Loading...
HomeMy WebLinkAboutPermit L93-0028 - SGA CORPORATION - GATEWAY BUILDING #8 DESIGN REVIEWl93-0028 gateway north #8 . JUN 02 '93 07:00 D KEHLE)•CHITECT • architect June 2, 1993 City. of Tukwila 6200 Southcenter Blvd. Tukwila, WA 98188 • .ATTN: Vernon & Bob Betts RE: E.B. Bradley Per your request, the following this project: . 1) Rezone P.2/2 • • • ••: ••% 03 DEVLLiT • R • 2 10 - L1:;;Jit King County file numbers apply to - Ordinance #8592 - July 11, 1988 2) Shoreline - 075-87-SH 3) priavious MDNS - July 19, 1988 - March 15, 1988 If ,you have any further questions, please call. Since ely David Kehle DK/ct cc: Phil Wood Bob Hart (206)433-8997 0 12878 INTERURBAN AVENUE MUM o SEATTLE,WASHINGTON 98168 typical reveal section SEATTLE,WASHINGTON 98118 architect FRACTURED LOOK DESIGNS rvWVWvw A NEW FACILITY FOR: THE E.B. BRADLEY COMPANY GATEWAY NORTH 116TH STREET TUKWILA, WASHINGTON BIA.R. APPROVED w DATE VA6......INITIALS.Af-t r I U ^) City of Tukwila John W. Rants, Mayor Department of Community Development Rick Beeler, Director NOTICE OF DECISION May 28, 1993 Mr. David Kehle 12878 Interurban Avenue S. Seattle, WA 98168 RE: L93 -0028: Gateway Building No. 8. Dear Mr. Kehle, This is to confirm that the Board of Architectural Review has completed its consideration of the subject application. A summary of their actions is shown below: 1. One panel of glazing in the middle of the west elevation, as shown on the BAR approved drawings, shall be replaced with a dark painted concrete strip to accommodate the applicant's need for additional structural support, 2. The findings and conclusions in the staff report of May 27, 1993, are otherwise adopted, 3. The project is approved subject to the following conditions: a. Signs for the building shall be approved as to general size, location, colors and scale, such that the applicant can obtain a specific permit by subsequent administrative approval within these guidelines, and b. Administrative review of the lighting in the proposed four parking space area for the trail head to assure adequate safe illumination as discussed at the public hearing. Note: Options discussed by the applicant at the hearing included moving the western light standard further north and adding a second light to the post. The need to allow no off -site glare was recognized. Please feel free to contact me at 431 -3684 if you have any questions. Sin er Vernon Umetsu, Assoc. Plan 6300 Southcenter Boulevard, Suite 11100 • Tukwila, Washington 98188 • (206) 4313670 • Fax (206) 431-3665 City of Tukwila John W. Rants, Mayor Department of Community Development HEARING DATE: PROJECT / NUMBER: APPLICANT: REQUEST: LOCATION: ACREAGE: ZONING: COMPREHENSIVE PLAN DESIGNATION: SEPA DETERMINATION: STAFF: ATTACHMENTS: STAFF REPORT to the BOARD of ARCHITECTURAL REVIEW Prepared May 20, 1993 May 27, 1993 L93 -0028: Gateway Building #8 Rick Beeler, Director Kemper Real Estate Management Company Construct a 42,155 square foot warehouse /office building for the E.B. Bradley Company. This project contains approximately 4,000 square feet of office space, high and low -bay loading facilities and 64 parking stalls. The proposal also includes a lot line adjustment for 36 feet. South 116th Street west of East Marginal Way, and south of the Duwamish River. Approximately 3.5 acres, after the 36 foot lot line adjustment M -1 Light Industry Light Industrial L93 -0027 DNS Issued 13 May 1993 Robert S. Betts A. Applicant's submittal B. Applicant's Narrative C. Perspective Drawing (to be submitted at hearing) 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • (206) 431-3670 • Fax (206) 431-3665 Staff Report to the L93 -0011: Gateway Bldg #8 Page 2 Board of Architectural Review FINDINGS BACKGROUND The proposal's entire northern line abuts the Duwamish River. The first 40 feet is designated as a river environment. As part of the original approvals for the overall park, this area is already developed with a public trail. Views from here of parking and loading areas will be screened by a combination of differences in grade, a concrete wall along the high -dock loading area, and extensive landscaping along the north property line. Site improvements in the shoreline environment include landscaping and constructing a set of access steps from the adjoining parking area. Since these improvements exceed the threshold for exempt construction activities, Kemper Real Estate must obtain a shoreline substantial development permit. Tukwila's Department of Community Development administratively reviews and approves such Shoreline applications, after Design Review has been completed. The State Department of Ecology makes final reviews and approvals. As part of this Shoreline review process, the City and the applicant will provide an easement or similar assurance for the public's use of a minimum of six parking spaces. This will be at a location mutually agreeable between the City and the applicant. The location does not have to be on the E.B. Bradley site, but in a suitable location to provide convenient access to the River Trail. It shall be subject to reasonable hours of use such as evenings and weekends, and the agreement shall provide suitable indemnification by the City. VICINITY /SITE INFORMATION Project description: This project is the seventh to be constructed in Gateway North Corporate Park. Original plans, approvals and permits for the overall park were by King County before this area was annexed to the City of Tukwila. The building will be essentially a warehouse facility. Most activities will be on the ground level. There will be two offices, one of which will be a 1,500 foot space on a mezzanine level. The building structure will be approximately 27 feet in overall height. It will be of the same colors and materials employed in the rest of the Park. Site improvements include utilities, parking areas, landscaping, walkways and a wall adjacent to the loading area. Staff Report to the Board of Architectural Review • L93 -0011: Gateway Bldg #8 Page 3 Site Description: The project abuts the Duwamish River. It has been rough - graded. All utilities are installed to the property lines. South 116th Street provides access all along the southerly margin of the property. This is a landscaped private road easement, maintained by the developer. It intersects with East Marginal Way, which provides primary access to the business park. The Duwamish River Trail abuts the site on the north, and Kemper Real Estate proposes to provide a direct pedestrian access to this trail. Surrounding Land Uses: Existing Gateway structures are to the south and west. The Duwamish River and Trail are to the north; A vacant lot, owned by the developer, is to the east. DECISION CRITERIA ' In reviewing any application, the Board of Architectural Review relies on the following guidelines. The applicant's response and the staff's summary of relevant facts follow. The applicant provided a Narrative (Attachment B) which should be referred to in conjunction with detailed responses to each review criterion. 1. Relationship of Structure to Site. (A) The site should be planned to accomplish a desirable transition with the streelscape and to provide for adequate landscaping and pedestrian movement; (B) Parking and service areas should be located, designed and screened to moderate the visual impact of large paved.areas; (C) The height and scale of each building should be considered in relation to its site. Applicant's Response (See Narrative Attachment B): "The building is sited to screen loading from river views and South 116th by placing these to the east and future development. The front (South 116th) presents the parking and landscaping to match the existing development frontage design. The building must then be placed up to the river setback." Staff Response: The transition between South 116th street is already constructed. It consists of earth berms, lawn, and street trees. A sidewalk is not planned, as pedestrian movement will be, accommodated along the River Trail. Parking and service areas are located on the street side of the building, rather than • Staff Report to the Board of Architectural Review L93 -0011: Gateway Bldg #8 Page 4 on the river side. These areas flank the structure, rather than concentrate on just one side. They are generally screened by the extensive berms mentioned above. The building's scale is compatible with that found elsewhere in the park, especially when viewed from South 116th Street. The scale of the building along the River Trail has been modified by extensive design work on the riverfront facade. These modifications include techniques such as variations in color, adjustments in wall locations, changes in surface texture, adjustments in silhouette, and a variety of landscaping. 2. Relationship of Structure and Site to Adjoining Area (A) Harmony in texture, lines and masses is encouraged. (B) Appropriate landscape transition to adjoining properties should be provided; (C) Public buildings and structures should be consistent with the established neighborhood character, (D) Compatibility of vehicular and pedestrian circulation patients and loadingfacilities in terms of safety, efficiency and convenience should be encouraged; (E) Compatibility of on -site vehicular circulation with street circulation should be encouraged. Applicant's Response (See Narrative. Attachment B): 'The building scale, materials and colors will be similar to the existing development and the owner -user facility will be designed to complement and accent the existing buildings. The facade design, recessed storefronts, concrete panel accent band is(are) all designed to match the existing buildings. Landscaping is similar to existing and will complement the existing. Circulation patterns are existing and the east curb cut will be shared with the east development." Staff's Response: Kemper's design reflects that found in the existing Corporate Park. The landscape transition is appropriate with the present River Trail environment, and is accomplished with berms to screen views of parking, walls to screen the loading area, and complementary landscape materials. Considerable attention has been given to the high -dock loading area on the building's east side. This design is intended to match similar loading bays on a future building, which would be located on the now - vacant lot to the east. The present driveway /access will be shared, reducing the amount of paving and minimizing congestion and turning movements on South 116th Street. If appropriate, the wall which separates the River Trail from this eastern loading area will be extended at the time a future structure is built. The extension is intended to provide continuity in design and in screening. It has another function as well. The Staff Report to the Board of Architectural Review L93 -0011: Gateway Bldg #8 Page 5 wall at the loading area acts as a deterrent from mixing pedestrian with truck traffic. The site design provides pedestrian access to the River Trail by a path and steps along the building's west side. Two entrances to the parking areas provide separation of truck and car traffic, with most loading activities occurring on the east and south sides, but customer and employee access on the west side. 3. Landscape and Site Treatment. (A) Where existing topographic patterns contribute to beauty and utility of a development, they should be recognized, preserved and enhanced; (B) Grades of walks, parking spaces, terraces and other paved areas should promote safety and provide an inviting and stable appearance; (C) Landscape treatment should enhance architectural features, strengthen vistas and important axes, and provide shade. (D) In locations where plants will be susceptible to • injury by pedestrian or motor traffic, mitigating steps should be taken; (E) Where building sites limit planting; the placement of trees or shrubs in paved areas in encouraged; (F) Screening of service yards and other places which tend to be unsightly should be accomplished by the use of walls, fencing; planting or combinations of these. Screening should be effective in winter and summer; (G) In areas where general planting will not prosper, other materials such as fences, walls, and pavings of wood, brick stone or gravel may be used; (H) Exterior lighting, when used, should enhance the building design and the adjoining landscape. Lighting standards and fixtures should be of a design and size compatible with the building and adjacent area. Lighting should be shielded, and restrained in design. Excessive brightness and brilliant colors should be avoided. Applicant's Response (See Narrative Attachment B): "The landscape design is in keeping with the surrounding Gateway North theme. Usage of grass berms, trees and building berming are in keeping with the overall park. The trail landscaping will be in keeping with the existing improvements and will be adjusted as required to meet Parks Dept. requirements." "Site lighting will be wall - mounted "shoe box" style fixtures to match existing (ones)." "Dumpsters are screened via concrete walls and landscaping. The loading area is also screened from the river via a concrete wall and landscaping." Staff's Response: Staff concurs with the applicant. Dumpsters and recycling areas meet city codes. Screening is adequate. Lighting diagrams indicate a restraint in night -time lighting, such that surrounding areas such as the River Trail will not be affected. Staff Report to the L93 -0011: Gateway Bldg #8 Page 6 Board of Architectural Review 4. Building Design. (A) Architectural style is not restricted; evaluation of a project should be based on quality of its design and relationship to surroundings; (B) Buildings should be to appropriate scale and be in harmony with permanent neighboring developments; (C) Building