Loading...
HomeMy WebLinkAboutFS 2014-10-21 Item 2A - Resolution - 2015 Permit Fee ScheduleTO: City of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM Mayor Haggerton Finance and Safety Committee FROM: Jack Pace, DCD Director BY: Nora Gierloff, Deputy DCD Director DATE: October 15, 2014 SUBJECT: Updated DCD and PW Permit Fees ISSUE Should Tukwila increase its land use permit fees and hourly inspection rates to reflect increased costs to provide this service? BACKGROUND Salaries for represented employees will increase in 2015 by 90% of the increase in CPI_W (June) 2013-14. The CPI-W for that period is 2.2% so 90% of that is an increase of 2%. ANALYSIS Staff is suggesting that the flat land use fees and hourly inspection rates increase at the rate of the City's labor costs. Most other permit fees are based on the valuation of the work which itself reflects inflation so no adjustment is needed for Public Works or the majority of Building Department fees at this time. We are proposing to increase the structural plan review fee from 33% to 35% of the non-structural fee to account for rising costs for this service that the City contracts out to a consultant and passes through to the applicant. New fees have been added for permits related to the new TUC zoning district. A reduced fee is proposed for sensitive area buffer modifications on single family parcels. We hope that this will encourage greater compliance with environmental regulations, especially when part of a code enforcement action. See the separate staff report and ordinance amending Title 16 for a discussion of the proposed new fees for minor residential remodels and final inspections for expired permits. RECOMMENDATION Staff recommends that the Committee forward the resolution to the October 27th Committee of the Whole and November 3rd Regular meeting for action. ATTACHMENTS Draft Building/Electrical/Plumbing/Mechanical Permit Fee Resolution 2 R FT A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, ADOPTING A CONSOLIDATED PERMIT FEE SCHEDULE AND REPEALING RESOLUTION NO. 1803. WHEREAS, the City intends to update permit fees on an annual basis, with any increases tied to growth in City expenses for providing permit services; and WHEREAS, the City Council wishes to recover a portion of the City's costs for review and processing of permit applications; and WHEREAS, the City has adopted a biennial budget process; and WHEREAS, salaries for represented City employees are adjusted by 90% of the Seattle CPI-W, which was 22% for the June 2013-2014 period; and WHEREAS, greater compliance with environmental regulations can be encouraged by offering reduced permit fees for residential homeowners on specific sensitive area permits; and WHEREAS, greater permitting compliance and streamlined disaster recovery can be encouraged by offering a flat permit fee for small residential remodels; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: Section 1. For 2015 and 2016, the Technology Fee shall be set at 5% of the applicable permit fee. W:\Word Processing\Resolutions\Consolidated permit fee schedule-2015-2016 10-2-14 NG:bjs Page 1 of 10 3 Section 2. Public Works fees will be charged according to the following schedule: PUBLIC WORKS FEE SCHEDULE PERMIT DESCRIPTION FEE Type A (Short-Term Non-profit) $ 50.00 + Technology Fee Type B (Short-Term Profit) 810O.00+ Technology Fee Type C (Infrastructure and Grading on Private Property and City Right-of-Way and Disturbance of City Right-of-Way) $25000 application base fee, Technology Fee, plus four components based on construction value: 1) Plan Review 2) Construction Inspection 3) Pavement Mitigation 4) Grading Plan Review $100.00 + Technology Fee Type D (Long-Term) Type E (Potential Disturbance of CityRi0h�of4Nay) $1OO� OO+ Technology Fee ' $250.00 plus � fee, ' � deposit, withdraw $100.00 per instance for inspection Franchise — Telecommunications $5.000.00 administrative fee Franchise — Cable $5.000.00 plus 5% of total revenue Street Vacation $1.200.08 Latecomer's Agreements $500.00 processing fee, plus 1796odministnativefee, _plus $500.00 segregation fee $50.00 + Technology