HomeMy WebLinkAboutPermit D06-226 - City View Estates - Lot 13CITY VIEW ESTATES 13058 34 LN S EXPIRED 06 -03 -08 D06 -226 6 98188 Parcel No.: 7359600670 Permit Number: D06 -226 Address* 13058 34 LN S TUKW Issue Date: 10/04/2006 Suite No: Permit Expires On: 04/02/2007 Tenant: Name: CITY VIEW ESTATES, LOT 13 Address' 13058 34 LN S, TUKW ILA WA Owner: Name: YOSHIKAWA TERRANCE Address: 2416 32 AV W, SEATTLE WA, 98199 Phone: Contact Person: Name: GEORGE HIRAI Address: 15615 NE 62 CT, REDMOND WA, 98052 Phone: 206 783 -2981 Contractor: Name: BAZALA INC Address' 2416 32ND AVE W, SEATTLE, WA 98199 -1031 Phone: 206 286 -3574 Contractor License No: BAZALI *163PR DESCRIPTION OF WORK: CONSTRUCTION OF 2018 SF SFR WITH 392 SF ATTACHED GARAGE. PUBLIC WORKS ACTIVIES INCLUDE: TESC, LAND ALTERING, STORM DRAINAGE, DRIVEWAY ACCESS, AND UNDERGROUNDING OF POWER. WATER DIST. 125 & VAL -VUE SEWER DIST. Value of Construction: $212,152.30 Fees Collected: $4,828.67 Type of Fire Protection: SPRINKLERS International Building Code Edition: 2003 Type of Construction: VB Occupancy per IBC: 22 doc: IBC - PERMIT T DEVELOPMENT PERMIT **continued on next page** PERMIT CENTER Expiration Date:01 /11/2008 D06 -226 Printed: 10 -04 -2006 Public Works Activities: Channelization / Striping: N Curb Cut / Access / Sidewalk / CSS: Y Fire Loop Hydrant: N Number: 0 Size (Inches): 0 Flood Control Zone: N Hauling: N Start Time: End Time: Land Altering: Y Volumes: Cut 20 c.y. Fill 20 c.y. Landscape Irrigation: N Moving Oversize Load: N Start Time: End Time: Sanitary Side Sewer: N Sewer Main Extension: N Private: Storm Drainage: Y Street Use: N Profit: N Water Main Extension: N Private: Water Meter: N Permit Center Authorized Signature I hereby certify that I have read and ordinances governing this work will The granting of this permit does not presume to give authority to violate or cancel the provisions of any otheF state or local laws regulating construction or the perform ce of work. I am authorized to sign and obtain this development permit. Signatui i Mir- an _ Date:g61y 06 Print Name: r�� This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. doc: IBC - PERMIT -I ,,33 ed PERMIT CENTER Permit Number: DO6 -226 Issue Date: 10/0412006 Permit Expires On: 04/02/2007 Public: Non - Profit: N Public: Date: 1Dj14 jolt his permit and know the same to be true and correct. All provisions of law and i with, whether specified herein or not. D06 -226 Printed: 10-04 -2006 Parcel No.: 7359600670 Address 13058 34 LN S TUKW Suite No: Tenant: CITY VIEW ESTATES, LOT 13 1: ***BUILDING DEPARTMENT CONDITIONS*** 8: All wood to remain in placed concrete shall be treated wood. doc: Conditions City &Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: ci.tukwila.wa.us PERMIT CONDITIONS Steven M. Mullet, Mayor Steve Lancaster, Director Permit Number: D06 -226 Status: ISSUED Applied Date: 06/12/2006 Issue Date: 10/04/2006 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431- 3670). 4: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 5: Truss shop drawings shall be provided with the shipment of trusses delivered to the job site. Truss shop drawings shall bear the seal and signature of a Washington State Professional Engineer. Shop drawings shall be maintained on the site and available to the building inspector for inspection purposes. 6: All construction shall be done in conformance with the approved plans and the requirements of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. 7: Notify the City of Tukwila Building Division prior to placing any concrete. This procedure is in addition to any requirements for special inspection. 9: There shall be no occupancy of a building until final inspection has been completed and approved by Tukwila building inspector. No exception. 10: All construction noise to be in compliance with Chapter 8.22 of the City of Tukwila Municipal Code. A copy can be obtained at City Hall in the office of the City Clerk. 11: Ventilation is required for all new rooms and spaces of new or existing buildings and shall be in conformance with the International Building Code and the Washington State Ventilation and Indoor Air Quality Code. 12: Except for direct -vent appliances that obtain all combustion air directly from the outdoors; fuel -fired appliances shall not be located in, or obtain combustion air from, any of the following rooms or spaces: Sleeping rooms, bathrooms, toilet rooms, storage closets, surgical rooms. 13: Equipment and appliances having an Ignition source and located in hazardous locations and public garages, PRIVATE GARAGES, repair garages, automotive motor -fuel dispensing facilities and parking garages shall be elevated such that the source of ignition is not less than 18 inches above the floor surface on which the equipment or appliance rests. 14: Water heaters shall be anchored or strapped to resist horizontal displacement due to earthquake motion. Strapping shall be at points within the upper one -third and lower one -third of the water heater's vertical dimension. A minimum distance of 4- inches shall be maintained above the controls with the strapping. 006 -226 Printed: 10 -04 -2006 City &Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 - 431 - 3665 Web site: ci.tukwila.wa.us Steven M. Mullet, Mayor Steve Lancaster, Director 15: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the Cityof Tukwila Permit Center. 16: All electrical work shall be inspected and approved under a separate permit issued by the Washington State Department of Labor and Industries (206/248- 6630). 17: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 18: ***FIRE DEPARTMENT CONDITIONS*** 19: The attached set of building plans have been reviewed by the Fire Prevention Bureau and are acceptable with the following concerns: 20: New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. Address numbers shall be Arabic numbers or alphabet letters. Numbers shall be a minimum of 4 inches (102mm) high with a minimum stroke width of 0.5 inch (12.7mm). (IFC 505.1) 21: Every building shall be accessible to Fire Department apparatus by way of access roadways with all- weather driving surface of not less than 20' wide and 13'6" vertical clearance. Access roads in excess of 150' shall be provided width an approved turn - around area. Access shall be within 150' of all portions of the buildings. (City Ordinance #2047) (As modified in letter dated 12/08/2004) 22: FIRE LANE - NO PARKING areas were declared at your complex because of less than minimum clearances for fire department vehicle access. Fire apparatus access roads "Fire Lanes" shall be identified by painting the curb yellow and a four inch wide line and block letters 18 inches high, painted in the lane, at fifty foot intervals, stating, "FIRE LANE NO PARKING ", color to be bright yellow, or by the posting of signs stating, "FIRE LANE NO PARKING ", and painting the curb. Signs shall be posted on or immediately next to the curb line or on the building. Signs shall be twelve inches by eighteen inches and shall have letters and background of contrasting color, readily readable from at least a fifty foot distance. Signs shall be spaced not further than fifty feet apart nor shall they be more than four feet from the ground. (City Ordinance #2047) ( Install signs and 4" yellow strip on access drive.) 23: All required hydrants and surface access roads shall be installed and made serviceable prior to and during the time of construction. (IFC 503.1, 508.1) 24: Fire hydrants shall conform to American Water Works Association specifications C- 502 -54; it shall be compression type, equipped with two 2 -1/2" N.S.T. hose ports and one 5" Storz pumper discharge port, and shall have a 1 -1/4" Pentagon open -lift operating nut. (City Ordinance #2052) 25: Fire hydrant installation requires a Public Works permit. 26: The minimum fire flow and flow duration requirements for one- and two- family dwellings having a fire area which does not exceed 3,600 square feet (344.5 m2) shall be 1,000 gallons per minute (3785.4 Umin.). Fire flow and flow duration for dwellings having a fire area in excess of 3,600 square feet (344.5 m2) shall not be less than that specified in Table A- III -A -1. Exception: A reduction in required fire flow of 50 percent, as approved by the chief, is allowed when the building is provided with an approved automatic sprinkler system. (IFC Appendix B105.1) 27: In lieu of a fire hydrant, an approved residential fire sprinkler system may be installed when vehicular travel distance from the nearest hydrant exceeds 150 feet. doe: Conditions 006 -226 Printed: 10-04 -2006 City Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206431 -3670 Fax: 206431 -3665 Web site: ct.tukwila.wa.us Steven M. Mullet, Mayor Steve Lancaster, Director 28: Adequate ground ladder access to rescue windows shall be provided. 29: ***ELECTRICAL*** - IFC - NFPA 70 - NEC 30: Each circuit breaker shall be legibly marked to indicate it's purpose. (NEC 110 -22) 31: Aboveground gas meters, regulators and piping exposed to vehicular damage due to proximity to alleys, driveways or parking areas shall be protected in an approved manner. (IFC Ch. 312, sec. 312.1 thru 312.3) 32: Any overlooked hazardous condition and/or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. 33' These plans were reviewed by Marshal 51. If you have any questions, please call Tukwila Fire Prevention Bureau at (206)575 -4407. 34: "'PUBLIC WORKS DEPARTMENT CONDITIONS*** 35: Contractor shall notify Public Works Project Inspector Mr. Greg Villanueva at (206)433 -0179 of commencement and completion of work at least 24 hours in advance. 36: Work affecting traffic flows shall be closely coordinated with the City Utilities Inspector. Traffic Control Plans shall be submitted to the Inspector for prior approval. 37: The City of Tukwila has an undergrounding ordinance requiring the power, telecommunications, and cable service lines be underground from the point of connection on the pole to the house. 38: Any material spilled onto any street shall be cleaned up immediately. 39: The site shall have permanent erosion control measures in place as soon as possible after final grading has been completed and prior to the Final Inspection. 40: The Land Altering Permit Fee is based upon an estimated 20 cubic yards of cut and 20 cubic yards of fill. If the final quantity exceeds this amount, the developer shall be required to recalculate the final quantity and pay the difference in permit fee prior to the Final Inspection. 41: From October 1 through April 30, cover any slopes and stockpiles that are 3H:1 V or steeper and have a vertical rise of 10 feet or more and will be unworked for greater than 12 hours. During this time period, cover or mulch other disturbed areas, if they will be unworked more than 2 days. Covered material must be stockpiled on site at the beginning of this period. Inspect and maintain this stabilization weekly and immediately before, during and following storms. 42: From May 1 through September 30, inspect and maintain temporary erosion prevention and sediment at least monthly. All disturbed areas of the site shall be permanently stabilized prior to final construction approval. 43: Downspouts, driveway, patio and drainage from other impervious areas shall be collected in an on -site storm drain system. Drains shall be 4" minimum diameter, PVC schedule 40 or corrugated poly ethylene pipe with a minimum 1% slope for gravity discharge to location approved by the Public Works Department. Downspouts shall not connect to footing drains. Footing drain and downspouts may share a single discharge pipe downstream of the lowest footing drain. 44: Downspouts and driveway shall be connected to the proposed storm drainage system within 34th LN South. Provide catch basins at connection points. Coordinate with Public Works Inspector in the field. 45: Driveways shall comply with City residential standards. Driveway width shall be a 10' minimum and 20' maximum. Slope shall be a maximum of 15 %. Turning radii shall be a minimum of 5'. doc: Conditions 006 -226 Printed: 10 -04 -2006 doc: Conditions City fir' Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: ct.tukwila.wa.us * *continued on next page ** Steven M. Mullet, Mayor Steve Lancaster, Director D06 -226 Printed: 10-04 -2006 10 -411. IMO" Sig e: Print Name: -71,0 o k dire doc: Conditions City ' Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: ci.tukwila.wa.us Steven M. Mullet, Mayor Steve Lancaster, Director I hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and ordinances goveming this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any other work or local laws regulating construction or the performance of work. 006 -226 Printed: 10- 04-2006 W f ► lir 1(JA /1A Community Developmenr "'pertinent Public Works Departmer‘si Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 htto://www.ci.tukwila.wa.us Contact Person: v0241 Poo t Lt I FLL Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **Please Print *' King Co Assessor's Tax No.: 73s — %/) t- (4 Site Address: 1 615 34, (*l 6 ( i-0 t 13) Suite Number: Floor: Tenant Name: New Tenant: ❑ .... Yes ❑..No Property Owners Name: 6-, /- H/ Q /}-/ r TN° /�.�.,.� Mailing Address: /S� I c NC (o2uh �` 7 / /2nt7/7L t/t) t4A- `!S' b 1. oZ State Zip City Name: (- 152.1,£ f< . f'/ /F-A - 1 Day Telephone: ,-1. 0(.9 - 714 - afg I Mailing Address: / / f 1 C A2/,r 0 CT. kr.O h bg A WA— 9 rS' QC7. City State Zip E -Mail Address: & ere( 6 , f {/ P-A- /@ (p ' cA-s-T. Fax Number: ) GENERAL CONTRACTOR INFORMATION r (Contractor Information for Mechanical (pg 4) for Plumbing and Gas Piping (pg 5) Company Name: 84-7 A- I— A- Zx/ n Mailing Address: ESL / ( ,32 X D A-t to . SLj -77LF I .t) IY 18/0/0( City State Zip Contact Person: GC b P-&F il--/ /Q/}- I Day Telephone: 020 C — 7t (- -22,v / E-Mail Address: &aP-/ -1Em . f i I R - A 1 e cob-in-cr. 'ICI Fax Number: Contractor Registration Number.. f f R keZ- A L - I .4e 103 Pic Expiration Date: / - 1/ -4 ARCIITI'ECT OF RECORD' All plans must be yv stamped by-Architect ofRecut Company Name: EC/ 1T/•/ S te/ 14 >U / / m I - rem Mailing Address: City State Zip Day Telephone: as - x 7a al E -Mail Address: Fax Number: - 3 - $ 7a - 36 4? OINEER' ()T' 2ECORD =All plans mustbe wet stamped by Engineer of Record_ Company Name: h, C D /14 Or O0 NS l 1 1-71 N (?- &/G-/q CFRf> -/ ( -nee Mailing Address: P. 0 /3 DI ,rA Sr2-9- 8/ / e i/LtC Ufli g eOic State City contact Person:" 4-t EM 14 14 Day Telephone: ie2S-_ 6 44/ -hinS E -Mail Address f kA1 JC 11'(10 h/ 14A Cf/r114CCQ . Fax Number: tt-C - 6 4" - 443 QMppliatbm'Fo nu- Appliatiom On Linet3-2006 - Permit Appliation.doc (AAA Revised: 4-2006 . bh Zip Page 1 of 6 Valuation of Project (contractor's bid price): $ Zp J 2 97O0 Existing Building Valuation: $ Scope of Work (please provide detailed information): 1 n'sl twoo .. J`n p.i '/ b v✓ne ex- 13 -n r ® rt. (1ttlA nit acrn�e c' -�' AO� 1 �1+�1 (' y o Qom, 17 AD et o sAt -- ina `jl entit Will there be new rack storage? ❑ .. Yes ❑ .. No (If yes, a separate permit and plan submittal will be required) Provide All Building Areas in quare Footage Below.> 2"iFloor Floors Basement(' I Accessory Str tcture Attached Garage Detached Garage - Attached Gatport Detached Carport Covered Deck Uncovered Deck Existing = >lnterior' Remodel Addition to Exists eture 3 % '�rCr 4- PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) -t7 7.() S *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area for accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? ❑ ....Yes ❑ ..No If "yes ", explain: FIRE PROTECTION/HAZARDOUS MATERIALS: .Sprinklers 0 ..Automatic Fire Alarm ❑..None ❑. Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑..Yes 0.. No If "yes", attach list of materials and storage locations on a separate 8 -1/2 x 11 paper indicating quantities and Material Safety Data Sheets. SEPTIC SYSTEM: 0 On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. Q Appliaaons\Fe,m,- Applicmiom On LincU -2006 - Permit ApplicMion.doc Rciscd: 4 -2006 Page 2 of 6 UBLIC WORKS PERMIT. INFORMATION -206-433-0179 Scilye Sc of Work (please provide detailed in rmation): Water District 0 .. Water District #125 'Q Water Availability Provide Sewer District ❑...TukwilaVaiVue o ...Sewer Use Certificate Sewer Availability Provided Su§stitted with Application (mark boxes which apply): e Civil Plans (Maximum Paper Size - 22" x 34 ") ❑ ...Technical Information Report (Storm Drainage) ❑ ...Bond ❑ .. Insurance ❑ .. Easement(s) Proposed Activities (mark boxes that apply): ❑ ...Right-of-way Use • Nonprofit for less than 72 hours ❑..Rightof- -way Use - No Disturbance 11 ...Construction/Excavation/Fill - Right-of-way _ Non Right -of -way Total Cut 2,0 cubic yards ...Total Fill 2.O cubic yards (Vet le Vvs ❑-Sanitary Side Sewer Call before you Dig: 1- 800424 -5555 Please refer to Public Works Bulletin #1 for fees and estimate sheet. ❑ ...Cap or Remove Utilities ❑...Frontage Improvements ❑...Traffic Control ❑ ...Backflow Prevention • Fire Protection Irrigation Domestic Water ...Permanrn t 1fre 12 s ". Water Meter Si ❑...Temporar Water Meter Size.. ❑...Water Only Meter Size ❑...Sewer Main Extension Public o ...Water Main Extension Public Of QMpplic. on.Wmmn- Appliutima On LineU -2006 - Permit Applieetion.de° Revised: 42006 • M ❑ .. Abandon Septic Tank ❑ .. Curb Cut ❑ .. Pavement Cut ❑ .. Looped Fire Line It Private Private ❑ .. Highline El ...Renton ❑ .. Renton ❑ ...Seattle ❑ .. Approved Septic Plans Provided 'rGeotechnical Report ❑...Traffic Impact Analysis ❑ .. Maintenance Agreement(s) — ❑...Hold Harmless - (SAO) ❑...Hold Harmless - (ROW) ❑ .. Right -of -way Use - Profit for Tess than 72 hours ❑ .. Right-of-way Use - Potential Disturbance ❑ .. Work in Flood Zone Stone Drainage ❑ .. Grease Interceptor ❑ . Channelization Trench Excavation Utility Undergrounding 0. Deduct Water Meter Size FINANCE INFORMATION Fire Line Size at Property Line ❑...Water ❑...Sewer Monthly Service Billing to: Name: r!Y. AL, HID r / , n Mailing Address: / 5 (., / r Kr, Number of Public Fire Hydrant(s) ❑ ...Sewage Treatment Water Meter RefundBilling: Name: ear /l HI /G-I 7 /-5-r ls_ CT Mailing Address: /s /., /r J ' �-( 1o21-4p Day Telephone: - 757 & " pZ 9 O v 121 z 4— '1'$ ns" Cit State Zip Day Telephone: tsa,h_ow 1 ni— 9R 60— Cit State Zip Page 3 of 6 Unit Type: Qty' Unit Type: _ Qty ' Unit:Type: Qty - goiter /Compressor: CZty , Ftunace<lO K BTU ' A ir 0 Handling Unit >10,000 CFM Fire Damper J 0-3 HP/100,000 $T.