HomeMy WebLinkAboutPermit L94-0079 - FOSTER LINKS PUMP STATION - SHORELINE SUBSTANTIAL DEVELOPMENTL94 -0079
FOSTER LINKS PUMP STATION
13490 NTERURBAN AV S
SHORELINE SUBSTANTIAL DEVELOPMENT
Shor -pine Management Act of 197rv,
PERMIT FOR SHORELINE MANAGEMENT SUBSTANTIAL DEVELOPMENT
File Number: L94 -0079
Status: APPROVED
Applied: 08/26/1994
Approved: 09/26/1994
Expiration: 10/06/1997
Pursuant to RCW 90.58, a permit is hereby granted to: FOSTER LINKS PUMP STATIC
to undertake the following development.:....
MAINTENANCE AND REPLACEMENT OF THE FOSTER LINKS
GOLF COURSE PUMP SYSTEM WHICH DRAWS ITS WATER FROM
THE DUWAMISH RIVER, ;.. 1aa(
...Permit revised April 28).which.allows modificat
ion:
on of irrigation pump system.
upon the following property:
Address: 13490 INTERURBAN AV S
Parcel No:
Sec /Twn /Rnge: 23/23/04
THE PROPOSED PROJECT WILL BE WITHIN THE AREA OF THE GREEN RIVER
AND ITS ASSOCIATED WETLANDS, WHICH, IS A SHORELINE OF STATEWIDE
SIGNIFICANCE AND IS DESIGNATED AS. AN URBAN ENVIRONMENT.
The following master program.pro.vis:ions;. are : applicable
tU lLW l LA-
Development pursuant to this; permit shall be undertaken pursuant to
attached terms. and conditions.
to this development:
This permit is granted pursuant to the Shoreline Management Act of 4971 an
nothing 'in ` this permit shall excuse the applicant from compliance with any
other Federal, State or local statutees, ,or.di`nances or'regulat ions>
applicable to this project, but not i'nconsi`s'tent.with the Shoreline
Management Act (Chapter 90.58 RCW).
This permit may be rescinded pursuant to RCW 90.58.140(8) in ,,the event the
permittee fails to comply with the terms or conditions hereof.,
CONSTRUCTION PURSUANT TO THIS PERMIT WILL NOT BEGIN OR IS NOT AUTHORIZED
UNTIL THIRTY (30) DAYS FROM THE DATE OF FILING WITH THE DEPARTMENT OF
ECOLOGY AS DEFINED IN RCW 90.58. 140(6): AND WAC 173 -14 -090, OR UNTIL ALL
REVIEW PROCEEDINGS INITIATED WITHIN THIRTY DAYS FROM THE DATE OF SUCH
FILING HAVE TERMINATED; EXCEPT AS PROVIDEDIN`:.: RCW . 90.58.140(5)(a)(b)(c).
Date: _4_L_2$ }L 5S7
Steve Lancaster
Director, Planning Department
Construction or substantial progress toward construction must begin within
two years from date of issuance, per WAC 173 -14 -060.
. A F F I D A V I T 0.F D I S T R I B U T I O N
i, Sylvia Schnug
hereby declare that:
❑ Notice of Public Hearing ❑Determination of Non -
significance
O Notice of Public Meeting 0 Mitigated Determination of
Nonsignificance
O Board of Adjustment Agenda fl Determination of Significance
Packet and Scoping Notice
f Board of Appeals Agenda O Notice of Action
Packet
Planning Commission Agenda D Official Notice
Packet
fl Short Subdivision Agenda ❑Other
Packet
fl Notice of Application for E Other
Shoreline Management Permit
Shoreline Management Permit
was mailed to each of the following addresses on 10 -4 -94
Department of Ecology
Department of Ecology - Shoreline Permit Reviewer
Friends of the Duwamish
Muckleshoot Indian Tribe
City Clerk — bin (t4 (72.ilrwti 4
Mayor — Ofr l�1 ( LIt vv!`+
Appl i cant— �v,Q (/yP vvv ,t
VvtiiolcC (cM s - QV tL' ir. i-vv“
Name of Project Foster Pump Station
File Number L94 -0079
Shoreline Management Act of 1971
PERMIT FOR SHORELINE MANAGEMENT. SUBSTANTIAL DEVELOPMENT
File Number: L94 -0079
Status: PENDING
Applied: 08/26/1994
Approved:
Expiration:
Pursuant to RCW 90.58, a permit is hereby granted to:
CITY OF TUKWILA
to undertake the following development:
MAINTENANCE AND REPLACEMENT OF THE FOSTER LINKS
GOLF COURSE PUMP SYSTEM WHICH DRAWS ITS WATER FROM
THE DUWAMISH RIVER.
upon the following property:
Address:
Parcel No:
Sec /Twn /Rnge:
THE PROPOSED PROJECT WILL BE WITHIN THE AREA OF THE GREEN RIVER
AND ITS ASSOCIATED WETLANDS, WHICH IS A SHORELINE OF .STATEWIDE
SIGNIFICANCE AND IS DESIGNATED AS AN URBAN ENVIRONMENT.
The following master program provisions are applicable to this development:
TUKWILA SHORELINE MASTER PROGRAM
Development pursuant to this permit shall be undertaken pursuant to the
attached terms and conditions.
This permit is granted pursuant to the Shoreline Management Act of 1971 an
nothing in this permit shall excuse the applicant from compliance with any
other Federal, State or local statutes, ordinances or regulations
applicable to this project, but not inconsistent with the Shoreline
Management Act(Chapter 90.58 RCW).
This permit may be rescinded pursuant to RCW 90.58.140(8) in the event the
permittee fails to comply with the terms or conditions hereof.
CONSTRUCTION PURSUANT TO THIS PERMIT WILL NOT BEGIN OR IS NOT AUTHORIZED
UNTIL THIRTY (30) DAYS FROM THE DATE OF FILING WITH THE DEPARTMENT OF
ECOLOGY AS DEFINED IN RCW 90.58.140(6) AND WAC 173 -14 -090, OR UNTIL ALL
REVIEW PROCEEDINGS INITIATED WITHIN THIRTY DAYS FROM THE DATE OF SUCH
FILING HAVE TERMINATED; EXCEPT AS PROVIDED IN RCW 90.58.140(5)(a)(b)(c).
Date ___21Ale
recti5r, Plan ing(Qpartment
L. Rick Beeler
Construction or substantial progress toward construction must begin within
two years from date of issuance, per WAC 173 -14 -060.
STATE OF WASHINGTON
DEPARTMENT OF ECOLOGY
Northwest Regional Office, 3190 - 160th Ave S.E. • Bellevue, Washington 98008 -5452 • (206) 649 -7000
May 5, 1995
City of Tukwila
6200 Southcenter Blvd.
Tukwila, WA 98188
Dear Sir or Madame:
Re: City of Tukwila Permit # L94 -0079
City of Tukwila - Applicant
Revised Shoreline Management Permit # 1995- NW- 41106A
The subject Revised Shoreline Substantial Development Permit was
approved by the City of Tukwila on April 28, 1995, and received by this
office on May 2, 1995. The 30 day appeal period will terminate June 1,
1995.
At your own risk, construction may begin during this appeal period
provided all other federal, state, and local laws regulating such
construction have been complied with. We will notify you by letter if
this permit is appealed.
Sincerely,
Robert J. itzen
Shorelands Specialist
Shorelands and Coastal Zone
Management Program
RF:rf
RECREV.WP
cc: Rick Beeler - City of Tukwila
RECEIVED
MAY 0 81995
TUKWILA
PUBLIC WORKS
- -�(d ALA,
••<
o
��� City of Tukwila John W. Rants, Mayor
VIII o.;
4���• :''_ Department of ('nmmllnihJ npvP_1nnmPnt Steve Lancaster Director
•
1908 -
MEMORANDUM
TO: Lynn Devoir, Recreation Superintendent
FROM: John Jimers , Associate Planner
DATE: May 1, 1995
RE: Foster Links Pump Station Amendment
L94 -0079
The Department of Community Development has approved the proposed
revision to the Foster Links Pump Station project. Pursuant to WAC
173 -14- 064(6), this revision goes into effect immediately. If
you have any questions on this action, do not hesitate to call me
at x. 1663.
