HomeMy WebLinkAboutPermit L97-0006 - KING COUNTY WATER AND LAND RESOURCES - SHORELINE AND SEPA EXEMPTIONSL97 -0006
NOTICE OF SHORELINE SUBSTANTIAL DEVELOPMENT EXEMPT AND SEPA EXEMPT
SHORELINE MANAGEMENT EXEMPT
A F F I D A V I T
'111)anted
0 Notice of Public Hearing
0 Notice of Public Meeting
O Board of Adjustment Agenda
Packet
O Board of Appeals Agenda
Packet
0 Planning Commission Agenda
Packet
0 Short Subdivision Agenda
Packet
0 Notice of Application for
Shoreline Management Permit
fl Shoreline Management Permit
O F D I S T R I B U T I O N
hereby declare that:
O Determination of Non -
significance
0 Mitigated Determination of
Nonsignificance
fl Determination of Significance
and Scoping Notice
O Notice of Action
0 Official Notice
Other ► V d -4.
Other
was talend to each of the following addresses
I a,b -e C--f)-4--K
\f‘ang,Megt
kt,n' CO, MCincM�
Name of Projec
2-�(0- 0)c-) Q—
s-his0a,�.e,
File Number, L9 2 -- O nn ( p
Fr? - OD 5(
Signatu
^ K^.` V�tFE1L?? u4nii2�•; iti¢ 5�''.. cJ: t', 'S}to.4mp."411.'itt•e;7,',4,,, �:
on
tti al" ';:44:1,.4g3;c'i•1■3. fir;:
z.
J
U 0,
t u
CO
wI
w O;
= C3
z�,,
1-0
z
0
w w,
— O:
w Zt
U CO'
H �
z
.�l
A F F I D A V I T
7'?
❑ Notice
❑ Notice
of Public Hearing
of Public Meeting
❑ Board of
Packet
[]Board of
Packet
❑ Planning
Packet
Adjustment Agenda
Appeals Agenda
Commission Agenda
❑ Short Subdivision Agenda
Packet
❑ Notice of Application for
Shoreline Management Permit
❑
Shoreline Management Permit
D I S T R I B U T I O N
hereby declare that:
[]Determination of Non -
significance
❑ Mitigated Determination of
Nonsignificance
[]Determination of Significance
and Scoping Notice
❑ Notice of Action
❑Official Notice
❑ Other
Other
was mailed to each of the following addresses on
rP
IPLaa_t_c_ 0-as
.30D zIg�
306 ICoo -14. flv.S.
ZdAnt)v1/4
Name of Projec 11/4014 y�y.����(Signatur
File Number L - ()() (,
�
:,l;`�;1 1 arm
O F P61-1 oo
.., °i'venk��%.:n`vti :'au$? ;�(uX+:�u i,� `Licu.�y'iuCt''ii:Taus`aY iil sVli iir' �dta}.dr:NiY 10i' 0 1 r r: d ... r •:; 1 r e F Ae i 4'; .v
Cocci f�a.�!'A' >`+�f�..#.er+�• • �kd" r,'?. �,'. C1> i=' �iftxlF� ",7"'Ftv+•'[�.�f�±�a�:�"ti�'? Pik ��{ �! F. �h,.��ka ?�uti�'�+Ns�:��aS�S ".4�,
ENVIRONMENTAL IMPACT STATEMENTS EIS SHORELINE MANAGEMENT
SHORELINE SUBSTANTIAL DEVELOPMENT
City of Tukwila
John W. Rants, Mayor
Department of Community Development Steve Lancaster, Director
•
January 31, 1997
Dave Clark
River Management Section
King County Surface Water Management
700 Fifth Avenue, Suite 2200
Seattle, WA 98104
RE: Notice of Shoreline and SEPA Exemption for Emergency Repair of Duwamish
River Revetment Adjacent to 42nd Avenue South (L97 -0006)
Dear Mr. Clark:
We have reviewed the request for exemption for riverbank repairs for the Duwamish River
revetment located along 42nd Avenue South as contained in your letter of January 30,
1997.
Shoreline Exemption: We have determined that the project is exempt from a shoreline
permit as Emergency Construction (WAC 173 -27 -040 (2)(d)). The project is necessary to
stabilize the failing slope and protect the adjacent road and water main.
SEPA: Because of the imminent threat to the public_ facilities, the proposal is also exempt
from SEPA pursuant to WAC 197 -11 -880.
If you have any questions, please call John Jimerson at 431 -3663.