� O .$' .. Fumace>100K BTU Evaporator Cooler Diffuser 3.15 HP/500,000 H , „ I AV Floor Furnace 1 Ventilation Fan Connected to Single Duct Thermostat 15 -30 HP /1,0O;0&) B` BTU Suspended/Wall/Floor Mounted Heater Ventilation Systyrtl Wood/Gas Stove 30 -50 HP/I,750,000 BTU Appliance Vent Hood and Duct Water Heater b 50+ HP /1,750,00 BTU Repair or Addition to Heat/Refrig/Cooling System Incinerator - Domestic Emergency Generator I. Air Handling Unit <10,000 CFM Incinerator — Comm/Ind Other Mechanical Equipment g1 • r� +C[ , .}1J� MECHANICAL CONTRACTOR INFORMATION Company Name: Mailing Address: City State Zip Day Telephone: Fax Number: Contact Person: E -Mail Address: Contractor Registration Number: Expiration Date: I Valuation of Project (contractor's bid price): $ 6 0 � Scope of Work (please provide detailed informatiod):_MA $etc.cl Aft!" !" rri?�"�c � Lyre vV �� 11 \i Use: Residential: New Replacement ....0 Commercial: New ....0 Replacement ....0 Fuel Type: Electric Pd' Gas Other: Indicate type of mechanical work being installed and the quantity below: Q: ApplicationsWorms- Applications On Linen- 2006 -Permit Appliation.doc Revised. 4-2006 bh Page 4 of 6 Fixture Type: Qty . Fixture Type: Qty Fixture Type: Qty Fixture Type: Qty Bathtub or combination bath/shower -9 Drinking fountain or water cooler (per head) Wash fountain Gas piping outlets Bidet Food -waste grinder, commercial Receptor, indirect waste Clothes washer, domestic 1 Floor drain Sinks Dental unit, cuspidor Shower, single head trap Urinals Dishwasher, domestic, with independent drain Lavatory 2/ Water Closet Building sewer or trailer park sewer Rain water system — per drain (inside building) Water heater and/or vent I Industrial waste pretreatment interceptor, Including its trap and vent, except for kitchen type grease interceptors Repair or alteration of water piping and/or water treating equipment Repair or alteration of drainage or vent piping Medical gas piping system serving one to five inlets/outlets for specific gas Additional medical gas inlets/outlets — six or more kLVMBING .AND GAS PIPING PERMIT INFORMATION - 206-431-307, Contact Person: E-Mail Address: Contractor Registration Number: Q:Uppl WnonsWonn,- Applicadau On LineU•3006 - Permit Appliuuon.doc Revised' m PLOMBING AND GAS PIPING CONTRACTOR INFORMATION Company Name: Mailing Address: City State Zip Day Telephone: Fax Number: Expiration Date: r Valuation of Project (contractor's bid price): $ Scope of Work (please provide detai ed information): A dk W4,1 y L9 es a l ✓ / v c . t . 4 , . 0c1/.4 1 Indicate type of plumbing fixtures and/or gas piping outlets being installed and the quantity below: Page of Value of Construction - In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review - Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. Building and Mechanical Permit The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). Plumbing Permit The Building Official may grant one extension of time for an additional period not exceeding 180 days. The extension shall be requested in writing and justifiable cause demonstrated. Section 103.4.3 Uniform Plumbing code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER AUTHORIZED AGE Signature: — l. G Print N- co RUc' k . 1- J � 121i-/ Mailing Address: / 51.2 / Date Application Expires: I Date Application Accepted: Q: ApplicnionsWomu- Applications On LineV -2006- Permit Applicatioa.doc Revised. 0-2006 bM1 Date: /f(C Day Telephone: 206 - g 6 - 0 'Park en yg6 S - 7 -- City State Zip Staff Initials: Page 6 of 6 QUANTITY IN CUBIC YARDS RATE Up to 50 CY Free 51 — 100 $23.50 101 —1,000 $37.00 1,001 — 10,000 $49.25 10,001 — 100,000 $49.25 for 1 s' 10,000, PLUS $24.50 for each additional 10,000 or fraction thereof. 100,001 — 200,000 $269.75 for l 100,000, PLUS $13.25 for each additional 10,000 or fraction thereof. 200,001 or more $402.25 for 1 200,000, PLUS $7.25 for each additional 10,000 or fraction thereof. L o'r is\ PROJECT NAME VIEW E st 5 PERM # .boa— 224 (x /3018 - 34.N, 4v sevrx) If you do not provide contractor bids or an engineer's estimate with your permit application, Public Works will review the cost estimates for reasonableness and may adjust estimates. 1. APPLICATION BASE FEE 2. Enter total construction cost for each improvement category: Mobilization Erosion prevention Water /Sewer /Surface Water Road/Parking /Access A. Total Improvements 3. Calculate improvement -based fees: B. 2.5% of first $100,000 of A. C. 2.0% of amount over $100,000, but less than $200,000 of A. D. 1.5% of amount over $200,000 of A. 4. TOTAL PLAN REVIEW FEE (B +C +D) 5. Enter total excavation volume Z 0 cubic yards Enter total fill volume 20 cubic yards Use the following table to estimate the grading plan review and permit fee. Use the greater of the excavation and fill volumes. GRADING Plan Review and Permit Fees TOTAL PLAN REVIEW AND APPROVAL FEE DUE WITH PERMIT APPLICATION (1 +4 +5) $ '2,50t?_ The Plan Review and Approval fees cover TWO reviews: 1) the first review associated with the submission of the application/plan and 2) a follow -up review associated with a correction letter. Each additional review, which is attributable to the Applicant's action or inaction shall be charged 25% of the Total Plan Review Fee. Approved 09.25.02 Last Revised Jan. 2006 BULLETIN A2 TYPE C PERMIT FEE ESTIMATE PLAN REVIEW AND APPROVAL FEES DUE WITH APPLICATION PW may adjust estimated fees 1 /000 /f o % too 0 /o so 4000- $ /00. SNP $250 ( 1) $ / 0 0 . (4) (5) RECEIPT NO: R06 -01567 Initials: JEM User ID: 1165 Payee: G K HIRAI, LLC SET ID: 1004 SET NAME: CITY VIEW ESTATES SET TRANSACTIONS: Set Member Amount D06 -223 D06 -224 D06 -226 TOTAL: City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 - 3670 Fax: 206 - 431 -3665 3,047.40 3,047.40 3,193.14 9,287.94 SET RECEIPT Payment Date: 10/04/2006 Total Payment: 9,287.94 TRANSACTION LIST: Type Method Description Amount Payment Check 1054 9,287.94 TOTAL: 9,287.94 ACCOUNT ITEM LIST: Description BUILDING - RES PW LAND ALT PERMIT FEE PW PERMIT /INSPECTION FEE PW PLAN REVIEW STATE BUILDING SURCHARGE TRAFFIC MITIGATION FEES Account Code Current Pmts 000/322.100 5,757.12 000/342.400 70.50 000/342.400 300.00 000/345.830 75.00 000/386.904 13.50 104.367.120 3,071.82 TOTAL: 9,287.94 0400 10/05 9710 TOTAL 9287.94 Steven M. Mullet, Mayor Steve Lancaster, Director RECEIPT NO: R06 -00851 Initials: JEM User ID: 1165 Payee: G K HIRAI, LLC SET ID: 0612 SET TRANSACTIONS: Set Member D06 -222 D06 -223 D06 -224 D06 -225 D06 -226 M06 -117 M06 -118 M06 -119 M06 -120 M06 -121 PG06 -055 PG06 -056 PG06 -057 PG06 -058 PG06 -059 TOTAL: Amount 1,455.09 1,540.80 1,540.80 3,989.30 1,635.53 38.70 38.70 38.70 38.70 38.70 32.00 32.00 32.00 32.00 27.00 10,510.02 TRANSACTION LIST: Type Method Description Payment check ACCOUNT ITEM LIST: Description 1033 PLAN CHECK - RES PW BASE APPLICATION FEE PW LAND ALT PLAN REVIEW PW PLAN REVIEW City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #I00 Tukwila, Washington 98188 Phone: 206431 -3670 Fax: 206- 431 -3665 SET RECEIPT SET NAME: CITY VIEW ESTATES TOTAL: Account Code Payment Date: 06/12/2006 Total Payment: 10,510.02 Amount 10,510.02 10,510.02 Current Pmts 000/345.830 6,436.52 000/322.100 1,250.00 000/345.830 23.50 000/345.830 2,800.00 TOT 6380 06/13 9716 1 9itk? 0 1 $ 510.Q 2 Steven M. Mullet. Mavor Steve Lancaster, Director h DESIGNS,UNLIMITED A STOCK PLANS • CUSTOM DESIGN FILE COPY Gravity Load Analysis PLAN 1294R/A/DB/2 Beam Calculations using Beam Chek 2.4 Software and/or TJBeam 6.16 Software NDS 97 5/23/2005 RECEIVED CITY OFTUKWIIA JUN 12 2008 PERMIT CENTER ■ COD C VIEWED FOR MPLIA CE AUG 15 2006 BUI Tic' °-kW DIVISION PG • 19613.81st Ave S • Suite F -2580 • Fax: (253) 872 -3649 ■ • Email: designstudio @designsuniimited.com ■ BeamChek v2.4 licensed to: Designs Unlimited Reg # 8101 -1456 /2.q? iejta/Z-. DINING/KIT Selection 14x 6 HF #2 Conditions NDS '91 Min Bearing Area R1= 2.7 in' R2= 2.7 in' Data Attributes Actual Critical Status Ratio Values Adjustments Loads R1 = 1091 t� Section (in') Shear (1n TL Deb (in) Fb (psi) BM (1) Prepared by: LA. Date: 4/29/05 Beam Span Beam Wtperft Bm Wt Included Max Moment TL Max Dell 4.5 ft 4.68 # 21 # 1227 It L/240 Reaction 1 TL Maximum V Max V (Reduced) TL Actual Dell 1091 # 1091 # 868 # L /763 Reaction 2 TL 1091 # 17.65 13.32 OK 76% 19.25 17.37 OK 90% 0.07 0.23 OK 31% Fv (psi) Lu = 0.0 Ft E (psi x mil) Uniform TL: 480 = A Uniform Load A SPAN =4.5FT Uniform and partial uniform loads are Ibs per lineal ft. R2 = 1091 Fc (psi) Base Values 850 Base Adjusted 1105 75 75 1.3 1.3 405 405 CF Size Factor Cd Duration Cr Repetitive Ch Shear Stress Cm Wet Use 1.300 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 CI Stability 1.0000 Rb = 0.00 Le = 0.00 Ft Kbe = 0.0 1 _ "°iRE _3 -16 -U/ /Z 1liQ /004 B 4x8 HF#2 / NDS'91 Min Bearing Area BED 2 Selection Conditions Data Attributes Actual Critical Status Ratio Values Adjustments Loads R1 = 1337 BeamChek v2.4 licensed to: Designs Unlimited Reg # 8101 -1456 R1= 3.3 in R2= 3.3 in' BM (2) Prepared by: I.A. Date: 4/29/05 Lu =0.OFt Beam Span Beam Wtperft Bm Wt Included Max Moment TL Max Defl 5.5 ft 6.17 # 34 # 1838 W L / 240 Reaction 1 TL Maximum V Max V (Reduced) TL Actual Defl 1337 # Reaction 2 TL 1337 # 1337 # 1043 # L / 954 Section (In Shear (n TL Defl (in) 30.66 19.96 OK 65% 25.38 20.86 OK 82% 0.07 0.28 OK 25% Fb (psi) Fv (psi) E (psi x mil) Base Values Base Adjusted 850 1105 75 75 1.3 1.3 405 405 CF Size Factor Cd Duration Cr Repetitive Ch Shear Stress Cm Wet Use 1.300 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 CI Stability 1.0000 Rb = 0.00 Le = 0.00 Ft Kbe = 0.0 Uniform TL: 480 = Uniform Load A SPAN = 5.5 FT Uniform and partial uniform loads are Ibs per lineal ft. R2 = 1337 Fc 1 (psi) 35473 ratir 1924R/A/DB/2 BM GARAGE Prep by: LA. Date: 5 /17/05 ele I 3 -I /Bx 10-1 /2 GLB 24F -V4 DF /D Lu = 0.0 Ft Conditions ata Attributes Actual Critical Status Ratio Values Adiustments Loads RI = 891 BeamChek v2.4 licensed to: Designs Unlimited Reg # 8101 -1456 Mtn Bearing Area RI = 1.4 in 1.4111 Beam Span Beam Wt per ft Bm Wt Included Max Moment TL Max Defl 16.5 ft 7.97 # Reaction 1 TL 132 # Maximum V 3674'# Max V (Reduced) L / 240 TL Actual Defl 891 # 891 # 796 # L / 598 Reaction 2 TL 891 # Section fin Shear (inz) TL Dell (in) 57.42 18.37 OK 32% 32.81 6.29 OK 19% 0.33 0.83 OK 40% Fb Fv (psi) E (psi x mil) Uniform TL: 100 = A Uniform Load A SPAN = 16.5 FT Uniform and partial uniform loads are Ibs per lineal ft. Fc 1 (psi) (psl) Base Values 2400 Base Adiusted 2400 190 190 1.8 1.8 650 650 Cv Volume Cd Duration Cr Repetitive Ch Shear Stress Cm Wet Use 1.000 I.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 CI Stability 1.0000 Rb = 0.00 Le = 0.00 Ft Kbe = 0.0 R2 = 891 /z BSMT Selection Conditions Data Attributes Actual Critical Status Ratio Values Adjustments BeamChek v2.4 licensed to: Designs Unlimited Reg # 8101 -1456 4x10 HF#2 Lu = 0.0 Ft NDS '91 Min Bearing Area R1= 4.7 in' R2= 4.7 in' Beam Span Beam Wt per ft Bm Wt Included Max Moment TL Max Dell 8.5 ft 7.87 # 51 # 3105'# L/ 240 Reaction 1 TL Maximum V Max V (Reduced) TL Actual Dell 1911 # Reaction 2 TL 1911 # 1457 # L / 993 1911 # Section (in') Shear (in') TL Dell (in) 49.91 36.53 OK 73% 32.38 29.15 OK 90% 0.08 0.33 OK 24% Fb (psi) BM (5) Prepared by: IA. Fv (psi) E (psi x mil) oads Uniform TL: 580 = A Uniform Load A SPAN = 6.5 FT Uniform and partial uniform loads are Ibs per lineal ft. Date: 4/29/05 Fol. ( Base Values 850 Base Adjusted 1020 75 75 1.3 1.3 405 405 CF Size Factor Cd Duration Cr Repetitive Ch Shear Stress Cm Wet Use 1.200 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 CI Stability 1.0000 Rb = 0.00 Le = 0.00 Ft Kbe = 0.0 R2 =1911 e /tio•- c �su. It::; PINES 03 -16 -07 BSMT Selection Conditions Data Attributes Actual Critical Status Ratio Values Adjustments R1 = 1586 BeamChek v2.4 licensed to: Designs Unlimited Reg # 8101 -1456 BM (4) Prepared by: IA. Date: 4/29/05 4x10 HF#2 Lu = 0.0 Ft NDS '91 Min Bearing Area R1 =3.9in' R2 =3.9in' Beam Span Beam Wtperft Bm Wt Included Max Moment TL Max Deft 6.5 ft 7.87 # Reaction 1 TL 1586 # Reaction 211 51 # Maximum V 1586 # 2577'# Max V (Reduced) 1210 # L / 240 TL Actual Defl L / >1000 1586 # Section (in') Shear (n') TL Dell (in) 49.91 30.31 OK 61% 32.38 24.19 OK 75% 0.07 0.33 OK 20% Fb (psi) Fv (ps) E (psi x mil) Base Values 850 Base Adjusted 1020 75 75 1.3 1.3 405 405 CF Size Factor 1.200 Cd Duration 1.00 Cr Repetitive 1.00 Ch Shear Stress Cm Wet Use 1.00 1.00 1.00 1.00 1.00 1.00 CI Stability 1.0000 Rb = 0.00 Le = 0.00 Ft Kbe = 0.0 Loads Uniform TL: 480 = A Uniform Load A SPAN = 6.5 FT Uniform and partial uniform loads are Ibs per lineal ft. R2 = 1586 Fc I (psi) 1294R/A/DB/2 PORCH Selection lido Data Attributes Actual Critical Status Ratio Values Adiustments RI = 393 BeamChek v2.4 licensed to: Designs Unlimited Reg # 8101 -1456 NDS '97 Min Bearing Area RI= 1.01n 1.0 in Section (in Shear (in TL Dell (in) Fb BM Prepared by: I.A. Fv (psi) E (psi x mil) Loads Uniform TL 140 = A Uniform Load A SPAN = 5.5 FT Uniform and partial uniform loads are lbs per lineal ft. Date: 5/19/05 4x 4 HF #2 Lu = 0.0 Ft Beam Span Beam Wt per ft Bm Wt Included Max Moment TL Max Deli 5.5 ft 2.98 # Reacdon 1 TL 393 # Reaction 2 TL 16 It Maximum V 393 It 541 '11 Max V (Reduced) 351 it L / 240 TL Actual Defl L / 365 393 7.15 5.09 OK 71% 12.25 7.03 OK 57% 0.18 0.28 OK 66% (psi) Base Values Base Adiusted 850 1275 75 75 1.3 1.3 405 405 CF Size Factor Cd Duration Cr Repetitive Ch Shear Stress Cm Wet Use 1.500 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 CI Stability 1.0000 Rb = 0.00 Le = 0.00 Ft Kbe = 0.0 Zcs R2 = 393 Fc (psi) • 1294R/A/DB/2 BACEMENT election Conditions Data Attributes Actual Critical Status Ratio Values Adjustments Loads RI = 1669 BeamChek v2.4 licensed to: Designs Unlimited Reg # 8101 -1456 3 -1 18x 9 GLB I 6F-V3 DF /DF Lu = 0.0 Ft Min Bearing Area R I = 3.0 in R2= 3.0 in Beam Span 5.5 ft Beam Wt per ft 6.83 # Reaction 1 TL 1669 # Reaction 2 TL 1669 # Bm Wt Included 38 # Maximum V 1669 # Max Moment 2295 '# Max V (Reduced) 1214 # TL Max Defl 1. / 240 TL Actual Dell L / >1000 Section fin Shear (ins) TL Defl (in) 42.19 17.21 OK 41% 28.13 9.58 OK 34% 0.04 0.28 OK 16% Fb BM Prepared by: I.A. E (psi x mil) Fv (psi) Base Values Base Adjusted 1600 1600 190 190 1.5 1.5 560 560 Cv Volume Cd Duration Cr Repetitive Ch Shear Stress Cm Wet Use 1.000 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0 Stability 1.0000 Rb = 0.00 Le = 0.00 Ft Kbe = 0.0 Uniform TL 600 = A Uniform Load A SPAN = 5.5 FT Uniform and partial uniform Toads are Ibs per lineal ft. Date: 5/19/05 R2 = 1669 Fe l_ (psi) cS C - -Q'[: INTRODUCTION This report presents the results of our geotechnical engineering investigation and evaluation of the Hirai Short Plat project in Tukwila, Washington. The site is located at the northwest corner of the intersection of South 132 Street and Pacific South; as shown on the Vicinity Map in Figure 1. The purpose of this study is to explore and characterize the site's surface and subsurface conditions, and to provide geotechnical reconunendations for site development. For our use in preparing this report, we were provided with an undated site plan titled "Hirai Site Plan," prepared by Medina Consulting Engineers, Inc., showing the existing site topography and the planned lot layout. Project plans include developing this 0.58 -acre site into five single - family residential lots with associated pavement and utilities. Daylight basement retaining walls may be incorporated into some of the structures constructed on mildly sloping ground. Stormwater management plans will likely consist of on- site detention, via either a vault or pipes. The proposed lot alignments and existing topography are shown on the Site Plan in Figure 2. SCOPE FILE Copy Permit No. Geotechnical Engineeringr Evattiatatim Hirai Short Plat . Tukwila, • Washington ' CODE REVIEWED COMPLIANCE ,eeoonru►1`n AUO 15 2006 Of a BVILtTNG DIVISION The purpose of this study is to explore and characterize the site subsurface conditions, and provide general recommendations for site development. Specifically, our scope of services includes the following: 1. Review available soils and geologic maps of the area. 2. Explore the subsurface soil and groundwater conditions within the site with trackhoe- excavated test pits. Trackhoe was subcontracted by NGA. 3. Map the surficial slope conditions and produce cross - sections. 4. Perform grain -size sieve analysis on soil samples. 