6300 Southcenter Boulevard, Suite. #100. • Tukwila, Washington 98188 • (206) 431:3670 • Fax (206) 4313665
Memorandum
TO: Jack Pace
FROM: John Jimerson
RE: Shoreline Permit Revision, Tukwila Parks and Recreation
DATE: April 28, 1995
6
Project File No. L94 -0079
1. PROJECT DESCRIPTION:
The Tukwila Parks Department has requested a revision to Shoreline
Permit No. L94 -0079 which was issued September 29, 1994. That
permit allowed for construction of a new irrigation pump station on
the Duwamish River at the Foster Golf Course. Rather than
installing a complete new station as authorized by the permit, the
applicant proposes rehabilitating the existing pump station by
installing a new steel pile at the same location as the existing
pipe, using the existing foundation and supports. Rather than
installing a new underground pump station as allowed in the initial
permit, the new pump station will replace the existing station on
the top of the bank on an existing concrete pad.
2. REVISIONS TO PERMITS:
WAC 173 -14 -064 allows revisions to permits for projects which meet
the following criteria:
(a) No additional over water construction is involved except that
pier, dock, or float construction may be increased by five
hundred square feet or ten percent from the provisions of the
original permit, whichever is less.
Response: No additional over water construction is proposed. The
new steel pipe will be located along the same alignment as the
existing pipe.
(b) Ground area coverage and height of each structure may be
increased a maximum of ten percent from the provisions of the
original permit.
Response: The new pump station is located on the same pad and is
lower in height than the existing pump station.
(c) Additional separate structures may not exceed a total of two
hundred fifty square feet.
Response: The pump station is less than 250 s.f.
(d) The revised permit does not authorize development to exceed
height, lot coverage, setback, or any other requirements of
the applicable master program except as authorized under the
.
original permit.
Response: The proposal meets the development standards of the
master program.
(e) Additional landscaping is consistent with conditions (if any)
attached to the original permit and with the applicable master
program.
Response: No additional landscaping is proposed
(f)
The use authorized pursuant to the original permit is not
changed.
Response: The use remains the same. Variations on the system design
are proposed.
(g) No substantial adverse environmental impact will be caused by
the project revision.
Response: The project will not have substantial environmental
impacts.
3. RECOMMENDATION:
Approve the permit revision.
City of Tukwila
6200 Southcenter Boulevard • Tukwila, Washington 98188 John W. Rants, Mayor
MEMORANDUM
TO: Jack Pace, Senior Planner
FROM: Lynn M. Devoir, Parks & Recreation Superint
DATE: March 6, 1995
SUBJECT: Shoreline Permit Revision - Foster Golf Links Pump Station -L94 -0079
In August 1994, the City applied for a Shoreline Permit for the Foster Golf Links Pump
Station Maintenance. Due to screening requirements by Fisheries and the uncertainty of
approval from the Muckleshoot Indian Tribe, we have made some revisions to the plans
and are seeking approval for an amendment to the original Shoreline Permit -L94 -0079.
Instead of replacing the current pump station, we will use it with some minor
maintenance improvements. The existing pipe supports and platform will be utilized
using the old pump station to fill the pond and pump the water from the pond into the
irrigation system. I have reviewed the revised plan drawings for the pump station with
John from your department and have attached them to this memo.
The maintenance type improvements to the old pump station are within the 200 foot
shoreline. The vault with the mechanical equipment for the pump will be installed on the
existing cement platform. After that is completed, a trench for a 6 inch water pipe will be
dug and a pipe laid to connect with the pond. At the pond, another pump station will be
constructed to take water from the pond into the irrigation system. The pond and
irrigation pump station are outside of the 200 foot area.
Please let me know if you need additional information for the revision to our Shoreline
Permit. Once I receive your approval, we will submit our Hydraulic Project Application.
Thank you and to your staff for all the assistance with this application.
LMD /dc
shorejp
Phone: (206) 433 -1800 • City Hall Fax (206) 433 -1833
STATE OF WASHINGTON
DEPARTMENT OF ECOLOGY
Northwest Regional Office, 3190 - 160th Ave S.E. • Bellevue, Washington 98008 -5452 • (206) 649 -7000
November 3, 1994
City of Tukwila
6200 Southcenter Blvd.
Tukwila, WA 98188
Dear Sirs:
Re: City of Tukwila Permit #L94 -0079
City of Tukwila - Applicant
Shoreline Substantial Development Permit #1994 NW 10006
The subject Shoreline Management Substantial Development permit was
filed with this office by the City of Tukwila on October 6, 1994.
The development authorized by the subject permit may NOT begin until the
end of the appeal period on November 7, 1994. You will be notified in
writing if this permit is appealed. Other federal, state, and local
permits may be required in addition to the subject permit.
If this permit is NOT appealed, this letter constitutes the Department
of Ecology's final notification of action on this permit.
Si rely,
Robert J /-itzen
Shorelands Specialist
Shorelands and Coastal Zone
Management Program
RF:rf
NOV 0 71994
Foster
Golf
Course
T
139 St
PR JFT
L. �ATII \
St
44 St
St
S 150 St
149 St
0 St
S 150
Pl
S 152
S152St
S 149 S
S
RECEIVED
AUG 1 9 1994
Evans
Black
iv
COMMUNITY
DEVELOPMENT
City of Tukwila
FOSTER GOLF COURSE PUMP STATI ❑N
* 1AM8
August 19, 1994
Vicinity
Map
n
mit
h 1
aA
- " h P WA AIR � r•
�
Mt
m hal
at
ns w M AP, pa
AP wan 'Gar
fh h43 M an a•
0I is
mo w Ara
an •lll
r Mar
•K IR aR as
In h•r N4R -al
-L "day- — —
a
a
a
11)
11 �
44 rn
o a 6
•
1
z
Dan AK URN
GflIMd0
••••• ont AA
PLAN AND PROFILE
FOSTER GOLF PUMP STATION
V
.M50v10.OA .AM,
.0 Awl. .11
DESION 2420
AIA - /Mw AIL OIL
SWIM 01.1MIN/ 101!
00008 ENGINEERS, _INC.
Gv1I. 1001455500 0115V1v1n0 RKIA4w0
AM• -IMM AK KS.- Y<< 111
0104.1we. MIa Sw..111•
(10) MI./TM 4A-s111
MEMO
TO:
FROM:
DATE:
SUBJECT:
City of Tukwila
John W. Rants, Mayor
Department of Community Development Rick Beeler, Director
Lynn D'evoir, Recreation Superintendent
Denni Shefrin, Associate Planner
September 29, 1994
Foster Links Golf Course Pump Station, L94 -0079; L94 -0080
I have attached comments received from the Department of Public
Works related to this project. All comments related to specific
design issues will be handled through Tukwila's Flood Control Zone
Permit (FCZ) process. Therefore, there are no conditions imposed
as part of the Shoreline Management Substantial Development Permit
or the SEPA Determination of Nonsignificance.
Please coordinate with John Pierog and /or Phil Fraser for the FCZ
Permit and plan revisions as described in the attached memo.
Thank you.
cc: John Pierog, Associate Engineer
Phil Fraser, Senior Engineer
6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • (206) 431-3670 • Fax (206) 431-3665
TO: John Pierog
FROM: Phil Fraser
DATE: 9/28/94
M E M O RAN D U M
SEP 2 g
(.liwiwIL.Yrs,
DEVELOPMENT•
:SUBJECT: Foster Golf links Golf Course Pump Station
(Project No. L94 -0079 & L94 -0080)
My comments w/ respect to the following application:
1. FCZ Permit required as stated.in environmental
2. Identify as part of scope of work (Page•3) and
information in•document how'existing pump facility to
be abandoned.
