HomeMy WebLinkAboutPermit L96-0023 - CITY OF TUKWILA - SHORELINE SUBSTANTIAL DEVELOPMENTL96 -0023 CITY OF TUKWILA PIPE @ 122 ST. & 42 AV S SHORELINE Memorandum TO: Jack Pace (D.\( FROM: Nora Gierloff RE: Shoreline Management Shoreline Substantial Development Permit - Pacific Highway Bridge Replacement DATE: July 1, 1996 Project File No. L96 -0023 1. PROJECT DESCRIPTION: The City of Tukwila plans construction of a stormwater pump station in the intersection of 122nd and 42nd Avenue South. It will be used to pump stormwater into the Green River through an existing outfall during periods of heavy rainfall when the River is unusually high. The project also includes providing new sanitary sewer facilities as well as replacing existing water lines within portions of the Allentown neighborhood. The sanitary system will consist of nearly 8,000 lineal feet of eight inch gravity mains together with associated side sewer stubs, manholes, and connections in City owned street right -of -ways. The water system includes construction of approximately 7,000 linear feet of ten inch and eight inch ductile iron water mains and related auxiliary items, to include fire hydrants; valves, services, ect. in City owned right -of -way. 2. POLICIES OF THE SMAJSMP: The site is within the jurisdiction of the King County SMP and is consistent with the goals and policies of that SMP. It will allow for improved public safety through a reduction in flood damage. 3. SHORELINE REGULATIONS: Following are the relevant review criteria as contained in the King County Shoreline Regulations as applied by the City of Tukwila: 25.16.030 General Requirements: A. Nonwater related development...shall not be permitted waterward of the OHWM. Response: The project is water dependent because it involves pumping stormwater out into the river when heavy rainfalls cause the river to rise and water to flow back through the drain pipes. C. All development shall be required to provide adequate surface water retention and sedimentation facilities during the construction period. Response: Normal erosion control practices will be followed. c„;.,;:, ru- i . scx• m.. ra *: r • rarsa r -. c 'n: c .+r cra z?s!rncx x... .. -- ----- F. Collection Facilities to control and separate contaminants shall be required where stormwater runoff from impervious surfaces would degrade or add to the pollution of recipient waters or adjacent properties. Response: The source of the stormwater will not be altered. It currently flows through ditches which act as bioswales before it is released into the river. 25.16.160 Utilities: C. The construction and maintenance of utility facilities shall be done in such a way as to : 1. Maximize the preservation of natural beauty and the conservation of resources; 2. Minimize scarring of the landscape; 3. Minimize siltation and erosion; 4. Protect trees, shrubs, grasses, natural features and topsoil from drainage; 5. Avoid disruption of critical aquatic and wildlife stages. Response: The majority of the disturbance will occur within previously paved street right -of -way so damage to the natural environment will be minimized. The project will control flood damage to the shoreline and neighborhood. 4. COMMENTS No comments were received. 5. SEPA: A determination of non - significance was issued on June 10,1996. The comment period expired without receipt of any comments. 6. RECOMMENDATION: Approve the shoreline substantial development permit. ...� -i�:. s:;.iYk,s�S';'•'.',,rd:» "..1'n��;!= :.s�aut5.,?Y'� :arrzctt2aaYa A F F I D A V I T J O F D I S T R I B U T I O N 1; g I -VIP M L — tJ hereby declare that: ONotice of Public Hearing O Notice of Public Meeting O Board of Packet O Board of Packet O Planning Packet Adjustment Agenda Appeals Agenda Commission Agenda O Short Subdivision Agenda Packet Determination of Non - significance O Mitigated Determination of Nons ignif icalwe ODetermination of Significance and Scoping Notice O Notice of Action O Official Notice O Other, O Notice of Application for O Other Shoreline Management Permit gShoreline Management Permit was mailed to each of the following addresses on -1--3 -940 be.JPv . of eCoLtth•4 5140,L-It6 �1i�JtEv� 31clo boo /_v SG TsUA- avWt;, oc . 54`.5 . W A. i ATE. p rropZ+Ss•l G E4J6z -- ECo,. 74M 1) V-PT. Qo +3- 14-0 11-7 nLN A&P IA ANA- `g504 N>0W/01/4tat I4 f0DtAr) Ba. i-c gA,(. Ja ;1/ 5- S'E -1 gel`s -bra , WA 9'O,-7,5- 7 u p r ,gyp -r (A4 n1 i'�► a E v 3015 ri z p a 4 v 5E- MA-131,-9-1•1 JA al 4.O`1 Z Name of Projected OP ILL .W I LA ' Signature, qta Mal V\ File Number 1.-q r 0a15 V�B was :i:.tiiCm.2'�..J.`.+=rvt'i:•n�.Y i.i ilk "u' . ,....aurrxvr u z �z. w re 2, 6 UO. CO o; CO w, w =; w o' u- Q u' a' z�.. I- O' Z I-:. w w ON w au V 11.x; z. W N; z I A F F I D A V I T 0 Notice of fl Notice of O F D I S T R I B U T I O N MVAM,U_--L_t hereby declare that: Public Hearing. Public Meeting JJ Board of Adjustment Agenda Packet O Board of Appeals Agenda Packet 0 Planning Commission Agenda Packet 0 Short Subdivision Agenda Packet O Notice of Application for Shoreline Management Permit Shoreline Management Permit LI Determination of Non - significance 0 Mitigated Determination of Nonsignificance 0 Determination of Significance and Scoping Notice fl Notice of Action Official Notice Other Other was,meiled to each of the following addresses rune) L A aw x1 p.1 SA-in-e._ TM Fs L4(01- - 2..5s 2 on 'I- 3-cp Name of ProjectO or `-rux 3 I LA SignatureSu E‘. 11 `C 1( File Number L2Te 00 27i its: i4' i'°' ��.` ai' uX '.ii'>�sV�r,•,-'v¢ui..:= s.::uN . >x :...:...1�,,..,.. cc _i V, U 0 CO Cr WI CO ILI J u-<. D. mow, 0, Z al 0 i- O— w 1- 0, — O. [Liz, 1- - 1_ O Shoreline Management Act of 1971 PERMIT FOR SHORELINE MANAGEMENT SUBSTANTIAL DEVELOPMENT File Number: Status: Applied: Approved: Expiration: L96 -0023 ISSUED 05/09/1996 07/01/1996 07/01/1998 Pursuant to RCW 90.58, a permit is hereby granted to: CITY OF TUKWILA, PUBL to undertake the following development: CONSTRUCT NEW STORM DRAIN PUMP upon the following property: Address: Parcel No: Sec /Twn /Rnge: 10/23/04 THE PROPOSED PROJECT WILL BE WITHIN THE AREA OF THE GREEN RIVER AND ITS ASSOCIATED WETLANDS, WHICH IS A SHORELINE OF STATEWIDE SIGNIFICANCE AND IS DESIGNATED AS AN URBAN ENVIRONMENT. The following master program provisions are applicable to this development: Development pursuant to this permit shall be undertaken pursuant to the attached terms and conditions. This permit is granted pursuant to the Shoreline Management Act of 1971 an nothing in this permit shall excuse the applicant from compliance with any other Federal, State or local statutes, ordinances or regulations applicable to this project, but not inconsistent with the Shoreline Management Act (Chapter 90.58 RCW). This permit may be rescinded ,pursuant to RCW 90.58.140(8) in the event the permittee fails to comply with the terms or conditions hereof. CONSTRUCTION PURSUANT TO THIS PERMIT WILL NOT BEGIN OR IS NOT AUTHORIZED UNTIL TWENTY -ONE (21) DAYS FROM THE DATE OF FILING WITH THE DEPARTMENT OF ECOLOGY AS DEFINED IN RCW 90.58.140(6) AND WAC 173 -14 -090, OR UNTIL ALL REVIEW PROCEEDINGS INITIATED WITHIN TWENTY -ONE (21) DAYS FROM THE DATE OF SUCH FILING HAVE TERMINATED; EXCEPT AS PROVIDED IN RCW 90.58.140(5)(a)(b) C` Po c �c fin n PAkee o r> Steve Lancaster Date : � (p Director, Planning Department Construction or substantial progress toward construction must begin within two years from date of issuance, per WAC 173 -14 -060. z ~w`, 6 • V 0 0 co w =` u' w0 g a: = d' I- w •z� 1- a ;o — ° 1-. ww H, U O: • Z Z. CITY OF. TUKWILA Department of Community Development .,. 6300 Southcenter Boulevard, Tukwila, WA 98188 Telephone: (206) 431 -3670 NOTICE OF APPLICATION The City of Tukwila Public Works Department has filed applications for installation of new sanitary sewer facilities, replacement of existing water lines, and construction of a stormwater pump station all to be located in the City owned right -of -way of South 116th, South 124th and South 122nd Streets and 43rd, 44th, 45th, 46th, 47th and 48th Avenues South in the Allentown neighborhood of Tukwila. Work will also include surface restoration. Permits applied for include: Shoreline Substantial Development Permit (City of Tukwila) Other known required approvals include: Approval of Construction Plans by the City of Tukwila Public Works Dept. Approval of Construction Plans by METRO An environmental checklist has been submitted with the studies identifed above. The project files are available at the City of Tukwila. To view the files, you may request them at the permit counter of the Department of Community Development (DCD), located at 6300 Southcenter Boulevard #100. Project Files include: E96 -0014 L96 -0023 Your written comments on the project are requested. They must be delivered to DCD at the address above or postmarked no later than 5:00 p.m., June 17, 1996. You may request a copy of any decision, information on hearings, and your appeal rights by calling DCD at 431 -3670. The environmental review decision is appealable to the City Council. The shoreline permit decision is appealable to the Shoreline Hearings Board. For further information on this proposal, contact Nora Gierloff at 431 -3670 or visit our offices at 6300 Southcenter Boulevard, Suite #100, Monday through Friday, 8:30 a.m. to 5:00 p.m. Application Filed: May 13, 1996 Notice of Application Issued: May 15, 1996 4v9 �Enr?w :vSr av 3 ^iuc. V. 1'1 A F F I D A V I T O F D I S T R I B U T I O N I , 6‘/L-VIA AA LC..L LiI\; hereby declare that: 0 Notice of Public Hearing O Notice of Public Meeting ❑ Board of Packet fl Board of Packet flPlanning Commission Agenda Packet 0 Short Subdivision Agenda Packet Notice of Application for Shoreline Management Permit 0 Shoreline Management Permit Adjustment Agenda Appeals Agenda 0 Determination of Non - significance Mitigated Determination of Nonsignificance 0 Determination of Significance and Scoping Notice 0 Notice of Action 0 Official Notice 0 Other 0 Other was mailed to each of the following addresses on 6 16 - 9(o (Sca 1 �» RIcAG -IE� S�IE� t'> Name of Project ePI IIA1-»3ILA Signature File Number t--0 o — Ooz KA6UC CITY OF T1KW!LJ DETERMINATION OF NONSIGNIFICANCE (DNS) DESCRIPTION OF PROPOSAL: THE CITY OF TUKWILA PLANS TO PROVIDE NEW SANITARY SEWER LINES, REPLACE EXISTING WATER LINES, AND CONSTRUCT A STORMWATER PUMP STATION IN THE ALLENTOWN NEIGHBORHOOD. . PROPONENT: LOCATION ''r PP&iPflAL INCLUDINGSTREET, ADDRESS, IF-ANY,,, PARCEL SEC/TWN/RNG:,,' 10/23/64 . ,. '...',. LEAD AGENCY:: CITY OF TUKWILA: FILE NO':.-::,,E960014 The CitY.has determined that the -proposal does not have..a.' Probable signifioant:adVerse impaOt on the envtronment. An environMental,, impactstatement tEIS) iS'not-reOuired,Un„der RCW 43.21c.030(2)(0. This deolsion-Was made-'after review ofa-tamp.leted enOronnehtaT, checklst and:other,information on f.f.le,with the lead agency... This information iS: aVailable'to, the pUbT4.6. on'request. .. . .. - ,t,,,-;. • _ . .• ;.:.-7,i, *****AA*1(4:16*****10k*A*:A*M*11(***A**4.4114444*-Ik*****Ick***A464*A.k4c/k4*A***A** • l',.: ;••:,. • :•• ;:.'1 . • . ". DNS,, is is'Sued underA97-11-340(2)': :.:7O.OMMents must '-'be'. submitted by E. 514 The 'lead -agency Will' not act on • - , this prOposal (,for '15 days from the 'date _ .•., ..• Steve Lancaster- Responsible Official! City of Tukwija, 2(206) 43173680 6300 Southoenter BOulevard ; • lukwila, WA .98138 • • -JUNE Date Copies of the procedure .for SEPA appeals are avai Department of Community:.beVelopment. . • . iisi•34•WiVtlte•46.144A41,,,k•at. • fable with the CITY OF. TUKWILA Department "of Community Development 6300 Southcenter Boulevard, Tukwila, WA 98188 Telephone: (206) 431 -3670 NOTICE OF APPLICATION The City of Tukwila Public Works Department has filed applications for installation of new sanitary sewer facilities, replacement of existing water lines, and construction of a stormwater pump station all to be located in the City owned right -of -way of South 116th, South 124th and South 122nd Streets and 43rd, 44th, 45th, 46th, 47th and 48th Avenues South in the Allentown neighborhood of Tukwila. Work will also include surface restoration. Permits applied for include: Shoreline Substantial Development Permit (City of Tukwila) Other known required approvals include: Approval of Construction Plans by the City of Tukwila Public Works Dept. Approval of Construction Plans by METRO An environmental checklist has been submitted with the studies identifed above. The project files are available at the City of Tukwila. To view the files, you may request them at the permit counter of the Department of Community Development (DCD), located at 6300 Southcenter Boulevard #100. Project Files include: E96 -0014 L96 -0023 Your written comments on the project are requested. They must be delivered to DCD at the address above or postmarked no later than 5:00 p.m., June 17, 1996. You may request a copy of any decision, information on hearings, and your appeal rights by calling DCD at 431 -3670. The environmental review decision is appealable to the City Council. The shoreline permit decision is appealable to the Shoreline Hearings Board. For further information on this proposal, contact Nora Gierloff at 431 -3670 or visit our offices at 6300 Southcenter Boulevard, Suite #100, Monday through Friday, 8:30 a.m. to 5:00 p.m. Application Filed: May 13, 1996 Notice of Application Issued: May 15, 1996 z �w re 6 00 Uo CO LIJ ' J= �L w0 LLQ =d Iw Z= o� Z 1-: 2 o' U 0 N. c 1- =w �U o z` C. p 0 A F F I D A V I T O F D I S T R I B U T I O N I, 9/LV$A /we'M(kLliN hereby declare that: Notice of Public Hearing J Notice of Public Meeting 0 Board of Adjustment Agenda Packet O Board of Appeals Agenda Packet fl Planning Commission Agenda Packet 0 Short Subdivision Agenda Packet Notice of Application for Shoreline Management Permit 0 Shoreline Management Permit 0 Determination of Non - significance 0 Mitigated Determination of Nonsignificance Determination of Significance and Scoping Notice fl Notice of Action O Official Notice 0 Other, 0 Other was mailed to each of the following addresses on 15- 110 (Sa i �-�� ���i�� SAFE) Name of Project C, N O I l l.tb i I t.44 Signature File Number �D - 0023 11A-61,1C G �� axsn,�:;:t.�Y:�w:J�ec,'ra: STATE OF WASHINGTON DEPARTMENT OF ECOLOGY Northwest Regional Office, 3190 - 160th Ave S.E. • Bellevue, Washington 98008 -5452 • (206) 649 -7000 July 8, 1996 Tukwila Public Works Dept. 9300 Southcenter Blvd. Tukwila, WA 98188 .,._::Attu: Patrick A. Brodin Dear Mr. Brodin: Re: City of Tukwila Permit:n 4496`= .0023��''° Tukwila Public Works Dept. - Applicant Shoreline Substantial Development Permit # 1996 -NW -20083 The subject Shoreline Management Substantial Development permit has been . filed with this office by The City of Tukwila on July 5, 1996. The development authorized by the subject permit may NOT begin until the end of the appeal period July 26, 1996. You will be notified in writing if this permit. is appealed. Other federal, state, and local permits may be required in addition to the subject permit. If this permit is NOT appealed, this letter constitutes the Department of Ecology's final notification of action on this permit. erely, m Gavin nvironmentalist Shorelands and Coastal Zone Management Program JG:jg CC: City of Tukwila .'itilF.Y3llTiSS4tf'.�':.Na1ri r::;,rrv+m.=vw .,,. :+. 0 9 1996 ' N sir 3P [VENT 0 • _ v..a .aLY..: wary M..` siEio6n7L. 4td✓ i.+' b.) SWi.: .:Yu1ti3hA.k42�r�.f3{L.4A:Y.'P)� ._.mot Short i ine. Management Act of 1971 PERMIT FOR SHORELINE MANAGEMENT SUBSTANTIAL DEVELOPMENT File Number: L96 -0023 Status: IS'SLIED Applied: 05/09/1996 Approved: 07/01/1996 Expiration: 07/01/1998 Pursuant to RCW 90.53, a permit is hereby granted to: CITY OF TUKWILA, PUBLIC Wl to under ~take the following development: CONSTRUCT NEW STORM DRAIN PUMP upon the following property: Address: Parcel No: Sec. /Twn /Rnge : 10/93/04 THE PROPOSED PROJECT WILL BE WITHIN THE AREA OF THE GREEN RIVER AND IT'S ASSOCIATED WETLANDS. WHICH IS A SHORELINE OF STATEWIDE SIGNIFICANCE AND I'S DESIGNATED AS AN URBAN ENVIRONMENT. The following ;master program provisions are applicable to this. development: Development pursuant to this permit shall be undertaken pursuant to the attached . terms and conditions This permit is granted pursuant to the Shoreline Management Act of 1971 an nothing in this, permit shall excuse the .applicant from compliance .. with any other, Federal. 'State or local statutes, ordinances or regulations applicable to this project, but not inconsistent with the Shoreline Management Act (Chapter 90.58; RCW) . This permit may be rescinded pursuant to RCW 90.58.140(8) in the •event the perm i ttee fails to comply with the terms or conditions hereof. CONSTRUCTION PURSUANT TO THI'S PERMIT WILL NOT BEGIN OR I'S NOT AUTHORIZED UNTIL TWENTY -ONE (21) DAYS FROM THE DATE OF FILING WITH THE DEPARTMENT OF ECOLOGY AS DEFINED IN RCW 90.58.140(6) AND WAC 17.3 -14 -090. OR UNTIL ALL REVIEW PROCEEDINGS INITIATED WITHIN TWENTY -ONE (21) DAYS FROM THE DATE OF SUCH FILING HAVE TERMINATED: EX(EPT AS PROVIDED IN RCW 90.58. 