HomeMy WebLinkAboutFS 2014-10-21 COMPLETE AGENDA PACKETCity of Tukwila
Finance and Safety
Committee
O Verna Seal, Chair
O Joe Duffie
O Kathy Hougardy
AGENDA
Distribution:
V. Seal
J. Duffie
K. Hougardy
D. Quinn
D. Robertson
Mayor Haggerton
D. Cline
P. McCarthy
C. O'Flaherty
R. Turpin
L. Humphrey
N. Gierloff
J. Hight
TUESDAY, OCTOBER 21, 2014 — 5:30 PM
HAZELNUT CONFERENCE ROOM
(formerly known as CR #3) at east entrance of City Hall
Item
Recommended Action
Page
1. PRESENTATION(S)
2. BUSINESS AGENDA
a. A resolution adopting a consolidated permit fee schedule.
a. Forward to 10/27 C.O.W.
Pg.1
Nora Gierloff, Community Development Deputy Director
and 11/3 Regular Mtg.
b. An ordinance relating to residential remodel permits.
b. Forward to 10/27 C.O.W.
Pg.13
Jerry Hight, Building Official
and 11/3 Regular Mtg.
3. ANNOUNCEMENTS
4. MISCELLANEOUS
Next Scheduled Meeting: Tuesday, November 4, 2014
16. The City of Tukwila strives to accommodate individuals with disabilities.
Please contact the City Clerk's Office at 206 - 433 -1800 ( TukwilaCitvClerk (aTukwilaWA.gov) for assistance.
TO:
City of Tukwila
Jim Haggerton, Mayor
INFORMATIONAL MEMORANDUM
Mayor Haggerton
Finance and Safety Committee
FROM: Jack Pace, DCD Director
BY: Nora Gierloff, Deputy DCD Director
DATE: October 15, 2014
SUBJECT: Updated DCD and PW Permit Fees
ISSUE
Should Tukwila increase its land use permit fees and hourly inspection rates to reflect increased
costs to provide this service?
BACKGROUND
Salaries for represented employees will increase in 2015 by 90% of the increase in CPI_W
(June) 2013-14. The CPI-W for that period is 2.2% so 90% of that is an increase of 2%.
ANALYSIS
Staff is suggesting that the flat land use fees and hourly inspection rates increase at the rate of
the City's labor costs. Most other permit fees are based on the valuation of the work which itself
reflects inflation so no adjustment is needed for Public Works or the majority of Building
Department fees at this time. We are proposing to increase the structural plan review fee from
33% to 35% of the non-structural fee to account for rising costs for this service that the City
contracts out to a consultant and passes through to the applicant.
New fees have been added for permits related to the new TUC zoning district.
A reduced fee is proposed for sensitive area buffer modifications on single family parcels. We
hope that this will encourage greater compliance with environmental regulations, especially
when part of a code enforcement action.
See the separate staff report and ordinance amending Title 16 for a discussion of the proposed
new fees for minor residential remodels and final inspections for expired permits.
RECOMMENDATION
Staff recommends that the Committee forward the resolution to the October 27th Committee of
the Whole and November 3rd Regular meeting for action.
ATTACHMENTS
Draft Building/Electrical/Plumbing/Mechanical Permit Fee Resolution
2
R FT
A RESOLUTION OF THE CITY COUNCIL OF THE
CITY OF TUKWILA, WASHINGTON, ADOPTING A
CONSOLIDATED PERMIT FEE SCHEDULE AND
REPEALING RESOLUTION NO. 1803.
WHEREAS, the City intends to update permit fees on an annual basis, with any
increases tied to growth in City expenses for providing permit services; and
WHEREAS, the City Council wishes to recover a portion of the City's costs for
review and processing of permit applications; and
WHEREAS, the City has adopted a biennial budget process; and
WHEREAS, salaries for represented City employees are adjusted by 90% of the
Seattle CPI-W, which was 22% for the June 2013-2014 period; and
WHEREAS, greater compliance with environmental regulations can be encouraged
by offering reduced permit fees for residential homeowners on specific sensitive area
permits; and
WHEREAS, greater permitting compliance and streamlined disaster recovery can
be encouraged by offering a flat permit fee for small residential remodels;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, HEREBY RESOLVES AS FOLLOWS:
Section 1. For 2015 and 2016, the Technology Fee shall be set at 5% of the
applicable permit fee.