components, such as windows, doors, eaves, and parapets, should have good proportions and relationship to one another. Building components and ancillary parts shall be consistent with anticipated life of the structure; (D) Colors should be harmonious, with bright or brilliant colors used only for accent; (E) Mechanical equipment or other utility hardware on roof, ground or buildings should be screened from view; (F) Exterior lighting should be part of the architectural concept. Fixtures, standards and all exposed accessories should be harmonious with building design; (G) Monotony of design in single or multiple building projects should be avoided, Variety of detail, form and siting should be used to provide visual interest. Applicant's Response (See Narrative Attachment B): "Building modulation and facade accents, corner notched treatments, building glazing and the expression of structure via the concrete colonade look, all accent the building design and are in keeping with the existing park design." Staff's Response: This design matches themes in the rest of Gateway North Corporate Park. The one exception is the building's north (riverfront) facade, which has been redesigned to provide variety. The new design for the north facade reduces the appearance of either monotony or massiveness. Deliberate changes in the facade's middle section provide variety. Walls are scored to create a change in texture, and they are offset several feet to recede into the structure and to break up the appearance of mass. The structure's silhouette now includes "stepping ", or deliberate jogs up- and -down. The eastern screening wall along the loading bays is . also "stepped," and provides a visual transition and linkage with the building. The parapet screens views of rooftop mechanical equipment. Signs are appropriate for the parapet. See 5., below. S. Miscellaneous Structures & Street Furniture (A) Miscellaneous structures and street furniture should be designed to be part of the architectural concept of design and landscape. Materials should be compatible with buildings, scale should be appropriate, colors should be in harmony with buildings and surroundings, and proportions should Staff Report to the Board of Architectural Review (B) 'SF L93 -0011: Gateway Bldg #8 Page 7 be to scale. Lighting in connection with miscellaneous structures and street furniture should meet the guidelines applicable to site, landscape and buildings. Applicant's Response (See Narrative Attachment B): "Picnic benches for employees and a stair access to the trail is being provided on site for E. B. Bradley's use. This can also be used by other park employees but is intended primarily for E. B. Bradley." Staff's Response: The picnic area and River Trail path are appropriately designed and located. E.B. Bradley's signs are shown on the drawings, and will be located on the facade, where they can be seen from South 116th Street. The signs' general characteristics include individual letters, no lighting, at locations near the structure's parapet. Board Approval of these features will allow subsequent administrative approval of specific details when an actual sign permit is requested at a later date. CONCLUSIONS General Review Criteria: '�_" �x--- � c •�.r c.....�. ,_ o- /fit:►. f Q ,'i 1. Relationship of Structure to Site. h fi ,- The design balances several competing requirements. One is to disperse the amount of parking. Another is to locate principal loading areas where they are not directly rr�� seen from either the street or the trail. A third is to provide a continuation a tXe. 7 parkway -type road throughout the Gateway North. � - • r U is 2. Relationship of Structure Sc. Site to Adjoining Area. = �'�5```� ' 11= - - `` 1(,,,,_ -7,-,-,, _ The structure relates well to its corporate neighbors, as it uses the ame design features found nearby. The presence of berms, lawns and swales provide a common and pleasing transition between the street and the building. The site is relatively narrow, such that the building's relationship to the River Trail required careful consideration. As designed, the design keeps from overwhelming the adjacent river environment. The north facade's design maintains a good relationship to the River. This has been accomplished by keeping the structure's overall height to 27 feet, by stepping the structure's silhouette, and by breaking the facade into sections which alternately Staff Report to the L93 -0011: Gateway Bldg #8 Page 8 Board of Architectural Review recede or protrude. Landscape materials complement the north facade's design. There is a mix of vertical large -scale evergreens with a set of small-scale deciduous and evergreen plantings. The larger- scaled trees define sections of the walls, while the smaller - scales materials act as a cushion and transition between the Trail's pedestrian environment and the Building's facade. 3. Landscaping and .Site Treatment. The design provides for use of the grass areas along the south to both blend into the common 116th Street design, and to provide "biofiltration" for the surface water runoff. While oil -water separators are still required for other portions of the project's parking areas, this reflects sensitive site design. See also the discussion in 2., above. 4. Building Design. The building expresses many of the same features in adjacent structures. There is a common band of "storefront" in the facade. Colors are identical. Construction is similar. It is a good neighbor. 5. Miscellaneous Structures & Street Furniture. Lighting standards for the parking areas are consistent with those found throughout the Corporate Park. The type, character, scale and location of E.B. Bradley's signs is in keeping with those found on other Gateway projects. RECOMMENDATIONS Staff recommends that Gateway North Corporate Park Building #8 be approved, subject to the following condition: 1. Signs for the building shall be approved as to general size, location, colors and scale, such that the applicant can obtain a specific permit by subsequent administrative approval within these guidelines. ,/2 f 1: •_r C_C� ..�o Ct BOARD OF ARCN'TL, TURAL REVIEW DESIG: _ •REVIEW APPLICATION CITY OF TUKWILA DEPARTMENT OF COly1MUNITY DEVELOPMENT 6300 Southcenter Boulevard, Tukwila, WA 98188 Telephone: (206) 431 -3680 1 1. BRIEFLY DESCRIBE YOUR PROPOSAL: 06 2. PROJECT LOCATION: (Give street address or, if vacant, indicate lot(s), block, and sub- division; or tax lot number, access street, and nearest intersection) Quarter: Section: /0 Township: '2 (This information may be found on your tax statement) 3. APPLICANT:* Name: 2vIP 1 tU (A-3-.ti-Lei Address: 1/67P2 II•ft ue.abti ,141 /*). Wb.. TJ)(r,& 1110 •j e: "- 11 Signature: 4 Date: 4.1 3 -4l' * The applicant is the person whom the staff will contact regarding the application, and to whom all notices and reports shall be sent, unless otherwise stipulated by applicant. Range: 4. PROPERTY Name: OWNER AFFIDAVIT OF OWNERSHIP 901p t92_ Patt�-�- Address: /0 -77.0 j0 et ewicr r)21N e 101 Phone: -11o3 I/WE,[signature(s)] (2 swear that I /we are the owner(s) or contract pufchaser(s) of the property involved in this application and that the foregoing statements and answers contained in this application are true and correct to the • best of my /our knowledge and belief. Date: .4114-1-11 • n.•..0 ATTACHMENT A DUO-11-1u ur HNLtil I =L &. iAL tiEVIC .W DESIGN REVIEW APPLIt ;ION. Page 2 CRITERIA The following criteria will be used by the BAR in its decision- making on your proposed project. Please carefully review the criteria, respond to each criterion (if appropriate), and describe how your plans and elevations meet the criteria. If the space provided for response is insufficient, attach additional response to this form. 1. RELATIONSHIP OF STRUCTURE TO SITE A. The site should be planned to accomplish a desirable transition with the streetscape and to provide for adequate landscaping, and pedestrian movement. B. Parking and service areas should be located, designed, and screened to moderate the visual impact of large paved areas. C. The height and scale of each building should be considered in relation to it site. (*), ikolt1) Ftwa.---0; Rt-i 1,6. l; .o LiA4RJArgersk.4 7c, FMC:N -4-119 I: • ;et uPt"c .416 QN62- O.t&x::- . 2. RELATIONSHIP OF STRUCTURE AND SITE TO ADJOINING AREA A. Harmony in texture, lines, and masses is encouraged. B. Appropriate landscape transition to adjoining properties should be provided. C. Public buildings and structures should be consistent with the established neighborhood character. D. Compatibility of vehicular pedestrian circulation patterns and loading facilities in terms of safety, efficiency and convenience should be encouraged. E. Compatibility of on -site vehicular circulation with street circulation should be encouraged. RESPONS aIL2 tILI')U-I4 445E V7i 11i6(0,1 ) WItL �c 69141114.--. ry�e ° Cmm� LiCl�tr frr / ? Fp164- �evo '`1114 >> '' 't� .. L �_ I,�(( ' cola tic R! Ci I1 • till el%IYl y 1,1 F lk(P LG�� r STflt i`l� I5-1 14.1 t uol i -Viev, Ra (1+� aft - 5391 jMco- ric61.0 (41COKE, 15;i4D is blb 176 ktircA4 150-4,1C1 f51 1 Lai -Icy%. D214,12 bp1`k(l. f M d Use_.. tt .) /110 (ui•t , atilifi,Vont JI.tiatubt1 1 f tet L DESIGN REVIEW APPLIC ,,_ Page 3 3. LANDSCAPE AND SITE TREATMENT A. Where existing topographic patterns contribute to beauty and utility of a development, they should be recognized and preserved and enhanced. B. Grades of walks, parking spaces, terraces, and other paved areas should promote safety and provide an inviting and stable appearance. C. Landscape treatment should enhance architectural features, strengthen vistas and important axis, and provide shade. D. In locations where plants will be susceptible to injury by pedestrian or motor traffic, mitigating steps should be taken. E. Where building sites limit planting, the placement of trees or shrubs in paved areas is encour- aged. F. Screening of service yards, and other places which tend to be unsightly, should be accom- plished by use of walls, fencing, planting or combinations of these. Screening should be effective in winter and summer. G. In areas where general planting will not prosper, other materials such as fences, walls, and pavings of wood, brick, stone, or gravel may be used. H. Exterior lighting, when used, should enhance the building design and the adjoining land- scape. Lighting standards and fixtures should be of a design and size compatible with the building and adjacent area. Lighting should be shielded, and restrained in design. Excessive brightness and brilliant colors should be avoided. RESPONS : � 1 11- .iD cx 6 It-1 Wi tH G'[ I7C-1u N OCT "c t--r ' ii gfx76 E r 1xvo fit, f 1 Dj 4C� '2.M 144, i 2tt fry ,1 \.b►�tT4 X11= (`1 2b V. 1-"12.e. �rM. P�+L. ��I tYY'b'0t•Ici LOtu i I1 I � (<)tiii -fir-. t IcYtial 1171plialet' FL* 6119 WM, t u'.1-02 J Qi0A10. . H a t AFiliV-ETY, ARV etq - Mae; 1407 tbN;77p,, Aci c " -C- �� i i .qtr?) f, :► •s 't �i s1 • - I.� , CeNC ► N . A 4. BUILDING DESIGN A. Architectural style is not restricted, evaluation of a project should be based on quality of its design and relationship to surroundings. B. Buildings should be to appropriate scale and be in harmony with permanent neighboring de- velopments. buAt-W or AHL:ril 1 tt: u ;�� L KtVItW DESIGN REVIEW APPLIC )N • Page 4 C. Building components - such as windows, doors, eaves, and parapets - should have good pro- portions and relationship to one another. Building components and ancillary parts shall be consistent with anticipated life of the structure. D. Colors should be harmonious, with bright or brilliant colors used only for accent. E. Mechanical equipment or other utility hardware on roof, ground or buildings should be screened from view. F. Exterior lighting should be part of the architectural concept. Fixtures, standards and all ex- posed accessories should be harmonious with building design. G. Monotony of design in single or multiple buildings projects should be avoided. Variety of detail, form, and siting should be used to provide visual interest. RESPONSE; Du i.V i E 3i _t bt�i 7 "` 19 E L :S.�rv�� e t l?o CIA " t�t�- O oc Q)tbNPJ c-ir: �L� V1 16- Li ut iscf t i b rr ,62E to Wd i i f -ICS � �I�l 5. MISCELLANEOUS STRUCTURES AND STREET FURNITURE A. Miscellaneous structures and street furniture should be designed to be part of the architec- tural concept of design and landscape. Materials should be compatible with buildings, scale should be appropriate, colors should be in harmony with buildings and surroundings, and proportions should be to scale. B. Lighting in connection with miscellaneous structures and street furniture should meet the guidelines applicable to site, landscape and buildings. RESPONSE: # 3 r 07' 4 bhp b / ,z x_ lee P n q qe), �=7 (:P1 l7fE9 ra, 132bP'L ire t . `rife? (6N Io') ee . Wo ex f etiE42. iPL. iPiuittr2 101,1;009 2aato¢WV rev_ spbpt, _ • ' tsUAKU U - ARUNITEL TU° IL REVIEW DESIGN REVIEW APPLI A ION Page 5 INTERURBAN SPECIAL REVIEW DISTRICT The following six criteria are used in the special review of the Interurban area in order to•manage the development of this area, to upgrade its general appearance, to provide incentives for compatible uses, to recognize and to capitalize on the benefits to the area of the amenities including the Green River and nearby recreational facilities, to encourage development of more people - oriented use, and to provide for development incentives that will help to spur growth. Please describe how your proposed development relates to the goals for this District. Use additional response space, if necessary. 1. The proposed development design should be sensitive to the natural amenities of the area. \ 13,-V.", 112t oil . btv , r ae c . l�u., LL�i ! _-- A- %)600ittT (s , ,-- L tLrtFl I•Mpn ;eME31 LOI+ll+7 Ialrlol, 2. The proposed development use should demonstrate due regard for the use and enjoyment of public recreational areas and facilities. 