3. Identify.if CORP's Nationwide permit or approval
required as part of this plan.
4. HPA, Shoreline and CORP's approvals /permits will be
conditions of Tukwila's'FCZ permit.
5. Plan Sheets request resubmittal to:
A. Show existing and final riverbank slopes from
toe to top of bank.
B. Revise plan to show rip rap keyed into toe of
river per "King County's Guidelines for Bank Stabiliz-
ation Projects"
C. Also, show how riverbank will be stabilized above
OHWM with' vegetation in accordance with "King County's
Guidelines for Bank Stabilization Projects"
Is electrical feed issues satisfied? (Refer to Ted
Freemire and Pat Brodin ^omments at Engineering
Plan Review meeting).
E. Show abandonment of existing pipe and pump station.
G. Provide temporary erosion control plan for PW review..
H., Include HPA, Shorelines and CORP's permits /conditions
D./
cc. Ron Cameron
PF:prf:donw
TO: John Pierog
FROM: Phil Fraser
DATE: 9/28/94
M E M O R A N D U M
RFCF ".
$Ep 2 81994
tili�vllvlLi�vi 1 1
'DEVELOPMENT
SUBJECT: Foster Golf links Golf Course Pump Station
(Project No. L94 -0079 & L94 -0080)
My comments w/ respect to the following application:
1. FCZ Permit required as stated in environmental
2. Identify as part of scope of work (Page 3) and
information in document how existing pump facility to
be abandoned.
3. Identify if CORP's Nationwide permit or approval
required as part of this plan.
4. HPA, Shoreline and CORP's approvals /permits will be
conditions of Tukwila's FCZ permit.
5. Plan Sheets request resubmittal to:
A. Show existing and final riverbank slopes from
toe to top of bank.
B. Revise plan to show rip rap keyed into toe of
river per "King County's Guidelines for Bank Stabiliz-
ation Projects"
C. Also, show how riverbank will be stabilized above
OHWM with vegetation in accordance with "King County's
Guidelines for Bank Stabilization Projects"
D. Is electrical feed issues satisfied? (Refer to Ted
Freemire and Pat Brodin ^omments at Engineering
Plan Review meeting).
E. Show abandonment of existing pipe and pump station.
G. Provide temporary erosion control plan for PW review..
H. Include HPA, Shorelines and CORP's permits /conditions
cc. Ron Cameron
PF:prf:donw
CHECKLIST: ENV&ONMENTAL REVIEW /SHORELINE PERMIT MAILINGS
FEDERAL AGENCIES
( )U.S. ARMY CORPS OF ENGINEERS
( )FEDERAL HIGHWAY ADMINISTRATION
( )DEPT. OF INTERIOR -FISH & WILDLIFE SERVICE
( )U.S. ENVIRONMENTAL PROTECTION AGENCY
( )U.S. DEPARTMENT OF H.U.D. (REGION X)
WASHINGTON STATE AGENCIES
( )OFFICE OF ARCHAEOLOGY
( )TRANSPORTATION DEPARTMENT
( )DEPT. OF NATURAL RESOURCES
( )OFFICE OF THE GOVERNOR
( )DEPT. OF COMMUNITY DEVELOPMENT
( )DEPT. OF FISHERIES
( )K.C. PLANNING & COMMUNITY DEV.
( )BOUNDARY REVIEW BOARD
( )FIRE DISTRICT #11
' ( )FIRE DISTRICT #2
( )SOUTH CENTRAL SCHOOL DISTRICT
( )TUKWILA LIBRARIES
( ) RENTON LIBRARY
( )KENT LIBRARY
( )CITY OF SEATTLE LIBRARY
( )US WEST
( )SEATTLE CITY LIGHT
( )WASHINGTON NATURAL GAS
( )WATER DISTRICT #75
( )SEATTLE WATER DEPARTMENT
( )GROUP W CABLE
( )OLYMPIA PIPELINE
( )KENT PLANNING DEPARTMENT
( )TUKWILA CITY DEPARTMENTS:
( )PUBLIC WORKS ( ) FIRE
( )POLICE ( )FINANCE
( )PLANNING ( )BUILDING
( )PARKS AND ORECREATION
( )TUKWILA MAYOR
( )DEPARTMENT OF SOCIAL & HEALTH SERVICES
( )DEPT. OF ECOLOGY, SHORELANDS DIVISION
( )DEPT. OF ECOLOGY, SEPA DIVISION*
( )DEPARTMENT OF WILDLIFE
( )OFFICE OF ATTORNEY GENERAL
*SEND CHECKLIST WITH DETERMINATIONS AND
*SEND SITE MAPS WITH DECISION
RING COUNTY AGENCIES
( )KING COUNTY DEPT. OF PARKS
( )HEALTH DEPARTMENT
( )PORT OF SEATTLE
( )BUILDING & LAND DEV. DIV.-
SEPA INFORMATION CENTER
SCHOOLS /LIBRARIES
( )HIGHLINE SCHOOL DISTRICT
( )KING COUNTY PUBLIC LIBRARY
( )SEATTLE MUNICIPAL REFERENCE LIBRARY
( )SEATTLE SCHOOL DISTRICTS
( ) RENTON SCHOOL DISTRICT
UTILITIES
( )PUGET SOUND POWER & LIGHT
( )VAL -VUE SEWER DISTRICT
( )WATER DISTRICT #20
( )WATER DISTRICT #125
( )CITY OF RENTON PUBLIC WORKS
( )RAINIER VISTA
( )SKYWAY
CITY AGENCIES
( ) RENTON PLANNING DEPARTMENT
( )CITY OF SEA -TAC
( )CITY OF SEATTLE
( )CITY OF BURIEN
( )TUKWILA PLANNING COMMISSION MEMBERS
( )TUKWILA CITY COUNCIL MEMBERS
OTHER LOCAL AGENCIES
( )PUGET SOUND REGIONAL COUNCIL
( )P.S. AIR POLLUTION CONTROL AGENCY
( )SW K.COUNTY CHAMBER OF COMMERCE
( )MUCKLESHOOT INDIAN TRIBE
( )DUWAMISH INDIAN TRIBE
MEDIA
( )DAILY JOURNAL OF COMMERCE
( )VALLEY DAILY NEWS
( )METRO ENVIRONMENTAL PLANNING DIV.
OFFICE /INDUSTRIAL 5,000 GSF OR MORE
RESIDENTIAL 50 UNITS OR MORE
RETAIL 30,000 GSF OR MORE
( ) HIGHLINE TIMES
( )SEATTLE TIMES
1
PUBLIC NOTICE MAILINGS FOR PERMITS
SEPA MAILINGS
Mail to: (comment period starts on date of mailing)
Dept. of Ecology Environmental Review Section
Applicant
Other agencies as necessary (checked off on attached list)
Include these documents:
SEPA Determination (3 -part form from Sierra)
Findings (staff report, usu. with MDNS)
SEPA Checklist (filled out by applicant)
Drawings /Plans of project (site plan, elevations, etc. from PMT's)
Affidavit of Dlstribution (notice was mailed & sent to newspaper).
SHORELINE MAILINGS
Notice of Application:
Notice of application for a substantial development Permit must be
mailed to owners and to property owners within 300 feet of subject
property, prepare an affidavit of publication, and publish two
consecutive weeks with deadline for comments due 30 days after last
newspaper publication date.
Shoreline Permit:
Mail to: (within 8 days of decision; 30 -day appeal period begins
date received by DOE)
Department of Ecology Shorelands Section
State Attorney General
Applicant
Indian Tribes
Other agencies as necessary (checked off on attached list).