W:\Word Processing\Resolutions\Consolidated permit fee schedule-2015-2016 10-2-14
NG:bjs
Page 1 of 10
3
Section 2. Public Works fees will be charged according to the following schedule:
PUBLIC WORKS FEE SCHEDULE
PERMIT DESCRIPTION
FEE
Type A (Short-Term Non-profit)
$ 50.00 + Technology Fee
Type B (Short-Term Profit)
810O.00+ Technology Fee
Type C
(Infrastructure and Grading on Private Property
and City Right-of-Way and Disturbance of City
Right-of-Way)
$25000 application base fee, Technology Fee, plus
four components based on construction value:
1) Plan Review
2) Construction Inspection
3) Pavement Mitigation
4) Grading Plan Review
$100.00 + Technology Fee
Type D (Long-Term)
Type E (Potential Disturbance of
CityRi0h�of4Nay)
$1OO� OO+ Technology Fee
'
$250.00 plus � fee, ' � deposit,
withdraw $100.00 per instance for inspection
Franchise — Telecommunications
$5.000.00 administrative fee
Franchise — Cable
$5.000.00 plus 5% of total revenue
Street Vacation
$1.200.08
Latecomer's Agreements
$500.00 processing fee, plus 1796odministnativefee,
_plus $500.00 segregation fee
$50.00 + Technology Fee
Flood Zone Control Permit
Section 3. Land use permit and processing fees will be charged according to the
following schedule:
LAND USE FEE SCHEDULE
All peer review fees will be passed through to the applicant per TMC Section 18.50.200.
Decision Type
(Current
Fee)
2015
Fee
2010
Fee
Plus
Hearing
Examiner
Fees
Plus
Technology
Fee (TF)
Appeal
Type 1, 2 and 4 Decisions
$579
$591
$602
+-��
SEPAyWDNSAppeal
$579
$591
$602
+7lF
Appeal of Sign Code Decision
$579
$591
$602
+lF
Impact Fee Appeals:
Fire
$5-79
$591
$802
Parks
$579
$591
$602
Transportation
$579
$591
$602
W:\Word Processi smmateupr^nit fee schodvw-2n1n-2o1o1oa'1*
4
Page 2 of 10
Decision Type
(Current
Fee)
2015
Fee
2016
Fee
Plus
Hearing
Examiner
Fees
Plus
Technology
Fee (TF)
Sign Permit (TMC Chapter 19)
Permanent
$243
S248
+ TF
Temporary
4
$106
$108
+ TF
Pole/Banner Initial Application
$238
$243
$248
+ TF
Special Event
1-04
$106
$108
+ TF
Pole/Banner Annual Renewal
$52
$53
$54
+ TF
New Billboard
$579
$591
$602
+ TF
Master Sign Program—Admin
2,130
$2,173
$2,216
+ TF
Master Sign Program—BAR
$341-1
$3,479
$3,549
+ TF
TUC Zone Modifications
Modification to TUC Corridor Standards
,$_591
$602
+ TF
(TMC Section 18.28.130.C)
Modification to TUC Open Space Regulations
5.591
8602
+ TF
UMC Section 18.28.250 D.4.d)
Transit Reduction to Parking Requirements
Si
.S_QQ?
_IF
(TMC Section 18.28.260.8.5.b)
Design Review (TMC Section 18.60.030)
Administrative
S2.192
$2,236
$2,281
+ TF
Public Hearing
S3.927
$4,006
$4,086
+ TF
Major Modification
$1-, 43
$1,370
$1,397
+ TF
Minor Modification
$61-0
$622
$635
+ TF
Parking Variances and Special Permissions
Administrative Parking Variance
(Type 2—TMC Section 18.56.140)
$579
$591
$602
+ TF
Parking Variance
(Type 3—TMC Section 18.56.140)
$950
$969
$988
+ HE
+ TF
Parking Standard for use not specified
(TMC 18.28.250 D.4.d.1 and TMC 18.56.100)
$48-9
$579
$591
+ TF
Residential Parking Reduction
(TMC Section 18.56.065)
$579
$591
$602
+ TF
Shared, covenant, Complementary Parking
Reduction (TMC Section 18.56.070)
$579
$591
$602
+ TF
Parking Lot Restriping
(TMC Section 18.56.120)
$579
$591
$602
+ TF
VV:\VVord Processing\Resolutions\Consolidated permit fee schedule-2015-2016 10-2-14
NG:bjs
Page 3 of 10
5
Decision Type
(Current
Fee)
2015
Fee
2016
Fee
Plus
Hearing
Examiner
Fees
Plus
Technology
Fee (TF)
Variances, al Permissions and Si e Plan Review
Variances
(T7WCSecb �i
Section
$2���
$2,825
$2,882
+ HE
+ TF
Environmentally Sensitive Areas Deviation
'
Buffer Reduction (77NCChapber18.45)
Reduced fee for LDR homeowners no
.
