Loading...
HomeMy WebLinkAboutPermit B93-0303 - BALLARD COMPUTER - TENANT IMPROVEMENT•'; '4. , -75 \-3 rrn �AUARD CorvtPoiER bc16-07-003 y of 71ZICWili. (206) 431 -3670 Community Development / Public Works • 6300 Southcenter Boulevard, Suite 100 • Tukwila, Washington 98188 BUILDING PERMIT Permit No: B93 -0303 Type: B -BUILD Category: ACOM Address: 339 TUKWILA PY Location: Parcel #: 022300 -0010 Zoning: Type Const: V -N Gas /Elec: Wetlands: Water: N/A Contractor License No.: SUNSEPG187BF TENANT BALLARD COMPUTER 339 TUKWILA PY, TUKWILA, WA OWNER SOUTHCENTER ANNEX ASSOC C/O BETA COMMERCIAL PROP, 201 116TH AVE; BELLEVUE CONTRACTOR SUNSET PACIFIC GENERAL CONTRACT :``Phone: 206 588 -9595 9500 FRONT STREET. #200,'; TACOMA, WA 98409 CONTACT ROD MCCARTEN 9500 FRONT STREET #200, •TACOMA, WA 98409.' Status: ISSUED Issued: 08/20/1993 Expires: 02/16/1994 Type of Occupancy: STORE Slopes: N Sewer: N/A WA 98004 Phone: 206 588 -9595 * **k * *kk•k * ** ** kit***** k***** k** k• k* k*********** 1. * * * * * * * * * ** * *** ******k*k***** Permit Description REMOVE /DEMISING WALLS, PARTITION WALLS, CEILING GRID, AND LIGHTING. Units: 004 _` Front: Buildings:, 001 Left. Fire Protection: SPRINKLERED UBC Edition: 1991 Valuation: SETBACKS_ Back: Right :: 8,50,0:00 ,Total Permit Fee: 18270 * *** ^• kk *9r**** lkkk * * * *,** * * *k,vY* * *tk** *kk ** * 4iti** * * *4*** ***k* *kk * * * *44,k44i *kk * Permit Center Authorized Signature I hereby certify 'that I have read and,exa'mined this permit, arid ::kn`ow; "the same to be;`. }true `,;and correct. All provisions of•.law. and ordinances'" governing thyis "work will be complied , with, ,whether .spe'cified herein or not The grantingof, this. permit does not presume. to`give auth''ority, to violate or cancel the:'- 'P'rovis,;idrs of 'any other state or ;:l'o`cal laws regulating construction or the performance of.. work,. , , I ahr authori zed to sign for and obtain this bui`l0 i perm' Signature: Print Name: ,Q /6-.4 Date: 3 V This permit shall become null and voi`d` ° "i "f" the work is not commenced within 180 days •from.the date of issuance, or if the work is suspended•or abandoned for a period of 180 days'from the last inspection. CITY OF TUKWILI Department of Cor inunity Development - Permit Center 6300 Southcenter Boulevard - #100, Tukwila, WA 98188 (206) 431 -3670 Building Permit Application Tracking PLAN CHECK NUMBER Fft3- 0:503 PROJECT NAME e__ G_Lkloa- d CIQMPkAte‘r SUITE NO ___-, SITE ADDRESS DATE NOTIFIED INSTRUCTIONS TO STAFF • Contacts with applicants or requests for information should be summarized in writing by staff so that the status of the project may be ascertained at any time. • Plan corrections shall be completed and approved prior to sending to the next department. • Any conditions or requirements for the permit shall be noted in the Sierra system or summarized concisely in the form of a formal letter or memo, which will be attached to the permit. • Please fill out your section of the tracking chart completely. Where information requested is not applicable, so note by using "N /A ", date and initial. • DEPARTMENTAL REVIEW "X" in box indicates which departments need to review the project. PARTMEf ATE BUILDING - Cr �_.CL initial review FIRE PROV: IUIRE.MENT `� 6175 CONSULTANT: Date Sent ROUTED X611"1 _i %3 INIT: �. 1 C.OMMEN' Date Approved FIRE PROTECTION: 4 S • rinkiers /9' /q, FIRE DEPT. LETTER DATED: ta Detectors INSPECTOR: N/A 5/ 2-- O PLANNING k ZONING: BAR/LAND USE CONDITIONS? INIT: REFERENCE FILE NOS.: MINIMUM SETBACKS: N- S- E- O PUBLIC , WORKS f31 i ,1 J' INIT: (..„‘V UTILITY PERMITS REQUIRED? ( ) Yes (44-N PUBLIC WORKS LETTER DATED: O OTHER )1 BUILDING - final review g BUILDING OFFICIAL INIT: s I123, 143 TYPE OF CO STRUCTION: INITY—Ae1• lig ✓r 'Dw.a 1144 INIT. CERT. OF OCCUPANCY? Dyes No UBC EDITION (year): lrc( REVIEW COMPLETED AMOUNT OWING: cl-) CONTACTED P nn 1' -Cis DATE NOTIFIED .o .. aI 3 BY: nit.) 2nd NOTIFICATION BY: (init.) 3RD NOTIFICATION BY:. (init.) 01/06/93 CITY OF TUKWILA Department of Community Development - Building Division 6300 Southcenter Boulevard, Tukwila WA 98188 DESCRIPTION (206) 431 -3670 BUILDIFsL PERMIT APPLICATION BUILDING :PERMIT :AMOUNT: RCPT DATE: FEE PLAN ;CHECK: FEE:'::;!: BUILDING: SURCHARGE TOTAL:: SITE ADDRESS SUITE # 33et ` b.xw I LA- ill -e. _td_ i`( V , LUE OF CONSTRUCTION - $ q,SO6 k. SESSOR ACCOUNT # 2.2300 - 0010- 66 PROJECT NAME/TENANT giqL-6,4 !.. *,. V- TYPE OF • New Building • Addition JR Tenant Improvement (commercial) ° Demolition (building) WORK: ❑ Rack Storage ❑ Reroof ❑ Remodel (residential ❑ Other DESCRIBE WORK TO BE DONE: -GMtig