3.. The proposed development should provide for safe and convenient on -site pedestrian circu- lation. \ lit / ' ' A'AD3 4. The proposed property use should be compatible with neighboring uses and complementary to the district in which it is located. ACQ,(20.11.11211•■1(1 bc1X- ftte/ M2er,. 5. The proposed development should seek to minimize significant adverse environmental im- pacts. 6. The proposed development should demonstrate due regard for si gnificant historical features in the area. LNG,i5 - �., .... EB 4 / 6 A NEW FACILITY FOR: THE E.B. BRADLEY COMPANY OAT[wAY 116 TN TOIIVK,. WAININOTON 71011011•1111 ►P 4 architect IIIN NLINJNIANAYO SLAW-WASHINGTON II I F 1NNONN 6 a Ile I )M,n � y M 4hr...114wJ m W CA ••• 0,4 A NEW FACILITY FOR: THE E.B. BRADLEY COMPANY IMMO NORTH I ISTH TUKWILA, wAsHINGT0/, poi mi204,473•114. • 'I architect 'MI ATI RAUH AV STATlitikAINNOION 1I' 4 1 a 8 H 2 2 r z n z DNI01Ifl8 DNIISIX3 3d1IDSONVI ONILSIX3 1N3WdO13A30 3Hfllfld riot �e >Ar s b s 3dY3SONV1 ONILSIX3 — CI 2 0 rl H1110S AtM 111NIDtl4V4 1SY3 m 07 A NEW FACILITY FOR: THE E.B. BRADLEY COMPANY GATEWAY NORTH 110TH $TTTTT TUKWILA, WASHINGTON 201 i 1 I7 111. L• ag 17111 NIEPUN61N AV 51801E 21IMNNION 1 1 1 6 1 arthtect ... -,V. "...I. V::::.,,.... "._T -... q,17 AA 6' ill III 1 `l llitliiiE! i3 i !Ii'vrliiIp ti iiii f f ! `c6 3i a zx$ .. a Y M ,,,,5 o00 �� (+n n nnn CI 2 0 rl H1110S AtM 111NIDtl4V4 1SY3 m 07 A NEW FACILITY FOR: THE E.B. BRADLEY COMPANY GATEWAY NORTH 110TH $TTTTT TUKWILA, WASHINGTON 201 i 1 I7 111. L• ag 17111 NIEPUN61N AV 51801E 21IMNNION 1 1 1 6 1 arthtect ... -,V. "...I. V::::.,,.... "._T -... q,17 AA XI 0, o. `c6 7f ... .{ni . .... m A NEW FACILITY FOR: THE E.B. BRADLEY COMPANY GATEWAY MONTH 111111 ...... TUKWILA. WASHINGTON 111:04,433•1111• L.. aGM NILIKALANLY stAnit 1..sneastoN 6 1 I 11 aichitect ...L.,,L, 81..b •,‘...• .r ....... 4 6 6 Y....• .., tfriol .... ,... .0-.1 wi 21YDf m co **. cn A NEW FACILITY FOR: THE E.B. BRADLEY COMPANY GATIWAY NORTH 111ITH TUKWILA. WASHINGTON pig 1111206/ 411.611111 reSI gghVg Inn INIENAGG• SIAM( BASHH(110Ii 1 111 1 aithstect rn r- 23 tn -NI 0 33 v 33 z m Qo P r z +L 4f 1Vri 31 4 t 714i Barghausen Consulting Engineers Inc.` Land Planning. Survey 1 Engineering Speck:11/11 urn 12........x. •... .... v.0.. :o., Ir • I:r> FACILITY BRADLEY COMPANY NOTON A NEW FACT TOR: THE E.B. Jr' GATEWAY MONTH IISTN TYII B.C.E. WASHINGTON NI B.CE JOB NO. 4788 0 77:e .33 lift fK�1'Ti ,We ,1(S. WA3 : S SUM NI5 5 ,. 0 0 4 1 4 1 arefutecd Project Narrative The E.B. Bradley Company is a wholesale distributor of plastic laminates, cabinet hardware and miscellaneous supplies to cabinet manufactures and suppliers. The building program requires a receiving area which will accommodate 1 large semi -truck (once a week) and smaller vans for dock high, a shipping /will call area separated from receiving for on grade access and UPS, and an office area with second floor. The,site is a part of the Gateway North Corporate Park project and abuts So. 116th and the Duwamish River. The site layout reflects the park existing street scape of bermed front landscape area buffering the parking areas and setting the building back from the street edge, providing for a spacious entry along the access route. The large loading dock area is placed so as not to face directly either to the road or the river. The intent is to develop the adjacent site with loading opposing. The loading is being shielded by the building from the major site access, and via landscaping and screen wall adjacent to the river. Vis44s to the river will be provided between building areas and with 2 or more buildings in the future, no massive blocking elements will occur. Parking is located at both ends, office parking areas for customers and employees parking at westerly end. The building is located adjacent to the river bank setback. The building design reflects not only the existing corporate park elements, but adds to the facade modulation which will break up otherwise flat planes of concrete. The building corners have been cut out to provide modulation and the storefront areas are recessed to add fenestration relief. Structure is expressed via concrete columns which are exposed and add additional rhythm to the facade and texture along the first floor area. The building is also designed with second floor windows which in the warehouse will act as clerestories for daylighting. While not being functionally able to locate the offices directly adjacent to the river, the river facade is being detailed as if it were storefront. Again the columns are exposed providing the structural expression as well as the rhythm and texture like, a storefront. The area will be bermed as much as possible. The recessed wall will be scored similar to the windows and a paint band imitating.the dark glass will occur. The overall painting scheme will be the same as the balance of the park. By utilizing the same detailing, paint schemes, facade treatment, and materials, this user facility will blend in and will be a key part of the continuing efforts at Gateway North. David Kehle ATTACHMENT B Robert S. Betts, Inc. ,may 7, IgR3 Mr. Ron Cameron City Engineer City of Tukwila 6300 Southcenter Blvd. Tukwila, WA 98188 Land Management Conservation and Development �..,..�� -. 700 108th Avenue NE Bellevue, WA 98004 Re: Phillips Appeal of Noise Variance; staff support Dear Ron: FAX 206/462 -9761 Phone 206/455 -9640 I am prepared to assist the City of Tukwila in this matter. My role will be to act as a staff member, and prepare the staff report on this appeal to the Board of Adjustment. I will rely on existing reports, files and materials. My draft staff report will be ready late Monday, May 10th. My smooth report will be ready Wednesday, May 12th. I will need the assistance of Mr. Shelton of your department to answer questions and to provide some documents. I will interact with members of the Community Development Department and with Martin Palmer of WSDOT. My fees for this service will be for two phases, the total of which will not exceed $2,300.00 Phase I: Preparation of the staff report not to exceed $1500. Phase II: Follow up and presentation to the BOA, if necessary. Not to exceed $800.00 I will bill the Department of Public Works at 75.00/hour plus any peripheral expenses at cost plus 10% and mileage at .28 /mile. Thank you for this opportunity to assist you and your department. Sir rely, Robert S. Betts BARGHAUSEN CONSULTING ENGINEERS, INC. "Land Planning, Survey, and Design Specialists" May 6, 1993 Phil Fraser City of Tukwila Public Works Department 6200 Southcenter Boulevard Tukwila, WA 98188 RE: Gateway Corporate Center Building No. 10 Our Job No. 4733 Dear Phil: RECEIVED MAY 7 - 1993 ' ESTATE As requested, I have reviewed the proposed site plan layout and storm drainage system for Building No. 10 at the Gateway corporate center. The existing site consists of nearly 100 percent impervious area. The proposed development will decrease the impervious area by approximately 10 percent. Since the entire site currently drains into the existing storm system and eventually through the storm pumps located along the Duwamish River, there will be a net decrease in surface water runoff entering the storm system. The existing storm pumps are privately owned and were overhauled approximately three to four years ago and are currently functioning without any apparent capacity problems. The pumps are also inspected on a regular basis. Since the proposed project will result in a net decrease in storm flows to the existing system, we can conclude that the existing conveyance system and storm drainage pumps have adequate capacity for the proposed project and will not be adversely impacted. If you have any questions or need additional information regarding this issue, please contact me. DKB /tb 4733C.001 cc: Bob Hart, Kemper Real Estate Dave Kehle, David Kehle Architect Sincerely, -411Afd-/ Daniel K. Balmelli, P.E. Principal Engineer Home Office: 18215 72nd Avenue South • Kent, Washington 98032 • (206) 251 -6222 • Fax (206) 251 -8782 California Office: 4612 Roseville Road, Suite #103 • North Highlands, California 95660 • (916) 348 -3057 • Fax (916) 348 -0953 �•..�( -,.. IVE.MPER Kemper Real Estate Management Company 12720 Gateway Drive, Suite 107, Seattle, Washington 98168 • 206/241 -1103 • Fax 206/241 -2191 May 5, 1993 Robert Betts Consultant City of Tukwila 6300 Southcenter Blvd. Tukwila, WA 98188 Re: Bldg 10 - Gateway Corporate Center Remediation Dear Bob, ReaL esTaTe manacemenT Attached is a copy of the Assessment and Remediation report by GeoEngineers which addresses the petroleum- related contamination found at the Bldg 10 site. The contamination was discovered and remediation occurred in 1989. Analysis of soil and groundwater samples in the area after the remediation was completed, detected either zero or below- significant levels of contamination. A representative of GeoEngineers was on site during the entire process and in addition to monitoring the remediation for Bedford Properties, acted as the agent for the EPA. A visual and olfactory inspection of the site by GeoEngineers following demolition of the Allied building in 1992 indicated no apparent residual contamination. Sincerely, 4E7 kLAN.J1-- Robert Hart Development Manager RECEIVED MAY 0 51993 COMMUNITY DEVELOPMENT RECORDING REQUESTED BY AND WHEN RECORDED RETURN TO: Bedford Properties, Inc. 12720 Gateway Drive Suite 107 Seattle, Washington 98168 Attention: Bob Hart DECLARATION OF EASEMENT THIS PT ^LARATION OF EASEMENT ( "Declaration ") is made by and between BEDFORD PROPERTIES, INC., a California corporation, and PETER B. BEDFORD AND KIRSTEN BEDFORD, husband and wife ( "Declarants "). RECITALS WHEREAS, Declarants own certain real property (the "Property ") located adjacent to the Duwamish River in the City of Tukwila, Washington which consists of six (6) lots (A; B -1; B -2; C -1; C -2; C- 3) (referred to collectively as the "Lots "), depicted on the site plan on Exhibit A and more particularly described in Exhibit B attached hereto and by this reference incorporated herein. WHEREAS, the Property includes a private road (currently designated as 116th Street) (the "Road ") that extends between East Marginal Way South and the east boundary of Lot A, more particularly described in Exhibit C attached hereto and by this reference incorporated herein;. WHEREAS, Declarants wish to grant cross - easements for the benefit of each lot which shall be binding on all future owners of the Lots (such owners being referred to herein collectively as the "Parties "); N0W, THEREFORE: Declarants hereby declare that the Lots shall be held, sold and conveyed subject to the following easements- which shall run with the Lots and shall be binding on Parties having or requiring any right, title, or interest in the Lots or any part thereof, and shall inure to the benefit of any successor of either Declarants or Parties in the ownership thereof: 1. Road Easement The Parties, their employees, contractors, agents and invitees and their tenants and their employees, contractors, agents and invitees shall have a perpetual non - exclusive right of way and easement to go upon and use the Road. 1 THENCE North 15° 27' 21" East, 25.00 teat; THENCE North 74° 32' 39" West, 62.74 feet; THENCE South 48° 02' 30" East, 56.02 feet; THENCE South 74° 32' 39" East, 12.60 feet to the POINT OF BEGINNING. PROJECT: SEAGATE CENTER September 1, 1989 2908.37 , . The cost of maintaining or modifying the Road shall be borne proportionately according to the land square footage of each lot in accordance with Exhibit D attached hereto and by this reference incorporated herein. 2. Mutual Ingress and Egress Easements. The Parties, their employees, contractors, agents and invitees and their tenants and their employees, contractors, agents and invitees shall have a perpetual non - exclusive right of way and easement to use the paved areas located on any adjacent lot located within 15 feet of the benefitted lot's common property line to the adjacent lot for ingress, egress and vehicle maneuvering. The cost of maintaining or modifying the paved areas subject to this Declaration shall be borne entirely by the owner of each lot uncipr which the maintenance or modification is required. 3. Fire Sprinkler Water and Domestic Water System Easement. Each Party is granted a construction easement to go upon any adjacent lot to the point -of- connection of the existing fire sprinkler water system piping to install a new fire sprinkler water line and tie -in to the existing system. Each Party is granted a construction easement to go upon any lot as required to the existing stub of the domestic water line in order to install new domestic water lines. (a) Construction costs. The cost of constructing either the fire sprinkler water lines or the domestic water lines shall be borne entirely by the owner of the benefitted lot and such costs shall also include the cost of restoring the servient lot to the condition existing prior to the construction activities. (b) Maintenance Costs. The cost of maintaining those portions of the fire sprinkler water system running under the Road shall be borne by the Parties in proportion to their square footage in accordance with Exhibit D. The cost of maintaining the remaining portions of the fire sprinkler system shall be borne entirely by the owner of each lot under which the maintenance is required. The Parties shall have the responsibility of carrying out any maintenance or repair of the lines running under and across each party's respective lot with the right to prompt reimbursement from the owner of the other lot of such owners share of the expense of maintenance or repair. In the event a party fails to commence any required maintenance or repairs under and across that party's lot within a reasonable time after written notice from the owner of another lot, the owner of the H: \RSO \B0296- 89.002 \easement 2 THENCE North 15° 27' 21" East, 25.00 feet; THENCE North 74° 32' 39" West, 62.74 feet; THENCE South 4$° 02' 30" East, 56.02 feet; THENCE South 74° 32' 39" East, 12.60 feet to the FOINT OF BEGINNING. PROJECT: SEAGATE CENTER September 1, 1989 2908.37 other lot may perform the work and obtain reimbursement from the non- performing party's share of the expense. Maintenance costs shall include the cost of restoring the servient parcel to the condition existing prior to maintenance activities. 