Sincerely,
Steve Lancaster
DCD Director
cc: File
Phil Fraser, Public Works
Ecology, Shorelands Division
6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • (206) 4313670 • Fax (206) 431-3665
s:i rx a
rPYri` tf?: afw' t sziiET Cat,: i. sG''.' Z.' F! ir3i+: :.'t'S.{b':4,0.+ b itou,
King County
Water and Land Resources Division
Department of Natural Resources
700 Fifth Avenue, Suite 2200
Seattle, WA 98104
(206) 296 -6519
(206) 296 -0192 FAX
January 30, 1997
Steve Lancaster, Director
Department of Community Development
City of Tukwila
6300 Southcenter Blvd.
Tukwila, WA 98188
Re: Maintenance Exemption for Proposed Emergency Repair
to the Duwamish River Revetment Adjacent to 42nd Avenue South
Dear Mr. Lancaster:
u. Q.
F=.. W.
Lu
•1.O;
Last spring we received the enclosed exemption to the City of Tukwila's Shoreline Substantial n`
Development Permit (SSDP), grading permit and SEPA requirements for flood damage repairs to c.0
three sites within the above- referenced project area. `o
wW
On January 24, a fourth, previously undamaged segment of the 42nd Avenue South revetment failed, z v'
necessitating a temporary closure of the road and shutoff of the 16 inch water main within the road ' O
prism. As you know, this 'road serves a Tukwila Fire Department located a short distance across the iu Z`
street from the point where the road has caved in. U co
f
Staff of the King County Roads and Water and Land Resources (WLR) Division would like to 0 . .
repair this damage immediately. We have already discussed the problem in the field with Tukwila
Department of Public Works staff and Phil Schneider, the Washington State Department of Fish and
Wildlife (WDFW) Regional Habitat Manager. We are applying for an expedited hydraulic project
approval (HPA) today. We intend to start the repairs on Monday, February 3, 1997, as soon as we
receive this permit. In the past, WD ' ? V`v has faxed us HPAs within 24 hours for work of this degree
of urgency.
This repair would entail construction of an access ramp to enable removal of unstable soils, followed
by replacement of the existing undersized toe rock, and stabilizing the lower bank with riprap and
geogrids (live willow brush layers and soil layers wrapped in geotextile fabric). The slump is roughly
75 feet long, but the total area affected by the project would amount to about 125 lineal feet due to
the need to construct the access ramp. The project would be similar in appearance and function to
the one that was conducted last summer. Every effort will be made to incorporate the two trees that
have toppled because of the slump into the revetment toe in order to improve fish habitat in this
reach of the Duwamish River.
The purpose of this letter is to confirm that the SEPA and permit exemptions for emergency
revetment maintenance discussed in the attached correspondence still apply to this project pursuant- V E
g p3 1997'
i: L;7Ki`.. >: :it<<•' k';,'.. S. t+ , ,{ ; isil,` ,ii= [:S' t1: - 5 i'1 eiu."ieh}Y:
` 4tit4,u4N4M.ai rigk2aA,f':Cl.ri :T a4isf'ryV%`ff ; 'r:9°w1itY ' i
4
Steve Lancaster
January 30, 1997.
Page 2 of 2
to WAC 173- 14- 040(b) and WAC 173-14-040(1X3) for the SSDP, and WAC 197 -11 -926 for
SEPA.
I would also like to mention that we have identified several additional previously undamaged
revetment segments that need to be repaired this summer. We will submit design drawings for this
work for your review later in the spring.
If you have any questions, please feel free to call me at 296 -8388. Senior Engineer Andy Levesque
(office: 296 -8379; pager: 680 -4996) will be the project lead, and Senior Ecologist Ruth Schaefer
(296 -8365) will provide ecological support. You may also wish to discuss the details of these
projects.with.Public Works Director Ross Earnst or Senior Engineer Phil Fraser.
S._-rely,
Dave Clark, Manager
Rivers Section
DC:RS:acJ13
Enclosures
: Ross Earnst, Director, City of Tukwila Public Works Department
Phil Fraser, Senior Engineer, City of Tukwila, Public Works Department
Paul Komoroske, Supervisory Civil Engineer, Seattle District, U.S. Army Corps of
Engineers
Andy Levesque, Senior Engineer, Green River Basin Program
Tim Sussex, Coordinator, Green River Basin Program
Ruth Schaefer, Senior Ecologist, Rivers Section
a."'.
U O`
CO 0
CO
.w=
I-,
w 0'
g
F w'
z
Z i
D
v
p
:w W
i
LIJ
0
0..
,z,
. .. , .. _ .. ._,`.., „ ,... ;S. , .. ,' i._ t ... *at.:t;` i x:'i - 5 ,' u:. i? ',5 r'l :dS:.d:• srsr. :b > ^ >: ;
4:s b:44W'301A `t_ie -Ii x,'.tybs;?' Test '7?u ;?C7:+!:'i'd111,,i9l.F LMW, 'F.. nlialia% i.a':.'-t'!Cw .
