF F1ntMP./
17900 W Valley Hy 28,000.00
PROJECT NAME/TENANT ASSESSOR ACCOUNT 0
Star Machinery 362304 - 9111 -0
TYPE OF Li-New Building (Addition U Tenant Improvement (commercial) U Demolition (building) Grading/Fill
WORK: 0 Rack Storage Reroof 0 Remodel (residential) 0 Other
DESCRIBE WORK TO BE DONE:
Reroof.
PROPERTY OWNER Rebel Properties
PHONE 251 -8044
DDA RESS 17900 West Valley Highway, Tukwila, WA
ZIP 98188
CONTRACTOR Kathol Roofing Inc.
PHONE
775 -0232
ADDRESS 7228 210th S.W., Edmonds, WA
ZIP 98020
WA. ST. CONTRACTOR'S LICENSE P KATHOI *118D8
EXP. DATE 3 -28 -90
ARCHITECT N/A
PHONE
ADDRESS
ZIP
COW ('Or.111I Inrlc;I
USE 4
/
/.
/
nap SQUARE OCC. SQUARE OCC. SQUAFE OCC. SQUARE OCC. SQUARE OCC. TOTAL TOTAL
W' FEET LOAD FEET LOAD FEET LOAD FEET LOAD FEET LOU) SQUARE FEET OCC. LOAD
TOTAL
TYPE OF CONSTRUCTION: UBC EDITION (year) 88
SETBACKS: s _ $ — E —
UTILITY PERMITS REC�UIRED ?O Yes (� N o
W —
(through
Public Works)
FIRE PROTECTION: L_J Sprinklers 0 Detectors ®NIA
ZONING: w BAR /LAND USE CONDITIONSoyes .0 No
/ If
SIGNATURE: U/ /7.
DATE: / 0 -- / cl -- j c7 g-9
CONDITIONS (other than those noted on or attached to . rmit/plans): . i • - • 111 . - „ - 4 d
- - i •
the fire classification Qf the roof is required
prior to the final_ sign nff_
APPROVED FOR
ISSUANCE BY: Ji,al I� ,, ,L�, OFFICIAL
/ • -17
I hereby certify t at I have read and exa it'd this permit and
of law and ordinances governing this work will be complied with,
this permit doe - not • resume to give authority to violate or cancel
know the same to be true and correct. All provisions
whether specified herein or not. The granting of
the provisions of any other state or local laws
to sign for and obtain this building permit.
regulating co -t n or th = ;, a e or work. I am authorized
/ If
SIGNATURE: U/ /7.
DATE: / 0 -- / cl -- j c7 g-9
PRINT NAME:
COMPANY: Ki, 7'- - / 05 ; kt C -
This permit shall become null and void if the work is not commenced within 180 days from the date of
issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection.
CERTIFICATE OF
OCCUPANCY NO.
DATE ISSUED:
Valle/WV
k5,.
BUILDING PERMIT APPLICATION TRACKING
PLAN CHECK
NUMBER
3)5
PROJECT NAME
SITE ADDRESS
INSTRUCTIONS TO STAFF
• Contacts with applicants or requests for information should be summarized in writing by staff so that
any time the status of the project may be ascertained.
• Plan corrections shall be completed and approved prior to sending on to the next department.
• Any conditions or requirements for the permit shall be noted on the plans or summarized concisely
in the form of a formal letter or memo, which will be attached to the permit.
• Please fill out your section of the tracking chart completely. Where information requested is not
applicable, so note by using "N /A ".
5I-Ar 'i'YIaCI't i nLr9
h w v0,11b_
SUITE NO.
