Loading...
HomeMy WebLinkAboutPermit 0215 - Arco Service StationBUILDING PERMIT CI OF TUKWILA BUILDING PUNT 14475 - 59th Ave. So. / Tukwila, Washington 98067 Applicant to complete numbered spaces only. BUILDING PERMIT NQ:, N2 215 JOB ADDR ESS 5800 Southcenter Blvd. DATE 4/23/73 LEGAL , 1 bESCR LOT NO. BLK TRACT J (SEE ATTACHED SHEET) OWNER MAIL ADDRESS ZIP PHONE z Sibarco Station, Inc. 2326 6th Ave. Seattle 98121 622 -5627 CONTRACTOR MAIL ADDRESS PHONE 525 -9818 LICENSE NO. Martens Construction Co. 9414 Stone Ave. No. Seattle 223- 012231 ARCHITECT OR DESIGNER MAIL ADDRESS PHONE LICENSE NO. Arco 1500 S. W. 1st. 2442150 ENGINEER MAIL AOORESS PHONE LICENSE NO. R. B. Shaffer 2326 — 6th Ave. Seattle LENDER MAIL ADDRESS BRANCH 0 -578- 062 -569 USE OF BUILDING Arco Service Station 8 Class of work: IX] NEW ❑ ADDITION • ALTERATION • REPAIR • MOVE ❑ REMOVE 9 Describe work: Construction 2 Bay rustic steel service station 10 Change of use from Change of use to 11 Valuation of work: $ 63,000.00 PLAN CHECK FEE 85.50 PERMIT FEE 171.00 SPECIAL CONDITIONS: Typo of Const. IV Occupancy Group F Division 1 Size of Bldg. (Total) Sq. Ft. 1400 No. of Stories 1 Max. Occ. Loaf? Fire Zone 11 Use Zone C -1 Flre Sprinklers Required •yes ®No APPLICATION ACCEPTED BY. �j► PLANS CHECKED BY 411P AP I OVED FO' sa....:4 S . E g INo, of 'Dwelling Units OFFSTREET PARKING Covered SPACES: Uncovered 'quip 'T E E PARATE PERMITS ARE REQUIRED F0 • ELE• RICAL, PI UMB- ING, HEATING, VENTILATING OR AIR COND • ING. THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUC- TION AUTHORIZED IS NOT COMMENCED WITHIN 60 DAYS, OR IF CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 120 DAYS AT ANY TIME AFTER WORK I$ COM- MENCED. 1 HEREBY CERTIFY THAT 1 HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED HEREIN OR r THE GRANTING OF A PERMIT DOES NOT PRESUME T• GIV AUTHORITY TQ` IOLATE OR CANCEL THE PROVISION OF • Y OTHER STATE • LOCAL LA. REGULATING CONSTR CT • OR T RFO - M •N 0 • •NSTRUCTION. r ee A L[- I!• . . r Special Approvals Required Not Required Approved e ZONING HEALTH DEPT. FIRE DEPT. SOIL REPORT OTHER (Specify) FOUNDATION FRAMING 5 GNAT RE OF OWNER or 0 t BUILDER/ / FINAL SIGNATURE 011 AUTHORIZED AGENT IDATE) WHE ROPERLY VALIDATED (IN THIS SPACE) THIS IS YOUR PERMIT PLAN CHECK VALIDATION CK. M.O. CASH PERMIT VALIDATION OCCUPANCY PERMIT REQUIRED CASH '�.► I . •, .i 4 I \.,r * L Y F 1 i..I`‘% i./ ■.d . 1..1./ . 1 ' ' .s li: .. * t 1 r 14475. 59th Ave. So. / Tukwila, Washington 98067 Applicant to complete numbered spaces only. .100 ADDRESS ,O 50j7i0. •" LvP DATE r3- / 73 i. IaRIMIATPJMIN V+a,012MWrIIIIPirAW;11 a'A Ftlr n *1 • LEGAL 1 D :C11. LOT N0. SLR TRACT �y� J,y�)S C ATTACHED SHEET) i� -\ OWNER MAIL ADDRESS ZIP PHONIC 2 f BAR C? .t rlo/J . INC . 2346 G7-41 ,4ac c ,4- 96/2/ G z z— 754,2.7 CONTRACTOR MAIL ADDRESS PHONE LICENSE NO. 3 ARCHITECT OR DESIGNER MAIL ADDRESS PHONE LICENSE N0. /9aPc,..., �� /52 6/0 /17- - ,may./- 2/ SLR ENGINEER MAIL ADDRESS PHONE LICENSE NO. 5 - '-) 2 32 ( e-}'D'- , 4 7 ;x,0041" T7� LENDER MAIL ADDRESS BRANCH 6 • USE OF OUUIILLDDING /D '// ,! _•-� yam- ^ 8 Class of work: KNEW • ADDITION • ALTERATION • REPAIR • MOVE 0 REMOVE 9 Describe work: �4N5'hq 0 e -r/6 r( r,2— 1�Ay ��'t)61 —i L „.1-c _L__.. (---, 3 grs2 1St G,___ C T/ -'7'/ e,..1-) 10 Change of use from Change of use to r11 Valuation of work: $ 3t off. >� 1 PLAN CHECK FEET �r] Typo 01 ' Const. � 5° Occupancy Group PERMIT FEE ,. i, 1,� Division SPECIAL CONDITIONS: Size of Bldg. (Total) Sq. Ft. tii No. o1 ) Stories Max. Occ. Load ( Fire Zone Use Zone L' — Fire Sprinklers Required III Yes No APPLICATION ACCEPTED BY: PLANS CHECKED BY: ' APPROVEO FOR ISSUANCE BY: No. of Dwolling Units OFFSTREET PARKING Covered SPACES: Uncovered NOTICE SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMB- ING, HEATING, VENTILATING OR AIR CONDITIONING, THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUC- TION AUTHORIZED IS NOT COMMENCED WITHIN GO DAYS, OR IF CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 120 DAYS AT ANY TIME AFTER WORK I$ COM- MENCED. 