Fee Flood Zone Control Permit Section 3. Land use permit and processing fees will be charged according to the following schedule: LAND USE FEE SCHEDULE All peer review fees will be passed through to the applicant per TMC Section 18.50.200. Decision Type (Current Fee) 2015 Fee 2010 Fee Plus Hearing Examiner Fees Plus Technology Fee (TF) Appeal Type 1, 2 and 4 Decisions $579 $591 $602 +-�� SEPAyWDNSAppeal $579 $591 $602 +7lF Appeal of Sign Code Decision $579 $591 $602 +lF Impact Fee Appeals: Fire $5-79 $591 $802 Parks $579 $591 $602 Transportation $579 $591 $602 W:\Word Processi smmateupr^nit fee schodvw-2n1n-2o1o1oa'1* 4 Page 2 of 10 Decision Type (Current Fee) 2015 Fee 2016 Fee Plus Hearing Examiner Fees Plus Technology Fee (TF) Sign Permit (TMC Chapter 19) Permanent $243 S248 + TF Temporary 4 $106 $108 + TF Pole/Banner Initial Application $238 $243 $248 + TF Special Event 1-04 $106 $108 + TF Pole/Banner Annual Renewal $52 $53 $54 + TF New Billboard $579 $591 $602 + TF Master Sign Program—Admin 2,130 $2,173 $2,216 + TF Master Sign Program—BAR $341-1 $3,479 $3,549 + TF TUC Zone Modifications Modification to TUC Corridor Standards ,$_591 $602 + TF (TMC Section 18.28.130.C) Modification to TUC Open Space Regulations 5.591 8602 + TF UMC Section 18.28.250 D.4.d) Transit Reduction to Parking Requirements Si .S_QQ? _IF (TMC Section 18.28.260.8.5.b) Design Review (TMC Section 18.60.030) Administrative S2.192 $2,236 $2,281 + TF Public Hearing S3.927 $4,006 $4,086 + TF Major Modification $1-, 43 $1,370 $1,397 + TF Minor Modification $61-0 $622 $635 + TF Parking Variances and Special Permissions Administrative Parking Variance (Type 2—TMC Section 18.56.140) $579 $591 $602 + TF Parking Variance (Type 3—TMC Section 18.56.140) $950 $969 $988 + HE + TF Parking Standard for use not specified (TMC 18.28.250 D.4.d.1 and TMC 18.56.100) $48-9 $579 $591 + TF Residential Parking Reduction (TMC Section 18.56.065) $579 $591 $602 + TF Shared, covenant, Complementary Parking Reduction (TMC Section 18.56.070) $579 $591 $602 + TF Parking Lot Restriping (TMC Section 18.56.120) $579 $591 $602 + TF VV:\VVord Processing\Resolutions\Consolidated permit fee schedule-2015-2016 10-2-14 NG:bjs Page 3 of 10 5 Decision Type (Current Fee) 2015 Fee 2016 Fee Plus Hearing Examiner Fees Plus Technology Fee (TF) Variances, al Permissions and Si e Plan Review Variances (T7WCSecb �i Section $2��� $2,825 $2,882 + HE + TF Environmentally Sensitive Areas Deviation ' Buffer Reduction (77NCChapber18.45) Reduced fee for LDR homeowners no . $1-466 $1' 4Q5 Q591 $1,525 $802 + TF associated short pj. Reasonable Use Exception (77NCSec�on18.45.Y80) $27{�2- $2,991 $3,050 + HE + TF .S, .,,,....~.~. ^~ ~~`~~''~''` ~^~''~~'~ $57-9 -+-TF Exception from Single Family Design Standard (TMC Section 18.50.050) $57.9 $591 $602 + TF Special Permission Cargo Container (TMC Section 18.50.060) $57Q $591 $602 + TF Landscape Perimeter Averaging (TMC Section 18.52.060) $5-79 $591 $602 + TF Tree and Landscape Modification Permit and $1-0-3 $105 $107 + TF Exceptions (TMC Cha bery8.54) Lot Cm*atkon and Cmnsodidaton Boundary Line Adustmen� ^v /TMC Chapter 17.08) �'f��4 $1' S77 1' 710 +TF Lot Consolidation (77NC Chapter Y70f) $61-0 $622 Q635 +TF Short P|at(2-4 lots) (T7N(� Chaph*r/�Y2) $37742 $3,817 ' $3,893 ' + TF Short Plat (5-9 lots) (T7N(� Chapter Y712) $47259 $4,344 ' $4,431 ' + TF Subdivision: Preliminary Plat (10+ lots) (T7WC Section Y7.Y4.02() $4;$88 �4' 986 5' 085 +HE +TF Final Plat (10+ lots) (TMC3aobmnY7f2D30 $2.;--932 �2 SS1 ' 3OSO - ' +TF Binding Site Improvement Plan (77NCCheph*r Y7.16) $877-42 �3' 817 3' 893 + TF Planned Residential Development: Adminiatrotive/77NC Section 18.46.110) 2430 $2,173 $2.216 + TF Pub|icHnaring(TMC Section 18.46.110) T 88@ $4.986 $5.085 + TF Minor Modification (TMC Section 18.46.130) $-57A $591 $602 + TF W1ajorKAodification/77NCSection 18.40.130V $-27877 $2,425 2.473 + TF W:\Word PProcessing\Resolutions\Consolidated permit fee schedule-2015-2016 10-214 NG:bjs 6 Page 4 of 10 Decision Type (Current Fee) 2015 Fee 2016 Fee Plus Hearing Examiner Fees Plus Technology Fee (TF) Wireless Communication Facility (TMC Chapter 