140(5) (a) (b) (c.) . Date : — 4k 4a Steve Lancaster Director, Planning Department Construction or substantial progress toward construction must begin within two years from date of issuance, per WAC 173 -14 -060. z • w. ce 6 _J C.) O 0. ND w= J H CO IL W O} g J W ?: � w Z Z �. I— O Z uj w 2 o` O- O I- W W • U' O wz _ O ~: z Memorandum TO: Jack Pace U\( FROM: Nora Gierloff RE: Shoreline Permit - Pacific Highway Bridge Replacement DATE: July 1, 1996 Project File No. L96 -0023 1. PROJECT DESCRIPTION: The City of Tukwila plans construction of a stormwater pump station in the intersection of 122nd and 42nd Avenue South. It will be used to pump stormwater into the Green River through an existing outfall during periods of heavy rainfall when the River is unusually high. The project also includes providing new sanitary sewer facilities as well as replacing existing water lines within portions of the Allentown neighborhood. The sanitary system will consist of nearly 8,000 lineal feet of eight inch gravity mains together with associated side sewer stubs, manholes, and connections in City owned street right -of -ways. The water system includes construction of approximately 7,000 linear feet of ten inch and eight inch ductile iron water mains and related auxiliary items, to include fire hydrants, valves, services, ect. in City owned right -of -way. 2. POLICIES OF THE SMA/SMP: The site is within the jurisdiction of the King County SMP and is consistent with the goals and policies of that SMP. It will allow for improved public safety through a reduction in flood damage. 3. SHORELINE REGULATIONS: Following are the relevant review criteria as contained in the King County Shoreline Regulations as applied by the City of Tukwila: 25.16.030 General Requirements: A. Nonwater related development...shall not be permitted waterward of the OHWM. Response: The project is water dependent because it involves pumping stormwater out into the river when heavy rainfalls cause the river to rise and water to flow back through the drain pipes. C. All development shall be required to provide adequate surface water retention and sedimentation facilities during the construction period. Response: Normal erosion control practices will be followed. nvirnfOlsierl F. Collection Facilities to control and separate contaminants shall be required where stormwater runoff from impervious surfaces would degrade or add to the pollution of recipient waters or adjacent properties. Response: The source of the stormwater will not be altered. It currently flows through ditches which act as bioswales before it is released into the river. 25,16.160 Utilities: C. The construction and maintenance of utility facilities shall be done in such a way as to : 1. Maximize the preservation of natural beauty and the conservation of resources; 2. Minimize scarring of the landscape; 3. Minimize siltation and erosion; 4. Protect trees, shrubs, grasses, natural features and topsoil from drainage; 5. Avoid disruption of critical aquatic and wildlife stages. Response: The majority of the disturbance will occur within previously paved street right -of -way so damage to the natural environment will be minimized. The project will control flood damage to the shoreline and neighborhood. 4. COMMENTS No comments were received. 5. SEPA: A determination of non - significance was issued on June 10,1996. The comment period expired without receipt of any comments. 6. RECOMMENDATION: Approve the shoreline substantial development permit. SHORELINE SUBSTANTIAL DEVELOPMENT APPLICATION • CITY OF TUKWILA DEPARTMENT OF COMMUNITY DEVELOPMENT 1 6300 Southcenter Boulevard, Tukwila, WA 98188 Telephone: (206) 431 -3680 1. BRIEFLY DESCRIBE YOUR PROPOSAL: Construct new storm drain pump on existing outfall pipe at 122nd St. /42nd Ave. in Allentown. 2. PROJECT LOCATION: (Give street address or, if vacant, indicate lot(s), block, and sub- division; or tax lot number, access street, and nearest intersection) South 122 Street just east of 42 Avenue South (Within R -•O -W) Quarter: SE Section: 10 , Township: 23 Range: 4 (This information may be found on your tax statement) 3. APPLICANT:* Name: TUKWILA PUELIC WORKS DEPARTMENT Address' 6300 Southcenter Elvd., Tukwila, WA 98188 CGF� hone: (206) 433 -0179 Signature: Date: May 9 1996 * The applicant is the person whom the staff will contact regarding the application, and to whom all notices and reports shall be sent, unless otherwise stipulated by applicant. AFFIDAVIT OF OWNERSHIP 4. PROPERTY Name: City of Tukwila OWNER 6300 Southcenter blvd. Address: Phone: (206) 433 -0179 I /WE,[signature(s)1 swear that I /we are the owner(s) or contract purchaser(s) of the property involved in this application and that the foregoing statements and answers contained in this application are true and correct to the = V '; Lea- 1 , . �, t ..> ,.,, best of my /our knowledge and belief. Date: y % q: A V 9 {996 OP WE N ., vnr:... W.s.,,,�•2'r.- •,�r^.F +`R':'u;;, rat!,'. r�.'' � 'rsF;;`.42t�t:x'#!c- i?a.!i!rr„� z . L J U U O. (o w J W O. �a • = d. H. _ z �o z uj D' • 1 w W; • 0. W Z U =' 0 z SHORELINE SUBSTANTIAL nEVELOPMENT APPLICATION - Page 2 5. Present use of property: South 122 Street is a residential right -of -way serving the Allentown residents. The street has existing utilities. 6. Total construction cost and fair market value of proposed project (include additional future developments contemplated but not included in this application): $150,000 7. List the master program policies (use program sections or page numbers) which are applicable to this development: Ring County Code - Title 25 - Shoreline Management_ The following sections apply: Section 23.16.030 - General Requirements Section 25.16.160 - Utilities 8. List any other permits for this project from state, federal or local governmental agencies for which you have applied or will apply, including the name of the issuing agency, whether the permit has been applied for (and if so, the date of the application), whether the application was approved or denied and the date of same, and the number of the application or permit: None. 9. Nature of the existing shoreline. Describe type of shoreline, such as stream, lake, marsh, flood plain, floodway, delta; type of beach, such as erosion, high bank, low bank, or dike; material such as sand, gravel, mud, day, rock, riprap; and extent and type of bulkheading, if any (to be completed by local official): Riverbank - Contains 100 -year flood. Improvements proposed are outside the floodplain. 10. In the event that any of the proposed builidngs or structures will exceed a height of thirty -five feet above the average grade level, indicate the approximate location of and number of residential units existing and potential, that will have an obstructed view (to be completed by local official): Does not apply_ o MAY 9 1996 ,:ek, ,YM'STIVT o',' k?M1°, n*• m.1 11: A'. ttT F7 y!t«r4TIYVIvITITAar.eacRUeM,ce 'ue,4 ,INT*.•utaftr: z ~w U0 w= Ili 0, J • co ?. • . =w Hmw, z �. E=0. .w U� O �. .D 1-. ww 2 1-U. LLO • .. Z w U =. .0 I' z • SHORELINE SUBSTANTIAL- "`EVELOPMENT APPLICATION Page 3 11. If the application involves a Conditional Use or Variance, set forth in full that portion of the Master Program which provides that the proposed use may be a Conditional Use or, in the case of a Variance, from which the variance is being sought (to be completed by local official): None are involved in this application. 12. Give a brief narrative description of the general nature of the improvements and land use within one thousand (1,000) feet in all directions from the development site: Proposed improvements are being made within public right -of -way to alleviate flooding problems associated with the adjacent residential neighborhood of Allentown. Improvements would include an underground manhole or vault with a sealed slide gate to keep river water from backing up into the existing storm system and a pump to keep rainwater from flooding the nearby ditches. Other than residential, a small business at 42 Ave. at 124 Street exists near the site of the new Community Center. I �. E C NED WAY 0 9 1996 COMMUNITY DEVELOPMENT • 30 31 lit 34 3 36 4K 95 S 4C. P4 47 . 93-f • I ►J 1 12- • 14 • C I t +1 -1-t t {F 4 5- •; 6 4r.• Y.i . .._ .._ is,,,, . , • 50 • 90 • Glee 7209 4 'I • i" _..Nay — --.S.2 • 88 Mit t • .;..: 53:_871 °aiar.K� 86 � ..... 4.2: ?........:�_;` 1._ .__ .i....... 01202 .. pg,c 55 rt5•_ ._- .._ -.. __ sort 56 84 •_57 83 81 1- 143111. Fi jig t2n57 63 ,1 77 C . 641i: 7e. 168 110 1 it • 52 •60 • 57 cr.], •i5 ..I 20 52'� 49. . r.._...__ ..•I rye[[ _.` . �....... 45 . Goss 2 t 1 28 12064 . 32 34 1 5 { 36 37 j 38; 3c; 40 =1.1 -j'? I - - y .. • . .( • l x O� i .i . j.. 1.31 t'- — 3 • =13 ;2, {� 3 15 +16 •111 18.1)0. 70 21 122 23 • LM T .. .... +.........£, 4 �.. .. It !R RI 6 39R 4;1 7 rt— ....._ 8. 1,7 Ma )t ,:. tai 4-33 ,♦ . • 13 32 • -K14,129:, 17 ! 7t 213 li .. YV Yl el '.. s .nrw.r .. r _.nw _s7 !24tH k'4O N£ „tN •� �� •15 'r.v:. +tn 50 r■• Sr s k .,, r" ".,”, at.rt,cra• >:rrvi' Fv ..'" rnr :,2".t:"- r`i'.,"'Si"..:`'.'.'__ .'.:_.--<--'-- 4 10 g., Z ~ W O 0 co 0 1. u_ w° Nd = to Z� w�. W 2o U co CI I- wW 0 WZ U= O~ Z ., , ij1;3d 4;1 s k .,, r" ".,”, at.rt,cra• >:rrvi' Fv ..'" rnr :,2".t:"- r`i'.,"'Si"..:`'.'.'__ .'.:_.--<--'-- 4 10 g., Z ~ W O 0 co 0 1. u_ w° Nd = to Z� w�. W 2o U co CI I- wW 0 WZ U= O~ Z CITY OF TUKWILA 530091 Z W re W. 6 JU O 0 N 0: co LL. W O. LL Q. = 0. I- W. 2' Z F- O. ZF-'. W uj UC3 O N Era W W'. '2 O Z w = O ~' Z • SHORELINE SUESTAI f1AL DEVELOPMENT APPLICATION CHECKLIST CITY OF TUKWILA DEPARTMENT OF COMMUNITY DEVELOPMENT 6300 Southcenter Boulevard, Tukwila, WA 98188 Telephone: (206) 431 -3680 The following materials must be submitted with your application. This checklist is to assist you in submitting a complete application. Please do not turn in your application until all items which apply to your proposal are attached to your application. If you have any questions, contact the Department of Community Development at 431 -3680. TURN: THIS =CHECKL IS I GENERAL n n Application Form Shoreline Permit Fee — $550.00 See- ge+1- '149-542' - sa /. 35-7. W..2 . Environmental Checklist Environmental Checklist Fee — $325.00 - sA�� Board of Architectural Review (BAR) Application (if proposal meets Zoning Code definition of "development") Board of Architectural Review (BAR) Application Fee — $900.00 MAY 0 9 1996 COMMUNITY DEVELOPMENT PLANS 17 Seven (7) copies of the site /landscape plan, elevations, and shoreline profiles. The scale shall not exceed 1 " =30' maximum, with the north arrow, graphic, scale and date all identified on the plan. Each set of plans shall have the license stamps of the architect and landscape architect. The following information should be contained within the set: Li n n Vicinity map showing location of site and surrounding prominent landmarks. Property survey showing property dimensions and names of adjacent rights -of- way. C. Existing top of bank (all uses and structures must be set back 30 feet from existing top of bank), floodway limit (no fill may occur within the floodway), utility lines, structures, rockeries, and other relevant man-made or natural features. D. Location, dimensions and nature of any proposed easements or dedications, including Dike Maintenance and Trail easements. E. Limits of the 40 -foot river and the 60 -foot low impact environments. F. All existing trees over 6" in diameter by species and an indication of which will be saved. Proposed landscaping: size, species, location and distance apart. Existing and finished grades a 2' contours with the precise slope of any area in excess of 15 %. G. H. SHORELINE SUBSTANTIAL ""EVELOPMENT APPLICATION CH" ^KLIST Page 2 ❑ I. Location and dimensions of proposed structure(s), accessory structures with ap- propriate setbacks and parking areas (include the degree of angle for parking stall design), and driveways. ❑y J. Location and size of proposed utility lines and a description of by whom and how water and sewer is available. ❑ K. Gross floor area by use and parking calculations. ❑ L. Dimensioned building elevations, induding height and exterior materials, drawn at 1/8" equals 1' or a comparable scale. ❑ M. Location and screening of dumpsters and HVAC units. ❑ N• . Locations and elevations of parking area and building. ❑ O. Conceptual storm drainage plans with detention for 10 -year storm event, or on- site retention for 100 -year event. ❑ P• . For multiple residential, location and dimensions of common open space recrea- tion requirements. ❑ Q. Shoreline profiles with cross- sections at minimum 75 -foot intervals along site's shoreline, showing: • shoreline environments • existing ground elevations • proposed ground elevations • height of existing and proposed structures ❑ R. Location of "Shoreline Profile" cross- section points on site plan. ❑ S. Identify source, composition and volume of fill materials. ❑ T• . Identify composition and volume of any extracted materials, and identify pro- posed disposal area. ❑ U. One (1) Photomaterial Transfer (PMT) of each drawing reduced to 8.5" by 11" (most printing companies can make PMT's). PUBLIC NOTICE ❑' A mailing list with address labels for property owners and residents within 300 feet of your property. (See attached "Address Label Requirements ") 2- A King County Assessor's Map which identifies the location of each property owner- ship and residence listed. The maps may be ordered from the King County Public Works Map Counter at 296 -6548. OPTIONAL ❑ Perspective drawings, photographs, color renderings or other graphics which may be needed to adequately evaluate your application. = FCEIVFD ❑ Other required information: 0 9 1996 t.a. ?,t;iivr um D- VE OPMir ' i Z • Z W 2 U O =U W- W I: J I- WO g Q d I- _: Z I- O zl- LU O N. IL. 0` • Z' UN O •Z ALLENTOWN SEWER IMPROVEMENT SERVICE AREA BOUNDARY - - -� EXISTING 4$ METRO-TRUNKLINE - - - -II EXISTING V TUKWILA GRAVITY COLLECTOR -�► PROPOSED CONSTRUCTION --M- FUTURE CONSTRUCTION PROPOSED CONSTRUCTION 9 FUTURE CONSTRUCTION FUTURE "REGIONAL` PUMP STATION (PROPOSED LOCATION) LVb cx223 T�ti�INfi�i!6MR`:l'Y:! ` IMItWR' r%/ �M' Mli��h�' �NCMYtrR!+ MfJOV .@�b}T'G�lY1MMlY.'1M�1GE�'N Memorandum TO: Jack Pace FROM: Nora Gierloff 01 RE: SEPA - Allentown Sewer/Water/Pumpstation Improvements Project DATE: June 7, 1996 (DY- Project File No. E96 -0014 Project Description: The City of Tukwila plans to provide new sanitary sewer facilities as well as replace existing water lines within portions of the Allentown neighborhood. The sanitary system will consist of nearly 8,000 lineal feet of eight inch gravity mains together with associated side sewer stubs, manholes, and connections in City owned street right -of -ways. The water system includes construction of approximately 7,000 linear feet of ten inch and eight inch ductile iron water mains and related auxiliary items, to include fire hydrants, valves, services, ect. in City owned right -of -way. The project also includes the construction of a stormwater pump station in the intersection of 122nd and 42nd Avenue South. It will be used to pump stormwater into the Green River through an existing outfall during periods of heavy rainfall when the River is unusually high. Agencies With Jurisdiction: Approval of construction plans by METRO Comments to SEPA Checklist: None Summary of Primary Impacts: 1. Earth - Soil will be disturbed during the process of trenching, laying pipe and refilling. Erosion control and revegetation measures will be used to minimize the effects of this disturbance. Construction will be within street right -of -way and pavement will be repaired to previous condition. 2. Air - There will be exhaust emissions from construction equipment during the project. Dust control measures in compliance with the Puget Sound Air Pollution Control Authority will be used as needed. The project will have no air emissions when complete. 3. Water - The stormwater pump will be used to control backflow during periods of heavy rainfall but no increase in the amount of water released into the River is expected. Groundwater will likely z • �W • 6 • JU 0 0. • N0. W • W -1 .N W, W 0 ¢, =d ▪ _:. I- 0 Z ,.o, w; U 0 Hi = V' I- F' LL -;. O: • Z, U N' •1-1_; O. z need to be pumped out of the sewer and water pipe trenches but the contractor will be required to use desiltation measures before releasing it into the drainage ditches. 4. Plants - Disturbed grassy areas will be replanted. No street trees will be removed. 5. Animals - No endangered or candidate species are known to be on site. 6. Energy and Natural Resources - The project will require energy for construction equipment and for vehicles coming to the site. 7. Environmental Health - No environmental health hazards are anticipated. Construction equipment operation will need to comply with Tukwila's noise ordinance. 8. Land and Shoreline Use - The proposed use will not adversely affect the existing use of the site as street right -of -way. 9. Housing - The proposal will not result in a change to the housing supply. 10. Aesthetics - The project is not subject to BAR requirements. 11. Light and Glare - The proposal will not generate light or glare. 12. Recreation - The proposal will not affect recreational facilities. 13. Historical and Cultural Preservation - The site is not known to have any historical or cultural significance. 14. Transportation - Construction phasing and flaggers will be used to minimize traffic delays and inconvenience to neighborhood residents. 15. Public Services - The project is likely to increase demand on other public services only to the extent that the installation of sewers may encourage infill development in the neighborhood.. 