5. Provide our opinion regarding slope stability. RECEIVED 6. Provide recommendations for earthwork, foundation support, and slabs- on- grad 6 JTY OFTI)KWILA 7. Provide recommendations for subgrade preparation and pavements. JUN 1 2 2006 8. Provide recommendations for site drainage and erosion control. PERMITCENTER 9. Document the results of our findings, conclusions, and recommendations in a written geotechnical report. ado -240 NELSON GEOTECHNICAL ASSOCIATES, INC. Geotechnical Engineering Evaluation Hirai Short Plat Tukwila, Washington March 30, 2006 NGA File No. 733906 Page 2 SITE CONDITIONS Surface Conditions The property is an irregularly shaped parcel covering approximately 0.58 acres. The property is bordered to the north and west by developed residential property, to the east by Pacific Hwy South, and to the south by South 132 Street. The site slopes gently down toward the eastern property line, where the slope then becomes moderate to steep over a vertical relief of less than 10 feet, buttressed by a 3.5 -to 8.0 -foot high rockery retaining wall. Profiles of the existing ground surface and the interpretive subsurface conditions are shown on Cross Sections A -A', B -B', and C-C', in Figures 3 through 5, respectively. Access to the property is currently from a gravel driveway off South 132 Street along the southwest corner of the site. The site is currently undeveloped, covered with grass, blackberries, and a few conifer and fruit trees. The northeast corner of the site in particular is heavily vegetated. We observed ponding water within the site during our site visit on March 15, 2006. This water appeared to be collecting on the surface of a previously graded building pad, where a structure was likely located in the past. The approximate location of the ponding water is shown on the Site Plan, Figure 2. Subsurface Conditions Geology: The geologic units for this area are shown on the Preliminary Geologic Map of Seattle and Vicinity, Washington, by Howard H. Waldron, Bruce A. Liesch, Donald R. Mullineaux, and Dwight R. Crandell (U.S.G.S., 1962). The site is mapped as Vashon till (Qt), and the area just east of the site is mapped as undifferentiated deposits of the Pleistocene age (Qtr). The till is described as a nonsorted mixture of clay, silt, sand, pebbles, cobbles, and boulders. Our explorations generally encountered glacially consolidated silt with trace fine sand. We interpreted this material to be an interglacial deposit, likely consolidated during the Vashon age glaciation. Explorations: The subsurface conditions within the site were explored on March 15, 2006 by excavating eight test pits to depths ranging from 2.0 to 11.0 feet below the existing ground surface using a trackhoe. The approximate locations of our explorations are shown on the Site Plan in Figure 2. An engineer from NGA was present during the explorations, examined the soils and geologic conditions encountered, obtained samples of the different soil types, and maintained logs of the test pits. NELSON GEOTECHNICAL ASSOCIATES, INC. Geotechnical Engineering Evaluation Hirai Short Plat Tukwila, Washington March 30, 2006 NGA File No. 733906 Page 3 The soils were visually classified in general accordance with the Unified Soil Classification System, presented in Figure 6. The logs of our test pits are attached to this report and are presented as Figures 7 and 8. We present a brief summary of the subsurface conditions in the following paragraph. For a detailed description of the subsurface conditions, the logs of the test pits should be reviewed. Test Pits 2, 4, and 8 exposed a 1.3 -to 2.0 -foot thick layer of dark brown to black silt with trace fine sand and roots, which was interpreted as topsoil/modified ground. Test pits 1, 3, and 5 through 7 exposed a 1.0-to 2.8 -foot thick surficial layer of dark brown silt with trace fine sand, roots, bricks, and other miscellaneous rubble. We interpreted this material to be undocumented fill. Underlying the topsoil and fill, our explorations exposed stiff to very stiff, brown -gray to blue -gray silt with trace fine sand extending to the bottom of the explorations. We interpreted this material to be native glacially consolidated material. Hydrologic Conditions Groundwater seepage was not encountered in any of our explorations, however, we would expect that a perched groundwater condition may develop on this site during the wet season. Perched water occurs when surface water infiltrates through less dense, more permeable soils, such as topsoil and fill, and accumulates on top of a relatively impermeable material, such as the very stiff to stiff native silt soils. Perched water does not represent a regional groundwater "table" within the upper soil horizons. Perched water tends to vary spatially and is dependent upon the amount of rainfall. We would expect the amount of groundwater to decrease during drier times of the year and increase during wetter periods. LABORATORY ANALYSIS We performed two grain -size analyses on selected soil samples obtained from the explorations, located in the central section of the development area, as shown on the Site Plan in Figure 2. The results of the sieve analyses are presented as Figures 9 and 10. The analyses indicated that the soils underlying the site are predominately composed of silt. NELSON GEOTECHNICAL ASSOCIATES, INC. Geotechnical Engineering Evaluation Hirai Short Plat Tukwila, Washington March 30, 2006 NGA File No. 733906 Page 4 SENSITIVE AREA EVALUATION Seismic Hazard We reviewed the 2003 International Building Code (IBC) for seismic site classification for this project. Since very stiff to stiff silt was encountered underlying the site at depth, the site conditions best fit the IBC description for Site Class D. Hazards associated with seismic activity include liquefaction potential and amplification of ground motion. Liquefaction is caused by a rise in pore pressures in a loose, fine sand deposit beneath the groundwater table. It is our opinion that the competent glacially consolidated deposits interpreted to underlie the site have a low potential for liquefaction or amplification of ground motion. Erosion Hazard The criteria used for determination of the erosion hazard for affected areas include soil type, slope gradient, vegetation cover, and groundwater conditions. The erosion sensitivity is related to vegetative cover and the specific surface soil types, which are related to the underlying geologic soil units. The Soil Survey of King County Area, Washington, by the Soil Conservation Service (SCS) was reviewed to determine the erosion hazard of the on -site soils. The site was mapped just beyond the boundaries of the Soil Survey; however, the surface soils are closely associated with the mapping unit of Kitsap Silt loam, 8 to 15 percent slopes. The erosion hazard for this material is listed as moderate to severe. It is our opinion that the erosion hazard for site soils should be low in areas where vegetation is maintained, and severe in areas of exposed silt. Landslide Hazard/Slope Stability The criteria used for evaluation of landslide hazards include soil type, slope gradient, and groundwater conditions. The overall site inclinations are gentle to moderate, however, a slope below the five residential lots has inclinations of up to 30 degrees, with a vertical relief of less than 10 feet. This slope is buttressed by a 3.5 -to 8.0 -foot high rockery retaining wall. The core of the site slope is inferred to consist of stiff to very stiff glacially consolidated silt. Relatively shallow failures as well as surficial erosion are natural processes and could be expected on the slope below the site during severe rainstorms. However, these processes would be limited through the NELSON GEOTECHNICAL ASSOCIATES, INC. Geotechnical Engineering Evaluation Hirai Short Plat Tukwila, Washington March 30, 2006 NGA File No. 733906 Page 5 maintenance of a vegetative cover and proper stormwater management. It is our opinion that there is not a significant potential for deep- seated slope failure under current site conditions. Proper site grading and drainage as well as vegetation management as recommended in this report should help maintain current stability conditions. Also, the recommended effective structure setback should reduce the potential adverse impacts of site development on the slope and vice versa. CONCLUSIONS AND RECOMMENDATIONS General It is our opinion from a geotechnical standpoint that the site is compatible with the planned development. Our explorations indicated that the planned development area is generally underlain by a one -to three -foot thick surficial layer of very soft topsoil and fill, underlain by competent silt deposits. The medium stiff or better native soils should provide adequate support for the planned structures and roadways. We recommend that the structures be designed utilizing shallow foundations. Footings should extend through any undocumented fill, or loose materials, and be founded on the underlying medium stiff or better native soils or structural fill extending to these soils. Our explorations generally encountered medium stiff or better native soils at depths of two feet below the existing ground surface. Adequate structure setbacks should be maintained in relationship to the locally steep sloping ground and rockery retaining wall. To protect the existing slope and rockery from development, we recommend that the downhill structure footing lines be set back at least 10 feet from a line drawn at 27 degrees from the horizontal, starting at the base of the rockery and extending upwards into the slope, intersecting the site ground surface above. NGA should be retained to evaluate fmal structure placement on each lot. Under no circumstances should water be allowed to flow over or concentrate on the steep slope, both during construction and after construction has been completed. The yard areas should be graded to direct runoff away from the top of steep slope, if possible. We recommend that stormwater runoff from the roofs, driveway, footing drains, and yard drains be collected in catch basins and tightlined into an approved stormwater management system. We understand that an underground detention vault or pipe will likely be considered for stormwater management on this project. If the vault will be located in an unexplored area of the site, or will extend to NELSON GEOTECHNICAL ASSOCIATES, INC. Geotechnical Engineering Evaluation Hirai Short Plat Tukwila, Washington March 30, 2006 NGA File No. 733906 Page 6 a depth below the depths explored, we should observe additional explorations in the area of the planned vault to confirm that the subsurface conditions are consistent with our design recommendations. Grading for the vault should be in accordance with the recommendations found in the Site Preparation and Grading and Temporary and Permanent Slopes subsections of this report. We would expect wet surficial soil conditions during the wetter times of the year We recommend the use of footing drains around structures, and wall drains behind stem/retaining walls. Specific drainage recommendations are given in the Site Drainage subsection of this report. The site soils are considered extremely moisture - sensitive and will disturb easily even in moderately wet conditions. We strongly recommend that construction take place during the drier summer months and suspended during wet periods. If construction is to be attempted in wet conditions, major additional expenses and delays should be expected due to the wet conditions. Additional expenses could include the need for placing a blanket of rock spalls and/or geo -fabric on exposed subgrades, construction traffic areas, and paved areas prior to placing structural fill, and the need for using all - weather material for structural fill. The use of the native on -site soils as structural fill will likely be unfeasible, but will depend on the moisture content of the soil at the time of construction. NGA should be retained to determine if the on -site soils could be used as structural fill material prior to construction. We should also note that major erosion control expenses and delays may be incurred if the site is to be developed in wet weather. Erosion Control The erosion hazard for the on -site soils is considered severe for exposed soils but actual erosion potential will be dependent on how the site is graded and how water is allowed to concentrate. Best Management Practices (BMPs) should be used to control erosion. Areas disturbed during construction should be protected from erosion. Erosion control measures may include covering exposed soils with a layer of crushed rock, diverting surface water away from the stripped or disturbed areas, and limiting construction traffic on prepared subgrades. Silt fences or straw bales should be erected to prevent muddy water from leaving the site. Disturbed areas should be planted as soon as practical and the vegetation should be maintained until it is established. Other erosion control measures may include the use of a temporary sediment control pond or Baker's tanks to store muddy water prior to leaving the site. This can be NELSON GEOTECHNICAL ASSOCIATES, INC. Geotechnical Engineering Evaluation Hirai Short Plat Tukwila, Washington March 30, 2006 NGA File No. 733906 Page 7 evaluated at the time of construction based on the actual site conditions. The erosion potential of areas not stripped of vegetation should be low. Temporary and Permanent Slopes Temporary cut slope stability is a function of many factors, including the type and consistency of soils, depth of the cut, surcharge loads adjacent to the excavation, length of time a cut remains open and the presence of surface or groundwater. It is exceedingly difficult under these variable conditions to estimate a stable, temporary, cut slope angle. Therefore, it should be the responsibility of the contractor to maintain safe slope configurations since he is continuously at the job site, able to observe the nature and condition of the cut slopes, and able to monitor the subsurface materials and groundwater conditions encountered. The following information is provided solely for the benefit of the owner and other design consultants and should not be construed to imply that Nelson Geotechnical Associates, Inc. assumes responsibility for job site safety. Job site safety is the sole responsibility of the project contractor. For planning purposes, we recommend that temporary cuts in any undocumented fill and loose soils be no steeper than 2.0 Horizontal to 1.0 Vertical (2H:1 V). Cuts in the native silt could stand at inclinations as steep as 11-1: 1V. If significant groundwater seepage is encountered, we would expect that flatter inclinations would be necessary. We recommend that cut slopes be protected from erosion. These erosion protection measures may include covering cut slopes with plastic sheeting and diverting surface runoff away from the top of cut slopes. We do not recommend vertical slopes for cuts deeper than four feet, if worker access is necessary. We recommend that cut slope heights and inclinations conform to appropriate OSHA/WISHA regulations. We recommend that permanent cuts in the native silt, as well as any permanent fill slopes to be constructed on site be no steeper than 2.0 unit Horizontal to 1.0 unit Vertical (2.0H:1V). We recommend that permanent cut and fill slopes be protected from erosion. Vegetation should be planted on permanent slopes and maintained until established. To reduce the potential for erosion, surface water runoff should not be allowed to flow uncontrolled over the permanent slopes. NELSON GEOTECHNICAL ASSOCIATES, INC. Geotechnical Engineering Evaluation Hirai Short Plat Tukwila, Washington March 30, 2006 NGA File No. 733906 Page 8 Site Preparation and Grading After erosion control measures are implemented, site preparation should consist of stripping the development areas of organics, any fill, and loose soils to expose medium stiff or better native soils for — the structural fill subgrade, and in foundation, slab, and pavement areas. Our explorations generally encountered medium stiff or better native soils at depths of two feet below the existing ground surface. However, additional stripping may be required in unexplored areas of the site or if the exposed subgrade becomes disturbed due to wet weather. The stripped materials should be removed from the site or stockpiled for later use as landscaping fill. If the stripped material is to be stockpiled on site, the stockpiles should be kept away from the steeper portions of the slope and covered with plastic at all times. We recommend that any undocumented fill encountered in the structure and pavement areas be removed and replaced with structural fill or rock spalls extending to competent native material. Depending on subgrade and weather conditions, pavement and slab subgrade should be compacted to a non - yielding condition using static rollers then proof - rolled with a heavy rubber -tired piece of equipment. Areas observed to pump or weave during the proof -roll test should be reworked to structural fill specifications or over - excavated and replaced with properly compacted structural fill or rock spalls. For better pavement and slab -on -grade performance, especially in wet conditions, a one -foot thick layer of crushed rock may be placed over the prepared subgrade prior to placing asphalt or concrete. Final subgrade preparation recommendations can be provided at the time of construction. If significant surface water flow is encountered during construction, this flow should be diverted around areas to be developed and the exposed subgrade maintained in a semi -dry condition. If wet conditions are encountered, alternative site stripping and grading techniques will be necessary due to the highly sensitive nature of the site soils. These methods could include using large excavators equipped with wide tracks and a smooth bucket to complete site grading and covering exposed subgrade with a layer of crushed rock for protection. If wet conditions are encountered or construction is attempted in wet weather, the