HomeMy WebLinkAboutPermit L98-0010 - WSDOT - SR 5 / BOEING ACCESS NOISE VARIANCEL98 -0010
WSDOT SR 5
Boeing Access Road
Temporary Noise
Variance
City of Tukwila
John W. Rants, Mayor
Department of Community Development Steve Lancaster, Director
October 23, 1998
JoAnne Welty
WSDOT
15700 Dayton Rd N
P.O. Box 330310
Shoreline, WA 98133 -9710
Re• Temporary Noise Variance for SR5 / Boeing Access Rd ramp modification
(L98 -0010)
Dear JoAnne:
Thank you for your phone call requesting an amendment on the construction
time frame for this project. The time frame change to March 1, 1999 to
November 1, 1999 is approved and will be noted in the file.
As this is the second such request since the original approval in April, 1998, any
additional amendments to extend the time frame will require a new application
and public review process. In addition, when the project begins and you have an
expected set of dates that will be needed for night time work we would
appreciate obtaining your schedule.
If you have any questions, feel free to contact me at (206) 431 -3685.
Sincerely,
Michael Jenkins
Assistant Planner
6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • (206) 431-3670 • Fax (206) 431-3665
City of Tukwila John W. Rants, Mayor
Department of Community Development Steve Lancaster, Director
July 14, 1998
Bruce Farrar
WSDOT
15700 Dayton Ave N.
P.O. Box 330310
Seattle, WA 98133-9710
Re: SR 5/Boeing Access Rd ramp modification
Dear Bruce:
Thank you for your amendment concerning ramp modifications, as referenced.
The change in time frame will be noted in the file. No other action will be
required based upon the scope of the previous public review, similarity in scope
of work and the lack of responses to the previous public notice.
Sincerely,
Michael Jenkins
Assistant Planner
6300 Southcenter Boulevard, Suite /1100 • Tukwila, Washington 98188 • (206) 431-3670 • Fax (206) 431-3665
WIWashington State
Department of Transportation
Sid Morrison
Secretary of Transportation
July 9, 1998
Michael Jenkins
City of Tukwila
6300 Southcenter Boulevard
Tukwila, WA 98188
Northwest Region
15700 Dayton Avenue North
P.O. Box 330310
Seattle, WA 98133 -9710
(206) 440-4000
SR 5 Boeing Access Road
Ramp Modification
OL 3201
Technical Noise Variance
Application Amendment
Dear Mr. Jenkins:
RECEIVED
JUL 13 1998
COMMUNITY
DEVELOPMENT
Please accept this amendment to the noise variance issued by your office on April 24,
1998. We request that the construction window be changed from a starting date of
September 15, 1998, and an ending date of December 24, 1998 to a new starting date of
August 1, 1998 and a new ending date of May 1, 1999. Approval of this request will not
add additional "noise nights." The 14 nights originally requested remain the same.
The reason for the change is that the City of Seattle, who is funding this project, needed
extra time to secure construction funding. This delayed the project's advertisement date
and pushed the construction schedule into the winter months. The Washington State
Department of Transportation (WSDOT) construction office administering the job •
expressed concern that the delayed construction schedule may require a winter shut -down
pushing the project into the spring of 1999.
Also, please find enclosed mailing address labels for all property owners within 500 feet of
the job site. A 600 foot radius was used to ensure compliance. Your help with this matter
is greatly appreciated. If you have any comments or questions please call me at (206)
440 -4546 or Joanne Welty at (206) 440 -4541.
Sincerely,
BRUCE P. FARRAR
Air Quality and Special Studies
Program Manager
:.a
JLW
Attachments
cc: Susan Everett / Maher Welaye MS 135
Cathy Arnold MS 58
Earl Franzen MS 111
Day file
file
OL3201E.DOC
A F F I D A V I T 4+
O F D I S T R I B U T I O N
WenL,w
hereby declare that:
0 Notice of Public Hearing fl Determination of Non -
significance
LI Notice of Public Meeting J Mitigated Determination of
Nonsignificance
LI Board of Adjustment Agenda E Determination of Significance
Packet and Scoping Notice
LI Board of Appeals Agenda Lj Notice of Action
Packet
0 Planning Commission Agenda fl Official Notice
Packet
fl Short Subdivision Agenda Other M&Fi& O f b e 516(/\
Packet
Q Notice of Application for fl Other
Shoreline Management Permit
Shoreline Management Permit
was mailed to each of the following addresses on 't'�1 ^ -�
•
Name of Project VV 1)0.-i- Signature
File Number t__q p io
z
J:U:
UO
cn w
.LLl =:
• w O;
J
w
112 a,
=.
• I-w
_
z f-'
�o
Z •
2o
o
ww..
U
w z;
ui
N`
Ham.
O
'z.
To:
City of Tukwila
John W. Rants, Mayor
Department of Community Development Steve Lancaster, Director
NOTICE OF DECISION
April 24, 1998
• Bruce Farrar, Washington State Department of Transportation (applicant)
• King County Assessor, Accounting Division
This letter serves as a Notice of Decision and is issued pursuant to Tukwila Municipal Code
(TMC) 18.108. The Director of Community Development hereby approves the applicant's
request, per TMC 8.22, for a Temporary Noise Variance for the ramp modification to the
southbound exit at the SR 5 / Boeing Access Rd interchange. A copy of the plan is attached.
PROJECT BACKGROUND
a. Project file number:
L98 -0010
b. The name of the applicant who is also the current property owner(s):
Washington State Department of Transportation
Project Description: Textual description as well as 8.5" x 11" site plans, building
elevations and other appropriate characteristics.
Modification to the southbound SR 5 / Boeing Access Rd interchange,
to include widening of the ramp, removal of existing westbound only movement,
additional of a dual left turn lane, construction of a new right turn lane and
installation of a signal at the ramp terminus.
d. Project location:
State Route 5 / Boeing Access Rd. ramp
6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • (206) 431-3670 • Fax (206) 431-3665
_ •
w
U
c� 0
N 0
w=i.
J ~�
w
J:
li..''
co
a,
1- w:,
z�
o
z�
co
mo• o,
O —
ww
I-
0 ;
.z.
z
April 24, 1998
Notice of Decision
L98 -0010 - WSDOT Temporary Noise Variance
e. The permits submitted concurrently with this application:
None
f. Environmental threshold determination (if any):
Not applicable
Property owners affected by this decision may request a change in valuation for property
tax purposes notwithstanding any program of revaluation.
z
�W
6
U 0;
CO 0
W =.
-J H .
wO
CO J
The period for administrative a pp eals is 14 da ys , starting from the issuance of hi s Notice D
d
of Decision. All appeal materials shall be submitted to the Department of Community
Development. Appeal materials shall contain: ?
E- O
z�-
U.1
Uo
2. The address and phone number of the appealing party, and if the appealing party ~'
is a corporation, association or other group, the address and phone number of a v
contact person authorized to received notices on the appealing party's behalf, and "-- o
U =i
H
O
z '
1. The name of the appealing party,
3. A statement identifying the decision being appealed and the alleged errors in that
decision. The Notice of Appeal shall state specific errors of fact or errors in
application of the law in the decision being appealed, the harm suffered or
anticipated by the appellant, and the relief sought. The scope of an appeal shall be
limited to matters or issues raised in the Notice of Appeal.
Project materials including the application, any staff reports, and other studies related to the
permit(s) are available for inspection at the Tukwila Dept. of Community Development; 6300
Southcenter Blvd.; Suite 100; Tukwila, WA; from Monday through Friday, between 8:30 AM to
5:00 PM. The project planner is Michael Jenkins, who may be contacted at 206 - 433 -7142 for
further information.
LI-Ze -56
DATE
Steve Lancaster, Director of Community Development
\\
0
0
1— n.
in LI 0.1
o :.-o 'F
• CC p
1_
co
ul In Ir
~ 0 O co
a_ O U
N n <C
U') • : F-
LU Li) N
CE 1 /
ti) V)
�pod.Joq uGp•jooysdowoIA\lpq•. :o 0G 033 90 C101J
k4.1141^ ausi
••,.•.••.,• ;G'. 40c;iica _14,A46. *iig Ft ti't'er ",io x.2Yi 'Ati
VICINITY MAP
FED.A!D PROJ.NO.
0
U
fD
u
O
O
0
H Z'
6 5.
U O'
NQ'
• LIJ
J 1—
• u.
w
J
LL <.
D. a
H =.
H O.