$1-466
$1' 4Q5
Q591
$1,525
$802
+ TF
associated short pj.
Reasonable Use Exception
(77NCSec�on18.45.Y80)
$27{�2-
$2,991
$3,050
+ HE
+ TF
.S, .,,,....~.~. ^~ ~~`~~''~''` ~^~''~~'~
$57-9
-+-TF
Exception from Single Family Design Standard
(TMC Section 18.50.050)
$57.9
$591
$602
+ TF
Special Permission Cargo Container
(TMC Section 18.50.060)
$57Q
$591
$602
+ TF
Landscape Perimeter Averaging
(TMC Section 18.52.060)
$5-79
$591
$602
+ TF
Tree and Landscape Modification Permit and
$1-0-3
$105
$107
+ TF
Exceptions (TMC Cha bery8.54)
Lot Cm*atkon and Cmnsodidaton
Boundary Line Adustmen�
^v
/TMC Chapter 17.08)
�'f��4
$1' S77
1' 710
+TF
Lot Consolidation
(77NC Chapter Y70f)
$61-0
$622
Q635
+TF
Short P|at(2-4 lots)
(T7N(� Chaph*r/�Y2)
$37742
$3,817
'
$3,893
'
+ TF
Short Plat (5-9 lots)
(T7N(� Chapter Y712)
$47259
$4,344
'
$4,431
'
+ TF
Subdivision:
Preliminary Plat (10+ lots)
(T7WC Section Y7.Y4.02()
$4;$88
�4' 986
5' 085
+HE
+TF
Final Plat (10+ lots)
(TMC3aobmnY7f2D30
$2.;--932
�2 SS1
'
3OSO
- '
+TF
Binding Site Improvement Plan
(77NCCheph*r Y7.16)
$877-42
�3' 817
3' 893
+ TF
Planned Residential Development:
Adminiatrotive/77NC Section 18.46.110)
2430
$2,173
$2.216
+ TF
Pub|icHnaring(TMC Section 18.46.110)
T 88@
$4.986
$5.085
+ TF
Minor Modification (TMC Section 18.46.130)
$-57A
$591
$602
+ TF
W1ajorKAodification/77NCSection 18.40.130V
$-27877
$2,425
2.473
+ TF
W:\Word PProcessing\Resolutions\Consolidated permit fee schedule-2015-2016 10-214
NG:bjs
6
Page 4 of 10
Decision Type
(Current
Fee)
2015
Fee
2016
Fee
Plus
Hearing
Examiner
Fees
Plus
Technology
Fee (TF)
Wireless Communication Facility (TMC Chapter 18 .58.050)
Minor (Type 1)
579
$591
$602
+ TF
Administrative (Type 2)
$1,644
$1,677
1,710
+ TF
Major or Height Waiver (Type 3)
286
$3,352
$3,419
+ HE
+ TF
SEPA and Environmental
Checklist
1-T6-75
$1,709
$1,743
+ TF
SEPA EIS
2932
$2,991
$3,050
+ TF
SEPA Planned Action
$579
$602
+ TF
SEPA Addendum
7
$591
$602
+ TF
SEPA Exemption Letter
$348
355
+ TF
Sensitive Area Master Plan Overlay
(TMC 18.45.160)
6
$4,986
$5,085
+ TF
Shoreline Permits
Substantial Development Permit: (TMC Chapter 18.44)
Project value: $5,000 - $10,000
$11158
$1,181
$1,205
+ TF
$10,001 - $50,000
$2-7-09
$2,763
$2,818
+ TF
$50,001 - $500,000
$4,320
$4,406
$4,495
+ TF
More than $500,000
$57478
$5,588
$5,699
+ TF
Permit Exemption Letter, Shoreline
$238
$243
$248
+ TF
Conditional Use Permit, Shoreline
(TMC 18.44.050)
$3,803
$3,879
$3,957
+ HE
+ TF
Shoreline Tree Permit
(TMC Cha er 18.44)
$1-0-3
279-32
$105
$2,991
$107
$3,050
+ TF
+ TF
Shoreline Environment Redesignation
Noise Variance (TMC Section 8.22.120)
Type I
$485
$494
+ TF
Type II
$654
$667
+ TF
Type III
$1,425
$1,454
$1,483
+ HE
+ TF
Use Permits
Conditional Use Permit
(TMC Section 18.64.020)
-
$3,879
$3,957
+ HE
+ TF
Unclassified Use Permit
(TMC Chapter 18.66)
$4,986
$5,085
+ TF
TSO Special Permission Use
(TMC Section 18.41.060)
$950
$969
$988
+ HE
+ TF