16. Utilities - The project will replace aging water lines with new pipes sized to meet future demand. New sewer lines will be installed and the area will gradually discontinue use of septic systems. This will increase demand at the METRO wastewater treatment plant. Recommended Threshold Determination: Determination of non - significance. Z, • • 2 D JU: U Q; co W =. N LL. w 5'� • a i v: I—. W. r z �. I— 0.. g D, oN ;w W: H V: U. —O. LLi z; U N. • O z STATE ENVIRONMENTAL POLICY ACT • ENVIRONMENTAL CHECKLIST 1 Purpose of Checklist: The State Environmental Policy Act (SEPA), chapter 43.21C RCW, requires all governmental agencies to consider the environmental impacts of a proposal before making decisions. An environmental impact statement (EIS) must be prepared for all proposals with probable significant adverse impacts on the quality of the environment. The purpose of this checklist is to provide information to help you and the agency identify impacts from your proposal (and to reduce or avoid impacts from the proposal, if it can be done) and to help the agency decide whether an EIS is required. Instructions to Applicants: This environmental checklist asks you to describe some basic information about your proposal. Governmental agencies use this checklist to determine whether the environmental impacts of your proposal are significant, requiring preparation of an EIS. Answer the questions briefly, with the most precise information known, or give the best description you can. You must answer each question accurately and carefully, to the best of your knowledge. In most cases, you should be able to answer the questions from your own observations or project plans without the need to hire experts. If you really do not know the answer, or if a question does not apply to your proposal, write "do not know" or "does not apply." • Complete answers to the questions now may avoid unnecessary delays later. Some questions ask about governmental regulations, such as zoning, shoreline, and landmark designations. Answer these questions if you can. If you have problems, the governmental agencies can assist you. The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of time or on difference parcels of land. Attach any additional information that will help describe your proposal or its environmental effects. The agency to which you submit this checklist may ask you to explain your answers or provide additional information reasonably related to determining if there may be significant adverse impact. A. BACKGROUND 1. Name of proposed project, if applicable: Allentown Water and Sewer Improvement Project 2. Name of applicant: City of Tukwila M AY 1 3 1996 1 z �w • U OI to cow.. W J 0) LL LL Q - „pm: �o z ►-: 2 0` O oF-.; = wi HU O • • ..z •z 3. Address and phone number of applicant and contact person: Applicant Engineer City of Tukwila Gray & Osborne, Inc. 6300 Southcenter Blvd., #100 701 Dexter Ave. N., #200 • Tukwila, WA 98188 - Seattle, WA 98109 Q 1 Pat Brodin, P.E. Tim Osborne, P.E. z Water /Sewer Engineer Project /Sewer En • 174 (206) 433 -0179 (206) 284 -0860 6 v 0 4. Date checklist prepared: 5/1/1996 co 0: ' co w: wI J I--i 5. Agency requesting checklist: City of Tukwila, Washington cn u. w 0' 6. Proposed timing or schedule (including phasing, if applicable): 71 u.a: Construction to take place beginning in approximately July, 1996. 59. d` = w i. 7. Do you have any plans for future additions, expansion, or further activity related to z or connected with this proposal? If yes, explain. I- szY z f-; w w, No. While future extensions and /or replacement of the system(s) are .'D o' anticipated, it is unknown, at this time, when this will occur. :v cn` pi-. 8. List any environmental information you know about that has been prepared, or will = w. be prepared, directly related to this proposal. 1- �! - u. O • As a part of the design phase, several random soil and /or drillings will be fu N` U conducted to ascertain sub - surface conditions in and along the proposed F- z pipeline route.. z 9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the property covered by your proposal? If yes, explain. No. 10. List any government approvals or permits that will be needed for your proposal, if known. Shoreline permit - City of Tukwila Department of Community Development. Approval of Construction Plans - City of Tukwila Public Works Approval of Construction Plans - "METRO" .: ,:'+ +fi+!k+_1uiuY1,F'- :L''.iliv. sty :Fa.,ts:L:o::.uu.+:n,ri.:.tadaa itea: n,. u+. ...,...- ...,..,. .....,. , • 2 11. Give brief, complete description of your proposal, including the proposed uses and the size of the project and site. There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You do not need to repeat those answers on this page. (Lead agencies may modify this form to include additional specific information on project description.) The City of Tukwila plans to provide new sanitary sewer facilities, as well as, replace existing water lines within portions of the "Allentown" area of the City. The project includes construction of approximately 7,000 LF of ten - inch (10 ") and (8 ") ductile iron water mains and related auxiliary items, to include fire hydrants, valves, services, etc. in the City-owned right -of -way, commonly known as S. 116th St., S. 124th St., S. 122nd St. and 43rd, 44th, 45th, 46th, 47th and 48th Ave. S. The sanitary system will consist of nearly 8,000 lineal feet of eight -inch (8 ") gravity mains together with associated side sewer stubs, manholes and connections also located in the above noted street right -of -ways. Work will also include surface restoration (in kind). See attached Exhibit. The project is also to include the construction of a stormwater pump station. The station is to be located within the intersection of 122nd and 42nd Avenue South and shall be designed to convey stormwater runoff out of the Allentown Drainage System during heavy rainfall periods. 12. Location of the proposal. Give sufficient information for a person to understand the precise location of your proposed project, including a street address, if any, and section, township, and range, if known. If a proposal would occur over a range of area, provide the range or boundaries of the site (s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist. The project is located in its entirety in the corporate limits of the City of Tukwila, King County, Washington within Section 10, Township 23N, Range 4E. More specifically, in the area of City commonly known as "Allentown". This area is located west of I-5/Burlington Northern Railroad right -of -way, east of 42nd Avenue South and the Duwamish River and north of 124th Street and the Duwamish River. Please see enclosed Exhibit. B. ENVIRONMENTAL ELEMENTS 1. Earth a. General description of the site (circle one): Flat, rolling, hilly, mountainous, other . Description noted in bold print. What is the steepest slope on the site (approximate percent slope)? Approximately 4% to 5% slope in steepest areas (enbankments). Generally 1 %to3 %. 3 c. What general types of soils are found on the site (for example, clay, sand, gravel,' peat, muck)? If you know the classification of agricultural soils, specify them and note any prime farmland. Sand, clay, organic matter and glacial till. d. Are there surface indications or history of unstable soils in the immediate vicinity? a If so, describe. z re 2 While previous construction in adjacent areas have indicated that clays and 6 D organic materials may be exposed during pipe installations, there is no U 0 surface evidence of "unstable soils" in the immediate vicinity. co w wz e. Describe the purpose, type, and approximate quantities of any filling or grading LL` proposed. Indicate source of fill. w 0 Import material will likely be required in trench and roadway g repair /reconstruction. No net increase in fill will be provided. Unsuitable co D trench spoils will be loaded and hauled to waste per the City approved = W construction contract documents. Minimal roadway grading will be required z F for roadway repair. F- O zt-: f. Could erosion occur as a result of clearing, construction, or use? If so, generally 2 D U O describe. o co An increase in wind and water erosion of stockpiled materials adjacent to at w' pipe trenching areas can be expected during the construction phase. The 1 v: potential conveyance of eroded materials shall be mitigated for until ., ~O: construction is complete and vegetation is established. z. Ili o g. About what percent of the site will be covered with impervious surfaces after o 1 project construction (for example, asphalt or buildings)? z The project will be primarily aligned within paved streets. Approximately 35% of the existing project site (City rights -of -ways) are presently covered by impervious surfaces. After construction, the project site will be covered by approximately the same percentage of impervious surfaces (i.e., pavement surfaces will be repaired in kind). h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: The contractor will be contractually required to incorporate provisions for erosion control such as the use of straw bales, siltation basins, silt fencing during construction, etc. per the City approved construction contract documents. 2. Air a. What types of emissions to the air would result from the proposal (i.e. dust, automobile, odors, industrial wood smoke) during construction and when the 4 project is completed? If any, generally describe and give approximate quantities, if known. Temporary Exhaust emissions from equipment, both diesel and gas operated, will take place during construction. Dust may be emitted during construction phase (pipe installation, backfill, and roadway repair /reconstruction). b. Are there any off -site sources of emissions or odor that may affect your proposal? If so, generally describe. No. c. Proposed measures to reduce or control emissions or other impacts to air, if any: The City approved construction contract will include provisions for dust and emission control during construction. Street cleaning/sweeping and compliance with the Puget Sound Air Pollution Control Authority shall be required by Contract. 3. Water a. Surface: 1) Is there any surface water body on or in the immediate vicinity of the site (including year -round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names. If appropriate, state what stream or river it flows into. The Duwamish River is located (borders) along both the southerly and westerly boundaries of the Allentown area of the city. Will the project require any work over, in, or adjacent to (within 200 feet) the described waters? If yes, please describe and attach available plans. Some work will be completed, within existing City/roadway right -of- way limits, in areas which are adjacent to the Duwamish River. Please see attached exhibit. Work will not be over or in the "waters ". Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill material. None. 4) Will the proposal require surface water withdrawals or diversions? Give general description, purpose, and approximate quantities, if known. Trench dewatering with conventional trench sump pumps (trash pumps) are anticipated due to expected groundwater seepage into the trench section (pipe construction). 5 z. 6 �Z J U. U o, CO W =. J V, W o. gQ =a, i:.. z I- UC N. 1- W W H V. LL 0 Z'. co 01-1 z 5) Does the proposal lie within a 100 -year floodplain? If so, note location on the site plan. No. 6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and anticipated volume of discharge. No. b. Ground: c. 1) Will ground water be withdrawn, or will water be discharged to ground water? Give general description, purpose, and approximate quantities, if known. Some dewatering is anticipated to occur due to the seepage of groundwater into the trench excavation area, during pipe line installation. Describe waste material that will be discharged into the ground from septic tanks or other sources, if any (for example: Domestic sewage; industrial, containing the following chemicals...; agricultural; etc.). Describe the general size of the system, the number of such systems, the number of houses to be served (if applicable), or the.number of animals or humans the system(s) are expected to serve. None anticipated. The completion of this project should result in the reduction of environmental damage currently caused by the utilization of "failed" private septic drain fields in the area which will be abandoned, over time, as the result of connections to the permanent public sewer system being installed as a part of this project. Water Runoff (including storm water): 1) Describe the source of runoff (including storm water) and method of collection and disposal, if any (include quantities, if know). Where will this water flow? Will this water flow into other waters? If so, describe. •; �:; &L'u- �::Hi:Sw.:. =•: ^L: «�i.::;;i�" ••�•tL`.i:1,' ?sissw.i'3.V'" •.,1tL's:isi:t�i N /A. Could waste materials enter ground or surface waters? If so, generally describe. No. 'UV, 5 . r,+ an 6 • 2 a • �w J V U O; 0 cnw wmi. 1 CO w 0: LL =d w. • _. z� o z t- ;. ut U U Ni o F-: �W W u- p; ui z. z d. Proposed measures to reduce or control surface, ground, and runoff water impacts, if any: Methods to minimize and mitigate construction related erosion will be provided in design and within the City approved construction contract documents. Methods include the use of silt fence, siltation ponds and straw bales to entrap migrating silt on site and the placing of filter fabric over catch basins to restrict silt from entering the existing storm system. Grassed areas disturbed by the construction of this project shall be re- seeded. Any significant dewatering will be routed to existing suitable roadside ditches, as may be pre - approved by the City, and /or the existing METRO sewer system, as may be pre - approved by METRO. 4. Plants a. Check or circle types of vegetation found on the site: X deciduous tree: alder, maple, aspen, other evergreen tree: fir, cedar, pine, other shrubs X grass pasture crop or grain wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other water plants: water lily, eelgrass, milfoil, other other types of vegetation b. What kind and amount of vegetation will be removed or altered? The project will be primarily aligned within exiting City -owned paved streets, and graveled shoulders, all as located in City -owned rights -of -way. The installation of pipe however will likely disturb some existing roadside grassed areas. These areas will be "replanted" with new seed, as applicable. List threatened or endangered species known to be on or near the site. None. d. Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation on the site, if any: Grassed areas disturbed by the construction of this project shall be reseeded. Animals a. Circle any birds and animals which have been observed on or near the site or are known to be on or near the site: birds: hawk, heron, eagle, songbirds, other: 7 mammals: deer, bear, elk, beaver, other: None. fish: bass, salmon, trout, herring, shellfish, other: b. List any threatened or endangered species known to be on or near the site. None. c. Is the site part of a migration route? If so, explain. w re 2 No. J U; UO U) 0 cnw N /A. co w0'. g J; w a. Z w w: D o CI I! w we r-: O ui _, z d. Proposed measures to preserve or enhance wildlife, if any: 6. Energy and Natural Resources a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet the completed project's energy needs? Describe whether it will be used for heating, manufacturing, etc. Oil, gasoline, and diesel fuel will be consumed by machinery during construction. b. Would your project affect the potential use of solar energy by adjacent properties? If so, generally describe: c. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts, if any: N /A. 7. Environmental Health a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal? If so, describe. No. 1) Describe special emergency services that might be required. N /A. Proposed measures to reduce or control environmental health hazards, if any: N /A. 8 b. Noise 1) • What types of noise exist in the area which may affect your project (for example: traffic, equipment, operation, other)? The project may experience noise from vehicular traffic and the nearby BNRR facilities. , 1- z o :w 2 2) What types and levels of noise would be created by or associated with the 6 M project on a short-term or a long -term basis (for example: traffic, 0 o construction, operation, other)? Indicate what hours noise would come co W from the site. w =i J H Short term noise from machinery during City approved (contracted) w 0 working hours will occur during the course of construction. No long 2 , term noise. u. 3). Proposed measures to reduce or control noise impacts, if any: i w 1 Z 1_ Working hours will be established by contract limiting working hours - o to City recognized work days (Monday through Friday) from 7:00 w a.m. to 6 :00 p.m., to comply with the guideline established by the City 2 D: of Tukwila Municipal Code, (Title 8.22.160) and the City's noise v C ordinance number 1363. o —: in w 8. Land and Shoreline Use = U F- w I= a. What is the current use of the site and adjacent properties? iii Z U N:. The construction site is currently used as City owned roadway and utility p �' right -of -way. Land uses adjacent to the project site are primarily residential ?.. { with limited commercial/industrial. b. Has the site been used for agriculture? Is so, describe. No. Unaware of any previous agricultural uses. c. Describe any structures on the site. Utility poles, power poles, fire hydrants and utility boxes exist within the project site (City right -of -way). Underground structures consist of water, storm drains and catch basins, manholes, telephone and electrical lines and gas lines. d. Will any structures be demolished? If so, what? Portions of existing City-owned utilities (mostly all located underground) will be removed and wastehauled to allow for the installation of new sanitary and water facilities. Most of the existing facilities, however, will be abandoned below ground in place. 