PeiA11I MC/ Mit, �, P4 VI' ►rlo)J w -LAS, . N c - r L - j ti BUILDING USE (office, warehouse, etc.) K-em i. NATURE OF BUSINESS: (oMx../ -61 WILL THERE BE A CHANGE IN USE? No Yes If Yes, new building requirements may need to bd met. Please explain: SQUARE FOOTAGE - Building:2ot -160 Tenant Space: )2.1544 Area of Construction: i 2 f A- A4 VAL THERE BE STORAGE OR USE OF bLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE BUILDING? a No ❑ Yes IF YES, EXPLAIN: 1,'ROPERTY OWNER Al 079. Uct6gmn wr Co •% efrizr OeiekLimer'r PHONE t%-4f3 /' 1-( ZIP ) 7_001 DRESS 4TH( "CONTRACTOR 1 e. pi 4 F._y 2s , ����T� , PHONEza „5:60....c7.5—,?5... ZIP ADDRESS /r�� `��J��� ��W /l% , � it s. : r . _/ WA. ST. CONTRACTOR'S LICENSE # ! q---713 EXP. DATE '_ 7 _ Gr3 PHONE ARCHITECT iv ADDRESS ZIP ,�. HEREBY :CERTIFY: THAT i HAVE READ;AN.D EXAMINED:.TMLS BE ::TRUE AND:CORRLCT ANDI:A ,'A HORI U:TO:AP • BUILDING OWNER SIGNATURE OR AUTHORIZED AGENT PPLICATION :AND KNQW • R.TNIS::PERMIT. DATE PRINT NAM 20'01 M`C f 1-el) P HON Ege?A+_666'q q _ ADDRESS CITY/ZIP CONTACT PERSON �6r..)0 T 6-r'e r gag T�4caM�9 �E (3S Mc ri,t_g_Tod PHONE .-zot APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill out the application completely and follow the plan submittal checklist on the reverse side of this form. Handouts are available at the Building counter which provide more detailed information on application and plan submittal requirements. Application and plans must be complete in order to be accepted for plan review. VALUATION OF CONSTRUCTION Valuation for new construction and additions are calculated by the Department of Community Development prior to application submittal. Contact the Permit Coordinator at 431 -3670 prior to submitting application. In all cases, a valuation amount should be entered by the applicant. This figure will be reviewed and Is subject to possible revision by the Building Division to comply with current fee schedules. BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal. EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of application shall expire by limitations. The building official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform Building Code (current edition). No application shall be extended more than once. If you have any questions about our process or plan submittal requirements, please contact the Department of Community Development Building Division at 431 -3670. DATE APPLICATION ACCEPTED (o—a3 DATE APPLICATION EXPIRES 611111/91 COMMERCIAL SUMITTAL CHECKLIST NEW COMMERCIACBUILDINGS/AD N • • • Completed 'building'permit application (one for each st fli .Asiessbi:oacco Two 'saii'..(2)Ofdthefollowing:„ :Specification State licensed engineer •.:. Soils report siampedby:a Washington State licensed engineer • .di Topographical........ [ Energy calculations stamped . by a Washington State licensed ....„.„. , . • ...• d:,.. , • .Woikiilij:.iiraWing4; stamped by a Washington State licensed 'architect; which • • , • • • •„„...• • ..d „ ........ • • .• . . Architectural drawings Structural drawings • • :::::::::•-:MeOhanioal :drawings • • '' ' • : • e. Elevations Civil drawings Landscape plan Com.toted utility permit application (one for entire project) S1)(.(6) sets of civil drawings NOTE See utility permit app//cation and checkhst for specific utility submittal requirements;.;..: : • : : ::: :: . .......................................................... :::::::::::::: ...... :••••.• ......................... . . RACK STORAGE::.:.': i.,„•:: :. • :''..... .. '.... ...-:::.......••:.: :. • •: .;...dd.ddi .: ...,.. ,. • • Li-.... d....::::. . ' ' ... ..'- ' . : . :: . •••,. — ......:.: ......;!....:1.:.::::••••."..."..:,',•...::' Completed building permit application • . .„ d : ,. , . , ,. ., , , [J . Assessor . Account Number ..„. .:;:d.' . ....S..: ....• . d ; :. ...: . ' ' , • ,.:::•:. id:: :. ::: ..d.... , , : ... :d ; ' • ' , . , : Two (2) sets of plans which include •... , . ..... :..• I I Building floo dr plan showing -.: . ...:. : • ..'. .: l.' ....'• :.•• ' .'... d... • -, ...dd.: .: : . . : • • . • Entire space whore racks will be located .: ::•.„ ... d. ........- •• „ Exit doors . •• Dimensions of all aisles . •:. .• : • . - . •:••••••: Tenant space floor plan shoWing rack storage layout, aisles and d d. NOTE: Include dimensions of racks (height;: Width and length), aisles: and exit ways On plan,: : Structural calculations staritped by a Washington StatellicenSed ongineer:(rack storage 8', and Over): I..• • • H • RESIDENTIAL -- NEW SINGLE•FAMILy.:DWELLINGS/ADDITIONS d. . d ..• .„ „.