BUILDING SQUARE FOOTAGE/OCCUPANCY INFORMATION
(to be filled out by Plan Checker)
::$ : ::.::: .:.: ... • •:: ... ......:....:...:.......:.:... r:. r..... • :: ! . .:..... .!. ::.:..:...:: • •..::••:::: •: }. }u:r �: };i: , F..f;. ?. /..e$x:..........Y+': •: .W. r +Y+..: :. ,,,..,<'. :
5.... ...xn:gi:.v...J,:•:::;,n.;. ::n /.::.v:: x:.Zv:. :: T .env rx:.i..:}:.6 ?}r:: xhxiviv: Si%i.'fSF 'i i}rhr. ':4....: ..... .v .: v.. :{i •: :%?. },
j : Y :: ::$* S;n $$$.;$4,.:::::: rnLFr: :: :.$ .G. } ..}�4, ... f : 'r'x'J,.•:r.: •. v. f ., r. ryJr,}:!Sy?:nS} \• ;;$ :JGi}X4'
ti : ..;;•n:• }:••x; .irk•: :::.::.::::: }n•' .i }' { {::.v}:�;i. •, {r.:; ::: ri. ..., .. .v:r:.. r. .:.: :: •nv.r,.::: n;, .: n, t;••r• '
.,,a.: r.• :.::.,•:.: �::::::.. .:. h .vn•.b.v :::) :. ?r F.:.:.. :..:.. v.:....., .. iy . S:• i:•: }x..,•r4:: •irY.• ; r ?.`d4' %r, ,
FZ:.u.YF v.: ; •'J.Y;.iv,: +,:r.;: , , ? x:; Y;..n ka•.ii: •„ :} :. sr:F:!:•.: ,; ;.. 'OA " "F:.`
n xir'; rx .:.k :
. Tv /.. :i;:i+, iS; :Yi:i4.:, .rt! .rte .v
:FiF}.i:4 4.giri iCy4r� rr
::. £}'%'F,,,: r.: :...::: ::.:::::. "'. x:.....a:Y::::n.,..:....,�r.. r..:.........'£• ^:..., ..: �.. ••:JJ .r:... .•� ",?:ie�.i'ir?F�.:/
.;...... ...:::: n• :::::::...:.. ....::.......:.�.......:.. ;;• }'Ya::• .:. r,,.,,• ::•z.+,.^':;r.Fyi;`J,.,: Fri• v.+, �S.}::} ze }F.Fi %Eg;».rr.4:YS,.F,..:. Sr:
., ,� a :: SQUARE OCC. SQUARE OCC. SQUARE OCC. SQUARE OCC. SQUARE OCC. TOTAL TOTAL OCCU-
sn<.. FEET LOAD FEET LOAD FEET LOAD FEET LOAD FEET LOAD SQUARE FEET PANCY LOAD
•1'.vx' ' : «i.i.
i4.::: %}{F i:it vii:
A
:ii: iii S:f• :::• 4
::n'C•i;•: is F..: hr }:, +:
'i R:;
DEPARTMENTAL REVIEW
"X" In box Indicates which departments need to review the project.
} }: }v i.:.. .� ..... x. ;: • w :::i +: i ?. i +4 •:Xp• ;5: .
.{; vi n:, ,+ }, ?,.k i
i ' > J A }
,3 x y o v Y
Y.i:. . ?Y} yyG�. hyy 1� •'4 rJ%JS % •':Y. % • . .•• r..>•... • l J� r . .4WS.i ! :} �4: 4: ' ij ., :� • }� i{:4 x F% f % : + :: i #T F+i :r } . y • A }4: iv: ••s F v• : ..h. h. +n. ,
rS .... ! : •.? > }; Y'.,4 .:
er! .; ,+e.:i•i•.i •Y, :}£F % +••, : }ryi'
f
-
0.- I "7 b`1 /
/� O -.
(ROUTED)
07."'':111' �1 yet• - Est• ...
O FIRE F
FIRE PROTECTION f I Sprinklers [ 1 Detectors M4UA
FIRE DEPT. LETTER DATED: INSPECTOR:
)NIT:
O PLANNING O
ONING: 7y) - 1 IBAR&AND USE COND TIONS? nYes pr.'
REFERENCE FILE NOS.:
INIT: M
MINIMUM SETBACKS: N• S- E- W-
0 PUBLIC P
I A ' 'r- T. -' - —r11011.1-71 OS 1' f •
PUBLIC WORKS LETTER DATED:
INIT:
O OTHER
INIT:
J BUILDING U
la'17 -69 I
U -I - `( •
• OF CONSTRUCTION: UBC EDITION (year):
INIT: 5Vp
DEPARTMENTAL REVIEW
"X" In box Indicates which departments need to review the project.
} }: }v i.:.. .� ..... x. ;: • w :::i +: i ?. i +4 •:Xp• ;5: .
.{; vi n:, ,+ }, ?,.k i
i ' > J A }
,3 x y o v Y
Y.i:. . ?Y} yyG�. hyy 1� •'4 rJ%JS % •':Y. % • . .•• r..>•... • l J� r . .4WS.i ! :} �4: 4: ' ij ., :� • }� i{:4 x F% f % : + :: i #T F+i :r } . y • A }4: iv: ••s F v• : ..h. h. +n. ,
rS .... ! : •.? > }; Y'.,4 .:
er! .; ,+e.:i•i•.i •Y, :}£F % +••, : }ryi'
f
-
0.- I "7 b`1 /
/� O -.