subgrade should not be compacted as this could cause further subgrade disturbance. In wet conditions it may be necessary to cover the exposed subgrade with a layer of crushed rock as soon as it is exposed to protect the moisture sensitive soils from disturbance by machine or foot traffic during construction. The prepared subgrade should be protected from construction traffic and surface water should be diverted around prepared subgrade. NELSON GEOTECHNICAL ASSOCIATES, INC. Geotechnical Engineering Evaluation Hirai Short Plat Tukwila, Washington March 30, 2006 NGA File No. 733906 Page 9 The site soils are considered extremely moisture - sensitive and will disturb easily even in moderately wet conditions. We strongly recommend that construction take place during the drier summer months. If construction takes place during the wet season, additional expenses and delays should be expected due to the wet conditions. This may include the need for installing an interceptor drain along the uphill side of the site. Additional expenses could also include the need for placing a blanket of rock spalls and/or geo- fabric on exposed subgrades, construction traffic areas, and paved areas prior to placing structural fill. The use of on -site soils as structural fill will likely be unfeasible, but will be highly dependent on the moisture content of the soil at the time of construction. NGA should be retained to determine if the on- site soils could be used as structural fill material at the time of construction. For planning purposes, the use of the on -site material as structural fill should be considered unfeasible. Foundations Conventional shallow spread foundations should be placed on undisturbed medium stiff or better native soils or be supported on structural fill extending to those soils. Where undocumented fill or less dense soils are encountered at the planned footing elevation, the subgrade should be over - excavated to expose suitable bearing soil. The over - excavation may be filled with structural fill, or the footing may be extended down to the native bearing soils. If footings are supported on structural fill, the fill zone should extend outside the edges of the footing a distance equal to one -half of the depth of the over - excavation below the bottom of the footing. Footings, including interior footings, should extend at least 18 inches below the lowest adjacent finished ground surface for frost protection and bearing capacity considerations. Foundations should be designed in accordance with the 2003 IBC. Footing widths should be based on the anticipated loads and allowable soil bearing pressure. Standing water should not be allowed to accumulate in footing trenches. All loose or disturbed soil should be removed from the foundation excavation prior to placing concrete. It might be prudent to place a layer of crushed rock on prepared foundation subgrade to limit subgrade disturbance by foot traffic. For foundations constructed as outlined above, we recommend an allowable design bearing pressure of not more than 2,000 pounds per square foot (psf) be used for the design of foundations supported on the medium stiff or better native soils or structural fill extending to the competent native soils. A representative of NGA should evaluate the foundation bearing soil. We should be consulted if higher NELSON GEOTECHN /CAL ASSOCIATES, INC. Geotechnical Engineering Evaluation Hirai Short Plat Tukwila, Washington March 30, 2006 NGA File No. 733906 Page 10 bearing pressures are needed. Current 1BC guidelines should be used when considering increased allowable bearing pressure for short-term transitory wind or seismic loads. Potential foundation settlement using the recommended allowable bearing pressure is estimated to be less than one -inch total and 1/2-inch differential between adjacent footings or across a distance of about 20 feet based on our experience with similar projects. Lateral loads may be resisted by friction on the base of the footing and passive resistance against the subsurface portions of the foundation. A coefficient of friction of 0.30 may be used to calculate the base friction and should be applied to the vertical dead load only. Passive resistance may be calculated as a triangular equivalent fluid pressure distribution. An equivalent fluid density of 200 pounds per cubic foot (pcf) should be used for passive resistance design for a level ground surface adjacent to the footing. This level surface should extend a distance equal to at least three times the footing depth. These recommended values incorporate safety factors of 1.5 and 2.0 applied to the estimated ultimate values for frictional and passive resistance, respectively. To achieve this value of passive resistance, the foundations should be poured "neat" against the native medium dense/stiff soils or compacted fill should be used as backfill against the front of the footing. We recommend that the upper one -foot of soil be neglected when calculating the passive resistance. Structural Fill General: Fill placed beneath foundations, pavement, or other settlement- sensitive structures should be placed as structural fill. Structural fill, by definition, is placed in accordance with prescribed methods and standards, and is monitored by an experienced geotechnical professional or soils technician. Field monitoring procedures would include the performance of a representative number of in -place density tests to document the attainment of the desired degree of relative compaction. The area to receive the fill should be suitably prepared as described in the Site Preparation and Grading subsection prior to beginning fill placement. Materials: Structural fill should consist of a good quality, granular soil, free of organics and other deleterious material and be well graded to a maximum size of about three inches. All- weather fill should contain no more than five- percent fines (soil finer than U.S. No. 200 sieve, based on that fraction passing the U.S. 3/4 -inch sieve). The use of on -site soils as structural fill will likely be unfeasible, but will be NELSON GEOTECHNICAL ASSOCIATES, INC. Geotechnical Engineering Evaluation Hirai Short Plat Tukwila, Washington March 30, 2006 NGA File No. 733906 Page 11 highly dependent on the moisture content of the material at the time of construction. Most of the on -site soils will be virtually impossible to compact to structural fill specifications in wet conditions. We should be retained to evaluate proposed structural fill materials prior to construction. Fill Placement: Following subgrade preparation, placement of structural fill may proceed. All filling should be accomplished in uniform lifts up to eight inches thick. Each lift should be spread evenly and be thoroughly compacted prior to placement of subsequent lifts. All structural fill underlying building areas _ and pavement subgrade should be compacted to a minimum of 95 percent of its maximum dry density. Maximum dry density, in this report, refers to that density as determined by the ASTM D -1557 Compaction Test procedure. The moisture content of the soils to be compacted should be within about two percent of optimum so that a readily compactable condition exists. It may be necessary to over - excavate and remove wet soils in cases where drying to a compactable condition is not feasible. All compaction should be accomplished by equipment of a type and size sufficient to attain the desired degree of compaction. Slab -on -Grade Slabs -on- grade, if used, should be supported on subgrade soils prepared as described in the Site Preparation and Grading subsection of this report. We recommend that all floor slabs be underlain by at least six inches of free - draining sand or gravel for use as a capillary break. We recommend that the capillary break be hydraulically connected to the footing drain system to allow free drainage from under the slab. A suitable vapor barrier, such as heavy plastic sheeting (6-mil minimum), should be placed over the capillary break material. Pavements Pavement subgrade preparation, and structural filling where required, should be completed as recommended in the Site Preparation and Grading and Structural Fill subsections of this report. Any undocumented fill should be removed and replaced with structural fill or thoroughly compacted prior to placing the pavement section. The pavement subgrade should be proof -rolled with a heavy, rubber -tired piece of equipment, to identify soft or yielding areas that require repair. The ability to leave some of the undocumented fill in the payment subgrade will be dependent on the nature of the fill and expected NELSON GEOTECHNICAL ASSOCIATES, INC. Geotechnical Engineering Evaluation Hirai Short Plat Tukwila, Washington March 30, 2006 NGA File No. 733906 Page 12 pavement performance. We should be retained to evaluate any fill to be left in pavement areas, observe the proof - rolling, and recommend repairs prior to placement of the asphalt or hard surfaces. Stormwater Management The soils exposed in our explorations on this site consisted of silt with trace fine sand. These soils have extremely low permeability and are not considered suitable for stormwater infiltration. A detention vault or pipe may provide a more practical alternative for stormwater management on this site. The possible location of a detention vault for this project had not been established at the time that this report was prepared. Preliminary recommendations for excavation and retaining walls of an underground vault are included in the following subsections of this report. However, if the vault will be located in an unexplored area of the site, or will extend to. a depth below the depths explored, we should observe additional explorations in the area of the planned vault to confirm that the subsurface conditions are consistent with our design recommendations. We understand that stormwater may also be handled using a detention pipe, rather than a detention vault. If a detention pipe is used, the bottom of the trench should be cleared of any loose or sloughing material prior to placing the pipe. The pipe should be underlain by one to two feet of washed rock and surrounded with washed rock at least halfway up the pipe, placed evenly in small lifts on both sides of the pipe. The top of the washed rock fill should be covered with filter fabric (Mirafi 140 N or equivalent) prior to placing native material. We recommend that construction equipment not be operated over the pipe until at least three feet of fill is placed over the pipe, or as recommended by the manufacturer. If native material is used over the washed rock, it should be clear of particles over 3 inches in diameter and be placed in thin lifts (no more than 6 inches in thickness). The fill should be compacted using walk behind vibratory plate compactors. We should be retained to review the layout and design of any detention pipe systems. Retaining Walls Retaining walls may be incorporated into project plans in the form of daylight basement stem -walls for the new structures and for any detention vault. The lateral pressure acting on subsurface retaining walls is dependent on the nature and density of the soil behind the wall, the amount of lateral wall movement which can occur as backfill is placed, wall drainage conditions, the inclination of the backfill, and other NELSON GEOTECHNICAL ASSOCIATES, INC. Geotechnical Engineering Evaluation Hirai Short Plat Tukwila, Washington March 30, 2006 NGA File No. 733906 Page 13 possible surcharge loads. For walls that are free to yield at the top at Least one thousandth of the height of the wall (active condition), soil pressures will be less than if movement is limited by such factors as wall stiffness or bracing (at -rest condition). We recommend that walls supporting horizontal backfill and not subjected to hydrostatic forces be designed using a triangular earth pressure distribution equivalent to that exerted by a fluid with a density of 45 pcf for yielding (active condition) walls, and 65 pcf for non- yielding (at -rest condition) walls. _ These recommended lateral earth pressures are for a drained granular backfill and are based on the assumption of a horizontal ground surface behind the wall for a distance of at least the subsurface height of the wall, and do not account for surcharge loads. Additional lateral earth pressures should be considered for surcharge loads acting adjacent to subsurface walls and within a distance equal to the subsurface height of the wall. This would include the effects of surcharges such as traffic loads, floor slab and foundation Loads, slopes, or other surface loads. Also, hydrostatic and buoyant forces should be included if the walls could not be drained. We could consult with you and your structural engineer regarding additional loads on retaining walls during final design, if needed. The lateral pressures on walls may be resisted by friction between the foundation and subgrade soil, and by passive resistance acting on the below -grade portion of the foundation. Recommendations for frictional and passive resistance to lateral loads are presented in the Foundations subsection of this report. All wall backfill should be well compacted as outlined in the Structural Fill subsection of this report. Care should be taken to prevent the buildup of excess lateral soil pressures, due to over - compaction of the wall backfill. This can be accomplished by placing wall backfill in thin loose lifts and compacting it with small, hand - operated compactors within a distance behind the wall equal to at least one -half the height of the wall. The thickness of the loose lifts should be reduced to accommodate the lower compactive energy of the hand - operated equipment. The recommended level of compaction should still be maintained. Permanent drainage systems should be installed for retaining walls. Recommendations for these systems are found in the Subsurface Drainage subsection of this report. We recommend that we be retained to evaluate the proposed wall drain backfill material and drainage systems. NELSON GEOTECHNICAL ASSOCIATES, INC. Geotechnical Engineering Evaluation Hirai Short Plat Tukwila, Washington March 30, 2006 NGA File No. 733906 Page 14 Site Drainage Surface Drainage: Final site grades should allow for drainage away from the planned structures. We suggest that the finished ground be sloped at a minimum gradient of three percent for a distance of at least — 10 feet away from the buildings. Surface water should be collected by permanent catch basins and drain lines, and be discharged into an appropriate discharge system. Water should not be allowed to collect in any area where footings, slabs, or pavements are to be constructed. Surface water generated from paved areas and roof drains should be routed into permanent catch basins and then tightlined into appropriate stormwater facilities. Water should not be allowed to flow over the slopes or adjacent rockery. Subsurface Drainage: If groundwater is encountered during construction, we recommend that the contractor slope the bottom of the excavations and collect the water into ditches and small sump pits where the water can be pumped out and routed to a suitable discharge point. We recommend the use of footing drains around the planned structures and wall drains behind retaining walls. Footing drains should be installed at least one foot below planned finished floor elevation. The drains should consist of a minimum four - inch - diameter, rigid, slotted or perforated, PVC pipe surrounded by free - draining material, such as washed rock, wrapped in a filter fabric. We recommend that an 18- inch -wide zone of clean (less than three- percent fines), granular material be placed along the back of the walls above the drain. Pea gravel is an acceptable drain material or a drainage composite may be used instead. The free - draining material should extend up the wall to one foot below the finished surface. The top foot of backfill should consist of impermeable soil placed over plastic sheeting or building paper to minimize surface water or fines migration into the footing drain. Footing drains should discharge into tightlines leading to an appropriate collection and discharge point with convenient cleanouts to prolong the useful life of the drains. Roof drains should not be connected to footing drains. If a detention vault or pipe is used and these elements can not be effectively drained, they should be designed to withstand hydrostatic forces. USE OF THIS REPORT NGA has prepared this report for Mr. George Hirai, and his agents, for use in the planning and design of the development planned on this site only. The scope of our work does not include services related to construction safety precautions and our recommendations are not intended to direct the contractors' NELSON GEOTECHNICAL ASSOCIATES, INC. Geotechnical Engineering Evaluation Hirai Short Plat Tukwila, Washington March 30, 2006 NGA File No. 733906 Page 15 methods, techniques, sequences, or procedures,, except as specifically described in our report for consideration in design. There are possible variations in subsurface conditions between the explorations and also with time. Our report, conclusions, and interpretations should not be construed as a warranty of subsurface conditions. A contingency for unanticipated conditions should be included in the budget and schedule. We recommend that NGA be retained to provide monitoring and consultation services during construction to confirm that the conditions encountered are consistent with those indicated by the explorations, to provide recommendations for design changes should