18 .58.050) Minor (Type 1) 579 $591 $602 + TF Administrative (Type 2) $1,644 $1,677 1,710 + TF Major or Height Waiver (Type 3) 286 $3,352 $3,419 + HE + TF SEPA and Environmental Checklist 1-T6-75 $1,709 $1,743 + TF SEPA EIS 2932 $2,991 $3,050 + TF SEPA Planned Action $579 $602 + TF SEPA Addendum 7 $591 $602 + TF SEPA Exemption Letter $348 355 + TF Sensitive Area Master Plan Overlay (TMC 18.45.160) 6 $4,986 $5,085 + TF Shoreline Permits Substantial Development Permit: (TMC Chapter 18.44) Project value: $5,000 - $10,000 $11158 $1,181 $1,205 + TF $10,001 - $50,000 $2-7-09 $2,763 $2,818 + TF $50,001 - $500,000 $4,320 $4,406 $4,495 + TF More than $500,000 $57478 $5,588 $5,699 + TF Permit Exemption Letter, Shoreline $238 $243 $248 + TF Conditional Use Permit, Shoreline (TMC 18.44.050) $3,803 $3,879 $3,957 + HE + TF Shoreline Tree Permit (TMC Cha er 18.44) $1-0-3 279-32 $105 $2,991 $107 $3,050 + TF + TF Shoreline Environment Redesignation Noise Variance (TMC Section 8.22.120) Type I $485 $494 + TF Type II $654 $667 + TF Type III $1,425 $1,454 $1,483 + HE + TF Use Permits Conditional Use Permit (TMC Section 18.64.020) - $3,879 $3,957 + HE + TF Unclassified Use Permit (TMC Chapter 18.66) $4,986 $5,085 + TF TSO Special Permission Use (TMC Section 18.41.060) $950 $969 $988 + HE + TF W:\Word Process ng\Resolu ons\Consolidated permit fee schedule-2015-2016 10-2-14 NG:bjs Page 5 of 10 7 Decision Type (Current Fee) 2015 Fee 2016 Fee Plus Hearing Examiner Fees Plus Technology Fee (TF) Comprehensive Plan Changes (TMC Chapter 18.84) Rezone (Map Change) $3424 $3,489 $3,559 + TF Comprehensive Plan Amendment $3,910 $3,988 $4,068 + TF Zoning Code Text Amendment $1,114 $4,533 $4,624 + TF Miscellaneous Services and Charges Development Agreement S1.955 $1,994 $2,034 + TF Code Interpretation (TMC Section 18.90.010) 1 $348 $355 + TF Zoning Verification Letter $341- $348 $355 + TF Legal Lot Verification $559 $570 + TF Preapplication Meeting $485 $494 + TF Mailing Fee to Generate Labels, per project $449 $458 $467 Public Notice Mailing Fee per address for each mailing $1- $1 $1 Section 4. Building permit fees will be charged according to the following schedule: Total Valuation $1 to $500 $501 to $2,000 $2,001 to $25,000 $25,001 to $50,000 $50,001 to $100,000 $100,001 to $500,000 BUILDING PERMIT FEE SCHEDULE Building Permit Fees $65.00 + Technology Fee $65.00 for the first $500, plus $4.30 for each additional $100, or fraction thereof, to and including $2,000 + Technology Fee $129.50 for the first $2,000, plus $19.60 for each additional $1,000, or fraction thereof, to and including $25,000 + Technology Fee $600.40 for the first $25,000, plus $15.30 for each additional $1,000, or fraction thereof, to and including $50,000 + Technology Fee $983.25 for the first $50,000, plus $10.60 for each additional $1,000, or fraction thereof, to and including $100,000 + Technology Fee $1,511.60 for the first $100,000, plus $8.50 for each additional $1,000, or fraction thereof, to and including $500,000 + Technology Fee $500,001 to $1,000,000 $4,906.30 for the first $500,000, plus $7.00 for each additional $1,000, or fraction thereof, to and including $1,000,000 + Technology Fee $1,000,001 to $5,000,000 $8,443.25 for the first $1,000,000, plus $4.70 for each additional $1,000, or fraction thereof, to and including $5,000,000 + Technology Fee $5,000,001 and up $27,243.25 for the first $5,000.000, plus $4.50 for each $1,000 or fraction thereof + Technology Fee W:\Word Processing \Resolutions \Consolidated permit fee schedule-2015-2016 10-2-14 NG:bjs 8 Page 6 of 10 1. Non-Structural Plan Review Fee. A non-structural plan review fee shall be paid at the time of submitting plans and specifications for review. The non-structural plan review fee shall be 65% of the calculated permit fee as set forth in the permit fee schedule. The non-structural plan review fee specified herein is a separate fee from the permit fee and is in addition to the permit fee. 2. Structural Plan Review Fee. Where a structural plan review is deemed necessary, a structural plan review fee shall be charged. The structural plan review fee shall be 