• Completed building permit application (one for each structure),.:,:. • „„ dd • d • •.• .• • :• Legal „ .:,.• :• • • • .. •••• • ' —• " • • • •••• •:. • Assessor Account Number „d: .•:„. •• •••• ..• • . . •• . • Two sets (2) of „.. working drawings which include •• •••••" • . ,•••. plan,shoWclosest hydrant Foundation plan Include access to building • •.,„;.•••••.'„ showing Floor plan •••,.. I : • Width and tang!!! of Root plan Building elevations (all cross•-sacticiri'..:•• • . Structural framing Ti Washington tate.Energy•Code data 11.11011■1■11. COMM ER CIALTENANT IM nov EM EflS • ::CeniPiOled,OUJIclingi'p:d.::::',. Assessor Account Number ,••••"•Twq.(2), sets of construction plans, which Includo • Location of tenant space , nd, Existing end :prOpOSed, parking • Landscape plan (if raii.Oliqab!ei'.0•;OP90.....ofuei) Overall building plan •Tenant location L.J.:'Use • of ................... .. ................................. t building ,orequ ri? Flecir.plan'.,:ef.:PrePosedH'tehaniiOao d•• • Tenant space plan with use of each room labelled Exit doors egress patterns • New " walls,: existing wall, and Walls to be demolis Construction details • • • . . attachment for floor and ceiling Structural calculations stamped by a Washington State licensed Ee7fd trioze: "d: . application and plans .. • . .. . .. • . '• . . . • . • . Completed building permit application (one for each structure Assessor Account Number • Narrative deSoribing.eXisting.*roOt. material being removed and i material being installed NOTE A certification letter is required prior to final Inspection and sign ... • . . :off of A 1‘ITENNA/SATELLITE DiSHES . . . 'Completed sets ofplans..Which include Site Plan (showing building and location at antenna/satellite dish Coatis antenna/satellite: clishl•and„.m.u•thod•ot;attaChment ...StrUctOral:calCulatione;stamped..by. alWashingtokstotkiiponsed.:i,:::::... .:.engineer may .. . . . 1 I 1 ■■■■■■•••■••, Completed utility permit application H • ''••••••, ri Six (6) sets Of site plans showing utilities • • •• NOTE: Budding site plan and utility site plan may be combined. See • utility permit application and checklist for specific submittal requirement&. Additional topographical and soils information may be required if unique . site conditions. . • •:•1 : Completed building .permit application (one for each structure) . •••••••::::..." • • .• Assessor Account Number . . Two (2) sets of working drawings, which include Site plan ouridation plan Flout plu Roof plan Buiidin elevations (all views) Building cnoss section ..... . . . ••• • • - StruCturatfrarning #17Y.. 0:q91147PT Yk19 :!411itY 'POTIP11;:i00/194!ion and plans must be RgROOFS::::::"i'":•::::::::::::::::::::::" ::::::::::::::::::: • " ": : ,-, : •-•,.'•:. : -: •••• - - " • ' . : ...,:::::..,,, . .,.:,:::.::;.i.:1:!,::::;:.:::::;,:,;::',...'",::i.'.i...:::::.:. ........ •:, '..:d :'•Completed building IpermitiapPlioatlan,i(one:for each structure r---:Assessor ACCOUnt.,iNlUrnbar,.:•:::'• ........ :•-,'•.•:•••••••::::::::;•?....::i'.." ::, . ,!:, .................. ::::::::';':.:':::::,•,,':!:..'•:••,::.:i,i., :::,.::;.•..":., Narrative describing eXiSting roof,....rnaterlal being raMOVedi...:60::::::':::: ' •••••,.,.;•.•••• Material being : : • • . • • • • • NOTE A certification letter is required prior to final inspection and sign off of the permit,': " • C REGISTERED 'AS PROVIDED BY LAW AS A: CCIN,T . c.tJn7. Cif �,F:I,,At REGISTRATION NUMBER ..EXPIRATION DATE fJW,'�L:T •0.4CX. 1'C. L J�h! r 9.500 is I? CM I SIGNATURE 4' ISSUED BY DEPARTMENT OF LABOR AND INDUSTRIES WA 06400 REGISTRATION 'VERIFICATION �o€,o -c..bg.. z0'd S99£Z£b90n A� }ndiuo -3 n\l�o9 01 014-i0Qd a.asung WOad Wd8c:S0 £66T-GT -60 teN""'�+y°"ht.pu"1'G"a: fi"7xr�ayv "ri"K »n•,:y..n�; i:n.ypaM+r A'kh************ khhk*** k*** kk****** k•k *h*hk * *k * * *k** * * * *k * ** * *k *hh CITY OF TUKWILA, WA TRANSMIT * ** A************* k****k k******* k * * ** ***********h * *****k*k**** ** TRANSMIT Number: 93001063 Amount.. 182.70 08/06/93 O9:O4 Permit No: 893.0303 Type: B -BUILD BUILDING PERMIT Parcel No: 022300 - -0010. 