the conditions revealed during the work differ from those anticipated, and to evaluate whether or not earthwork and foundation installation activities comply with contract plans and specifications. We should be contacted a minimum of one week prior to construction activities and could attend pre - construction meetings if requested. Within the limitations of scope, schedule, and budget, our services have been performed in accordance with generally accepted geotechnical engineering practices in effect in this area at the time this report was prepared. No other warranty, expressed or implied, is made. Our observations, findings, and opinions are a means to identify and reduce the inherent risks to the owner. o-O -o NELSON GEOTECHNICAL ASSOCIATES, INC. Geotechnical Engineering Evaluation Hirai Short Plat Tukwila, Washington March 30, 2006 NGA File No. 733906 Page 16 It has been a pleasure to provide service to you on this project. If you have any questions or require further information, please call. Sincerely, NELSON GEOTECHNICAL ASSOCIATES, INC. ( A. McCaughan, EST Senior Staff Engineer Khaled M. Shawish, PE Principal CAM: KMS:lam Ten Figures Attached NELSON GEOTECHNICAL ASSOCIATES, INC. j VICINITY MAP Not to Scale Protect Number 733906 Figure 1 Hiral Short Plat Vicinity Map Tukwila, WA NELSON GEOTECHNICAL No. Date Revision NN A ASSOCIATES, INC. 3.20/06 Original GEOTICHNICAL ENGINEERS & GEOLOGISTS m wr .w� w . (42.5)410480011t48141110 +�a.om. J See • \\ \ ,. • TP -3 —. P ,••• LEGEND Property Line TP -1 -- Number and Approximate Location of Test Pit A t of Cross- Location of Cross- s- S Section Concrete Walkway Reference: Site Plan is based on a topographic site plan dated June 1, 2005, titled 'Hirai Site Plan, prepared by Medina Consulting Engineers, Inc. Existing Rockery Catch basin Ditch 40 80 Scale: 1 Inch = 40 feet Project Number 733906 Figure 2 Hirai Short Plat Site Plan NELSON GEOTECHNICAL NGA ASSOCIATES, INC. GEOTECHNICAL ENGINEERS Si GEOLOGISTS " C:111:4:.ou.; No. Date 3/20/06 ReWelon By ACO CK Original CAM 5 1 T t0 c w 1 z 0 0 6' • g Southwest 230— to c 0 m w 0 2 210 190- 170— 0 Exploration Test Pit Designation —4 TP -1 Groundwater Level —) During Ecploratian 1 Geologic Contact —j ? () Gravel Alleyway R. All Tp - (Projected 154 Southeast) 'T18• Stiff to very stiff silt with trace sand All Concrete Walkway Existing Rockery up to 30° locally TP - 1 R 20 40 60 80 100 120 140 160 Distance (feet) Reference: Cross Section is based on a topographic site plan dated June 1, 2005, titled "Hirai Site Plan; prepared by Medina Consulting Engineers, Inc. Northeast —230 210 190 — 170 NOTES: 1) Stratigraphic conditions are interpolated between the explorations. Actual conditions may vary. 2) Elevations are approximate. r+c0,0 an3Ooavxisnewatrcsavy m c C CD A 'o a W g 03 O c rn 3 S 0 a = men &D o my 07 .« 5. 0 Drafting 20061733aoe Southwest 220 200 180 160 B Exploration Test Pit Designation —4 TP -1 During Exploration � --> 1 Geologic Contact —3 ? (apptcodmate) B' Gravel Alleyway Topsoil & Fill — — 7 TP-5 with trace sand Northeast — 220 — 200 Existing Rockery Stiff to very stiff silt TP-4 Concrete — Walkway rrrr irrrr lrrrr lrrrr �rrrr lrrrr Jrr lr lrr tr �rirrlirit�rrrilirri�rrttlrrri� 20 40 60 60 100 120 Distance (feet) 140 Reference: Cross Section is based on a topographic site plan dated June 1, 2005, titled 'Hirai Site Plan; prepared by Medina Consulting Engineers, Inc. — 180 — 160 NOTES: 1) Stratigraphic conditions are interpolated between the explorations. Actual conditions may vary. 2) Elevations are approximate. NGA NraYCS.Qaig T to C kr 0 a = nA 2 ko 0, a • 0 O O 7. • V 9 °: n a I " z i.� o tri o e z • 0 ▪ r• a R O (! Z PI n � • gi Ay w Q ✓ Z a n • a r 1 0 3 e z 0 1 8 to r Southwesst� 220— 200 160 Groundwater Level —9 Dude; Exploration Geologic Contact --j ? (approximate) Exploration Test Pit Design - aeon _--9 TP -1 Gravel Alleyway R Fill TP-3 —?— — Stiff to very stiff sift with trace sand Distance (feet) Existing Rockery Concrete Walkway 1 1 11 1 1 , PIIIPI l I j „ 111111111111111111111411111111111111111111 0 20 40 60 80 100 120 — 200 Northeast 220 — 180 — 160 NOTES: 1) Stratigraphic conditions are interpolated between the explorations. Actual conditions may vary. 2) Elevations are approximate. Reference: Cross Section Is based on a topographic site plan dated June 1, 2005, titled "Hirai Site Plan prepared by Medina Consulting Engines, Inc. NGATha11tip2Ouflg00 walk:$its UNIFIED SOIL CLASSIFICATION SYSTEM MAJOR DIVISIONS GROUP SYMBOL GROUP NAME COARSE - GRAINED SOILS - MORE THAN 50 % RETAINED ON NO. 200 SIEVE • GRAVEL MORE THAN 50 % OF COARSE FRACTION RETAINED ON NO. 4 SIEVE CLEAN GRAVEL GW WELL - GRADED, FINE TO COARSE GRAVEL GP POORLY - GRADED GRAVEL GRAVEL WITH FINES GM SILTY GRAVEL GC CLAYEY GRAVEL SAND MORE THAN 50 % OF COARSE FRACTION PASSES NO. 4 SIEVE CLEAN SAND SW WELL-GRADED SAND, FINE TO COARSE SAND SP POORLY GRADED SAND SAND WITH FINES SM SILTY SAND SC CLAYEY SAND FINE - GRAINED SOILS MORE THAN 50 % PASSES NO. 200 SIEVE SILT AND CLAY LIQUID LIMIT LESS THAN 50 % INORGANIC ML SILT CL CLAY ORGANIC OL ORGANIC SILT, ORGANIC CLAY SILT AND CLAY LIQUID LIMIT 50 % OR MORE INORGANIC MH SILT OF HIGH PLASTICITY, ELASTIC SILT CH CLAY OF HIGH PLASTICITY, FLAT CLAY ORGANIC OH ORGANIC CLAY, ORGANIC SILT HIGHLY ORGANIC SOILS PT PEAT NOTES: 1) Fleld classification Is based on visual SOIL MOISTURE MODIFIERS: examination of soil In general accordance with ASTM D 2488-93. Dry - Absence of moisture, dusty, dry to the touch 2) Soil classification using laboratory tests Is based on ASTM D 2488 -93. Moist - Damp, but no visible water. 3) Descriptions of soli density or Wet - Visible free water or saturated, consistency are based on usually soil is obtained from Interpretation of blowcount data, below water table visual appearance of soils, and/or test data. Zg Project Number 733906 Hirai Short Plat Soli Classification Chart _ %. NE LSON GEOTECHNICAL N� - Gq�1. ASSOCIATES, Inc. GEC/TECHNICAL ENGINEERS & GEOLOGISTS ^ a . ;� ,,,� 1 y , ��.�.. , l ate Revision t K 0 J 1 q • V Figure 6 IItaMHW /In441ilp �xb,p.uYNm�_ DEPTH(FEET) TEST PIT ONE TEST PIT THREE TEST PIT FOUR 0.0 - 1.3 1.3 - 2.0 TEST PIT FIVE 0.0 -1.0 1.0 - 5.5 ACO:CAM LOG OF EXPLORATION USC SOIL DESCRIPTION 0.0- 2.0 ML DARK BROWN SILT WITH TRACE FINE SAND, DARK ORGANICS, BRICK, AND TIMBER (VERY SOFT, MOIST) Mk) 2.0 -8.0 ML BROWN-GRAY, IRON -OXIDE STAINED, SILT WITH TRACE FINE SAND (STIFF, MOIST) 8.0 -10.0 ML BLUE -GRAY SILT WITH TRACE FINE SAND (VERY STIFF, MOIST) SAMPLES WERE COLLECTED AT 1.8, 3.0, AND 9.0 FEET GROUNDWATER SEEPAGE WAS NOT ENCOUNTERED MODERATE TEST PIT CAVING WAS ENCOUNTERED BETWEEN 0.0 AND 2.0 FEET TEST PIT WAS COMPLETED AT 10.0 FEET ON 3/15/06 TEST PIT TWO 0.0 -1.3 DARK BROWN TO BLACK SILT WITH TRACE FINE SAND AND ROOTS (TOPSOIL) 1.3 -7.0 ML BROWN -GRAY, IRON -OXIDE STAINED, SILT WITH TRACE FINE SAND (STIFF, MOIST) 7.0 -8.5 ML BLUE -GRAY SILT WITH TRACE FINE SAND (VERY STIFF, MOIST) SAMPLES WERE COLLECTED AT 0.8, 2.5, AND 8.0 FEET GROUNDWATER SEEPAGE WAS NOT ENCOUNTERED MODERATE TEST PIT CAVING WAS ENCOUNTERED BETWEEN 0.0 AND 1.3 FEET TEST PIT WAS COMPLETED AT 8.5 FEET ON 3/15/06 0.0 -32 ML DARK BROWN SILT WITH TRACE FINE SAND, ROOTS, BRICK, AND CONCRETE (VERY SOFT, MOIST TO WET) (F111) 3.2 - 10.5 ML BROWN -GRAY, IRON -OXIDE STAINED, SILT WITH TRACE FINE SAND (STIFF, MOIST) 10.5 -11.0 ML BLUE -GRAY SILT WITH TRACE FINE SAND (VERY STIFF, MOIST) SAMPLES WERE COLLECTED AT 3.0, 4.0, AND 10.8 FEET GROUNDWATER SEEPAGE WAS NOT ENCOUNTERED MODERATE TEST PIT CAVING WAS ENCOUNTERED BETWEEN 0.0 AND 3.2 FEET TEST PIT WAS COMPLETED AT 11.0 FEET ON 3/15/06 DARK BROWN TO BLACK SILT WITH TRACE FINE SAND AND ROOTS (TOPSOIL) ML BROWN -GRAY SILT WITH TRACE FINE SAND (STIFF, MOIST) SAMPLES WERE NOT COLLECTED GROUNDWATER SEEPAGE WAS NOT ENCOUNTERED TEST PIT CAVING WAS NOT ENCOUNTERED TEST PIT WAS COMPLETED AT 2.0 FEET ON 3/15/06 ML DARK BROWN SILT WITH TRACE FINE SAND, TOPSOIL, AND GARBAGE (VERY SOFT, MOIST TO WET) (FILL? ML BROWN -GRAY, IRON -OXIDE STAINED, SILT WITH TRACE FINE SAND (STIFF, MOIST) SAMPLE WAS COLLECTED AT 5.0 FEET GROUNDWATER SEEPAGE WAS NOT ENCOUNTERED MODERATE TEST PIT CAVING WAS ENCOUNTERED BETWEEN 0.0 AND 1.0 FEET TEST PIT WAS COMPLETED AT 5.5 FEET ON 3/15/08 NELSON GEOTECHNICAL ASSOCIATES, INC. FILE NO 733808 FIGURE 7 TEST NT SIX - 0.0 -1.5 ML DARK BROWN SILT WITH TRACE FINE SAND, BRICKS, AND GARBAGE (VERY SOFT, MOIST) (RLL) 1.5 -4.5 ML BROWN -GRAY SILT WITH TRACE FINE SAND (STIFF, MOIST) - TEST PIT SEVEN 0.0 - 2.8 TEST PIT EIGHT 0.0 - 2.0 DARK BROWN TO BLACK SILT WITH TRACE FINE SAND AND ROOTS (TOPSOIL) 2.0 -2.4 ML BROWN -GRAY SILT WITH TRACE FINE SAND (STIFF, MOIST) SAMPLES WERE NOT COLLECTED GROUNDWATER SEEPAGE WAS NOT ENCOUNTERED TEST PIT CAVING WAS NOT ENCOUNTERED TEST PIT WAS COMPLETED AT 2.4 FEET ON 3/15/00 DEPTH (FEET) 2.8 - 5.2 ML BROWN -GRAY SILT WITH TRACE FINE TO MEDIUM SAND AND FINE GRAVEL (STIFF, MOIST) ACO:CAM LOG OF EXPLORATION USC SOIL DESCRIPTION SAMPLES WERE NOT COLLECTED GROUNDWATER SEEPAGE WAS NOT ENCOUNTERED HEAVY TEST PIT CAVING WAS ENCOUNTERED BETWEEN 0.0 AND 1.5 FEET TEST PIT WAS COMPLETED AT 4.5 FEET ON 3/15/00 ML BROWN -GRAY, IRON -OXIDE STAINED, SILT WITH TRACE FINE SAND AND ROOTS (VERY SOFT, MOIST) (BUJ SAMPLES WERE COLLECTED AT 1.5 AND 4.5 FEET GROUNDWATER SEEPAGE WAS NOT ENCOUNTERED MODERATE TEST PIT CAVING WAS ENCOUNTERED BETWEEN 0.0 AND 2.8 FEET TEST PIT WAS COMPLETED AT 5.2 FEET ON 3/15/08 NELSON GEOTECHNICAL ASSOCIATES, INC. FILE NO 733008 FIGURE 8 I I 1 1 1 1 1 1 I1 10 c 1 A 100 90 60 1- 70 m t0 z 60 LL 1- w 40 U1 W 30 a 20 10 0 1000 11 11 1 I it! Y1111i1211111■111 II- IIahhIatIII 111111 111111•111 11a11m1u1•1111 11111111111111101111 111111111111111111111 12111111111111112 11111111111111121111111 1111111111111111111 11111112111111112111 111111111111111111 11a111111u1 •1111 M•isi•1111 11.ilwi•l.1111 NRllSilPUII TEN1111 1 1111 011 Alm 100 U.S. STANDARD SIEVE SIZE sue s�' bg eo 4 eP 4 as 4 ' 4 • 10 1.0 GRAIN SIZE IN MILLIMETERS 0.1 0.01 0.001 COBBLES GRAVEL SAND COARSE ( FINE !COARSE' MEDIUM ( FINE SILT OR CLAY U.S.C. SYMBOL •ML EXPLORATION NUMBER TP -1 SAMPLE DEPTH 9.0 feet SOIL DESCRIPTION Gray silt with trace fine sand SOIL DISTRIBUTION Gravel = 0% Sand = 3% SNUClay = 97% Ix ra cworan g � I irar ca. AS uolsIney _I10 saOQ/C 1 NUM 'ON ea., MMI Y11a RM AM OMWaM ":.mac oC aow �'wn +iui 010/007010 9 •1111NION3 9V 1NN071O11e1 'ONI 'S31YI3O88y 1YOINHOS1030 NOSI � V tJ N 3pj \� slsAleuy analg leld Jous I�w 0" aJn61U 906EEL JagwnN Pajad • r N N 1 0 co. C in P m of x� 8 T _ z m 2 T 2 m N tr- PERCENT FINER BY WEIGHT 0 0 8 8 O 8 8 O 8 `S • 1 U1 t II i I i ±± —+ • — --- y o g J J O 0 0 O 8 I Section 7 OTHER PERMITS Technical InlnnaBOn Repoli (T11;905-251-2008 IMAM Consulting E glneess. N[. IMEDINA PiojecfsWinal SPIEnpineaing Other Permits: The project owners will obtain for a Right -Of -Way Use permit from the City of Tukwila to install drainage improvements in Pacific Highway (99), and will obtain the proper permits from King County Water District No. 49 and Valvue Sewer District for the installation of the proposed water and sanitary systems. The owners will also obtain a Clearing Grading Permit from the City of Tukwila to clear and grade the sites, and for an individual Building Permits to construct proposed homes. Technical InMxmetion Report (TIR) 05-251 -2008 o0o MIAMI Canwevg Engh¢ess. Inc IMEDINA ProjectsWirei SPIEnginee,ing L FILE COPY Perry. ?t No. c . , rr.i mis51on$. Lateral Load. AnalAis for Design Unlimited Plan 12941VA/1)D/2 Western Washington Default Per 2003 IBC uringQlat v 4.0 Seismic Design Category Site Class SDs R Exposure Wind Speed Snow Load D D 0.865 6.5 (OSB) `B, 85 mph (3 sec) 25 psf May 9, 2005 CODE COMPLIANCE Aboonyro AU0 15 2006 Of BUILDING D IV SI IEk IRES 03- 16 -0 This lateral has been personally reviewed by me and it is in full compliance with the 2003 International Building Code. CITVO TTIJKKWIIA JUN 12 2006 PERMITCENTER PO(o-22k 1 4 A Walls Holddowns Struts 1 4 Story : 2 20 • • • • • • • • 1 1 1 40.0 11 1 3 05 -09 -2005 1294RDB2 C 7/16" Wood Structural Panel w/ 1Od Box ECr III Species ]_ C Simpson Strong -Tie Holdown] [ Cr III Species I Simpson Cnnctr ] x- Exceeds maximum table value 2 4 A Walls Holddowns Struts 1 4 Story 2 20.0 3 40.0 05 -09 -2005 129411DB2 C 7/16" Wood Structural Panel w/ 1Od Box EGr III Species ]_ C Simpson Strong -Tie Holdown] C Gr III Species [ Simpson Cnnctr ] Exceeds maximum table value Designs Unlimited Time : 03:06:05 Date : 05 -10 -2005 ==me==s==a== SUMMARY OF SHEAR WALL AND HOLDDOWN SELECTIONS Walls Parallel to X axis Story Line Wall SW LtHD RtHD 2 A 1 1 2 A 2 1 2 A 3 1 2 A 4 1 2 B 1 1 2 C 1 1 1 1 2 C 2 1 1 1 * Exceeds table capacity - None required 1 A 1 1 1 1 1 A 2 1 - - 1 A 3 1 - 3. 1 B 1 2 1 C 2 1 - WOODCAD QLAT (Pro V4.0) File: 1294RDB2 Page: 1 SW selection based on file: W7HF10BW.TBL HD selection based on file: HCWA.TBL OCWA.TBL Designs Unlimited Time : 03:06:05 Date : 05 -10 -2005 ======================== ta= a====== = = ==a = = = == = = == == ==a == = == = = = == == = SUMMARY OF SHEAR WALL AND HOLDDOWN SELECTIONS Walls Parallel to Y axis Story Line Wall SW LtHD RtHD 2 1 1 1 2 2 2 1 2 3 1 1 2 3 2 1 1 1 1 1 1 2 1 3 1 3 1 1 * Exceeds table capacity - None required WOODCAD QLAT (Pro V4.0) File: 1294RDB2 Page: 1 SW selection based on file: W7HF10BW.TBL HD selection based on file: HCWA.TBL OCWA.TBL — L o11cOL na111 ocneuuLc [ 7/16" Wood Structural . - -- - 0.71- 111 .7rc Panel w/ 10d Box] , Shear Wall Edge Anchor Bottom Rim /Blk to Allow SW Sheathing Nailing Bolts Plate Top plate Shear Notes # [Thick (side)] (in oc) (in oc) (in oc) (in oc) (K1 7/16" OSB(1) 10d @ 6 5/8" @ 48 16d @ 5 A35 @24 w /12 -8d 0. to N M rn VD W VD r♦ r! . I 1 I ra r4 r4 r4rl 7/16" OSB(1) 10d @ 4 5/8" @ 32 16d @ 3 A35@16 w /12 -8d 0. 7/16" OSB(1) l0d @ 3 5/8" @ 12 16d @ 2 A35 @12 w /12 -8d 0. W 7/16" OSB(1) 10d @ 2 5/8" @ 8 16d @ 2 A350 9 w /12 -8d 0. 7/16" OSB(2) 10d @ 4 5/8" @ 24 2 -16d @ 3 2- A35 @15 w12 -8d 0.70 7/16" OSB(2) 10d @ 3 5/8" @ 18 2 -16d @ 2 2- A35 @12 w12 -8d 0.90 7/16" OSB(2) 10d @ 2 5/8" @ 12 2 -16d @ 2 2 -A35@ 9 w12 -8d 1.20 [ Shear Wall Notes ] GENERAL NOTES (apply to all shear walls) a) For Rated Sheathing panels, space nails @ 12 in (305 mm) oc along intermediate framing members. b) Block all panel edges with minimum 2x (51mm) blocking c) Apply nailing to all studs, top and bottom plates and blocking. d) Framing to be a maximum of 24 in (610mm) oc. e) Fasteners shall be driven flush with surface of sheathing. f) Provide solid blocking under the shear walls at the diaphragms to accommodate the bottom plate attachment. g) Offset panel joints on each side of wall minimum one stud bay. SPECIAL NOTES FOR SHEAR WALLS (apply to walls specifically noted) 1) APA Rated Sheathing EXP1 /EXP2 /EXT or C- C /C- D /Struct II Plywood. 2) Provide 3x's (76mm) at adjoining panel edges w /nails staggered. 3) Provide minimum 3x (76mm) blocking or joists beneath bottom plate with bottom plate nails staggered. 4) Walls >0.35 klf use a minimum of a 3x sill. For walls between 0.35 and 0.60 anchor bolt spacing has been decreased by 1/2 (use 2x). 5) Framing to be a maximum of 16 in (610 mm) o.c. for shear walls 1 and 2. 6) Provide nailing at intermediate supports the same as edge nailing in shear walls that use GWB (shear walls 1 and 2). 7) For shear walls 2, 7, 8, and 9, panel joints shall be offset to fall on different framing members or framing shall be 3" nominal or thicker, and nails on each side shall be staggered. = L nuluvwll Dulle(luse ( Simpson Strong [ Simpson 2004 J l l.L -Tie Holdown] Catalog ] 111 zpeCle9 1— Foundation Level HD Type Stud Fastner Anchor Cap Detail # ' Type to Stud Bolt Kips Number STHDB X X X X X X X X N N N N N TN d' di LO N N N N N (24) 16d - -- 2.37 STHD1 (28) 16d - -- 2.99 STHD14 (38) 16d - -- 4.43 PHD6 (18)SDS3 7/8 "0 5.86 Lrl PHDS (24)SDS3 7/8 "0 6.73 HDQ8 (20)SDS3 7/8 "0 8.33 HD10A (4)7/8 "t 7/8 "0 9.54 HD14A (4) 1" 0 1" 0 11.08 HD15 (5) 1" 0 1 -1/4 "0 15.30 = nosuowi1 .�. t.:ileuule 1 [ Simpson Strong -Tie [ Simpson 2003 Catalog l 1/411 Holdown ] ] 111 A (Jet -lcb 1 Other Levels Type Stud Fastener Tie Cap Detail Type to Stud Rod Kips Number CS18(36 ") N N N N N N OIL) W W W N N N N • X X X X X X X X X (18)10d - -- 1.27 (2)CS20(36 ") (18) 8d ea - -- 2.01 (2)CS18(36 ") (18)10d ea - -- 2.54 (2)CS16(48 ") (28) 8d ea - -- 3.30 MST72 (56)16d ea - -- 5.80 2)MST48 (42)16d ea - -- 7.63 2)MST60 (46)16d ea - -- 8.92 2)MST72 (56)16d ea - -- 11.60 HD15 (5) 1 "t 5/4 15.30 • [ Holddown Notes ] GENERAL NOTES a) Minimum concrete compresive strength to be 2.5 ksi (17.2 MPa). b) Refer to manufacturers' catalogs for minimum distance to foundation corner. c) Refer to manufacturers' catalogs for minimum backing member size. d) Refer to manufacturers' catalogs for anchor bolt embedment depth. e) Posts at holddewn: 2x & 4x (38mm x and 89mm x) - -- #2 or better 5:k ( 140mm x ) - -- #1 or better f) The anchor type holddowns at other levels shall have a pair, one above and one below, tied by a threaded rod. g) Use STHDBRJ for STHDS, STHD1ORJ for STHD10, and STHDI4RJ for STHD14 where rim joists are installed. The stud f astener ` -or STHD's shall oe 16d sinkers. Minimum stem wall to be G" wide for - -story buil dings, 3" wide for buildings haying _ or more stories — I uiay SLLUI. [ Simpson Cnnctr [ Simpson 1996 oeheaule 1 (Gr. 1 Catalog s /i. aNcL:ic1 — DS Conn Drag Fastner Thru Ca e # Type Strut to Cnnctr Rod Ki D. 24 " -CS16 DBL TOP PL (22) -l0d -- 1. r- 4HrI.-1 HNNNN (2)24 " -CS16 DBL TOP PL (22) -l0d ea -- 3. (3)24 " -CS16 4x 6 (22) -10d ea -- 4. 155 "- CMST14 4x 6 (88) -10d -- 6. 