Include these documents:
Shoreline Substantial Development Permit (3 -part form from Sierra)
Findings (staff report, if applicable)
Shoreline Application Form (filled out by applicant)
Drawings /Plans of project (site plan, elevations, etc. from PMT's)
Site plan, with mean high water mark & improvements
Cross- sections of site w /structures & shoreline
_ Grading plan
Vicinity map
SEPA Determination (3 -part form from Sierra)
Findings (staff report, usu. with MDNS)
SEPA Checklist (filled out by applicant)
Any background studies related to impacts on shoreline
Notice of Application
Affidavit of Distribution (notice was mailed & sent to newspaper)
Affidavit of Publication (notice was published in newspaper).
A F F I D A V I T
Robin R. Stanley
O Notice of Public Hearing
O Notice of Public Meeting
OBoard of Adjustment Agenda
Packet
O Board of Appeals Agenda
Packet
OPlanning Commission Agenda
Packet
0 Short Subdivision Agenda
Packet
O F D I S T R I B U T I O N
hereby declare that:
X(XNotice of Application for
Shoreline Management Permit
O Shoreline Management Permit
fl Determination of Non -
significance
0 Mitigated Determination of
Nonsignificance
O Determination of Significance
and Scoping Notice
O Notice of Action
0 Official Notice
0 Other
0 Other
was mailed to each of the following addresses on 8/29/94
MAILED TO DEPARTMENT OF ECOLOGY
MAILED TO FRIENDS OF THE DUWAMISH
MAILED TO MUCKLESHOOT INDIAN TRIBE
SENT TO THE MAYORS OFFICE
SENT TO CITY CLERKS OFFICE
SENT TO THE APPLICANT
Name of Project FOSTER PUMP STATION
File Number L94 -0079
Signature
FORM 81 (REV. 7/86)
Affidavit of Publication .EoEN�D
STATE OF WASHINGTON,
COUNTY OF KING,
SEP 3 0 1994
CITY OF TUKWILA
FINANCE DEPT.
APPLE BOUNYARITH being duly sworn, says that he /she is the Principal Clerk of
Seattle Times Company, publisher of THE SEATTLE TIMES and representing the SEATTLE POST -
INTELLIGENCER, separate daily newspapers, printed and published in Seattle, King County, State of
Washington; that they are newspapers of general circulation in said County and State; that they have
been approved as legal newspapers by order of the Superior Court of King County; that the annexed,
being a 101 classified advertisement ❑ display advertisement, was published in:
n The Seattle Times ❑ Seattle Post - Intelligencer ❑ and
not in a supplement thereof, and is a true copy of the notice as it was printed in the regular and entire
issue of said paper or papers on the following day or days September 02, 09, 1994
and that said newspaper or newspapers were regularly distributed to its subscribers during all of said
period.
• NOTICE OF APPLICATION
FOR SNORELINE MANAGE=
z• MENTSSUS ANTIAL
*i ?P.�FRMtTi,
KWrppclt�rl���,,. «,1�.
r 7AN�IRL
•
MeV!
Subscribed and sworn
of Relatpmb Pr
%�i/!L•1•[r, (ti.
to before me this
Twenty -third
,19s�_ (j
� Z Notary Public In
day
.e Sta noton
residing at
Affidavit of Publication •
STATE OF WASHINGTON,
COUNTY OF KING,
RECEIVtV
OCT .1 21994
CFINANCE TUKWILA
APPLE BOUNYARITH being duly sworn, says that he /she is the Principal Clerk of
Seattle Times Company, publisher of THE SEATTLE TIMES and representing the SEATTLE POST -
INTELLIGENCER, separate daily newspapers, printed and published in Seattle, King County, State of
Washington; that they are newspapers of general circulation in said County and State; that they have
been approved as legal newspapers by order of the Superior Court of King County; that the annexed,
being a ❑ classified advertisement ❑ display advertisement, was published in:
TEK The Seattle Times ❑ Seattle Post - Intelligencer ❑ and
not in a supplement thereof, and is a true copy of the notice as it was printed in the regular and entire
issue of said paper or papers on the following day or days October 7. 1994
and that said newspaper or newspapers were regularly distributed to its subscribers during all of said
period.
Shoreline Management Act :r
PERMIT FOR •
SHORELINE MANAGEMENT
DEVELOPMENT
File Number: 1940079
Status: PENDING
Applied: 011/26 /1994
Approved:
Expiration:
Pursuant to RCW 90.511, a permit
Is hereby granted to:
CITY OF TUKWILA
to undertake the following
development:
PLACEMENT OF AND FOS-
TER LINKS GOLF COURSE
DRAWS S ITSSWATER WHICH
rHE DUWAMISH RIVER
upon the following property:
Address:
Parcel No:
SecfTWNRnge:
THE PROPOSED PROJECT
OF THE GREEN RIVER AREA N
ITS ASSOCIATED W ETLANM
WHICH 15 A SHORELINE OF
STATEWIDE SIGNIFICANCE
AND EIRNEN AN ANNVOEMT
The following master program
Provisions are applicable fa MIS
development: TUKWILA
- SHORELINE MASTER.
PROGRAM
permit be undertaken this
suant to the attached terns and
conditions.
This permit is granted pursuant
to the Shoreline Management
Act of 1971 and nothing In thIs
cant froshall cmpllia4en with any
other Federal, State or local
statutes, ordinances or Ice.
but s not incconsistenti with the
Shoreline Management .Act
(Chapter90.Se RCW).. .
This permit may be rescinded
thereventtthe permittee tto11. io
comply with the terms or condi-
tions hereof.
CONSTRUCTION PURSUANT
TO THIS PERMIT WILL NOT
BEGIN OR I5 NOT AUTHO-
RIZED THE (DATE IOF
FILING WITH THE DEPART -
MENT OF ECOLOGY AS DE-
FINED N AC)173-1� ORE UNTIL.
INIt REVIEW WITH NETHIIRTY
SUCH FILIINGTHAVE TTERMI
NATEDI EXCEPT AS PRO-
ED M0ISHa) (b) (e).
Date: 9/29/94 W L. Rick Beeler
Director, Planning Department
substantial
obf s i Construction ulan rtpd er o WnAr1 1, pmufst i
Subscribed and sworn to before me this
of October s 19 94
d7) aa/lar'`/
•
Tenth
day
NolafviPublic in and r the State of Washington
residing at C
•
SHORELINE SUBST•F iTIAL DEVELOPMENT
CEIVED APPLICATION
CITY OF TUKWILA P J3 1 '
DEPARTMENT OF COMMUNITY QkliaQEM
DEVELOPMENT
T A'Cr•f �l �
6300 Southcenter Boulevard, Tukwila, WA 98188
Telephone: (206) 431 -3680
1. BRIEFLY DESCRIBE YOUR PROPOSAL: Replace Existing Irrigation Pump
Station at Foster Links Golf Course
2. PROJECT LOCATION: (Give street address or, if vacant, indicate lot(s), block, and sub-
division; or tax lot number, access street, and nearest intersection)
Foster Golf Links
Quarter: Section: 14 Township: 23 Range: 4
(This information may be found on your tax statement)
3. APPLICANT :* Name: Lynn M. Devoir
Address. 6200 Southcenter Boulevard, Tukwila, WA 98188
Phone. 433 -1846
Signature: Date:
* The applicant is the person whom the staff will contact regarding the application, and
to whom all notices and reports shall be sent, unless otherwise stipulated by applicant.