(ROUTED)
07."'':111' �1 yet• - Est• ...
O FIRE F
FIRE PROTECTION f I Sprinklers [ 1 Detectors M4UA
FIRE DEPT. LETTER DATED: INSPECTOR:
)NIT:
O PLANNING O
ONING: 7y) - 1 IBAR&AND USE COND TIONS? nYes pr.'
REFERENCE FILE NOS.:
INIT: M
MINIMUM SETBACKS: N• S- E- W-
0 PUBLIC P
I A ' 'r- T. -' - —r11011.1-71 OS 1' f •
PUBLIC WORKS LETTER DATED:
INIT:
O OTHER
INIT:
J BUILDING U
la'17 -69 I
U -I - `( •
• OF CONSTRUCTION: UBC EDITION (year):
INIT: 5Vp
REVIEW COMPLETED
PERMIT NO. - CONTACTED
DATE READY DATE NOTIFIED �� �t�J Kc�.kh31 Pt.)
PERMIT EXPIRES 2nd NOTIFICATION BY:
(Init.)
AMOUNT OWING 59% Do 3RD NOTIFICATION (init.
(init.)
CITY OF TUKWILA
Department of Community Development - Building Division
6200 Southcenter Boulevard, Tukwila WA 98188
(206) 433 -1849
BUILDII . PERMIT
APPLICATION
PLAN ER CHECK �� 0
1PF�LICATION MILL; I HI
1 I I I) OUT COMPLETELY
FEES (for staff use only)
DESCRIPTION
AMOUNT :: RCPT:: N; DATE. :
BUILDING PERMIT FEE'
PLAN: CHECK: FEE:
BUILDING 'SURCHARGE
ENERGY>SURCHARGE >:
OTHER: Cn 4tiian
TOTAL
070, ock
SITE ADDRESS SUITE #
/ 7900 / -JNSf [ic,/(ey J -I .0 y
VALUE OF CONSTRUCTION - $ 2g) O o p
PROJECT NAME/TENANT
ASSESSOR ACCOUNT #
S /'�r c1.; S <<i --�c OC 50/! - 701I -o
TYPE OF New Building U Addition U Tenant Improvement (commercial) U Demolition (building)
WORK: ❑ Rack Storage WrReroof ❑ Remodel (residential) ❑ Other
DESCRIBE WORK TO BE DONE: R er ,o �� ,- C_ ( s s - C - 13 c ;11- - v io -a o �' ► v: S -l- . ►' 94 tic ti
r,, - / :S I , t. i h 5 ! /- P ,t• . ; 6 P 3 c, s 5 b S ,-- S. I, N F -f - 4- I3 v : (--)5. , i4 e c •
/1 /'7 /-7-1 e--fr, / -I 1 S /, . . e� v u v vtof 14 r v h-r r V5* •
BUILDING USE (office, warehouse, etc.)
4- e-L) v1- ro,/s�
NATURE OF BUSINESS:
/-1-7 �� c•-• I e 5-
WILL THERE BE A CHANGE IN USE? (--14o U Yes IF YES, EXPLAIN:
SQUARE FOOTAGE - Building: 2 50
Tenant Space: sr, Area of Construction: 0 op
WILL THERE BE STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE
BUILDING? aI loo ❑ Yes IF YES, EXPLAIN:
PROPERTY OWNER R/ 6 r L jD v , , ; e
ADDRESS
PHONE Gtr - n 4h44
/ 7'ioo e -t) G >c, //r- 1/1-) •i
'CONTRACTOR l // `C?
ADDRESS 7;22s Z/ 077' J �� � /,..)/4
WA. ST. CONTRACTOR'S LICENSE # % "TR 2 1� c l / g r
ARCHITECT
ZIPC/
PHONE 2 :?s."-- pL 32
ZIP��O `c2
EXP. DATE
PHONE
ADDRESS
ZIP
(CONTACT PERSON
APPLICATION SUBMITTAL In order to ensure that your application Is accepted for plan review, please make sure to fill
out the application completely and follow the plan submittal checklist on the reverse side of this form. Handouts
are available at the Building counter which provide more detailed information on application and plan submittal
requirements. Application and plans must be complete in order to be accepted for plan review.