08I09/93 Site Address: 339 TUKWILA PY Payment Method:. CHECK Notation: SUNSET PACIFIC Init. SLB ********* k****** k"** k************** ** ****** ** * ** ******* *** *** *k** Account Cade 000/322.100 000/345.830 OOO /386.904 Description BUILDING - NONRES PLAN CHECK M NONRES STATE BUILDING SURCHARGE Total (This Payment) :. •Total Fees :, Totai.All.Payments: Balance: 182.70 182.70 .00 Paid 108.00 70.20. A.5O 182.70 GENERA 108.00 GENERA 70.20 GENERA 4.50 TOTAL 182.70 CHECK( 182.70 CHANGE 0.00 3236A000 14 :42 CITY OF TUKWILA Address: 339 TUKWILA. PY Permit No: B93-0303 Tenant: BALLARD COMPUTER Status : ISSUED Type: B -BUILD Applied: 08/06/1993 Parcel #: 022300-0010 . Issued: 08/20/1993 *************************************************************************** Permit Conditions: _, _-----_ 1. No changes will be mida4ogOiPlaif.6040ass approved by the 'Architect and the 114,k41,TOU1I-ding DTVf'S4On, 2.. Electrical prm1t:sI)011' be obtained6Athrough"Ttiiiiaahington State Di vi s i on4i5f,,bor, and. Industries andiia11'44ri ca 1 work w i l l be4Irt. c0 by that Vagency sj 24 By-A Sp 3. All perinitpscqop,nt 6 r a 5, , and aPprciVW00,ivis '0*-KI be ma iyi ta i n eick4i4va i 401p :4A t' t. hq job 'S' f ee prior stai4Cof any consattlbriftlieW&cUmet ' are t� 'be ma 91teaied'U,, a va i 1 ta7)'ei‘,ifiiallnspeetjo,H/Oprova 1 is granted: , .2...N 4. Any exp,Oed insulations bacillhg material shall 'haViat'PlamaM, Sprea0aOng of 2-5 or 414*\1,and makari a 1 shall bear' "t;Ointl% ficap'0 414wingAhe fire pertorp6c rating thereof. kh 5. All onstrudt1on to b e,J:done iii6dtTfOrmance with a ppro4cW M p 1 anaq requirements of Building Code ',0991 Ed i i On) 'as4'am,6n de di„by't.hie •„ W as .i n.'g..,,X h O'.., 1 n ASt/ , a w••t•• ipi a, B u 1 1 d i ngCoJe;' \ ' } Uni ' m MechanA ca 1 Coce U991' State Energy Code (091.Seon(\Eci ion) 6 . Va lkOli tyiwof4 Permit. 7TWAAqance of or approval of p 1 specificat•i�ns conptat1on not be op n ,,,,,,; strq9d . to,,,,be a permit for,' or an approval ,(:)'T4 any violation v Pf WiiS,..of Vtle ,provfoCcitmi;i"V th*tsAco.de\x:C3f—,4ny other o r d litl n c,e lo OA the jurisdiction. 110paRtii....=:(e.syming to c 0vp' autlib,Jt9.0trdr vfolate, or cancel ttr'20-141Wfsions a this code shall ' e valid - - t..„ kk A { r_ ' 4. , 7. MAINTNIN egalLING Ic.RAFTSTOPS 8. "NO" Od'1,1PANCY UNDEp THIS PERMIT: %, ,.. ii x-, ,,, ,; ,‘• ' , . „, ,, , ° 4 ':-;: dek,p4 4 • Jit .5 rt? I; - • ' ' 4,; ,,f ‘,1' , . 1908 City oTukwila FIRE DEPARTMENT 444 Andover Park East Tukwila, Washington 98188 -7661 (206) 575 -4404 John W. Rants, Mayor August 19, 1993 Fire Department Review Control #B93 -0303 (512) Re: Ballard Computer - 339 Tukwila Parkway Dear Sir: The attached set of building plans have been reviewed by The Fire Prevention Bureau and are acceptable with the following concerns: 1. Accumulation of combustible waste material is prohibited during the demolition phase of this project. Remove and properly dispose of all waste material prior to the close of the working day and as often throughout the day as needed. 2. All new sprinkler systems and all modifications to existing sprinkler systems shall have fire department review and approval of drawings prior to installation or modification. New sprinkler systems and all modifications to sprinkler systems involving more than 50 heads shall have the written approval of the W.S.R.B., Factory Mutual, Industrial Risk Insurers, Kemper or any other representative designated and /or recognized by The City of Tukwila, prior to submittal to the Tukwila Fire Prevention Bureau. No sprinkler work shall commence without approved drawings. (City Ordinance #1646) Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (UFC 10.503) (City Ordinance #1646) 3. This review limited to speculative tenant space only - special fire permits may be necessary depending on detailed description of intended use. Any overlooked hazardous condition and /or violation of the adopted Fire or Building Codes does not imply approval of INSPECTION RECORD Retain a copy with permit CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 PERMIT (206) 431 -3670 .1A-E.4.40,9 roeM: .1A-E.4.40,9 '.ivy, P� ►�Yt.- ypeo nspedan: ...1 f.»-c..- .t�e—>►.0. Address; .5 _ lc- ex,7 Date Called; Special Instructions: Date Wanted: Requester: Phone No,: ,E1 Approved per applicable codes. COMMENTS: ' ❑ Corrections required prior to approval. spector: T- 16 -:93 ❑ $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Poet/e"_? 6..7 1 Dtald - ' - drs:3 9 744 /Dtatd,..7......mCT pcantutos euse: Poe N. . 