W:\Word Process ng\Resolu ons\Consolidated permit fee schedule-2015-2016 10-2-14
NG:bjs
Page 5 of 10
7
Decision Type
(Current
Fee)
2015
Fee
2016
Fee
Plus
Hearing
Examiner
Fees
Plus
Technology
Fee (TF)
Comprehensive Plan Changes (TMC Chapter 18.84)
Rezone (Map Change)
$3424
$3,489
$3,559
+ TF
Comprehensive Plan Amendment
$3,910
$3,988
$4,068
+ TF
Zoning Code Text Amendment
$1,114
$4,533
$4,624
+ TF
Miscellaneous Services and Charges
Development Agreement
S1.955
$1,994
$2,034
+ TF
Code Interpretation (TMC Section 18.90.010)
1
$348
$355
+ TF
Zoning Verification Letter
$341-
$348
$355
+ TF
Legal Lot Verification
$559
$570
+ TF
Preapplication Meeting
$485
$494
+ TF
Mailing Fee to Generate Labels, per project
$449
$458
$467
Public Notice Mailing Fee per address for each
mailing
$1-
$1
$1
Section 4. Building permit fees will be charged according to the following
schedule:
Total Valuation
$1 to $500
$501 to $2,000
$2,001 to $25,000
$25,001 to $50,000
$50,001 to $100,000
$100,001 to $500,000
BUILDING PERMIT FEE SCHEDULE
Building Permit Fees
$65.00 + Technology Fee
$65.00 for the first $500, plus $4.30 for each additional $100, or fraction
thereof, to and including $2,000 + Technology Fee
$129.50 for the first $2,000, plus $19.60 for each additional $1,000, or
fraction thereof, to and including $25,000 + Technology Fee
$600.40 for the first $25,000, plus $15.30 for each additional $1,000, or
fraction thereof, to and including $50,000 + Technology Fee
$983.25 for the first $50,000, plus $10.60 for each additional $1,000, or
fraction thereof, to and including $100,000 + Technology Fee
$1,511.60 for the first $100,000, plus $8.50 for each additional $1,000, or
fraction thereof, to and including $500,000 + Technology Fee
$500,001 to $1,000,000 $4,906.30 for the first $500,000, plus $7.00 for each additional $1,000, or
fraction thereof, to and including $1,000,000 + Technology Fee
$1,000,001 to $5,000,000 $8,443.25 for the first $1,000,000, plus $4.70 for each additional $1,000,
or fraction thereof, to and including $5,000,000 + Technology Fee
$5,000,001 and up
$27,243.25 for the first $5,000.000, plus $4.50 for each $1,000 or fraction
thereof + Technology Fee
W:\Word Processing \Resolutions \Consolidated permit fee schedule-2015-2016 10-2-14
NG:bjs
8
Page 6 of 10
1. Non-Structural Plan Review Fee. A non-structural plan review fee shall be paid at the
time of submitting plans and specifications for review. The non-structural plan review fee shall be 65% of
the calculated permit fee as set forth in the permit fee schedule. The non-structural plan review fee
specified herein is a separate fee from the permit fee and is in addition to the permit fee.
2. Structural Plan Review Fee. Where a structural plan review is deemed necessary, a
structural plan review fee shall be charged. The structural plan review fee shall be 33%-35Y6 of the
calculated non-structural plan review fee.