Z
Q Q'
O • N
Q I–.
W W'
LL Os
Lil
U �
O
Z
City of Tukwila
John W. Rants, Mayor
Department of Community Development Steve Lancaster, Director
STAFF REPORT TO
THE DIRECTOR OF COMMUNITY DEVELOPMENT
FOR A NOISE VARIANCE
DATE:
NOTIFICATION:
FILE NUMBER:
APPLICANT:
REQUEST:
LOCATION:
ACREAGE:
ADJACENT ZONING:
SEPA DETERMINATION:
RECOMMENDATION:
STAFF:
ATTACHMENTS:
April 24, 1998
Notice of Application was mailed to surrounding
properties on March 16, 1998. As project occurs in
the right -of -way, no sign was posted.
L98 -0010
Bruce Farrar, for Washington State Department of
Transportation
Temporary Noise Variance to conduct work on an
off -ramp on 14 separate nights
State Route 5 / Boeing Access Road interchange
Not applicable
Manufacturing/Industrial Center Heavy
(MIC/H)
Exempt
Approval
Michael Jenkins, Assistant Planner
A: Overhead map
B: Application materials
C: Channelization and site plans
D: Noise analysis related to project activities
6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • (206) 431-3670 • Fax (206) 431-3665
MIA :.... V. 24n4t; ^11.4,4 4 Fir:� ni wii ga4k 9iYFgiae'd tit.:' : eH:41Etch t.tARwiklitZ.C.R t •.• 4 At':i3 "ri4ai4Yn4a's''.
1
Staff Report - L98 -0010
April 24, 1998
Temporary Noise Variance - WSDOT
FINDINGS
BACKGROUND
The Washington State Department of Transportation (WSDOT) proposes improvements
to the State Route (SR) 5 / Boeing Access Road interchange to improve the southbound
exit from SR 5. The proposed improvements are to occur on 14 separate nights between
9:00 p.m. on Fridays through 5:00 a.m. Mondays. The anticipated project time line is
between June 15, 1998 through December 24, 1998.
Construction noise between the hours of 7:00 a.m. and 10:00 p.m. is exempt from the
City's Noise Ordinance, Tukwila Municipal Code (TMC) 8.22. Noise generated between
10:00 p.m. and 7:00 p.m., if in excess of allowed levels at receiving properties and
anticipated to last only 14 days maximum, requires a temporary noise variance. TMC
8.22.040 allows a maximum of 70 dBA when both the sound source and the receiving
properties are in an industrial zone. Attachment A is an overhead photograph of the
project area. While the project is located in the right -of -way and is not specifically
zoned, all of the surrounding property is located in the Manufacturing Industrial
Center/Heavy (MIC/H) zone.
SITE / VICINITY INFORMATION
Project description
The scope of the proposed improvements to the SR 5 / Boeing Access Rd. interchange,
listed in Attachment B, includes:
• widening southbound off -ramp
• removing existing westbound only movement
• add a dual left turn lane
• build a new right turn movement
• install signal at ramp terminal
Attachment C is the channelization, paving and site preparation plans for the project.
In their application materials (Attachment B) applicants have indicated that lane
restrictions to close or substantially limit access to the Southbound ramp can only occur
between either 8:00 p.m. and 5:00 a.m. or 7:00 p.m. to 6:00 a.m. These limitations have
been imposed on WSDOT to ensure safety of workers and automobiles. To affect the
improvements indicated above, the applicant's are seeking a temporary noise variance
due to the anticipated noise levels related to the improvement work schedule.
The activities to be performed to affect improvements include:
m Gr t�Mnk,t+ +6 j: Y i i s slF i� iy' :t' Z4W W' 16411 t f _ i1 4c' +h ?"' �Y .
1--w
Q W
J0
O 0
w
W =.
CO
w
w0
ga.
- d
=w
Z �.
I— O.
Z
w
U • 0'
O N'
O I--`
= w
V`
O
wz
O
z
Staff Report - L98 -0010
April 24, 1998
Temporary Noise Variance - WSDOT
• Excavation
• Debris removal
• Installation and removal of signs / illumination
• Roadway grading
• Placement and removal of traffic barriers
• pavement installations, removal, widening and overlay
• Sidewalk installation
• Drainage installation
• Striping
• Traffic control
• Guardrail removal
Attachment D is a list of the anticipated activities and corresponding noise levels. As
indicated, a maximum 90 dBA will occur as a result of saw cutting machines. As
referenced, 70 dBA is the maximum noise allowed to be generated in the MIC zone. To
mitigate the amount of noise generated during the project to affect the improvements, the
applicants will:
• use rubber bed liners on all trucks
• reduce noise levels on backup warning devices
• focus lighting on project and away from residences /oncoming traffic
• removal debris by hand and not machines
• monitor project with 24 hour telephone complaint line
Decision Criteria
TMC 8.22.180 establishes the review process for all noise variances:
"No variance shall be granted pursuant to this chapter until the administrator
has considered the relative interests of the applicant, other owners or possessors
or property likely to be affected by the noise, and the general public...The
administrator may grant a variance, if he finds that:
1. The noise occurring or proposed to occur does not endanger public
health or safety;
2. The applicant demonstrates that the criteria required for a temporary,
technical or economic variance under TMC 8.22.190 are met."
Z
JU
0
• WI
,
N.LL
w O.
J
u. <;
to
= a.
_;
I-- o
;z
0 f-'
w:
z.
U,=
O ~:
:z
Staff Report - L98 -0010
April 24, 1998
Temporary Noise Variance - WSDOT
TMC 8.22.190 describes a Temporary Variance as:
"The administrator may grant a temporary variance, not to exceed 14 days, for
any activity, use, process or equipment which the administrator determines, in
accordance with rules and regulations, does not annoy a substantial number of
the people and does not endanger public health or safety."
The project site is surrounded by industrial uses in an industrial zone. Under TMC 8.22,
70 dBA is the maximum noise allowed. As indicated in Attachment D, the listed
activities will exceed the maximum allowed 70 dBA by up to 20 dBA on 14 separate, not
consecutive, nights over a 192 day period from June 15 through December 24, 1998.
The closest residential zone and uses in the City of Tukwila are located approximately
2,000 feet from the project site. Adjacent residential uses in the City of Seattle are also
located approximately 2,000 feet from the project site. TMC 8.22.050 requires a 10 dBA
reduction in nighttime noise when the receiving property is in a residential district. The
maximum allowed dBA during 10:00 p.m. and 7:00 a.m. when noise is received at
residential properties and generated on industrial property is 50 dBA.
Applicants have also indicated that noise levels will diminish at approximately 6 dBA
with the doubling of distance from the noise generator. Using this calculation, the 90
dBA maximum noise generated by saw cutters will dissipate entirely at 1500 feet from
the project site. As the referenced, the closest residential property in Tukwila is located
outside the likely noise field.
CONCLUSIONS
1. A temporary noise variance is required for the 14 days of night time activities that
exceed the 70 dBA limit in the MIC zone
2. A list of mitigating activities will be enacted that directly correspond to noise
generators
3. The noise generated during the evening hours will most likely dissipate before
being registered at nearby residential properties
RECOMMENDATION
Approval of the request for a 14 day temporary variance, to extend from June 15, 1998
through December 24, 1998
z
z 1-
~ w
re g.
0
fA
W =,
I —:
w
2
LL
_.
z
o'
z I—:
w uf
U�
1—.
w w::
=V
LI
z
w
U =;
O~
z
7V.r...".:
.• •
1": 4-0 f
ATTACHMENT A
- & - ' •
t.,•4:. • 't •••• 7 -1' "•"".4 •`* ;■^' MI■4111,-.Wcalzrerei...41•garii.ti.atX="141Z.0.4. MIAs.
• •
Winaggeliffiliwfo'n
If.
Lt
7908
City of Tukwila
John W. Rants, Mayor
Department of Community Development Steve Lancaster, Director
April 1, 1998
Bruce Farrar
WSDOT - Northwest Region
15700 Dayton Rd North
P.O. Box 330310
Shoreline, WA 98133 -9710
Re: L98 -0010, Technical Noise Variance - I -5 /Boeing Access Rd.
Dear Bruce:
As you may recall, the Notice of Application for your project was sent out to
surrounding properties on March 16, 1998. The Notice included a March 31,
1998 cutoff date for comments on the project. To date, I have not received any
requests to review the file, nor have I received any written comments about the
proposal.
