HomeMy WebLinkAboutPermit 5869 - Ballard and Company - OfficesBUILDING PERMIT
(POST WITH INSPE .. I'ION CARD AND PLANS
IN A CONSPICUOUS LOCATION)
. CITY OF TUKWILA
Department of Community Development - Building Division
6200 Southcenter Boulevard, Tukwila WA 98188
(206) 433 -1849
BUILDING
PERMIT NO.
DATE ISSUED:
1Q(4a-ql
FEES
DESCRIPTION
AMOUNT
RCPT 0
DATE
BUILDING PERMIT FEE
72 co
4-65
3650
-a;1
11 -17 -89
PLAN CHECK FEE
47.00
BUILDING SURCHARGE
4.50
c139 3
)a -Q0-11
ENERGY SURCHARGE
OTHER:
TOTAL -
123.50
PLAN CHECK #89 -392
PIMA C i IFJf 011r.1A 1I0t
625 Strander B1
1 1 le ell' -, re”
4,640.00
PROJECT NAME/TENANT Ballard and Co . ASSESSOR ACCOUNT s 022330 - 0020 -01
TYPE OF ❑ New Building Addition Tenant Improvement (commercial) L.) Demolition (building) ❑ Grading/Fill
WORK: ❑ Rack Storage ❑ Reroof ❑ Remodel (residential) ❑ Other
DESCRIBE WORK TO BE DONE:
Create two offices in existing space.
PROPERTY OWNER Kol l Co.
PHONE 575 -0765
—,
ADDRESS . 1 . 1 • - t • - . • , A . •_, WA
ZIP 98188
CONTRACTOR PH Boden Inc.
PHONE 455 -4515
ADDRESS 12507 Bel Red Road #102, Bellevue, WA
ZIP 98005
WA. ST. CONTRACTOR'S LICENSE P pAREI I213DM
EXP. DATE 5 -01 -90
ARCHITECT Owner Representative
PHONE
ADDRESS
ZIP
('OL)L (Or.11)1 1/1t/C1
USE
FLOOR 4
/
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
TOTAL
SQUARE FEET
TOTAL
OCC. LOAD
TOTAL
TYPE OF CONSTRUCTION: UBC EDITION (year)
V -N 88
SETBACKS:
N S- E -
_
FIRE PROTECTION:OSprinklers ❑ Detectors ® N/A
UTILITY PERMITS REOUIRED?❑Yes ®No
(through
Public rough Worits1
ZONING: C -MBAR /LAND USE CONDITIONSEyes No
DATE: / , / 6'
PRINT NAME: y//1 Tyrle
CONDITIONS (other than those noted on or attached to permit/plans):
APF'HOVED FOR . BUILDING
ISSUANCE BY: i. goL ` 1 AF „L 0, . 44 OFFICIAL
DATE:
/2- 18- 0
I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions
of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of
this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws
regulating construction or the performance or work. I am authorized to sign for and obtain this building permit.
SIGNATURE: .2 /, ., ,. /„ ._ ,
DATE: / , / 6'
PRINT NAME: y//1 Tyrle
COMPANY:
This permit shall become null and void if the work is not commenced within 180 days from the date of
issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection.
DATE ISSUED:
CERTIFICATE OF
OCCUPANCY NO.
•
BUILDING PERMIT ,/
(POST WITH INSP:,, TION CARD AND PLANS
IN A CONSPICUOUS LOCATION)
CITY OF TUKWILA
Department of Community Development - Building Division
6200 Southcenter Boulevard, Tukwila WA 98188
(206) 433 -1849
BUILDING
PERMIT NO.
5S(4)(1
DATE ISSUED:
FEES
DESCRIPTION
MOTJNT RCP R
DATE
BUILDING PERMIT FEE
22_,AD
LI `
—Vi
PLAN CHECK FEE
47.Q0
?650
Lf FJ %')
.Zc1
11- 17 -81i
BUILDING SURCHARGE
4.50
10: q(:,)-m
ENERGY SURCHARGE
SQUARE
FEET
ADDRESS
OTHER:
M_
1ZIP
TOTAL
OCC. LOAD
TOTAL -
3 5
PLAN CHECK 1189 -392
PROJECT INFORMATION
SITEADIRESS 625 Strander B1 SUITE# VALU 0 Q. TRU O -$ 4,640.00
PROJECT NAME/TENANT ASSESSOR ACCOUNT #
Ballard and Co. 022330- 0020 -01
me
TYPE OF L) New Building 0 Addition L2 Tenant Improvement (commercial) ( Demolition (building) CJ Grading/Fill
WORK: O Rack Storage CD Reroof 0 Remodel (residential) 0 Other:
DESCRIBE WORK TO BE DONE:
Create two offices in existing space.
PROPERTY OWNER
Ko'I l Co.
607 5trander Boulevard, Tukwila. WA
PH Boden Inc.
, ! ,; , {'
/
PHONE
PHONE
575 -0765
1ZIP 98188
455_4515
ADDRESS
!CONTRACTOR
ADDRESS
12507 Bel Red Road #102, Bellevue, WA
SQUARE
FEET
!EXP. DATE
'PHONE
;71P 98005
5 -01 -90
WA, ST. CONTRACTOR'S LICENSE # pAF;EII2130Pi
ARCHITECT
Owner Representative
SQUARE
FEET
ADDRESS
.._.