1 HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED HEREIN OR NOT, THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CONSTRUCTION OR THE PERFORMANCE OF CONSTRUCTION. � , r 'FOUNDATION tie C • 46, T _ •'C/ 1- Special Approvals Required Not Required Approved ZONING HEALTH DEPT. FIRE DEPT. SOIL REPORT OTHER (Specify) FRAMING SIGNI;oillr OWN •OWNER � ILOCR) i VI ..ice% fglrLs 7 3 FINAL IG•ATURE OR AUTHORI �0 i ENT (OAT PLAN CHECK V WHEN PROPERLY VALIDATED (IN THIS SPACE) THIS IS YOUR PERMIT t ' ATION M.O. CASH PERMIT VALIDATION cK. M.O. CASH Mrs OCCUPANCY PERMIT REQUIRED SURVEY ADDENDUM, DESCRIPTION: THAT PORTION OF TRACT 35 OF BROOKVALE GARDEN TRACTS AS PER PLAT. RECORDED IN VOLUME 10 OF PLATS, ON PAGE 47, RECORDS OF KING COUNTY, AND OF THE UNPLATTED STRIP OF LAND ADJOINING ON THE EAST OF SAID TRACT 35 IN THE SOUTHEAST QUARTER OF SECTION 23, TOWNSHIP 23 NORTH, RANGE 4. EAST, W.M., DESCRIBED AS FOLLOWS: BEGINNING AT THE INTERSECTION OF THE EAST LINE OF SAID UNPLATTED STRIP WITH THE NORTH LINE OF STATE HIGHWAY AS CONDEMNED IN KING COUNTY COURT CAUSE NO. 600726; THENCE NORTHWESTERLY ALONG SAID NORTH LINE TO ITS INTERSECTION WITH A LINE WHICH IS 25 FEET WEST OF AS MEASURED AT RIGHT ANGLES TO AND PARALLEL WITH THE EAST LINE OF SAID UNPLATTED STRIP AND THE TRUE POINT OF BEGINNING; THENCE CONTINUING NORTHWESTERLY ALONG THE NORTH LINE OF SAID HIGHWAY A DISTANCE OF 163 FEET; THENCE NORTH AT RIGHT ANGLES TO THE NORTH LINE OF THE HIGHWAY A DISTANCE OF 135 FEET; THENCE EAST PARALLEL WITH THE NORTH LINE OF SAID HIGHWAY TO A POINT IN SAID LINE WHICH IS 25 FEET WEST OF AND PARALLEL WITH THE EAST LINE OF SAID UNPLATTED STRIP; THENCE SOUTH ALONG SAID LINE TO THE TRUE POINT OF BEGINNING; TOGETHER WITH A NON- EXCLUSIVE EASEMENT FOR INGRESS, EGRESS AND UTILITIES OVER A STRIP OF LAND 25 FEET IN WIDTH BEING THE 25 FOOT STRIP OF LAND LYING SOUTH OF THE EASTERLY PROJECTION OF THE NORTH LINE OF THE MAIN TRACT HEREINABOVE DESCRIBED AND LYING EAST OF AND CONTIGUOUS TO THE EAST LINE OF SAID MAIN TRACT, AND LYING NORTH OF THE HIGHWAY; TOGETHER WITH A NON- EXCLUSIVE EASEMENT FOR INGRESS, EGRESS AND UTILITIES DESCRIBED AS FOLLOWS: BEGINNING AT THE SOUTHWEST CORNER OF ABOVE DESCRIBED MAIN TRACT; THENCE NORTHWESTERLY ALONG THE NORTH LINE OF THE HIGHWAY A DISTANCE. OF 20 FEET;THENCE NORTHEASTERLY TO A POINT IN THE WEST LINE OF SAID MAIN TRACT WHICH IS 50 FEET NORTH OF THE POINT OF BEGINNING; THENCE SOUTH ALONG SAID WEST LINE TO THE POINT OF BEGINNING. April 19, 1973 Mr. John E. Richards Office Engineer City of Tukwila 14475 - 59th Avenue South Tukwila, Washington 98067 Dear Mr. Richards: Relative to items noted on structural check by Lloyd F. Quatier and Associates, the following action has been taken: 1. Plans have been revised and each sheet signed as required and checked by Mr. Quatier. 2. Plans have been so noted. 3. Plans have been revised to 20# as requested and checked by Mr. Quatier. 