I will be out of the office from April 3 -14. On my return, I will begin preparing
the staff report for review by the Director of Community Development. I will
contact you once the staff report has been finaled. "'
If you have any questions, feel free to contact me at 431 -3685.
Sincerely,
Michael Jenkins
Assistant Planner
6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • (206) 431 -3670 • Fax (206) 431-3665
iettiSs kY 4 S't NaV -:s+ wF 1". V Dfal.14 5 aF ":' "i tfo• ::aJ4takS+a n
z
1Z
• r
J U;
6
O O,
'W w.
wo.
u<
'V) D:
_
•
:z
• I- o .
Z E--;
W
U `
o �'
D H
ui
H U'
o.
D' •
0
•
A F F I D A V I T
fl Notice of Public Hearing
Q Notice of Public Meeting
OBoard of
Packet
Board of
Packet
Adjustment Agenda
Appeals Agenda
Planning Commission Agenda
Packet
L Short Subdivision Agenda
Packet
O F D I S T R I B U T I O N
hereby declare that:
LI Notice of Application for
Shoreline Management Permit
Q Shoreline Management Permit
flDetermination of Non -
significance
L Mitigated Determination of
Nonsignificance
ODetermination of Significance
and Scoping Notice
O Notice of Action
0 Official Notice
Other
was mailed to each of the following addresses on 3144,
dJ;tviket, :
Name of Project i T veLridyitignature
File Number
Northe riington
777 Main #2680
Fort Wo i, 76102
ASSOCIATED GROCERY INC
PO Box 3763
Seattle,, WA 98124
CITY OF SEATTLE
400 Yesler Way #4th
Seattle, WA 98104
Northern Rr Burlington
777 Main St #2680
Fort Worth, TX 76102
LINDAL CEDAR HOMES
1422 Euclid Ave #900
Cleveland, OH 44115
NOR 1' C, PACIFIC RR CO
777 Mai
Fort W.rth, T 76102
LINDAL CEDAR HOMES INC
10411 Empire Way S
Seattle, WA 98178
STERNCO LAND CO
8512 172nd Ave NE
Redmond, WA 98052
S & Boei c N
S cess Rd Ai
. W.
CALL SERVICES INC
14917 SE 142nd Ave
Clackamas, OR 97015
C A NEWELL CO INC
9877 40th Ave S
Seattle. WA 98118
PAPE PROPERTIES
101 E Broadway #400
Eugene. OR 97401
Ronald Ziegler
9883 40th Ave S
Seattle, WA 98118
City of Tukwila
John W. Rants, Mayor
Department of Community Development Steve Lancaster, Director
z
NOTICE OF APPLICATION
DATED MARCH 16,1998 w
6
J V'.
O o
O;
wW
Jam,..
U.
w o:
u- • Q,
D. a
t=o
zI
n
U
o N,.
These files are available for review at the Department of Community Development, 6300 W ~`
w
Southcenter Blvd., #100, Tukwila, WA. Please call (206) 431 -3670 to ensure that the file(s) will be • v.
available. .L!-
z
o�
z
The following applications have been submitted to the Department of Community Development for
review and decision.
FILE NUMBERS: L98 -0010 (Noise Variance)
APPLICANT: Washington State Department of Transportation
LOCATION: Boeing Access Rd, between E. Marginal Way and Martin Luther King
Jr. Way
PROPOSAL: Temporary 14 day Noise Variance to conduct road improvements
between 10:00 p.m. and 7:00 a.m., between June 15, 1998 and
December 24, 1998
OTHER REQUIRED
PERMITS: Public Works Permits
OPPORTUNITY FOR PUBLIC COMMENT
You can submit comments on this application. You must submit your comments in writing to
the Department of Community Development by 5:00 p.m. on March 31, 1998. If you have
questions about this proposal contact Michael Jenkins, the Planner in charge of this file. Anyone
who submits written comments will become parties of record and will be notified of any decision on
this project.
APPEALS
You may request a copy of any decision or obtain information on your appeal rights by contacting
the Department at 431 -3670. A decision from the Planning Commission may be appealed to the
City Council. The Department will provide you with information on appeals if you are interested.
6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • (206) 431-3670 • Fax (206) 431-3665
z: 4.4".Mi.49.14;4 '
iii
Washington State
Vi Department of Transportation
Sid Morrison
Secretary of Transportation
•
• PI
Michael Jenkins
City of Tukwila
6300 Southcenter Boulevard
Tukwila, WA 98188
Dear Mr. Jenkins:
Northwest Region
15700 Dayton Avenue North
P.O. Box 330310
Seattle, WA 98133 -9710
(206) 440-4000
March 12, 1998
MAR ! 3 19g0 •
F1f
;ON f-1 •∎et«," y
"..1 VELOPMENT
SR 5 Boeing Access Road
Ramp Modification
OL 3201
Technical Noise Variance
Application Amendment
Per my phone conversation with you March 12, 1998, please accept this amendment to the
noise variance application sent to you March 4, 1998. We request that the construction
ending date be changed from September 15, 1998, to December 24, 1998. Approval of
this request will not add additional "noise nights." The 14 nights originally requested
remain the same. Also, please find enclosed mailing address labels for all property owners
within 500 feet of the job site. A 600 foot radius was used to ensure compliance. Your
help with this matter is greatly appreciated. If you have any comments or questions please
call me at (206) 440 -4546:
Sincerely,
BRUC'1 P. 1 ARRAR
Air Quality and Special Studies
Program Manager
BPF:jw
Attachments
cc: Susan Everett / Maher Welaye MS 135
Cathy Arnold 58
Earl Franzen MS 111
Day file
file
OL3201D.DOC
z
i-.
.ce w'
2:
• .0O;
o:
w ='
ILL o;
CA a
z�
'1— p.
Z
;O --t.
`
z:
ui
:0, •
z
Ai&
171.1 Washington State
Department of Transportation
Sid Morrison
Secretary of Transportation
Michael Jenkins
City of Tukwila
6300 Southcenter Boulevard
Tukwila, WA 98188
Dear Mr. Lancaster:
Northwest Region
15700 Dayton Avenue North
P.O. Box 330310
Seattle, WA 98133-9710
(206) 440-4000
March 4, 1998
;.!
SR 5 Boeing Access Road
Ramp Modification
OL 3201
Technical Noise Variance Application
The Washington State Department of Transportation (WSDOT) is planning to improve
the SR 5 / Boeing Access Road interchange. Currently, southbound traffic exiting from
SR 5 has the sole option of westbound travel on the Boeing Access Road. The proposed
project will widen the southbound off-ramp, remove the existing westbound only
movement, add a new dual left turn pocket (eastbound movement), build a new "free"
right turn movement (westbound) and install a new signal at the ramp terminal. This new
signal will be interconnected with the existing signal at SR 900 (Martin Luther King Jr.
Way) and will coordinate with the existing signal at E. Marginal Way S. The widening
will occur soon after the ramp comes off the mainline, to provide adequate storage for the
signal queue, and will continue as a two lane ramp up to the terminal where it becomes a
two lane left turn pocket with a free right turn at the intersection with the Boeing Access
Road. Attached you will find an aerial and a listing of the property owners with mailing
labels.
The job requires night work which will allow the ramp to be open to traffic a maximum
amount of time during construction. The WSDOT is planning to close the ramp
completely for two weekends.. On the first weekend the existing ramp terminal will be
removed and rebuilt. On the second weekend the entire ramp will be overlayed and
permanent striping will be applied. In order to perform all of the work required, the
contractor must work throughout the night during these weekend closures. The closures
will occur from 9:00 PM Friday to 5:00 AM Monday.
Work to be performed at night includes:
Excavation
Debris removal
Installation and removal of signs and illumination •
ww
Roadway grading 3
-1 0,
UO
Installation of loop detectors, data stations and other SC &DI equipment ` w
w =:
1—
Placement and removal of construction traffic barrier 'u w
w 0;
Pavement installation, removal, widening and overlay ga'
w a.
Sidewalk installation I w.
_.
Z �..
Drainage installation F- O,
z
w w;
Striping 0
N.
Traffic control w uj --:
t ;w,.
Guardrail removal and installation LL
O:
ui z
SR 5 is a high volume highway and traffic restrictions . will be necessary. Work will occur $
in narrow area's within and adjacent to the travel lanes, presenting a danger to the public O
and project workers: Lane restrictions are needed for the movement of equipment and
materials and to allow enough room for equipment and workers to perform the work. For
public safety, lane restrictions on SR 5 are only allowed between 8:00 PM to 5:00 AM and
7:00 PM to 6 :00 AM depending on location and day of the week. It is therefore necessary
to perform this work at night.