Section 5. Mechanical permit fees will be charged according to the following
schedule:
MECHANICAL PERMIT FEE SCHEDULE
Valuation of
Work (Total
Amount) Contract
$250 or less
$251 to $500
Mechanical Permit Fee
$32.50 for issuance of each permit (base fee) � Technology Fee
$65.00 + Technology Fee
$65.00 for first $250, plus $7.83 for each $100 or fraction thereof to
and including $500 + Technology Fee
$501 to $1,000 $84.60 for the first $500, plus $8.70 for each $100 or fraction thereof to
and including $1,000 + Technology Fee
$1,001 to $5,000 $128.10 for the first $1,000, plus $9.65 for each $1,000 or fraction
thereof, to and including $5,000 + Technology Fee
$5,001 to $50,000
$50,001 to $250,000
$250,001 to $1,000,000
$1.000.001 and up
$166.70 for the first $5,000, plus $10.05 for each $1,000 or fraction
thereof, to and including $50,000 + Technology Fee
$639.20 for the first $50,000, plus $8.40 for each $1,000 or fraction
thereof, to and including $250,000 + Technology Fee
$2,319.20 for the first $250,000, plus $7.40 for each $1,000 or fraction
thereof, to and including $1,000,000 + Technology Fee
$7,869.20 for the first $1.U0O.OUO. plus $8JO for each $1.0OOor
fraction thereof + Technology Fee
Section 6. Plumbing permit fees will be charged according to the following
schedule:
PLUMBING PERMIT FEE SCHEDULE
Permit Issuance—Issuance of each permit (base fee) $32.50 + Technology Fee
Unit Fee Schedule (in addition to base fee above:
For one plumbing fixture (a fixture is a nink, toi|et, bathtub, etc.)
For each additional fixture
For each building sewer and each trailer park sewer
Rain water system – per drain (inside building)
For each water heater and/or vent
$65.00 + Technology Fee
$14.00 + Technology Fee
$24.80 + Technology Fee
W:\Word Processing\Resolutions\Consolidated permit fee schedule-2015-2016 10-2-14
$14.00 + Technology Fee
$14.00 + Technology Fee
Page 7 of 10
PLUMBING PERMIT FEE SCHEDULE (continued)
For each industrial waste pretreatment interceptor, including its
trap d vent, except for kitchen interceptors
For each grease interceptor for commercial kitchens
For each repair or alteration of water piping and/or water treating
eq_uipment, each occurrence
For each repair or alteration of drainage or vent piping, each
fixture
For each medical gas piping system serving one to five
inlets/outlets for a specific gas
$28.00 + Technology Fee
$29.10 + Technology Fee
$14.00 + Technology Fee
$14.00 + Technology Fee
$82.00 + Technology Fee
For each additional medical gas inlets/outlets
$16 20 + Technology Fee
For each lawn sprinkler system on any one (1) meter including
baokflow protection devices therefor.
For atmospheric-type vacuum breakers not included in lawn
sprinkler backflow protection:
1 to5.... $14.00 + Technology Fee
Over 5... $14.00 for first 5 plus $3.25 for each additional
+ Technol Fee
$29 10 + Technology Fee
For each backflow protective device other than atmospheric type
vacuum breakers:
2-inch diameter and smaller... $29.10 + Technology Fee
Section 7. Fuel Gas Piping permit fees will be charged according to the following
schedule:
FUEL GAS PIPING PERMIT FEE SCHEDULE
1. Permit Issuance:
For issuing each permit (base fee): ($0 if permit is in conjunction with
a plumbing permit for an appliance with both plumbing and gas
connection.)