4. PROPERTY Name:
OWNER
AFFIDAVIT OF OWNERSHIP
City of Tukwila
Address: 6200 Southcenter Boulevard
Tukwila, WA 98188
Phone, 833 -1800
I /WE,[signature(s)] -1i Off- 6�
swear that I /we are th er(s) or ntr a6urchaser(s) of the property involved
in this application and that the foregoing statements and answers contained in this
application are true and correct to the
best of my /our knowledge and belief. Date: 4i) , /6') M14
SHORELINE SUBSTANTIAL DEVELOPMENT APPLICATION Page 2
5. Present use of ro er
p p ty : Municipal Golf Course
6. Total construction cost and fair market value of proposed project (indude additional future
developments contemplated but not induded in this application): $10 , 000
7. List the master program policies (use program sections or page numbers) which are applicable
to this development
1, 2, 5s 6, 10
8. List any other permits for this project from state, federal or local governmental agencies for which
you have applied or will apply, induding the name of the issuing agency, whether the permit has
been applied for (and if so, the date of the application), whether the application was approved or
denied and the date of same, and the number of the application or permit:
SFPA (State Environmental Protection)
Flood Control (City of Tukwila)
Hydraulic. Project Approval (State Fisheries)
9. Nature of the existing shoreline. Describe type of shoreline, such as stream, lake, marsh, flood
plain, floodway, delta; type of beach, such as erosion, high bank, low bank, or dike; material such
-- as sand; gravel, mud; clay; rock, riprap; and :extent and type of bulkheading, if any (to be completed-
by local official):
High Bank River Shoreline
10. In the event that any of the proposed builidngs or structures will exceed a height of thirty -five feet
above the average grade level, indicate the approximate location of and number of residential
units existing and potential, that will have an obstructed view (to be completed by local official):
none
SHORELINE SUBSTANTIAL DEVELOPMENT APPLICATION
Page 3
11. If the application involves a Conditional Use or Variance, set forth in full that portion of the Master
Program which provides that the proposed use may be a Conditional Use or, in the case of a
Variance, from which the variance is being sought (to be completed by local official):
N/A
12. Give a brief narrative description of the general nature of the improvements and land use within
one thousand (1,000) feet in all directions from the development site:
Proposed pump is located on a fully landscaped golf course.. The
only built improvements within 1000 feet are a pedestrian/golf cart
bridge and a - 300 square foot restroom building.
•
City of Tula "ila
Central Permit System — Engineering Division
6300 Southcenter Blvd., Suite #100, Tukwila, WA 98188
Apply ?oon #
Phone: (206) 433 -0179
UTILITY PERMIT APPLICATION
:;'PROJ.E
<4NF.:.4) RMATION >'
Site Address:
13490 Interurban Avenue South, Tukwila, WA
98188
Name of Project: Maintenance and Renewal
Property Owner:
Street Address:
Engineer:
Street Address:
Contractor:
Street Address:
City of Tukwila
6200 Southcenter Boulevard
RECEIVED
AIE 9 1994
Foster Pump Station
Phone No.: 206 - 433 -1846
City /State/Zip: Tukwila, WA 98188
Phone No.:
CU►viw'ivwi t'Y
King Cty Assessor Acct #: DEVELOYMEN'►
City / State/Zip:
Phone No.:
City /State/Zip:
Contractor's License #:
❑ Channelization /Striping /Signing
Curb CuVAccess /Sidewalk
Fire Loop /Hydr. (main to vault) — No.: Sizes:
■ Flood Zone Control
❑ Hauling
❑ Land Altering cubic yards
❑ Landscape Irrigation
❑ Moving an Oversized Load
Est. start/end times*
Date:
❑ Sanitary Side Sewer — No.:
❑ Water
ESCRIPT,ION
Exp. Date:
❑ Sewer Main Extension ❑ Private ❑ Public
❑ Storm Drainage
❑ Street Use
❑ Water Main Extension ❑Private ❑ Public
❑ Water Meter / Exempt: — No.: Sizes:
Deduct ❑ Water Only ❑
❑ Water Meter / Permanent — No.: Sizes•
❑ Water Meter/ Temporary: — No.: Sizes
Estimated quantity:
Schedule:
❑ Other:
Name: Foster Golf Links Phone No.: 242 -4221
Street Address: 6200 Southcenter Boulevard City / State/Zip: Tukwila,,
Name: Foster Golf Links
WA 98188
Phone No.: 242 -4221
Street Address: 6200 Southcenter BoulevardCity /State/Zip: Tukwila,
❑ Sewer ❑ Metro ❑ Standby
JECTs ❑ Single- Family Residential
WA 98188
❑ Multiple - Family Dwelling ❑ Hotel
No. of Units: ❑ Motel
❑ Commercial/Industrial ❑ Office
❑ Retail
❑ New Building
Square
Footage:
King County Assessor's valuation of existing structures: $
M.I.S.C:ELt~'ANEOUS
INFORMATION
El Duplex
El Triplex
El Warehouse
❑ Manufacturing
❑ Apartments
❑ Condominiums
lOther: Golf Course
❑ Church ❑ School/College /University
❑ Hospital ❑ Other:
❑ Remodel/
Addition
Square footage of original building space:
Square footage of additional building space:
Valuation of work to be done: $
I HEREBY CERTIF:.::l'
Applicant /Authorized
Agent Signature:
Print Name:
`AREA.. D :THIS APPLICATION . ND'KNDW.. THE':.
IEAVD ?COR.R.ECT
Contact Person
(print name):
Address:
Date:
Phone:
Phone:
Date Application Accepted:
Date Application Expires:
04/22/92
SUBMITTAL CHI ;KLIST
All site plans shall be provided in one submittal for review by the Public
Works Department. Six (6) sets of plans stamped by a licensed engineer
are required along with this application completed and signed by the
applicant's representative.
The following information is necessary for Public Works Department
evaluation and approval of site plans:
• All utility construction is to meet the City of Tukwila Standards
• Indicate scale of drawing and show north arrow
• Identify location by address or distance to nearest intersection
• Identify public right -of -way and any easements
• Use standard 24' x 36' sheets for all site plans
CURB CUT /ACCESS /SIDEWALK /
CHANNELIZATION /STRIPING/SIGNING
O Dimensions
O Type of surfacing - asphalt, crushed rock, etc.(and thickness)
O Percent of slope and runoff direction
O Size of curb cuts / locations
O Vehicular and pedestrian traffic facilities, including signing and
striping, wheel chair ramps, curb cuts
O 20' of paving on all gravel driveways connecting to paved roads
FIRE LOOP /HYDRANT
O Type of pipe / hydrant
O Size of pipe/location
O Location and type of all valves
O Type of bedding and backfill material / percent compaction
O Distance from structures, storm and sewer facilities
O Location and size of thrust blocking
FLOOD: ZONE CONTROL x (Requirements are under :Rood Ord"
Y.9,146 2, and can be obtained from the f?ublic,Works Det.
O .Lowestfinishedt floor. elevation,!,;; �.;;, },;;;�f;_, -_�: • r
:O - Contours and elevations per National Geodetic Vertical Datum
LAND ALTERING (CLEARING, CUT AND FILL)
O Contour map (2' intervals) showing existing and proposed contours
O Estimate of yardage, both cut and fill
O Erosion control plan with temporary and permanent measures
HAULING
O Quantities of materials to be hauled to and/or from site
O Copy of Certificate of insurance coverage (minimum $1,000,000)
O $2,000 bond made out to the City of Tukwila for property damages
caused by activities
O Route map
LANDSCAPE IRRIGATION
O Location of DSHS approved double check valve •
O Type of pipe - copper, high density molecular plastic, ductile
O Size and depth of pipe
O Size of meter and meter box
O Location and elevation of meter box (water meter - permanent and
exempt). Clearly show whether tap is on main or domestic service
O Location and type of tap
O Type of bedding and backfill material / percent compaction
MOVING AN OVERSIZED LOAD
O Copy of Certificate of insurance coverage (minimum $1,000,000)
O $5,000 bond made out to the City of Tukwila for property damages
caused by activities
O Business License with City of Tukwila
O Route map
O Dimensions (L X W X H) of overall load
SANITARY S : SEWER
O Type of pipe - °'ncrete, PVC, etc.