June 7, 1996
City of Tukwila John W. Rants, Mayor
Department of Community Development Steve Lancaster, Director
Mr. Dave Clark, Manager
River Management Section
King County Surface Water Management Division
700 Fifth Avenue, Suite 2200
Seattle, WA 98104
RE: NOTICE OF EXEMPTION
• for Proposed 1996 Flood Damage Repairs (File #L96-0025) .
Dear Mr. Clark:
I have reviewed your proposal for riverbank repairs along 42nd Avenue South.
I find that the proposed work meets the criteria for a "maintenance" exemption from a Shoreline
Substantial Development Permit (WAC 173- 14- 040(b)), and for compliance with the Shoreline
Management Act and local shoreline master program .policies (WAC 173 -14- 040(1)(3)). I find that the
project is also exempt from SEPA review as an "emergency" (WAC 197 -11 -880). These findings are
based on information contained in the project file, as noted below:
Project Name: 42nd Avenue Riverbank Repairs
Applicant: King County Surface Water Management Division
Location of Project: Green/Duwamish River, 42nd Avenue South, Tukwila, WA
SE 1/4 Sec. 10, Twn. 23, Rge. 4
Corps Public Notice
Number: NWP 3, Section 404
Project Description:
The project involves the excavation/regrading of failed riverbank areas, and reconstruction of the
bank. Riverbank repair will occur at. three sites along 42nd Avenue South as follows: for
approximately 200 1.f. to the west of the Tukwila Community Center; approx. 150 1.f. at 12026
42nd Ave. So. (Fire Station 53), and approx. 120 1.f. at 11810 42nd Ave. So., for a total of
approx. 470 1.f. for the entire project. All work will be conducted on the west side of 42nd
Avenue South or within City of Tukwila right -of -way. Existing significant ( >4" diam.) trees
along the riverbank will not be damaged by the project. Work will include the installation of a
6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • (206) 431-3670 • Fax (206) 4313665
.;r ea 6; k%3r?a^SCit4thW i4: -14,..V,bile::ib"'.iJR:ka,'A tASk S.;hWcis <ea f'Iw°r"S§ isit 'Aet "4,144:ty
z
'a•
X I-
r—CC .Z •
: w.
• U O;
moo;.
w w,
wo
u_.<•
. moo;'
z
0 N.
w W,
1- V:
u_ ~O:
U N'
z •
toe buttress and large woody debris for fish habitat. The embankment will be reconstructed with
live geogrid layers containing willow and dogwood cuttings. Work in front of the Community
Center will be completed by July 30, 1996, to avoid potential interference with the City's pending
42nd Avenue street improvements.
While the above project has been found to meet exemption criteria, any future riverbank repair projects
should be evaluated through the SEPA process. We agree (ref. your memo 5/29/96) that the original
programmatic checklist may be out of date and/or inconsistent with new regulations and your own
project designs. In addition, the cumulative impacts of similar, related proposals need to be evaluated
relative to Tukwila's new shoreline and Comprehensive Plan policies. To expedite Tukwila's review of
future riverbank repair projects,- I strongly recommend that a revised programmatic checklist be
prepared as soon as possible.
Please feel free to call me if you have any questions (431- 3670).
Sincerely,
Steve Lancaster
Director, DCD
cc: File
Ann Siegenthaler, DCD
Phil Fraser, Public Works
sob Fritze:r. DJ; Alice Kelly, DOE
�i r_;« "::i ,....�..r.'•l,sr:i`_�.�. �..'.. w:.suai..li4:„
01/31/1997 09:00
206 - 205 -5134
KC WLRD RIVERS SEC.
1
IMAMS 1111ZRY/UNZ
1
s
PAGE 05
tY;- 170%70:.41i1V, Ali3APRZ+nra EVIIT nr'intleNSLritZtiR4! .6`.
Z
• reW
6
• U O'
au,.
•
.W =;
J
.g J,
•
= C1
_
1—.0:
• 'Z H:
D p:
• OI
W W':
U
LLZ
w:
°_`
• o .
z
01/31/1997 09:00 206 -205 -5134
KC WLRD RIVERS SEC. PAGE 06
al
N d cfl
N N N (.0 a N 0 0p co c (NI O I I I
1
1
1
a
1
c' �cY�? S•?? 4Z'c:Ei:�3itii' +�. ^�"'+3:y?':n'. ixQ:i�.3wi'�<'t
z
Z •
re W;
OU '
'gyp
Lik
W=
.J H
N �l
WO'
g-71:
N �.
Z OF-;
� p
:0 Ht
'W
"Z.),
V`
U. ~O•
ti.i
UN
~ _'
O F—
z ..