M_
1ZIP
�.
JSE -}
.v, ,.
/
, ! ,; , {'
/
! ,,r t, �O.O t�.'.,,X. q00.,•
/
_,�,-t;l�y1 C' E i
/
,•r �..•'6 ,' 1 . f
/
.< i ,� '
this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws
=L X i
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD t
SQUARE
OCC.
L AD
TOTAL
SQUARE FEET
TOTAL
OCC. LOAD
I- ___.
•
(OTAL
TYPE OF CONSTRUCTION: UBC EDITION (year)
�� RS
SETBACKS: _ — fM ^
-
(through
Public Works/
=IRE PROTECTION: (]Sprinklers O Detectors [ N/A
UTILITY PERMITS RE4UIRED ?n
0 Yes (x No
?ONING: C_N BAR /LAND USE CONDITIONSOyes Cl No
.ONDITIONS (other than those noted on or attached to permit/plans):
this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws
•
IGNATURE: rfrx. (/U iuk l DATE -• /Lr/
/517%
RINT NAME: 'r/ //t 7drt d. ___._— :COMPANY:
/ / BUILDING
PPHOVED FOR i 1 7
DATE:
3SUANCE BY: / ertC'CT -i \ -4 -L1./ (,(' -,e) OFFICIAL
t
/c'-_ O. 'Ft
I hereby certify that I have read and examined this permit and know the sarne
to be true and correct. All provisions
of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of
this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws
regulating construction or the performance or work. 1 am authorized to sign for and obtain this building permit.
IGNATURE: rfrx. (/U iuk l DATE -• /Lr/
/517%
RINT NAME: 'r/ //t 7drt d. ___._— :COMPANY:
466.,
This permit shall become null and void if the work is not commenced within 180 days from the date of
issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection.
•ERTIFICATE OF q DATE ISSUED:
>CCUPANCY NO. 1 O a
CITY OF TUKWILA
Building Division
6200 Tukwila,,tWashington ul98188
(206) 433 -1849
Type of Inspect on no,k
Site Address
Requestor
Special Instructions
INSPECTION RECORD
PERMIT # L4pq
Date 0 ^ (D-90 0 ur s.
Date Wanted -S -90 p .n
roject \Ord k C _ompo.n3u
Phone # 55- H S LS
Inspection Results /Comments:
Date
�i�' �rfS�e�V: 15;'✓ N' A' tJ�:±+:' 1s :,.w.•.x:��nmwrwrr.wa.,.,�..�W �....,,.«, ............,.._._.,.......__..
CITY OF TUKWILA
Building Division
Tukwila, tWi hinatonul98188
(206) 433 -1849
Type of Inspection (2 -42. `Otzti<l
Site Address 42-5- J
Requestor
Special Instructions
INSPECTION RECORD
PERMIT # .TS-6
9
Date
C.l� %diwr154
Date Wanted 7---6c.c4Av •i:>>' 1 a.
gnZez,zej./ e
Project
Phone #
Inspection Results /Comments: Q{ /6 Gt,75nP�n 2.GX v�2� e t'o
Inspector 7244,1
Date 5 %D
CITY OF TUKWILA
Building Division
6200 Southcenter Boulevard
Tukwila, Washington 98188
(206) 433-1849
Type of Inspection
Site Address
Requestor
Special Instructions
From■ ry
ca:a
INSPECTION RECORD
PERMIT # ').:(4196)
Date
r 61
ok
Date Wanted 1 -1q-q0
Project i30■.\[0\fd 4_, C.O.
Phone # S" Li515
I o: 3.5
Inspec ion Results/Comments:
Cert)-e/71,4
e--L ateteiJ-e-X /02(■av 74- ad—Q.
Inspector
Date ib9h
CITY OF TUKIL iLA
Central Permit System
ontrol No. SSq J -59Q
Permit No. 5g6°r
FINAL APPROVAL FORM
TO: ❑ Building
❑ Planning,
❑ Public Works
El Fire Dept.
❑ Police
❑ Parks/ Recreation
i Project Name
Address
J
2 /I/ 9
Type of Permit(s) %-
This project is nearing completion. Please investigate your area of responsibility and indicate
below either your final approval or necessary corrections.
If no response is received within one week, it will be assumed that the project is of no concern
to your department and a certificate of occupancy may be issued.
This project is NOT approved by this department; the following corrections are necessary:
()
()
()
()
()
()
()
()
()
()
()
()
Authorized Signature
Date
This project is approved by this department:
/7:2'1'2 „ 4,/
Authorized Signature
Date
CPS Form 3
Plan Check #89 -392: Ballard and Co. Bldg D
625 Strander 81
THE FOLLOWING COMMENTS APPLY num IVCOME PART OF THE APPROVED PLANS UNDER ,
TUKWILA BUILDING PERMIT NUMBER _
1. No changes will be made to the plans unless approved by the
Architect and the Tukwila Building Division.
2. Electrical permit shall be obtained through the Washington State
Division of Labor and Industries and all electrical work will be
inspected by that agency (872 - 6363).
3. All mechanical work shall be under separate permit through the
City of Tukwila.
4. All permits, inspection records, and approved plans shall be
posted at the job site prior to the start of any construction.
5. Any new ceiling grid and light fixture installation is required to
meet lateral bracing requirements for Seismic Zone 3.
6. Partition walls attached to ceiling grid must be laterally braced
if over eight (8) feet in length.