4. We feel that inspection of welding, which on this job is quite minor, is acceptable and if you require we will have local testing laboratory perform the check. As to the concrete, since virtually none is structural in nature and is in fact mostly shallow footings and ground level flat slabs, that the intent of the code really doesn't require this rather expen- sive procedure and we ask relief. 5. Plans again so noted to agree with specifications. 6. As discussed with our Mr. Windier, since we are deal- ing with unknown as far as water table is concerned, this phase should be delayed until excavation is complete to determine if ground water table requires anchoring of tanks. We will so install if required. 7. Sign base and details will be applied for separately by our sign contractor. UtlanticRichgeldCompany Mr. John E. Richards April 19, 1973 Page 2' On items*ntioned in your letter, the following is the statust 1. Building Contractor - Martens Construction CoMpany 9414 Stone Avenue North Seattle, Washington 525-9818 License number 223-012231 Tax number C-578-062569 Steel Contractor •- Ray F. Becker CoMpany 2345 North Ross Portland, Oregon (503) 288-5341 Licenite nuMber 223-01-250 Tax number C-409-7041 2. No comment. 3. We will raise berm on asphalt at property line to insure ground Water gets 't�. catch basin. Xncidentally, we wonder why the adjoining restaurant did not have to comply with.theserequitements. 4. Our :contractor will uee non-tonibustible plywood as 4ireoted. 5. As per conversation with.Mr. Windier, we will provide hose opening:in:overhead'doori and will install adequate sign in tube bays that motors must not be run without doors being opened.. 6. A separate furnace room is being built as per revised structural and general arrangement plans and one hour separation .is being installed. 7. We will cemply:with.these provisions. 8. We will comply with these provisions. 9. 0 agreed verbally with Mr, Windler,fluewill be.4'0" above furnace'room roof. AllanllcRIchfieldCompany c Mr..John"E, Richards April 19, 1973 Page 3 10. Our steel fabricator pointed out that .exception #1 from the tempered glass provision pertains on glass over 18" above floor which is this instance. Doors will have tempered glass'as requested where full glass panels exist. On items mentioned in the letter from City of Tukwila Pire Department, the following will be our procedure: 1. Two dry chemical Ansul 10 -E "Plus Fifty" extinguishers capacity pounds 10 U.L. 30 B.C. are on order and will be installed in service bay and sales foyer per OSHA mounting requirements. 2. All electrical work will be done by Pox and Nystrom from Renton and will comply with all national and state electrical codes. 3. Tanks and piping installation and testing will be per NFPA #30. .General contractor Will notify myself and the fire department to witness testing. 4. Emergency pump shut -off switch will be conspicuously alined.. . Furnace room will be separated from lube bay by one hour fire retardent wall and ; will have - outside ' excess, per plans revision. An automatic fire damper will be installed in duct where it enters main building. Pire retardant roof ,will be.•installed. 7, No Smoking -, Stop:Your Motor signs will be installed..on pump island as our standard operation. 8. General contractor: will- acquire oil tank permit..and furnace permit from fire- department. The yearly,,permit for repairing :and servicing motor vehicles will be acquired from fire department by incoming dealer. Sincerely, R. B. SHAFFER Conttruction & Maintenance Engineer RBS:gu cc: City of Tukwila , (2) Mr. R. E. Peterson Marten Construction. sibarco station service station engineering general arrangement landscape plan