4. Storm Sewer'Easement. Each lot owner shall have the responsibility of carrying out any maintenance or repairs of the storm sewer lines, french drains, and grass lined swales running on or under their own lot. The storm drainage trench located at the City of Tukwila's right -of -way adjacent to East Marginal Way South shall be maintained between the outfall at catch basin #27 to the outfall at the Duwamish River (as depicted on Exhibit A) and shall be borne by the owners of the Lots in proportion to their square footage in accordance with Exhibit D. In the event a lot owner fails to commence any required maintenance or repairs on, under or across their lot within a reasonable time after written notice from the owner of another lot, the owner of the other lot may perform the work and obtain reimbursement from the owner of the lot of such owner's share of the expense. 5. Indemnity; Liability. Each party shall forever defend, indemnify, and hold the other party harmless from any claim, loss or liability arising out of or in any way connected with that party's use of the easements created by this Declaration or arising from any action undertaken by that party pursuant to construction or maintenance, unless the claim, loss or liability is proximately caused by the negligence or willful conduct of the other party, or its employees, contractors, or agents. In the event of any litigation or proceedings brought against any party and arising out of or in any way connected with any of the above events or claims, against which one party has agreed to indemnify the other, the indemnifying party shall, upon notice from the other party, vigorously resist and defend such actions or proceeding through legal counsel reasonably satisfactory to the other party, at the indemnifying party's expense, and pay any amount awarded against that party which that party is otherwise required to pay pursuant to the conditions set forth in this Declaration. 6. Benefit and Burden. The easements created by this Declaration shall be for the benefit of and appurtenant to the Lots as specifically described above, and shall be appurtenant to and for the benefit of any and all portions of the Property regardless of the type of intensity of development thereon, and whether a portion of the Property is subdivided or developed separately. The benefits and burdens shall run with the land so benefitted or burdened as specifically described above and each and every portion thereof. H: \RSO \B0296- 89.002 \easement 3 THENCE North 15.0 27' 21" East, 25.00 feet; THENCE North 74° 32' 39" West, 62.74 feet; THENCE South 48° 02' 30" East, 56.02 feet; THENCE South 74° 32' 39" East, 12.60 feet to the POINT OF BEGINNING. PROJECT: SEAGATE CENTER September 1, 1989 2908.37 7. Enforcement. In the event of any breach of the provisions of this Declaration, the aggrieved party shall be entitled to exercise any remedies available at law or in equity, including the remedies of injunction and /or specific performance. In the event litigation is commenced to enforce or interpret the provisions of this Declaration, including any appeal therefrom, the prevailing party shall recover from the other party, in addition to all other costs and damages, reasonable attorneys' fees as determined by the judge at trial or upon any appeal. 8. Notice. Any notice under this Declaration shall be in writing and shall be effective when actually delivered or, if mailed, when deposited postpaid. Mail shall be directed to the address of the record owner of the subject property or to such other address as a party may specify by notice to the other party. 9. Binding Effect. The covenants contained in this Declaration are not personal, but shall run with the properties and shall be binding upon and inure to the benefit of the respective heirs, personal representatives, transferees or successors in interest of the Parties. 10. Amendment. This Declaration may not be modified, amended or terminated without the prior written approval of the then owner or owners of the Lots who are benefited or burdened by the provision of any amendment to this Declaration. 11. Waiver. No waiver of any of the provisions of this Declaration shall be effective unless it is in writing, signed by the person or entity against whom it is asserted and any such written waiver shall only be applicable to the specific instance to which it relates and shall not be deemed to be a continuing, or future waiver. 12. Severability. If any one or more of the provisions contained in this Declaration . shall for any reason be held to be invalid, illegal or unenforceable in any respect, such invalidity, illegality or unenforceability shall not affect any other provision, and this Declaration shall be construed as if such invalid, illegal or unenforceable provision had never been contained in this Declaration. HMSO 4 THENCE North 15° 27' 21" East, 25.00 feet; THENCE North 74° 32' 39" West, 62.74 feet; THENCE South 48° 02' 30" East, 56.02 feet; THENCE South 74° 32' 39" East, 12.60 feet to the POINT OF BEGINNING. PROJECT: SEAGATE CENTER September 1, 1989 2908.37 13. Applicable Law. This Declaration shall be governed by and construed in accordance with the laws of the State of Washington. r DECLARED this /)2 day of November, 1989. DECLARANTS: BEDFORD PROPERTIES, INC., a California corporation By Joseph`S. Layman Its Vice President '..01.QC.0 {Z Z /! Kirsten Bedford La. I /1-' o�`c� -u Peter B. Bedford By: BEDFORD PROPERTIES, INC., a California corpora -Lion, Their Attorney -In -Fact 7 BY: Joseph/S. Layman !% Its Vice President H:1RSO1B0296.89.0021eascment 5 YMV 4.14. .. •.Y .rte .��.� �..������. -�. THENCE North 15° 27' 21" East, 25.00 feet; THENCE North 74° 32' 39" West, 62.74 feet; THENCE South 48° 02' 30" East, 56.02 feet; THENCE South 74° 32' 39" East, 12.60 feet to the POINT OF BEGINNING. PROJECT: SEAGATE CENTER September 1, 1989 2908.37 East Marginal Way South DUWAMISH RIVER 6 Z 1 r1 f LI •fj. :1. I H a 6or 261,428 S.F. • 0 • • 0 9 z System Outfall 0 UD riC.w.00d41v ...... THENCE North 15° 27' 21" East, 25.00 feet; THENCE North 74° 32' 39" West, 62.74 feet; THENCE South 48° 02' 30" East, 56.02 feet; THENCE South 74° 32' 39" East, 12.60 feet to the POINT OF BEGINNING. PROJECT: SEAGATE CENTER September 1, 1989 2908.37 Exhibit "A" Z 0 cc 0 Z 0 0 t-- 0 W 0 a 0 0 ICEmrER Kemper Real Estate Management Company 12720 Gateway Drive, Suite 107, Seattle, Washington 98168 • 206/241 -1103 • Fax 206/241 -2191 May 5, 1993 Ron Cameron City Engineer City of Tukwila 6300 Southcenter Blvd. Tukwila, WA 98188 Re: SEPA - E.B. Bradley Co. - Gateway North Dear Ron, ReaL ESTATE manacemenT This letter provides an update to the January, 1989 traffic study prepared by TDA Inc and addresses the mitigation discussed at the pre - application meeting for the E.B. Bradley building (Bldg 8). Our most current information on Gateway North's square footage and usage is as follows: Bldg Total sq. ft. Office Warehouse 1 59,300 15,418 43,882 2 54,179 16,6;85 37,494 3 28,510 7,698 20,812 4 37,679 11,052 26,627 5 36,554 13,159 23,395 6 50,254 12,899 37,355 E.B. Bradley 42,155 4,000 38,155 TOTAL 308,631 80,911 227,720 Shown below is a comparison of the above actual and proposed Bldg 8 figures with Table 3, page 12 of the Traffic Study: A.M. Peak Total P.M. Peak Total TDA Actual TDA Actual Office 205 232 214 243 Warehouse 466 372 451 360 Total 671. 604 665 603 The actual use for Bldgs 1 through 6 and the proposed use for Bldg 8 indicate that the daily trips for the above buildings are less than projected at full buildout. There is still a potential for approximately 70,000 square feet of additional office and warehouse buildings at Gateway North. Mg 0 5 1993 COMMUNITY DEVELOPMENT . IVEmPER REML eSTaTe manacemenT Per our discussions, our Contractor is budgeting the channelization work in conjunction with Bldg 8. Any subsequent mitigation (traffic signal) will be analyzed with subsequent development projects within the park. 1 understand that the City is procuring estimates to do asphalt overlay work along East Marginal Way. If it's convenient, please include the channelization work in the estimates. It might be cheaper for us to have the City's contractor perform the work. I am including a copy of the 1989 TDA. Traffic Study for your reference. Please let me know if you need additional information. Sincerel, /: 1 Robert Hart Development Manager KimrER Kemper Real Estate Management Company 12720 Gateway Drive, Suite 107, Seattle, Washington 98168 • 206/241 -1103 • Fax 206/241 -2191 May 5, 1993 Ron Cameron Jack Pace City of Tukwila 6300 Southcenter Blvd. Tukwila, WA 98188 Re: SEPA - E.B. Bradley Co. - Gateway North Dear Ron and Jack, Rea eSTaTe manacemenT This letter is to clarify discrepancies between stated square footage numbers for the proposed E.B. Bradley building (Bldg 8). The square footage indicated on the SEPA checklist was approximate. The square footage shown on the recently submitted site plan shows the accurate number and should control. Sincerely, ;12 Robert Hart Development Manager RECEIVED MAY 0 51993 COiV:I\IIUNITY DEVELOPMENT IVEmrrR Kemper Real Estate Management Company 12720 Gateway Drive, Suite 107, Seattle, Washington 98168 • 206/241 -1103 • Fax 206/241 -2191 May 5, 1993 Ron Cameron City Engineer City of Tukwila 6300 Southcenter Blvd. Tukwila, WA 98188 Re: Bldg 8 - Gateway North Riverbank Erosion Dear Ron, Reap esTaTe manacemenT I recently met with Phil Fraser, Andy Levesque with King County, and Dan Balmelli of Barghausen Engineers to discuss erosion at the riverbank along Gateway North. At that meeting we tried to determine the extent of the erosion, possible options to fix the problem, responsibilities for maintenance, and timing. As a quick background, Bedford Properties completed the Riverbank work in 1989. This work was accepted by King County, the governing authority at the time.. The entire length of the riverbank was re- shaped and planted in order to provide adequate stabilization. In addition, fish habitats were created which include logs rooted with large rocks. These habitats also helped control erosion along the river. An easement was recorded in favor of the City of Tukwila which clearly places the responsibility for riverbank stabilization and maintenance upon the City of Tukwila. A copy of the easement is attached for your reference. The extent of erosion is fairly severe at two locations, and is evident to various lesser degrees along half of the river along Gateway North. We agreed that the first step in resolving the fix is to have the riverbank surveyed. We discussed several options to fix the erosion which include cutting the bank back at a 2 to 1 slope from the existing eroded grade. This is not an acceptable option from our perspective. This would entail moving the existing trail back, moving the drainage system of perforated pipe and french drain, and taking land from the adjacent lots. Not only would this be an expensive option for the City and leave us with an undesirable lot configuration, but it would probably not be a permanent fix; providing a stable slope configuration is exactly what our Contractor did during the initial construction. The City would very likely have to repeat the above procedure periodically. \ r.-. .'t : :. MAY 0 61993 CQMMUNITY ICemreR • REM. ESTATE manacemenT Another option is to place additional rocks and logs at the waterline at various locations, then fill with dirt, jute mats, and river plantings. We believe that this is the best option in terms of cost and feasibility. Timing was another matter of concern. Apparently, by calling the fix a "restoration" requires an incredible morass of agencies, permits, consultants, bids, etc. The timetable I received from Phil shows that construction wouldn't even start until 1995! I suggest the City consider this erosion a minor maintenance problem and /or an emergency maintenance concern. By waiting a year and a half, the problem will certainly be much worse. Without acknowledging responsibility, both Kemper and E.B. Bradley (Bldg 8) are willing to help the City of Tukwila with the erosion repair providing that the timing and cost are reasonable. We offer all the dirt that is required and some heavy equipment time. Our schedule for earthwork at Gateway North is August and September of this year. I suggest the City quickly perform the survey after which we'll work together to finalize the extent of the maintenance and target the work for this summer. Please call me with any concerns you have. We're very interested in finding an expeditious solution to this problem. Sincerely, )?