7. Any exposed insulations backing material to have Flame Spread
Rating of 25 or less, and material shall bear identification
showing the fire performance rating thereof.
B. All construction to be done in conformance with approved plans and
requirements of the Uniform Building Code (1988 Edition), Uniform
Mechanical Code (1988 Edition), Washignton State Energy Code (1989
Edition), and Washington State Regulations for Barrier Free
Facility (1989 Edition).
9. Validity of Permit. The issuance of a permit or approval of
plans, specifications and computations shall not be construed to
be a permit for , or an approval of, any violation of any of the
provisions of this code or of any other ordinance of the
jurisdiction. No permit presuming to give authority or violate or
cancel the provisions of this code shall be valid.
BUILD.1G PERMIT
INSPECTION RECORD
(Post with Building Permit in conspicuous place)
CITY OF TUKWILA
Department of Community Development - Building Division
6200 Southcenter Boulevard, Tukwila WA 98188
(206) 433 -1849
BUILDING
PERMIT NO.
DATE ISSUED:
5Sol
I ia- ao -s1
SITE ADDRESS:
SUITE NO.:
PROJECT:
625 Strander B1 Ballard and Co.
CALL FOR INSPECTIONS AT LEAST 24 HOURS IN ADVANCE
"X"
REQUIRED INSPECTIONS
PHONE •
DATE
APPROVED
INSPECT.
INITIALS
DATE(S)
CORRECTION NOTICE ISSUED
1 Footings
433 -1849
2 Foundation
433 -1849
3 Slab and/or Slab Insulation
433 -1849
4 Shear Wall Nailing
433 -1849
5 Roof Sheathing Nailing
433 -1849
6 Masonry Chimney
433 -1849
7 Framing
433 -1849
8 Insulation
433 -1849
9 Suspended Ceiling
433 -1849
10 Wall Board Fastening
433 -1849
11
12
13
14 FIRE FINAL Insp:
575 -4404
15 PLANNING FINAL
433 -1849
16 PUBLIC WORKS FINAL
433 -0179
X
17 BUILDING FINAL
433 -1849
INSPECTION PROCEDURES AND REQUIREMENTS
All approved plans and permits shall be maintained available on the site in the same location.
1. FOOTING - When survey stakes and forms are set and rebar is tied in place.
2. FOUNDATION - When forms and rebar are in place.
3. SLAB - If structural slab or if underslab insulation is required.
4. SHEARWALL NAILING - Prior to cover.
5. ROOF SHEATHING NAILING - Prior to cover.
6. MASONRY CHIMNEY - Approximately midpoint.
7. FRAMING - Atter rough -in inspections such as mechanical, plumbing, gas piping, electrical and fire stopping is in place.
8. INSULATION - After framing approval, but before installation of wallboard. Baffles must be installed to keep attic
ventilation points clear.
9. SUSPENDED CEILING - Fasten diffusers, lights and seismic bracing.
10. WALL BOARD FASTENING - Prior to taping (see UBC Chap. 47 and Table 47G).
11.
12.
13.
14. FINAL FIRE INSPECTION - Contact Fire Department for their requirements.
15. FINAL PLANNING INSPECTION - Contact Planning Department for their requirements.
16. FINAL PUBLIC WORKS INSPECTION - Contact Public Works Department for their requirements.
17. FINAL BUILDING INSPECTION - When all work, corrections, reports and other inspections are complete.
OTHER AGENCIES:
Plumbing (including gas piping) — King County Health Department — 296 -4732
Electrical — Washington State Department of Labor and Industries — 872 -6363
A preconstruction meeting with the Building Inspector may be scheduled prior to starting the job by
contacting the Department of Community Development, Building Division at 433 -1849. Although not
required, a meeting of this type can often eliminate problems, delays and misunderstandings as the
project progresses. 04/2844
PLAN CHECK
NUMBER
"X"
REQUIRED INSPECTIONS
1 Footings
2 Foundation
3 Slab andlor Slab Insulation
4 Shear Wall Nailing
5 Roof Sheathing Nailing
6 Masonry Chimney
X7
Framing
8 Insulation
9 Suspended Ceiling
X10
Wall Board Fastening
11
12
13
X14 FIRE FINAL !nap:
15 PLANNING FINAL
16 PUBLIC WORKS FINAL
X17 BUILDING FINAL
PROJECT: ('VL
r
THE FOLLOWING COMMENTS APPLY TO AND BECOME PART OF THE APPROVED ANS UNDER
TUKWILA_BUILDING PERMIT NUMBER
No changes will be made to the plans unless approved by the
Architect and the Tukwila Building Division.
O2 Plumbing permit shall be obtained through the King County Health
Department and plumbing will be Inspected by that agency,
i eluding all gas piping (296- 4732).
Electrical permit shall be obtained through the Washington State
Division of Labor and Industries and all electrical work will be
inspected by that agency (972-63631.
All mechanical work shall be under separate permit through the
City of Tukwila.
--V 11 permits, inspection records, and approved plans shall be
posted at the Job site prior to the start of any construction,
OWhen special inspection is required either the owner, architect or
engineer shall notify the Tukwila Building Division of appointment
of the inspection agencies prior to the first building inspection.
Copies of all special inspection reports shall be submitted to the
Building Division in a timely manner. Reports shall contain
address, project name and permit number of the project being
inspected.
