Loading...
HomeMy WebLinkAboutPermit L94-0010 - WIELAND ALBERT - TREE PERMIT . eview — E02 -020 If Course Clubhouse Steven M. Mullet, Mayor Department of Community Development Steve Lancaster, Director Transportation The site is served by Interurban Avenue South, which borders the property on the west. Interstate 5 and Interstate 405 are within one -half and one mile respectively of the site. The project proposes to relocate the current entrance to the site approximately 120 feet to the south and add a second entrance at the far south end of the site. The project will provide 286 parking stalls, an increase of 99 stalls over the existing 187 stalls. The site is served by transit and there is a park and ride lot across the street from the project. Public Services The construction of a larger clubhouse, with meeting space as well as enlarged restaurant and lounge will likely generate a slight increase in the need for public services such as police and fire. A fire lane will be constructed around the new clubhouse. Utilities Utilities currently available at the site include electric, natural gas, water, refuse service, telephone, storm water and sanitary sewer. No additional utilities are anticipated to be needed as a result of the building construction. Recommendation Determination of Nonsignificance, Mitigated The following conditions apply to this project: 1. Excavations into historically native soil, when in an area of archaeological potential, shall have a professional archaeologist on site to ensure that all State statutes regarding archaeological conservation/preservation are implemented. The applicant shall provide a written commitment to stop work immediately upon discovery of archaeological remains and to consult with the State Office of Archaeology and Historic Preservation to assess the remains and develop appropriate treatment measures, which may include refilling the excavation. 2. A certified arborist must identify measures to protect the Foster Maple Tree, both during construction as well as after completion of the project. 8 c: \mydocs \Foster Golf Course\sepa -rpt 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665 �r•:C.4 •.:= ::u.._...::ui'n ... ....:::i.i..xi i::L:::.1?.C�tiiil�i'i >n? r, G,•:;%[ �fA2 311Ma g.,&n iP+: ti-+ r.' r�iAv- inr�,.,«,„ ..�ow.�acxurxuaactr+ee�4wIX4c5M City of Tukwila John W Rants, Mayor. Department of Community Development Rick Beeler, Director MEMORANDUM To: Denise Millard, Permit Coordinator From: Vernon Umetsu, Assoc. Planner Date: May 25, 1994 RE: L94 -0010: Wieland Tree Permit. Please cancel this permit per the Gary Schulz memo of May 24, 1994 (attached to file). The proposed clearing area has been reduced so that no tree permit is required. Thank you. 6300 Southcenter Boulevard, Shcte #100 • Tukwlla, Washington 98188 • (206). 4313670 • Fax (206) 431:3665 MEMORANDUM TO: Vernon Umetsu, Associate Planner Jack Pace, Senior Planner, DCD FROM: Gary Schulz, Urban Environmentalist, DCD DATE: May 24, 1994 RE: Wieland Tree Permit No. L94 - 0010. About two weeks ago I received a telephone inquiry from Mr. Al Wieland at 4654 S. 156th Street. He informed me that he had applied for a Tree Permit in February so that he could remove some hazardous trees and other trees possibly located in a wetland. At Al's request, I visited the property with him on 5/20/94. He has a situation that warranted a site visit and an interpretation of the Tree Regulations. His property consists of about 3 acres that is mostly downslope from his developed residence. His request to remove trees is related to developing the land in the future. Instead of clearing now, I advised him to wait until he or his son decide on a development proposal. His immediate need to remove potentially hazardous trees is actually just a few trees around his house which is a flat and non- sensitive area. After our discussion he decided to only remove four non - hazardous trees and a couple we agreed were hazardous to his home. I