202 "- CMST12 4x 6 (118) -10d -- 9. (2) -HD14A 4x 6 ea (4)- 1" 0 1" 0' 11.08 (2) -HD15 6x10 ea (5)- 1" 0 1 -1/4 "0 15.30 (4) -HD10A 6x10 ea (4) -7/8 "0 7/8 "0 19.80 (4) -HD15 6x10 ea (5)- 1" ¢ 1 -1/4 "0 30.61 ( Drag Strut Notes ] GENERAL NOTES (apply to all drag struts) a) Each listed drag strut is the minimum size for the design drag force and may be replaced by members with larger cross sections. b) Double top plates to be graded Standard or better (Ft critical). c) 4x and 6x members to be graded No.2 or better (Ft critical). SPECIAL NOTES FOR DRAG STRUTS (where specifically noted) 1) The length of the metal strap is the total nailing length, one half applies within shear wall, the other half beyond shear wall on the drag strut. The number of nails to metal strap connector is the total number of nails required, one half applies within shear wall, the other half beyond shear wall on the drag strut. 2) The anchor tie shall have a pair, one applies within shear wall, the other beyond shear wall on the drag strut. Designs Unlimited Time : 03:06:06 Date : 05 -10 -2005 ==A=== r= = _ __ _ ____ z Ht (ft) 8.0 - 9.0 - SUMMARY SHEET SEISMIC DATA: Manual = = = EPVRA = 0.33 EPA = 0.33 SHEG = I Seis Perf Cat = Soil Profile = S4 Period = 0.17 Snow Factor = 0.25 R Y -Axis = 4.5 BSF Y -Axis = 0.095 R X -Axis = 4.5 BSF X -Axis = 0.095 WIND DATA: Manual Wind Exposure = B Wind Speed = 85 Structure = Encl /Unencl Imp Factor = 1.00 Story 2 Story 1 WOODCAD QLAT (Pro V4.0) File: 1294RDB2 Page: 1 of 5 Load Summary II to Y (1 to X Level (K) DL Seis Wind DL Seis Wind 2 - 31.5 3.7 3.6 33.1 4.1 6.4 1 - 20.4 1.3 3.2 30.1 2.0 3.7 Base Total 4.9 6.8 6.0 10.1 Designs Unlimited Time : 03:06:06 Date : 05 -10 -2005 INPUT DATA - Walls WOODCAD QLAT (Pro V4.0) File: 1294RDB2 Page: 2 of 5 Calc Plot Wall Length Wall Lt Trib Rt Dis Dis Dis Ht Shear Holddown DL Span Width Span (ft) (ft) (ft) (ft) (ft) (ft) (Ksf) (ft) (ft) (ft) WALLS Parallel to Y -Axis X X Y Story 2 Line 1 Wall 1 0.0 0.0 20.0 8.0 23.0 23.0 0.015 0.0 20.0 0.0 Line 2 Wall 2 20.0 20.0 26.5 8.0 16.5 16.5 0.015 0.0 1.0 0.0 Line 3 Wall 1 40.0 40.0 0.0 8.0 27.5 27.5 0.015 0.0 20.0 5.0 Wall 2 40.0 40.0 32.5 8.0 13.5 13.5 0.015 5.0 20.0 0.0 Story 1 Line 1 Wall 1 0.0 0.0 3.0 8.0 20.0 20.0 0.015 0.0 1.0 0.0 Line 2 Wall 1 20.0 25.0 38.0 8.0 8.0 8.0 0.150 0.0 1.0 0.0 Line 3 Wall 1 40.0 40.0 3.0 8.0 43.0 43.0 0.015 0.0 1.0 0.0 WALLS Parallel to X -Axis Y Y X Story 2 Line A Wall 1 0.0 3.0 8.0 8.0 4.5 4.5 0.015 0.0 1.0 8.0 Wall 2 0.0 3.0 20.5 8.0 4.5 4.5 0.015 8.0 1.0 0.0 Wall 3 0.0 0.0 25.0 8.0 4.5 4.5 0.015 0.0 1.0 6.0 Wall 4 0.0 0.0 35.5 8.0 4.5 4.5 0.015 6.0 1.0 0.0 Line B Wall 1 23.0 23.0 0.0 8.0 20.0 20.0 0.015 0.0 1.0 0.0 Line C Wall 1 46.0 46.0 25.0 8.0 5.0 5.0 0.015 0.0 1.0 5.0 Wall 2 46.0 46.0 35.0 8.0 5.0 5.0 0.015 5.0 1.0 0.0 Story 1 Line A Wall 1 0.0 3.0 8.0 8.0 4.5 4.5 0.015 0.0 8.0 6.0 Wall 2 0.0 3.0 18.5 8.0 11.0 11.0 0.015 6.0 8.0 6.0 Wall 3 0.0 3.0 35.5 8.0 4.5 4.5 0.015 6.0 8.0 0.0 Line B Wall 1 23.0 23.0 0.0 8.0 20.0 20.0 0.150 0.0 1.0 0.0 Line C Wall 2 46.0 46.0 25.0 8.0 15.0 15.0 0.150 0.0 3.0 0.0 Designs Unlimited Time : 03:06:06 Date : 05 -10 -2005 _■_____ _____■ =____ === = = =___ ___ INPUT DATA - Diaphragms WOODCAD QLAT (Pro V4.0) File: 1294RDB2 Page: 3 of 5 Build Dead Part Live Start Cant Ext Roof Slope Dimen Load Load Load Dia Dia Wall Front Back (ft) (Ksf) (Rsf) (Ksf) (ft) (Ksf) ems =__________________ = =e = === = ____ _ = = LINES Parallel to Y -Axis Roof Level Lines 1 2 43.0 0.015 0.000 0.000 3.0 0.015 3.2 3.2 Lines 2 3 46.0 0.015 0.000 0.000 0.0 0.015 4 4 Level 1 Lines 1 2 20.0 0.010 0.000 0.000 3.0 N 0.015 3.5 3.5 Lines 2 3 43.0 0.010 0.000 0.000 3.0 N 0.015 0 0 LINES Parallel to X -Axis Roof Level Lines A B 40.0 0.015 0.000 0.000 0.0 0.015 4 4 Lines B C 40.0 0.015 0.000 0.000 0.0 0.015 3.54 3.5 Level 1 Lines A B 40.0 0.010 0.000 0.000 0.0 0.015 0 0 Lines B C 40.0 0.010 0.000 0.000 0.0 0.015 Designs Unlimited Time : 03:06:06 Date : 05 -10 -2005 ==.=====_ ______________________ = == = == === = = _ _ OUTPUT DATA - Shear Walls and Holddown Forces story 2 Ln 1 0.9 Wall 1 Ln 2 1.8 Wall 2 Ln 3 0.9 Wall 1 Wall 2 Story 1 Ln 1 1.1 Wall 1 Ln 2 2.5 Wall 1 Ln 3 1.4 Wall 1 WOODCAD QLAT (Pro V4.0) File: 1294RDB2 Page: 4 of 5 Line Shear Wall Shear H Drag Force Holddowns Seis Wind Seis Wind - -- Lt Rt Left Rght (K) (K) (kif) (klf) W (K) (K) (K) (K) WALLS Parallel to Y -Axis 0.9 1.8 0.9 1.7 3.4 1.7 WALLS Parallel to X -Axis Story 2 Ln A 1.0 1..6 Wall 1 Wall 2 Wall 3 Wall 4 Ln B 2.0 3.2 Wall 1 Ln C 1.0 1.6 Wall 1 Wall 2 Story 1 Ln A 1.5 2.5 Wall 1 Wall 2 Wall 3 Ln B 3.0 5.1 Wall 1 Ln C 1.5 2.5 Wall 2 0.039 0.039 0.3 0.4 0.0 0.111 0.109 0.5 1.0 0.0 0.023 0.022 0.3 0.0 0.0 0.023 0.022 0.6 0.0 0.0 0.055 0.085 0.4 0.0 0.0 0.308 0.425 1.0 1.5 0.0 0.032 0.040 0.2 0.0 0.0 0.056 0.056 0.056 0.056 == == = = 0.089 0.089 0.089 0.089 0.101 0.161 1.8 1.8 1.8 1.8 0.3 0.4 0.2 0.2 0.4 0.0 0.0 0.2 0.0 0.0 1.6 0.101 0.161 1.6 1.0 0.4 1.0 1.0 0.101 0.161 1.6 0.6 0.0 1.0 1.0 0.075 0.126 1.8 0.0 0.0 1.2 1.0 0.075 0.126 0.7 0.2 0.0 0.075 0.126 1.8 0.0 0.0 0.7 0.150 0.253 0.4 0.0 0.9 0.100 0.169 0.5 0.6 0.0 S- Support required beneath holddown M- Manaul input of holddown Designs Unlimited Time : 03:06:06 Date : 05 -10 -2005 WOODCAD QLAT (Pro V4.0) File: 1294RDB2 Page: 5 of 5 = a;========== s=====_ _________________________ = = = = =s =________________ OUTPUT DATA - Diaphragms and Chord Forces H Dia Load Seismic Shear Wind Shear Chord Force - -- Seismic Wind Left Right Left Right Max at W (Kips) (Kips) (Klf) (Kif) (K1f) (Kif) (Kip).xxL _________= a =___________ _ = = =s= LINES Parallel to Y -Axis Roof Level Lines 1 2 0.5 1.78 1.80 0.02 -0.02 0.02 -0.02 0.1 .50 Lines 2 3 0.4 1.89 1.80 0.02 -0.02 0.02 -0.02 0.1 .50 Level 1 Lines 1 2 1.0 0.41 1.60 0.01 -0.01 0.04 -0.04 0.2 .50 Lines 2 3 0.5 0.85 1.60 0.01 -0.01 0.02 -0.02 0.1 .50 LINES Parallel to X -Axis Roof Level Lines A B 0.6 2.03 3.22 0.03 -0.03 0.04 -0.04 0.2 .50 Lines B C 0.6 2.03 3.22 0.03 -0.03 0.04 -0.04 0.2 .50 Level 1 Lines A B 0.6 0.98 1.84 0.01 -0.01 0.02 -0.02 0.1 .50 Lines B C 0.6 0.98 1.84 0.01 -0.01 0.02 -0.02 0.1 .50 Designs Unlimited Time : 03:06:07 Date : 05 -10 -2005 ___»___ _______________________________ * * * * * * * * ** WALLS Parallel to Y -Axis Story 2 Line 1 Wall Force: OTM Uniform DL: Header DL : MaX Down . Res Moment: Holddown . Story 2 Line 2 Wall Force: OTM Uniform DL: Header DL : Max Down . Res Moment: Holddown . Story 2 Line 3 Wall Force: OTM Uniform DL: Header DL : Max Down . Res Moment: Holddown . Story 2 Line 3 Wall Force: OTM Uniform DL: Header DL : Max Down . Res Moment: Holddown . Story 1 Line 1 Wall Force: OTM Uniform DL: Header DL : Max Down . Res Moment: Holddown . Wall 1 Height Seismic 0.892 8.182 0.300 LT 0.000 RT LT -0.356 RT LT 94.426 RT LT -3.750 RT Wall 2 Height Seismic 1.836 15.439 0.015 LT 0.000 RT LT -0.936 RT LT 15.620 RT LT -0.011 RT Wall 1 Height Seismic 0.633 6.320 0.300 LT 0.000 RT LT -0.230 RT LT 134.991 RT LT -4.679 RT Wall 2 Height Seismic 0.311 3.103 0.300 LT 0.750 RT LT -0.980 RT LT 41.138 RT LT -2.817 RT Wall 1 Height Seismic 1.098 9.699 0.010 LT 0.000 RT LT -0.485 RT LT 22.100 RT LT -0.620 RT Detailed Calculations WOODCAD QLAT (Pro V4.0) File: 1294RDB2 Page: 1 === === = = =___ __ = = = = = =__ * * * * * * * * ** 8.0 SW Len 23.0 HD Len 23.0 Wt 0.015 Wind 0.900 7.200 0.140 0.000 LT 0.000 RT 0.000 -0.356 LT -0.313 RT -0.313 94.426 LT 46.076 RT 46.076 -3.750 LT -1.690 RT -1,690 8.0 SW Len 16.5 HD Len 16.5 Wt 0.015 Wind 1.800 14.400 0.007 0.000 LT 0.000 RT 0.000 -0.936 LT -0.873 RT -0.873 15.620 LT 11.583 RT 11.583 - 0.011 LT 0.171 RT 0.171 8.0 SW Len 27.5 HD Len 27.5 Wt 0.015 Wind 0.604 4.829 0.140 0.750 LT 0.000 RT 0.350 -0.980 LT -0.176 RT -0.526 152.522 LT 65.869 RT 72.318 -5.316 LT -2.220 RT -2.454 8.0 SW Len 13.5 HD Len 13.5 Wt 0.015 Wind 0.296 2.371 0.140 0.000 LT 0.350 RT 0.000 -0.230 LT -0.526 RT -0.176 32.532 LT 19.040 RT 15.874 -2.180 LT -1.235 RT -1.000 8.0 SW Len 20.0 HD Len 20.0 Wt 0.015 Wind 1.700 13.600 0.010 0.000 LT 0.000 RT 0.000 - 0.485 LT -0.680 RT -0.680 22.100 LT 17.420 RT 17.420 - 0.620 LT -0.191 RT -0.191 Designs Unlimited Time : 03:06 :07 Date : 05 -10 -2005 Story 1 Line 2 Wall Force: OTM Uniform DL: Header DL : Max Down . Res Moment: Holddown . Story 1 Line 3 Wall Force: OTM Uniform DL: Header DL : Max Down . Res Moment: Holddown . WALLS Parallel to Y -Axis Wall 1 Height Seismic 2.465 23.370 0.010 LT 0.000 RT LT -2.921 RT LT 32.912 RT LT -1.193 RT Wall 1 Height Seismic 1.367 12.895 0.010 LT 0.000 RT 0.000 LT -0.300 RT -0.300 LT 102.157 RT 102.157 LT -2.076 RT -2.076 WOODCAD QLAT (Pro V4.0) File: 1294RDB2 Page: 2 __ 8.0 SW Len 8.0 HD Len 8.0 Wt 0.150 Wind 3.400 27.200 0.010 0.000 LT 0.000 RT 0.000 -2.921 LT -3.400 RT -3.400 32.912 LT 25.942 RT 25.942 -1.193 LT 0.157 RT 0.157 8.0 SW Len 43.0 HD Len 43.0 Wt 0.015 Wind 1.700 13.600 0.010 LT 0.000 RT 0.000 LT -0.316 RT -0.316 LT 80.524 RT 80.524 LT -1.556 RT -1.556 Designs Unlimited Time : 03:06:07 Date : 05 -10 -2005 = =a= = == == a === ==== = =a = == s=====eam = =a = == == WALLS Parallel to X -Axis Story 2 Line A Wall Force: OTM Uniform DL: Header DL : MaX Down . Res Moment: Holddown . Story 2 Line A Wall Force: OTM Uniform DL: Header DL : Max Down . Res Moment: Holddown . Story 2 Line A Wall Force: OTM Uniform DL: Header DL : Max Down Res Moment: Holddown . Story 2 Line A Wall Force: OTM Uniform DL: Header DL : Max Down . Res Moment: Holddown . Wall 1 Height 8.0 SW Len Seismic 0.253 2.233 0.015 LT 0.000 RT 0.060 LT -0.496 RT -0.556 LT 1.162 RT 1.391 LT 0.238 RT 0.187 Wall 2 Height 8.0 SW Len Seismic 0.253 2.233 0.015 LT 0.060 RT 0.000 LT -0.556 RT -0.496 LT 1.391 RT 1.162 LT 0.187 RT 0.238 Wall 3 Height 8.0 SW Len Seismic 0.253 2.233 0.015 LT 0.000 RT 0.045 LT -0.496 RT -0.541 LT 1.162 RT 1.334 LT 0.238 RT 0.200 Wall 4 Height 8.0 SW Len Seismic 0.253 2.233 0.015 LT 0.045 RT 0.000 LT -0.541 RT -0.496 LT 1.334 RT 1.162 LT 0.200 RT 0.238 Story 2 Line B Wall 1 Height 8.0 SW Len 20. Seismic Wall Force: 2.028 OTM 17.134 Uniform DL: 0.015 Header DL : LT 0.000 RT 0.000 Max Down LT -0.857 RT -0.857 Res Moment: LT 22.950 RT 22.950 Holddown LT -0.291 RT -0.291 WOODCAD QLAT (Pro V4.0) File: 1294RDB2 Page: 3 4.5 HD Len 4.5 Wt 0.015 Wind 0.402 3.220 0.007 LT 0.000 RT 0.028 LT -0.716 RT -0.744 LT 0.862 RT 0.946 LT 0.524 RT D.5O5 4.5 HD Len 4.5 Wt 0.015 Wind 0.402 3.220 0.007 LT 0.028 RT 0.000 LT -0.744 RT -0.716 LT 0.946 RT 0.862 LT 0.505 RT 0.524 4.5 HD Len 4.5 Wt 0.015 Wind 0.402 3.220 0.007 LT 0.000 RT 0.021 LT -0.716 RT -0.737 LT 0.862 RT 0.925 LT 0.524 RT 0.510 4.5 HD Len 4.5 Wt 0.015 Wind 0.402 3.220 0.007 LT 0.021 RT 0.000 LT -0.737 RT -0.716 LT 0.925 RT 0.862 LT 0.510 RT 0.524 0 HD Len 20.0 Wt 0.015 Wind 3.220 25.760 0.007 LT 0.000 RT 0.000 LT -1.288 RT -1.288 LT 17.018 RT 17.018 LT 0.437 RT 0.437 Designs Unlimited Time : 03:06:07 Date : 05 -10 -2005 ___¢______ _____________ =_______________ __ ______ = - == WALLS Parallel to X -Axis Story 2 Line C Wall Force: OTM Uniform DL: Header DL : Max Down . Res Moment: Holddown Story 2 Line C Wall Force: OTM Uniform DL: Header DL : Max Down . Res Moment: Holddown . Story 1 Line A Wall Force: OTM Uniform DL: Header DL : Max Down . Res Moment: Holddown . Story 1 Line A Wall Force: OTM Uniform DL: Header DL : Max Down . Res Moment: Holddown . Story 1 Line A Wall Force: OTM Uniform DL: Header DL : Max Down . Res Moment: Holddown . Wall 1 Height Seismic 0.507 4.283 0.015 LT 0.000 RT LT -0.857 RT LT 1.434 RT LT 0.570 RT Wall 2 Height Seismic 0.507 4.283 0.015 LT 0.038 RT LT -0.894 RT LT 1.594 RT LT 0.538 RT Wall 1 Height Seismic 0.338 2.909 0.080 LT 0.000 RT LT -0.646 RT LT 1.721 RT LT 0.264 RT Wall 2 Height Seismic 0.826 7.111 0.080 LT 0.240 RT LT -0.886 RT LT 12.529 RT LT -0.493 RT Wall 3 Height Seismic 0.338 2.909 0.080 LT 0.240 RT LT -0.886 RT LT 2.639 RT LT 0.060 RT WOODCAD QLAT (Pro V4.0) File: 1294RDH2 Page: 4 8.0 SW Len 5.0 HD Len 5.0 Wt 0.015 Wind 0.805 6.440 0.007 0.038 LT 0.000 RT 0.018 -0.894 LT -1.288 RT -1.305 1.594 LT 1.064 RT 1.122 0.538 LT 1.075 RT 1.064 8.0 SW Len 5 0 HD Len 5.0 Wt 0.015 Wind 0.805 6.440 0.007 0.000 LT 0.018 RT 0.000 - 0.857 LT -1.305 RT -1.288 1.434 LT 1.122 RT 1.064 0.570 LT 1.064 RT 1.075 8.0 SW Len 4.5 HD Len 4.5 Wt 0.015 Wind 0.569 4.554 0.080 0.240 LT 0.000 RT 0.240 - 0.886 LT -1.012 RT -1.252 2.639 LT 1.357 RT 2.080 0.060 LT 0.710 RT 0.550 8.0 SW Len 11.0 HD Len 11.0 Wt 0.015 Wind 1.391 11.132 0.080 0.240 LT 0.240 RT 0.240 -0.886 LT -1.252 RT -1.252 12.529 LT 9.876 RT 9.876 - 0.493 LT 0.114 RT 0.114 8.0 SW Len 4.5 HD Len 4.5 Wt 0.015 Wind 0.569 4.554 0.080 0.000 LT 0.240 RT 0.000 -0.646 LT -1.252 RT -1.012 1.721 LT 2.080 RT 1.357 0.264 LT 0.550 RT 0.710 Designs Unlimited Time : 03:06:07 Date : 05 -10 -2005 WALLS Parallel to X -Axis Story 1 Line B Wall 1 Height 8.0 SW Len 20.0 HD Len 20.0 Wt 0.150 Wind 5.060 40.480 0.010 LT 0.000 RT 0.000 LT -2.024 RT -2.024 LT 162.140 RT 162.140 LT -6.083 RT -6.083 Wall Force: OTM Uniform DL: Header DL : Max Down . Res Moment: Holddown . Story 1 Line C Wall Force: OTM Uniform DL: Header DL : Max Down . Res Moment: Holddown . Seismic 3.004 33.155 0.010 LT 0.000 RT 0.000 LT -1.658 RT -1.658 LT 205.700 RT 205.700 LT -8.627 RT -8.627 Wall 2 Height 8.0 SW Len Seismic 1.502 18.857 0.030 LT 0.000. RT 0.000 LT -1.257 RT -1.257 LT 117.619 RT 117.619 LT -6.584 RT -6.584 WOODCAD QLAT (Pro V4.0) File: 1294RDB2 Page: 5 15.0 HD Len 15.0 Wt 0.150 Wind 2.530 20.240 0.030 LT 0.000 RT 0.000 LT -1.349 RT -1.349 LT 92.711 RT 92.711 LT -4.831 RT -4.831 Designs Unlimited Time : 03:06:08 Date : 05 -10 -2005 ======= == === == =___ ========= _ _== ===== = = e ase= == ======= __ _ __ SUMMARY OF ACCUMULATED HOLDDOWN FORCES @ LEFT END OF SHEAR WALL Walls Parallel to Y axis LEFT END SEIS WIND X Y Lt Lt Dis Dis HD HD Story Line Wall ft ft K K 2 2 2 20.00 26.50 0.00 0.50 1 2 1 20.00 20.00 0.07 1.71 2 3 3 25.00 39.00 0.07 0.47 1 3 1 25.00 39.00 1.79 4.86 2 4 2 40.00 32.50 0.00 0.14 WOODCAD QLAT (Pro V4.0) File: 1294RDB2 Page: 1 Designs Unlimited Time : 03:06:08 Date : 05 -10 -2005 ==s47===== == = = === SUMMARY OF ACCUMULATED HOLDDOWN FORCES @ RIGHT END OF SHEAR WALL • Walls Parallel to Y axis RIGHT END SETS WIND X Y Rt Rt Dis Dis HD HD Story Line Wall ft ft K K 2 3 3 25.00 46.00 0.07 0.47 1 3 1 25.00 46.00 1.79 4.86 2 4 2 40.00 46.00 0.00 0.04 WOODCAD QLAT (Pro V4.0) File: 1294RDB2 Page: 2 Designs Unlimited Time : 03:06:08 Date : 05 -10 -2005 = == stews= x = = = =c==== == mesas == == == ===== == SUMMARY OF ACCUMULATED HOLDDOWN FORCES @ LEFT END OF SHEAR WALL Walls Parallel to X axis LEFT END SEIS WIND X Y Lt Lt Dis Dis HD HD Story Line Wall ft ft K K 2 A 1 8.00 3.00 0.50 0.92 1 A 1 8.00 3.00 1.09 2.52 2 A 2 20.50 3.00 0.45 0.92 1 A 2 18.50 3.00 0.16 1.75 2 B 1 0.00 23.00 0.00 0.38 1 8 1 0.00 23.00 0.00 1.53 2 C 1 25.00 46.00 1.01 1.65 1 C 2 25.00 46.00 0.94 2.49 2 C 2 35.00 46.00 0.98 1.65 1 C 2 25.00 46.00 0.94 2.49 WOODCAD QLAT (Pro V4.0) File: 1294RD82 Page: 3 Designs Unlimited Time : 03:06:08 Date : 05 -10 -2005 == F==ee===s= = = F == = == == = = = == __ _____ SUMMARY OF ACCUMULATED HOLDDOWN FORCES @ RIGHT END OF SHEAR WALL Walls Parallel to X axis RIGHT END SEIS WIND X Y Rt Rt Dis Dis HD HD Story Line Wall ft ft K K 2 A 1 12.50 3.00 0.45 0.92 1 A 1 12.50 3.00 0.82 2.35 2 A 2 25.00 3.00 0.50 0.92 1 A 2 29.50 3.00 0.09 1.55 2 B 1 20.00 23.00 0.00 0.38 1 B 1 20.00 23.00 0.00 1.53 2 C 1 30.00 46.00 0.98 1.65 1 C 2 40.00 46.00 0.94 2.49 2 C 2 40.00 46.00 1.01 1.65 1 C 2 40.00 46.00 0.94 2.49 WOODCAD QLAT (Pro V4.0) File: 1294RDB2 Page: 4 ......... 'J . . ...... it 00 Ila to 1P 7- J, J) 001, 40 4, ,, ND ),00 [j7j-j-j-M,-j]-j'l-.j-, I 1 -1-1- 1-1-1- 6 1/16 5 Inch 6 2" WIMP JRS Since I VOR W, 1,;, yti+ I 'ill1.1 1 1111 lip I OrTY O ftoetvab F TUkWILA JUN 2 2 2006 PERMIT CENTER -Z V) V) �j RECEIVED JUN. 7 fIlITS TOO VVII PUBUO"' WORK INCOMPLETE LTR# --------- mown, Nz- ......... 'J . . ...... it 00 Ila to 1P 7- J, J) 001, 40 4, ,, ND ),00 [j7j-j-j-M,-j]-j'l-.j-, I 1 -1-1- 1-1-1- 6 1/16 5 Inch 6 2" WIMP JRS Since I VOR W, 1,;, yti+ I 'ill1.1 1 1111 lip I OrTY O ftoetvab F TUkWILA JUN 2 2 2006 PERMIT CENTER -Z V) V) �j RECEIVED JUN. 7 fIlITS TOO VVII PUBUO"' WORK INCOMPLETE LTR# --------- mown, P' King County Department of Development and Environmental Services 90ii Oukcsdulc A venue Southwest Rata,, WA 98055 -1219 FILE COPY Pe-r!± No. 121R LATERAL DESIGN COMP IAi r : r r ECKLIST For Use with the 2003 IBC METI IC , SIMPLIFIED Introduction The lateral design provisions of the 2003 edition of the International Bi i .: editions of the Uniform Building Code. Generally, the lack of a prescril: o • analysis results in varying submittal formats often difficult to interpret h. review staff to assist in the plan review process to assess compliance eu lateral design is based on the simplified method In part er whole, plc. .e second page and submit it along w th the lateral calculations. The re for both wind and seismic 14teral design. This checklist pertains only to Section 1617.5. Both are addressed separately. Simplified Seismic Load Design Method: Performance Criteria 1130 Section 1617.6 allows for the simplified seismic design based on the following formula: V= 1.2Sos W . R „REVIEWED DE W P NCE iinn AUG 15 2006 BUILDING armies uig Code (IBC) differ significantly from previous �ubmlttal format for required engineering purpose of this checklist Is to provide a tool to IBC Section 1609 and Section 1815. If the .. nplete the front and backside of the attached :rmlts both analytical and simplified approaches simplified methods of IBC Section 1609.6 and Simplified Wind Load Design Method: Performance Crii.:r is IBC Section 1609.6 establishes building and site criteria necessary In ordt (to use the simplified method. These criteria are as follows: 1. The structure is an enclosed building. 2. The building must not have a mean roof height In excess of 6(1 feet. 3, The roof height cannot exceed the least horizontal dimension of the building. 