O7 All structural concrete to be special inspected (Sec. 306, UBC).
(8 All structural welding to be done by W.A.B.0, certified welder and
special inspected (Sec. 306, UGC).
OAll high - strength bolting to be special inspected (Sec. 306, UDC /.
Any new ceiling grid and light fixture installation is required to
meet lateral bracing requirements for Seismic Zone 3.
Partition walls attached to ceiling grid must be laterally braced
if over eight (8) feet in length.
12 Readily accessible access to roof mounted equipment is required.
!3 Engineereed truss drawings and calculations shall be on site and
available to the building inspector for inspection purposes.
Documents shall bear the seal and signature of a Washington State
Professional Engineer.
Any exposed insulations backing material to have flame Spread
Rating of 20 or less, and material shall bear identification
showing the fire performance rating thereof.
ESubgrade preparation including drainage, excavation, compaction,
and fill requirements shall conform strictly with recommendations
given in the soils report prior to final inspection (see attached
procedure.).
!6 A statement fros the roofing contractor verifying fire retardancy
of rook will be required prior to final inspection (see attached
• rocedure).
f.)2CP
All construction to be done in conformance with approved plans and
requirements of the Uniform Building Code (1988 Edition), Uniform
Mechanical Code (1988 Edition), Washinnton State Energy Code (1989
Edition), and Washington Stae Regulations for Barrier Free
Facility (1989 Edition).
!a All food preparation establishments oust have King County Health
Department sign -off prior to opening or doing any food processing.
Arrangements for final Health Department inspection should be made
by calling King County Health Department, 296 -4787, at least three
working days prior to desire inspection date. On work requiring
Health Department approval, it is the contractor's responsibility
to have a set of plans approved by that agency on the Job site.
l9 Fire retardant treated wood shall have a flame spread of not over
2S. All materials shall bear identification showing the fire
performance rating thereof. Such identification shall be issued
by an approved agency having a service for inspection at the
factory.
20 Notify the City of Tukwila Building Division prior to placing any
concrete. This procedure is in addition to any requirements for
special inspection.
OAll spray applied fireproofing as required by U.I.C. Standard No.
43 -a, shall be special inspected.
22 All wood to remain in placed concrete shall be treated wood.
OAll structural masonry shall be special inspected per U.B.C.
Section 306 (a) 7.
(Z47 Validity of Persit. The issuance of a permit or approval of
�`-. plans, specifications and computations shall not be construed to
be a permit for , or an approval of, any violation of any of the
provisions of this code or of any other ordinance of the
Jurisdiction. No permit presueing to give authority or violate or
cancel the provisions of this code shall be valid.
City oT Tukwila
FIRE DEPARTMENT
444 Andover Park East
Tukwila, Washington 98188 -7661
(206)575 -4404
Gary L. VanDusen, Mayor
December 13, 1989
Fire Department Review
Control Number 89 -392
Re: Ballard and Company - 625 Strander Blvd., Bldg. #D,
Tukwila, Wa.
Dear Sir:
The attached set of building plans have been reviewed by
The Fire Prevention Bureau and are acceptable with the
following concerns:
1. Maintain fire extinguisher coverage throughout.
2. Exit hardware and marking must meet the requirements
of Uniform Fire Code Sections 12.104 & 12.114.
Exit doors shall be openable from the inside without
the use of a key or any special knowledge or effort.
(UFC 12.104b)
EXIT signs shall be installed at required exit
doorways and where otherwise necessary to clearly
indicate the direction of egress. Signs shall be of a
contrasting color with the surrounding area and shall
have letters not less than six inches high with a
minimum letter width of 3/4 ". (UFC 12.114a & 12.114b)
3. In order to provide you with the fastest police and
fire protection under emergency conditions, please post
your suite, room or apartment number in a conspicuous place
near the main entry door. Numbers shall contrast with
their background. (UFC 10.208)
All required occupancy separations, area separation
walls, and draft -stop partitions shall be maintained
and shall be properly repaired, restored or replaced
when damaged, altered, breached, penetrated, removed
or improperly installed. (UFC 10.401)
City (OT Tukwila
FIRE DEPARTMENT
444 Andover Park East
Tukwila, Washington 98188 -7661
(206) 575 -4404
Gary L. VanDusen, Mayor
Page number 2
Walls and ceilings of corridors serving an occupant
load of 30 or more shall be not less than one -hour
fire resistive construction. (UFC 3305g) (UFC
12.106a)
All interior wall covering materials shall be
fire - resistive or shall be treated to be
fire - resistive, so as to result in a flame- spread
rating as required by UFC Appendix VI -C tables 42A and
42B. A certificate of the flame spread rating is
required to be delivered to the Tukwila Fire
Department. (UBC 4204) (UFC 10.401)
Yours truly, �
The Tukwila Fire Prevention Bureau
cc: T.F.D. file
ncd
CITY OF TUILe..A
DEPARTMENT OF COMMUNITY DEVELOPMENT
4-60. -134De.
Co?A-- ',1-40kg(0512:14&AM
ADDRESS
'79 8.