explained to Al that he is subject to Tree Regulations because he has a sensitive slope on his property. However, if he meets the Permit exemptions he can still remove certain trees without processing a permit. In summary, Al was frustrated that he had applied for the Permit in February and had not received help to interpret the regulations or review the property's trees. He told me there had been no application fee but submitted a site plan with property information. In addition to submitted information he was told he would need to have a topographic survey before his permit could be processed. I believe the required Permit application materials (TMC 18.54.070) are necessary sometimes but in this case a waiver to permit materials could have also been proposed. As it turned out, there is no need to process this permit because a simple 1 -hour site visit was conducted. I advised Al to remove trees within the exemption limit and withdraw a Tree Permit application. cc: Rick Beeler, Director - DCD INFORMATION Name of Project: CR.Q.A.AN,m.,a...52,- City of Tuft: vita {:•FB °2.2 1994 Central Permit System - Engineeri DtvlsqR{{ 6300 Southcenter Blvd., Suite 0 pi�k4yirai ! ((98188 TRF-E- 4z . P /f•[ /Y- APPLICATION Pq t ooarTh App N°n * LOoc Phone: (206) 433 -0179 Site Address: 1+4=5 1 S L - �•� ��� et%k %is Property Owner: e- Abe.",-.c-- G- W: € 1. L Street Address: Engineer: Street Address: Contractor: Street Address: 11-66q- -,. 1S0 J- Phone No.: 23-/S City /State/Zip: 9f t8% -1_713 Phone No.: City /State/Zip: Phone No.: City /State/Zip: 4$ -35zY King Cty Assessor Acct #:„) Li -C106-1 Contractor's License #: ERMI:TS ❑ Channelization/Striping /Signing <kEQUEST:ED> ❑ Curb Cut/Access/Sidewalk "` - ❑ Fire Loop /Hydr. (main to vault) - No.: Sizes: ❑ Flood Zone Control ❑ Hauring Jand Altering cubic yards ❑ Landscape Irrigation ❑ Moving an Oversized Load Est. start/end times: Date: ❑ Sanitary Side Sewer - No.: Exp. Date: DEPOSIT/ :REFUNDIBILLI TER:; > >€ Name: Street Address: Name: Street Address: ❑ Sewer ❑ Metro NTH RVICE LUNGS' ❑ Water ❑ Sewer Main Extension ❑ Private ❑ Public ❑ Storm Drainage ❑ Street Use ❑ Water Main Extension ❑Private ❑ Public ❑ Water Meter / Exempt:- No.: Sizes' Deduct ❑ Water Only ❑ ❑ Water Meter / Permanent - No.: Sizes' ❑ Water Meter/ Temporary:- No.: Sizes• Estimated quantity: Schedule: Other.v�e.Q Phone No.: City/State/Zip: Phone No.: City /State/Zip: DESCRIPTION'<'OF :PROD ❑ Multiple- Family Dwelling ❑ Standby Single- Family Residential No. of Units: ❑ Hotel ❑ Motel ❑ Duplex ❑ Triplex ❑ Apartments ❑ Condominiums ❑ Other: ❑ Commerciatllndustrial ❑ Office ❑ Retail ❑ New Building Square Footage: King County Assessors valuation of existing structures: <:MISCELLANEOUS< ::INFORMATION; < <<` ❑ Warehouse ❑ Manufacturing ❑ Remodel/ Addition ❑ Church . ❑ School/College /University ❑ Hospital ❑ Other: Square footage of original building space: Square footage of additional building space: Valuation of work to be done: $ I HEREBY; CERTIFY THAT I HAVE READ :THIS - LLCAT1 NAND KNQW.:.... :. E: TO`BE TRUE ANQ , . ORRE . Applicant /Autho • e• A. - n r• n._ r -. ".t_ Print Name: t{1.b.e,,--' k I .., fa . I. _ i-- l,Y:e_\ o v,1� Contact Person •rint name): k\te•rk- Cs- h- ze�c.N.tQ Address: Date: z. - t7 -99- - Phone: Zug —352_4/— Phone: Date Application Accepted: D_ nQ�ci q Date Application Expires: c6- Qa r 9 04/22/92 SUBMITTAL CH:KL1ST All site plans shall be provided in one submittal for review by the Public Works Department. Six (6) sets of plans stamped by a licensed engineer are required along with this application completed and signed by the applicant's representative. The following information is necessary for Public Works Department evaluation and approval of site plans: • All utility construction is to meet the City of Tukwila Standards • Indicate scale of drawing and show north arrow • Identify location by address or distance to nearest intersection • Identify public right -of -way and any easements • Use standard 24' x 36' sheets for all site plans CURB CUT /ACCESS /SIDEWALK / CHANNELIZATION /STRIPING/SIGNING O Dimensions O Type of surfacing - asphalt, crushed rock, etc.