9 e. What is the current zoning classification of the site? The project site is within the existing City of Tukwila owned street rights -of- way. The "neighborhood" is currently zoned Low Density Residential (LDR). g. What is the current comprehensive plan designation of the site? While the project is located within the existing City -owned street right -of- way, the neighborhood is currently zoned Low Density Residential (LDR). If applicable, what is the current shoreline master program designation of the site? N /A. h. Has any part of the site been classified as an "environmentally sensitive" area? If so, specify. No. (Not within project construction site). i. Approximately how many people would reside or work in the completed project? N /A. 1. Approximately how many people would the completed project displace? None. Proposed measures to avoid or reduce displacement impacts, if any: N /A. Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, if any: N /A. 9. Housing a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low- income housing. None. b. Approximately how many units, if any, would be eliminated? Indicate whether high, middle, or low - income housing. None. 10 c. Proposed measures to reduce or control housing impacts, if any: N /A. 10. Aesthetics a. What is the tallest height of any proposed structure(s), not including antennas; what is the principal exterior building material(s) proposed? Fire hydrants (30" to 36" high). All other improvements will be at or below existing grade. b. What views in the immediate vicinity would be altered or obstructed? None. c. Proposed measures to reduce or control aesthetic impacts, if any: N /A. 11. Light and Glare a. What type of light or glare will the proposal produce? What time of day would it mainly occur? None. b. Could light or glare from the finished project be a safety hazard or interfere with views? No. c. What existing off -site sources of light or glare may affect your proposal? None. Proposed measures to reduce or control light and glare impacts, if any: N /A. 12. Recreation What designated and informal recreational opportunities are in the immediate vicinity? None. 11 Z a o: W 6 • J U. U O' D` coW; W I. • •J 0 a.a = a; I— W. z 1- 0 z U ; CO' W W, z ; 1-- V a.5 z. U V); o.1` • z b. Would the proposed project displace any existing recreational uses? If so, describe. No. c. Proposed measures to reduce or control impacts on recreation, including Q z I recreation opportunities to be provided by the project or applicant, if any: ; E- w , . m. N /A. J o; oO 13. Historic and Cultural Preservation . cow: w _: J 1-. a. Are there any places or objects listed on, or proposed for, national, state, or local co LL, preservation registers known to be on or next to the site? If so, generally describe. w O; gas: None. LL ,,:c . a b. Generally describe any landmarks or evidence of historic, archaeological, scientific, I Ui . or cultural importance known to be on or next to the site. ? �; z o, An archeological site is located near the most northwesterly corner of w w "Allentown", but not within this project site. 2 o CY 10 221 c. Proposed measures to reduce or control impacts, if any: +o 1- w None. LL p=, O. iii o O i-`. a. Identify public streets and highways serving the site, and describe proposed access to the existing street system. Show on site plans, if any. The major roads which provide access to the project are Interurban Avenue South, 42nd Avenue South and South 129th Street. The project is to be constructed within the right -of -way corridors previously noted. The construction contract will require the contractor to submit and acquire City approval of a traffic control plan b. Is site currently served by public transit? If not, what is the approximate distance to the nearest transit stop? 14. Transportation Several transit stops are located in and adjacent to the project. c. How many parking spaces would the completed project have? How many would the project eliminate? N /A. .i �*„: �; des &;;i .i#9tei;+:4:4 &Mki+c+n'r�`i' .L:�.:i;a. ;,.c:su:a.:sx •.�.,..,, 12 ffr d. Will the proposal require any new roads or streets, or improvements to existing roads or streets, not including driveways? If so, generally describe (indicate whether public or private). Yes. Streets will be restored to a like or superior condition. e. Will the project use (or occur in the immediate vicinity of) water, rail, or air transportation? If so, generally describe. No. f. How many vehicular trips per day would be generated by the completed project? If known, indicate when peak volumes would occur. g. No additional traffic generation is anticipated. Proposed measures to reduce or control transportation impacts, if any: Construction will take place in a timely manner to minimize disturbances to traffic flow through the various street corridor(s). City approved traffic control through the construction area will be required by contract. 15. Public Services a. Would the project result in an increase need for public services (for example, fire protection, police protection, health care, schools, other)? If so, generally describe. Yes. Additional wastewater treatment is anticipated at the METRO facilities as dwellings are anticipated to connect to the new proposed facilities. b. Proposed measures to reduce or control direct impacts on public services, if any. The contract documents will include provisions for maintaining existing utility service to residents and businesses. The contractor shall be required to locate all existing utilities and coordinate all construction activities with all affected utility companies during the construction phase. 16. Utilities a. Underline utilities currently available at the site: electricity, natural gas, water, refuse service, telephone, sanitary sewer, television cable, septic system, other. (As underlined above) b. Describe the utilities that are proposed for the project, the utility providing the service, and the general construction activities on the site or in the immediate vicinity which might be needed. Utilities proposed for the project include the installation of new water mains and sanitary sewer lines to be owned and operated by the City. 13 z H Z1 Ct w 6?' -.I C.) O 0; N p' N w` U.1= J � CO LL W0 g • Q!. co d 1- w. z� I- 0: Z f-; uj O Cu O 1:1' 0 1 =w f.. U O' •Z U • N O E-. z C. •SIGNATURE The above answers are true and complete to the best of my knowledge. I understand that the lead agency is j eIyi g on them to make its decision. Signature: (2ZI Date Submitted: • ;U O` W; • W =r • • J H' .N • • I W;•; _c: Z f-; iW LIJi • Z., o 14 4 kru ILA:1.;f4:c:k.AANRfTLr. uL.i:: TO BE COMPLETED BY APPLICANT E. SUPPLEMENTAL SHEET FOR ALL PROJECT AND NON PROJECT PROPOSALS The objectives and the alternative means of reaching the objectives for a proposal will be helpful in reviewing the aforegoing items of the Environmental Checklist. This information provides a general overall perspective of the proposed action in the context of the environmental information provided and the submitted plans, documents, supportive information, studies, etc. 1. What are the objective(s) of the proposal? The objectives of this proposal were provided in the Utilities Element of the City's Land Use Policy. Plan, namely: The elimination of any point or non -point pollution sources associated with sewage disposal systems. In areas such as Allentown of continuous septic and drain field failures, the installation of sanitary sewer facilities should be accomplished, and • the replacement of old and deteriorated water lines to meet infrastructure standards that are appropriately scaled for use specified in the City's Land Use Policy Plan. 2. What are the altemative means of accomplishing these objectives? Septic and drain fields would need to be rebuilt or maintained in order to reduce the point or non- point pollution. No alternatives for the deficiencies in the water system. 3. Please compare the altemative means and indicate the preferred course of action: It is unfeasible to eliminate point or non -point pollution without building new sewers therefore construction of sanitary sewer facilities is the preferred course of action. 4. Does the proposal conflict with policies of the Tukwila Comprehensive Land Use Policy Plan? If so what policies of the Plan? No. Proposed measures to avoid or reduce the conflict(s) are: None. z re LL12' JU 00, u, w: w z, J 1- N u.; w0 g w ¢ • d w z ~. 1- 0: u 10 51, 2V 1- - w o; U col O A F F I D A V I T O F D I S T R I B U T I O N 9JLV IA A40Mt c..L 1A 1\ hereby declare that: 0 Notice of Public fJ Notice of Public fl Board of Packet O Board of Packet Hearing Meeting Adjustment Agenda Appeals Agenda O Planning Commission Agenda Packet fl Short Subdivision Agenda Packet VNotice of Application for Shoreline Management Permit 0 Shoreline. Management Permit fl Determination of Non - significance 0 Mitigated Determination of Nonsignificance O Determination of Significance and Scoping Notice fl Notice of Action Official Notice Other Other was mailed to each of the following addresses on 6- 110 -9(o C r ) Name of Project LI N 0 `Tuuki I LA Signature File Number Ak.0 00Z3 i UG � .,.: �tr�ka. x'_' i�4t;': cs::,. 4v'.. rr�iy':. PA: S; iv:.,» tYl.;+ zz< a:7k'�Twrfivi {G�.».�Siitru�+.:'9 ��= Lli� .�#f;,:5fu'C4 °bti•�w4F;,iriis' CITY OF'UKWILA Department of Community Development 6300 Southcenter Boulevard, Tukwila, WA 98188 Telephone: (206) 431 -3670 NOTICE OF APPLICATION The City of Tukwila Public Works Department has filed applications for installation of new sanitary sewer facilities, replacement of existing water lines, and construction of a stormwater pump station all to be located in the City owned right -of -way of South 116th, South 124th and South 122nd Streets and 43rd, 44th, 45th, 46th, 47th and 48th Avenues South in the Allentown neighborhood of Tukwila. Work will also include surface restoration. Permits applied for include: Shoreline Substantial Development Permit (City of Tukwila) Other known required approvals include: Approval of Construction Plans by the City of Tukwila Public Works Dept. Approval of Construction Plans by METRO An environmental checklist has been submitted with the studies identifed above. The project files are available at the City of Tukwila. To view the files, you may request them at the permit counter of the Department of Community Development (DCD), located at 6300 Southcenter Boulevard #100. Project Files include: E96 -0014 L96 -0023 Your written comments on the project are requested. They must be delivered to DCD at the address above or postmarked no later than 5:00 p.m., June 17, 1996. You may request a copy of any decision, information on hearings, and your appeal rights by calling DCD at 431 -3670. The environmental review decision is appealable to the City Council. The shoreline permit decision is appealable to the Shoreline Hearings Board. For further information on this proposal, contact Nora Gierloff at 431 -3670 or visit our offices at 6300 Southcenter Boulevard, Suite #100, Monday through Friday, 8:30 a.m. to 5:00 p.m. Application Filed: May 13, 1996 Notice of Application Issued: May 15, 1996 z z .6D • -J C.) o oo'. CO cn w w =: J w o: u- CO ?. • E' w • _; z� F- o Z w w. o` • O F- =w - o; w Z o o I' z City of Tukwila Department of Community Development 6300 Southcenter Boulevard Tukwila, WA 98188 -2599 Department of Ecology Shoreline Permit Review Section 3190 160th Avenue SE Bellevue, WA 98008 -5452 '::J.••••• :.•••& :.i.si..::a:a..I..:. i.:.4.•...t••nay.a.w�:...r.. ":r. •+4•n.,.rrv•a.:..�rr r:rn••a••-• .. City of Tukwila Department of Community Development 6300 Southcenter Boulevard Tukwila, WA 98188 -2599 Metro Environmental Planning Division 821 2nd Avenue MS -92 Seattle, WA 98104 . dIMIRl l�YGK�}R.�:!•.�1,�'.!.'..Orl•:. : �� •i.:.•:..t'i..;+....u.cv�«...w i...u.i:.a. trrr:•c..s- ..iG:. ..nit.- ..a�.•nt+�•N.wA::4�+:.:: 1145+ c�7:•» V�• �aT���: Ll.' 1?.`.' cddl.^ ul l�ivhYl:. lil E.' ibfiYl �L: ilt�iM •.e�ac.:rWw.4cu•✓dJ4.du�.:... City of Tukwila Department of Community Development 6300 Southcenter Boulevard Tukwila, WA 98188 -2599 King County Department of Development Environmental Division - SEPA Information Center 3600 136th Place SE Bellevue WA 98006 -1400 z• . re 11 JUG UO rn C :CO a. :w =; • ,J 1-: U) u w0 ga f.. W; • Z 1•-, F-O' Z F-. • w w;: Di- U N'r ;0 1- w w' Oi H V 0 z...: City of Tukwila Department of Community Development 6300 Southcenter Boulevard Tukwila, WA 98188 -2599 Muckelshoot Indian Tribe Fisheries Department 39015 172nd Avenue SE Aurburn, WA 98002 City of Tukwila Department of Community Development 6300 Southcenter Boulevard Tukwila, WA 98188 -2599 Duwamish Indian Tribe . 140 Rainier Avenue South - Suite 7 Renton, WA 98055 -2000 ter ,C7ti'..�u....;A.:..._......... .... .....�._,� -.s.. ... .'.+:. e;:✓ ��...,.:. 4�i�:,. yu:' u1�•... L' Ja:. a:.:r:.' u :aS'a'.�.:..:..+w.;.n:a..,«W --. •. City of Tukwila Department of Community Development 6300 Southcenter Boulevard Tukwila, WA 98188 -2599 Department of Environmental PO Box 47703 1 O Imp _ia la Ecology Review Section 9, ,5.D 7,7.03 01 79 0000 05 JACOBSON JAMES 12202 42ND AVE S TUKWILA WA 98168 -2525 01 79 0000 25 OCCUPANT 12214 42ND AVE S TUKWILA WA 98168 01 79 0000 40 MATERO ROCCO FRANK 12222 42ND AVE S TUKWILA WA 98168 01 79 0000 70 & 80 KOLSTAD BEN 12238 42ND AVE S TUKWILA WA 98168 -2525 01 79 0000 90 KWON JONG -MYUN 1512 SW 327TH ST FEDERAL WAY WA 98023 01 79 0001 05 WALKER FREDERICK F 4208 S 124TH ST TUKWILA WA 98168 01 79 0001 60 & 161 LYLE MARK S 645 SOUTHCENTER MALL #369 TUKWILA WA 98188 01 79 0001 61 ROBAR KEITH & TANI 3767 S 194TH ST SEATAC WA 98188 01 79 0002 20 WAGERS LARRY & KIM 12203 43RD AVE S TUKWILA WA 98178 01 79 0002 65 BRAUCHER ANNE A 12226 43RD AVE S TUKWILA WA 98178 -3402 01 79 0000 20 CASTILLO ELIZABETH 12210 42ND AVE S TUKWILA WA 98168 01 79 0000 30 VALENTINE BRETT 17344 34TH AVE S SEATAC WA 98188 01 79 0000 60 MEAD LEONARD 12232 42ND AVE S TUKWILA WA 98168 -2525 • 01 79 0000 80 OCCUPANT 12244 42ND AVE S TUKWILA WA 98168 -2525 01 79 0001 00 HOWE LARRY & EVELYN 14548 SE 51ST ST BELLEVUE WA 98006 01 79 0001 40 SWEENEY LONA M 12253 43RD AVE S TUKWILA WA 98178 -3402 01 79 0001 60 OCCUPANT 12241 43RD AVE S TUKWILA WA 98168 01 79 0002 00 SMITHAM DENNIS 12223 43RD AVE S TUKWILA WA 98178 -3402 01 79 0002 30 MATSON JIM D 12204 43RD AVE S TUKWILA WA 98168 01 79 0002 70 CITY OF TUKWILA PETERSON HALL 6200 SOUTHCENTER BLVD TUKWILA WA 98188 -2599 e— MAY 1 1996 01 79 0000 25 DEROSIER WAYNE =P" ! i C2-A Tai' 210 NW 107TH SEATTLE WA 98177 01 79 0000 30 OCCUPANT 12218 42ND AVE S TUKWILA WA 98168 01 79 0000 65 TURPIN RONALD PERRY 12229 43RD AVE S TUKWILA WA 98178 01 79 0000 90 RICHARDSON MARK 12250 42ND AVE S TUKWILA WA 98168 -2525 01 79 0001 00 ALLEN BRIDGET 12258 42ND AVE S TUKWILA WA 98168 -2525 01 79 0001 40 BARRY JESSIE 12247 43RD AVE S TUKWILA WA 98178 -3402 01 79 0001 61 OCCUPANT 12235 43RD AVE S TUKWILA WA 98168 01 79 0002 10 OBRIEN MYRTLE I 12211 43RD AVE S TUKWILA WA 98178 -3402 01 79 0002 40 KIRKPATRICK KIM 12212 43RD AVE S TUKWILA WA 98178 -3401 01 79 0002 90 CARLSON JACK JAY 2024 S 304TH ST FEDERAL WAWA 98003 -4845 z Z' now JU UO w o: w= J H N u_ w 0 g Q, P_ Da =w H = z� H0 z� uj 00 g2, 0 I- 111 w: 1- V LL. I-: 0 U N 0 z 01 79 0002 90 BUSBE WENDY J 12248 43RD AVE S TUKWILA WA 98178 01 79 0003 15 GEARHART PHILLIP 219 S 107TH ST SEATTLE WA 98168 01 79 0003 30 EXTINE CASSANDRA 4306 S 124TH ST TUKWILA WA 98178 01 79 0003 60 NISTOR IOAN 12253 44TH AVE S TUKWILA WA 98178 01 79 0003 90 JACOBSEN CHRIS • 12235 44TH AVE S TUKWILA WA 98178 01 79 0004 10 KLISE HAROLD & JUNE 12221 44TH AVE S TUKWILA WA 98178 01 79 0004 29 OCCUPANT 12205 44TH AVE S TUKWILA WA 98168 33 47 4003 35 MIYAO WILLIAM S 12054 42ND AVE S TUKWILA WA 98168 33 47 4003 55 TYE MARGUERITE H 4202 S 122ND ST TUKWILA WA 98168 33 47 4003 70 BLAKE SALLY H 12108 203RD AVE SE MONROE WA 98272 01 79 0003 00 DELEZA SANDRA 12240 43RD AVE S TUKWILA WA 98178 01 79 0003 15 OCCUPANT 12254 43RD AVE S TUKWILA WA 98178 01 79 0003 40 GREENWAY JEFFREY 4316 S 124TH ST TUKWILA WA 98178 -3445 01 79 0003 65 WEIKUM LAURENCE 12249 44TH AVE S TUKWILA WA 98178 01 79 0004 00 BAILEY EDWARD 5713 S NORFOLK ST SEATTLE WA 98118 01 79 0004 20 CUNNINGHAM CHARLES 12207 44TH AVE S TUKWILA WA 98168 01 79 0004 40 WALKLEY EUGENE W 12201 44TH AVE S TUKWILA WA 98178 -3410 33 47 4003 40 GREGORY CHARLES M 12058 42ND AVE S TUKWILA WA 98168 -2524 33 47 4003 60 RAMEY REGGIE R 4206 S 122ND ST TUKWILA WA 98168 33 47 4003 70 ELLIS ANTHONY 4214 S 122ND ST TUKWILA WA 98168 401 79 0003 10 MAY 1 1996 SHUMWAY TODD E II PO BOX 69373 RIVERTON HEIGHTS STA SEATTLE WA 98168 01 79 0003 20 ANDERSON KIM M 4304 S 124TH ST TUKWILA WA 98178 -3445 01 79 0003 50 GARRISON LORI W 4318 S 124TH ST TUKWILA WA 98178 01 79 0003 80 JACOBSEN GAYLE M 12245 44TH AVE S TUKWILA WA 98178 01 79 0004 00 OCCUPANT 12227 44TH AVE S TUKWILA WA 98178 01 79 0004 29 MOLTANE GARY C/0 COLDWELL BANKER BAIN 17650 140TH AVE SE RENTON WA 98058 -6814 33 47 4003 25 WIEMAN DAN 12048 42ND AVE S TUKWILA WA 98168 -2524 33 47 4003 45 BIGELOW GLADYS L 12062 42ND AVE S TUKWILA WA 98168 33 47 4003 65 BEEMAN BETH 4210 S 122ND ST TUKWILA WA 98168 33 47 4003 80 GALLOWAY DAVID GROVE NANCY 25325 237TH PL SE MAPLE VALLEY WA 98038 33 47 4003 80 OCCUPANT 4220 S 122ND ST TUKWILA WA 98168 33 47 4004 10 JACOBSEN SAMUAL F 12065 44TH AVE S TUKWILA WA 98178 33 47 4003 90 & 395 MCGUIRE CHARLES T JR MCGUIRE MICKEY R 525 MORRIS AVE S RENTON WA 98055 33 47 4004 20 JENNE RAYMOND W 12055 44TH AVE S TUKWILA WA 98178 -3408 33 47 4004 00 ADAIR RONALD L 4310 S 122ND ST TUKWILA WA 98178 33 47 4004 30 ELLIS EVERETT 12049 44TH AVE S TUKWILA WA 98178 w. J0 0 O co C:1; IJJ W 0: LL j Z� I-- 0, Z h- . W U co! iO P1-' W;. I ~i O; Z; Z MAY 1It1996 P7'F1nai1 i°%;r NT F1 .:..,cr..lurrwe iaim7st :s'�t�a:�.rsx= n��a:�1 "-• - - - ,:�:.v�o... A F F I D A V I T 4 l-V 1 A M °MuLL� r 0 Notice of Public Hearing 0 Notice of Public Meeting O Board of Adjustment Agenda Packet O Board of Appeals Agenda Packet fl Planning Commission Agenda Packet 0 Short Subdivision Agenda Packet O F D I S T R I B U T I O N hereby declare that: Notice of Application for Shoreline Management Permit 0 Shoreline Management Permit fl Determination of Non - significance 0 Mitigated Determination of Nonsignificance 0 Determination of Significance and Scoping Notice O Notice of Action 0 Official Notice O Other O Other wasimiled to each of the following addresses on _ \5 _q Li OA Qk)-G2 S rr TtMEG tQLt 2682-- Name of Pro jectOJ 1 1 O F'1 ULW 1 LA Signature S File Number L°1 L - 0 02.