0 INSPECTION RECORD y/ Retain a copy with permit Type of Inspection: CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 59_3 63 63 PERMIT NO. (206) 431-3670 Approved per applicable codes. X Corrections required prior to approval. COMMENTS: ' a7»7 v „dila 0 $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. De: .c • CITY OF TUKWILA Id: ACTP125 Keyword: UACT User: 1677 Activity Table Processing Permit No: B93 -0303 Tenant: BALLARD COMPUTER Status: PENDING Address: 339 TUKWILA PY 08/17/93 BUILDING PERMIT Type: B -BUILD Vers: 9101 Screen: 01 Base Information Parcel No: 022300 -0010 Owner: SOUTHCENTER ANNEX ASSOC Validated By: SLB Plan Ck Approved: / / Status: PENDING Applied: 8/ 6/1993 Issued: / / Active /Inactive: A Completed: / / To Expire: / / C of 0 Issued: / / Bus Lic #: Final Notice: / / Nature of Work: REMOVE DEMISING WALLS, PARTITION WALLS, CEILING Location: Category: ACOM (N= NEW /A= ADD /ALT + SFR,DUP,TRI,APT,MH,COM,IND) Zoning: Gas /Elec: Census Code: 437 # of Units: 1 # of Bldgs: 1 Pub Own:N Streams: Slope: N Wetlands: Water:N /A Sewer:N /A Setbacks - North: .0 South: .0 East: .0 West: .0 Valuation: 8,500.00 Fire Protect: Type Const: Type Occ:0023 STORE UBC Edition: 1991 Occupant Load:N /A Occupancy Grp:B -2 F7= Update, F2= Previous Line, F1= Screen Index, ESC = Cancel Update CITY OF TUKWILA Id: ROUT130 Keyword: UACT User: 1677 08/17/93 Activity document routing maintenance. BUILDING PERMIT Permit No: B93 -0303 Tenant: BALLARD COMPUTER Status: PENDING Address: 339 TUKWILA PY Route: 1 Current Route Line: 3 of 6 Packet Units Description Station Status Received Assigned Complete aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa Packet Units Action Station Initials Status Received Assigned Completed BUILD 01 01 C BLDG KEN Ap Cond. 08/06/93 08/17/93 08/17/93 Priority (0 /low..9 /high): 0 Regular hours (HH.MM): .00 Overtime Hours(HH.MM): Comments 1[SCOPE OF WORK, INTERIOR DEMO. ] 2[1. "NO ; OCCUPANCY'!';: AFTER ; FINAL. ] 3[2. MAINTAIN DRAFT STOPS. ] 4[ ] 5[FIRE PLEASE REVIEW AND COMMENT. ] 6[ ] 7[ ] 8[ 9[ ] ] aaaaaaaaaaaaaAaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa aaaaaaaaaaaa F1 =Help, ESC =Exit current screen. ff r{ • 1 a 4 Z 0 tJ fDl Wvlt4II`I6r •HHEt.t. 930 lak..Ids • Sosssia weak. 8911, 0•IEO 3R5 Rbes3 THE. ANNEX AN>kmt i' cK W1 -rucW It.,A7 WASH I IAlerc,PJ TUKWILA t?J Kv.IA -r , M'A L./146YeeVIST ter". I'a5TA OfVE apMl;Nr IIII(illilll( IIII lII1 IIIIIII�IIIlI�lIl�Ill�il� {lII�III�III(I P�! 111 11 (lli1!'jl(IIlf !Ii pit III 1; 111�ij1(ijl�lji((i 0 18 INS INCH •1 2 3 4 5 6 a NOTE: If. the microfilmed document is lees clear than this notice, {,t is due to the quality of the ;>riglua1 document. t. lob no. drawn chmnkod d$18• ! l$I I1 l If Il 1f Il 1i If 1l IfI`�i..I> IiJ : 1 I,il i I.I ,i .1:I i- i,1 1 9 1 10 11 EWE 12 0v 6Z se z..z 9IIZ GZ +7`Z C LT tZ OZ 61 01 � L 91 St ht CI Zt It O1, 6 11111111111111l�11 1111111111llill1,11111111 11111111111l1111111011llll 11111'!! 1IllI1l 10111 !111111111111illllll14,1,ll11J� 11II1!l11111l111111111I III!l IU ;II111I11111�1illii!Ilillll�f 1111111111I1Illi1i!!I a tee �1 6evto 1 DCC FAIX '",.,..."---w° --- ova is are r aIld II: the plan f ��5 approval r;`s ' rt . , c•rrtlls and o�Is "` ; t�,:t, jtiOr`• O ��y 7,:; nOt ;Of ti z,_ , � ;ut1 tc,(�81Rt Of L''� ;od or Ordlnant;'' r �,�r�,�,�yfed�J�, ,,/,--.-- -7- _ rOVE:d plane ••� of anp Y ,7d� SEPARATE PERMIT REQUIRED FOR: 0 MECHANICAL k` ELECTRICAL o PLUMBING 0 GAS PIPING CrN OF TUKWILA BUILDING DIVISION RECEIVED CITY OF TUKWILA AUG 5 1993 PERMIT CENTER 't M�YY ��.ly 3,• • .se • ;1,• ,•c %•"" • •;; • •1• • it • • • • • Fvr'vg E CD' I4 I r%6 Ce-)11G.." re< c-) r 17c is yr I"vP'. I C te. ,(7lc5 FFIG . LV.•M1s to--N� 0 ✓ Gc)NT .'I� TUKJA I L New Eiti-N $1- oiIiefz.s IA hwef sere(. rF(r°i1-r I. 1'1 -i15 c,c.NTr .CYc.)R:_..... -_- ... •�•a„jeai14iwl.ris+`w..L� -_. u��'�.:r'`_ �.'r.►./iMYV.•IM•. I-r. • .uY+.Y. I . •.••.a............. -.-. • •, • ' •, • ,r• 1 • , •. I • • 1 • I •µ e e • '1 ' , •1 • ' . I • •, • . • • • ' , ' • - • eiAlA )1(l.4I LA 1)N111\ C'/••• ='11= i181 2, • c::- • L'IlA.N 'r( 1=. • • a , r1 T:: M • :' F11'S • `31''ft.IN Kt, Efrl -�t2 .. l 1- ..4? ...6A • 1414, f� '2. tea. P..- • -- EX I4.rIi*.' GVILOIN ./s.f �..2�,. 7:7� F• A917 i 1-''NI FAA I. (7i'N44 • ' _'_ % .: t4 I N%x, • 31,7 5. fib 01. rr AR Ntfr • • •�__ r3 I MT'G • 1I N .N lZ,ANS1=' .,01E� D. ? r7 A. G. rA.VI NCB. EXC15TIt■1c TR S re-WI IEQ • i Cc: PAC. rs 1_xle -o INe4 ._P: �".. _ IN Rc2JF r2RAINI N/d \fir FwN 6-r Mr�.l•+. - -r 3. Lrx�1'�'Ns 7 e IA7 _ Mlr.l_ ' NEN STRUGTUKc CON 0, - --, : I,.JA i.IC' EXIST I NCi- ' Tf .k,-rL1l •QE&IC. WE'r{•t _ 1" Iz 117 I NCul,. "jti Aar c- '1.1i-r f? F EX12,GNS k7■1 GINS -r7 4UII:.7II\16- 3°1, 7c9c, S. ~ .- S Ex I' 1I N! C r?: r•A I N4 - T7' r° I4ra t.. THQE.E. I.z-.1s4%.1-k.)W c i 9 I I' • a NfI.I C.AN?Fr • IU • • :›, c-9 New CP'• 4•alr7e- (,URIC:. N /•a1�i4 z L • Is - 7" f 2NI- r1 -s.Ro L/-kN PINCI- SI tin L. r ME NT 1= )(16r. . i °UTVIZE. cev !.if'maNT x•17 LIC,I'h -r l 1 • I 1 1 • r, t? 13c'o Ncr STIM11201. AN 12 S I!„t1`iN..fr:, (TP KA I/ Fe-IL/ I . Lc) lc21,t ) T 1 I I. 1 I EX T1H4 r3\v ;r2 .. 1^'./�l? INip' • v, ..- :. - • • -,.