$32.50 + Technology Fee
2. Unit Fee Schedule (in addition to item in subparagraph 71j:
For each gas piping system of one to five outlets
For each additional gas piping system outlet, per outlet
$65.00 + Technology Fee
$14.00 + Technology Fee
Section 8. Electrical permit fees will be charged according to the following
schedule:
ELECTRICAL PERMIT FEE SCHEDULE
1. NEW SINGLE-FAMILY DWELLINGS
New single-family dwellings (including a garage)
Garages, pools, spas and outbuildings
Low voltage systems
W:\Word Processing muteu permit fee achaume-2o10-2o/o10-214
NG:bjs
10
$152 85 + Technology Fee
$81.90 + Technology Fee
858 85 + Technology Fee
Page 8 of 10
ELECTRICAL PERMIT FEE SCHEDULE (continued)
2. SINGLE-FAMILY REMODEL AND SERVICE CHANGES
Service change or alteration-no added/altered circuits
Service change $81.90 with added/altered circuits, plus $11.55 for
each added circuit (maximum permit fee $152.85)_
Circuits added/altered without service change (includes up to 5
circuits)
Circuits $54.60 added/altered without service change (more than
5 circuits); $7.65 for each added circuit (maximum permit fee $98.70
Technology Fee)
Meter/mast repair
Low voltage systems
$81.90 + Technology Fee
$81.90 + Technology Fee
$54.60 + Technology Fee
$54.60 + Technology Fee
$68.25 + Technology Fee
$59.85 + Technology Fee
3. MULTI-FAMILY AND COMMERCIAL (including low voltage)
Valuation of
Work (Total
Contract Amount)
Permit Fee
$250 or less
$65.00 + Technology Fee
$251 - $1,000
$65.00 for the first $250 plus $4.30 for each $100 or fraction thereof, to and
including $1,000 + Technology Fee
$1,001 - $5,000
$97.00 for the first $1,000 plus $21.60 for each $1,000 or fraction thereof,
to and including $5,000 + Technology Fee
$5.001-$50.000
$183.30 for the first $5,000 plus $17.70 for each $1,000 or fraction thereof,
to and including $50,000 + Technology Fee
$50,001 - $250,000
$979.15 for the first $50,000 plus $12.90 for each $1,000 or fraction thereof,
to and including $25O.00O+ Technology Fee
$250,001 - $1,000,000
$3,567.20 for the first $250,000 plus $9.15 for each $1,000 or fraction thereof,
to and including $1,000,000 + Technology Fee
Over $1,000,000
$10,440.70 plus 0.5% of cost over $1,000,000 + Technology Fee
4 MISCELLANEOUS ELECTRICAL PERMIT FEES
Temporary service (residential)
Temporary service/generators
$65.00 + Technology Fee
$80.90 + Technology Fee
Manufactured/mobile home parks and RV park sites, each service
and feeder
Carnivals:
• Base fee
• Each concession fee
• Each ride and generator truck
Inspections or plan review not specified elsewhere (one-half hour
minimum). S i ons, plan revisions.
Adult family home inspection (paid at the time of scheduling the
/nsPfcIion)L_-
Disaster recovery emergency repair permit (residential structures
only)
W:\Word Processing\Resolutions\Gonsolidated permit fee schedule-2015-2016 10-2-14
NG:bjs
$86.25 + Technology Fee
$80.60 + Technology Fee
Fee
$10.80 + Technology Fee
$6G]}Q65.50/hour
$65-0066.50
$20.00
Page 9 of 10
Section 9. Other inspections and fees will be charged according to the following
schedule:
OTHER INSPECTIONS AND FEES
Inspections outside of normal business hours (three hour minimum charge) $97.50100.00/hour
Re-inspection fee $6-5,0066.50/hour
Inspection for which no fee is specifically indicated—investigations or safety
$6-5,0066.50/hour
inspections
Additional plan review required by changes, additions, or revisions to approved
$65-0066.50/hour
plans (minimum charge one-half hour)
Work commencing before permit issuance shall be subject to an investigation fee 100% of the permit
equal to 100% of the permit fee. fee
Plan review fee—Mechanical, Plumbing, Fuel Gas Piping and Electrical: The fee
for review shall be 25% of the total calculated permit fee. The plan review fee is a
separate fee from the permit fee and is required when plans are required in order
to document compliance with the code.
Work covered without inspection or work not ready at the time of inspection may
be charged a re-inspection fee of $65,0-066.50.
Administrative fee for permit extension request longer than one year $65,00
Expired permit final – includes two inspections $133.00
Expired permit final – each additional inspection $66.50
Minor residential remodel plan review and permit (projects up to $20,000) $20.00
Section 10. Repealer. Resolution No. 1803 is hereby repealed effective
December 31, 2014.
Section 11. Effective Date. The permit fee schedules contained in this resolution
shall be effective as of January 1, 2015.
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at
a Regular Meeting thereof this day of , 2014.