-b 1,130C V D z rew. 2, La J U! 00; o, w w; J H CO u. •. wO. ga' -:. u.¢ I_ z�, I- 0 z I— w al 2 ,V 0: O co, wuf O. Iii z' co O 1- z CITY OF,TUKWILA r� Departmer,. J Community Development 6300 Southcenter Boulevard, Tukwila, WA 98188 Telephone: (206) 431 -3670 NOTICE OF APPLICATION Tire City of Tukwila Public Works Department has filed applications for installation of new sanitary sewer facilities, replacement of existing water lines, and construction of a stormwater pump station all to be located in the City owned right -of -way of South 116th, South 124th and South 122nd Streets and 43rd, 44th, 45th, 46th, 47th and 48th Avenues South in the Allentown neighborhood of Tukwila. Work will also include surface restoration. Permits applied for include: Shoreline Substantial Development Permit (City of Tukwila) Other known required approvals include: Approval of Construction Plans by the City of Tukwila Public Works Dept. Approval of Construction Plans by METRO An environmental checklist has been submitted with the studies identifed above. The project files are available at the City of Tukwila. To view the files, you may request them at the permit counter of the Department of Community Development (DCD), located at 6300 Southcenter Boulevard #100. Project Files include: E96 -0014 L96 -0023 Your written comments on the project are requested. They must be delivered to DCD at the address above or postmarked no later than 5:00 p.m., June 17, 1996. You may request a copy of any decision, information on . hearings, and your appeal rights by calling DCD at 431 -3670. The environmental review decision is appealable to the City Council. The shoreline permit decision is appealable to the Shoreline Hearings Board. For further information on this proposal, contact Nora Gierloff at 431 -3670 or visit our offices at 6300 Southcenter Boulevard, Suite #100, Monday through Friday, 8:30 a.m. to 5:00 p.m. Application Filed: May 13, 1996 Notice of Application Issued: May 15, 1996 z w 6 00 CO 0 ww: J CO Li- w O. 2 q LL =. = w F' _. z� I- O Z I. uj U , ON 0 F-' ww z I- U; wz 0 D. 0 z GEOTECHNICAL ENGINEERING STUDIES ALLENTOWN WATER AND SEWER IMPROVEMENT PROJECT TUKWILA, WASHINGTON HWA Project No. 96023 March 8, 1996 Revised April 29, 1996 Prepared for:. Gray & Osborne, Inca . uurai +IONGWEST drASSOCIATES,INC.. MAY 1 3 1996 PERMIT CENTER z W 6 00 Wo CO ILI J CO LL w 0 u. co �. =d w Z. z �. 1— o z W • w O -. O 1- WW H• 0 O .. z W —• I 0 z , • [MI iONGWEST &ASSOCIATES,INC. March 8, 1996 Revised April 29, 1996 HWA Project No. 96023 Gray & Osborne, Inc. 701 Dexter Avenue North, Suite 200 Seattle, Washington 98109 Attention: Mr. Timothy Osborne, P.E. Subject: GEOTECHNICAL ENGINEERING STUDIES Allentown Water and Sewer Improvement Project Tukwila, Washington Dear Tim: Geotechnical Engineering Hydrogeology Geoenvironmental Services Testing & Inspection In accordance with your request, Hong West & Associates, Inc. has performed geotechnical engineering studies for the proposed Allentown Water and Sewer Improvement project in Tukwila, Washington. The results of our studies are presented in the accompanying report. This revised report incorporates the project team's comments that were transmitted to us in your letter dated April 11, 1996, and completely replaces the previous draft report dated March 8, 1996. We appreciate the opportunity to provide geotechnical services on this project. Should you have any questions or comments, or if we may be of further service, please call. Sincerely, HONG WEST & ASSOCIATES, INC. Sg„ Ortx, Steven R. Wright, P.E. Ralph N. Boirum, P.E. Geotechnical Engineer Vice President SRW:RNB:srw 19730 -64th Avenue West Lynnwood, WA 98036 -5904 Tel. 206 - 774 -0106 Fax. 206 - 775 -7506 z z; r4< U: O O: NDi CO W. w z': J H, N LLi w O: LL =, • a w _, .z�. z Oi ;o Ni 0I- ww IL. g o= lii 1-'f z TABLE OF CONTENTS Page 1.0 INTRODUCTION 1 1.1 GENERAL 1 1.2 PROJECT DESCRIPTION 1 1.3 AUTHORIZATION AND SCOPE OF WORK 2 2.0 FIELD AND LABORATORY INVESTIGATIONS 2 2.1 FIELD EXPLORATION 2 2.2 LABORATORY TESTING 2 3.0 SITE CONDITIONS 2 3.1 SURFACE CONDITIONS 2 3.2 GENERAL GEOLOGIC CONDITIONS 3 3.3 SUBSURFACE CONDITIONS 3 3.3.1 Soils 3 3.3.2 Groundwater 4 4.0 CONCLUSIONS AND RECOMMENDATIONS 4 4.1 GENERAL 4 4.2 EXCAVATION AND TEMPORARY SHORING 5 4.3 DEWATERING 6 4.4 PIPE SUPPORT 7 4.5 TRENCH BACKFILL 8 4.6 PIPE SETTLEMENT 9 4.7 BUOYANCY AND UPLIFT 9 4.8 PAVEMENTS 10 4.9 WET WEATHER EARTHWORK 11 5.0 UNCERTAINTY AND LIMITATIONS 12 REFERENCES 14 LIST OF TABLES Table 1. Alternative Flexible Pavement Sections 10 LIST OF FIGURES (FOLLOWING TEXT) Figure 1. Vicinity Map Figure 2. Site Plan Figure 3. Earth Pressures for Temporary Cantilever Shoring Figure 4. Earth Pressures for Temporary Braced Shoring Figure 5. Parameters for Calculating Uplift z • �L C, . -J ;U O; i WW O: 11-S; ` =d` W`. z a • • ,Dpi N( • OF- H Table of Contents (Continued) APPENDICES Appendix A: Field Investigation Figure A-1. Legend of Terms and Symbols Used on Exploration Logs Figures A -2 - A -11. Boring Logs BH -1 through BH -8 Appendix B: Laboratory Testing Figure B -1. Plasticity Chart Figures B -2 - B-4. Grain Size Distribution Curves k:•G r i.::kniy =2r�r 96023RF.DOC 11 HONG WEST & ASSOCIATES, INC. epertlr:7"i:: ` �r .Tt:vEA «T'.•AF4er�aMnu.. »...:.. • t S 1•J GEOTECHNICAL ENGINEERING STUDIES ALLENTOWN WATER AND SEWER IMPROVEMENT PROJECT TUKWILA, WASHINGTON 1.0 INTRODUCTION 1.1 GENERAL This report presents the results of subsurface explorations and geotechnical engineering studies for the proposed Allentown Water and Sewer Improvement project in Tukwila, Washington. The location of the site and the approximate limits of the project area are shown on the Vicinity Map and the Site Plan, Figures 1 and 2, respectively. The purpose of the geotechnical engineering studies was to evaluate the soil and groundwater conditions along the project alignment, and provide recommendations for the geotechnical aspects of the proposed improvements. 1.2 PROJECT DESCRIPTION Our understanding of the project is based on discussions with and design information provided by Messrs. Timothy Osborne and Jon Hinton with Gray & Osborne, Inc. We understand that the City of Tukwila plans to install new sanitary sewer and water lines for the area commonly referred to as "Allentown." The alignment of the new pipes will follow portions of existing surface streets located within the limits of the project area. The proposed sanitary sewer system improvements include installing several new 8 -inch diameter PVC pipes. The inverts of the new sanitary sewers will range from about 5 to 16 feet below the existing ground surface. The new sewers will be connected to Metro's existing Allentown trunk line at five separate locations. The proposed water system will consist of 8 -, 10 -, and 12 -inch diameter ductile iron pipes that will be installed within the construction corridors proposed for the new sanitary sewers. We anticipate that the proposed water mains will be installed about 3 to 4 feet below the existing ground surface. Other improvements associated with the project include installation of new manholes, and construction of a lift station near the intersection of 50th Avenue South and South 122nd Street. We understand the bottom of the proposed lift station will be about 15 feet below existing grade. • z Z • w• QQ i '0 0: CO 0 Lu =. o; w: z E- O zF D o: O N1 w w`. 'I U; Oi w z: • '.0 N z March 8, 1996 Revised April 29, 1996 HWA Project No. 96023 1.3 AUTHORIZATION AND SCOPE OF WORK The work was performed in general accordance with our revised scope of work dated February 8, 1996. Written authorization for the work was subsequently given by Mr. Tim Osborne on February 8, 1996. 2.0 FIELD AND LABORATORY INVESTIGATIONS 2.1 FIELD EXPLORATION On February 19 and 20, 1996, HWA personnel conducted a site reconnaissance and directed the drilling and sampling of eight exploratory borings, designated BH -1 through BH -8. They were drilled to depths ranging from 111/2 to 44 feet below the existing ground surface using a continuous flight hollow stem auger, under subcontract to HWA. The borings were located in the field by taping and/or pacing distances from existing site features. The approximate locations of the explorations are shown on Figure 2. The borings were monitored and logged by a geotechnical engineer from HWA. Soil samples were obtained at selected intervals and taken to our laboratory for further examination and testing. Field exploration methods are described, and logs of the borings are presented in Appendix A. 2.2 LABORATORY TESTING Laboratory tests were conducted on selected soil samples to characterize certain engineering and index properties of the on -site soils along the project alignment. Laboratory testing included determination of natural moisture contents, plasticity characteristics (Atterberg Limits), and grain size distribution. Testing was conducted in general accordance with appropriate American Society for Testing and Materials (ASTM) standards, as discussed in Appendix B. The test results are presented in Appendix B, or displayed on the boring logs in Appendix A, as appropriate. 3.0 SITE CONDITIONS 3.1 SURFACE CONDITIONS The alignment for the proposed water and sewer system is located in the north - central portion of Tukwila, Washington, as shown on Figure 2. Topographically, the project area slopes slightly downward from west to east. Maximum relief across the project area is about 10 feet, with existing elevations, measured from the NGS Datum, ranging from 96023RF.DOC Stt'WWIWVRYPALVV?ttalnegtrrm. "malts 2 HONG WEST & ASSOCIATES, INC. ..u.t••nx,.mrnvtionet R. 1,, ,,TeOgWrMt'7tWtS?.'1190M'F.46K:' z 're 2: 6 m. —I 0; U 01 mac: • W= Nu.. w O' g u. , • I— w Z t! • • o cn .O H 'w w: U ..z =; O�• I• March 8, 1996 Revised April 29, 1996 HWA Project No. 96023 about 20 feet (120 feet; Metro Datum) near the intersection of South 124th Street and 42nd Avenue South to about Elevation 10 feet (110 feet; Metro Datum) near the intersection of South 112th Street and 51st Place South. Development along the project alignment is generally limited to single family housing; although several light industrial and commercial developments occupy portions of the neighborhood. Vegetation along the project alignment generally consists of cultivated lawns, trees, and shrubs associated with the surrounding residences. The larger undeveloped parcels along the alignment are typically covered with coniferous and deciduous trees with a moderate undergrowth of brush. 3.2 GENERAL GEOLOGIC CONDITIONS .r._.. Geologic information for the project site was obtained from the map titled Preliminary Geologic Map of Seattle and Vicinity, Washington (Waldron, et al., 1962), published by the U.S. Geological Survey. According to Waldron, the project area is located in the Duwamish River flood plain where surficial soils consist primarily of geologically recent alluvium deposited by the Duwamish River. Alluvial deposits typically consist of stratified deposits of silt, sand, and some gravel. Alluvial deposits are typically soft/loose and moderately compressible. Waldron indicates that in areas, the alluvium may contain interbeds of peat and organic silt. • • 3.3 SUBSURFACE CONDITIONS 3.3.1 Soils Based on the subsurface conditions observed in our exploratory borings, the project alignment appears to be underlain by alluvial deposits. In areas, a thin layer of fill was observed above the alluvium. Each of these units are discussed separately below in the order of deposition, beginning with the most recently deposited. The generalized depth ranges given are for descriptive purposes only and may not represent actual subsurface conditions at a given location. The attached summary logs (Figures A -2 through A -11) provide more detail relative to soil conditions observed at specific locations and depths. • Fill - Fill was encountered at the ground surface in borings BH -1, BH -2, BH -4, and BH -5. The fill observed in these explorations extended to depths ranging from about 2 to 6 inches below the existing ground surface. Where encountered, the fill was observed directly over alluvial deposits. In general, the fill consisted of either medium dense, silty gravel or loose, 5/8 -inch minus crushed rock. It appeared to be pavement subbase material. 96023RF.DOC 3 HONG WEST & ASSOCIATES, INC. r March 8, 1996 Revised April 29, 1996 HWA Project No. 96023 • Alluvium - Alluvium was encountered at the ground surface in borings BH -3, BH -7, and BH -8; directly below the fill in borings BH -1, BH -2, BH -4, and BH -5; and directly below the pavement section in boring BH -6. The alluvium generally consisted of very loose to medium dense sand and silty sand with layers of very soft to medium stiff sandy silt and silt. A layer of very soft organic silt was observed in boring BH -3, between about 9'/2 and 12 feet below the existing ground surface. The alluvial deposits were not fully penetrated and extended to the full depth of our explorations. 3.3.2 Groundwater Groundwater was observed in all of the borings completed for this study, at depths ranging from about 21/2 to 9 feet below the existing ground surface. It should be noted that observations of groundwater levels during drilling can be misleading, as the actual groundwater level is often somewhat higher than appears in the boring. Consequently, the localized water table may actually be several feet higher than indicated during the exploration program. The groundwater conditions reported on the boring logs are for the specific dates and locations indicated, and therefore may not necessarily be indicative of other times and/or locations. Furthermore, it is anticipated that groundwater conditions will vary depending on the weather, local subsurface conditions, the level of the nearby Duwamish River, and other factors. 4.0 CONCLUSIONS AND RECOMMENDATIONS 4.1 GENERAL The results of our explorations indicate that the proposed pipelines and lift station will be installed within recent alluvial soils. The alluvium generally consists of loose to medium dense sands and sandy silts. In our opinion, these soils will provide suitable foundation support for the proposed pipelines, manholes and lift station. In some areas, peat or very soft clayey silts could be encountered at pipe grade. Where present these unsuitable materials should be overexcavated (to a maximum depth of about 3 feet), and replaced with 1 -1/4- inch -minus crushed rock, (WSS 9- 03.3(9). In general, pipe installation should be in accordance with appropriate sections of the 1994 WSDOT Standard Specifications for Road, Bridge, and Municipal Construction (WSDOT Standard Specifications). 96023RF.DOC 4 HONG WEST & ASSOCIATES, INC. Q w. ` re f ug D. JU UO: CO o; cow, w =. J 4. CO I1..: w O. J.' Lt. a' P_ a. � w zF.: Z O: i0 N. ,o w w. :_ U u. — O; wz o); O z March 8, 1996 Revised April 29, 1996 HWA Project No. 96023 The inverts of the proposed water and sewer mains are anticipated to vary from about 3 to 16 feet below the existing ground surface. The regional groundwater table within the alluvial soils was observed between about 21/2 and 9 feet below the ground and may be higher depending on the weather and other factors. Thus a significant portion of the required excavations may extend below the regional groundwater table, and dewatering will be required. Where excavation is required more than 2 or 3 feet below the groundwater level, dewatering from within the excavation may not be sufficient and wells or well points may be required. In general the soil conditions are favorable for dewatering by conventional construction -type dewatering wells; however, in some areas, a layer of silt between elevations 110 and 105 may be continuous enough to restrict the effectiveness of wells. Where this occurs, more closely spaced wells or well points could be required. The areal extent and depth of dewatering must be controlled to prevent settlement of existing nearby structures. Trench boxes should be suitable for support of trench excavations for most of the proposed pipelines. Shoring may be required near settlement sensitive areas and where the excavations may be open for an extended period of time, such as at the proposed lift station. Recommendations addressing these issues are presented below, in addition to recommendations regarding pipe bedding, trench backfill, pipe settlement, buoyancy and uplift, pavements, and wet weather earthwork. 