-�-• • ---,. ,- --vim . ✓- ' 11111111 1x111 � 1 111111111111111 111111111IIIII111111111LII- III' /1I ' L�- �1j1 11 L .:I:1r1II lfI1 111, l I JI II' 0 ,a ,S INCH 1 2 3 v r Yo I11111 .11111 l 1 4 5 6 7 NO'T'E: - -if the aicrofilsaed document is less clear than this notice, it is due to the quality of the •Ariginal. document. I !I I f IZ oz 6t RI IGII 911 IGI' �i+l Cl Zt 14 01, 6 lI.11fIL11111��111llu_ 1111111. 11 )1111111!111111111!!111illItIi 161),J1111111l III: II11,1111111111111111111111i►il f 111! 1111x11 !1i1111111jiil111111111111 06 6Z 8e 47 97, sZ 47Z ' CZ ZZ �IlillIlll 1111{ IILIIIIII! lllill !I111lllllll1i11lIIIIIIIiII DVMP%T .. ; r(e t-1 . F1/4.9 C ai M \Eh'ISTINIt�r (:rail° / \ 'e 1 •1 I- E I,:6 frok%vEQ -'. -_- ,�� ..-.- -- fa 1% r'�a Imo, I F ; O 11 TreAc K 1 , l t••1 V . P , I : 1N,% a srg.1, \1.. f9A1:1C Ho. I, %�,C•C -Or- -U I NC.r M.Af TI•tF -rte c:9 t G�r�U�1' INI Vvt,• U M c cp . or f"'1,. -0-4 , I M ICI NCt C . c 2 u N•11--1, 1/NIASi in 1 N(•. i' N1 . y.tU III111I I If 111 Ii 111111(' I111111II11111i11 10 11 MME W GERMANY 12 9 s �! C zI II HI-4 0 I! �Il1!! 111Ifi1111i1111111ii! 111111111x!( 1i1111111i1111il11111111111 !1 - I curl E 0 ._ c"?. e4e. !b ..SNP rk g.1 . + C, 1 . Separate permit for grade and fill.-required. •• • • • 2. Required - hSdran'ts•.•.per City 'Ordinance -to '•be operational with' purity tests performede:prior',to- combustible building. materials being delivered .to' site. Hydrant ,locations sha1q. be: approved by Fir.e Department. . 3. Mechanical ; and electrical to . be'•'design- build: by., Contractor. Submit drawings stamped,by•Registered Professional Engineer to Owner /Architect'••for' approval. Mechanical to submit"' calculations:: to' show compliance of !.building ,envelope ;'.t,o11 th•�; Washington Stake Energy Code.' ' ' 4. Sprinkler systems shall comply with '•NFPA:-.13•*:1:979 .• (interior) and" NFPA 24 -1979 (exterior: :-underground fire.' protection mains)., and be approved; ; :by. lairs; :Department.• .:.... Storage, handling, use'• of combustible liquids ;•pair:' • Article 15,' Uniform Fire 'Code. 6. Portable fire extinguishers ':,per. ill?PA''10- •t979' end in construction shack. Permanent:; extin&.i:ahers'•.by+ :. Owner. 7. Debris on city streets during construction. wili:•:.b : the Contractor's responsibility '. -'- 8. No occupancy prior to issuance of Certificate'•o><. Occupancy. - . - • ,:... . 9. Special inspection by approved -testing laboratory required , for all site welding, 'high strength. bolting, piling, spray -on fireproofing, structural masonry and all structural concrete. •• ; s�A 10. Suspended ceilings to be designed for - earthquake Zone -III. Submit sales- to city _for , epproval.. ., 11. Hack storage over 8 feet ` in height requires seismic design calculations under separate - permit: from the-Building Department. . 5• j~�'11 r' •_• • • • • 12. Required attic -draft stops at provided at tenant improvement time. 13. Contractor to verify all dimensions•' with Architect. Do not scale drawings. • '. 14. Provide approved monitored alarm system per Ordinance where required or as required by Spec.. 15. Provide approved hose stations. per Ordinance where required. ' 16. All concrete work in'• excess of ,2000 poi shall 1 be inspected by testing lab. . 17. Pour no concrete when the anticipeter3 site. temperature ti:i11 be below 34 °F during the first 43 _ _ _,_hours- of caring,.... - . .. -.,:- • ... , 18. The :Contractor• shall call the structural ' engineer for field, inspection prior to application of roofing, • 19. In the event of .' field errors or omission:: the Contractor shall notify the Architect rand make. no repairs without his approval. 20. Ceotechnical Engineer to verify soil bearing ' prior to pouring of footings. 21. Geotechnical Engineer to inspect and ;approve building pad prior. to •1•ouri.np, floor. •;.• 22. Geotechnical• Engineer to inspect • and .approve.' paving' areas prior to paving. . 23. Contractor shall' Coordinate the work of alp trades; to avoid• interference betworn • di-i s ions oc the work. ' 24. Contractor to provide all work, -services And materials ' necessary to con: trust ete operating facility. • 25. The Contractor shall fipple end secure 6]1 occupancy, sewer, storm, water, electrical and other permits except building: permits. He qr n11 pay all necessary fees and post bonds required. 26. Building address •to be cleorly visible P" nume*rsle minimum. 27. 'Tcnent' improvements to hove Fpprovai of Building /Fire Department prior to construction or occupancy. 2$i. Project sign shall he under separate permit. �^ _ 1 �Mt'i, ( jv ��tG � (j'.Iv ✓f�R1 %•� vf= WQ�.�h11v�.