Equipment to be used may include, but is not limited to, a small crane, diesel generators,
chipping guns, compressors, dump trucks, paving machines, rollers, light plants, arrow
boards, concrete trucks, saw cutting machine, front end loader, backhoe, trenching •
machine, and flat bed trucks.
Noise levels diminish with distance. A 6 dBA noise level drop off will occur with the
doubling of distance from a noise source. For example, a noise level of 70 dBA measured
at 50 feet would be 64 dBA at 100 feet, 58 dBA at 200 feet, and 52 dBA at 400 feet.
Sound also decreases if an object interferes with the receiver's line of sight to the noise
source. This attenuation depends on the relative elevations of the source and the receiver
and the height and location of the intervening object.
•._.. �; r-,':;. R;,' dir�A= %)i?i.:C,- ^.:lra:!ir`.'t';:"�} tai:= o:'{ �: a5' d'; kJ%^�1'�A{«'s "�lEi:i`a'."1:,.�` 3i:Y ?EGi�f
VIAMitiff?'•. • rZOPU3'tf xi9i' r46'•`G'ivafit,ifiv 'aadt4??'x`+S h'R�S� «tl9tJCr =Y�!:
•
Tukwila residential neighborhoods closest to the project location are approximately 1800
to 2000 feet to the east of the proposed project. (Residences located within Seattle are
approximately 1700 to 2500 feet from the project. A noise variance application is being
tendered to the City of Seattle as well.) Analysis and projected worst case nighttime
construction noise levels for residences closest to the project are as follows: Four
residences are found on 47th Ave. S. (south of S. Ryan Way). A forested hill blocks the .
line of sight between this residential area and the project site, which is approximately 2000
feet away. Project related noises will usually be imperceptible to residences in this area.
Occasional project related noises might be barely perceptible (45 - 50 dBA)to an exterior
receiver in this neighborhood. 47`x' Ave. S. is also found north of S. Ryan Way. There are
approximately 8 - 10 residences on the west side of 47th Ave. S., which is closest to the
project site. These residences are 2000 to 2200 feet from the project location. A forested
hillside, Martin Luther King Jr. Way, SR 5, and numerous warehouses and industrial
buildings separate this neighborhood from the project location. Distance, line of sight
interruption, and the forested hillside will combine to provide 37 - 50 dBA of attenuation
to project activity noise levels. Worst case project generated peak noise levels to this
residential area are expected to be 45 - 53 dBA as perceived by an exterior receiver in this
neighborhood.
As a measure to mitigate noise, our contractor will perform the work under the following
conditions :
• All trucks performing export haul shall have rubber bed liners between the hours of
10:00 PM to 7:00 AM;
All backup warning devices shall be the least intrusive ambient sensitive type or the
contractor may use a backup observer in lieu of backup warning devices as allowed by
WAC 296 - 155 -610 (2) (e);
Lighting and other stationary equipment such as generators, air compressors, or any
other similar equipment used for nighttime work shall be directed away from on
coming traffic and residences.
• Any material or debris that spill on the pavement shall be removed by hand or by
sweeping. The contractor shall employ no scraping type equipment or activity to clean
pavement surfaces.
• The WSDOT will periodically monitor project related noise levels at residential sites.
Periodic written reports will be submitted to the City of Tukwila. WSDOT will
provide and monitor a 24 hour complaint line. The complaint line telephone number
will be distributed to area residents.
• The Construction Project Engineer (PE) will be alerted of all complaints. The PE will
evaluate the complaint and the monitoring measurements and take appropriate
+# > S' �,,;iµf,:l etn` {,:'.;',%i: !'rA.1cl'��+'.i1i�J �a k6�;(.'' :5''1'ti(g'„tFUyrhS#,1Sii u�5i5A•�.: ��. 4,,v4,71; :3f,.rD" t.u. • r F -
z
re al
6�
00
t °
w =
wO
g n-
u..a
I- _
Z �...
F- O'
Z I-
LL) tu
U°
O
!-
w w,
I
- O.
•Z
w
Oh-'
z
measures, which will include further mitigation activities, removal of equipment from
the job, or a work stoppage to develop an acceptable procedure.
To ensure the reasonable safety and convenience of the public, we ask for a temporary
noise variance from the requirements of Tukwila Municipal Code Chapter 8.22.180(b).
The project is schedules to be advertised on April 13, 1998 with the earliest start date of
June 15, 1998, and ending construction by September 15, 1998. We are requesting one
14 night variance to be used throughout the construction project.
If you should have any questions or comments please call me at (206) 440 -4546 or Joanne
Welty at (206) 440- 4541. Address labels, for all businesses and / or residences within 500
feet of the subject project are included, per your instructions.
BPF:jw
Attachments
cc: Susan Everett / Maher Welaye MS 135
Cathy Arnold 58
Earl Franzen MS 111
Day file
file
OL3201C.DOC
Sincerely,
BRUCE P. ' ARRAR
Air Quality and Special Studies
Program Manager
ef:�i?Fn1.1i dobrp;i`; ;;1,: ^h'.` hiL^, +:s , .'t;
Equipment varies in decibel output depending on many factors. However, based on
previous observation, the expected noise levels for each piece of equipment is the
following:
Approximate dBA at 50 feet
Crane 75 - 87
Diesel Generators 71 - 82
Chipping guns 75 - 85
Compressors 74 - 87
Dump trucks 83 - 88
Paving machines 86 - 88
Rollers 75 - 85
Light plants 65 75
Arrow boards 65 - 75
Concrete trucks 83 - 85
Saw cutting machines 85 - 90
Front end loaders 72 - 80
Backhoes 72 - 85
Flat bed trucks 75 - 80
v
MetroScan / King
Owner :Lindal Cedar Homes
Site :10400 Martin Luther King Jr Way Tukwila 98178
jail :1422 Euclid Ave #900 Cleveland Oh 44115
Use :505 Ind,Warehouse,50k To 100k Sqft
Lgl :STR 032304 TAXLOT 26 POR NW 1/4 OF
Bedrm: Bth F3H: / / Stories:1 B1dgSF:46,720
* MetroScan / King
Owner :Lindal Cedar Homes
Site :10400 Martin Luther'King Jr Way Tukwila 98178
Mail :1422 Euclid Ave #900 Cleveland Oh 44115
Use :.505 Ind,Warehouse,50k To 100k Sqft
Lgl :STR 032304 TAXLOT'26 POR NW 1/4 OF
Bedrm: ,Bth F3H: / / Stories:1 B1dgSF:32,570
* MetroScan / King
Owner :Lindal Cedar Homes
Site :10400 Martin Luther King Jr Way Tukwila 98178
Mail :1422 Euclid Ave #900 Cleveland Oh 44115
Use. :505 Ind,Warehouse,50k To 10.0k Sqft
Lgl :STR 032304 TAXLOT 26 POR NW 1/4 OF
Bedrm: Bth F3H: / / Stories:1 B1dgSF:14,163
* MetroScan / King
Owner :0 & W R R
Site :S Boeing Access Rd Tukwila
Mail :S Boeing Access Rd Wa
Use :953 Misc,Right -Of- Way,Utility
Lgl :STR 032304 TAXLOT 27 0 & W R R NAV
Bedrm: Bth F3H: / / Stories: B1dgSF:
*
Owner
Site
Mail
Use
Lgl :STR 032304 TAXLOT 30 N
Bedrm: Bth F3H: / /
MetroScan / King
:City Of Seattle
:11030 E Marginal Way S Tukwila 98168
:400 Yesler Way #4th Seattle Wa 98104
:356 Rec,Pools,Playgrounds,Etc.