VALUATION OF CONSTRUCTION Valuation for new construction and additions are calculated by the Department of
Community Development prior to application submittal. Contact the Permit Coord!nator at 433 -1851 prior to
submitting application. In all cases, a valuation amount should be entered by the applicant. This figure will be
reviewed and is subject to possible revision by the Building Division to comply with current fee schedules.
BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or
contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent
to submit this permit application and obtain the permit will be required as part of this submittal.
EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of
application shall expire by limitations. The building official may extend the time for action by the applicant for a
period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform
Building Code (current edition). No application shall be extended more than once.
If you have any questions about our process or plan submittal requirements, please
contact the Department of Community Development Building Division at 433 -1849.
DATE APPLICATION ACCEPTED
1 0- I "1 -Cc1
DATE APPLICATION EXPIRES
H (1- 90
031301119
COMMERCIAL
EW
SLBMITTAL CHECkLIST
OONYER $AL 00*4.OB/A
COMMEgdAL 7ENAHT IWPROVE MEI!
Complgted budding permit apt
igloo
ono. for ea
pets (2) 01die fo1
tamped .by !► WashinptonState Ifoanied.
• Looadon of aenant spAoe
• Exitdng and, proposod parttfng
.M building Pte. : >';'
• Use oa0:f adjacent tcanmon wall} tenant:
• Ovor.ditnentions ct building orsquare l
Lena tt:ppeo 'plar whh :. esch room
$ Ezit ticore, prostt patterns
io atr tion Beta.
<` >< etotec o< r . fer s'a
%. or e .
f
rtps[ aya.,Wsh1 t!pfon9tetR Ncenat
tie • doii;2;;ee
cto0 a0 !•0
rM'utYd}►n
to
....sgvk!rmpNtsn<.:.. :.
at'STO
n
an
mtptsoed buiidiny permit 4phi*
u1Kbr llaaoimt NimbrZt
} pan. � .....................
owe
..............
oHo /tha
........................ ...............:...........::..
ANTENti.NA TEU lTE t N
i� >:�orolee! tiuiiihd'perm
RESIDENTIAL
•$ NQ.L Er..F*MICY: OWELLINGS/A..Q
.MI;Pt aPaicatlorj
Au uscr'Account Num
fldsQlevaron
<* BuU G p ctosssa
ai d plans;mUat;�tie a bmltpi4
c�bntl�ptl rrqu/nmsvlts •
• tttrNpd .uctTgvp..
gmpla%id buikifp P!
aeasopAocount N j,.,._.....
io tva do p.bin'p ex :" ``roo
natwlal bg:Inh114d :
N A. areillc#gn %tt#1' /S rrquXroi
liftWatkomeo,4 iM! iM. t+¢ sgln! ktidmrk- au4asors+ u�mearK+ auuadn,.. w..... k...«.... .. «.....w,..�,,,,...«..........
Type of Inspection
v
Site Address /74 )
Requestor
Special Instructions
CITY OF TU WILA
Building q' .'tment
6300 Sout .ter Boulevard
Tukwila, WA 98188
(206) 431 -3670
INSPECT N RECORD
i;;
PERMIT e5'' xi
Date /0 AO- 0
Date Wanted /9_/O-_22
Project
hone #
•
a.m.
Inspection Results /Comment
Date 'O-
le\thol roofing inc.
AND CONTINUOUS ALUMINUM GUTTERS
7228. 210th St. S.W.
Edmonds, Washington 98020
Phone: 775.0232
Fax: 778.0370
Contractor's License
Number KATHOI.118D8.
October
1990
City of::Tukwila
Department of Community
Building. Division
6200. Southcenter Blvd.
Tukwila, . WA 98188
Attention,: Dave Larson -.Bldg Div.
• Permit #5778 -Star Machinery,
Kathol Roofing has installed a. roof membrane assembly including .
insulation if applicable consisting of Spec # B- SO- 4000NN (data
sheet: enclosed), which meets or exceeds the.;:reguirement` for :Class
13 ;roof with a Class A'fiberated aluminun .coating(see data sheet.
enclosed).:
This sroof was .installed at 17900 West Valley Highway under the.
Ci.Ly,of Tukwila building permit #5778.
Kathol,. Vice. President
KATHOL ROOFING,
The Best for Less , . , From the Best in the Business
•
New Roofing
NON NAMABLE ROOF DECK
ix
PRIMER (ONLY IF INSULATION IS TO BE HOT MOPPED INTO PUKE) --
&RAIMEMBRANE
INSULATION
NON - NAILABLE DECK
1-PLY SYSTEM
SPECIFICATION Na: B-SP 4000 -NNI.