PROJECT
EJ
PLAN CHECK
NUMBER
811-92,
ORDINANCE COMPLIANCE CHECKLIST Uniform Buildin Code, 198,3 Edition.
ncruPANcy GRoup e'e•-*Z OFF me
TYPE OF CONSTRUCTION
LOCATION ON PROPERTY
RUTIDING HjFGHT/NO nf STORIFR
FLOOR AREA ":1774t4t4T — 6,06
t
OCCUPANT LOAD
IDAGREQuiRFMFNTS .L.X) 6E.00.E.D rzricsa C
L-] St?) . _
-AP-3Pr-rsk4-T--4X•gS---T;;Et)EwN;4),
0.14i0e cca = ONE c-xtr
ri 11 11, ci it = it " "
11 ci 44-010 It= s- /4 11 1./ 0, 144
it
/Egir!A 014.
1
LI
!I] DETAILED REQUIREMENTS:
(1CCIPANCY
[1] TYPE OF CONSTRUCTION 1:11PEETAILig) " cbt-ip..qt5 t4412,9mka-rrig*4
ri] ENGRG. REGS. & REQMTS.
CHAPTER ..51.-ao
NOTES:
rL
Lil
T.]
jQ
vz-g-e•A_
•
c
BUILDING PERMIT APPLICATION TRACKING
PLAN CHECK
NUMBER
PROJECT NAME 60A` ar d 0.n J� b)
U
SITE ADDRESS Coos 5-4- 5-4- andPr S E .
INSTRUCTIONS TO STAFF
• Contacts with applicants or requests for information should be summarized in writing by staff so that
any time the status of the project may be ascertained.
• Plan corrections shall be completed and approved prior to sending on to the next department.
• Any conditions or requirements for the permit shall be noted on the plans or summarized concisely
in the form of a formal letter or memo, which will be attached to the permit.
• Please fill out your section of the tracking chart completely. Where information requested is not
applicable, so note by using "N /A ".
BUILDING SQUARE FOOTAGE/OCCUPANCY INFORMATION
(to be filled out by Plan Checker)
SQUARE OCC.
FEET LOAD
SQUARE OCC.
FEET LOAD
SQUARE OCC.
FEET LOAD
SQUARE OCC.
FEET LOAD
SQUARE OCC.
FEET LOAD
TOTAL
SQUARE FEET
TOTAL OCCU-
PANCY LOAD
DEPARTMENTAL REVIEW
"X" In box Indicates which departments need to review the project.
BUILDING -
initial review
(ROUTED)
FIRE
CONSULTANT: Date Sent -
Date Approved -
ME-PROTECTION: O Sprinklers (l Detectors
O PLANNING
INIT: c7/y"
FIRE DEPT. LETTER DATED: i . - 3 INSPECTOR: 5/3
INIT:
ZONING: (' —/Yt IBAR&AND USE CONDITIONS? nYes DO-No
REFERENCE FILE NOS.:
MINIMUM SETBACKS: N-
s-
E- W
O PUBLIC
WORKS
UTILITY PERMITS REQUIRED?
INIT:
PUBLIC WORKS LETTER DATED:
it Yes Q No
O OTHER
BUILDING -
final review
I2-lS_&9
INIT:
INIT: 2L
TYPE OF CONSTRUCTION:
UBC EDITION (year):
V14
tclee
REVIEW COMPLETED
PERMIT NO.
CONTACTED
Kszv n
DATE READY
DATE NOTIFIED
iQ- I ; _ SCI
l I
Bnit.
�
PERMIT EXPIRES
2nd NOTIFICATION
BY:
IlnIt.)
AMOUNT OWING
. c,C+ �0
3RD NOTIFICATION
BY:
(init.)
CITY OF TUKWILA
Department of Community Development - Building Division
6200 Southcenter Boulevard, Tukwila WA 98188
(206) 433 -1849
BUILDII 3 PERMIT
APPLICATION
APPLICATION MUST OE
FILLED OUT COMPLETELI'
FEES
(for staff use only)
DESCRIPTION;::
AMOUNT : RCPT # DATE
BUILDING PERMIT. FEE
PLAN. CHECK FEE
BUILDING SURCHARGE
c):.
1.00
t -11 -Th
ENERGY SURCHARGE:
OTHER:
TOTAL .
1
SITE ADDRESS SUITE #
625 Stra4- ! /vd, el P /Yea?,
VALUE OF CONSTRUCTION - $
I'/ YO
PROJECT NAME/TENANT
id./.. 4 ,.. ■ .
ASSESSOR ACCOUNT #
021- 0- 007-0 -o/
TYPE OF New Building • Addition P:0 Tenant Improvement (commercial) • Demolition (building)
WORK: 0 Rack Stora.e 0 Reroof • Remodel residential 0 Other
DESCRIBE WORK TO BE DONE:
�ede /AM O tCs 41 Pk-/J 1 1/ _.
aLC
BUILDING USE (office, warehouse, etc.) 1
Of-6(c
NATURE OF BUSINESS: s r C r1LS fevv
WILL THERE BE A CHANGE IN USE? P5 No U es IF YES, EXPLAIN:
SQUARE FOOTAGE - Building: /'g' 30 Tenant Space: /tog Area of Construction: Sew
WILL THERE BE STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE
BUILDING? JO No 0 Yes IF YES, EXPLAIN:
PROPERTY OWNER dew 4)
PHONE S7 'O %6s
/
ADDRESS 607 S7L_(1fr ,f'e„ /3/(iGt �v,�c✓, / IP?d,i,sd,
CONTRACTOR fin 666,1,_ 1-tic.