33%-35Y6 of the calculated non-structural plan review fee. Section 5. Mechanical permit fees will be charged according to the following schedule: MECHANICAL PERMIT FEE SCHEDULE Valuation of Work (Total Amount) Contract $250 or less $251 to $500 Mechanical Permit Fee $32.50 for issuance of each permit (base fee) � Technology Fee $65.00 + Technology Fee $65.00 for first $250, plus $7.83 for each $100 or fraction thereof to and including $500 + Technology Fee $501 to $1,000 $84.60 for the first $500, plus $8.70 for each $100 or fraction thereof to and including $1,000 + Technology Fee $1,001 to $5,000 $128.10 for the first $1,000, plus $9.65 for each $1,000 or fraction thereof, to and including $5,000 + Technology Fee $5,001 to $50,000 $50,001 to $250,000 $250,001 to $1,000,000 $1.000.001 and up $166.70 for the first $5,000, plus $10.05 for each $1,000 or fraction thereof, to and including $50,000 + Technology Fee $639.20 for the first $50,000, plus $8.40 for each $1,000 or fraction thereof, to and including $250,000 + Technology Fee $2,319.20 for the first $250,000, plus $7.40 for each $1,000 or fraction thereof, to and including $1,000,000 + Technology Fee $7,869.20 for the first $1.U0O.OUO. plus $8JO for each $1.0OOor fraction thereof + Technology Fee Section 6. Plumbing permit fees will be charged according to the following schedule: PLUMBING PERMIT FEE SCHEDULE Permit Issuance—Issuance of each permit (base fee) $32.50 + Technology Fee Unit Fee Schedule (in addition to base fee above: For one plumbing fixture (a fixture is a nink, toi|et, bathtub, etc.) For each additional fixture For each building sewer and each trailer park sewer Rain water system – per drain (inside building) For each water heater and/or vent $65.00 + Technology Fee $14.00 + Technology Fee $24.80 + Technology Fee W:\Word Processing\Resolutions\Consolidated permit fee schedule-2015-2016 10-2-14 $14.00 + Technology Fee $14.00 + Technology Fee Page 7 of 10 PLUMBING PERMIT FEE SCHEDULE (continued) For each industrial waste pretreatment interceptor, including its trap d vent, except for kitchen interceptors For each grease interceptor for commercial kitchens For each repair or alteration of water piping and/or water treating eq_uipment, each occurrence For each repair or alteration of drainage or vent piping, each fixture For each medical gas piping system serving one to five inlets/outlets for a specific gas $28.00 + Technology Fee $29.10 + Technology Fee $14.00 + Technology Fee $14.00 + Technology Fee $82.00 + Technology Fee For each additional medical gas inlets/outlets $16 20 + Technology Fee For each lawn sprinkler system on any one (1) meter including baokflow protection devices therefor. For atmospheric-type vacuum breakers not included in lawn sprinkler backflow protection: 1 to5.... $14.00 + Technology Fee Over 5... $14.00 for first 5 plus $3.25 for each additional + Technol Fee $29 10 + Technology Fee For each backflow protective device other than atmospheric type vacuum breakers: 2-inch diameter and smaller... $29.10 + Technology Fee Section 7. Fuel Gas Piping permit fees will be charged according to the following schedule: FUEL GAS PIPING PERMIT FEE SCHEDULE 1. Permit Issuance: For issuing each permit (base fee): ($0 if permit is in conjunction with a plumbing permit for an appliance with both plumbing and gas connection.) $32.50 + Technology Fee 2. Unit Fee Schedule (in addition to item in subparagraph 71j: For each gas piping system of one to five outlets For each additional gas piping system outlet, per outlet $65.00 + Technology Fee $14.00 + Technology Fee Section 8. Electrical permit fees will be charged according to the following schedule: ELECTRICAL PERMIT FEE SCHEDULE 1. NEW SINGLE-FAMILY DWELLINGS New single-family dwellings (including a garage) Garages, pools, spas and outbuildings Low voltage systems W:\Word Processing muteu permit fee achaume-2o10-2o/o10-214 NG:bjs 10 $152 85 + Technology Fee $81.90 + Technology Fee 858 85 + Technology Fee Page 8 of 10 ELECTRICAL PERMIT FEE SCHEDULE (continued) 2. SINGLE-FAMILY REMODEL AND SERVICE CHANGES Service change or alteration-no added/altered