Material Description:
1. BRAI membrane consists of a tough, non -woven
polyester fabric impregnated on both sides with BRAI
modified bitumen.
2. Base Sheet:
The base sheet is to be an asphalt saturated or poly-
mer modified fiberglass base sheet. The base sheet
may either be Mechanically attached or fully adhered
in hot asphalt. Intec Base or Intec Modified Base is rec-
ommended.
3. Insulation:
We recommend a prefaced insulation (see General
Requirements Pages 5.7).
Type of Deck:
1. Poured concrete
_ 2. Double 1', Prestressed T prefabricated concrete, and
precast concrete. If BRAI membrane is to be used on
this type of deck a mechanically fastened base sheet
must be used. See General Requirements.
Procedure:
1. The General Requirements on Pages 5a are a part of
this specification and must be adhered to where appli-
cable.
Application:
DANGER
FOR YOUR OWN SAFETY
Application of modified bitumen products manufacture
and distributed by U.S. Intec, Inc. requires the use of an open
flame, and/or an electrical heating device. IMPROPER USE
OF BRAI PRODUCTS AND THESE APPLICATION
DEVICES CAN RESULT IN SEVERE BURNS, ELECTRI-
k2
BASE SHEET MECHANICALLY FASTENED D
L OR APPLIED IN HOT ASPHALT.
CAL SHOCK AND /OR OTHER PHYSICAL INJURY, AS
WELL AS DAMAGE 'ID PROPERTY. In order to insure your
safety and the safe use of these products and application
devices, your application procedures must conform to the
safety precautions and procedural safeguards outlined on
Page 46 of this specification manual. Do not begin applica-
tion of these products until you have read and fully under-
stand all procedures and precautions set forth on Page 46.
1. The insulation board must be mechanically attached
or fully adhered in hot asphalt according to manufac-
turer recommendation. All insulation board seams
must be staggered and applied perpendicular to the
roof slope.
2. Over the surface of the insulation board install one ply
of base sheet. The base sheet is to be mechanically fas-
tened as per the fastening specifications on Pages 19-
21 of this book. Lap each base sheet two inches (2 ").
3. Install BRAI membrane over entire surface of base
sheet. The BRAI membrane must be applied perpen-
dicular to the roof slope and heat welded in place as
per the General Requirements.
Coating /Ballast
A. Coating
1. A roof coating must be applied as per coating manu-
facturer specifications.
B. Ballast
•
1. A cold applied emulsion installed as per the manufac-
turer specifications must be used to install the ballast.
2. The ballast must be round, smooth river bottom
gravel applied in the wet emulsion at a rate of 400 lbs
per 100 sq. ft. (see General Requirements).
3. See General Requirements for other types of ballast
and application.
-13-
.
Celotex
Certain -Teed
Conglas
Evsnite
GAF
Genstar
Georgie - Pacific
Globe
IKO
Lundy- Thagard
Malarkey
Manville
Mineral Fiber Mtg,
Owens Corning
Pabco
Tamko
Grundy, lnduttrles, Inc.
4 Insulation:
-- Single layer construction must use perlite, flberglasl
or wood flber,
-- Two or, more layer construction must use perllte
fiberglass or wood fiber as the top layer. Below the tol
layer, any UL listed. Insulation may be used In an;
thickness, Some of these Insulations are:
• Ieooyanurate
• Isooyanurate %Perlite Composite
• Phenolic
• Polyurethane , r
• Polyurethane/P,erllte Composite
1301 Herkimer ., :1 ■800.435.1210
Joliet IL 60432 °„' IIIInols: 516.726.6017
- 188 -R1
•
■
;
GRUNDi
MODIFIED BITUMEN
JL
NON-COMBUSTIBLE
RATED SYSTEMS
SINGLE PLY -- FULLY ADHERED
NON - COMBUSTIBLE DECK (NC)
FOR NEW CONSTRUCTION AND REROOF1 APPLICATIONS
MEMBRANE
MANUFACTURER
MEMBRANE(S)
MAX,
ROOF
SLOPE
APPROVED
INSULATIONS
INSULATION
THICKNESS
GRUNDY
SURFACE
COAT
APPLICATION
RATE PER
100 of
UL
RATING
ARC
•
• Premium
• Golden Eagle
• Granule Surface
1"
•
Any of the
following:
. leocyanurete
Unlimited
aIMB
Aluminum
1 to 2 Gal.