ATTEST/AUTHENTICATED:
Christy O'Flaherty, MMC, City Clerk De'Sean Quinn, Council President
APPROVED AS TO FORM BY:
Filed with the City Clerk:
Passed by the City Council:
Resolution Number:
Rachel Turpin, City Attorney
W:\Word Processing \Resolutions\Consolidated permit fee schedule-2015-2016 10-2-14
NG:bjs
12
Page 10 of 10
TO:
City of Tukwila
Jim Haggerton, Mayor
INFORMATIONAL MEMORANDUM
Mayor Haggerton, David Cline
Finance & Safety Committee
FROM: Jack Pace, Director of the Department of Community Development
BY: Jerry E Hight, Building Official
DATE: October 21, 2014
SUBJECT: A. Flat fee for residential remodels AND B. Expired permit finals
ISSUE
A. Should a flat permit fee for minor residential remodels be adopted in order to encourage
homeowners to obtain permits for small projects and therefore receive needed safety inspections?
B. Should a procedure be adopted that allows applicants to close out expired construction projects
with a final inspection?
BACKGROUND
A. On occasion homeowners have not been financially motivated to apply for and receive a permit
for their smaller projects. In doing so they miss out on the benefits of safety inspections for their
water heater or furnace replacement, deck installation, and bathroom remodels. Not receiving
proper inspections allows safety issues to go uncorrected. Example: An owner builds a small
second floor deck and nails the deck ledger to the house, not using the code required lag bolts.
The deck ledger could separate from the house the first time the owner has a party to show off
their handiwork.
B. The contact listed on the application receives several written notifications from the City that their
permit is due to expire. If the applicant fails to request an extension while the permit is still active
the permit expires. An expired permit cannot be "reactivated" and the applicant must start over to
obtain a new permit. This requires the submittal of new project documents: plans, completed
application, energy calculations, geotechnical reports, structural engineering, et cetera. The
printing cost alone for new submittal documents can be extensive, not to mention redesign cost if
the state codes have changed.
The proposed procedure will allow the applicant to call for and receive a final inspection up to 180
days after their permit has expired. The absence of a final inspection can allow unsafe conditions
to continue that would normally warrant corrections and so without this final check public safety
may be jeopardized.
DISCUSSION
Adopting a modest, predetermined fee for minor residential remodels could help to encourage
compliance with building codes and therefore improve public safety. Creating a streamlined
process for closeout of expired permits could encourage applicants to get a final inspection,
ensuring compliance with building codes and therefore improving public safety.
RECOMMENDATION
The Council is being asked to approve the ordinance and consider these items at the October 27,
2014 Committee of the Whole meeting and subsequent November 3, 2014 Regular Meeting.
ATTACHMENTS
Ordinance in draft form
13
14
DRIFT
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF
TUKWILA, WASHINGTON, AMENDING ORDINANCE NOS. 2418
§1, 2402 §4, 2171 §1 (PART), AND 2121 §1 (PART), AS
CODIFIED AT TUKWILA MUNICIPAL CODE SECTION 16.04.250,
TO CREATE A FLAT FEE FOR PLAN REVIEW AND PERMIT FOR
SIMPLE RESIDENTIAL PROJECTS; PROVIDING FOR
SEVERABILITY; AND ESTABLISHING AN EFFECTIVE DATE.
WHEREAS, the City Council seeks the safety of the citizens first and foremost; and
WHEREAS, permits are required for certain home improvement projects; and
WHEREAS, the City Council desires to lessen the financial impact for homeowners
undertaking this work by creating a flat permit fee for simple residential projects that still
ensures code compliance and required inspections;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, HEREBY ORDAINS AS FOLLOWS:
Section 1. TMC 16.04.250 Amended. Ordinance Nos. 2418 §1, 2402 §4, 2171 §1
(part), and 2121 §1 (part), as codified at Tukwila Municipal Code Section 16.04.250,
"Procedures applicable to all construction permits," are hereby amended to read as
follows:
16.04.250 Procedures applicable to all construction permits
A. Permit and plan review fees applicable to all construction permits are listed in
the most current permit fee resolution.
B. Work covered without inspection or work not ready at the time of inspection
may be charged a re- inspection fee at the hourly rate listed in the most current permit
fee resolution.
C. Work without a permit. Any person who commences work before obtaining
the necessary permits shall be subject to an investigation fee. The investigation fee
shall be equal to the established permit fee as set forth in the most current permit fee
W: Word Processing \Ordinances \Flat permit fee for residential projects 10 -13 -14
JH:bjs
Page 1 of 3
15
resolution. This fee, which shall constitute an investigation fee, shall be imposed and
collected in all cases, whether or not a permit is subsequently issued.