PHONE DT._ yf-4r
ADDRESS 04-0 7 &.7t tej a #' /a7- ,s,,,,,,,,,„
ZIP view-
WA. ST. CONTRACTOR'S LICENSE # ppT2r/ . t 3 Del
EXP. DATE J Apo
ARCHITECT AwnQA_ 4�„rr.te fiVe,.
PHONE
ADDRESS ��
ZIP
1 HEREBY CERTIFY THAT:I HAVE READ AND EXAMINED THIS'ARPLIGATIO I AND KNOY1f TH ; SAME TO BE
TRUE ANC CORRECT, AND l AM AUTHORIZED .. O APPLY; FOR THIS PERMIT, ::<:::.: >::;::::::
BUILDING OWNER
AUTHORIZED
AGENT
SIGNATURE -
DATE
PRINT NAME -
A.. -
PHONE
y .1-- y /
ADDRESS / • 1 Qi tv /0 Z
CITY /ZIP Wve 9 yotts-
CONTACT PERSON K TUI/r
PHONE f f J- J--
APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill
out the application completely and follow the plan submittal checklist on the reverse side of this form. Handouts
are available at the Building counter which provide more detailed information on application and plan submittal
requirements. Application and plans must be complete in order to be accepted for plan review.
VALUATION OF CONSTRUCTION Valuation for new construction and additions are calculated by the Department of
Community Development prior to application submittal. Contact the Permit Coordinator at 133-1851 prior to
submitting application. In all cases, a valuation amount should be entered by the applicant. This figure will be
reviewed and is subject to possible revision by the Building Division to comply with current fee schedules.
BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or
contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent
to submit this permit application and obtain the permit will be required as part of this submittal.
EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of
application shall expire by limitations. The building official may extend the time for action by the applicant for a
period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform
Building Code (current edition). No application shall be extended more than once.
If you have any questions about our process or plan submittal requirements, please
contact the Department of Community Development Building Division at 433 -1849.
DATE APPLICATION ACCEPTED
DATE APPLICATION EXPIRES
n-c10
COMMERCIAL
St 3MITTAL CHECK.IST
• •
.„.„.. „ . . . .
rePortstamped by a Washington State U�nsed anglneer
. .
:..Topographical ':•••• ••••
• -.ErtertiY•calculatiens stamped by.aWathingttii:StiteliCenied
engineer or erchitectl...::.:
• • ,. •• • •
• .- ••••
Working drawings, stamped by a Washington State Ilcens�
architect, which include:
• ..• •••• • • •
Site
. • . ...•...
• Elevations
• Civil •drawings
. . • ...
Completed utlHty Penn!t atrOlicatiOn'(Orie':•fOr:entire:'•:••••
•
siii(6) sett Ofcivil drawings .....•••• • •
1E See utilfty permit: applictidonandcharjaist for
STORAGE
RESIDENTIAL
fictrfili
..... •
: • ••• • • • .. • • • .
ettM141ERCItt7F.Nly■ti :iltiftr:)V ......
r— Completed perinitappliCittlOn• (OnefOr:eaCli'kbOCture
• • •"!
-..AisettOr:ACCount • -•••••• •
:•:"
Two (2) sets Of 'CoristruCtiOnplens;,vrhichincludei:45i,,;.•!:'
•••Site :.• ••••, •
;:t.:::.••• • of tenant
an Pa. rki
• Tenant Iocatlon
• Usa 01 adjacent (common wail) tenant
Floor pian ot proposed tenant space
Tenant ... . . ..„..
• Exit N',44;03•Pisi*:19,,patte:wItti use 01 each room Iabeiled.
New waiis existing wall and wafls to be demollshed
• Cross section. showing wal oonstructlon and method of
......„.....
engineer may be requwod 11 structural worh Is to be done (2 sets)
s:
CoMpleted.birildirig permit aPplication:(one foreach airy
EAssessor AcCotint
Narrative diltiCribing•eXitting root ,• :Material being removed, and
NOTE A Corti ficatlan letter prior to final inapaction and
sign-
offofthepermlt
.• • • ''
ANTENNAMAT.ELLITE:: •- • • •
• '
"Site:ROO, (shO,Onia.building.endiecation. of anitin.na(elaMliler.41th).:.:•:J
—,-.•••••••••
Strucerral:01ilculatiOns: stamped by a Washington State tboonsed
. • „ „
Assessor Account Number
NEW ElltiCitLEfAINILY DWEI.UNGS/AGCNTIONS •
. . .
ECompleted building permit application (one for each structure)
(2).Of, working
• • .• • •
• •:..: Site
. •
• • Foundation plan
• • Roof plari : .•
„.::. • Building elevations (all views).
: • BulkIng cross-section • •- •:: •
, • Structural training plans :
, • , • : • •
E Washington State Energy Code data
• . • . • . ,
Completed utility permit application • • :
■•••••••••
Six (6) sets of site plans showing utilities ....:•• .
• •
NOTE: Building alto plan and utility site plan may be combined. See
utility permit application and checklist for specific submittal require:mints.
Attritional topographical and soils information may be required if unique
oho ixinditfons.
..,•
]Completed buiIng permit appHcation (ano for each structure)
Assessor A�ount • .• ...„. . , ....
Number .....
NOTE: ilAnYutility•Werkis tdbel•dcirre..-pro.e.,
and • . . '1.