O Size of pipe/location
O Percent of slope on pipe/length of run
O Connection point(s) to existing system
O Location of cleanout(s) and test Tec(s)
O Type of bedding and backfill material /percent compaction
O Invert elevations at structures and junctions
SEWER MAIN EXTENSION
O Type of pipe - concrete, PVC, etc.
O Size of pipe/location
O Percent of slope on pipe/length of run
O Connection point(s) to existing system
O Location of cleanouts and manholes
O Type of bedding and backfill material /percent compaction
STORM DRAINAGE (include existing topography and proposed
grading and surfacing)
O Type of pipe — concrete, ADS, etc.
O Size of pipe / location
O Percent of slope on pipe / length of run
O Location of ali structures
O Square footage of area to be drained, including roof area
O Type of bedding and backfill material / percent compaction
O Invert or flow line elevations
STREET USE
O Complete description of proposed activity
O Map with address and outline of limits of activity relative to public
right -of -way and easements
O Proposed traffic control/detour (per Manual of Uniform Traffic
Control Devices)
O Proposed schedule (times and dates)
WATER MAIN EXTENSION
O Type of pipe — copper, PVC, etc.
O Size of pipe / location
O Hydrant types and locations
O Valve types and locations
O Connection point(s) to existing system
O Type of connection - live tap, tee, etc.
O Location and size of thrust blocking
O Size and location of mains, including elevations (profile)
WATER METER - EXEMPT
O Diagram of domestic system/tie in of exempt meter
O Number /account for existing domestic meter
O Size and type of material of meter, service and meter box
O Site address
WATER METER - PERMANENT
O Type of pipe - copper, high density molecular plastic, ductile
O Size and depth of pipe
O Size of meter and meter box
O Location and elevation of meter box (water meter - permanent and
exempt)
O Location and type of tap .
O Type of bedding and backfill materials /percent compaction
WATER METER - TEMPORARY
O Address and hydrant location
O Size of meter
O Estimate of quantity and schedule
After the Public Works Department has completed their review and the plans are approved, the applicant will be notified
by letter conceming the necessary permits and requirements; an approved set of plans will accompany the letter.
If the plans are not approved, the applicant will be notified by letter of ,necessary resubmittal requirements.
kZl
I,
O
15
Pti •
iRol�ot> .f
.
7
•
EX1�T, fAl
. ELEVATION
x�T. (c ,'I 1
cot-4G
/
gEMW . �CIr3t tt7� IMt�
1m'
` f o -�F '/P,L.Je VAULT
1
EX1hT. &r-Pm —.
M
i12.vrob,
It-tk=='
Kje
ELEVATION
L,
x T.(oXI1`
?AFI N o. I P-1•A o- �EFJ GE
-1Ac -H r �4e
LA- v'x6`5tctLt
45r .f- JG
PLAN VIEW
F.08TSR GOLF LINKS
TUKWILA. WA's
EF101110N CONTROL PLAN 1 /0 ".1'
L94 -0079
FOSTER LINKS
PUMP STATION
13490 NTERURBAN
AV S
SHORELINE
1' 1111111111111111 1 111 11 111'111111 1111111 111'11 11111111 '111111 111111 11 111 11111 1 1 111 1 1111 1 111 111 11111 1 1 1 Ili 1 1 11111 1 11111 1 1 1 1 1 111111 I1i 1 11111 1 1111x_..
O 16 THS INCH ,� 4 • 5 6 7 8 9 10 11 MADE IN GERMANY 1%
OE 6Z • 8G ':.. LC 9G '- SZ v EZ c2 lZ 0? 6L - 8l LL 9L Sl 17L El ZL ll Ot,
r.\.i., „.? 1h.. 1 i1: .1 \�, 'II iI• . I ;.I� 2,., , 1 1� . 1r i11r1 1 :.Ir. ti z1
I9 t.sIrdII F 1I I^ . I r I1I•. I.�I.a . 111.1. 1' 1., 1 ” I� Ifi I...I.^ ,I . .I5 1 1z 1, � 1 1.\. 1i1�1f'..t1., � 1 .. �1Iz , I, I <1. r11ti11 41,.1.1..1 1 .1.t. , 1 11 1 ... 1 1 ... � II \ .. ... . ,^' . , 1 >I r 111 .c 1 ,a1 rt „11,11 C .'�IliI 1�.. 1. 11SY1 1 11�.. 1, 11, 1 11 1 I. 1 I. I
AtrAVi
�. _ ..
IF THIS MICROFILMED DOCUMENT IS LESS
CLEAR THAN THIS NOTICE, IT IS DUE TO
THE QUALITY OF THE ORIGINAL DOCUMENT
'PUMP CONTRO', VALVE. DETAIL',
20
O- I/vO'l LI2:4.11D rlu.Er:
1T- r-1("X- 4-1PG GAu fri (2)
I.I,1LlbOpc.
`t- lu1 -rrr VAL '�
15'
10"
•
STAI4Dp42 mit) rev FLfra cL�LlATlui.1 7�
i:XY7T40I.16 .6=2 LI"i.'l
,1e . 100 YEAR FLOOD.ELEVATION'
P1111 VII 1111.
EXIST. BANK PROFILE
95% COMPACTED BACKFILL
PLANT ALL DISTURBED AREAS
WITH TURF TYPE TALL FESCUE GRASSES
:.. ,i1}.tip .e F
• -ydi Atv. vr1x -s k FUT.,
,,. .
1)
'Al.L�:Mrl:r� ypA � e..iv lzE tK-rcoArFJ
r e .L4ZEr5- 12.;Llhr.
J\`
If
'" • 24W51,.. let) I 71-1124.1.,:f -OC•K
el'r /6 Hltit • 150 '
f1 hlP- t'LIJIt
E' iNrcal- tv41rvAtvE••.�IJct2.9_q,ptz. ozeOtle ,
Te [3U 1JI �Lltly vANv�
D •rJ. •ATM- F4ow.77 HE1.Kv`ibJr- e•WG1 -••
8" -Koep &,,ge VALdE•i t ti WEpbE •?lt7l°hl wt.'. I /erallLE I.IOp.14A -1 .
&J& COI- 14ZETt9vAVLT '\j %61IGGIJ4..LID6HII -1 EtiG< E,1bA 't2E�'T51:,PalokE.pEAMG}10rA.A I' C.11,824.
// r .r .BIt III I I I I II
13'rvc• G•L200 ra i�CV� p�' MAIN LJr1E
1066 1°
Ey.1- iptJhr 1 HlFJ rJ.mro.Amaf -irrg
!JI -T•LL )
ORDINAR
2' LINE OF VEGETA
.1 WATER LEVE
0' LOW WATE
N
7 -9
9/B
PROPOSED WET WELL INSTALLATION - 1/4".71'0-
•
fLF J VIEW /VAULTGOVeI-
TWO 0IAMorlr7i r.rzz12- `4/1.0exik,I_irGH
c•h & GAL-
C/-17 221'2°ELE:ok1
roJ 114 pls,c.E.VAJLT
" XIS' )= WETWeLL�J /Ah }iAL71G wpm 1.16
IS°
IFItAte. H9 T0.
Gol ICFarg. cwcJC,tJ1.
cou L} &
II in 4` 111
II II .,ollll
-I 1 - -
.1
6Qq
LhTatkIL iy,, cc" e5yo..ic -f1014
6GEIIJ HAJI blE f dl f t^I
i(aLtCIYd°h�� iv.vi. ,LOCKd4A4A -1 i
2- 1/4110 1 -1 -- E1. Iec.E�
V4Xl r-EI.1 rwIE
V2 ✓TEELWELT I7tborTori .