505.21 FT
Stories:
*
Owner
Site
Mail
Use
Lgl
Bedrm:
Owner
Site
Mail
Use
Lgl
Bedrm:
*
B1dgSF:
MetroScan / King
:N P Ry Co
:Airport Way S Tukwila
:Airport Way S Wa
:933 Vacant,Industria1,5 To 10 Acres
:STR 032304 TAXLOT 35 50 FT N P R/W
Bth F3H: '1 / Stories: B1dgSF:
MetroScan / King
:Burlington Northern Rr
:S Boeing Access Rd Tukwila
:777 Main St #2680 Fort Worth Tx 76102
:953 Misc,Right -Of- Way,Utility
:STR 032304 TAXLOT 36 C & P S RY
Bth F3H: / / Stories: B1dgSF:
MetroScan / King
Owner :Associated Grocery Inc
Site :3301 S Norfolk St Seattle 98118
Mail :PO Box 3763 Seattle Wa 98124
Use :506 Ind,Warehouse,100k+ Sqft
Lgl :STR 032304 TAXLOT 58 N 447 FT OF S
Bedrm: Bth F3H: / / Stories: B1dgSF:
Owner :Northern Pacific Rr Co
Site :Airport Way S Tukwila
Mail :777 Main St Fort Worth Tx 76102
Use :953 Misc,Right -Of -Way, Utility
Lgl :STR 032304 TAXLOT 60 400 FT STRIP
Bedrm: Bth F3H: / / Stories: B1dgSF:
MetroScan / King
*
Paice_ #
Sale Date
Sale Price
Asd.V
Q:SW
Ac:4.60
:032304 9026 07
:09/12/90
:$1,608,750 Full
:$2,927,600
S:03 T:23N
YB:1978 Ph:
R: 04E
*
Parcel # :032304 9026
Sale Date :09/12/90
Sale Price :$1,608,750
Asd.V :$2,927,600
Q:SW S:03 T:23N
Ac:4.60, YB:1978 Ph:
07
Full
R:04E
*
Parcel #
Sale Date
Sale Price
Asd.V
Q:SW
Ac:4.60
:032304 9026
:09/12/90'
:$1,608,750
:$2,927,600
S:03 T:23N
YB:1978 Ph:
07
Full
R:04E
*
Parcel #
Sale Date .
Sale Price
Asd.V
:032304 9027 06
:$939,100
Q:SW S:03 T:23N
Ac:14.00 YB: Ph:
R: 04E
*
Parcel # :032304 9030 01
Sale Date
Sale Price .
Asd.V :$414,300
Q:SW S:03 T:23N R:04E
Ac:3.16 YB: Ph:
Parcel # :032304 9035 06
*
Sale Date
Sale Price
Asd.V
:$675,300
Q:NW S:03 T:23N
Ac:7.75 YB: Ph:
R:04E
Parcel # :032304 9036 05
Sale Date
Sale Price .
Asd.V :$527,000
Q:SE S:03 T:23N R:04E
Ac:6.05 YB: Ph:
Parcel # :032304 9058 08
Sale Date
Sale Price .
Asd.V :$1,430,100
Q:SW S:03 T:23N R:04E
Ac:4.69 YB: Ph:206- 762 -2100
*
*
Parcel # :032304 9060 04
Sale Date
Sale Price .
Asd.V :$2,161,500
Q:SW S:03 T:23N
Ac:22.75 YB: Ph:
The Information Provided Is Deemed Reliable, But Is Not Guaranteed.
R: 04E
*
MetroScan / King
Owner :Associated Grocery Inc
Site :3301 S Norfolk St Seattle 98118
:fail :PO Box 3763 Seattle Wa 98124
Use :506 Ind,Warehouse,100k+ Sqft
Lgl :STR 032304 TAXLOT 61 BEG W 1/4 COR
Bedrm: Bth F3H: / / Stories: B1dgSF:
MetroScan / King
Owner :Associated Grocers Inc
Site :3301 S Norfolk St Seattle 98118
Mail :PO Box 3763 Seattle Wa 98124
Use :506 Ind,Warehouse,100k+ Sqft
Lgl :STR 032304 TAXLOT 171 POR OF NW
Bedrm: Bth F3H: / / Stories: B1dgSF:
MetroScan / King
Owner :Lindal Cedar Homes Inc
Site :10411 Empire Way S Tukwila
Mail :10411 Empire Way S Seattle Wa 98178
Use :262 Off,1 -3 Story,5k To 15k Sqft
Lgl :STR 032304 TAXLOT 213 POR OF NE
Bedrm: Bth F3H: / / Stories:2 B1dgSF:11,948
*
MetroScan / King
Owner : Lindal Cedar Homes Inc
Site :10411 Empire Way S Tukwila
Mail :10411 Empire Way S Seattle Wa 98178
Use :262 Off,l -3 Story,5k To 15k Sqft
Lgl :STR 032304 TAXLOT 213 POR OF NE
Bedrm: Bth F3H: / / Stories:2 B1dgSF:1,933
* MetroScan / King
Owner : Lindal Cedar Homes Inc
Site :10411 Empire Way S Tukwila
Mail :10411 Empire Way S Seattle Wa 98178
Use :262 Off,1 -3 Story,5k To 15k Sqft
Lgl :STR 032304 TAXLOT 213 POR OF NE
Bedrm: Bth F3H: / / Stories:2 B1dgSF:3,219
* MetroScan / King
Owner : Sternco Land Co
Site :Airport Way S Tukwila •
Mail :8512 172nd Ave NE Redmond Wa 98052.
Use :932 Vacant,Industrial,1 To 5 Acres
Lgl :STR 032304 TAXLOT 214 POR NE 1/4
Bedrm: Bth F3H: / / Stories: B1dgSF:
* MetroScan / 'King
Owner
Site
Mail
Use
:Sternco Land Co
:S Boeing Access Rd Tukwila
:8512 172nd Ave NE Redmond Wa 98052
:931 Vacant,Industrial,Less Than 1 Acre
Lgl :STR 032304 TAXLOT 215 POR NE 1/4
Bedrm: Bth F3H: / / Stories: B1dgSF:
* ▪ MetroScan / King
Owner :Associated Grocery Inc
Site :3301 S Norfolk St Seattle 98118
Mail :PO Box 3763 Seattle Wa 98124
Use :506 Ind,Warehouse,l00k+ Sqft
Lgl :STR 032304 TAXLOT 230 BEG NE COR
Bedrm: Bth F3H: / / Stories: BldgSF:
*
Parce. # :032304 9061 03
Sale Date
Sale Price
Asd.V :$427,000
Q:SW S:03 T:23N R:04E
Ac:1.40 YB: Ph:206- 762 -2100
Parcel # :032304 9171 00
Sale Date
Sale Price
Asd.V :$490,700
Q:SW S:03 T:23N R:04E
Ac:1.60 YB: Ph:206 -762 -2100
Parcel # :032304 9213 00
Sale Date
Sale Price
Asd.V
:$985,000
Q:SW S:03 T:23N
Ac:1.52 YB:1972 Ph:
R: 04E
*
Parcel # :032304 9213 00
Sale Date
Sale Price
Asd.V :$985,000
Q:SW S:03 T :23N R:04E
Ac:1.52 YB:1994 Ph:
*
Parcel # :032304 9213 00
Sale Date
Sale Price
Asd.V :$985,000
Q:SW S:03 T:23N R:04E
Ac:1.52 YB:1987 Ph:
Parcel # :032304 9214 09
Sale Date
Sale Price
Asd.V :$22,200
Q:SW S:03 T:23N R:04E
Ac:2.48 YB: Ph:
*
Parcel # :032304 9215 08
Sale Date
Sale Price
Asd.V :$200
Q:SW S:03 T:23N R:04E
Ac:.26 YB: Ph:
*
Parcel # :032304 9230 09
Sale Date
Sale Price
Asd.V
:$228,900
Q:SW S:03 T:23N R:04E
Ac:.75 YB: Ph:206- 762 -2100
The Information Provided Is Deemed Reliable, But Is Not Guaranteed.
g,2s'.. my K y Ca 3i ' +Y$'2Fd5 i td ,d� fai 1L
p�S.�ir�.i 3'.i�: � U \•ti �^'��iYT.•�F�• �'�i`Y'.�n�,i:%��vF '�T•i�Y4�'�.Crtl'f�S4i .fwe2+�itf �YSY I 4 1 ^` �'j :,
* -- \ MetroScan / King . - - -- *
Owner :Associated Grocers Inc Paice_ 4 :032304 9024 09
Site :3301 S Norfolk St Seattle 98118 Sale Date
jail :PO Box 3763 Seattle Wa 98124 Sale Price .
Use :506 Ind,Warehouse,100k+ Sqft Asd.V :$18,470,500
Lgl :STR 032304 TAXLOT 24 POR GL 1 WLY Q:NW S:03 T:23N R:04E
Bedrm: Bth F3H: / / Stories:1 B1dgSF:296,752 Ac:17.66 YB:1952 Ph:206- 762 -2100
* MetroScan / King *
Owner :Associated Grocers Inc Parcel # :032304 9024 09
Site :3301 S Norfolk St Seattle 98118 Sale Date .