. ,,, • •
• "..EkiiidiPti•eleov•ass" •
plans fault: be submkted
• :•••••
AsNarrse:::r eda-A:21-
mateflal being installed
of offfie mom!
�
/- �" �l�-~ �u.x`
`
'
F!LF-7. �)
COPY
1 ___'
|undo.dand that the Plan Chock approvals are
,!,0u03eci to errors and onxisuions and approval Of
u' |ans aas not authorize the violation of any-
a/.cptc cc-:-p or ordinance. Receipt of contractor's
copy of approved plans acknowledged.
Date /2/24/al
-~^^^^^^^~-^^
Permit No �~x�,+' � ..
�
^rnxr»x�[
��rHrl�\�
�~.. ,�
�F�&8�T AND ���
' �,`n.'/ '`'," ��E2A
APPROVAL
��AN���
:��u`�~
Strander Blvd
(-4 .•;`.t
PATRICK H. BODEN NC
12507Bel-Reit Rd. #102
Bellevue, YAQ0+4
(206) 455-4515
___42iikt-G
)\-6y,z.\\
Kell Commerce Center
Tract
U-Y AF lAKWitik
APPROVED
(. 9�
4
Mil DING OIV(S ON
RECEIVED
CITY OF TUKWILA
Q 0 V � ' 7 \ �H � �
p°v ' '~`
0
M:nkle Blvd
■
n777717"
�~�~�����
Phase IV
gav , .-°~~^^-�°°/
��+v~~r V-10 71
. ) o /
r-r,r,..'".. rq
��
��
Mi
Phase V
E".:1
' '''' ''F
||///1//'|||/U�'/��////�/||/!//|i�|||||/!/� /i�/|^-��` ||'� " --'�
/'' | . | /// . �'/ '/'� � | / | ' | / � / /'| / '' |/|/| /�/ |' ' ' / '|/|/|'|/| |/|/i ' | / /| / |/| '
3 _ 4 5 _ 6 _ 7 . �� ___ 9 1(l 11 ����=M" 12 r' -- '�—
»�u ! NOTE: If the rniorcfi|rnod document is (eau clear then this
m�� |
notice, t is �ue to the conUty o� the oriy|n�| �uvu:`ont. \
\ . �
\
UE ��� y< �/ *'� �z *6 CF, �c L� (],� u� el Ll 91 si �� el Z� u {)L 6
' ! | |
|!||||||J|!|!/|U||U!|i||]|�UUh!||1|!||i|!!/||U||UUi|i||�|!||�|�|!|�|@|||U/||U|iU|U�||HU|||||!!|�||U|U!|||!|�|i|��||�||||
•
L. 9
�"=U
|
' � |
UU`U||/|!||/
Rua
ft�f
al a
II
II
II
II
A 11 • i
1090 SF 11 1200 SF
ii
11
11
II
c
12(10 SF
1.
s4rt1 "
°• I F
�= = =�C.-
• NI E/�, Ni NE
z_ / ^21 SF
L1.v.113 of
11 11 11 11 11
11 11 if 11 !I II
11 11 II I 11 1
11 II II I 11 11
II 11 j li
II a it E II iF I G II H I� J
I I 1400 SF 11 120-0 SF j1 1400 SF l 5100 SF I 1200 SF i1 1400 SF
II 11 1 1 1, it
11 j1 11 i 11
11 _ 11 1 11 II 11 11 cw
11 1_: °� Ii
11 it 11
u II
TIC
K
1200 SF
L
1200 SF
12110 SF
zi
OD o�
m co c
-o -Co co
co"
C3 ;15 N N r
CO I-- 1--
,1 I III1II,'I ; ;II I;1111, li11111 11111111111111
WOW
623 621 613
u
0 0 1
617 6'75
625
ae+e
613 611
..:.. :. _.. .::.. -:_... ..:. ..........�+.. '.....s: -..- �. .w <.: - -. xra..: r+ icw. wc. n:,.. �L i..w....r- :.ay.:..._.�..:..,.�. ,.... .n,..... �:...�a�._:::�_ �.�:_..._..__....... ..- ...:....... ...._ -_,1. i ...:.... . - �
I�IjIIi;i;l�iii IIl 1Ij1 11ilijl�!;l li ;i�ljl�l;i�ljl'Ijl�Ijill;!iljl iIi'I;Iliji Ijl!! j!`Ijl�ijl�ijij►jijlj,1ljiiiji� ji�ij ";ij�lli �► 11111'I
11 5 E 7 & r'A(,F (,EF'',Ar„ 1 2
N3T7. I; the rnicrcfilmed document is Tess clear then this
notice, it is ci.e to the cuality cr the cripinel cocurrent,
CT)
605 603
60'9
FER3v1IT CENTER
se +9e ee Ze. lG 1l 81 LA 91_ St bl Cl et ll (J(
'.1'.I I I' !I!I� 1i I I�I,,� , 111 � �� I ��� I 11 I fill I I. •�
I IlfI I1 „1!W i� Ij i�'I i ��:�. i 111,1 ��i1. i'Iii� {Ili,{ !IIi II I I;�,li ;I1.1!I1I I IIII H ! 1 1111111 II i1 1 111' I III 1 111 Dili 1 1
1 II .I .I I, : 1I I! 1111111 l dill Illi 1111. ,.Mill ..l l 1.1,11
8 G
H111111:1 1111h1111111,1 11
5 r�
111111iiiilill0111.l11hUl
Illl1llli Illiiilii1 �.l
�ldllll1
gat e, ' 4�a�.fv
6 i°v vaZca,. ,,{e, ,(w.
re, kw, 76 9$ /b''
Bxil ¢r
it
PATRICK H. ROUEN IN6.