4.2 EXCAVATION AND TEMPORARY SHORING Based on the soil conditions observed in our explorations, we anticipate that the on -site soils can be excavated with conventional excavating equipment, such as backhoes and trackhoes. Maintenance of safe working conditions, including temporary excavation stability, should be the responsibility of the contractor. Temporary excavations in excess of 4 feet in height must be sloped in accordance with Part N of Washington Administrative Code (WAC) 296 -155, or be shored. The existing fill and alluvial soils classify as Type C Soil and may be inclined no steeper than 1Y2H:1V (horizontal to vertical) according to WAC 296 -155. Flatter slopes may be required where groundwater flow is present. Dewatering may be required to lower the groundwater table below the base of the excavation. Vibrations created by traffic and construction equipment may cause caving and raveling of the trench walls. In such an event, lateral support for the trench walls should be provided by the contractor to prevent loss of ground support and possible distress to previously installed utilities and/or the adjacent roadway. General recommendations for design and implementation of temporary shoring and bracing systems are presented below. 96023RF.DOC 5 HONG WEST & ASSOCIATES, INC. 401 z HZ re 6 JU o o CO CI CO I J • u. wo g� LL j `0a I-_ ZF �o Z U• � o cn:. 0 I-,. W W, • U • Z • N: z - -1 3E March 8, 1996 Revised April 29, 1996 HWA Project No. 96023 • Trench boxes should provide suitable support of excavations in the native alluvial soils, provided the groundwater level is below the base of the excavation and settlement sensitive structures or utilities are not situated immediately adjacent to the excavation. • Where a trench box is used to support excavations in the alluvial soils, one or both sides of the trench is likely to cave against the box. The caving may extend out on either side of the trench for a distance approximately equal to the depth of the trench. Additional bracing or sheeting may be required where the near edge of the trench will be closer than about 1.5 times the trench depth to settlement sensitive structures or utilities. • Excavations that will be open for an extended period of time, such as at the proposed lift station, may require shoring. The shoring system should be designed and constructed to support lateral loads exerted by the retained soil mass. Recommended lateral earth pressures for design of temporary cantilevered sheetpile and soldier pile and lagging walls are presented in Figure 3. Recommended lateral earth pressures for design of temporary braced shoring systems are presented in Figure 4. The design pressures presented in Figures 3 and 4 assume the excavations have been dewatered and do not include hydrostatic pressures. In addition, any surcharge loads from construction equipment, construction materials, excavated soils, or vehicular traffic on adjacent roadways should be included in the shoring design. • Precautions should be taken during removal of the temporary shoring system, to minimize disturbance of the pipe, underlying bedding materials, and native soils. 4.3 DEWATERING A significant portion of the excavations for the pipelines and lift station will extend below the groundwater level. The alluvial deposits are relatively permeable, and substantial flow into the excavations may occur where excavations extend more than 2 or 3 feet below the groundwater level. Groundwater seepage will tend to destabilize excavation slopes and increase lateral loads on shoring systems. In addition groundwater flowing into the excavation can cause "quick" conditions. Under "quick" conditions, the relative density of the sandy alluvial soils will be reduced, resulting in increased pipe settlement during and after construction. Because of these impacts we recommend that dewatering be accomplished so that 96023RF.DOC 6 HONG WEST & ASSOCIATES, INC. .� �.a- e., +.�.R.,.- •......" ' »__ .... ��....». Fw.enw».r•+.+vr:ern,eca <wror�FY^ u,"tm, !n^., fS.T ,, ,'!@a Pfi!rtllR rn!'d rrtrort, z z o• 6 JU 0 0; co cnw J = • CO u. w O. ga co =a f- _. z� z 0: U 0: O F-9-. w w. `f- • 0'. • z• UN O z March 8, 1996 Revised April 29, 1996 HWA Project No. 96023 excavation and placement of the pipe and pipe bedding and backfill materials is completed in the dry. In our opinion a combination of wells or well points and sumps will be required to effectively dewater excavations which extend more than a few feet below the groundwater level in the alluvial soils. Conventional 24 to 36 -inch diameter wells with slotted casings and properly graded filter sand and gravel should be capable of dewatering most of the alignment. In some areas, a layer of silt between about elevation 110 to 105 (refer to the logs of borings BH -2, BH -3, BH -4, BH -5, and BH -7) may be continuous enough to limit the ability of wells to dewater the soil above the silt layer. Additional sumps or well points could be required in these areas. Extended dewatering for the lift station and utility trench excavations could result in a lowering of the water table over a large area which would cause settlement of the underlying alluvial soils. The magnitude of the settlement and its lateral extent would depend on the amount of change in the water level; the length of time the water level was lowered; and the compressibility, thickness, and permeability of the underlying soils. If wells are used to facilitate installation of the proposed improvements, HWA should review the dewatering system design to evaluate potential impacts. The extent of dewatering should be monitored during construction to minimize the potential for settlement damage. To the extent possible considering the potential for settlement of adjacent structures, dewatering wells should be operated continuously for as long as they are needed in a given area. Turning the wells off at night and turning them back on the next day causes rapid drawdown conditions in the soils and tends to increase caving and sloughing of excavation slopes. 4.4 PIPE SUPPORT The loose to medium dense sands and medium stiff sandy silts expected at the invert elevations of the proposed pipelines over the majority of the alignment will generally provide suitable support for the pipes, provided the trench excavation is properly dewatered. If soft silt, organic soils, or otherwise unsuitable material is encountered in the base of the excavation, we recommend that these materials be removed and replaced with compacted 1 -1/4- inch -minus crushed rock. The over - excavation to remove the unsuitable soils should extend to either side of the pipe a distance equal to the depth of over - excavation beneath the pipe, to a minimum of 3 pipe diameters. Over - excavation to remove unsuitable materials in the bottom of the trench should generally be limited to a depth of 3 feet. It may be beneficial to use a geotextile filter fabric to separate the pipe bedding materials from the underlying soft subgrade soils. 96023RF.DOC 7 HONG WEST & ASSOCIATES, INC. ,.. ,, ...n �.. ...,..,,. �.. �. r+ �. ��. �. ....tiw.;«,�,��,•.•a�ae�*,,v. >�, rte?. rH.' rrYrS�se '�`?1D:{41,r,'b"�.tu"?' ?� .. . ��at�.» • •l March 8, 1996 Revised April 29, 1996 HWA Project No. 96023 General recommendations relative to the bedding of the proposed underground utility pipelines include: z • Pipe bedding for the proposed sanitary sewer mains should meet the gradation = requirements for Bedding Material for Flexible Pipe, Section 9 -03.16 of the w: WSDOT Standard Specifications. Bedding material for the proposed ductile 6 D iron water mains may consist of select native granular soil that is less than 2 .v o inches in maximum dimension and is free of organics and other debris. ' co W w Z. • Prior to installation of the pipe, the pipe bedding should be shaped to fit the co LL w 0; lower portion of the pipe exterior with reasonable closeness to provide g continuous support along the pipe. g 7; wa. Np.. • Backfill around the pipe should be placed in layers and tamped around the pipe I w` to obtain complete contact. Pipe bedding material should be used as trench z �, backfill to at least 12 inches over the top of the pipe, for the full width of the z o trench. In areas where a trench box is used, the bedding material should be. 2 D' placed before the trench box is advanced. v �` DI—, • Where a trench box is used, we recommend that pipe restraint in the form of a :w w cable and winch system be used inside the pipe so that the joints of previously I— laid pipe are not pulled apart as the trench box is advanced. u' w z P._-±-°' O z 4.5 TRENCH BACKFILL In paved roadways, we recommend that trench backfill consist of select granular material meeting the specifications for Bank Run Gravel for Trench Backfill; Section 9 -03.19 of the WSDOT 1994 Standard Specifications. The fines content of the trench backfill may be increased somewhat during weather conditions if the soils are not too wet for proper compaction. The relatively clean native sands in the project area would generally be suitable for use as backfill in the lower portion of the trench provided it is allowed to drain prior to placement. The silty sands and silts will generally be too wet for proper compaction. Trench backfill within 3 feet of the pavement subgrade, should consist of clean sand and gravel. Most of the native soils will not be clean enough for use as backfill in the upper 3 feet of trench. The silt and organic portions of the native soils are not suitable for trench backfill at any depth. 96023RF.DOC 8 HONG WEST & ASSOCIATES, INC. asY"'K +n. ax *cr4YP 19' E March 8, 1996 Revised April 29, 1996 HWA Project No. 96023 Asphaltic concrete pavement may be pulverized and blended with the recommended roadway ballast and trench backfill materials, provided the asphalt content by weight does not exceed 10 percent, and the appropriate gradation, sand equivalent, and fracture requirements outlined in the WSDOT Standard Specifications are met. For the purpose of this report, asphalt content is based on the weight of asphalt particles retained on all screens 1/4-inch and larger. We recommend that trench backfill placed more than 3 feet below subgrade elevations be compacted to at least 90 percent of its maximum dry density (MDD) as determined in accordance with ASTM D 1557. The upper 3 feet of the backfill should be compacted to at least 95 percent to provide an adequate subgrade for the overlying pavement section. Trench backfill compacted to 95 percent can be expected to settle about 'h percent of its thickness. Backfill compacted to 90 percent could settle about 1 percent of its thickness. Increasing compaction requirements (to 92 or 95 percent) will reduce but not eliminate the settlement of trench settlement. We recommend waiting as long as possible (up to a year) to allow most of the post construction settlements to occur before repaving. In areas where several inches of backfill settlement can be tolerated, such as landscaped areas, backfill compaction could be reduced to 85 percent, except the upper 2 feet which should be compacted to at least 90 percent. 4.6 PIPE SETTLEMENT Construction of the proposed pipelines will result in little or no increase in soil bearing stress, and as a result, little post construction pipe settlement is expected. Disturbance of the bearing soils for the proposed pipes during construction could result in increased settlement. If the subgrade soils are disturbed during construction, the bottom of the trench should be over - excavated and replaced as described in Section 4.4. The recommendations for over - excavation and replacement of unsuitable materials at pipe grade are intended to minimize such settlements. 4.7 BUOYANCY AND UPLIFT Buried vaults and manholes will be subjected to upward buoyancy forces when the groundwater level around the structure is higher than the fluid level inside the structure. Such structures should be designed to resist this upward force and to prevent possible heave and cracking of their bottoms. The weight of the structure and friction along the sides of the vaults will resist uplift forces as illustrated in Figure 5. The uplift resistance of a structure can be increased by extending the base of the structure, as shown on the right side of Figure 5. 96023RF.DOC arrOP1strresmati`grp eta+ oT arrrmeer& ocranma Ksn rwr w,....f ..........- .,..._.....— ........ 9 HONG WEST & ASSOCIATES, INC. ■ March 8, 1996 Revised April 29, 1996 HWA Project No. 96023 4.8 PAVEMENTS New pavement will be required over portions of the backfilled trenches and in some areas, the entire road will be resurfaced rather than repaired. We understand that the design team is interested in using Asphalt Treated Base (ATB) as a base course for South 124th Street, South 122nd Street, and 42nd Avenue South, to allow traffic back on the street prior to placing Asphaltic Concrete Pavement (ACP). Based on the results of our subsurface investigation and our experience on sites with similar subgrade soils, it is our opinion that flexible pavements constructed at the site on a subgrade that has been compacted to a dense and unyielding condition, or on properly compacted structural fill, could be designed for a California Bearing Ratio of about 10 percent (Resilient Modulus of about 15,000 pounds per square inch). Utilizing AASHTO design methodology (AASHTO, 1993) and limited traffic information provided by Gray & Osborne, the alternative flexible pavement sections described below in Table 1 were developed for the repaired and/or reconstructed portions of the residential streets, South 122nd Street, South 124th Street, and 42nd Avenue South. Table 1. Alternative Flexible Pavement Sections ACP, Class B 2 4 3 3 ATB N/A CSBC 7 N/A 3 N/A 2 9 -03.8 3 9 -03.6 8 6 9 7 9 -03.9(3) ACP = Asphalt Concrete Pavement, Class B. ATB = Asphalt Treated Base. CSBC = Crushed Surfacing Base Course, compacted to 95% of maximum dry density determined using ASTM D 1557 as the standard. The upper 2 inches of Crushed Surfacing Base Course may be replaced by' /. -inch minus Crushed Surfacing Top Course (CSTC). WSDOT = Washington State Department of Transportation, 1994, Standard Specifications for Road, Bridge, and Municipal Construction. The proposed alternative pavement sections were evaluated to estimate their capacities in total equivalent 18 -kip single axle loads (ESALs). Total capacities of about 10,000, 980,000, and 250,00 ESALs were estimated for the residential streets; South 124th Street; and 42nd Avenue South and South 122nd Street, respectively. The estimated ESALs assume 2 percent heavy trucks (FHWA Class 5 or greater), 3 percent annual growth, and 96023RF.DOC 10 HONG WEST & ASSOCIATES, INC. i 4'RiFi i= 7+� -vY' `Y.!STiTw"�(:� ;4p4FKMq z Iz w u�2 0 O: w• = • w- IA O. g a �w z� HO z�—: O • N ci w W. - V�. ▪ z; O -; H H 0 z M 4 747 March 8, 1996 Revised April 29, 1996 HWA Project No. 96023 a 20 year analysis period. For the residential streets, 1/2 percent heavy trucks was assumed. Based on this information and the results of our analyses, the proposed alternative pavement sections appear to be adequate for the anticipated traffic conditions. If the anticipated traffic conditions are significantly different from that described above, HWA should be notified for review of the pavement design, and revision of such if necessary. The native subgrade soils are generally frost susceptible. Frost protection for pavements normally require that a total of at least 12 inches of pavement, base course, and/or granular sub -base be provided between the native subgrade soils and the top of the pavement. For residential streets with relatively light traffic, a total pavement section of at least 9 inches may be adequate; however, this 9 inch pavement section would not necessarily provide suitable protection from frost penetration and it may be necessary to apply heavy load restrictions for several days after an extended period of below - freezing weather. Heavy load restrictions on residential streets may be of little consequence since the normal traffic is relatively light. The pavement sections for residential and heavy traffic areas recommended in Table 1 have been increased to 9 and 12 inches, respectively. Adequate surface gradients and drainage systems should be incorporated in the final grading design such that surface runoff is permanently directed away from paved areas and into roadside ditches or other controlled drainage devices. If roadside ditches are used, a slope with a maximum inclination of 2H:1V (Horizontal:Vertical) should be maintained between the edge of the pavement structure and the bottom of the ditch. This recommendations is based on geotechnical considerations only; safety considerations may necessitate increasing the horizontal distance between the ditch and the edge of pavement. 4.9 WET WEATHER EARTHWORK If earthwork is to be performed or fill is to be placed in wet weather or under wet conditions when control of soil moisture content is not possible, the following recommendations should apply: • Earthwork should be accomplished in small sections to minimize exposure to wet weather. Excavations or the removal of unsuitable soil should be followed immediately by the placement and compaction of a suitable thickness of clean structural fill, as described below. The size of construction equipment used may have to be limited to prevent soil disturbance; • Material used as trench backfill should consist of clean, granular soil, of which not more than 5 percent by dry weight passes the U.S. Standard No. 200 sieve, 96023 RF. DOC 11 HONG WEST & ASSOCIATES, INC. ti z' W. re J U. O 0' Wo w W J H !w w0 u. a. a �• w Z= I- O' Z U• O O N, oI- w` W .I-- U z: I= _ O 1 • • March 8, 1996 Revised April 29, 1996 HWA Project No. 96023 based on wet sieving the fraction passing the 3/4 inch sieve. The fines should be non - plastic; z • The ground surface in the construction area should be sloped and sealed with a _ E smooth drum roller to promote rapid runoff of precipitation, to prevent surface w re 2 water from flowing into excavations, and to prevent ponding of water; U U0 • No soil should be left uncompacted so it can absorb water. Soils which P co N cnw; become too wet for compaction should be removed and replaced with clean LU granular materials; and N w' w0 • Excavation and placement of fill should be observed on a full time basis by a 4a _,; IL Q_ person experienced in wet weather earthwork to verify that all unsuitable N materials are removed and suitable compaction and site drainage is achieved. I w Z !