�C.G1JG� -ETE FsPf..E
NI, h'i J-13os I 14 /4LeLEcTl.IGhKrUit •
<J-K.10.4-2w /G .„9,1 p L
pJr- 11°cG1-ITg •Iot-1 . 1-1
- l2- 2.w/ /G r I �I
To Govr.tr*- ra,- -I
rPrG i� ll1l°�16Nk1 L�JICr: I L17 f
I1, ( J0UJITh q'
j NEW r pLGA"31VE-f
I TALLI NE �O1 LOLJU- . deT0 -i Irl 15 "(f�P 1�-0L paw t
G -h10• &-rHH110 hr r
- IJ0.1nTHHNroIOh14 'JMr
I - F012-6,RGLaIJDIIJ�
PLL GOI.1bUL1-t?hpri -e ctj' 1'-•
1- 4,111 / WEi ALL COI -II IELTI7hIGi
WE h 24 TOI°TO Tor oF•c
r�,r
r0LiE=L� �4 F[2AMt.L
r5,- 4 _ I'it cGt`160.ETE
)4I,,1:4PJ/ -j,4, rbtibtz
to
•
��4ii /lAIIU
I�TLII -1 5TALL11.1/ E7izE1- c.1i'.JfIVilG�
• r -... '.•::::::::::::: : :::: :.:: •:.
14!')V-ji
NL� h7EkL 11It IzIE'
- .!aIIX�:' Hrz- fug `7C`•r'L "7GP
UOrTOr4f e. <=I2 ?7
F11-1v-:,H vlzP t7
-}1.44 y 1/v I(o`ca�-�l,Ca- GP+t'�IIJE'r L1EJ•�,�, 4.
G ate/. F Iti11<�H w /vK • I EHAr1EL Fn4i-
c ItJEr 17.91z.WIU:FI•Vt.. L5I- ITE12_hLJr1 r
t„.,eILIErNILL GOI,,TAINTFle LOiJIIJ� P.��I�M�rf:
4'112 - 1• o V MAlr1 ,v,LL1 -1 NEcf- I
"tJ- HOP. 661 - 1701 -�0 .2-�i01�p I- 101- +�1�ull•<Ir<� .
t4- nlhca -1LcT EA 4 111'
/OTA(GrE[2- F'o[2- FAGH R-IMI° •
4Y1'1GU'1 I� 1i'�•�E� �aEl�+ I ,Mf
?9o-4•E2 v T9 2ry 12ov-112a.14-4-oru'1pg •AF1r
60.4 1 V w /FGL6,1 wuvN& covtriw /i2ov t7_Ir►- • 00- r
Y rai -tot
L-IA-7G ; /<f/v x4/4 , fX- - AhHE1SeIJLITh
TO I cA lHI✓rToFF,Lwle ---2I HGj2-Ir�,.11 1 -12-
C_!, 1,' 7) .. .
IIfGIGffign .1 1 . 1 I'r 11' 1111MIIINIi
I 1
1 1e 1 . 6 1 I 1 0 1 12' f
6
I= 1XIrH� DEL
1/l e.A. hs .v/6 d) hGlzt;br!
Wb" X 114' <)/-, LOCK L1PhH LICIT
V41'xl' IM •
-1 1v4 L--771-
512 NIEW__P- ✓59frt
24
v
1212 601. F. TE r'OOri1 -16
4MLV.£fu,dIrroz- 440 - rooJfpk •ro rim r4
2I AA4 v. 1--012 I.O v WEI2
•b/ emow.GaJ is,JIT roVAd .
n
r= g -okr1• C f�T lOh1
0- a.:716 G 511,44 -T F{ZPJ IE-
PUMP ,CONTROL ELECTRIC CABINET DETAIL
POSTER GOLF LINKS'
TUKWILA, WA 98188
f /21`( ' KGIh 'rI;KLLIFTI(JLIzld&-Tyr(cpi- • �/
el4 LIFtI 6'E
WEl�.
V2'hTEeL COL.11? MoJIJrI Gr1n,7'F � -
cGVEizr1A1>✓ -1- r l•
•
•
WALL
•
• v2"x02'/.1,2' EL1-ara
WkiliXg11hTCEL11-ATE1 r'lodi.1714" laIMr '
yr' m brxl••I 1 . Mt cur-oar Fop- 10b prif. opre.
lAtX.I2•X12'ereeLp.eireT MoL11Jt11I6ShppJMP
�/4 AJTAI1JLFi 17 �✓ Tai - -JIn &F rm .16,5- 1`(151eA4-.
Iva" LIOL.f IPTITE ELEalzIc•aL Errii61‘,.0
B' hTE�I%HEAte..1.I/6.4E1.175t7 riiriiJ!,',
21 /2 "TAp.F o&rtp�'
InTAr Fop IZwIJ61120No.1=sipLlrei&COLIH -It.4 &VALVE,
•■•••■•ININIM
kJ LbF.b �T�I I � > I� NoiJ F
L.L.IA/2Hr 1i
1 91"
t -t1r _0
II
21
EL5VATI01 -1
J
"'PUMP SPECIFICATIONS?
lour f,..;11- 6.krAo-tY I'' 136
eohwluHr ' 'T-'i ?2 <eC_FIV1,6.1
blrlHt Jb vAlf U- tx lz
i.' LOGKII
•
51g
F1?JJIZE(zELIEFVALVE• /71 -E1z•IObfZPs0'ggxJAL
<�r r l l � M� uhkjy�l gla l GO.I.Oert IU 1012
:adailN aA�e ..
fro11 x44 : r
L.W•Erl OL} -r-y1 1.
101 es,r
II 15" Gyp LbdrLING
IcoCy/'L- /ieacb�wr a .1/!�LANS
b?-f- I F
goalt.t11- L ELt3oWFLA146Fb
CI1✓IL( JI1GL�� <�(rQ tlnhiil Hipt�G
L
1 -142- 6v1TA1L 06-,-)00 f,l ri FLY VAW 'J /2• hrY1 /iv COJN- D14.g cH
GbLI p�AMEjc `t Gtr 6 "(NLV. code. WELUEDINTV "STegI.I tE
a_ 1z.Edn,i pz.c.
°›.11e: Wl 01:r• N )IGGL a T NC 1 - rE ��3•
4
.To 8"HE>0E_
JOT
I /21IJ r L.I°l -ATE
b.•
<.. .
x,
*
(rc`
k
•
II
q•
•
FRS
fk
A�. Cj
..
.O
01,
C
;
.
V' .
y
. • ...
- .:
TOP HUB ELEV. 22.52
25 x
I
PUMP HOUSE
CONC.. P4D.
20 .,.:.. ELEV. J9.�
15
10
5
0
SEC: 14, T WP. 23, RGE
N I 7
\ i 'EX /STING GROUND
•
1'
o—
STA 0+17
GND. ELEV. 16.5
CONC. PAD
ELEV 19.9
STA 0 +18
STA 0 +32
/i RIVER SURFACE j
EL. 1.1-
PROFILE
HOR /Z. SCALE: 1"= 10'
BERT. SCALE. 1"= 5'
GND. •ELEV. 9.9
N
0
T.B.M. ELEV. 2Z2.5 = SURFACE BRIDGE DECK
AT ABUTMENT NO. 2,.
TAKEN FROM URS ENG.
DRAWING FOR BRIDGE
LAYOUT DUWAM/SH
RIVER CROSSING" DRAW /NG
NO. 3074 SHT. 7 OF 18.
DATED OCT. 1985.