_ Robert Hart Development Manager • F;iCE' RECORDING REQUESTED BY AND , i I.I�, 19 WHEN RECORDED RETURN 1W) •2 L Bedford Properties, Irie. + ^ ..i.t.:: 12720 Gateway Drive kc:.' ,,;`'•'� ; Suite 107 Seattle, Washington 98168 Attention:. Bob Hart DECLARATION OF EASEMENT _ r r: '/' .4 CD THIS DECLARATION OF EASEMENT ( "Declaration ") is made by and 11-) between PETER B. BEDFORD AND KIRSTEN BEDFORD, husband and wife ("Grantors") and the CITY OF TUKWILA, a Washington optional (-\., municipal code city ( "Grantee "). CT RECITALS WHEREAS, Grantor owns certain real property located adjacent to the Duwamish River in the City of Tukwila, Washington (the "Property "), more particularly described in Exhibit A attached hereto and incorporated herein by this reference; and WHEREAS, Grantee is in the process of developing a public recreational trail (the "Trail ") along the Duwamish River within Grantee's corporate . limits; and WHEREAS, Grantee requires access to the riverbank for maintenance, monitoring, and construction of the Trail and other public recreational facilities as hereinafter provided and for construction of possible additional dike /levee and /or riverbank stabilization improvements; and WHEREAS, Grantor has developed the riverbank which includes landscaping, sod, and 12'± bic- filtration slope and a french drain (the "landscaping, 12'+ bio- filtration slope, sod and the french drain are hereinafter referred to as the "Landscaping ") as depicted in Exhibit B attached hereto and incorporated herein by this reference, and desires to maintain the Landscaping and any future hardscape amenities constructed by Grantor with Grantee's approval; NOW, THEREFORE, in consideration of the benefits and conditions described herein, Grantor hereby conveys and grants Grantee, its successors and assigns, a perpetual nonexclusive Easement (the "Easement ") (more particularly described in Exhibit C attached hereto and incorporated herein by this reference) across,.along, in and upon, the Property, subject to the following terms and conditions, by which Grantee agrees to be bound: H. \RSO \10296.89.001 \esmnt3.rvr 1 EXCISE TAX NOT REQUIRED King Co. Records Division • By /. /.: ��.-, , Deputy 90032.31504 1. Use of the Property. The Easement granted herein shall be for the purpose of providing Grantee the right to landscape, develop, and maintain the Trail and for installing, maintaining and providing certain recreational facilities for public use. The use of the Easement and the Trail contained therein shall be restricted to pedestrian, equestrian and bicycle use. Grantee warrants and represents that it will prohibit camping, campfires, motorized vehicles except those required to construct or maintain any improvements within the Easement, the use of firearms, and any other activities that would be inconsistent with the safe use of the Easement by the public. Grantee warrants and represents that it has the power and will use such power for the benefit of Grantor to promulgate and enforce such other rules and regulations pertaining to the public's use of the Easement as it may deem fit and proper to promote safe and equitable use. The Easement shall also be used for the purpose of maintaining, monitoring, constructing and stabilizing the riverbank and /or additional dike /levee systems. In the event that Grantee's plans for the Easement would interfere with or potentially cause the destruction or removal of any of the current or future improvements made by Grantor within the Easement, Grantee shall first meet with Grantor to discuss how best to minimize the economic and aesthetic impact of such plans. 2. Construction and Maintenance. The design and construction of the Trail, shall be at the sole cost and reasonable discretion of the Grantee. Grantee agrees to design the Trail and locate other facilities within the Easement to accommodate Grantor's use of the Property not within the Easement (the "Development ") and any future plans for the Development. Except as otherwise provided in this Declaration, Grantee shall be responsible for all maintenance incurred with respect to the Easement at the area depicted on Exhibit B as "City Maintained.Area ". 3. Timing of construction. Grantor and Grantee understand and agree that the time at which Grantee will develop the Trail is unknown at present because of the necessity of Grantee to acquire additional right-of -way and funding necessary to construct the Trail. Grantee agrees that Grantor may, with the prior written consent of Grantee, provide additional improvements within the Easement pending construction of the Trail. Grantee shall have sole discretion in determining whether or not to approve any improvements within the Easement, but such discretion shall be based upon whether the improvements would interfere with or be inconsistent with Grantee's use of the Easement. Such consent shall be made in a timely manner and shall H: \R5O \B02 96.89.00 I \e;mnt 3. rn 2 not be unreasonably withheld. Grantee's approval of landscaping or other development by the Grantor within the Easement shall not constitute a waiver of Grantee's rights under this Easement to construct and maintain the Trail, nor shall any delay in construction of the Trail constitute an abandonment or release of Grantee's right to develop the Trail. 4. Costs. (a) The cost of and responsibility for maintaining the Easement shall be borne by the parties as set forth below: GRANTOR: Grantor shall bear all costs and maintenance responsibilities for the Landscaping. However, CD should Grantee do anything whatsoever that In negatively affects the ability of either the french drain or the bio- filtration slope to provide water N drainage from the Property, then Grantee shall construct, install and maintain at its own cost and CD CD expense an alternative drainage system that is comparable to the current drainage system. GRANTEE: Grantee shall bear all costs and maintenance responsibilities for the Trail, any improvements constructed by Grantee within the Easement, and any riverbank and /or additional, dike /levee systems constructed by Grantee. (b) Notwithstanding the provisions in Paragraph 4(a) Grantor shall not be excluded from participating in future Local Improvement Districts for improvements to the Easement as depicted in Exhibit B. (c) In the event that either Grantor or Grantee fails to commence any required maintenance or repairs on, under or across their respective areas of responsibility within a reasonable period of time after written notice from the ot.hc,r party, the other party may perform the work and obtain reimbursement from the non- performing party for the non - performing party's share of the expense. (d) In the event that Grantee determines that any facilities or improvements within the Easement must be removed pursuant to the provisions in Paragraph 1, Grantee, shall bear the entire cost and burden of removal. H: \R50180296.89,001 \esmnt 3.rvr 3 5. Indemnity. Grantee shall forever defend, indemnify, protect, and hold harmless the Grantor from and against any and all costs, expenses, charges, fees, claims, loss, or liability, or any portion thereof, arising out of, in connection with, or relating to the Easement unless the claim, loss or liability is proximately caused by the negligence or willful conduct of Grantor. Such indemnity shall include, without limitation, the following: (a) Injury or death to persons; (b) Damage to either the property, improvements or facilities; (c) Claims of third parties (including governmental agencies) for damages, penalties, response costs, injunctive, declaratory or other relief; and (d) Mechanic's liens; In the event of any litigation or proceedings arising out of or in any way connected with any of the above events or claims, against which Grantee has agreed to indemnify Grantor, Grantee shall, upon notice from Grantor, vigorously resist and defend such actions or proceeding through legal counsel reasonably satisfactory to Grantor, at Grantee's expense, and pay any amount awarded against Grantee which Grantee is otherwise required to pay pursuant to the conditions set forth in this Declaration. .6. Successor. This Easement shall be recorded with the King County Auditor and shall constitute an easement and servitude running with the land, inuring to the benefit of the parties hereto, their heirs, executors, administrators, successors and assigns. 7. Applicable Law. This Declaration shall be governed by and construed in •accordance with the laws of the State of ,Washington. H:1RSO\B0296•89.0011eamnt 3.rvr 4 ...,- Any notice under this Declaration shall be in writing and shall be effective when actually delivered or, if mailed, when deposited postpaid. Mail shall be directed to the address of the record owner of the subject property or to such other address as a party may specify by notice to the other party. DECLARED this jc /- day of. December, 1989. GRANTORS: ,- / 1 / KIRSTEN BEDFORD PETER B. BEDFORD CD L( ) ) By: BEDFORD PROPERTIES, INC., a California corporation, CD Their Attorney -In -Fact CD Q` By: / :.% Jo eph %S . Layman f Its Vice President GRANTEE: .1 - 5-9'0 CIT OF- •TX Glj Y L. \AN DUSEN, MAYOR ATTEST /AUTHENTICATED: MA: ,•E ANDERSON, CITY CLERK AP VE_ AS 'YO FO 4: - V 0 FICE OF THE Y ATTOR EY H; \RSO \80196.69.00 I \esmnt 3.1vt 5 'Z1 5, 0 .1; 4 •ft,1(,OI DUWAMISH RIVER I0/ k East Marginal Way South L1 I) 544.61 N 3 •1.0.1.1.11 • • • • • • C,~ O 1 o o- 43 0 h • MD m 1) h o • • • i w 0 • n • • COMPOSITE LOT.CONFIGURATION ICEmPt R Kemper Real Estate Management Company ,12720 Gateway Drive, Suite 107, Seattle, Washington 98168 • 206/241 -1103 • Fax 206/241 -2191 May 5, 1993 Ron Cameron City Engineer City of Tukwila 6300 Southcenter Blvd. Tukwila, WA 98188 Re: Bldg 10 - Gateway Corporate Center River Protection Easement Dear Ron, ReaL ESTaTe manacemenT Attached is a copy of the River Protection /Recreation Trail Easement which was made in December, 1991. As you recall, this easement replaced existing and inadequate easements and was endorsed by Tukwila's Parks and Recreation, the Green River Flood Control Zone District, Public Works, and the City Council. The City has in their files drawings by Barghausen Engineers that detail sections along the river. The easement area allows for flood control, landscaping, riverbank stabilization, recreation trail and road. Unless the regulations have changed, the easement should be current. Sincerely, Robert Hart Development Manager E EE Iv,` D MAY 0 5 1993 COMMUNI'T'Y DEVELOPMENT reference as if set forth in full. Page 1 of 2 Filed For Record At The Request Of 9112171259 King County Real Property Division RIVER PROTECTION /RECREATIONAL TRAIL EASEMENT th THIS AGREEMENT made this ? r day o 6- 1991 -018 DUWAMISH RIVER between !,&l)Fv/2 () n,CVE4 -0P 4 F v l 1- m GRANTOR, and King County, a political subdivision of the State of Washington, the City of Tukwila, Washington and the Green River Flood Control Zone, District as tenants in common, as GRANTEES: WITNESSETH: The Grantor, in consideration of mutual benefits, receipt rm.( of which is acknowledged, and the benefits which will accrue to the land of VeGrantor . by the exercise of the rights herein granted, do hereby remise, r-1 release, and perpetually grant unto the Grantees, as tenants in common, thier G9 successors and assigns, an easement and right of way for the purposes hereinafter stated along the left bank of the Green /Duwamish River, within a r'(strip of land as constructed or reconstructed on the following described property: That portion of revised Lot 3 of City of Tukwila Boundary Line Adjustment No. 91 -4 -BLA as recorded under Recording No. 9105231162, records of King County, Washington, lying Northerly of the following described line: SEE ATTACHED EXHIBIT "A" Said easement and right of way is based :4: i:•e •.; following agreements: 1. The grant contained herein is a covenant running with the land. 2. By the acceptance of this grant the Grantor and Grantees mutually agree that this instrument does hereby supersede, extinguish and relinquish those certain instruments and rights acquired under Recording Nos. 5479828 and 5928214. 3. This easement grants and conveys to the Grantees those rights and interests in the real property herein described as authorized in Sections 86.12.020, 86.15.080, 86.15.100 and 86.16.120 of the Revised Code of Washington (RCW). 4. No structure, fill, or obstruction shall be permitted within the River Protection Easement unless otherwise approved by the Grantees. 5. No party shall take any action on the described easement that would injuriously affect or render the easement appreciably less convenient and useful to any one of the other tenants in common. 6. Grantor and Grantees are subject to the terms and conditions as described in Exhibit "B ", attached hereto and incorporated herein by this reference as if set forth in full. Page 1 of 2 VER PROTECTION EASEMENT PUWAMISH RIVER Together with the right to enter upon the above described lancl to conrt.ruct, reconstruct, maintain, and repair a bank protection and/or other flood control works, including all appurtenances thereto, together with right to trim, cut, fell and remove all such trees, brush, other natural growth, and obstructions as are necessary to provide adequate clearance and to eliminate interference; with or 'hazards to the structures. The consideration above mentioned is accepted, as full compensation to the exorcise of the rights above granted. To have tend to hold, all and singular, the said easement and right of way together with appurtenances unto Grantees, thipr successors and assigns. IN WITNESS WHEREOF, j C:rtntor h year first above written. By: IIy: ed this instrument the day and El)FOIX1) DEVE COMPANY - t2t5jn '\/ 19)2F.11:6.0 OR GRANTOR STATE OF Wigam ) Rt1 COSTA) ss COUNTY OF ) On this day of 19 ` / , before me me personally appeared and b- 5 (C- /C- -- to me known to be trh and of the corporation that execu•ed the foregoing inmtruwtrt, and acknowledged said instrument to be the fr and voluntary act and deed of said corporation for the uses and purposes therein mentioned, and an oath stated that is authorized to execute said instrument, and that the seal affixed is the corporate seal of said corporation. GIVEN under ' my hand and official seal, the day and year last above written. 