A
BITEC
• APS-4T • 5PM -4.6T
• APM-4T • SPM -3.5H
1„
Unllmlted
IIMt3
Aluminum
1 to 2 Gal
A
CELOTEX
Oelopal 2 ,
1"
Unllmlted
AIMS
Aluminum
1 to 2 Gal,
A
GAF
• Ruberold MB • Premium
• Smooth • Granular
1/2"
Unlimited
elMS
Aluminum
1 tot Gat.
A
GENSTAR
FlintIastla
1�4„
• leacyanurale/
Composite
• Fiberglebo
• Pe:'Ilte
. Phenolic
• Polyurethane
• Polyurethane!
Partite
Oompealte
Unllmlted •
aJM
1 to to Gal.
A
—"
NORD '
AITUMI
• Nordllex 6 , •Nord 2C0
• Nordflex M • EM 4000
• Nordllex Ultra
• Nordpoly 4B & 68
1 I
Unllmlted
IIMS
Aluminum
1 to 2 Gal.
A
OWENS CORNING
FIBERGLAS
OerbIQum • HPS • 8P
1"
Unlimited
-
.IMB
Aluminum
1 to 2 Gal,
A
• 5133-250 • SBS -170
1/2"
2'h Max
PERFORMANCE
auILDING
PRODUCTS
• Permax Smooth
or Granular
• A or B X -tre
• A or B Special
• A or B Economy
1"
Unllmlted
-4---.
Unlimited
aIMB
Aluminum
1 to 2 Gal,
A
TARMAC
• APP-46 • SOS-170
• APP-4M • SBS-5M
• SB6-4M
• APP Black Diamond
• 8B8 DoUble Coverage
1"
aIMB
Aluminum
1 to 2 Gal.
A
TELTEx
• Rhoflex • 8P8
• Mnnoply plus
1/4
1/4"
• Wnod Fiber
Ur�IIIIII ed
AIMS
Aluminum
1 to 2 Gal.
A
TRI -PLY
TP-4
1"
Unllmlted
aIMB Aluminum
• 1 to 2 QaI.
A
U.S. INTEC
• Br& 4 • 54
• B5P -4 • Brai 9P-4
1/2"
Unllmlted
AIMS
Aluminum
1 to 2 Gal.
A
TAMKO
Awaplan
Granule Surface
1/4"
Unllmlted
AIMS
. Aluminum
1 -1 /2 GAI,
A
1 REROOF APPLICATIONS INCLUDE: A) REPLACEMENT- The existing roof must be torn down to the NC deck, then
replaced with one of the above systems; B) RECOVER The above systems can be used over NC or Combustible
decks if the existing roof Is left In plane. The recovered roof takes on the LJL classification Of the original roof. Wood fiber
to be used on NC decks only,
2 A G1 or G2 fiberglass ply shoat or Type 15 felt must be Installed over the insulation prior to the Installation of the
modified bitumen membrane.
Grundy Industries, Inc. 6
1301 Herkimer • 1.800.4354310
Joliet, IL 60432 Illinois: 615.725.5017
1 0. 1 7. 8
IED
1 1 :
/A AMP Cs
LASS A TESTED
P 0 1
ARC
TARMAC
TAMKO awaplan
Celotex Celopal 2
TELTEX RHOFL1r1
GENSTAR Mitlas it ,0
BITEC
TRI -PLY
Nord Bitumi
U.S. INTEC /BRAT
RUBEROID MB
orgies DERBIGUM
CLA
IIVEN
New from Grundy Industries, aIMBrM
is the aluminum roof coating for
modified bitumen membranes.
And It's your prime pick when
It comes to roofs requiring a UL
CIQes A hating" It also meets or
exceeds requirements for ASTM
D -2824 Type II classification as well
as Federal Speolflcation TTC -498C,
Even tar combustible decks,
We've covored all our bases. Our
product Improvements and quality
refinements' have put MB In a roof
coating league by itself. But aside
from providing roofing pros and spec-
ifiers with a superior coating, aIMB
has more In store for roof ownora.
With one coat of high - performance
'Ask your distributor or call Grundy Induatrloe fur A oomploto list of tested and prawn MD membranes.
Grundy aIMB, owners get a longer
lasting, better looking roof. aIMB's
Special aluminized formula protects
the modified bitumen surface from
tho dostructive ravagos of the surf
and helps Increase the weathering
durability of the membrane.
Grundy aIMB Is the economical
answer to extending the life cycle
cost benefits of Installed modified bitu-
men roof systems. We can help make
a roof tougher —and more beautiful,
For more Information about alM6 and
other provon Orundy roofing products
formulated for the professional roofing
contractor, call 800. 435 -1210. There's
a distributor near you.