Mail :PO Box 3763 Seattle Wa 98124 Sale Price .
Use :506 Ind,Warehouse,100k+ Sqft Asd.V :$18,470,500
Lgl :STR 032304 TAXLOT 24 POR GL 1 WLY Q:NW S:03 T:23N R:04E
Bedrm: Bth F3H: / / Stories:1 B1dgSF:49,493 Ac :17.66 YB:1963 Ph:206- 762 -2100
* MetroScan / King *
Owner :Associated Grocers Inc Parcel # :032304 9024 09
Site :3301 S Norfolk St Seattle 98118 Sale Date
Mail :PO Box 3763 Seattle Wa 98124 Sale Price .
Use :506 Ind,Warehouse,100k+ Sqft Asd.V :$18,470,500
Lgl :STR 032304 TAXLOT 24 POR GL 1 WLY • Q:NW S:03 T:23N R:04E
Bedrm: Bth F3H: / / Stories:1 B1dgSF:68,691 Ac:17.66 YB:1961 Ph:206- 762 -2100
* MetroScan / King *
Owner :Associated Grocers Inc
Site :3301 S Norfolk St Seattle 98118
Mail :PO Box 3763 Seattle Wa 98124
Use :506 Ind,Warehouse,100k+ Sqft
Parcel # :032304 9024 09
Sale Date
Sale Price .
Asd.V :$18,470,500
Lgl :STR 032304 TAXLOT 24 POR GL 1 WLY Q:NW S:03 T:23N R:04E
Bedrm: Bth F3H: / / Stories:1 B1dgSF:116,655 Ac:17.66 YB:1960 Ph:206- 762 -2100
* MetroScan / King
Owner :0 & W R R
Site :S Boeing Access Rd Tukwila
Mail :S Boeing Access Rd Wa
Use :953 Misc,Right -Of -Way, Utility
Lgl :STR 032304 TAXLOT 27 0 & W R R NAV
Bedrm: Bth F3H: / / Stories: B1dgSF:
* • MetroScan / King
Owner :N P Ry Co
Site :Airport Way S Tukwila
Mail :Airport Way S Wa
Use :933 Vacant,Industrial,5 To 10 Acres
Lgl :STR 032304 TAXLOT 35 50 FT N P R/W
Bedrm: Bth F3H: / / Stories: B1dgSF:
* MetroScan / King
.Owner :Burlington Northern Rr
Site :S Boeing Access Rd Tukwila
Mail :777 Main St #2680 Fort Worth Tx 76102
Use :953 Misc,Right -Of -Way, Utility
Lgl :STR 032304 TAXLOT 36 C & P S RY
Bedrm: Bth F3H: / / Stories: B1dgSF:
* • MetroScan / King
Owner :Call Services Inc
Site :9833 40th Ave S Seattle 98118
Mail :14917 SE 142nd Ave Clackamas Or'97015
Use :620 Ind,Terminals,Auto,Bus,Other
Lgl :STR 032304 TAXLOT 197 POR SE 1/4
Bedrm: Bth F3H: / / Stories:2 B1dgSF:11,988
* ▪ MetroScan / King
Owner :Call Services Inc
Site :9833 40th Ave S Seattle 98118'
Mail :14917 SE 142nd Ave Clackamas Or 97015
Use :620 Ind,Terminals,Auto,Bus,Other
Lgl :STR 032304 TAXLOT 197 POR SE 1/4
Bedrm: Bth F3H: / / Stories:1 B1dgSF:1,830
Parcel # :032304 9027 06
Sale Date
Sale Price .
Asd.V :$939,100
Q:SW S:03 T:23N R:04E
Ac:14.00 YB: Ph:
Parcel # :032304 9035 06
Sale Date
Sale Price .
Asd.V :$675,300
Q:NW S:03 T:23N R:04E
Ac:7.75 YB: Ph:
Parcel # :032304 9036 05
Sale Date
Sale Price .
Asd.V :$527,000
Q:SE S:03 T:23N R:04E
Ac:6.05 YB: Ph:
*
Parcel # :032304 9197 00
Sale Date :07/25/95
Sale Price .
Asd.V :$1,205,100
Q:NW S:03 T:23N R:04E
Ac:3.98 YB:1980 Ph:
*
Parcel # :032304 9197 00
Sale Date :07/25/95
Sale Price .
Asd.V :$1,205,100
Q:NW S:03 T:23N R:04E
Ac:3.98 YB:1980 Ph:
The Information Provided Is Deemed Reliable, But Is Not Guaranteed.
A •
*
Owner :Pape Properties Inc
Site :9892 40th Ave S Seattle 98118
Vail :PO Box 407 Eugene Or 97440
Use :504 Ind,Warehouse,25k To 50k Sqft
Lgl :STR 032304 TAXLOT 202 BEG AT SE
MetroScan / King
*
Parce� # :032304 9202 03
Sale Date :08/03/90
Sale Price :$1,601,000
Asd.V :$1,244,000
Q:NW S:03 T:23N R:04E
Bedrm: Bth F3H: / / Stories:1 B1dgSF:37,351 Ac:2.83 YB:1969 Ph:
*
Owner :C A Newell Co Inc
Site :9877 40th Ave S Seattle 98118
Mail :9877 40th Ave S Seattle Wa 98118
Use :505 Ind,Warehouse,50k To 100k Sqft
Lgl :STR 032304 TAXLOT 221 POR OF SE
Bedrm: Bth F3H: / / Stories:1 B1dgSF:60,448
* MetroScan / King
MetroScan / King •
Owner :Pape Properties Inc
Site :9899 40th Ave S Seattle 98118
Mail :PO Box 407 Eugene Or 97440
Use :502 Ind,Warehouse,2k To 10k Sqft
Lgl :STR 032304 TAXLOT 222 PARCEL B OF
Bedrm: Bth F3H: / / Stories:1 B1dgSF:4,728
* MetroScan / King
Owner :City Of Seattle
Site :Near Airport Way S Seattle
Mail :600 4th Ave #400 Seattle Wa 98104
Use :933 Vacant,Industrial,5 To 10 Acres
Lgl :STR 032304 TAXLOT 223 POR OF S 1/2
Bedrm: Bth F3H: / / Stories: B1dgSF:
* • MetroScan / King
Owner :Pape Properties
Site :End Of 40 Ave S Seattle
Mail :101 E Broadway #400 Eugene Or 97401 •
Use :931 Vacant,Industrial,Less Than 1 Acre
Lgl :STR 032304 TAXLOT 224 POR OF SE
Bedrm: Bth F3H: / / Stories: B1dgSF:
* ▪ MetroScan / King
Owner :Ziegler Ronald L
Site :9883 40th Ave S Seattle 98118
Mail :9883 40th Ave S Seattle Wa 98118
Parcel #
Sale Date
Sale Price
*
:032304 9221 00
Asd.V :$1,961,800
Q:NW S:03 T:23N R:04E
Ac:2.51 YB:1978 Ph:
*
Parcel # :032304 9222 09
Sale Date :08/03/90
Sale Price :$1,601,000
Asd.V :$242,800
Q:NW S:03 T:23N
Ac:.80 YB:1979 Ph:
Parcel # :032304 9223
Sale Date :10/07/94
Sale Price :$12,000 Full
Asd.V :$35,800
Q:NW S:03 T:23N
Ac:5.00 YB: Ph:
Parcel # :032304 9224
Sale Date :03/17/94
Sale Price :$4,000 Full
Asd.V :$26,100
Q:NW S:03 T:23N
Ac:.15 YB: Ph:
Parcel # :032304 9241
Sale Date :06/10/85
Sale Price .
Use :504 Ind,Warehouse,25k To'50k Sqft Asd.V :$1,043,400
Lgl :STR 032304 TAXLOT 241 PARCEL A OF Q:NW S:03 T:23N
Bedrm: Bth F3H: / / Stories:1 B1dgSF:30,004 Ac:1.72 YB:1979 Ph:
The Information Provided Is Deemed Reliable, But Is Not Guaranteed.
444. 4.4 . -, :v : ia`' iw.., wei: tui; 3'd'31aufwirti[;i'.Sw.,''r;4;;,: Aiia'�+. 146 .
R:04E
*
08 •
R:04E
*
07
R:04E
06
* -
R: 04E
J
:?