1/i c.rL .Pre Sr GL2.n 'C r1vrprot.bum NOTARY PUBLIC in lad for ti ?3 Sta residing at; _ My appointment s Page 2 of 2 OFFICIAL SEAL LISA A. KUHN NOTARY PUOUC — CALIFORMA CONTRA COSTA COUNTY My commiuion esOu Jaw 21, 1111 EXHIBIT "B" 1. Use of the Easement. The City of Tukwila's (City). use of the Easement shall be for the purpose of landscaping, developing and maintaining the Easement for public recreational trail and road purposes and of installing,. maintaining and providing for public use of recreational facilities thereon. The use of the recreational trail will be restricted to pedestrian and bicycle use. The use of the road will be for vehicular traffic. Camping, campfires, the use of firearms and any other activities that would be inconsistent with the safe use of the Easement by the public will be prohibited. In addition to the restrictions on use provided herein, the City shall have the power to promulgate and enforce such other rules and regulations for use of the trail and /or road by the public as it may deem fit and proper to promote safe and equitable use. 2. Construction and Maintenance. The design of the public recreational trail and /or road shall be in the sole discretion of the City. The City agrees to make reasonable attempts in designing the public recreational trail and /or road to accommodate any plans for development by Grantor on property adjacent to the trail and /or road. All design, engineering and construction costs incurred shall be at the developer's and /or City's expense. The City shall be responsible for all maintenance and maintenance costs incurred with respect to the trail and /or road. The construction and maintenance of trail and /or road systems and associated landscaping shall be in accordance with the most current riverbank stabilization studies conducted for this easement. 3. Timing of Construction. Both parties understand and agree that the time at which the City will develop the recreational trail and /or road is unknown at present because of the necessity to acquire additional right -of -way and the funding necessary to construct the trail and /or road. Grantor and the City agree that Grantor may, with the prior written consent of the City, make temporary improvements to the Easement pending construction of the trail and /or road. The City shall have sole discretion in determining whether or not to approve any improvements in the Easement which would interfere with or be inconsistent with the City's use of the Easement for a recreational trail and /or road. In the event that improvements are made on the Easement with the City's consent, the City shall bear the cost of removal of such improvements at the time of trail and /or road construction. The City shall not be responsible, however, for paying the cost of relocating or reinstalling such improvements, or for paying the costs of installing such improvements incurred by the Grantor, or for paying the cost of replacing said improvements. The City's approval of landscaping or other development by the Grantor in the easement area shall not constitute a waiver of the City's rights under this easement to construct and maintain the recreational trail and /or road, nor shall any delay in construction of such trail and /or road constitute an abandonment or release of the right to develop such trail and /or road by the City. 4. Indemnity. The City shall indemnify, defend and hold harmless the Grantor from and against any and all claims, losses or liability, or any portion thereof, arising from injury or death to persons or damage to property occasioned by a negligent act, omission or failure of the City, its officers, agents and employees, in constructing and maintaining the recreational trail and /or road. Kemper Real Estate Management Company 12720 Gateway Drive, Suite 107, Seattle, Washington 98168 • 206/241 -1103 • Mr. Rick Beeler City of Tukwila 6300 Southcenter Boulevard Tukwila, WA 98188 Re: Permit - Gateway North IVEmPER ReaL ESTATE manaGemenT Fax 206/24 91 1993 April 0, 1993 COMMUNITY DEVELOPMENT Dear Rick, We are in the final stages of completing a sales transaction for approximately three acres at Gateway North with the E.B. Bradley Company. This land, and the proposed building are part of a 1031 (tax- deferred) exchange. In addition, the company will be moving out of their existing facilities in the Georgetown area. For both of these reasons, it is imperative that the new building be complete by the end of 1993. In January, Jack Pace indicated that if we (the applicants) did our part, the Shorelines and Building Permit process could be completed in four months. I realize that Planning has recently had some staff changes and they are under a heavy workload. However, the Gateway North transaction, and related collateral transactions, are already underway. Kemper and the E.B. Bradley Company are willing to explore any and all options in order to help the City of Tukwila process the Shorelines application to meet the schedule. With this letter, we request that the City of Tukwila replace the Gateway North (E.B. Bradley) application with the Gateway Bldg #10 application which has already been submitted and is scheduled for the May 27th B.A.R. I'd like to meet with you to discuss the attached schedule to determine other options that could be pursued in order for this project to stay on track. During the four years that I've been with Bedford /Kemper, the City of Tukwila has been very cooperative. Because of our teamwork approach, the buildings, land sales, and tenant improvements at Gateway and Gateway North have been completed on schedule and in conformance with the City's (and Kemper's) requirements and high design standards. I look forward to working with all of you again on this project. Sincere y. Robert Hart Development Manager Work Item April May June July August September October November December Shorelines Pre -Application X ,Landscape t. �zvil Elevations X Site Plan X SEPA Application Staff Review BAR (Design Review) Building Permit Construction Documents Submit for Permit Review Process Bldg Permit Construction Site/Earthwork Ftgs/Foundation Slab Tilt -up Walls oof Structure Storefront Final Grading Paving/Curbs Landscaping Occupancy Permit X X X X X X X X X X X 4-16 X X X X X X X X 5-27 X XXXX 5-28 X X X X X X XXXX 7-30 X X XXXX X X X X X X X X XX XX X X X X X X X X X X X X X X X X XX X X X X X X X X X A , -�.� ' r't`e "o ( RJr P f f S ( a l? v c- { TIP ICA "S712.6- rsC -APf`" 2T' �- 5'z-7A, Lc.) 5 r-aLrZ _,.icLsz' Qc t- et r ti L 5 ti4.slyzc r-Ac tri G cge e-r1 w H 2 D h c a ,.. G wK0cc -t FAcG: s i rE pR.oeJ ►Ge. sav -rdei rACrisLG c.JES r ALorcG RIVc`12 6/4c4 K Ls/ 2O pr QLDGS_ �I.. ,roa(c') • Z/Z FA 1PIa kof rK4)*t.D ACRR °ss f e C1' srY�...op* Rives 9103070405 AND REMEDIATION OF SUBSURFACE PETROLEUM- RELATED CONTAMINATION FORMER TIME -DC TRUCK TERMINAL FOR BEDFORD PROPERTIES lu w mmailm ,1Y4; c1Ni 11!!3:I311 40. 40405 [. . 00 CRSHSL '5409.00 • ':� . T A B L E O F CONTENTS SITE CONDITIONS SURFACE CONDITIONS AND DRAINAGE SUBSURFACE SOIL CONDITIONS GROUND WATER CONDITIONS Page No. 1 1 2 2 3 3 PETROLEUM - RELATED CONTAMINATION 4 GENERAL 4 SOIL CONTAMINATION 5 GROUND WATER CONTAMINATION 6 FREE PETROLEUM PRODUCT 7 SITE REMEDIAL ACTIVITIES 7 CONCLUSIONS 10 Lf7 LIMITATIONS 10 O C' O List of Fig res N.— Figure No. O CD O VICINITY MAP 1 SITE PLAN 2 SITE PLAN AND GROUND WATER ELEVATIONS 3 SOIL SAMPLE LOCATIONS 4 APPENDIX Page No. FIELD EXPLORATIONS A -1 BORINGS A -1 REMEDIAL EXCAVATION A -3 MONITOR WELL CONSTRUCTION A -3 GROUND WATER SAMPLING PROGRAM A -4 GROUND WATER ELEVATIONS A -4 CHEMICAL ANALYTICAL PROGRAM A -4 List of Appendix Figures SOIL CLASSIFICATION SYSTEM KEY TO BORING LOG SYMBOLS LOGS OF MONITOR WELLS Figure No. A -1 A -2 A -3 & A -4 Geo *1Engineers , REPORT ASSESSMENT AND REMEDIATION OF SUBSURFACE PETROLEUM- RELATED CONTAMINATION FORMER TIME-DC TRUCK TERMINAL FOR BEDFORD PROPERTIES INTRODUCTION This report presents the results of our services during the assessment and remediation of subsurface petroleum- related contamination at the site of the former Time -DC Truck Terminal in Tukwila, Washington. The former truck terminal facility is located south of the Duwamish River and north of the intersection between 48th Avenue South and Interurban Avenue South. The Lf7 Osite location and surrounding features are shown in Figure 1. The general CD layout of the site is shown on Figure 2. Cr) The former truck terminal facility included 15 underground steel tanks O Q) used for the storage of diesel, gasoline, lubricating oil and waste oil. These tanks included ten 20,000 - gallon diesel tanks, two 10,000 - gallon diesel tanks, one 10,000 gallon gasoline tank, one 10,000 gallon lube oil tank and a 5,000 gallon waste oil tank. The underground tanks were removed from the site during February 1989. The locations of the former tanks are shown in Figure 2. Soil contaminated by petroleum products and free (floating) product consisting of diesel fuel were encountered during removal of the underground storage tanks. PURPOSE AND SCOPE The purpose of our services was to monitor the tank removal activities, explore and evaluate the extent of subsurface petroleum- related GeoP.Engineers contamination, develop recommendations for remedial measures and monitor the remedial activities at the site. The scope of services completed during this project includes:. 1. Monitor the removal of the fifteen underground storage tanks. 2. Subcontract and monitor the drilling of eight exploratory borings and the installation of monitor wells in each boring. 3. Develop recommendations for remedial actions and monitor the remedial program. 4. Collect soil and ground water samples from each boring /monitor well and from the excavation completed for removal of the tanks and contaminated soil. •;• 5. Subcontract the analysis of the soil and ground water samples for qd- O the presence of petroleum- related contamination. O CD O SITE CONDITIONS 0) SURFACE CONDITIONS AND DRAINAGE The general layout of the former Time -DC truck facility is shown in Figure 2. The facility included a corrugated metal building, fifteen underground storage tanks and three fuel pump islands prior to the remedial activities. The underground storage tanks and fuel pump islands were removed from the site as part of the remedial program. The western portion of the corrugated metal building included remote fueling lines and truck maintenance facilities. The western portion of the building was demolished and removed from the site during the remedial program. The site is bordered by the Duwamish River along the eastern property line. The surface of the site is relatively level and is covered by asphaltic concrete pavement outside of the limits of the remedial 2 Geo k! Engi neers excavations and building footprint. Runoff from precipitation is collected in a storm drain system and is pumped to the Duwamish River. Runoff from areas where remedial activities were conducted was diverted to a Metro sewer line. SUBSURFACE SOIL CONDITIONS Information pertaining to subsurface soil conditions was obtained by drilling eight borings (MW -1, MW -2 and MW -4 through MW -9) at the locations indicated in Figure 3 and observing conditions in the excavation completed for the removal of the underground storage tanks and petroleum- contaminated soil. Details of the field exploration program and the boring logs for MW -8 and MW -9 are presented in Appendix A of this report. The logs for MW -1, Ln MW -2 and MW -4 through MW -7 are. given in our reports dated April 18, 1989 �d- O and May 23, 1989. Boring MW -3 was completed by Geraghty & Miller, Inc. O CZ) Two general soil units were observed in the remedial excavation and 5 borings at the site. The uppermost soil unit consists of 8 to 10 feet of brown to gray interbedded silt, silty sand and sand. The lowermost unit consists of black fine to medium sand. The base of the black sand was not encountered in the excavation or the borings. Numerous horizontal tree logs, ranging from 1 to 4 feet in diameter and up to 100 feet in length, were encountered in the lower soil unit. GROUND WATER CONDITIONS Ground water conditions at the site were explored by constructing wells (MW -1, MW -2 and MW -4 through MW -9) in each of the borings completed by GeoEngineers. Construction details for MW -1, MW -2 and MW -4 through MW -7 are given in our reports dated April 18, 1989 and May 23, 1989. Construction 3 Geoff! Engineers details for MW -8 and MW -9 are given in Appendix A of this report. Well MW -3, installed by Geraghty & Miller, Inc., was included in our field measurements to provide additional information pertaining to ground water conditions beneath the site. Ground water was encountered at depths of approximately 11 to 14 feet below the ground surface. Water level measurements conducted on June 12, 1989 indicate that the shallow ground water beneath the site generally flows northeastward toward the Duwamish River. Water table elevations at each well on June 12, 1989 are shown in Figure 3. Water table contours based on interpretation of the June 12, 1989 measurements are also shown in Figure 3. Lin PETROLEUM- RELATED CONTAMINATION GENERAL MSubsurface petroleum- contaminated soil was detected during the removal O of the fifteen underground storage tanks from the site. The tanks were removed between February 15 and February 22, 1989 by Gaston Brothers Excavating. Free (floating) petroleum product was detected on the water table in portions of the excavation completed for removal of the tanks. The extent of subsurface contamination at the site by petroleum products was evaluated by: 1. Physical examination of soil samples for visual indications of petroleum contamination. 