(and thickness) O Percent of slope and runoff direction O Size of curb cuts / locations O Vehicular and pedestrian traffic facilities, including signing and striping, wheel chair ramps, curb cuts O 20' of paving on all gravel driveways connecting to paved roads FIRE LOOP /HYDRANT O Type of pipe / hydrant O Size of pipe/location O Location and type of all valves O Type of bedding and backfill material / percent compaction O Distance from structures, storm and sewer facilities O Location and size of thrust blocking FLOOD ZONE CONTROL (Requirements are under Rood Ord. No. 1462 and can be obtained from the Public Works Dept.) O Lowest finished floor elevation O Contours and elevations per National Geodetic Vertical Datum LAND ALTERING (CLEARING, CUT AND FILL) O Contour map (2' intervals) showing existing and proposed contours O Estimate of yardage, both cut and fill O Erosion control plan with temporary and permanent measures HAULING O Quantities of materials to be hauled to and/or from site O Copy of Certificate of insurance coverage(minimum $1,000,000) O $2,000 bond made out to the City of Tukwila for property damages caused by activities O Route map LANDSCAPE IRRIGATION O Location of DSHS approved double check valve O Type of pipe - copper, high density molecular plastic, ductile O Size and depth of pipe O Size of meter and meter box O Location and elevation of meter box (water meter - permanent and exempt). Clearly show whether tap is on main or domestic service O Location and type of tap O Type of bedding and backfill material / percent compaction MOVING AN OVERSIZED LOAD O Copy of Certificate of insurance coverage (minimum $1,000,000) O $5,000 bond made out to the City of Tukwila for property damages caused by activities O Business License with City of Tukwila O Route map O Dimensions (L X W X H) of overall load SANITARY SIL SEWER O Type of pipe - concrete, PVC, etc. O Size of pipe/location O Percent of slope on pipe/length of ruri O Connection point(s) to existing system O Location of cleanout(s) and test Tec(s) O Type of bedding and backfill material/percent compaction O Invert elevations at structures and junctions SEWER MAIN EXTENSION O Type of pipe - concrete, PVC, etc. O Size of pipe/location O Percent of slope on pipe/length of run O Connection point(s) to existing system O Location of cleanouts and manholes O Type of bedding and backfill material /percent compaction STORM DRAINAGE (include existing topography and proposed grading and surfacing) O Type of pipe — concrete, ADS, etc. O Size of pipe / location O Percent of slope on pipe / length of run O Location of all structures O Square footage of area to be drained, including roof area O Type of bedding and backfill material / percent compaction O Invert or flow line elevations STREET USE O Complete description of proposed activity O Map with address and outline of limits of activity relative to public right -of -way and easements O Proposed traffic control/detour (per Manual of Uniform Traffic Control Devices) O Proposed schedule (times and dates) WATER MAIN EXTENSION O Type of pipe — copper, PVC, etc. O Size of pipe / location O Hydrant types and locations O Valve types and locations O Connection point(s) to existing system O Type of connection - five tap, tee, etc. O Location and size of thrust blocking O Size and location of mains, including elevations (profile) WATER METER - EXEMPT O Diagram of domestic system/tie in of exempt meter O Number /account for existing domestic meter O Size and type of material of meter, service and meter box O Site address WATER METER - PERMANENT O Type of pipe - copper, high density molecular plastic, ductile O Size and depth of pipe O Size of meter and meter box O Location and elevation of meter box (water meter - permanent and exempt) O Location and type of tap O Type of bedding and backfill materials/percent compaction WATER METER - TEMPORARY O Address and hydrant location O Size of meter O Estimate of quantity and schedule After the Public Works Department has completed their review and the plans are approved, the applicant will be notified by letter concerning the necessary permits and requirements; an approved set of plans will accompany the letter. If the plans are not approved, the applicant will be notified by letter of necessary resubmittal requirements. Q....e..4C.r.,..:.T 5■.S-ke.404r. - . C.