•
O
U
cn z
co
V)
3AV
ISIS
z
O
I- 0
U 0
IY O
(f) CC
z <
0m
U
Q
Z i-
W t/)
TIN LUTHER KING JR WAY S
DO
U u'1 •
W •--'
V
O Q. N
Cr Z N
Q 1t) W
Z K
D
W In In
LiJ
U
U
Q
O
1-
O v
N
CC •
1— On
• Ln
O
U Q,
z
ul
C7
W CC
00 l/)
\o
O
MPRG\NP�
N S 1 W
I
VICINITY MAP
z
z
I�
O
..risTATE1 FED.AID PROJ.NO.
x
0
1
0
0
K
m
W
3
m
u
5
O
1
O
O
2
5
W
'paRJJoq
u6p•4aaysdowDIn\Ipq\u6p\Z3
86 933 90
UOld
`u'i1�uA'wr9s1'ideu5 ..;fii 2ti 1„.4libi..t4..r..2b`a ra,V,NcAtiS`:4.1it 4,14rt. )i'i(4.
ww
6
J U •
.rn o
cow,
w =.
'w 0
• LL. • Q
d
F— _.
.1-- ZO
w uj
CI E—
..
w w'
H U
O;
wZ
.) I.
O~.
cu
9
LLJ
M
M
v)
1-
J
Q
w
Z 1 CC
Wln In
• 9 N Mib�� Sl /r
S1 /ry /' 73f 11004103 3 �- 4.2'3S
111 12.01 03001 31101 1 101 0351.3s
'15103 N010M•99't.2.2
0
0 m • 13.
O 0 x
LL a ,,A
o cc
Q.
cc
v
s a 0
IX Z
X
VI N U
CC i O W ~ V
Y _ - • x
5-
cc a
rut w o 0
O 1 O M •-• - 0 LL LL {-
N 1 a Z W N M
• 0 1 x41 H
1 W m W 0 u. u..J.. (�1 Yr
w Z VI0 WZ
w 1)5 1 ate a w <-1 s 1a-
W JZ N J41 5� J I
u1 Q J aY Z; 13. ILO
CIS U �Q OW O OY 1�
2 1 2 .fi Nx Q 4Q DZ ( N
C .--. w 0 Z 1— 0 0 2 C 1_
x > z1- wo z zw !` 1
CC z z z �w MIn la �° e N si 3 iji
CO ▪ .0... V1W OW VI V1 to sr ci `r
N W W w WQ JZ W w 1 1 1
1 l 0 0 0 Win ao N Ina
z - N M 4. In • lD ti III
tl3dvi 31101 1101 111030
11 1 0.61 8[•002.2 3.5
m...a0
0. .i
na ..o
0 ..i to
pa6JJDq
u69•UDL0IDUI,\Ipq\u6p \ :3
rr,' k :ka iiY 4+ah'4.
96 93I 60
k
Z10 Id
.5.'
> pig
z
~ w
re 2
J U;
U O;
r� 0.
W uj
J
lJJ O
Q .'
u) d
W.
Z
HO..
Z H:
U
�
U.
O
0 f-:
w W.
H
o.
W
N.
H
O
Z
M °e-
•fie
S111yJ� 31��a��b� v'JH0�`\`
d33d 0N1 19 Hd 1 3Oa
(11 19'91 d]p9'212.2
3.9
0
w
CD
-J
0
ACP LEVELING COURSE
EXISTING FENCE
EXISTING BEAN GUARDRAIL
BEAN GUARDRAIL
9
r-1
CO
W
z I CC
w Van
u,
13
W
w
W
2 O
la
▪ 1-
0
W Z
acl▪ w
v)H
Z Z
O W
W O
DE
H In
O W
J J
J Z
a�
A016oq
CIO! 3NY1 1101 N1030
111 1'111 St•900, 3-
1 I
a I
- I
1
1
t a
S Ic\i°-1
I ▪ I
sul
III
I
j1lrapprn9 nr3p�
1 � M '2
H10 a. pg•tl p�• j 7NIIf1Y3 H]IYn +
F
Wi d]Y ONIl f /r3 H3 J f['Y21• vl
P I$t'
01 N at r
1 0
ON i N \1\
SW N W 1
rs � 1
r a \
tmm7 \` \ \\` \'I 1 1
„\\ ft E0 S9
lipi004;0111111!
0
1`
in
N
N
PT
\�Q
o
+
M
CO
10 •
tO
N
0
O
O
1n
In
M'
JS•S,_
• ^� • '3'y/
Fp.B .
Sr
d
PAVING PLAN - LEVELING
0
0a
2
s�
� O
01 b
f:
N 0
ba
30
't
FED.AID PROJ.NO.
1
0
0
W
¢
a
m
0
W
fZv
W
u
8
4
8
W
0
Up 'lo ( \u6p \13
77; t' �tki„ v,„ 4 t•:Y:::vSa'1:14341W444'14•lAti
86 831 b0
amid
itaat,404.4001:. -0640-
.t f 4.,41
mow.
Q 2:
W =:
00
W =LL
r
LL
WO
u- <.
i CY,
W
Z�.
Z
O• N.
H
W W
it U .
LI O'
L1• Z
z...:
a
E
w
z
J
N
I • 0
C.) •ul w
w — M
-c Fm
ONO.. F0
Ct +X to
CL In m
Lt) N
°w NN
Z 1 0= VI w
W V3 l/7 NN
S1 jh;'
7
3.fr ,yOd "., "' 4
` \3S
lry�nl��`
CC
CC
w
w
w
O
Z1-
O
w Z
<
V/
111 '-'
Z
0 Cr
u_
Z 1-
w 0
ow
J J
aZ
111 19'91 d]•10N1�199595 953
199'/YL.L 3.5
0
w
m
a,
toO
W
a
O
N
a
`� W W
SS >� 006 ,`�'�
J b \` mow. `\` `
•9.9t
Q oh S �S
0..0+
...
\
�
'...
-� -- �;
°
o• Z
O
to F--
tin
w C>
U
a�
c9
7-o
O 1
wa
CO
• O:
un
aa
to
SITE PREPARATION, ALIGNMENT & R/W PLAN
FED.AID PROJ.NO.
N
0
0
r
2
0
ri
0
8
0
W
IJ
W
s
0
s
Ral6oq
u6p.IOZf \u6p \:0
86 83! b0
68101d
Z
~Ce
lw
6 D.
0 CO lir
' 'W
J I,
V) U
0
u_ a
co i V
wx
Z
Z
D;
U 0_
W Ili
LL0`
Z
O~
z
1
Equipment varies in decibel output depending on many factors. However, based on
previous observation, the expected noise levels for each piece of equipment is the
following:
Approximate dBA at 50 feet
Crane 75 - 87
Diesel Generators 71 - 82
Chipping guns 75 - 85
Compressors 74 - 87
Dump trucks 83 - 88
Paving machines 86 - 88
Rollers 75 - 85
Light plants 65 - 75
Arrow boards 65 - 75
Concrete trucks 83 - 85
Saw cutting machines 85 - 90
Front end loaders 72 - 80
Backhoes 72 - 85
Flat bed trucks 75 - 80
TTACHMENT D
... ,:.. �. :. ,..J• -.:.., .:•..:.: „7p.: ., -: i:;..,; .,:• _ ,..r';;:'n`.: q, "c'..; 2' ^r•. a:,, sv�Hi'.' - y:�;':'::
UY :ti':✓ �.w,'%r�:.ud;: foci¢ d; o.{ su�iJ�i •.w,Sc6'.:= •�S•;S�rea4.w.+W' cR.4 v�t�5in. xrv, Yayn.` i, 5f:$. aitvi". d' i'!;.` i'; �• ��wa.., a., 11' r..: ,.n1b�.h {,nt.an...,u�.r::GT��.; ttifxi:�:...tC+SX:* J�iS•.4” ........t
„cti • ,c,;44,...