4. The building cannot be situated on top of a hill or escarpment over 60 feet in height for Exposure 5, and 30 feet for exposure C. The maximum average slope does not exceed 10 percent. In addition the hill or escarpment is unobstructed by other topographic features for a distance from the high point of 50 times the height of the hill or 1 mile, whichever Is less. • 5. The building is a simplified diaphragm building per IBC Section 1609,2 6. The building is not a flexible structure with a 'funpdamental period greater than 1 second. 7. The building has no special Joints dr separatiods. s. The building has regular shape and Is approximately symmetrical in cross section and in each direction. 9. Roof slopes do not exceed 45 degrees for gable roofs or 27 degrees for hip roofs. CITyOF iWKWiLA JUN 12 2006 P ERMITGENTER IBC Section 1616.6.1 outlines the criteria limiting the use of the simplified method according to the following criteria: 1. Structure Is Seismic Use Group I: 2. Building is of light frame construction and does not exceed three stories in height, excluding basements. 3. Buildings,of any construction other than light- framed construction, not exceeding two stories in height, excluding`baseinents, with flexible diaphragms at every level as defined in IBC Section•1602. This worksheet addresses the requirements of the Simplified Method specific to IBC Section 1609.6 and Section 1617.5. Alternatives to the simplified method are contained in ASCE 7 -02. Alternative use of AS'bE 7 -02 For Wind and Seismic Load Design: ✓V V -l. Ground snow load Wind speed (mph) Seismic . design category Subject to dan age from Winter design temp. Ice- shield required Flood hazards Air freezing index Mean annual temp. Weathering ' Frost line depth Temilte Decay Vpries { 85 01 or D2 Moderate 12" < 1,00011 elev.,; Slight to Mod. Slight to Mod. 25 No Veries 100 to 250 50 IRC Design cr tetia. • 1. Buildings and structures, and all parts thereof, shall be constructed to safely supp9fl tIJgq p Including dead loads, )1Ve loads, `roof loads, flood loads, snow leads; wind loads and cotmntc loads es prescribed By this code. The "construction of buildings and Structures shall remit In a.system that provides a complete Toad path capable of transferring all loads from their point of origin ilmtNgh the lead - resisting elements to the founn,ddation. R3d1.1 As an ' alternative to the requirements In Section R301 :1 the folloviing standards are permitted subject to the limitations of this code and the limitations therein. Where erfglneered design 13 used In conjunction with these standards the design shall comply With the. International Building Code. 1, American Forest and Paper Assodatlon (AF &PA) Wood Frame Construction Manual (WFCM). 2. American Iron and Steel Institute (AISI), Standard for Cold- Formed Steel Framing— PreslrIptive Method for One- and Two - family Dwellings (COFS /PM). R301.1.1 2. Table R301.2(1) as Adopted for Unincorporated King County. King County Code Title 16.05.040. CLIMATIC AND GEOGRAPHIC DESIGN CRITERIA FOR KING COUNTY 1. The "Snow Load Analysis for Washington" Second•Editton (1985), pubtshed by the Structural Engineers Association of Washington, shall be used in determining snow load except where the department determines by public rule that a different standard is necessary to protect the public health and safety. The minimum roof snow load shall be 25 pounds per square feet. ' 2. Seismic design category shall be 01 for areas of unlhgorporated King County to the east of the Snoquaimie River as It traverses from the King County — Snohomish County fin<f to the oily limits of Snoquaimie, east of the town of Snoquaimie, east of the Snoquaimie Parkway and the Echo Lake - Snoqualmle Cut -off SE bs they run from the city limits of the town of Shoqualmie to State Highway 18 and to the south or east of State Highway 1a. All other portions of unincorporated King County shall be selsrnte design category D2. 3. The frost line depth shall be considered to be '12 Inches for sites up to an elevation 0 feet above sea level. For sites over 1,000 feet above sea level a specific site analysis may be required. 4. Flood hazard within King County varies. See the hood hazard code provisions of KCC 21A.24. 1' V C . 11403 tui Step Question Background Information ' Answer Comment 1 Have you used the 3- second gust wind speed of 85 MPH in your design? Basic wind speed for most of King County Is 85 mph. per Table R301.2 (1) and IBC Figure 1609. es o the peed • No . wind used t4' ' 2 What is the importance factor, Iw, used in your design? Importance factor, lw, pursuant to IBC Section 1809.6 and Table 1604.5.• 1 rfl -- __ )w , ..- ; ,. 3 What is the Exposure category used? • Exposure category per IBC Section 1609.4 for all building exposure quadrants. Most of King County utilizes Exposure B with the exception p tion of commercial applications where Exposure C Is assumed unless justifying,p, documentaiinn Is provided by the enu. .,r to use a different exposure Lai : of . sure • C i` 4 What is the mean building height of the building? ' Building height. Exposure AdjuatmentCoefficient (EAC), from IBC Table 1609.8.2.1 4 based on mean roof height. Feet _ E A.C. 1� 6 What is the Exposure Adjustment Coefficient used? 6 Has the building been segmented Into the specific zones pursuant • to the guidelines of IBC Figure 1609.6.2.1? Based on the main wind force resisting system ( MWFRS) and illustrated in IBC I Igure 1809.6.2.1, sections of the building are now zoned to receive different wind loading conditions. The MWFRS is comprised of the structural elements that are necessary for the overall stability of the building to resist lateral forces. IBC Section 1609.2 anti ASCE 7, Section 8.2 provides forrthal definitions of what constitutes the MWFRS. J ` 3s • • No ? From IBC Table 1609.6.2.1 (1), What are the wind design wind pressures used for the following • zones: Horizontal Pressures Zone A IBC Table 160911,2.1 (1) specifies the design wind pressures, ps30, for both the transverse and bngitudinal directions of the main wind force resisting system for buildings less than 30 feet.in height and subject to Exposure B. For buildings over 30 feet In height or in Exposure C , the values from Table 1609.6.2.1.(1) will need to be adjusted based on the formula: Ps 4IwPs30 • ❑ Yes is ' rye ,�r t' of i � mel ji.l • 1 -040 Zone B Zone O. Zone D Vertical Pressures Zone E Co $ /561 0�'� ��f • ❑ No us? _ "`� Zone F Zone G Zone H Oyerhang Zone EOH Overhang Zone GoH Has the design wind pressures been modified due to building height exceeding 30 feet or subject to Exposure C conditions? Have the wind pressures for the Application, of modified design wind Step •; Step Procedure Checklist for Wind Load Design by Mut Jd I: Simplified WIND AND SEIRMIC LATERAL DESIGN CHECKLIST 2003 IBC King County Application No., _ Engineer /Architect Seismic Design Performance Criteria Used: • Wind Design Performance Criteria Used: Building and site meet criteria and simplified method used pursuant to IBC 1609.6. Alternate design procedure fn 'm ASCE 7 -02. Step by Step Procedures Checklist for Seismic Load Design by Method I: Simplified Question Background Answer Comment Information Step 1 2 3 4 5 Simplified analysis procedure pursuant to IBC Section 1616,6.1. Alternate design procedure trim ASCE 7 -02. • Are you using the for mii specified In IBC Section 1617,5? What Is the design ele x c response acceleration used? Design Loads Has the seismic force been determined for of ich level of the building? Are you dividing the ultimate base shear It 1.4 to get the ailownt le working stress base shear? Have you calculated . redundancy factor p Please specify the design dead Toads used for the bulldinnr Based on the ultimate base shear formula outlined above In the scoping language, reference IBC Section 1617.5 for details pertaining to the formula values. The design elastic • response acceleration, SDS„ for short period as modified with Section 1615.1.3:Sos =% Sms where: Sms =Fa Ss per IBC Section 1615,1.2 . Vertical distribution of seismic forces at each level Is Calculated pursuant to iBC Section 1617,52 using the following formula: FX= 1.2SDSWx R Ultimate base shear may be adjusted per IBC Section 1605.3 Check for redundancy p, per IBC Section 1617.2.2. ?Yes ❑ No r2e 5 = Sos syes❑ • es 17 No *es El No Roof • W psf Wails /Parl]fons = I) psf Floor = i/V psf Flat roofs s 5% slope with a 30 Ibs snow Toad, 20% snow load = nef 05 -08 -2008 GEORGE HIRAI 15615 NE 62 CT REDMOND WA 98052 RE: Permit No. 1)06 -226 1305834LNSTUKW Dear Permit Holder: In reviewing our current records the above noted pennit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code and/or the International Mechanical Code, every permit issued by the Building Division under the provisions of this code shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within 180 days from the date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work is commenced for a period of 180 days. Based on the above, you are hereby advised to: Call the City of Tukwila Inspection Request Line at 206 - 431 -2451 to schedule for the next or final inspection. This inspection is intended to determine if substantial work has been accomplished since issuance of the permit or last inspection; or if the project should be considered abandoned. If such determination is made, the Building Code does allow the Building Official to approve one or more extensions of time for additional periods not exceeding 90 days each. Extension requests must be in writing and provide satisfactory reasons why circumstances beyond the applicants control have prevented action from being taken. In the event you do not call for the above inspection and receive an extension prior to 06/03/2008 , your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, XC: Ter Marshall, t Technician Permit File No. D06 -226 City of Tukwila Jim Haggerton, Mayor Department of Community Development Jack Pace, Director 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206-431-3670 • Fax: 206- 431 -3665 January 29, 2008 George Hirai 15615NE62Ct Redmond WA 98052 RE: Request for Extension Development Permit No. D06 -226 Mechanical Permit Nos. M06 -121 Plumbing/Gas Piping Permit Nos. PG06 -059 City View Estates, Lot 13 —13058 34 Ln S Dear Mr. Hirai, This letter is in response to your written request for an extension Permit Nos. D06 -226, M06- 121, and PG06 -059. The Building Official has reviewed your letter and considered your request to extend the above referenced permit. The City of Tukwila Building Division will be extending the expiration date of your permit an additional 180 days, through June 3, 2008. If you should have any questions, please contact our office at (206) 431 -3670. Sincerely fer Marshall Permit Technician File: Permit No. D06 -226, M06 -121, PG06 -059 Pak-rink CenteiExtension Letten\Pemdro\2006\D06 -226+ Permit Extension M3.doc Page 1 off Jim Haggerton, Mayor Department of Community Development Jack Pace, Director 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206- 431 -3670 • Fax: 206- 431 -3665 Memo • Page 1 To Jennifer Marshall & Bilf From: Bob Benedicto CC: Brenda Holt , Brandon Miles Date: January 8, 2008 Re: George Hirai request for extension for permits applicable to City View Estates. Attached is a list of his permits. Please extend as indicated. City OfTu kwsgila I 1puanot dGnnmxmuy I1tti24rnxnt BUILDING DIVISION Mr. Hirai applied for all of his permits in June of 2006, consequently he is entitled to be vested in the code requirements (induding the administrative sections) of the 2003 IRC, IMC, IFGC & UPC. The administrative provisions allowed one or more extensions of 90 days each for applications, and one or more extensions for the time period in which to commence work. Each request for extension had to be in writing and justifiable cause cited. Mr. Hirai has complied with this requirement. GEORGE HIRAI PERMITS - Building LOT # Permit # Applied Approved Issue Expiration A- 9 006 -222J 06/12/2006 ,g 10 D06 -223 06/12/2006 11 D06 -224 06/12/2006 12 D06 -225✓/ 06/12/2006 ' 13 D06 -226 V 06/12/2006 12/05/2006 NO 12/04/2007 09/29/2006 YES 12/28/2007 08/16/2006 YES 12/28/2007 04/11/2007 NO 12/04/2007 08/16/2006 YES 12/28/2007 MECI-filict ✓ II In (o MO6 -118 / 06/1212008 ry M06.120✓/ 06/12/2006 rb M06 -121■ 06/12/2006 PLUMBING //& GAS PIPING 1 PG06-0551p6/1212006 12/05/2006 NO 1 q PG06 -056 96/12/2006 09/29/2006 YES / ( PG06 -057 ✓06/12/2006 08/16/2006 YES 12 PG06- 058 /106/12/2006 04/11/2006 NO r5 PG06 -059 08/16/2006 YES PUBLIC WORKS DEVELOPMENT PERMIT 09/29/2006 YES 04/11/2007 NO 08/16/2006 YES PW07 -063 Pending NO N/A 12/04/2007 12/04/2007 12/28/2007 Request for Extension Extend 12/06/2007 YES 12/06/2007 YES 12/06/2007 YES 12/06/2007 YES 12/06/2007 YES 12/06/2007 YES 12/06/2007 YES 12/06/2007 YES 12/04/200712/06 /2007 YES 12/28/2007 12/06/2007 YES 12/28/2007 12/06/2007 YES 12/04/2007 12/06/2007 YES 12/28/2007 12/06/2007 YES 7 Period 90 DAYS 6r 180 DAYS 180 DAYS 90 DAYS er 180 DAYS 180 HAYS 90 DAYS 180 DAYS 90 DAYS 180 DAYS 180 DAYS 90 DAYS 180 DAYS N/A GEORGE HIRAI 15615 NE 62 CT REDMOND WA 98052 RE: Permit No. D06 -226 13058 34 LN S TUKW Dear Permit Holder: In reviewing our current records the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code and/or the International Mechanical Code, every permit issued by the Building Division under the provisions of this code shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within 180 days from the date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work is commnenced for a period of 180 days. Based on the above, you are hereby advised to: Call the City of Tukwila Inspection Request Line at 206- 431 -2451 to schedule for the next or final inspection. This inspection is intended to determine if substantial work has been accomplished since issuance of the permit or last inspection; or if the project should be considered abandoned. If such determination is made, the Building Code does allow the Building Official to approve one or more extensions of time for additional periods not exceeding 90 days each. Extension requests must be in writinz and provide satisfactory reasons why circumstances beyond the applicants control have prevented action from being taken. In the event you do not call for the above inspection and receive an extension prior to 12/28/2007 , your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, XC: 11 -06 -2007 3 1199. r Marshall, t Technician Permit File No. D06-226 Steven M. Mullet, Mayor Department of Community Development Steve Lancaster, Director 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206-431-3670 • Fax: 206- 431 -3665 07 -31 -2007 GEORGE HIRAI 15615 NE 62 CT REDMOND WA 98052 RE: Permit No. D06 -226 13058 34 LN S TUKW Dear Permit Holder: In reviewing our current records the above noted pennit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code and/or the International Mechanical Code, every permit issued by the Building Division under the provisions of this code shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within 180 days from the date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work is commenced for a period of 180 days. Based on the above, you are hereby advised to: Call the City of Tukwila Inspection Request Line at 206-431 -2451 to schedule for the next or final inspection. This inspection is intended to determine if substantial work has been accomplished since issuance of the permit or last inspection; or if the project should be considered abandoned. If such determination is made, the Building Code does allow the Building Official to approve one or more extensions of time for additional periods not exceeding 90 days each. Extension requests must be In writine and orovide satisfactory reasons why circumstances beyond the applicants control have prevented action from being taken. In the event you do not call for the above inspection and receive an extension prior to 09/29/2007 , your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, xc: Pent File No. 006 -226 City of Tukwila Steven M. Mullet, Mayor Department of Community Development Steve Lancaster, Director 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206-431-3670 • Fax: 206-431-3665 March 14, 2007 George Hirai 15615NE62Ct Redmond WA 98052 Dear Mr. Hirai: Sincerely, File: Permit No. D06 -223, 224, 226 jem City of Tukwila Department of Community Development Steve Lancaster, Director RE: Request for Extension Development Permit Nos. D06 -223, 224, & 226 City View Estates This letter is in response to your written request for an extension to Permit Nos. D06 -223, D06 -224, and D06 -226. The Building Official has reviewed your letter and considered your request to extend the above referenced permits. The City of Tukwila Building Division will be extending the expiration date of your permit an additional 180 days, through September 29, 2007. If you should have any questions, please contact our office at (206) 431 -3670. P:VennifeAExtension Letters \ Permits \2006\D06 -223, 224 & 226 Permit Extemsion.doc Page 1 of 1 Steven M. Mullet, Mayor 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 -431 -3670 • Fax: 206 - 431 -3665 To: City of Tukwila, Department of Community Development RE: permit Numbers: D06 -223, D06 -224 and D06 -226 for Lots10, 11, and 13 Dear Permit Center Due the delay in obtaining approval from the City of Tukwila Public Works Department affecting the above building permits for the subject lots, I am asking for an extension on the subject permits. merely, rge Hirai Permit Applicant. r ctopwot - , _ So* 03- /3 -07 crille cnzat izA MAR 13 2007 PERMIT CENTER 6-j62jor4- '-t- o°t12-Pl - 03 -01 -2007 GEORGE HIRAI 15615 NE 62 CT REDMOND WA 98052 RE: Permit No.1)06 -226 13058 34 LN S TUKW Dear Permit Holder: Thank you for your cooperation in this matter. Sincerely, XC: Permit File No. D06 -226 City of Tukwila Steven M. Mullet, Mayor Department of Community Development Steve Lancaster, Director In reviewing our current records the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code and/or the International Mechanical Code, every permit issued by the Building Division under the provisions of this code shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within 180 days from the date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work is commenced for a period of 180 days. Based on the above, you are hereby advised to: Call the City of Tukwila Inspection Request Line at 206 -431 -2451 to schedule for the next or final inspection. This inspection is intended to determine if substantial work has been accomplished since issuance of the permit or last inspection; or if the project should be considered abandoned. If such determination is made, the Building Code does allow the Building Official to approve one or more extensions of time for additional periods not exceeding 90 days each. Extension requests must be in writinr and provide satisfactory reasons why circumstances beyond the applicants control have prevented action from being taken. In the event you do not call for the above inspection and receive an extension prior to 04 /02/2007 , your permit will become null and void and any further work on the project will require a new permit and associated fees. 