��..r.QPar..1:v:.5.vh 4k\V. -C_LAQAL. eL..r . '-' -mac \\ a% . 5 `v\O-S \ \•-•..5'*C-.reA c...c %,c 1 1r3'` S o.,: -`ate \& (' RECEIVED FEB 2 21994 COMMUNITY DEVELOPMENT I0 4 fl eL•ei■r •■ wSl, p rVCrCO SkV7 o AZ.Q Y2—\ 0. C\ Cam_ .. ... V` ti R\14-' - 4�1'S... . vaike-s Sv,w,.e. W��: car. -- •cv...dvJ's i \mow. �'� \&a��J v &s .C-L . e cam.. a-o $ . `■".k.pNro uQ @..4"-SvAN6 00L O■,.,.- - sL V.+S o-c- .,`\f,,,J :N c-•• • I■ vNo tw.v,.►.Q-.`d s `_��ov�•� oc a\ • / .c e:'-- A-k,IV.it_ -Q- r ■Ac^c, t�5 � zewe _ Ra.■ `j 2 o o S:v.S Q - a..,ti`�.� •r Qs: ci�Q....Le . CIS. e. 4Nrovu.. - G _ �Z•�.��C: - �'(L.,�. l�rQe t� . �v :?� -�,.. _ 4 _... V∎ W k_ Acv ‘.e.O e_ S�� -.�.� �1�oM we_ w 0.5, Te, V o ay. a -ov.�� _ _ o .... u--- \ S∎JS „w.' -4k .sL %-rs VAvvJ 's -1A42._ (-_\(:)emce,r-Q_ --\\0ee-S .tt ; Arm °-e N- v%cL.. ' .. ...t-so.�.Tr-. 5 .s,.,.�.�,.Q e,‘ \C\ t It SA \N °Alb t3 )Sme.t.T.totJ RECEIVED FEB COMMU Y DEVELOPM T oP• 3 . 0 0 0 0 0 5 C. t%3 /3/5-/2 (x.) , 40 S4•39 / .39 tr) 0 0 a; u 35 GP _o 40 4 1 o's)v So DJ 1.• N 0 4- si9 N Ic-, . 55 0 C , •-te. 006 CaLG-iq'c,SE. : NriLa.A.p...0■Pclik.._CRO4nM.k*____Ant_SN.Z.,_e"35:tsw‘fS ‘31/4Te"0.. cK•41..r_vv•••■•:\* %..0 VV.< Ule-04.‘i■ r too* sussk--e.....S w.osk ch-N-42- C.CAtA).-.1C■ND•NV V_C1/47.45•4.44..apv.e> -Ict) d5CJ 0LAA,,12. / err s421:'q SN-0-4-‘,..s •Oh-V42- eke_ mcel. Ate, J4& _________S•-:0&. U.-4*-- • • 9-3.4■ Pl2PO C5■•••■.442- „e,a. 6..\\ Ne.-4-v■A:-*5 k-scvA.Ot \oe_ \CK,S W4.5 t"%o•-,=>%.k.••‘ kl1/4e-ex-t°` CkNFgASke--"A-S) z)447 acu're-f-4--%C C%""A‘P'elf qZ.'0•••■r-.1r1JS Were ‘1 exc. k--NreA2-5 42.44.40...dt-e.5 P •r '\ t090 r • W.L. 286.5 ./ • �~ X '.946.0{ I ECEi '1 ED • 2 FEB COMM DEVELOP 7994 NT i ix435) x439 0 ?t'I 1- .i._ on rol • LIZ; W x 4/ O �. ' 1.i. ' -% v • 0 / "% a&Y i 74 d/AS W II■PM ei5-z CON TOUR INTERVAL c0 k 0 00 1- s4.39't g 6a , a . ss .v. 40 N 80 P /3-0_39 4I a� 0 30 Q a 30 N O • %"-2.5%ao 6,a, .0 141 ki c,1 Y03 x. ti g 110 eb (/283 13/5"/Z Cpl " og 47 co � � • o et, - - —' -N v ,tp 6So80 c. 4,9.. 00 !' I 3 5 •35 04 • ScG,1 /gc r f + i � (lad RECEIVED FEB .2 21994 COMMUNITY DEVELOPMENT (f) Zoo p Z C '7- G it th rtiy � >� ° Nth yt 1 o Th N0) N / ° OOL /6r7 . 2 7' M Co 6 O p. G� �l 101 a ,- ? '' ka jI : S�, k1, n RECEIVED FEB 2 2194 441.- COMMU ITY ''���5 DEVELOP ENT „o4ii 1.01"1"4114441111h1 2090 Sign I I I I I I I 144 I I I 11--11--1 I :111° M I 5 275 11111146411A111 INN W. L • 286.5 I 1 I I V I I I . . 1 r I •.. -rf f-- illi••• .. It '-'--A5/9)0(11111 111-1 11111.14111441111.1 ■ I 1 1 113 i I '-.):.:,) *j, ! 4.• 11 . • .-** • • .k.3460 • Ii -' t ' 37 . 7r 400 / LL.----------7.:/ i ... •‘\7"-------,...„.„ , Z. I . --...._. / i I ta.:•„,. .4 :..---- 4z5 1Cr a 1 ..........111,. ..,\ 1 LIS j II ,/ . -----1-1-----___ • I I 1A4L_P3 2 r439 27 1.111 s. Otl n't x4 160 TH ,f).1 w. k - 1 'I' sr /1%. gelo' 1 N \\ - _ 17 • 1 • / ' e \E REC NEC) Es 2 21994. 0 DE MMUNITY LOPMEN11\ • Ej., \, • , r \tj x 7:6 kar. S 1-771/1444S 1APIEI 213 M 4 CON TOUR INTERV, , tZt■JE:.—tio4‘i 0 ocdp,w5a2(..si 0,a4 —4"4' —r-nC441-L I KJE.- Ril.4rort AT t-T taSTAL..4.-eo ZAWN I C.:1A1.7\ • 1 (..* — 2 FqZ., c AouT Li■( t'FRewi Hus'Atoe%f 3o ' 9, A IhksogeAt r...)Ptri.0 / • \\. 4.----r0x, kA it ■ .1 . ead a) ... . s'' el-6" I .C.. s' zo"4, I --- 1000 pyw- 10;) 1/4 LY Pri TAtJ. tkA T±. --rcikAu C)4“.1 1)4 OAJFtL±LQ • ,.• • "•• "•• • • . RECEIVP • FEB 2 2 1994 COMMUN1TY .' , DEVELOPMENT RECEIVED FEB 2 21994 COMMUNITY: DEVELOPMENT