GND. BRK. ELEV. .5.3
EDGE RIVER
TOE ELEV. -3.9
STA 0 +57.5
N 4130'00'W
STA 0+60
_ CONCRETE. BRIDGE FOR
DUWAM/SH RIVER CROSSING
PLAN
BASELINE FOR. PROFILE
195.86'
,.`� .�..s:..t,..,
1I 1 111 1 1 1 111 1I 111 I II II 1I I I I I I I II I I I I I I II II I 111 1I 1 I 1 I 1 I I I 1 I 1 I 1 I I 111 1 I 1 I I I 1 I I I 1 I I I 1 I 111 11 I 1 I 1 I 1 I I 111 1I 1 II 111 1I 1 I 111 11 I 1 I111I 1111 111 11111 1 1 111 11 I 1 111 1111 111 1 111 1 111 11111 111 I' 111 1111 1 j 1 1 111 I' 11
I6TN5INCH 1 ? 2 4 5 6 7 8 9 10 11 M41iIINGINNI.NY 17
qb
FLEXIBLE RULER -302
6Z EIG LB 9L GE vc EZ c6 lZ OZ 6l 8l LI. 9l al 7l El al ll 06 6 El a 9S v E Z l ww 0
111l liiiliiiill )1111111411111111iiiiilliiiihliilli111111111ni1inIIIIIIIIIIthit, !1Ilu.1.l!u�uii 11111 111. 11IIIInIIIIIIImIIIIIIIIIHIIIIIIIiu hul1�u h�u1n i I I I i i
1 ,,. 1 ..., III) I lU lhl �. jiu u. 1l. l idea ii!! illuil. IulilMbuilii V 11u1liu1111<< 10, 11,11111Lu1i61l1B111 li1.l11u1lodnnl.
NOTES
w
0
z
0
w
1. The purpose' of this survey is to show profile of existing ground in the vicinity of
pump station.
2. Utilities other than those shown may exist on this site. Only those utilities with
evidence of their installation visible of ground surface are shown hereon.
3. This survey represents visible physical improvement conditions existing on June 6,
1994. All survey control indicated as "found" was recovered for this project in
June of 1994.
4. All distances are in feet.
SCALE: 1" = 10'
0 5 10 20
ASSUMED MERIDIAN
IF THIS MICROFILMED DOCUMENT IS LESS
'CLEAR THAN THIS NOTICE, IT IS DUE TO
THE QUALITY OF THE ORIGINAL DOCUMENT
•
"'=1VED
1�i9941
DEVELOPM ry r
0 0
UZ
ZZ
CC
,^d
Ww
Ug
Z_R�
o
V �
Z
W�
W
N�
W
0;
CU
4205 -148TH AVE: N.E. -. SUITE 200
BELLEVUE, WASHINGTON 98007
N
0
coN
N
N
ro
CD •
0
DATE JUNE 1994
•W
Z
in
w
0
SHEET
OF
PROJECT NUMBER
94085
A
..• • „ , , ,. . , • , • • • .
', It77t7,7t7n7.4!i...*:$/4,71P" ,.....,it.;.,7*.i.kr."7!:!!"`.. ,r.177.ftir.777,7r,%.7""!7M.:77t7r7717.7,;.5‘7,%"."."7•7".7r7".771•777.'!7.7`•7`-".77,••'•7"!`„;:rr',777-7":7777;;.%`.77.7."7777."%7••••"77',••:"77•77,..7,7:77.77r."•%'77717h7.••!:!•7"•„7.77:7,7tr"."..7.,•••;•7":r!-,77%,”77,":7,,!•,..•'`••2,1-%•":7;.,!%7••77:7•7-77•;•7"77-"-:, ' !-!-:•!,,,•!-!•-!,:••-•:!!.i,•:,--!-,,,,,,..,.,...,,...,!----,<...:!--:•,+!".!n!::•;"!'"7!..7,--,.y!!!;!,...--•.,-..,! ..',,,...!,`,"'",..7"-. -7!.....,-7,!'"•.!•,..-•,"''';',,,':•'",`":'.1.':,".7 `,..! .",,'!':",`..-. n:-.".. '"•''''''," ".-,%%. '' ' '`,!....,^',-,,•'',..., '•-!":".."!'"'‘`;'!•• ..",
..
. .
••• , • • ,••• • , • . . „ . .
. .
. . . .
. „
. .
, . . . .
•
rp-P,Mff-
EXIST. B_ANK_EP_GE-LOW WATER_
111 ; 4 ; 6..
l•
., . .
• v'•••%141-x-,
. ,H-L•I%-'-"' ""
"..t.
5Y-1.4,,e0I-7(111'
••• ". :
• . . • .
• . • , • „, • • ; • • • • .„ • • .
• • •
. •
- EXIST. STEEL FRAMEWORK . •
Ti F2 -1 yr
NEW STEEL PIPE
•
teo,/ kie krt.-7i tz_rt2tyr.:
• .
• I • 1.1141J,10L11.1111-.) 1
Ji! • 4'
I •
!!i !! , ,
• !:;;•!•• .
.
: 7
1 •
"IS BOLT PIPE TIE-DOWN
PLAN VIEW . • .
„. 001=14W(14.1,1i'C'lifv:t?
• • • ;!;'/.24.....:7"......:(Ayi14-,,y{:i'..,,:1411-1
•
;01-F
e • ••r-
kvai E r1=)11.-•frirtkicrili.26.1i2-1[1v,v04-1-
•
FL4-'146.-e • "' • • •
" 5)/4917
12,0.170;
EXIST. CONCRETE PAD & ROOF STRUCTURE DEMOLITION DETAIL.
..•
eclo
• V,:',-If•A:',/tf,"L_
ELEVATION -
'
-• - • 7 7 7-
.41:4..y_r2i/IcALvt-1:412,q.,11411'9
•1.
':rz",:
•
PLAN VIEW
ELEV. 24.98
• EXIST. CONCRETE. PAC)]
FIRE-.BUILT PUMP VAULT • .
PUMP INSTALLATION DETAIL T . • •
PUMP VAULT COVER PLATE DETAIL
Hz,"1-PIrr52
ir'-'1/-5r01 • r5itT,4
f- lq.'• Virri•F
Tit ,__ILIIJA.411 LLLa.duALLIthmtably.1,11.LL.LittthtitLIL1LL■diLNIL..1
•
r '
•
•
EXIST. PUMP PAD, ELECTRIC EQUIPMENT HOUSE
& POWER PANEL LOCATION MAP-1 /B"= 1
I I ,
I
I T- r--,1
• —
•
1
1:11=
— 1.4•1111:7-1'
• ::::11.4?-11
ELEVATION
•
. EXIST. WOOD STRUCTURE TO BE RAZED
raTE:Yrr:17V.r.r.t..”TRTs.
, • • ,. ;'•77:71,77,77„
.• ." „ . • •.
Ofziktot;',W-', • 44, We
• '
. A 4,;"'4t11:•.Z.
piiitiiii11111(1111110111111i1111111111111110p111101111111111(11111110111111111111111111111111i1111i11i111111111111111111111111111iwiwiii11111111111111111i1(11111111111111111111111111
0 .TH5 WIEN 4 5 6 7 8 9 10 MA.Ur IN OrNMANY
9
1/4..)€: 6Z BC LZ 96 SZ VG Ea de La Oa 6L
ls
1111W
•.!!%. .!,4•4•!..■■.•% 1,%! '447 •1/41F 1,41;••••a•,"' • • • • •
FLEXIBLE RULER -302 AWattn,...e...-.
" 0 L
w1,1.41,116b
.‘•
, H-r•-.11-...t."; J11
•
• .
• •
•
. •
• 41 L.
•
.1rv.
4.411mikilkiLlr)
---
11.7:11
Crir-ICY1i .>1 Jw
IRRIGATION POND FILL. PIPE DETAIL
, • ; •
• •
I EXIST: PCIWER PANEL HOUSANG-REMOVE
IF THIS MICROFILMED DOCUMENT IS LESS
CLEAR THAN THIS NOTICE, IT IS DUE TO
THE QUALITY OF THE ORIGINAL DOCUMENT
14,05.ed PLOL5,
4pf,00,j1 Aplt SO(
es-
- 't • „ „ „
• • • •
7.7
. • • , • .• , •
„ • - •••• ••• '
„ r.• • • "•.
„ • : , , • • • „ •
• • , • , , • • 1. „ ,
,L■ „ •. ::„■