�'� 1 V* r G f�.l%�F�a a'; I.r'�ry� I�l r .,1�IL, FoiC. ,NZRIF2 MEG N1.1 Q tear 1 c • - • • • RECEIVED CITY OF TUKWILA AUG •5 PERMIT CENTER _.v.!..._n ..tsrr •si_. a +. N5. +mrilrrN +asys•ru•v,: a^s KF: �'- No-me •n`l1 $ 43 4' .. 1 yC 4 •4 1 :.1 V1 L. , .. . w' 111111 y i. e w CD !ecked to •0u • L.. co . in C•••3 Po e: w - -) NI: ' V�. • • -1. .,. • :.•4 • . L ,. •• • • • o l !•. • �' , -- • • ■ . w1, �. , ; j~�'11 r' •_• • • • • 12. Required attic -draft stops at provided at tenant improvement time. 13. Contractor to verify all dimensions•' with Architect. Do not scale drawings. • '. 14. Provide approved monitored alarm system per Ordinance where required or as required by Spec.. 15. Provide approved hose stations. per Ordinance where required. ' 16. All concrete work in'• excess of ,2000 poi shall 1 be inspected by testing lab. . 17. Pour no concrete when the anticipeter3 site. temperature ti:i11 be below 34 °F during the first 43 _ _ _,_hours- of caring,.... - . .. -.,:- • ... , 18. The :Contractor• shall call the structural ' engineer for field, inspection prior to application of roofing, • 19. In the event of .' field errors or omission:: the Contractor shall notify the Architect rand make. no repairs without his approval. 20. Ceotechnical Engineer to verify soil bearing ' prior to pouring of footings. 21. Geotechnical Engineer to inspect and ;approve building pad prior. to •1•ouri.np, floor. •;.• 22. Geotechnical• Engineer to inspect • and .approve.' paving' areas prior to paving. . 23. Contractor shall' Coordinate the work of alp trades; to avoid• interference betworn • di-i s ions oc the work. ' 24. Contractor to provide all work, -services And materials ' necessary to con: trust ete operating facility. • 25. The Contractor shall fipple end secure 6]1 occupancy, sewer, storm, water, electrical and other permits except building: permits. He qr n11 pay all necessary fees and post bonds required. 26. Building address •to be cleorly visible P" nume*rsle minimum. 27. 'Tcnent' improvements to hove Fpprovai of Building /Fire Department prior to construction or occupancy. 2$i. Project sign shall he under separate permit. �^ _ 1 �Mt'i, ( jv ��tG � (j'.Iv ✓f�R1 %•� vf= WQ�.�h11v�.�'� 1 V* r G f�.l%�F�a a'; I.r'�ry� I�l r .,1�IL, FoiC. ,NZRIF2 MEG N1.1 Q tear 1 c • - • • • RECEIVED CITY OF TUKWILA AUG •5 PERMIT CENTER _.v.!..._n ..tsrr •si_. a +. N5. +mrilrrN +asys•ru•v,: a^s KF: �'- No-me • --'`----- Fr: lr 1,16t-h% c.F rstcg c_.,c:. "r aGh f, "r " 4.1ST'L T 4014 Go 1,-1 NP.5 z &'• -c'" te•c, -I C r=Kvviir ) HEW . STRW•rug.r.. , EX 1 s1'1Z.veTvttE AG' Wll1LvlN4 • f)FPT. N> I° - NEICJ 247 MINI. EX1•r 7_;.2 t;s rM,4: e Art p E 9 -1?.) Ci >rz•f_! AT • ! !M1 F.. • i i Il 0 4 c t-.IwM P►• - _■••••••••••••• ,...•••••••••■••1 .0•...... GLoE/4-(:. ?.s,' ■Cr,›r' 3', EX I - PC? N-1 ` ur`6. . • ---- r Lo l`1 9 I�NJNSrr�1 r °--► I I L__ _4 3 �vtr -ss v 1- E? I�a"1 I Imo! t-1') • 1Z.Ep,$c. F ISTII�I�- �.� (. v 1(L5 0 - I He.. cc2K.IZI0c7g. - •/,r?��.wfA.,!s/.,.: `!r...;.r►.. —.r _ �r;—� ,I�'.,.. cc,,g-g.10c21z,. 1 ------ p --�• -- EN NF.1k sTf�U��'v1�G r - ExIS1_II`IL- X- qv fe/36 ING#r to v2e 'I -i- IWoL .. ,e,rrz;' d M ENt , sr!ZI Mk:L.Pttw Tr' 1'; .:.... rae- ExISTtr* Et.Earfzl l.. . VEg.I -Ntl;l4• �.. VIPN 161\11' • F 6' Ntl J • . 1,e... TkwN_:tw11'{° :T>~ f21# c>Th 125 �.. ADPierw.i•k�L.. :... • c :Ir611tix 4 r 11-'N .., k.M °.K S. '.7R.o•iY • - r ge, oc/2' 1 -Rrl� • E,CI Itkc1Vl(j&2 Pkrz 'EC'fkNl 33I�t X11( A00 NEIL vvEg _ EX.15TINla PITS 1 .d=r—====tt-,11 Ex151-1N6-r. �r(ZrJc�'V2�p r 1701 i51/IZ/ Uigiz. ;,. '4 5.xlGT1NLr• r'Ii- nu!. AA ft G- >VE'., I^Vrli ENZIs� "►ri %- 1'a5 Trite F /ISTIN(— �a ISM GC/2Z C.. 1U IZF 1'J IN - . 1- UAL, Sr :�5 kj - 3\rtAL f, . l/& --i III Q" I Vs"))'.) CU n0 '4 Cu CU r� a a 0 co RECEIVED CITY OF TUKWILA AU6 S PERMIT CENTER ..•... .. .... -, f r:st> t. "f v•'; �S �S'.. 2� ;i':' .si. .A.1 "i 14. i14,r 4,,•� f r.r'r �.'. `y J lijl,llif I(I�II IIIIiill�lllll( l�ill�Illllll�l(I�Illil(I�II'I� rj!'!l1l1I` 111 111'111 111 ltI•)l�lj !�! {(lit llllll(IIII I(!lf }ili�El.l�hl l i 3 4 5 6 7 8 NOTE :. If the microfilmed document is less clear than this notice, it is due to the quality of the original. document. lz Qc7, 61. 8 LI. 96 S6 +A C6 zl • 66 01, 6 illll.1.11111111 ,1111111111111! ithill14II`11 111111 1111Il611111111 1111.1.41111111111 llll{i 1111111fillhill 0€ 6z 8G LZ 9Z GZ 17Z ;' EZ ZZ I I ! I (1111 {IIL,I.ii�lii, 1111 I! 1, III......,.Illii_L �,Il,illll {}dL1�.111�II.JUI i lll{I1111111111111 1lll1lll{Il11111{Ill1lll{ 9 10 11 MADEMGERwVn 12 jjj 9 Sjj 47 £ Z l "Pi 0 !ROM!' ill 11111111l1111'i1II 1111!IIII!!I!i!I' !l!!!IIII{ rt, es•N.:nsJi rL,.