D. Fee refunds. The Building Official may refund any permit fee paid by the
original permit applicant that was erroneously paid or collected. The Building Official
may also authorize the refund of not more than 80% of the permit fee when no work has
been done under a permit issued in accordance with the code. Where a plan review fee
has been collected, no refund will be authorized once it has been determined that the
application is complete and the plan review process has commenced. Refund of any
permit fee paid shall be requested by the original permit applicant in writing and not later
than 180 days after the date of fee payment.
E. Expiration of Permits. All building, mechanical, plumbing, fuel gas piping and
electrical permits shall become invalid unless the work on the site authorized by such
permit is commenced within 180 days after issuance or the work is suspended or
abandoned for a period of 180 days after the time the work is commenced. The
Building Official may grant one or more extensions for periods not more than 180 days
each. The extension shall be requested in writing and justifiable cause demonstrated.
F. Expired Permit Final. A permit within 180 days of expiration may receive a
final inspection provided a new permit application is completed and a fee is paid per the
most current permit fee resolution.
G. Residential remodel permits. Owner - occupied residential remodel permits for
projects not exceeding $20,000.00 in valuation are eligible for a flat fee for the plan
review and permit per the most current permit fee resolution. The valuation will be
cumulative during a rolling one year period and projects that exceed the $20,000.00
limit will be subject to the standard permit fee schedule. All requirements for submittal
documents and inspections are as required for a new house under this section; only the
fee is reduced.
H. Appeals. All references to Board of Appeals is amended as follows: Any
person, firm or corporation may register an appeal of a decision or determination of the
Building Official provided that such appeal is made in writing within 14 calendar days
after such person, firm or corporation shall have been notified of the Building Official's
decision. Any person, firm or corporation shall be permitted to appeal a decision of the
Building Official to the Tukwila Hearing Examiner when it is claimed that any one of the
following conditions exists.
1. The true intent of the code or ordinance has been incorrectly interpreted.
2. The provisions of the code or ordinance do not fully apply.
3. The decision is unreasonable or arbitrary as it applies to alternatives or
new materials.
4. Notice of Appeal procedures shall be in accordance with TMC Section
18.116.030.
W: Word Processing \Ordinances \Flat permit fee for residential projects 10 -13 -14
JH:bjs
16
Page 2 of 3
1G. Violations. Whenever the authority having jurisdiction determines that there
are violations of this code, a written notice shall be issued to confirm such findings. Any
Notice of Violation issued pursuant to this code shall be served upon the owner,
operator, occupant or other person responsible for the condition or violation, either by
personal service or mail, or by delivering the same to and leaving it with some person of
responsibility upon the premises. For unattended or abandoned locations, a copy of
such Notice of Violation shall be posted on the premises in a conspicuous place, at or
near the entrance to such premises, and the Notice of Violation shall be mailed by
registered or certified mail, with return receipt requested, to the last known address of
the owner, occupant or both.
JAI. Penalties. Any person, firm or corporation who shall willfully violate or fails to
comply with a Notice of Violation is liable for the monetary penalties prescribed in TMC
Section 8.45.100.A.2.
Section 2. Corrections by City Clerk or Code Reviser. Upon approval of the
City Attorney, the City Clerk and the code reviser are authorized to make necessary
corrections to this ordinance, including the correction of clerical errors; references to
other local, state or federal laws, codes, rules, or regulations; or ordinance numbering
and section /subsection numbering.
Section 3. Severability. If any section, subsection, paragraph, sentence, clause
or phrase of this ordinance or its application to any person or situation should be held to
be invalid or unconstitutional for any reason by a court of competent jurisdiction, such
invalidity or unconstitutionality shall not affect the validity or constitutionality of the
remaining portions of this ordinance or its application to any other person or situation.
Section 4. Effective Date. This ordinance or a summary thereof shall be
published in the official newspaper of the City, and shall take effect and be in full force
five days after passage and publication as provided by law.
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at
a Regular Meeting thereof this day of , 2014.
ATTEST /AUTHENTICATED:
Christy O'Flaherty, MMC, City Clerk
APPROVED AS TO FORM BY:
Rachel Turpin, City Attorney
Jim Haggerton, Mayor
Filed with the City Clerk:
Passed by the City Council:
Published:
Effective Date:
Ordinance Number:
W: Word Processing \Ordinances \Flat permit fee for residential projects 10 -13 -14
JH:bjs
Page 3 of 3
17
18