12507 Bel -Red Rd. #102
Bellevue, WA 98005
(208) 455 -4515
/� 1 112,41_ 0(I1
c✓Ise :0 T /Go✓ move
6xitiir`9 1.X iar i� rztcu�frca/ Gel /iry
' - Ife W {%ac/c et7&
Nate: Va6 /s diva rig war eXeuse.
f tend h suJ/ i ed t ei/i'
0 ®f wed di (C. MI z�� t( ie /r
a40//e. $ ' -O"
" Pei /iy ke
le/7/17 4 , ra
4h et 0 �'�'iGe
ry aeda a,(`/ad mfg
ed iIU f fac/uke
71-y,e X . 41, 14 e • . -. (-nu-4s ,lac ed
17' 0 . 1 . . On eolfes / 1 . , " 0 . G . I4. ie /
2
Z.f tur 91 d d f Q) 3 yi wig% , .Z y "D. C .
e rne,M C/4..tAe rstck
-ate 3-/AL ram SG It t eee.�fe efafvc ,orn e '8 " 0. L.
clECENED
CITY OF TUKWIIA
NOV 0 1 7 1 "0
PERMIT CENTER
1111; 111 11111111 IIl1111111111� 1111111IIj1I111
2
O14 Tiff IN(..
11
!� 1';11':,11
11
11111 WW1
4
11jl 1111111
5
CITY OF TUKWILA
APPROVED
l_'EC /1-9
f
EaDI
G DIVISION
I 111111111 1 1111 X11{ 1111 i1111II1I 7 111 (Ii1111111111i1111111111
6 7 8 9
NOT'=: If the micrcfilmed document is Tess clear then this
notice, it is Cue to the cuaiity cr the cri'inal document,
1
10
Le. 9‹. SZ *!G Ca'. c lG Q bl 8l Ll 9l cl hl Cl el IL O(, 6 8 L 9
� I I I
I!i 'Ifilil:,l !'iil'' ;I i'I 1''11 I I !i +1'11 li i 11!11! Ilil! 11 I i 1 1. 1.. Iflfff II 1 i ' ll i i ll II''; li 'iIl!I�1 !'il!f l Illli i 11 i
11I�II ,, ,,,II, .. 111,! I,fl 1;.111 i! I I!. „ •1111, 1:I11!I�111, lull „i „i ,1,.I , LI.. 11 1!11,!,11 1.1{111 {II Lul{I,Illllllll 1H1h11111�11h1 1 11111111 i11d1111 I!. it IIJI. I.IIIIL,I... 1,111. I�IIJI11111.
III j11111\1111111'
11 MADE If ,EE MAN! 12
L
,1 1 1! 11114111
f.1�1
WAPRESSSE tx tS f l kit+ 1) 5 1 ifZeFsu4 tr+
f COW Ex/3f/ gait 10 ‘c 'Co
an CY.
we. am
kOt)-
.
Ilk w 6u(7Ir ry sfQ4,J wafts tvi fk vrx.t
fo-oav< it4Gr petersec el ¢;o►p•. Z, tric
NEW b(A Ili $Lard
4,rcfa!sfi.As
. llype X &.-.r/
/3(q X 3O 7° e,c - io
PATRICK • i-1. BODE; 1. :,.
12507 Ref -Red Rd. P.102
Bellevue, WA 86005
. 4206) 455 -4515
6-4140-tetpLA .
U1 I v OF I ti ;WILD
APPROVED
I`-C. 341989
BUJ DING DI /IS nry
Exts fi.l
`16,4/,0<: _ (2)
I 1j1111111 111!i;!11I jl
0
1G Ti:'. IN<...
(J :; e•." iiC
11;1'1!1
!Iilllli) !Milli
11111111111111j1'1
• - _.II111111a11 1111 1111_��11111�1 �l�i1Ill 1111111 �l11111i1l;l 111111111 1111 111- l-jj
4 5 6 7 8
NAT it the rnicrcfilmec; document is less clear than this 1
ncticc, it is cue t^• the quality cf the cric' nel c'ccurr.ent.
sc: fie ce Zc'. LG LC bl 81 LL 9L cl fit CL el 11 OL 6 € L 9 ci *)
I i
I�1 1 i1 �i I�Ii1 Il; gill 1 1 I li I i I 'I it I X11 !, i I I;! I I ri ' I I 1 11 I I hl III 'I�!i��' ll 11' I ' 1I
''� �!�.I W !,..II! 1111 ,1 11.!III�I∎.1! 11111 1I!,!I!I!,!�I,!III:,1.1!II�!I I;!II Illllil!! I !!�!111I1!.,,I!1!11!II�I!!i I Ii.lnl {II,III.11,lI'I II,I Illiil!11 I,II.,! 11 ..,I .,iliiiiil.l.Ill. nII, 1111
i ,1
RECEIVED
CITY OF T`UKWILA
PERMIT CENTER
11I1II! �Ili�l !lijl�lll`II!I!III!1! {III�II!I
9 16 ! 1 u.DE 111 LF MN:< 12
11111i!1.11i11i1111
R.N
dull
1