-a i.tiw. �.ci?..f:eat`a.aaittJ �L.::➢4:lle»T fi�f:s:.li«+e..•:- 'v'••. ,•,�•••""•• .•••]lma idliiYWiVrat( 4,1k •- •-•r.u. -•••∎- .0 .... -..,_. • � -- r ..�.. �.- ---- . . • • • • cc,,g-g.10c21z,. 1 ------ p --�• -- EN NF.1k sTf�U��'v1�G r - ExIS1_II`IL- X- qv fe/36 ING#r to v2e 'I -i- IWoL .. ,e,rrz;' d M ENt , sr!ZI Mk:L.Pttw Tr' 1'; .:.... rae- ExISTtr* Et.Earfzl l.. . VEg.I -Ntl;l4• �.. VIPN 161\11' • F 6' Ntl J • . 1,e... TkwN_:tw11'{° :T>~ f21# c>Th 125 �.. ADPierw.i•k�L.. :... • c :Ir611tix 4 r 11-'N .., k.M °.K S. '.7R.o•iY • - r ge, oc/2' 1 -Rrl� • E,CI Itkc1Vl(j&2 Pkrz 'EC'fkNl 33I�t X11( A00 NEIL vvEg _ EX.15TINla PITS 1 .d=r—====tt-,11 Ex151-1N6-r. �r(ZrJc�'V2�p r 1701 i51/IZ/ Uigiz. ;,. '4 5.xlGT1NLr• r'Ii- nu!. AA ft G- >VE'., I^Vrli ENZIs� "►ri %- 1'a5 Trite F /ISTIN(— �a ISM GC/2Z C.. 1U IZF 1'J IN - . 1- UAL, Sr :�5 kj - 3\rtAL f, . l/& --i III Q" I Vs"))'.) CU n0 '4 Cu CU r� a a 0 co RECEIVED CITY OF TUKWILA AU6 S PERMIT CENTER ..•... .. .... -, f r:st> t. "f v•'; �S �S'.. 2� ;i':' .si. .A.1 "i 14. i14,r 4,,•� f r.r'r �.'. `y J lijl,llif I(I�II IIIIiill�lllll( l�ill�Illllll�l(I�Illil(I�II'I� rj!'!l1l1I` 111 111'111 111 ltI•)l�lj !�! {(lit llllll(IIII I(!lf }ili�El.l�hl l i 3 4 5 6 7 8 NOTE :. If the microfilmed document is less clear than this notice, it is due to the quality of the original. document. lz Qc7, 61. 8 LI. 96 S6 +A C6 zl • 66 01, 6 illll.1.11111111 ,1111111111111! ithill14II`11 111111 1111Il611111111 1111.1.41111111111 llll{i 1111111fillhill 0€ 6z 8G LZ 9Z GZ 17Z ;' EZ ZZ I I ! I (1111 {IIL,I.ii�lii, 1111 I! 1, III......,.Illii_L �,Il,illll {}dL1�.111�II.JUI i lll{I1111111111111 1lll1lll{Il11111{Ill1lll{ 9 10 11 MADEMGERwVn 12 jjj 9 Sjj 47 £ Z l "Pi 0 !ROM!' ill 11111111l1111'i1II 1111!IIII!!I!i!I' !l!!!IIII{ rt, es•N.:nsJi rL,.-a i.tiw. �.ci?..f:eat`a.aaittJ �L.::➢4:lle»T fi�f:s:.li«+e..•:- 'v'••. ,•,�•••""•• .•••]lma idliiYWiVrat( 4,1k •- •-•r.u. -•••∎- .0 .... -..,_. • • • asx L'. 24 z '� -t: C c IsTINC,r) • e4 ldiiaC lnfiltriregillin alirWakquer7m ,Uyn settleNrOOltibalM't sIKAMItilleffealrerrmivnit ile441iw C, EY 11' IN4) I,e • t. 2 & c7" C F-X 4001 Ni 06-Pr NO1 • MAY E. 4.00F0 AT '1"IME. cM TENIANT IM1(Ve:vaMENT. +rc%). S PAC, C� - zv L G' l_sr,e. NEWr •s- REF NT I c`,1 F �i • TYP f3 t'LAcE MAS.- 'NIt`'F c)F / eo- TANOAre.17 1°11'2E }SIG F',a.tNT - • C ISTINIt.r) C151'1NC.I' ex IT t7�2 A,NO ex)N6. 1--%4\-11 Iv* Iwo, ,,,.,r.,_...,.,....wo.- I FII.0 .EXITI1-16r -- -- - -__�, c -'PEN IR( .. — --4 EX 1ST II`lcf- C..-.)1• VriNS •ISTINC-- se IsM l' 1 A . I a ,_._ �_-- Monona EX 1ST I NCI- I`et,o,-,I I(ZY WALL. (NSvLATh4•l ANC? INTtrI:.I >r PI-117} -1 N. 1.6., AT S(I 5 T I N{Lr' IAA\ C, T� NCI Ipl fV, vEM kNT) FILI- 1'5i' 1i ,16.1' /--, I NC. ' t -r f'fJ r.�-• FA. Q -E _.. Th II A.G. f7A- VINr:�.. Pei. 51-re I'L,N LAN PACT - - I�JiNtJ 06-3c5g. 'S 1 z E ..... _._..-- ----•- - - _ -- A3'•&' '-------7-7-1-1-7.77A 6 _ 71-0.1.1... . . � ., X 7- .. • � I�' II � ALUI" IINUM „AN 0 CI-LASS - • IMP .1 c.rt- AziNLT (T) et, g4 T 1C)1 -i S I'GG vF Ili E. TVr-N 4 &MN I Push inut,L F1/42.tic-v4,4 F 1101 to . e. 4URrIsAE ' L 3K ?EP HE o UL,E.. t.4I 1"I 1 rI iS2cT Z.I Hsu l<.A1 Q • rix,IT i.t ' /ER. It :NPl.9.. -'FLvsrI• '4TALIN . ._. . ..'AS S EN11647 1 .. I. EV Ce • HAN 01...1_ 4.55 -ALUM. T}Ii;ESI -t�.p. S &T 'INT &. SgAI.4441' . 4 ,11.,.Vr1 -_st- mn :.`'.__; I; li • If ; • • • - • e 1\p 6-‹ r2Ir�. /e-J61-4 Eo vGF, k; 114 I�ITH�CGT21(' K �N FL M . !' I r1 I� ►1'H V64-'. FI . Tem // AND Ji- MGM • ST 11\1 �r <2,6. .r R. %' MIN.. A55E t��lX 1 FLUSN W.M. 1 • M0T'1 -t �\;14 Cil 1.e • t'"* 'S FIDE ORAININ4 F} - IS • � (N -- �'AVMNT 2 in t.ti Cu • ,, In RI 011 W .0 L. aCO CO • 36... E0. ar • gyp► '� CD jaj� i � � CO by - t�1 MLA • ti) Ir • Te.1z.Ile 41-d HECEIVED CITY OF TUKWILA AUG 5 1993 RefMiv CENTER sheet Nc, r a - III RI I1(1111Ii1(1111111( 111( 111111111111111111 111.111!(II;'Pil :. 0 i6 THS INCH 1 2 •Jy hj11(l�l� [T111119111111111. 111111 -11111 IIII111111I1 'itt }1111 3. 4 5 6 7 R&M: If the microfilmed document is less clear then this notice, it is due to the quality of the pri6inai document. • ...y�c;v ���a! X54- e^.•�•Jd++,nrn<�-xretin.;;iiv ., ' %, yYc•R..- .�1 , w sI"':.,. 3.K' ` Sf; '� •�".J', xr,:'? J_..t Fx R•�r.r t N ! ' L,I1�•tI�iji,Iji1i11iji1lll 111,111 III1111111i1lli 9 10 11 MA6EIHGE341 KI 12 0€ 6z 8!G 6z 9iiz Ci +z t'Z ez ez Lz OZ 6L 81 L1 91 GIt ', et Zt tit 01. 6 8 ' IIIII !IIi111111J11111111111111111 111!111 lh11111111111111111111li111111 J111 .111111 I11g111tl1�. 111111! I�IIII11111t1II11111 1�1J 11141111111ll ;ititlliii!1111111111 ttii 1111I!It111iil1llllli4ll 11111 1111tl111111ill11t11111111( i!'llllllllillll