- The above recommendations for wet weather earthwork should be incorporated into the z 0 contract specifications. w w O U` 5.0 UNCERTAINTY AND LIMITATIONS 0 �. w�. U We have prepared this report for the City of Tukwila and the Gray & Osborne design team LL o for use in design of a portion of this project. This report should be provided in its entirety z to prospective contractors for bidding and estimating purposes; however, the conclusions v and interpretations presented herein should not be construed as a warranty of the z ~' subsurface conditions. Experience has shown that soil and groundwater conditions can vary significantly over small distances. Inconsistent conditions can .occur between explorations that may not be detected by a geotechnical study. If, during future site operations, subsurface conditions are encountered which vary appreciably from those described herein, HWA should be notified for review of the recommendations of this report, and revision of such if necessary. If there is a substantial lapse of time between submission of this report and the start of construction, or if conditions change due to construction operations along the project alignment, it is recommended that this report be reviewed to determine the applicability of the conclusions and recommendations considering the changed conditions and time lapse. This report is issued with the understanding that it is the responsibility of the owner, or the owners' representative, to ensure that the information and recommendations contained herein are brought to the attention of the appropriate design team personnel and incorporated into the project plans and specifications, and the necessary steps are taken to see that the contractor and subcontractors carry out such recommendations in the field. 96023RF.DOC 12 HONG WEST & ASSOCIATES, INC. March 8, 1996 Revised April 29, 1996 HWA Project No. 96023 HWA is available to monitor construction to evaluate soil and groundwater conditions as they are exposed and verify that pipe bedding, backfilling and compaction are accomplished in accordance with the specifications. Within the limitations of scope, schedule and budget, HWA attempted to execute these services in accordance with generally accepted professional principles and practices in the fields of geotechnical engineering and engineering geology at the time the report was prepared. No warranty, express or implied, is made. The scope of our work did not include environmental assessments or evaluations regarding the presence or absence of wetlands or hazardous or toxic substances in the soil, surface water, or groundwater at this site. This firm does not practice or consult in the field of safety engineering. We do not direct the contractor's operations, and cannot be responsible for the safety of personnel other than our own on the site. As such, the safety of others is the responsibility of the contractor. The contractor should notify the owner if he considers any of the recommended actions presented herein unsafe. 0.0 We appreciate this opportunity to be of service. Sincerely, HONG WEST & ASSOCIATES, INC. Steven R. Wright, P.E. Geotechnical Engineer SRW:RNB:snv 96023RF.DOC 13 3/t/F- Ralph N. Boirum, P.E. Vice President HONG WEST & ASSOCIATES, INC. z' w .J U' U O ;. U 0: CO al CO Jam:. wo LL< :. 1_ w. z�. F- O z U vi = w U ir ui Z. � F z • March 8, 1996 Revised April 29, 1996 HWA Project No. 96023 REFERENCES American Association of State Highway and Transportation Officials, 1993, AASHTO Guide for Design of Pavement Structures. Waldron, H.H., B.A. Liesch, D.R. Mullineaux, and D.R. Crandell, 1962, Preliminary Geologic Map of Seattle and Vicinity, Washington, U.S. Geological Survey, Miscellaneous Geologic Investigations, Map I -354. Washington State Department of Transportation/American Public Works Association, 1994, Standard Specifications for Road, Bridges, and Municipal Construction. z;. 96023RF.DOC 14 HONG WEST & ASSOCIATES, INC. • • I i MAM +IONGWEST &ASSOCIATE& INC. ALLEN TOWN WATER AND SEWER IMPROVEMENT PROJECT VICINITY MAP PROJECT NO.: 96023 FIGURE: 1 C: \ACLMIN\STD\VICINITCDWG OfrOnMtgePNP.Mtfilf,V,WAVSPWOM4. rAVI!!!!!:!NAldrAWYMrot,rM41■I'!''''"?'". 1 re -I 00 cn co w ul -J LL ui 5 u_ < (1) I I- al Z I- 0 Z u.I 0 = UJ Lu' • 0 Z' • (I) O I— z REFERENCE: Base mop provided by GRAY & OSBORNE, INC. C: \JOBS \96023\93023001.0WG "0IA 0-0.. BH-2 11q a0 1 1 1 11 1 r0 11 I I 1111111gil:1 all BH-1 • I1 1 • .1 1 I11 M 1 1 I1IU.1 LI mIiI1 I 1I1 1. M I1m1 .1.1 1 01•W1a 1 1 1 l11111 I1 1 l i.. 11MI M1 .1 II11N1M 1 1 1- 11M1 1 1 I U W1I 11 M 1 1 I1 ■ 1N. . MnI M 1 I.A 1n .- 2 • : 1 CM 11.1..1.sI..N6..1-..a.•...M...F."...1- 1.1.- ...1 11. M. .'.I IMM.u.• - .R..1E..'r m . M 7. . . ' . 1r. '0 . . ..• N —la -i1T. l M.M .E1..1oa, 11 .o• M.0 11.., l . 1 . .a .• II1•- - .=7 1=miI 7. 1lk .. oI1•um 1.1 .I m.m..1m.w..M..."1.i■ .r .w, : 1M • MM: :/ . . .. .. .. ■. m"= "7 —. , n . • A11.==■."1.•."..•"...•.1 5.•.1.7'. ■ ■L! .7".=•, :1 wM =■ ."1"0.l.'"..'.. ii=M •.M: .mw- .i11lk 1I:.11 11/1k •• .: • = 7C "= ■. MM r' . Fitt: H-4 ballillIMIIIMilliiiiiiiiiiliiMMIIk. ■jV 1; 1 1 1 1 M11 1 lU• 1.iM l• M MI1.1Is=W _ 1M.N1.mI1E.1.I UiN.M .I.I 1■.. '.1. .NlM 1 .1.00■1N1=1111•111..=11M 111•1.m"=1.. 17 It11.111I110 .I1m 1l• 111I•1•. •M 11I11 .11nr11'• 1 I 1. I 1m11N1=M •■•I■•M 1N=M= • M BI1s.M 11 •1 1 M 1M1! 1■ 1I11M• N11 1 1=M 1•N .11 1Ir1•11E1 1-1111m7 . IN.N. 1l- • L • 1 I I I-INMIM9MII" ..■I..MM M. -II.0I= ".IINO II.1MMF =1 • 1m 0. -- - % m. 1 • RH 1 rie mum 100 I I • 1111111 tsM=I11=..•i..m11 1 1 111 '24 HONG WEST & ASSOCIATES, INC. ... bk. Pla lk 'I.. /1.. . WI _ ik ill �. • ra Slim. r-.. ••• an .r • Ems. Moir Moll MEM MPS MIL r IMO MIN =NW MS NNW mr: ot- ■ rM = m- m. .∎.._ �_ •M mss: NIL III a GB mum ik- 11.--1 iiiiii Milk Ilh• 11 riltt Ii I11111iir 1ti 111 • 0' 200' 400' 600' 1200' SCALE: 1'-600' LEGEND BH -1 BORING DESIGNATION AND APPROXIMATE LOCATION ALLENTOWN WATER AND SEWER HOiNGWEST IMPROVEMENT PROJECT &ASSOCIATES INC. SITE PLAN PROJECT NO.: 96023 FIGURE: 2 5i >T:.Pi41,, ei,as-V.'iF�0/46.J:F:...,4Aw.: 635r ri: t4.i`E�3".43:•? ;t •r:tt H DESIGN _ GROUNDWATER LEVEL NOTES: CANTILEVERED SOLDIER PILE OR SHEETPILE WALL BOTTOM OF EXCAVATION [Ka1f'D Ka1fH KpYD D Ka = .33 for level backslope (o = 301 Ka = .54 for 2H:1V backslope Kp = 3.0 if = 115pcf 3' = 53pcf 1. Recommended lateral earth pressure values assume subsurface soils consist of loose fill and alluvial deposits. 2. It is assumed that drainage is provided so that water pressures do not act on wall above bottom of excavation. 3. The coeffients of active and passive pressure do not include the effects of wall friction 4.. For soldier walls, the active and passive pressure coefficients can be assumed to act over three times the pile width below the base of the excavation. 5. Surcharge Toads should be added to the active pressure where appropriate. 6. A factor of safety has not been applied to the recommended earth pressure values. MMI ♦IONGWEST &ASSOCIATES. INC. ALLEN TOWN WATER AND SEWER IMPROVEMENT PROJECT EARTH PRESSURES FOR TEMPORARY CANTILEVER SHORING PROJECT NO.: 96023 FIGURE: 3 C: \ACLTVAN \STD \CAN T1LVR.owG Z Z. re J V, UO co W= W 0, 2 LL TN y: F. W ar- Z Off. O W W S r UN Z .. t 't LJ t DESIGN GROUNDWATER LEVEL cOl&e.t<lt<4 ...r.—BRACED SHEETING OR SOLDIER PILE AND LAGGING WALL BOTTOM OF EXCAVATION PH KpYD D P Lateral Pressure Coefficient 25pcf Kp = 3.0 r = 53pcf NOTES: 1. Recommended lateral earth pressure values assume subsurface soils consist of loose fill and alluvial deposits. 2. It is assumed that drainage is provided so that water pressures do not act on wall above bottom of excavation. 3. For soldier piles, the passive pressure can be assumed to act over three times the pile width. 4. Surcharge loads should be added to the active pressure where appropriate. 5. Embedment (D) should be determined by summation of moments below the lowest brace. 6. A factor of safety has not been applied to the recommended earth pressure values. HONGWEST &ASSOCIATES, INC. ALLEN TOWN WATER AND SEWER IMPROVEMENT PROJECT EARTH PRESSURES FOR TEMPORARY BRACED SHORING PROJECT NO.: 96023 FIGURE: 4 C: \ACLIVAN\STDVIRACED.DWG PROPOSED STRUCTURE DESIGN GROUNDWATER LEVEL v Ht H2 W PASSIVE SOIL WEDGE • • . • • • • 1 FSs 1 FB* * Buoyant force could result in high bending moments in slab SYMBOL B = Width of extended base in feet (2 —foot minimum required) W = Structure weight in kips W B = Total soil weight above base in kips FB = Buoyant force in kips = Unit weight of water x volume of structure below design groundwater level L = Perimeter around base of wall in feet Fsw = Fss= Shearing resistance of soil to wall 0.011H12 + 0.023111 H2 + 0.005H22 (in kips per foot of wall) Shearing resistance of soil 0.017H12 + 0.034H1 H2 + 0.008H22 (in kips per foot of wall) ASSUMPTIONS Soil Unit Weight = 120 pcf Soil Friction Angle = 36' Wall /Soil Friction Angle = 25' At —rest Pressure Coefficient = 0.41 Buoyant Soil Unit Weight = 58 pcf NOTES Factor of Safety = W + Fsw L Fe (without extended base) Factor of Safety = W + WB + Fss L FB (with extended base around perimeter of structure) Refer to text for additional clarification regarding calculating uplift resistance. Yl�fii HONGWEST &ASSOCIATES` INC. ALLENTOWN WATER AND SEWER IMPROVEMENT PROJECT PARAMETERS FOR CALCULATING UPLIFT RESISTANCE PROJECT NO.: 96023 FIGURE: 5 C: VCLTYMN \STD \UPUFT.DwG Z _I— • • • F— w D 00 .co co =. gQ. I— _ • I- CY Z 1—; tll U NI 1—' UJ W`; U —O ..Z` U N; • Z z W re JU 0 N J = W • O 2 Q U I W z I-- O z 0 O N O I- WW H• 0 -LL. O w.• U W _ O ~ z • • APPENDIX A FIELD INVESTIGATION Subsurface conditions were explored on February 19 and 20, 1996, under the full -time observation of a HWA engineer. The exploration work consisted of drilling and sampling eight borings (BH -1 through BH -8) at locations selected by Gray and Osborne, Inc. The borings were advanced to depths ranging from about 111/2 to 44 feet below the existing ground surface. The boreholes were located approximately in the field by taping and/or pacing distances from known site features and plotted on the Site Plan (Figure 2). A legend to the terms and symbols used on the boring logs is presented on Figure A -1. Summary borehole logs are presented on Figures A -2 through A -11. Geotechnical drilling was performed by Geoboring & Development, Inc. of Puyallup, Washington under subcontract to HWA. The borings were drilled with a truck- mounted, Mobile B -61 drill rig advancing a 4 -inch I.D., continuous flight hollow stem auger. Upon completion of drilling, the borings were backfilled with cuttings and bentonite chips. Explorations located in areas of existing pavement were repaired using an asphalt patch. At each boring location, Standard Penetration Test sampling was performed in general accordance with ASTM D 1586, using a 2 -inch outside diameter split -spoon sampler and a 140 -pound hammer. During the test, samples were obtained by driving the sampler 18 inches into the soil with a hammer free - falling 30 inches. The number of blows required for each 6 inches of penetration was recorded. The Standard Penetration Resistance ( "N- value ") of the soil was calculated as the number of blows required for the final 12 inches of penetration. If a total of 50 blows was recorded within a single 6 inch interval, the test was terminated, and the blow count was recorded as 50 blows for the number of inches of penetration. This resistance, or N- value, provides a measure of the relative density of granular soils and the relative consistency of cohesive soils. Soil samples obtained from the split - barrel sampler were classified in the field and representative portions were placed in air - tight, plastic bags. These soil samples were taken to our Lynnwood, Washington laboratory for further examination and testing. In addition, pertinent information including soil sample depths, stratigraphy, soil engineering characteristics, and groundwater occurrence was recorded. The stratigraphic contacts shown on the individual borehole logs represent the approximate boundaries between soil types; actual transitions may be more gradual. The soil and groundwater conditions depicted are only for the specific dates and locations reported, and therefore, are not necessarily representative of other locations and times. 96023RF.DOC A -1 HONG WEST & ASSOCIATES, INC. z i ~. w' 'U 0 moo: CO w =` JF.'. Nw w0 •ga J ?• F w: _. I- 0 Z 2 ?` U , • O N' w w: .H U. • O w z, 0 � RELATIVE DENSITY OR CONSISTENCY VERSUS SPT N —VALUE TEST SYMBOLS COHESIONLESS SOILS COHESIVE SOILS Density N (blows /(t) Approximate Relative Density(%) Consistency N (blows /ft) Approximate Undrained Shear Strength (psf) Very Loose Loose Medium Dense Dense Very Dense 0 to 4 4 to 10 10 to 30 30 to 50 over 50 0 — 15 15 — 35 35 — 65 65 — 85 85 — 100 Very Soft Soft Medium Stiff Stiff Very Stiff Hard 0 to 2 2 to 4 4 to 8 8 to 15 15 to 30 over 30 <250 250 — 500 500 — 1000 1000 — 2000 2000 — 4000 >4000 ASTM SOIL CLASSIFICATION SYSTEM MAJOR DIVISIONS GROUP DESCRIPTIONS Coarse Grained Soils More than 507 Retained No. 200 Sieve Size Gravel and Gravelly Soils More than 50% of Coarse Fraction Retained on No. 4 Sieve Clean Gravel (little or no fines) a °;' ac. GW Well— graded GRAVEL • ,• . GP Poorly— graded GRAVEL Grovel with Fines (appreciable amount of fines) + } ! I GM Silty GRAVEL rj / <: GC Clayey GRAVEL and Sandy Soils 507. or More of Coarse Fraction Passing on No. 4 Sieve Clean Sand (little or no fines) •Sand SW Well— graded SAND : SP Poorly— graded SAND Sand with Fines (appreciable amount of fines) •on SM Silty SAND / SC Clayey SAND Fine Grained Soils . 50% or More Passing No. 200 Sieve Size Silt and Liquid Limit Clay Less than 507. ML SILT CL Lean CLAY 11 OL Organic SILT /Organic CLAY. Silt Liquid Limit Cla 50% or More y MH Elastic SILT. CH Fat CLAY ' OH Organic Silt /Organic Clay. Highly Organic Soils PT PEAT COMPONENT DEFINITIONS COMPONENT SIZE RANGE Boulders Larger than 12 in Cobbles 3 in to 12 in Gravel 3 in to No 4 (4.5mm) Coarse gravel 3 in to 3/4 in Fine gravel 3/4 in to No 4 (4.5mm) Sand No. 4 (4.5 mm) to No. 200 (0.074 mm) Coarse sand No. 4 (4.5 mm) to No. 10 (2.0 mm) Medium sand No. 10 (2.0 mm) to No. 40 (0.42 mm) Fine sand No. 40 (0.42 mm) to No. 200 (0.074 mm) Silt and Clay Smaller than No. 200 (0.074mm) GS Grain Size Distribution %F Percent Fines CN Consolidation TX Triaxial Compression UC Unconfined Compression DS Direct Shear K Permeability PP Pocket Penetrometer Approximate Compressive Strength (tsf) TV Torvane Approximate Shear Strength (tsf) CBR California Bearing Ratio' MD Moisture /Density Relationship PID Photoionization Device Reading AL Atterberg Limits: PL Plastic Limit LL Liquid Limit I 0 17 SAMPLE TYPE SYMBOLS 2.0" OD Split Spoon (SPT) (140 Ib. hammer with 30 in. drop) Shelby Tube 3.0" OD Split Spoon with Bross Rings Small Bog Sample Large Bag (Bulk) Sample Core Run Non — standard Penetration Test (with split spoon sampler) COMPONENT PROPORTIONS DESCRIPTIVE TERMS RANGE OF PROPORTION Trace 0 — 5% Few 5 — 10% Little 15 — 25% Some 30 — 457. Mostly 50 — 100% GROUNDWATER WELL COMPLETIONS Locking Well Security Casing Well Cap Concrete Seal Well Casing Bentonite Seal Groundwater Level (measured at time of drilling) Groundwater Level (measured in well after water level stabilized) Slotted Well Casing Sand Backfill NOTES: Soil classifications presented on exploration logs are based on visua and laboratory observation in generol accordance with ASTM D 2487 and ASTM D 2488. Soil descriptions are presented in the following general order: Density /consistency. color. modifier (if any) GROUP NAME, additions to group name (if any). moisture content. Proportion. gradation. and angularity of constituents. additional comments. (GEOLOGIC INTERPRETATION) Please refer to the discussion in the report text as well as the exploration logs for a more complete description of subsurface conditions. MOISTURE CONTENT DRY MOIST WET Absence of moisture, dusty, dry to the touch. Damp but no visible water. Visible free water, usually soil is below water table. fIONGWEST &ASSOCIATES,INC. ALLEN TOWN WATER AND SEWER IMPROVEMENT PROJECT LEGEND OF TERMS AND SYMBOLS USED ON EXPLORATION LOGS PROJECT NO.: 96023 FIGURE: A -1 C \ACLTIMN \STD\LEGEND.DWG $?iTglI4 tSbX":YFr? + t°? me.. tiri+ CGrA7! k';+n»ss:�mre+•e+*mrm�Mx;nr_,. r,+.»xy^tv "-" ^ +...Y�^.�.,.,- •F..,.,c:�e:.;•• ^^ ;"; ra.. ,...,..,..,.,.x«,ra�,,,nn..cur; m'v,n *tas�:, ?six... „a•4,�C',•,»�fi a7;en >'Q'i'::rnstvH^C:'; t'f ?