CITY OF TUKWILA
Permit 579,
Dore eci l o- fl-�
REROOF CONDITIONS
Department of Community Development - Building Division
6200 Southccnter Boulevard, Tukwila, WA 98188
(200) 433.1849
THE FOLLOWING CONDITIONS WILL APPLY TO RE -ROOF PERMITS:
1. All re- roofing projects will be accomplished in compliance with Appendix Chapter 32 of the
Uniform Building Code. (UBC)
2. Inspections:
A. New roof coverings shall not be applied without first obtaining a pre - roofing inspection
from the Building Division and written approval from the Building Inspector. The pre -
roofing inspection shall pay particular attention to evidence of accumulation of water.
Where extensive ponding of water is apparent, an analysis of the roof structure for
compliance with Section 3207, UBC, shall be made and corrective measures, such as
relocation of roof drains or scuppers, resloping of the roof or structural changes, shall
be accomplished. An inspection covering the above listed topics prepared by a qualified
special inspector, as determined by the Building Official, may be accepted in lieu of the
pre - inspection by the Building Inspector.
B. A final inspection and approval shall be obtained from the Building Division when the re-
roofing is complete. As a condition of the final inspection for roofs that require a fire
retardant roof covering under the provisions of Table 32 -A, 1988 UBC, the roof installer
shall provide the inspector with a written statement indicating the following (or something
similar):
I HAVE INSTALLED A ROOF MEMBRANE ASSEMBLY, INCLUDING INSULATION IF AP-
PLICABLE, CONSISTING OF (Manufacturer), SPECIFICATION # , DATA SHEET
ENCLOSED, WHICH MEETS OR EXCEEDS THE REQUIREMENTS FOR CLASS A OR
CLASS B ROOFS. THIS ROOF WAS INSTALLED AT (Address) , UNDER CITY OF
TUKWILA BUILDING PERMIT NO.
(The statement will include the name of the roofing company
that installed the roof, signature of installer and date.)
CITY OF TUKWILA
Department of Community Development - Building Division
6200 Southcenter Boulevard, Tukwila WA 98188
(206) 433 -1849
BUILD'1G PERMIT
INSPECTION RECORD
(Post with Building Permit In conspicuous place)
BUILDING �-- �..-)�
PERMIT NO.
SITE ADDRESS:
17900 W Valley Hy
SUITE NO.:
PROJECT:
Star Machinery
CALL FOR INSPECTIONS AT LEAST 24 HOURS IN ADVANCE
"X"
REQUIRED INSPECTIONS
PHONE
DATE
APPROVED
INSPECT.
INITIALS
DATE(S)
CORRECTION NOTICE ISSUED
1 Footings
433 -1849
2 Foundation
433 -1849
3 Slab and/or Slab Insulation
433 -1849
4 Shear Wall Nailing
433 -1849
5 Roof Sheathing Nailing
433 -1849
6 Masonry Chimney
433 -1849
7 Framing
433 -1849
8 Insulation
433 -1849
9 Suspended Ceiling
433 -1849
10 Wall Board Fastening
433 -1849
11
12
13
14 FIRE FINAL Insp:
575 -4404
15 PLANNING FINAL
433 -1849
16 PUBLIC WORKS FINAL
433 -0179
X
17 BUILDING FINAL
433 -1849
(INSPECTOR COMMENT SECTION ON REVERSE)
INSPECTION PROCEDURES AND REQUIREMENTS
All approved plans and permits shall be maintained available on the site in the same location.
1. FOOTING - When survey stakes and forms are set and rebar is tied in place.
2. FOUNDATION - When forms and rebar are in place.
3. SLAB - If structural slab or If underslab insulation is required.
4. SHEARWALL NAILING - Prior to cover.
5. ROOF SHEATHING NAILING - Prior to cover.
6. MASONRY CHIMNEY - Approximately midpoint.
7. FRAMING - After rough -in inspections such as mechanical, plumbing, gas piping, electrical and fire stopping is in place.
8. INSULATION - After framing approval, but before installation of wallboard. Baffles must be installed to keep attic
ventilation points clear.
9. SUSPENDED CEILING - Fasten diffusers, lights and seismic bracing. '.
10. WALL BOARD FASTENING - Prior to taping (see UBC Chap. 47 and Table 47G).
11
12.
13.