2. Conducting field sheen tests on the soil samples. 3. Sampling the well casings for presence of free (floating) petroleum products. 4 i ^0(-. Geo gEngineers 4. Analyzing soil and ground water samples from the remedial excavation and the borings /wells for the presence of petroleum - related contamination. The laboratory data are presented in Appendices B, C and D. SOIL CONTAMINATION Soil samples were collected from beneath the tanks during the tank removal program and analyzed for the presence of total petroleum hydrocarbons (TPH) and benzene, ethylbenzene, toluene and xylenes (BETX). The concentrations of TPH and BETX detected in the soil samples collected during the tank removal program generally exceeded Ecology's cleanup guidelines for underground petroleum storage tanks. The analytical results VD Ofor soil samples collected during the tank removal program are summarized CD in Table 1. O The extent of the petroleum- contaminated soil was evaluated primarily Ca Q� during the excavation phase of the remedial program. The remedial program is described in a later section of this report. Soil samples were collected from the base and sidewalls of the excavation and submitted for analysis of the presence of TPH and BETX. The locations from which soil samples were collected from the excavation are shown in Figure 4. The analytical results for soil samples from the excavation are summarized in Table 2. Excavation of soil continued until the concentration of petroleum- related contaminants in the remaining soil were less than Ecology's cleanup guidelines. The limits of the excavation are shown in Figures 2, 3 and 4. Soil samples were also collected from MW -1 through MW -9 and submitted for analysis of the presence of TPH, BETX and /or fuel hydrocarbons. The analytical results for soil samples from the borings are summarized in 5 Ge01 EllgilleerS Table 3. Petroleum- related contaminants were not detected in the soil samples from MW -1, MW -2, MW -3 and MW -5 through MW -9. TPH was detected at a concentration of 6.3 ppm in the soil sample from MW -4. BETX and fuel hydrocarbons were not detected in the soil sample from MW -4. GROUND WATER CONTAMINATION Ground water samples were collected from MW -1 through MW -9 and submitted for analysis of TPH and BETX. The analytical results for the ground water samples from the wells are summarized in Table 4. Petroleum - related contaminants were not detected or were detected at concentrations much less than drinking water quality standards in the ground water samples from MW -1 through MW -9. (n Ground water samples were also collected from the remedial excavation qicit and from a temporary recovery well that was installed in the remedial f`. excavation. The analytical results for the ground water samples from the O excavation and recovery well are summarized in Table 5. Petroleum- related contaminants were detected at concentrations greater than drinking water quality standards in the ground water samples collected from the excavation during the initial portion of the remedial program. Petroleum- contaminated soil and free product were present in the excavation during the initial portion of the remedial program. Petroleum- contaminated soil and free product were removed from the excavation as part of the remedial program. Petroleum - related contaminants were generally' not detected, or were detected at concentrations less than drinking water quality standards, in the ground water samples collected from the excavation during the later portion and after completion of the remedial excavation. 6 Geol Engineers FREE PETROLEUM PRODUCT Free (floating) product was encountered during removal of the underground storage tanks. Analysis of petroleum product present in the excavation indicated that the product was diesel fuel. SITE REMEDIAL ACTIVITIES Gaston Brothers Excavating excavated approximately 14,500 cubic yards of soil contaminated by petroleum products between February 15 and May 26, 1989. The limits of the excavation are shown in Figure 4. The excavated soil was stockpiled on -site. Free product and contaminated soil were found to extend horizontally beneath the western portion of the terminal building. A portion of the of the building was demolished during March 1989 to remove the contaminated soil and free product beneath the building. As described above, soil samples were collected from the base and sidewalls of the excavation and submitted for analysis of the presence of TPH and BETX. Excavation of soil continued until the concentration of petroleum - related contaminants in the remaining soil were less than Ecology's cleanup guidelines. Ecology's petroleum cleanup guidelines at the time of the site remedial work are summarized below. PARAMETER CONCENTRATION Benzene 660 ppb Toluene 143 ppm Ethylbenzene 14 ppm Total Petroleum Hydrocarbons 200 ppm Free product that was encountered in the excavation was recovered with the use of a product recovery well and by skimming product from the water 7 • Geo En��i veers surface with vacuum trucks operated by Environmental Transport, Inc. and Northwest EnviroService, Inc. The majority of the free product was recovered by skimming the surface of the water in the excavation with a boom and removing it with the vacuum trucks. Water and product that was removed from the excavation with the vacuum trucks was transported to ChemPro's facility for disposal. Water that was pumped from the recovery well was discharged to a Metro sewer line (Minor Discharger Permit No. 154). Contaminated soil that was removed from the excavation was subjected to a thermal treatment process by Olympus Environmental, Inc. The soil was treated between July 5, 1989 and October 5, 1989. The th"eTmal treatment process involved the removal of petroleum hydrocarbons from the soil by the ur-3O application of heat followed by treatment of the exhaust gases. The "d' treatment plant consisted of a diesel -fired rotary kiln with facilities to 1 0 control air emissions. Soil was conveyed to the kiln where the petroleum Q7 hydrocarbons were volatilized and partially incinerated. The exhaust gas treatment plant included a bag house and wet scrubber to reduce the emission of dust and volatile hydrocarbons. Olympus Environmental monitored the effectiveness of the thermal treatment process by collecting soil samples at a frequency of about one sample per 240 cubic yards of treated soil. These soil samples were analyzed to determine the concentration of TPH remaining in the soil after treatment. The analytical results are given in Appendix D and summarized in Table 6. The concentrations of TPH detected in the treated soil averaged less than 50 ppm and did not exceed 100 ppm. Ecology's current cleanup guideline for TPH is established at 200 ppm. 8 Geo 1i Engineers GeoEnginee effectiveness GeoEngineers at treated soil. concentrations after treatment summarized in T GeoEngineers we Environmental s also collected samples of the treated soil to monitor the f the treatment process. Samples were collected by a frequency of about one sample per 1,850 cubic yards of These soil samples were analyzed to determine the f TPH, BETX and fuel hydrocarbons remaining in the soil The analytical results are given in Appendix D and ble 7. The analytical results for the samples collected by e generally similar to the results obtained by Olympus a d indicated contaminants re guidelines. C treatment indic percent of the The remedi base of the exc concrete was ob excavation was fabric was pla treated soil. Approximat concrete and w oversized mater. An additional 4 treatment proce Permission for granted by the that the concentration of petroleum- related aining in the treated soil were less than Ecorogy's cleanup mparison of the concentrations of TPH before and after tes that the thermal treatment process removed about 98 etroleum product from the soil. 1 excavation was backfilled with crushed concrete from the ation to about one foot above the water table. The crushed ained from a recycling plant. The remaining portion of the ackfilled with treated soil. A layer of woven geotextile ed over the crushed concrete prior to placement of the ly 1,000 cubic yards of oversized material (cobbles, od) were removed from the soil prior to treatment. The al was transported to the Newcastle Landfill for disposal. 0 cubic yards of soil that was not subjected to the thermal s was transported to the Ceder Hills Landfill for disposal. disposal of the untreated soil and oversized material was ing County Health Department prior to disposal. 9 Geo'� Engineers . z: J;; 3R; ,31I. """. ;4F!!` K• 1 at l- rippi < ;��'�; v , _r,...a.....1':t;..C.ii:�i: -'.. ,; r {.y.:....•;>�"at:f( {..,. r c',..' cd+; ;.x}'�"T.4wJf^.y.".':?>t�rr+.:rea CONCLUSIONS Based on the results of our field observations and analytical testing, it is our opinion that actions to mitigate subsurface petroleum- related contamination in the vicinity of the former underground storage tanks at the Time -DC facility have been completed successfully. On -site observations and chemical analysis of soil and ground water samples indicate that no petroleum- related contamination of regulatory significance remains in the vicinity of the former underground storage tanks. LIMITATIONS We have prepared this report for use by Bedford Properties. This report may be made available to regulatory agencies. This-report is not L f7 Q intended for use by others and the information contained herein is not got O applicable to other sites. ti Our interpretation of soil conditions during remediation is based on CD O7 field observations and chemical analytical data. It is always possible that areas with undetected contamination may exist in portions of the site which were not excavated or analyzed. Within the limitations of scope, schedule and budget, our services have been executed in accordance with generally accepted practices in this area at the time the report was prepared. No other conditions, express or implied, should be understood. 0 0 0 10 Geo 1/�la• jEngineers Please call if you have any questions regarding this submittal. Yours very truly, GeoEngineers, Inc. JHB:JAM:sd Two copies submitted 11:77-Le John H. Biggane Associate James A. Miller, P.E. Principal 11 777 9 I 03070405 TABLE 1 RESULTS OF ANALYTICAL TESTING OF SOIL SAMPLES COLLECTED DURING TANK REMOVAL PAGE 1 OF 2 Total Petroleum Hydrocarbons Benzene ppb Ethyl— benzene ppb Toluene ppb Total Xylenes ppb Sample Number(1) Date Sampled 418.1(2) ppm TLC(3) ppm Comments(4) Tank #1-1 2/15/89 <50 -- -- -- -- -- West end Tank #1 Tank #1-2 2/15/89 <50 -- -- -- -- -- East end Tank #1 Tank #2-1 2/15/89 <50 -- -- -- -- -- West end Tank #2 Tank #2-2 2/15/89 <50 -- -- -- -- -- East end Tank 112 Tank #3-1 2/15/89 <50 -- _ -- -- -- -- West end Tank #3 Tank #3-2 2/15/89 130 -- -- -- -- -- East end Tank #3 Tank #4-1 2/15/89 16,000 -- -- -- • -- -- West end Tank #4 Tank #4-2 2/15/89 <50 -- -- -- -- -- East end Tank 114 Tank #5-1 2/15/89 21,000 -- -- -- -- -- West end Tank #5 Tank #5-2 2/15/89 6,100 -- -- -- -- -- East end Tank #5 Tank #6-1 2/23/89 84 -- -- -- -- -- West end Tank 116 Tank #6-2 2/23/89 110 -- -- -- -- -- East end Tank 116 Tank #7-1 2/23/89 8.1 -- -- -- -- -- West end Tank #7 Tank #7-2 2/23/89 110 -- -- -- -- -- East end Tank #7 Tank #8-1 2/23/89 34 -- -- -- -- -- West end Tank #8 Tank #8-2 2/23/89 760 -- -- -- -- -- East end Tank 118 Tank #9-1 2/23/89 57 -- -- -- -- -- West end Tank #9 Tank #9-2 2/23/89 220 -- -- -- -- -- East end Tank 119 Tank #10-1 2/I23/89 1,500 -- -- -- -- -- West end Tank 1110 Tank #10-2 2/23/89 1,500 -- -- -- ` -- 1 -- East end Tank 1110 Notes: (1) Sample Numbers "Tank //1-1" through "Tank 1115-2" were collected by Gas on Brothets Excavating; Sample Numbers "T-1" through "T-9" were collected by GeoEngineers. (2) EPA Method 418.1 (3) Thin -layer chromotagraphy method (4) Tank locations shown in Figure 2 ppm = parts per million; ppb = parts per billion: -- = not tested; Soil samples collected from beneath the tanks. 0 I4 9103070405 TABLE 1 (CONTINUED) PAGE2OF2 Total Petroleum Hydrocarbons Benzene ppb Ethyl- benzene ppb Toluene ppb Total Xylenes ppb Sample Number(1) Date Sampled 418.1(2) ppm TLC(3) ppm Comments(4) Tank #11-1 2/27/89 119 -- -- -- -- -- North end Tank #11 Tank #11-2 2/27/89 6090 -- -- -- -- -- South end Tank #11 Tank #12-1 2/27/89 7310 -- -- -- -- -- North end Tank #12 Tank #12-2 2/27/89 19,900 -- -- -- -- -- South end Tank #12 Tank #13-1 2/27/89 -- -- 540 34,000 34,000 20,000 North end Tank #13 Tank #13-2 2/27/89 -- -- <1.0 <1.0 <1.0 <3.0 South end Tank #13 Tank #14-1 2/20/89 11,200 -- -- -- -- -- North end Tank #14 Tank #14-2 2/20/89 22,300 -- . -- -- -- -- South end Tank #14 Tank #15-1 2/20/89 18,000 -- -- -- -- -- North end Tank #15 Tank #15-2 2/20/89 81,500 -- -- -- • -- -- South end Tank #15 T-1 2/15/89 5.0 -- -- -- -- -- Center Tank #2 T-2 2/15/89 240 -- -- -- -- -- Center Tank #4 T-3 2/17/89 30,000 -- -- -- -- -- Center Tank #11 T-4 2/17/89 6,600 -- -- -- -- -- Center Tank //13 T-5 2/20/89 140,000 -- -- -- -- -- Center Tank 1114 T-6 2/23/89 940 -- -- -- -- -- Center Tank #9 T-7 2/23/89 16 -- -- -- -- -- Center Tank 117 T-8 2/23/89 68 -- -- -- -- -- Center Tank #6 T-9 2/28/89 920 -- -- -- -- -- Center Tank #11 Notes: (1) Sampfe Numbers "Tank #1-1" through "Tank #15-2" were collected by Gaston Brothers Excavating; (Sample Numbers "T-1" through "T-9" were collected by GeoEngineers. (2) EPA Method 418.1 (3) Thin -layer chromotagraphy method (4) Tank locations shown in Figure 2 ppm = parts per million; ppb = parts per billion: -- not tested: Soil samples collected from beneath the tanks. 