= yut?,74.c7!11",'nrc";M�.K' 'TLmr..,v R^1 HONG WEST & ASSOCIATES, INC. BORING LOG DRILLING COMPANY: Geoboring and Development, Inc. DRILLING METHOD: Mobile B -81, 4" Hollow Stem Augers SAMPLING METHOD: SPT TOTAL DEPTH: 18.5 Feet SURFACE ELEVATION: 201 Feet MEASURING POINT EL.: Feet DEPTH (feet) 0—, 5— 10— 15— 20— 25— SAMPLE TYPE SAMPLE NUMBER N —VALUE (blows /ft) MOIST. CONT. (%) S -I 2-2 -5 7 32 S -2 1-4 -3 7 18 NS -3 3-4 -5 9 12 NS -4 3 -8 -7 15 27 S -5 7 -10 -10 20 28 OTHER TESTS DESCRIPTION • Moist. Cont. (X) • Pen. Resistance (blows /foot) 20 40 80 80 GM Medium dense, gray, silty GRAVEL, moist. ML (UNDOCUMENTED FILL) Medium stiff, dark brown, SILT with sand, moist. Fine grained sand, trace organics. (ALLUVIUM) Loose, very dark grayish brown, poorly graded SM SAND with silt, moist. Fine grained sand. SP Medium dense, very dark grayish brown, poorly graded SAND. wet. Fine to medium grained END OF BORING BH -1 AT 18.5 FEET. During drilling, groundwater observed at a depth of about 7 feet. A. r • • • A• NOTE: This log of subsurface conditions apples only at the specified location and on the date indicated, and therefore. may not necessarily be indicative of other times and /or locations. PROJECT: Allentown Water & Sewer BORING: BH -1 LOCATION: Tukwila, Washington DATE COMPLETED: 2/19/98 LOGGED BY: S. Wright PROJECT NUMBER: 98023 PAGE: I OF I rflrOsesTrowawr xeialnavvcx,=F-,,, -. ..., n,...,,- .-„wm...Mwwt.of9me,r MtV6xR Figure A -2 HONG WEST & ASSOCIATES , INC . DRILLING COMPANY: Geoboring and Development, Inc. DRILLING METHOD: Mobile B -81. 4" Hollow Stem Augers SAMPLING METHOD: SPT BORING LOG TOTAL DEPTH: 18.5 Feet SURFACE ELEVATION: 19* Feet MEASURING POINT EL.: Feet 0. W 0 0— 5— 10— 15— 20— 25— SAMPLE TYPE .SAMPLE NUMBER S -I S -2 S -3 N -VALUE (blows /ft) MOIST. CONT. (%) 2 -2 -3 5 18 2-1 -2 3 18 1 -2 -2 4 19 NS-4 2-6 -9 15 30 NS-5 2-3 -8 9 28 OTHER TESTS J 0 03 u) DESCRIPTION • Hoist. Cont. (X) 1 Pen. Resistance (blows /foot) 20 40 80 80 SM Ir. of 5/8" minus crushed rock base course. Loose to very loose, dark grayish brown, silty SAND, moist. Fine grained sand, trace organics. (ALLUVIUM) Rough drilling between about 8 and 9 feet. ML Stiff, dark grayish brown, sandy SILT, wet. Fine grained sand. SP- Loose, very dark grayish brown, poorly graded SM SAND with silt, wet. Fine to medium grained sand. END OF BORING BH -2 AT 18.5 FEET. During drilling, groundwater observed at a depth - of about 9 feet. A A • A NOTE: This lop of subsurface conditions applies oNy at the specified location and on the date Indicated, and therefore, may not necessarily be Indicative of other times and /or locations. PROJECT: Allentown Water & Sewer BORING: BH -2 LOCATION: Tukwila. Washington DATE COMPLETED: 2/19/96 LOGGED BY: S. Wright PROJECT NUMBER: 98023 PAGE: 1 OF 1 Figure A -3 . eta' 1KF�41ri� +;,tsT4++2!Aut2r"- ',gt°rRL'+'. •r...•,,r.rw. !m9torX75^F". NTORdy smn HONG WEST & ASSOCIATES, INC. DRILLING COMPANY: Geoboring and Development, Inc. DRILLING METHOD: Mobile 8 -81, 4" Hollow Stem Augers SAMPLING METHOD: SPT BORING LOG TOTAL DEPTH: 34 Feet SURFACE ELEVATION: 18s Feet MEASURING POINT EL.: Feet DEPTH (feet) 0— 5— 10— 15— 20— 25-- SAMPLE TYPE SAMPLE NUMBER W CYO QZ 0—c Ws- CC wen " �0 a N -VALUE (blows /ft) MOIST. CONT. (%) NS -i 1-h3 4 20 S -2 3-5 -8 11 28 OTHER TESTS S -3 4 -5-8 11 35 NS-4 0-0-1 1 88 AL NS-5 3-4 -3 7 40 NS-8 4 -4 -K) 14 41 S -7 8 -18 -21 37 27 J 0 m s N DESCRIPTION • Moist. Cont. (X) 1 Pen. Resistance (bows /toot) 0 20 40 80 80 SM /2" of sod. Loose to medium dense, very dark grayish brown, poorly graded SAND with silt, moist to wet. Fine grained sand. OH (ALLUVIUM) Very soft, very dark brown, ORGANIC SILT, wet. SM Loose to medium dense, very dark gray, silty SAND, wet. Fine grained sand with thin interbeds - of gray organic soil and silt. SM Dense, very dark gray, poorly graded SAND, wet. Fine to medium grained sand. • 1 1 • • 1 1 • 1 NOTE: This log of subsurface conditions applies only at the specified location and on the date Indicated, and therefore. may not necessarily be Indicative of other times and /or locations. PROJECT: Allentown Water & Sewer LOCATION: Tukwila, Washington DATE COMPLETED: 2/20/98 LOGGED BY: S. Wright BORING: BH -3 PROJECT NUMBER: 98023 PAGE: 1 OF 2 Figure A -4 z ~ w• . 00. W, J =• CO LL. W 0 2 J LL. Q: = zW 1= o: z 2 uj O • N'. .0 1-! UJ W. W z; UN - z • A!. DEPTH (feet) 3 35— 40— 45— SAMPLE TYPE 50— N -VALUE (blows /ft) MOIST. CONT. ( %) NS-8 t2 -19-28 47 26 OTHER TESTS NS-9 7 -19 -28 45 27 GS HONG WEST & ASSOCIATES, INC. BORING LOG X .%Q Cr/� 0 4C Is o cC co cv _ >- 00 VI u, s • Mast. Cont. (%) Pen. Resistance (blows /foot) DESCRIPTION 0 20 40 60 80 Dense. very dark gray, poorly graded SAND with — si1t. wet. Fine to medium grained sand END OF BORING BH -3 AT 34 FEET. During drilling. groundwater observed at a depth of about 5 feet. A PROJECT: Allentown Water & Sewer BORING: BH -3 LOCATION: Tukwila, Washington DATE COMPLETED: 2/20/98 LOGGED BY: S. Wright PROJECT NUMBER: 98023 PAGE: 2 OF 2 Figure A -5 HONG WEST & ASSOCIATES, INC. DRILLING COMPANY: Geoboring and Development, Inc. DRILLING METHOD: Mobile 8 -81, 4" Hollow Stem Augers SAMPLING METHOD: SPT BORING LOG TOTAL DEPTH: 18.5 Feet SURFACE ELEVATION: 20* Feet MEASURING POINT EL.: Feet d d W 0— 5— 10— 15— 20— 25-- SAMPLE TYPE SAMPLE NUMBER NS -1 1 -1-2 N —VALUE (blows /(t) MOIST. CONT. (X) 3 14 OTHER TESTS S -2 2-2 -2 4 18 NS -3 2-2 -3 5 28 S -4 0-0-1 1 43 AL NS-5 5 -0-9 19 33 DESCRIPTION • Mast. Cont. (X) Pen. Resistance (blows /foot) 20 40 80 80 S /2" of 5/8" minus crushed rock base course. Very loose to loose, dark grayish brown, silty SAND, moist. Fine grained sand. (ALLUVIUM) ML Very soft, dark yellowish brown, SILT, wet. Trace fine grained sand, trace organics. SM Medium dense, very dark grayish brown, silty SAND, wet. Fine grained sand, trace fine gravel. END OF BORING BH -4 AT 18.5 FEET. During drilling, groundwater observed at a depth of about 5 feet. 1 A • • LHLi; A • NOTE: This log of subsurface conditions applies only at the specified location and on the date Indicated, and therefore, may not necessarily be Indicative of other times and /or locations. PROJECT: Allentown Water & Sewer LOCATION: Tukwila, Washington DATE COMPLETED: 2/19/98 LOGGED BY: S. Wright BORING: BH -4 PROJECT NUMBER: 98023 PAGE: 1 OF 1 Figure A -6 _ , _,,:, �i. usrilG. ��:. z�iaiza- .iaini,!z�ic�.�:�kr�ats�;'• � tctr�V nom= .""* -...., ar z ,fY w. 6 •J U U O; NO' rn W W 2: JI- N IL: WQ o. LL <, 1-O: z W W: 2 D. DO ,0 Ni Ca .W `6, .LL H O t.. z .0 ^^i HONG WEST & ASSOCIATES , INC . DRILLING COMPANY: Geoboring and Development, Inc. DRILLING METHOD: Mobile B -81. 4" Hollow Stem Augers SAMPLING METHOD: SPT BORING LOG TOTAL DEPTH: 18.5 Feet SURFACE ELEVATION: 10: Feet MEASURING POINT EL.: Feet 0 a W 0- 5- 10- 15- 20- 25- SAMPLE TYPE SAMPLE NUMBER MOIST. CONT. (X) NS -1 1 -2-3 5 38 NS -2 2 -3 -8 9 33 S -3 4 -5-5 10 28 NS -4 8 -11 -18 27 25 NS-5 3-9 -12 21 25 OTHER TESTS J 0 m u) s m CO •-••• ui••• 0 4C Is UQ 00 DESCRIPTION • Moist. Cont. (X) I Pen. Resistance (bows /foot) 0 20 40 80 80 ML! 4" of 5/8" minus crushed rock base course. Medium stiff, mottled grayish brown and dark yellowish brown, SILT, moist. Trace organics. SM (ALLUVIUM) Loose, very dark grayish brown, silty SAND, wet. - Fine grained sand. SP Medium dense, very dark gray, poorly graded SANG, wet. Fine to coarse grained sand. ENO OF BORING BH -5 AT 18.5 FEET. During drilling, groundwater observed at a depth - of about 3 feet. A A 4 • • r b NOTE: This log of subsurface conditions applies only at the specified location and on the date Indicated, and therefore, may not necessarily be Indicative of other times and /or locations. PROJECT: Allentown Water & Sewer BORING: BH -5 LOCATION: Tukwila, Washington DATE COMPLETED: 2/19/96 LOGGED BY: S. Wright PROJECT NUMBER: 98023 PAGE: 1 OF 1 Figure A -7 z • re t 6G= JU; U 0' COO. W = 1 t.. W• }0} u-Q: N d'' = tL Z 1- 0 Z UJ • _, D 0 O — w w: H 0 • o. - 0 z. HONG WEST & ASSOCIATES , INC . DRILLING COMPANY: Geoboring and Development, Inc. DRILLING METHOD: Mobile B -81, 4" Hollow Stem Augers SAMPLING METHOD: SPT BORING LOG TOTAL DEPTH: 11.5 Feet SURFACE ELEVATION: 10: Feet MEASURING POINT EL.: Feet DEPTH (feet) 5— 10— 15— 20— 25— SAMPLE NUMBER 1 0 Z UJ 0 1 0 J H Z Z NS -I 3 -5 -4 9 29 NS -2 2-8 -8 12 31 NS -3 3-7 -7 14 34 NS-4 3-5 -9 14 32 OTHER TESTS DESCRIPTION • Nast. Cont. (X) • Pen. Resistance (blows /foot) 20 40 80 80 1 -1/2" ACP over 3" crushed rock base course. SM Loose, very dark grayish brown, poorly graded SANG with silt, moist to wet. Fine to medium grained sand. (ALLUVIUM) SP Medium dense, very dark gray, poorly graded SAND, wet. Fine to medium grained sand. SM Medium dense, very dark grayish brown, silty SAND, wet. Fine to medium grained sand. END OF BORING BH -8 AT 11.5 FEET. During drilling, groundwater observed at a depth of about 2.5 feet. Y L • • A • NOTE: This log of subsurface conditions applies only at the specified location and on the date Indicated, and therefore, may not necessarily be Indicative of other tines and /or locations. PROJECT: Allentown Water & Sewer LOCATION: Tukwila, Washington DATE COMPLETED: 2/19/98 LOGGED BY: S. Wright BORING: BH -6 PROJECT NUMBER: 98023 PAGE: 1 OF 1 Figure A -8 HONG WEST & ASSOCIATES , INC. DRILLING COMPANY: Geoboring and Development, Inc. DRILLING METHOD: Mobile B -81. 4" Hollow Stem Augers SAMPLING METHOD: SPT BORING LOG TOTAL DEPTH: 11.5 Feet SURFACE ELEVATION: 112! Feet MEASURING POINT EL.: Feet d w O 0— 5— 10— 15— 20— 25— SAMPLE TYPE SAMPLE NUMBER N —VALUE (blows /ft) MOIST. CONT. (X) 2-4-5 9 32 OTHER TESTS NS -2 3 -5 -4 9 33 GS S -3 1 -1-0 1 51 AL NS-4 8-0 -10 18 32 J O } u, DESCRIPTION • Mast. Cont. (X) 1 Pen. Resistance (blows /foot) 20 40 80 80 M Loose, very dark grayish brown, poorly graded SAND with silt, moist to wet. Fine grained sand. /2" of sod. SM (ALLUVIUM) Loose, very dark grayish brown, silty SAND, wet. Fine grained sand. ML Very soft, mottled dark yellowish brown and dark gray, SILT, wet. Trace organics. SP Medium dense, very dark grayish brown, poorly graded SAND, wet. Fine to coarse grained sand, trace fine gravel. END OF BORING BH -7 AT 11.5 FEET. During drilling, groundwater observed at a depth of about 3 feet. 4 A • PLI • NOTE: Thls log of subsurface conditions applies only at the specified location and on the date Indicated, and therefore, may not necessarily be Indicative of other times and /or locations. PROJECT: Allentown Water & Sewer BORING: BH -7 LOCATION: Tukwila, Washington DATE COMPLETED: 2/19/98 LOGGED BY: S. Wright PROJECT NUMBER: 98023 PAGE: 1 OF 1 .+r..aon.am Figure A -9 J HONG WEST & ASSOCIATES , INC . DRILLING COMPANY: Geoboring and Development, Inc. DRILLING METHOD: Mobile B -81, 4" Hollow Stem Augers SAMPLING METHOD: SPT BORING LOG TOTAL DEPTH: 44 Feet SURFACE ELEVATION: 10* Feet MEASURING POINT EL.: Feet DEPTH (feet) 0— 5— 10— 15— 20— 25— SAMPLE TYPE SAMPLE NUMBER N -VALUE (blows /ft) MOIST. CONT. (%) S -1 1-4 -5 9 28 S-2 4 -7 -7 14 28 NS-3 4-5-8 11 33 NS -4 1-9-5 14 39 NS-5 5 -11-14 25 24 NS-43 8 -10-15 25 28 OTHER TESTS S -7 3-7-2 19 25 GS J 0 m 0) s 1.••• m 4v N of 0 UQ J 00 DESCRIPTION • Moist. Cont. (%) 1 Pen. Resistance (blows /foot) 20 40 80 80 ae, /2" of sod. SM Loose, very dark grayish brown, poorly graded SAND with silt, moist to wet. Fine grained sand. (ALLUVIUM) SP Medium dense, very dark grayish brown, poorly graded SAND, moist. Fine grained sand. SM Medium dense, dark grayish brown, silty SANG. wet. Fine grained sand. SM graded SAND with silt, wet. Fine to medium grained sand with thin interbeds of dark gray silt. Medium dense to dense, very dark gray, poorly A • 4 • • 4 • hi A• NOTE: This log of subsurface conditions applies oNy at the specified location and on the date indicated, and therefore, may not necessarily be indicative of other times and /or locations. PROJECT: Allentown Water & Sewer BORING: BH -8 LOCATION: Tukwila, Washington DATE COMPLETED: 2/19/98 LOGGED BY: S. Wright PROJECT NUMBER: 98023 PAGE: 1 OF 2 Figure A -10 • DEPTH (feet) w } w J O. x N 25— 30— 35— 40— 45— 50— SAMPLE NUMBER w (-)771, Zy .1:Cu �C tn. co O aZ N -VALUE (blows /ft) MOIST. CONT. (X) NS-8 9 -17 -20 37 29 S- 918 -34- 50/410+ 26 NS-I0 11 -24 -33 50+ 26 S -11 4 -5 -7 t2 31 OTHER TESTS HONG WEST & ASSOCIATES , INC. BORING LOG X COW N <CO N o vv J CA NO sm DESCRIPTION Medium dense to dense, very dark gray, poorly graded SAND with silt, wet. Fine to medium grained sand with thin Interbeds of dark gray silt. END OF BORING BH -8 AT 44 FEET. • Moist. Cont. (%) ► Pen. Resistance (blows /foot) 0 20 40 80 80 During drilling, groundwater observed at a depth of about 7 feet. - l 50+ A • 50+ PROJECT: Allentown Water & Sewer BORING: BH -8 LOCATION: Tukwila, Washington DATE COMPLETED: 2/19/98 LOGGED BY: S. Wright PROJECT NUMBER: 98023 PAGE: 2 OF 2 Figure A -11 C.4 ■ z IL ,' .J U, 0 W Z, J H: N u. J u.': co - a. w z 1-o z 1—< 'O U: .I W, = U'. 1- ip — O• • Z ti N' 0 f."= Z LABORATORY TESTING APPENDIX B LABORATORY TESTING Soil samples obtained from the borings were taken to the HWA laboratory for further examination and testing. Laboratory tests were conducted on selected soil samples to characterize certain properties of the on -site soils. Laboratory tests, as described below, included determination of moisture content, Atterberg Limits, and grain size distribution. MOISTURE CONTENT TESTING The moisture contents of all soil samples were determined in general accordance with ASTM D 2216. The test results are shown at the sampled intervals on the appropriate boring logs in Appendix A. ATTERBERG LIMITS TESTING The liquid limit (LL), plastic limit (PL), and plasticity index (PI) of selected soil samples were determined in general accordance with ASTM D 4318. The tests were conducted on selected fine - grained soil samples for the purpose of classification. The test results are summarized on Figure B -1 and are shown on the appropriate boring logs. GRAIN SIZE ANALYSIS The grain size distributions of selected soil samples were determined in general accordance with ASTM D 422. Grain size distribution curves for the tested samples are presented on Figures B -2 through B -4. 96023RF.DOC B -1 HONG WEST & ASSOCIATES, INC. • 70 60 ri X 50 0 Z 40 1- 30 U (/) 20 J 10 0 0 10 20 _ _ _ BORING DEPTH (FEET) LL (x) PI (X) • BH -3 10 -11.5 / 16 • BH -4 rJ /\>' 35 r •� P ti� BH -7 7.5 -9 48 16 d / / d MH or OH / G)\' • • OL iE'Lgk►nv / M L or 1 30 40 50 60 70 80 90 100 110 LIQUID LIMIT (LL) SYMBOL BORING DEPTH (FEET) LL (x) PI (X) • BH -3 10 -11.5 66 16 • BH -4 10 -11.5 35 7 • BH -7 7.5 -9 48 16 YIIii� H0NGWEST &ASSOCIATES` INC. ALLEN TOWN WATER AND SEWER IMPROVEMENT PROJECT PLASTICITY CHART PROJECT NO.: 96023 FIGURE: B -1 C: \ACLTWIN \Sm \PL AST1TY.DWG • w. 4.1ANY Z = 1- • F-Z 6 iC.O: cn p' • (1)W = LL iN 0: ›. D O zt U p. N; Y= 1--U 'U p•. !'z• HONG WEST & ASSOCIATES, INC. GRAIN SIZE DISTRIBUTION ASTM D422 Project Allentown Water and Sewer Improvement Project Location: Tukwila, WA Project Number: 96023 Date Tested: 2/28/96 Remarks: Very dark gray, poorly graded SAND with silt (SP-SM) 1 PERCENT SMALLER Test Hole Number: BH-3 Sample Number: S-9 Depth: 32.5-34.0 feet Sample Description: Gravel: 0.0 Sand: Fines: 6,6 Clay Silt Sand Gravel Fine 1 Medium I Crse Fine 1 Crse SIEVE SIZES 200 100 60 40 30 20 16 10 4 3/8 3/4 1 3/2 2 3 90 80 70 60 50 40 30 20 1 0 0 - -=-- - - - I I I I r•-• -- 1- . 1 --1-. . - 1 1 ■ i t -I I 1------r--' ji i 1 1 L i I t I - - - - I i _1_ I I - I t- •• I i i t I t • i t . . .-____-__ • 1 111 1 mill 1 1111111 i 1 Ei 1 1 1 1. 1 1 1 111 1 1 i 1 1 0.0005 0.001 0.01 0.1 1 GRAIN SIZE - MILLIMETERS 10 gni HONG WEST Of ASSOCIATES, INC. C \ACLIIMN\STD\NEWGRAIN.DWG :UW:rril.3' ' VtaitAi&-‘ ' • • — ALLENTOWN WATER AND SEWER IMPROVEMENT PROJECT GRAIN SIZE DISTRIBUTION CURVE PROJECT NO.: 96023 FIGURE: B-2 • Ny.w,:r4vilVYMILMV#41W-M1MWM. riVergKeM1944.79.-11$113 - II- c, 21u, —J 0 C.) 0 CO CI: !COW WI ■I CI) uj g LL CO a 1— al Z 1— 0 Z 1—; WLU 2 n' (.) uj I— - Z. W pm' 0 I- Z r- PERCENT SMALLER HONG WEST & ASSOCIATES, INC. GRAIN SIZE DISTRIBUTION ASTM D422 Project Allentown Water and Sewer Improvement_toject Location: Tukwila WA Project Number: 96023 Date Tested: 2/28/96 Remarks: Very darkgrayish brown, silty SAND (SM) 100 90 so 70 so 50 40 30 20 10 0 Test Hole Number: BH-7 Sample Number: S-2 Depth: 5.0-6.5 feet Sample Description: Gravel: 0.1 Sand: 6.3,9 Fines: 36,0 Clay Silt Sand Gravel Fine 1 Medium 1 Crse Fine 1 Crse SIEVE SIZES 200 100 60 40 30 20 16 10 4 3/8 3/4 1 3/2 2 3 1 1 1 1 1 1 1 1 1 1 1 1 111 1 1 1.1 1111 0.0005 0.001 2 5 2 0.01 5 2 5 0.1 1 GRAIN SIZE - MILLIMETERS 2 5 2 5 10 gni 'HONG WEST &ASSOCIATESANC. ALLENTOWN WATER AND SEWER IMPROVEMENT PROJECT GRAIN SIZE DISTRIBUTION CURVE PROJECT NO.:96023 FIGURE: 8-3 C: \ACLIVAIASTD\NEWGRAIN.DWG kwteitimovnw.lraR•mtorisaNstt'StevarrATItiOrtiV.V.M•tfeMIIMPIMWRIOW•Mosokrem,k PERCENT SMALLER HONG WEST & ASSOCIATES, INC. GRAIN SIZE DISTRIBUTION ASTM D422 Project Allentown Water and Sewer Improvement Project Location: Tukwila, WA Project Number: 96023 Date Tested: 2/29/96 Remarks: Very dark qray, poorly qraded SAND with silt (SP-SM) 1 Test Hole Number: BH-8 Sample Number: S-7 Depth: 22.5-24.0 feet Sample Description: Gravel: 0.5 Sand: $29 Fines: 6,6 Clay Silt Sand Gravel Fine 1 Medium 1 Crse Fine 1 Crse SIEVE SIZES 200 100 60 40 30 20 16 10 4 3/8 3/4 1 3/22 3 0.0005 0.001 0.01 0.1 1 GRAIN SIZE - MILLIMETERS 10 +IONGWEST & ASSOCIATES. INC. ALLEN TOWN WATER AND SEWER IMPROVEMENT PROJECT GRAIN SIZE DISTRIBUTION CURVE PROJECT NO.: 96023 FIGURE: B-4 C: CLTIVIN\STDVIENGRAIN.DWG • ,..t.e.araindiiiii•k::•:4;d„war4ccx,zw4•AittvArg, Acia.Nougaizegii _ z < m z, w 0. re, 00: op: LLI. w LL.: wo, g u. D' uti z 0, :z ILI La • C..V. u) iz _ _ • . , , 1 1 i ! i I I 70 — I 60 _ — I 4.. ._...... 1 i i 1 50 _ — ...4........ i . I I 40 30 20 10 0 — ■... — _ _ — _ — — 1 i i I i ,_ : 1 I i I I I i I I i . I f I f 1 I , • i I i • I i II Li 0.0005 0.001 0.01 0.1 1 GRAIN SIZE - MILLIMETERS 10 +IONGWEST & ASSOCIATES. INC. ALLEN TOWN WATER AND SEWER IMPROVEMENT PROJECT GRAIN SIZE DISTRIBUTION CURVE PROJECT NO.: 96023 FIGURE: B-4 C: CLTIVIN\STDVIENGRAIN.DWG • ,..t.e.araindiiiii•k::•:4;d„war4ccx,zw4•AittvArg, Acia.Nougaizegii _ z < m z, w 0. re, 00: op: LLI. w LL.: wo, g u. D' uti z 0, :z ILI La • C..V. u) iz