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 -431 -3670 • Fax: 206-431-3665 June 16, 2006 George K. Kirai 15615 NE 62 Ct Redmond WA 98052 RE: Letter of Incomplete Application # 1 Development Permit Application D06 -226 City View Estates, Lot 13 — 34xx S 132 St Dear Mr. Kirai: This letter is to inform you that your permit application received at the City of Tukwila Permit Center on June 12, 2006 is determined to be incomplete. Before your application can continue the plan review process the attached items from the following department needs to be addressed: Building Department: Allen Johannessen, at 206 433 -7163, if you have any questions concerning the attached comments. Planning Department: Brandon Miles, at 206 431 -3684, if you have any questions concerning the attached comments. Please address the comments in an itemized format with applicable revised plans, specifications, and/or other documentation. The City requires that four (4) sets of revised plans, specifications and/or other documentation be resubmitted with the appropriate revision block. In order to better expedite your resubmial a 'Revision Submittal Sheet' must accompany every resubmittl. I have enclosed one for your convenience. Revisions must be made in person and will not be accepted through the mail or by a messenger service. If you have any questions, please contact me at the Permit Center at (206) 433 -7165. Sincerely, Jennifer Marshall Permit Technician Enclosures File: Permit D06 -226 Department of Community Development Steve Lancaster, Director P:Uennifer\ncomplete Letters \2006\D06 -226 Incomplete Ltr #I.DOC jem Steven M. Mullet, Mayor 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206- 431 -3670 • Fax: 206- 431 -3665 Determination of Completeness Memo Date: June 15, 2006 Project Name: City View Estates, Lot 13 Permit #: D06 -226 Plan Review: Allen Johannessen, Plans Examiner Tukwila Building Division Alien Johannessen, Plan Examiner A Building Division has deemed the subject permit application Incomplete. To assist the applicant in expediting the Department plan review process, please forward the following comments. PLAN SUBMITTALS: (Min. size 11x17 to maximum size of 24x36; all sheets shall be the same size). (If applicable, structural drawings and structural calculations sheets shall be original signed wet stamp not copied.) 1 The site plan does not show a footing discharge system. Provide a site plan that identifies the footing drain discharge system. The footing discharge system will generally be separate from the roof drain system. Coordinate any combined discharge systems with the Tukwila Public Works Department. The intent is that groundwater will not accumulate in the basement or crawl space. Should there be questions conceming the above requirements, contact the Building Division at 206 - 431-3670. No further comments at this time. DATE: CONTACT: RE: ADDRESS: ZONING: June 15, 2006 George Hirai D06 -226 130xx TIB LDR PLANNING DIVISION COMMENTS The Planning Division of DCD has reviewed the above permit application. The application is incomplete and additional information is required. 1. Provide individual site maps for each lot. There is simply too much information on sheet C6 of C6 to be able to evaluate setbacks on the property. Ensure that the site map shows the proposed deck. Note: The deck must meet setbacks. 2. On sheet 8 label the elevations in terms of direction, for example, east elevation, north elevation, etc. December 8, 2004 Mr. George K. Hirai George K. Hirai Inc. LLC 15615 NE 62n Court Redmond, WA 98052 RE: PRE04 -022 Dear Mr. Hirai; I have received your undated letter in regards to a variance for the Hammer Head Turnaround for the proposed development reviewed by the Design Review Committee, # PRE04 -022. If you provide approved residential fire sprinkler systems in all the residential structures that will be built on lot's 9,10,11,12 and13, this office will accept the 16' wide West access drive with a provision for a modified turnaround on lot 12. The modified turnaround should have the length on lot 12 of at least 25' for emergency vehicle use. If you have any further questions please contact me at 206 - 575 -4404. Sincerely, Capt. Don Tomaso Fire Marshal City Of Tukwila dtomaso@ci.tukwila.wa.us City of Tukwila Steven M. Mullet, Mayor Fire Department Nicholas J. Olivas, Fire Chief Headquarters Station: 444 Andover Park East • Tu/cwila, Washington 98188 • Phone: 206 -575 -4404 • Fax: 206 -575 -4439 ACTIVITY NUMBER: D06 -226 DATE: 06 -22 -06 PROJECT NAME: CITY VIEW ESTATES, LOT 13 SITE ADDRESS: 13058 34 LN S Original Plan Submittal X Response to Incomplete Letter # 1 Response to Correction Letter # Revision # After Permit Issued DEPARTMENTS: :uil ding Esion Puhlir� Wnr4c , t'M& DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Y Incomplete Comments: TUES/THURS ROUTING: Please Route V Structural Review Required REVIEWER'S INITIALS: APPROVALS OR CORRECTIONS: Approved ❑ Notation: REVIEWER'S INITIALS: Documents/routing slip.doc 2 -28-02 PERMIT COORD COPY PLAN REVIEW /ROUTING SLIP Fire Prevention Structural Approved with Conditions ❑ Permit Coordinator No further Review Required DATE: DATE: ��jj � 3 Plarnn�fn Divisi DUE DATE: 06 -27-06 Not Applicable ❑ Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: DUE DATE: 07-25-06 Not Approved (attach comments) n Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping 0 PW ❑ Staff Initials: PERMIT COORD COPY PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: D06 -226 DATE: 06 -12 -06 PROJECT NAME: CITY VIEW ESTATES, LOT 13 SITE ADDRESS: 34XX S 132 ST X Original Plan Submittal Response to Correction Letter # Response to Incomplete Letter # Revision # After Permit Issued DEPAR Buil i ng Division Public Works Comments: Documents/routing slip doc 22&02 F re P t� Structural DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete ❑ Incomplete TUESTTHURS ROUTING: Please Route ❑ Structural Review Required REVIEWER'S INITIALS: APPROVALS OR CORRECTIONS: Permit Center Use Only rA INCOMPLETE LETTER MAILED: ail l R(! ta° LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg Fire ❑ Ping Ly PW ❑ Staff Initials: DATE: DATE: C 44 (g Planning Division IY�Jf Permit Coordinator ❑ DUE DATE: 06 -15-06 Not Applicable ❑ No further Review Required DUE DATE: 07-13-06 Approved ❑ Approved with Conditions ❑ Not Approved (attach comments) r Notation: REVIEWER'S INITIALS: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: Date: i (n-IQP Summary of Revision: City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206431 -3670 Fax: 206 -431 -3665 Web site: httn: / /www.cttukwila.wa.us 1 REVISION SUBMITTAL 1 Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. ® Response to Incomplete Letter # 1 ❑ Response to Correction Letter # ❑ Revision # after Permit is Issued ❑ Revision requested by a City Building Inspector or Plans Examiner Project Name: City View Estates, Lot 13 Project Address: 13058 34 Ln S Contact Person: George Hirai Phone Number: 2cc- — 7% 298 Sheet Number(s); - "Cloud" or highlight all areas of revision including date of revision Received at the City of Tukwila Permit Center by: Entered in Permits Plus on 11,42412 tapplicationsVorms- applications on hnetrevision submittal Created: 8- 13.2004 Revised: Plan Check/Permit Number: D06 -226 Steven M. Mullet, Mayor Steve Lancaster, Director CrTY OF TUKKWIL/l JUN 222006 PERMITCENTER Ja�2_ 'n, LIAR aOt atf ain-1 rrt„r p tw i.t;5'e Part At (To Be. Completed by Applicant) Purpose o - - " ficate: Building Permit ❑ Preliminary Plat or PUD ❑ Other. ❑ Short Subdivision ❑ Rezone Proposed Use: ❑ Residential Single Family ❑ Residential Multi- Family ❑ Commercial ❑ Other E - fig.,c Phone: as 7F36,29 i51 C.D.L.- Applicants Name: E o2� [ Property Address or Approximate Location: Tax Lot Number. `34X1 .5. / 3Z AJo 1 23i96U"UL,070 Legal Description(Attach Map and Legal Description if necessary): E0645/A4-5 1E j S Zx- i ,e7a-Ta u 4-655 .S'T CZ) Part B: (To Be Completed by Sewer Agency) 1. cfra. Sewer Service will be provided by side sewer connection only to an existing In # size sewer on -feet-fronrthe site and the sewer system has the capacity to serve the proposed use. OR ❑ b. Sewer service will require an improvement to the sewer system of: ❑ (1) feet of sewer trunk or lateral to reach the site; and/or ❑ (2) the construction of a collection system on the site; and /or ❑ (3) other (describe): 2. (Must be completed if 1.b above is checked) ❑ a. The sewer system improvement is in conformance with a County approved sewer comprehensive plan, OR ❑ b. The sewer system improvement will require a sewer comprehensive plan amendment. 3. Era. The proposed project is within the corporate limits of the District, or has been granted Boundary Review Board approval for extension of service outside the District, OR ❑ b. Annexation or BRB approval will be necessary to provide service. 4. Service is subject to the following: PERMIT: $ A ®O. °O a. District Connection Charges due prior to connection: GFC: $ SFC: $ UNIT: $ TOTAL: $ (Subject to Change on January 1st) King County/METRO Capacity Charge: Currently, $4250.70 /residential equivalent, will be billed directly by King County after connection to the sewer system. (Subject to change by King Co /Metro without notice.) 0/ RECBVED Required Easements: f/ Required ❑ May be Required CITYOFTUKWIIA c. Other. JUN 12 2006 PERMIT CENTER b- TOWARD AD "ENViRON6rENr,. 14816 Milif v Road South P.O. Box Ier50 Tukwila, WA 98168 Phone: (206) 242 -3236 Fax: (206) 242 -1527 CERTIFICATE OF SEWER AVAILABILITY /NON - AVAILABILITY ❑ Certificate of Sewer Availability OR ❑ Certificate of Sewer Non - Availability I hereby certify that the above sewer agency information is true. This certification shall be valid for one year from the date of signature. -CAM' Pi - By Title 3-9- 0A Date porn -z2k ATTACHMENT TO VAL VUE SEWER DISTRICT CERTIFICATE OF SEWER AVAILABILITY /NON- AVAILABILITY The following terms and conditions apply to the attached Val Vue Sewer District ( "District ") Certificate of Sewer Availability/Non- Availability ( "Certificate "). 1. This Certificate is valid only for the real property referenced herein ( "Property "), which is in the District's service area, for the sole purpose of submission to the King County Department of Development and Environmental Services, King County Department of Public Health, City of Seattle, City of Tukwila, City of Burien and/or City of SeaTac. This Certificate is between the District and the applicant only, and no third person or party shall have any rights hereunder whether by agency, third -party beneficiary principles or otherwise. 2. This Certificate creates no contractual relationship between the District and the applicant and its successors and assigns, and does not constitute and may not be relied upon as the District's guarantee that sewer service will be available at the time the applicant may apply to the District for such service. 3. As of the date of the District's signature on this Certificate, the District represents that sewer service is available to the Property through sewer systems that exist or that may be extended by the applicant. The District makes no other representations, express or implied, including without limitation that the applicant will be able to obtain the necessary permits, approvals and authorizations from King County, City of Seattle, City of Tukwila, City of Burien, City of SeaTac or any other governmental agency before the applicant can utilize the sewer service which is the subject of this Certificate. 4. If the District or the applicant must extend the District's sewer system to provide sewer service to the Property, the District or applicant may be required to obtain from the appropriate governmental agency the necessary permits, approvals and authorizations. In addition, the governmental agency may establish requirements that must be satisfied as a condition of granting any such permits, approvals or authorizations, which may make impractical or impossible the provision of sewer services to the Property. 5. Application for and possible provision of sewer service to the Property shall be subject to and conditioned upon availability of sewer service to the Property at the time of such application, and compliance with federal, state, local and District laws, ordinances, policies, and/or regulations in effect at the time of such application. 1 ackno ledge that I have rec ived the Certificate of Sewer Availability/Non-Availability and this Attachment, and fu rstand the to % s and conditions herein. NNW Ap icant's Signature Date CITY OF TUKWILt Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 ' ( , �yJJi� xyytlnm0�tl{4 EV�i, {��n�„lii�p�!m .n MnEint�tT�4ii; ���:.tn ✓ Site address (attach map end,legal description showing hydrant location and size of mot: -ncq l° -O6 --¢7R Rnc `im re "Iti tiµ ; ) fl' r Address: S6 (C rt4E 6,2nn Ler- Phone 24 , -trc This certificate Is for the purposes of: Residential Building Permit Q Preliminary Plat Commercial /Industrial Building Permit ❑ Rezone Estimated number of service connections and water meter size(s): 1 S. Vehicular distance from nearest hydrant 10 the closest point of structure is ft. Area is served by (Water Utility District): -C!' /7.C ner /Age Slgna� >NE ' w (Use asperity sheet it more mom la needed) I hereby Polity that the above Information Is true and correct. CERTIFICATE OF WATER AVAILABILITY Required only If outside City of Tukwila water district k t . CO, C ,Jr sea.. 17 L 7" tza Agency/ one B z06- 2,q-Z,- W7 By Permit Center /Builtti Division: 201"11431.3670 Public Works Oepartment: 206-433-0179 Planning Division: 206 -431 -3670 PERMIT NO.: ddress: AD F- & a rrfr— Phone: rrna - 786 . 2e TV Cel e Q Short Subdivision ❑ Other t, Date l) o • 5, 4 M A' •' nA a till de af. 1. The proposed project Is within I (q 2. o improvements required. 3. The Improvements required to upgrade the water system to bring It Into compliance with the udlitlee' comprehensive plan or to meet the minimum flovi'requirements of the project before connection and to meet the State cross connection control requirements: (City /County) 4. Based upon the improvements listed above. water can be provided and will be available at the site with a flow of / 7 V O gpm at 20 psi residual fur a duration of 2 hours at a velocity of J 1 ii tps as documented by the attached calculations. OFTLI W 5. W jLA � �ilabiil a ter� CITy `L J Acceptable service can be provided to this project JUN 12 2006 ❑ Acceptable service cannot be provided to this project unless the Improvements In Item 13-2 are met. ❑ System is not capable of providing service to this project. PERMITCENTER 3 -6 '0,G Date 3-6 --0 This certificate is not valid without Water District No. 125's attac entitled Attachment to Certificate of Water Availability." e z r License Information License BAZALI *163PR Licensee Name BAZALA INC Licensee Type CONSTRUCTION CONTRACTOR UB1 600540739 Ind. Ins. Account Id #4 Business Type CORPORATION Address 1 2416 32ND AVE W Address 2 City SEATTLE County KING State WA Zip 981991031 Phone 2062863577 Status ACTIVE Specialty 1 GENERAL Specialty 2 UNUSED Effective Date 10/19/1984 Expiration Date 1/11/2008 Suspend Date Separation Date Parent Company Previous License Next License Associated License Bond Information Bond Bond Company Name Bond Account Number Effective Date Expiration Date Cancel Date Impaired Date Bond Amount Received Date #4 CBIC 616241 12/28/2001 Until Cancelled 01/01/1980 512,000.00 01/11/2002 Business Owner Information Name Role Effective Date Expiration Date YOSHIKAWA, TERRANCE Y 01/01/1980 VANDERVELDE, PAUL M 01/01/1980 CARPENTER, SHARON L 01/01/1980 Look Up a Contractor, Electrician or Plumber License Detail Page 1 of 2 % \ Washington State Department of Labor and Industries General/Specialty Contractor A business registered as a construction contractor with L&I to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. https: // fortress. wa. gov/ lni/ bbip /printer.aspx?License= BAZALI* 163PR 10/04/2006 x x x x x x x x x x x x x