V 4'
#1,?,
'4;i4,Aeui
---- -Pro ad- famtri
600' rad; i (sop' P.evAirfc()
j"; 4-00
C.S. 1767
- ,•.4-.k,tp.-7'
„ .3'10'1;
W44■.#74''Y.;,41," ' ▪ ' •
• I
F—
w
< • 2
w
O 0
• W
W m
• u_
w 0
• <
W
Z
I- 0
Z
0
0 -U2
0 I-
W w
0
- 0
u)
0
0
I/ Washington State
Department of Transportation
Sid Morrison
Secretary of Transportation'
Steve Lancaster
Director of Community Development
City of Tukwila
6300 Southcenter Boulevard
Tukwila, WA 98188
Attention: Vernon Umetsu
Dear Mr. Lancaster:
Northwest Region
15700 Dayton Avenue North
P.O. Box 330310
Seattle, WA 98133 -9710
(206) 440-4000
February 25, 1998
SR 5 Boeing Access Road
Ramp Modification
OL 3201
Technical Noise Variance Application
The Washington State Department of Transportation (WSDOT) is planning to improve
the SR 5 / Boeing Access Road interchange. Currently, southbound traffic exiting from
SR 5 has the sole option of westbound travel on the Boeing Access Road. The proposed
project will widen the southbound off - ramp, remove the existing westbound only
movement, add a new dual left turn pocket (eastbound movement), build a new "free"
right turn movement (westbound) and install a new signal at the ramp terminal. This new
signal will be interconnected with the existing signal at SR 900 (Martin Luther King Jr.
Way) and will coordinate with the existing signal at E. Marginal Way S. The widening
will occur soon after the ramp comes off the mainline, to provide adequate storage for the
signal queue, and will continue as a two lane ramp up to the terminal where it becomes a
two lane left turn pocket with a free right turn at the intersection with the Boeing Access
Road. Attached you will find a vicinity map and plan sheets.
The job requires night work which will allow the ramp to be open to traffic a maximum
amount of time during construction. The WSDOT is planning to close the ramp
completely for two weekends. On the first weekend the existing ramp terminal will be
removed and rebuilt. On the second weekend the entire ramp will be overlayed and
permanent striping will be applied. In order to perform all of the work required, the
contractor must work throughout the night during these weekend closures. The closures
will occur from 9 :00 PM Friday to 5:00 AM Monday.
Work to be performed at night includes:
:1.6eptgzs1. L d . =�r't' + .;N�:';t2S` xt,A r i`Lk�4 "i44:;t3f°(' J^i'i aP `u`''il:t! , f- ";;?ouk „"t r.' 40,41 'i ` r�''3$, 9M .
�t'd+�$'di% " >�t � �: �Fk�OS�r�.' �.. �, �" �. L .�,�Xi..3n.t7`'''%�u��w'wA'�dii
z
a •
X
mow`:
�U
U0:
o:
' W ='
H
w0;
g J.
d'
=w
z
z a.
• U0
{O N,
:w
. 'Z
—O
• U U.
o�'`
z
4
1:
Excavation
Debris removal
Installation and removal of signs and illumination
Roadway grading
Installation of loop detectors, data stations and other SC &DI equipment
Placement and removal of construction traffic barrier
Pavement installation, removal, widening and overlay
Sidewalk installation
Drainage installation
Striping
Traffic control
Guardrail removal and installation
SR 5 is a high volume highway and traffic restrictions will be necessary. Work will occur
in narrow areas within and adjacent to the travel lanes, presenting a danger to the public
and project workers. Lane restrictions are needed for the movement of equipment and
materials and to allow enough room for equipment and workers to perform the work. For
public safety, lane restrictions on SR 5 are only allowed between 8:00 PM to 5 :00 AM and
7:00 PM to 6 :00 AM depending on location and day of the week. It is therefore necessary
to perform this work at night.
Equipment to be used may include, but is not limited to, a small crane, diesel generators,
chipping guns, compressors, dump trucks, paving machines, rollers, light plants, arrow
boards, concrete trucks, saw cutting machine, front end loader, backhoe, trenching
machine, and flat bed trucks.
Noise levels diminish with distance. A 6 dBA noise level drop oil: will occur with the
doubling of distance from a noise source. For example, a noise level of 70 dBA measured
at 50 feet would be 64 dBA at 100 feet, 58 dBA at 200 feet, and 52 dBA at 400 feet.
Sound also decreases if an object interferes with the receiver's line of sight to the noise
source. This attenuation depends on the relative elevations of the source and the receiver
and the height and location of the intervening object.
a°:.1.:'�aF'ak 6erA:;Dfra.2i51kAiT scA1d.-vkz.YXtvi.l:iy* Y04,#[;}.,iitINM1F$IKw �.. f'd% VT ?3T,i:F'iY'R
Fz, .
JU:
Uoi
.N
.w I
, • J I-;
w 0'
= d:.
�m
.z�.
F-a
Z F-,
11J a
pa,
• Z'
w w,
• U
O ~`
z
.Y:
Tukwila residential neighborhoods closest to the project location are approximately 1800
to 2000 feet to the east of the proposed project. (Residences located within Seattle are
approximately 1700 to 2500 feet from the project. A noise variance application is being
tendered to the City of Seattle as well.) Analysis and projected worst case nighttime
construction noise levels for residences closest to the project are as follows: Four
residences are found on 47th Ave. S. (south of S. Ryan Way). A forested hill blocks the
line of sight between this residential area and the project site, which is approximately 2000
feet away. Project related noises will usually be imperceptible to residences in this area.
Occasional project related noises might be barely perceptible (45 - 50 dBA)to an exterior
receiver in this neighborhood. 47th Ave. S. is also found north of S. Ryan Way. There are
approximately 8 - 10 residences on the west side of 47th Ave. S., which is closest to the
project site. These residences are 2000 to 2200 feet from the project location. A forested
hillside, Martin Luther King Jr. Way, SR 5, and numerous warehouses and industrial
buildings separate this neighborhood from the project location. Distance, line of sight
interruption, and the forested hillside will combine to provide 37 - 50 dBA of attenuation
to project activity noise levels. Worst case project generated peak noise levels to this
residential area are expected to be 45 - 53 dBA as perceived by an exterior receiver in this
neighborhood.
As a measure to mitigate noise, our contractor will perform the work under the following
conditions :
• All trucks performing export haul shall have rubber bed liners between the hours of
10 :00 PM to 7:00 AM;
• All backup warning devices shall be the least intrusive ambient sensitive type or the
contractor may use a backup observer in lieu of backup warning devices as allowed by
WAC 296 -155 -610 (2) (e);
• Lighting and other stationary equipment such as generators, air compressors, or any
other similar equipment used for nighttime work shall be directed away from on
coming traffic and residences.
• Any material or debris that spill on the pavement shall be removed by hand or by
sweeping. The contractor shall employ no scraping type equipment or activity to clean
pavement surfaces.
• The WSDOT will periodically monitor project related noise levels at residential sites.
Periodic written reports will be submitted to the City of Tukwila. WSDOT will
provide and monitor a 24 hour complaint line. The complaint line telephone number
will be distributed to area residents.
• The Construction Project Engineer (PE) will be alerted of all complaints. The PE will
evaluate the complaint and the monitoring measurements and take appropriate
z
a
_�
w
6
U,
U O'
co
CO LL'
w O
g
D a.
�i
z�
H O
Z
w Lu
0 �'
0 H:
LI
w z;
O ;
z....
measures, which will include further mitigation activities, removal of equipment from
the job, or a work stoppage to develop an acceptable procedure.
To ensure the reasonable safety and convenience of the public, we ask for a temporary
noise variance from the requirements of Tukwila Municipal Code Chapter 8.22.180(b).
The project is schedules to be advertised on `Apri1'13 ` 1,998 ;iwith the earliest start date of
June 15, 1998, and ending construction by September 15, 1998. Wesare;requesting,.one.
,,,4. night.variance to.';be:used throughout the construction project.
If you should have any questions please call me at (206).440-4546 or Joanne Welty at
(206) 440 -4541.
BPF:jw
cc: Susan Everett / Maher Welaye MS 135
Cathy. Arnold 58
Earl Franzen MS 111
Day file
file
OL3201B.DOC
Sincerely,
BRUCE P. ' ARRAR
Air Quality and Special Studies
Program Manager
•
•
Equipment varies in decibel output depending on many factors. However, based on
previous observation, the expected noise levels for each piece of equipment is the
following:
Approximate dBA at 50 feet
Crane 75 - 87
Diesel Generators 71 - 82
Chipping guns 75 - 85
Compressors 74 - 87
Dump trucks 83 - 88
Paving machines 86 - 88
Rollers 75 - 85
Light plants 65 - 75
Arrow boards . 65 - 75
Concrete trucks 83 - 85
Saw cutting machines 85 - 90
Front end loaders 72 - 80
Backhoes 72 - 85
Flat bed trucks 75 - 80