14. FINAL FIRE INSPECTION - Contact Fire Department for their requirements.
15, FINAL PLANNING INSPECTION - Contact Planning Department for their requirements. Gf?
16. FINAL PUBLIC WORKS INSPECTION - Contact Public Works Department for their requirements.
17. FINAL BUILDING INSPECTION - When all work, corrections, reports and other inspections are complete.
OTHER AGENCIES:
Plumbing (including gas piping) — King County Health Department — 296 -4732
Electrical — Washington State Department of Labor and Industries — 872 -6363
A preconstruction meeting with the Building Inspector may be scheduled prior to starting the job by
contacting the Department of Community Development, Building Division at 433 -1849. Although not
required, a meeting of this type can often eliminate problems, delays and misunderstandings as the
project progresses. 01,28489
CITY OF TUKWILA
CIVILV1,4U F'LHMIT
(POST WITH INSt .,,CTION CARD AND PLANS
IN A CONSPICUOUS LOCATION)
Department of Community Development • Building Division
6200 Southcenter Boulevard, Tukwila WA 98188
(206) 433 -1849
BUILDING 571$
PERMIT NO.
DATE ISSUED:
-101
FEES
DESCI%IPTION
AMOUNT
RCPT #
DATE
BUILDING PERMIT FEE
272.00
ri95
ZIP 980 ?0
, o- I
PLAN CHECK FEE
ARCHITECT N/A
BUILDING SURCHARGE
4.50
ZIP
OCC.
•-.'
1
ENERGY SURCHARGE
SQUARE
OCC.
OA'
SQUARE
44
OCC.
•
SQUARE
OTHER: Invest. Fee
,
272.00
TOTAL
• . • • .
2
\---- +i
-----
TOTAL •
548.50 _
.1k . . ;:•
PROJFCT INFORMATION
PROJECT NAME /TENANT Star Machiner
TYPE OF ■ New Building • Addition ■ Tenant Improvement (commercial) • Demolition (building) • Grading/Fill
WORK: 0 Rack Storage a Reroof 0 Remodel (residential) 0 Other:
DESCRIBE WORK TO BE DONE:
Reroof.
PROPERTY OWNER Rabel Properties
PHONE 251
-8044
ZIP 98188
ADDRESS 17900 West Valley Highway, Tukwila, WA
CONTRACTOR Kathol Roofing Inc.
PHONE 775-0232
ADDRESS 7228 210th S.W. , Edmonds, WA
ZIP 980 ?0
WA. ST. CONTRACTOR'S LICENSE # KATHOI *118D8
EXP. DATE 3-18-90
ARCHITECT N/A
PHONE
ADDRESS
ZIP
USE 4
/
/
CODE
COMPLIANCE
/
(throng , •„_
/
1
M -1 BAR/LAND USE CONDITIONSDYes 'i No,
wog
SQUARE
OCC.
•-.'
SQUARE
OCC.
••_•
SQUARE
OCC.
OA'
SQUARE
44
OCC.
•
SQUARE
OCC.
• .
TOTAL
-•,. ii q
TOTAL
• . • • .
2
33
=4
-q
TOTA4
TYPE OF CONSTRUCTION: UBC EDITION (year) 88
SETBACKS: _
_
SIGNATURE: .V.�
PRINT NAME: -
FIRE PAOTECTION:QS•rinklers • Detectors ® N/A
UTILITY PERMITS REQUIRED. • Yes fi77 No
(throng , •„_
ZONING:
M -1 BAR/LAND USE CONDITIONSDYes 'i No,
CONDITIONS other than those noted on or attached to • armit/plans): • • • - . . • . - „ - ,
- • '
l •
the fjre.rlassification of the roof is required
prior tQ the fina_1 sign Off_
APPROVED FOR r pirr • BUILDING
ISSUANCE BY: i • If e s OFFICIAL
DATE: �
/O -1 `7 5 /
I hereby certify t at I have read and exa i t d this permit and know the same to be true and correct. All provisions
of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of
this permit doe not .resume to give authority to violate or cancel the provisions of any other state or local laws
regulating col /., n or th = • Merman e or work. I am authorized to sign for and obtain this building permit.
SIGNATURE: .V.�
PRINT NAME: -
DATE:
COMPANY:
A -- C -- / C/ 0
%rt 'L, ., l '-L ; „� C
This permit shall become null and void if the work is not commenced within 180 days from the date of
issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection.
CERTIFICATE OF
OCCUPANCY NO.
l DATE ISSUED:
cJ',Y III•Y