circuits Service change $81.90 with added/altered circuits, plus $11.55 for each added circuit (maximum permit fee $152.85)_ Circuits added/altered without service change (includes up to 5 circuits) Circuits $54.60 added/altered without service change (more than 5 circuits); $7.65 for each added circuit (maximum permit fee $98.70 Technology Fee) Meter/mast repair Low voltage systems $81.90 + Technology Fee $81.90 + Technology Fee $54.60 + Technology Fee $54.60 + Technology Fee $68.25 + Technology Fee $59.85 + Technology Fee 3. MULTI-FAMILY AND COMMERCIAL (including low voltage) Valuation of Work (Total Contract Amount) Permit Fee $250 or less $65.00 + Technology Fee $251 - $1,000 $65.00 for the first $250 plus $4.30 for each $100 or fraction thereof, to and including $1,000 + Technology Fee $1,001 - $5,000 $97.00 for the first $1,000 plus $21.60 for each $1,000 or fraction thereof, to and including $5,000 + Technology Fee $5.001-$50.000 $183.30 for the first $5,000 plus $17.70 for each $1,000 or fraction thereof, to and including $50,000 + Technology Fee $50,001 - $250,000 $979.15 for the first $50,000 plus $12.90 for each $1,000 or fraction thereof, to and including $25O.00O+ Technology Fee $250,001 - $1,000,000 $3,567.20 for the first $250,000 plus $9.15 for each $1,000 or fraction thereof, to and including $1,000,000 + Technology Fee Over $1,000,000 $10,440.70 plus 0.5% of cost over $1,000,000 + Technology Fee 4 MISCELLANEOUS ELECTRICAL PERMIT FEES Temporary service (residential) Temporary service/generators $65.00 + Technology Fee $80.90 + Technology Fee Manufactured/mobile home parks and RV park sites, each service and feeder Carnivals: • Base fee • Each concession fee • Each ride and generator truck Inspections or plan review not specified elsewhere (one-half hour minimum). S i ons, plan revisions. Adult family home inspection (paid at the time of scheduling the /nsPfcIion)L_- Disaster recovery emergency repair permit (residential structures only) W:\Word Processing\Resolutions\Gonsolidated permit fee schedule-2015-2016 10-2-14 NG:bjs $86.25 + Technology Fee $80.60 + Technology Fee Fee $10.80 + Technology Fee $6G]}Q65.50/hour $65-0066.50 $20.00 Page 9 of 10 Section 9. Other inspections and fees will be charged according to the following schedule: OTHER INSPECTIONS AND FEES Inspections outside of normal business hours (three hour minimum charge) $97.50100.00/hour Re-inspection fee $6-5,0066.50/hour Inspection for which no fee is specifically indicated—investigations or safety $6-5,0066.50/hour inspections Additional plan review required by changes, additions, or revisions to approved $65-0066.50/hour plans (minimum charge one-half hour) Work commencing before permit issuance shall be subject to an investigation fee 100% of the permit equal to 100% of the permit fee. fee Plan review fee—Mechanical, Plumbing, Fuel Gas Piping and Electrical: The fee for review shall be 25% of the total calculated permit fee. The plan review fee is a separate fee from the permit fee and is required when plans are required in order to document compliance with the code. Work covered without inspection or work not ready at the time of inspection may be charged a re-inspection fee of $65,0-066.50. Administrative fee for permit extension request longer than one year $65,00 Expired permit final – includes two inspections $133.00 Expired permit final – each additional inspection $66.50 Minor residential remodel plan review and permit (projects up to $20,000) $20.00 Section 10. Repealer. Resolution No. 1803 is hereby repealed effective December 31, 2014. Section 11. Effective Date. The permit fee schedules contained in this resolution shall be effective as of January 1, 2015. PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a Regular Meeting thereof this day of , 2014. ATTEST/AUTHENTICATED: Christy O'Flaherty, MMC, City Clerk De'Sean Quinn, Council President APPROVED AS TO FORM BY: Filed with the City Clerk: Passed by the City Council: Resolution Number: Rachel Turpin, City Attorney W:\Word Processing \Resolutions\Consolidated permit fee schedule-2015-2016 10-2-14 NG:bjs 12 Page 10 of 10