9103070405 TABLE 2 RESULTS OF ANALYTICAL TESTING OF SOIL SAMPLES COLLECTED DURING THE REMEDIAL EXCAVATION PAGE 1 OF 6 Total Petroleum Hydrocarbons Benzene ppb Ethyl— benzene ppb Toluene ppb Total Xylenes ppb Sample Number(1) Date ' Sampled Depth Interval 418.1(2) ppm TLC(3) ppm Comments T-10 4/26/89 12-13 1.3 -- <290 <280 1600 1200 T-11 4/26189 12-13 26 -- <280 <280 <280 <560 T-12 4/26/89 12-13 <1.0 -- <300 <300 <300 <600 • T-13 4/26/89 13-14 1.3 -- <260 <260 <260 <520 T-14 4/26/89 14-15 110 -- <280 <280 <280 <560 T-15 4/26/89 13-14 <1.0 -- <260 <260 <280 <520 T-16 4/26/89 14-15 2 -- <270 <270 <270 <540 T-17 4/26/89 13-14 12 -- <290 <290 <290 <580 T-18 4/26/89 12-13 <1.0 -- <290 <290 <290 <580 T-19 4/27/89 15-16 6.5 -- <290 <290 <290 <580 T-20 4/27/89 14-15 <2 -- <280 <280 <280 <560 T-21 5/04/89 15-16 46 -- -- -- -- -- T-22 5/04/89 15-16 100 -- -- -- -- -- T-23 5/04/89 14-15 460 -- -- -- -- -- (4) T-24 5/11/89 13-14 2800 -- 590 1300 2400 6600 (4) T-25 5/11/89 13-14 1400 -- <500 760 910 3000 (4) T-26 5/11/89 13-14 390 -- <550 <550 550 1900 (4) T-27 5/11/89 13-14 2600 -- 1300 1500 3300 8700 (4) T-28 15/11/89 13-14 1200 -- <500 <5?0 <500 2900 (4) Notes: (1) Sample locations shown in Figure 4. (2) EPA Method 418.1 (3) Thin -layer chromotagraphy method (4) Additional soil excavated from this area after sample was collected. Area was resampled after additional excavation. ppm = parts per million; ppb =parts per billion; -- = not tested ft li 9I03070405 TABLE 2 (CONTINUED) PAGE2OF6 Total Petroleum Hydrocarbons Benzene ppb Ethyl- benzene ppb Toluene ppb Total Xylenes ppb Sample Number(1) Date Sampled Depth Interval 418.1(2) ppm TLC(3) ppm Comments T-29 5/11/89 13-14 3.9 -- <540 <540 <540 <1100 T-30 5/11/89 13-14 7.7 -- <530 <530 <530 <1100 T-31 5/11/89 13-14 15 -- <520 <520 <520 <1000 (4) T-32 5/11/89 13-14 <2 -- <270 <270 <270 <540 T-33 5/12/89 13-14 300 -- <250 <250 <250 <500 (4) T-34 5/12/89 13-14 3 -- <260 <260 <260 <520 • T-35 5/12/89 13-14 1000 -- <310 620 <310 3700 T-36 5/12/89 13-14 90 - -- <270 <270 <270 <540 T-37 5/15/89 13-14 <2.0 -- <130 <130 540 530 T-38 5/15/89 13-14 <2.0 -- <130 <130 <130 <260 T-39 5/15/89 13-14 <2.0 -- <130 <130 <130 <260 T-40 5/15/89 13-14 <2.0 -- <120 <120 <120 <240 T-41 5/15/89 15-16 8.1 <50 <1 <1 <1 1 T-42 5/15/89 15-16 38 <50 <1 <1 <1 <1 T-43 5/15/89 15-16 47 <50 4 <1 <1 4 T-44 5/15/89 15-16 163 100 2 <1 <1 <2 T-45 5/15/89 15-16 12 <50 <1 1 <1 <2 T-46 5/15/89 13-14 -- 600 -- -- -- -- (4) T-47 5/15/89 13-14 -- 1000 -- -- -- -- (4) T-48 5/15/89 13-14 -- 1600 36 15 <1 45 (4) T-50 5/15/89 13-14 -- 600 -- -- -- -- (4) Notes: (1) ample locations shown in Figure 4. (2) EPA Method 418.1 (3) Thin -layer chromotagraphy method (4) Additional soil excavated from: this area after sample was collected.: Area was resampled after additional excavation. ppm = parts per million; ppb = parts per billion; -- not tested 9103070405 TABLE 2 (CONTINUED) PAGE 4 OF 6 Total Petroleum Hydrocarbons Benzene ppb Ethyl- benzene ppb Toluene ppb Total Xylenes ppb Sample Number(1) Date Sampled Depth interval 418.1(2) ppm TLC(3) ppm Comments T-72 5/17/89 12 -- 3000 <1 <1 <1 36 (4) T-73 5/17/89 10 18 100 <1 <1 <1 <2 T-74 5/17/89 12 -- 3000 99 54 39 130 (4) T-75 5/17/89 12 -- <50 <1 <1 . <1 <2 T-76 5/18/89 12 22 <50 <1 <1 <1 3 • T-77 5/18/89 12 -- <50 <1 <1 <1 2 T-78 5/18/89 12 13 50 6 8 11 106 T-79 5/18/89 12 74 50 2 <1 <1 6 T-80 5/19/89 16-17 -- <50 <1 <1 <1 <2 T-81 5/19/89 16-17 -- 500 <1 8 <1 21 (4) T-82 5/19/89 16-17 431 800 <1 <1 <1 52 (4) T-83 5/19/89 16-17 18 <50 -- -- -- -- T-84 5/22/89 13-14 8.9 <50 <1 <1 <1 <2 T-85 5/22/89 13-14 -- <50 <1 <1 <1 <2 T-86 5/22/89 13-14 11.3 <50 <1 <1 <1 <2 T-87 5/22/89 13-14 -- 300 <1 <1 <1 2 (4) T-88 5/22/89 13-14 5.7 <50 <1 <1 <1 <2 T-89 5/22/89 15-16 -- <50 <1 <1 3 5 T-90 5/22/89 13-14 22.1 <50 <1 <1 <1 <2 T-91 5/22/89 13-14 -- <50 <1 <1 <1 <2 T-92 e l 5/22/89 18-19 <5.0 300 5 , ) 5 <1 12 • ' (4) Notes: (1)Sample locations shown in Figure 4. (2) EPA Method 418.1 (3) Thin -layer Chromotagraphy method (4) Additional soil excavated from this area after sample:: was collected. Area was resampled after additional excavation. ppm = parts per million; ppb = parts per billion; = not tested 0 mis 91030/0405 TABLE 2 (CONTINUED) PAGE 5 OF 6 Total Petroleum Hydrocarbons Benzene ppb Ethyl- benzene ppb Toluene ppb Total Xylenes ppb Sample Number(1) Date Sampled Depth Interval 418.1(2) ppm TLC(3) ppm Comments T-93 5/22/89 18-19 -- <50 <1 <1 <1 2 T-94 5/22/89 16-19 <5.0 <50 <1 <1 <1 3 T-95 5/22/89 16-19 -- <50 <1 <1 <1 <2 T-96 5/22/89 16-19 16.2 <50 4 3 5 17 T-97 5/23/89 16-19 -- <50 <1 <1 <1 2 T-98 5/23/89 16-19 12.4 <50 <1 <1 <1 <2 • T-99 5/23/89 16-19 -- 300 8 3 <1 38 (4) T-100 5/23/89 16-19 <5.0 <50 <1 <1 <1 <2 T-101 5/23/89 16-19 -- 500 28 12 <1 120 (4) T-102 5/23/89 17-19 189 300 <1 <1 <1 51 (4) T-103 5/23/89 17-19 -- 500 <1 <1 <1 <2 (4) T-104 5/23/89 17-19 138 100 18 79 <1 <2 T-105 5/23/89 17-19 73 100 11 <1 <1 <2 T-106 5/23/89 17-19 -- 100 22 54 <1 97 T-107 5/24/89 17-19 -- 500 <1 <1 <1 19 (4) T-108 5/24/89 17-19 94 100 <1 <1 <1 <2 T-109 5/24/89 17-19 -- 100 <1 <1 <1 <2 T-110 5/24/89 17-19 61 50 <1 <1 <1 <2 T-111 5/24/89 17-19 -- <50 <1 2 <1 <2 T-120 5/25/89 18-19 75 -- <62 <62 <62 <120 T-121 5/25/89 18-19 49 -- <62 <62 <62 <120 Notes: '1 (1) Sample locations shown in Figure 4. (2) EPA Method 418.1 (3) Thin -layer chromotagraphy method (4) Additional soil excavated from this area after sample was collected. Area was resampled after additional excavation. ppm - parts per million; ppb = parts per billion; -- = not tested 9 1030T0405 TABLE 2 (CONTINUED) PAGE6OF6 Total Petroleum Hydrocarbons Ethyl- Total Sample Date Depth 418.1(2) TLC(3) Benzene benzene Toluene Xylenes Number(1) Sampled Interval ppm ppm ppb ppb ppb ppb Comments T-122 5/26/89 18-19 51 -- <62 <62 <62 <120 T-123 5/26/89 18-19 64 -- <65 110 <65 340 T-124 5/26/89 18-19 <4.0 -- <65 <65 <65 <130 T-125 5/26/89 18-19 22 -- <59 <59 <59 <120 Notes: (1) Sample locations shown in Figure 4. (2)EPAMethod418.1 (3) Thin -layer chromotagraphy method. (4) Additional soil excavated trcm this area after sample was collected. Area was resampled after additional excavation.: ppm =parts per million; ppb = parts per billion; --= not tested;: { 91030T0405 TABLE 3 SUMMARY OF ANALYTICAL RESULTS FOR SOIL SAMPLES FROM BORINGS Boring Sample Depth Date Collected Field Screening (1) TPH (2) (ppm) Fuel Hydrocarbons (ppm)(3) BETX (ppb) (4) Headspace Vapors (ppm) Sheen Test B E T X MW-1 12.5 03/24/89 240 NS <5 NT <5 <5 <5 <5 MW-2 17.5 03/24/89 175 NS <5 NT <5 <5 <5 <5 MW-3 12.5 04/03/89 NT NT NT <5 NT NT NT NT MW-4 8 05/03/89 <100 NS 6.3 <5 <25 <25 <25 <25 MW-5 8 05/04/89 <100 NS _ <1 <5 <25 <25 <25 <25 MW-6 8 05/03/89 <100 NS <1 <5 <25 <25 <25 <25 MW-7 8 05/04/89 <100 NS <1 <5 <25 <25 <25 <25 MW-8 13 06/08/89 <100 NS <1 NT <25 <25 <25 <25 MW-9 13 06/08/89 <100 NS <1 NT <25 <25 <25 <25 Notes: (1) Measurements for headspace vapors obtained using a BacharachTLV Sniffer calibrated to hexane (110 ppm = 1% LEL hexane). (2) TPH analyzed by EPA Method 418.1 (3) Fuel Hydrocarbons analyzed by. modified EPA Method 8015 (4) BETX analyzed by EPA method 8020 B =. Benzene, E = Ethylbenzene, T = Toluene, X = Total Xylenes ppm = parts pes-million ppb =.parts per billion NT _ indicates not tested Results for MW-3 from Geraghty & Miller INA N1\\: ao CD C Engineers TABLE 4 SUMMARY OF ANALYTICAL RESULTS FOR GROUND WATER SAMPLES FROM WELLS WELL Sheen (1) TPH (2) (ppm) BETX (ppb) (3) B E T X MW-1 NS <0.05 <0.5 <0.5 <0.5 <0.5 MW-2 NS <0.05 <0.5 <0.5 0.5 <0.5 MW-3 NS NT <0.5 <0.5 <0.5 <0.5 MW-4 NS <0.5 <2.0 <2.0 <2.0 8.7 MW-5 NS 0.7 <2.0 <2.0 <2.0 <4.0 MW-6 NS <0.5 <2.0 <2.0 <2.0 6.3 MW-7 NS <0.5 <2.0 <2.0 <2.0 <4.0 MW-8 NS <0.05 <0.5 <0.5 <0.5 <1�0 _ MW-9 NS <0.05 <0.5 <0.5 <0.5 <1.0 Notes: .:.. (1) "NS^.means no sheen detected on water surface (2) Total. Petroleum Hydrocarbons. by EPA Method 418.1 (3) BETX by EPA Method 602 :, : • B = Benzene E:= Eth ylbenzene, T ppm a park per million• ppb = paris per'billion Results 1or.MW=3 from Geraghty & Miller ;: 9103070405 TABLE 5 SUMMARY OF ANALYTICAL RESULTS FOR GROUND WATER SAMPLES FROM REMEDIAL EXCAVATION AND R Sample Date(1) Collected TPH (2) (ppm) BETX (ppb) (3) B E T X Comments W-3 03/23/89 420 375 80 515 435 Collected from excavation WR-1 03/29/89 275 26.4 <1.0 18.3 31.2 Collected from recovery well WR-2 03/31/89 20 5 <1.0 <1.0 15 Collected from recovery well W-3A 05/04/89 10 260 <40 140 140 Collected from recovery well W-4 05/15/89 <0.5 <1.0 <1.0 <1.0 <2.0 Collected from recovery well W-5 05/31/89 <5.0 1.5 <1.0 1.2 8.3 Collected from recovery well Notes: (1) Remedial Excavation was completed on 05/26/89 (2) Total Petroleum Hydrocarbons by EPA Method 418.1 (3) BETX by EPA Method 602 B Q Benzene, E - Ethyibenzene, T ppm = parts per million ppb = parts per billion Toluene, X =Total xylenes 0 rn Geo NO Engineers TABLE 6 RESULTS OF ANALYTICAL TESTING OF TREATED SOIL SAMPLES COLLECTED BY OLYMPUS ENVIRONMENTAL, INC. Sample No. TPH(1) ppm Sample No. TPH(1) ppm Sample No. TPH(1) ppm Sample No. TPH(1) ppm SSGC -1 78.5 S -13 19.7 S -27 70.3 S -40 33.0 SSGC -2 15.6 S -14 26.0 S -28 36.9 S -41 47.2 SSGC -3 7.9 S -15 46.5 S -29 33.9 S -42 78.8 SSGC -4 59.6 S -17 43.3 S -30 45.3 S -43 37.3 B 25.9 S -18 72.5 S -31 41.5 S -44 38.0 C 46.7 S -19 37.4 S -32 79.4 3-45 27.8 SSG -6 52.6 S -20 15.2 S -33 42.3 S -46 54.9 SSG -7 26.4 S -21 48.8 S -34 78.2 SSG -47 41.9 SSG -8 28.0 S -22 61.3 S -36 71.6 SSG -48 _29.0 S -9 41.3 S -23 74.5 S -37 70.3 SSG -49 32.8 S -10 78.6 S -24 70.0 S -38 40.6 S -51 41.9 S -11 30.0 S -25 37.3 S -39 76.0 S -52 36.3 S -12 23.3 S -26 89.3 Notes: Total Petroleum. Hydrocarbons. by EPA Method 418.1.; • ppm = parts per million Sample No. TPH(1) ppm Benzene ppb Ethyl- benzene ppb Toluene ppb Total Xylenes ppb Gasoline ppm Diesel ppm S -1 16 <25 <25 <25 34 <5 89 S -2 46 <25 <25 <25 <25 <5 60 S -3 14 <25 <25 <25 <25 <5 41 S -5 16 <25 <25 <25 <25 <5 17 S -6 13 <25 <25 31 <25 <5 48 S -7 24 <25 <25 <25 <25 <5 87 S -8, 20 <25 <25 <25 <25 <5 120 Notes: (1) TPH Total Petroleum Hydrocarbons by EPA Method 418.1 ppm =parts per, milUon 'pod =parts per billion ■ 3 D 7 7 • „•••••.,- „..-- , • • * 0. I/99 -U7 -4 (9yr • MW-9 rtr 84.74 MW-3 6p. \803 MW-1 5 1 • cP •0 MW-2 \ • `, 84.12 MW-5 • 83.85 MW-6' 83.65 • e/MW-4 \ • .10 MW-7 80 N83.66 Former Building N/ EXPLANATION: MW-1 84.35 Nk • MW-8 84.69 Approximate Limits Of Excavation N Existing Building 0 150 1 300 SCALE IN FEET MONITOR WELL LOCATION AND NUMBER WATER TABLE ELEVATION ON 6/12/89 GROUND WATER CONTOUR BASED ON 6/12/89 MEASUREMENTS GENERAL DIRECTION OF GROUND WATER FLOW BENCHMARK AT WATER MAIN LID. ASSUMED ELEVATION AT 100.00 FEET. Geo,.Engineers SITE PLAN AND GROUND WATER ELEVATIONS FIGURE 3 Cont. ,,. No. ''7 Epic File No. --C3- Cna I Fee $ 325 Receipt No. ENVIRONMENTAL CHECKLIST A. BACKGROUND 1. Name of proposed project, if applicable: Building 8 - E.B. Bradley Co. - Gateway North 2. Name of applicant: SGA Corporation 3. Address and phone number of applicant and contact person: 6414 204th St. S.W. Suite 200, Lynnwood, WA 98036 - c/o David Kehle, Architect 433 -8997 4. Date checklist prepared: 4/13/93 5. Agency requesting Checklist: City of Tukwila 6. Proposed timing or schedule (including phasing, if applicable): Start in August, 1993 7. Do you have any plans for future additions, expansion, or further activity related to or connected with this proposal? If yes, explain. No . 8. List any environmental information you know about that has been prepared, or will be prepared, directly related to this proposal. None 9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the property covered by your proposal? if yes, explain. No -2- I 10. List any government approvals or permits that will be needed for your proposal. Tukwila Building Permit 11. Give brief, complete description of your proposal, including the proposed uses and the size of the project and site. There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You do not need to repeat those answers on this page. Section E requires a complete description of the objectives and alternatives of your proposal and should not be summarized here. Building 8 - 38,500 s.f. Use will be office and warehouse in accordance with the M -1 zoning. 12. Location of the proposal. Give sufficient information for a person to understand the precise location of your proposed project, including a street address, if any, and section, township, and range, if known. If a proposal would occur over a range of area, provide the range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the agency, you are not required to duplicate maps or detailed plans submitted with any permit applica- tions related to this checklist. Location is in Gateway North, bordered by So. 116th Street to the South, and West, the Duwamish River to the North, and a vacant lot Qe appnoadmiati4 3.5 acres to the East. (See site plan attached L. 13. Does the proposal lie within an area designated on the City's Comprehensive Land Use Policy Plan Map as environmentally sensitive? The property lies within the Shoreline 200 foot zone. .. TO BE COMPLETED BY APPLIC L. .;: Evaluation for Agency Use Only B. ENVIRONMENTAL ELEMENTS 1. Earth a. General description of the site (circle one): Flat, rolling, hilly, steep slopes, mountainous, L r b. What is the steepest slope on the site (approximate percent slope)? Less than 2% c. What general .types of soils are found on the site (for example, clay, sand, gravel, peat, muck)? If you know the classification of agricultural soils, specify them and note any prime farmland. Site was primarily vacant land prior to grading work in 1989. Soils consist primarily of silty fine to medium sand with occasional gravel. d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, describe. No e. Describe the purpose, type, and approximate quanti- ties of any filling or grading proposed. Indicate source of fill. No new fill required.' f. Could erosion occur as a result of clearing, construction, or use? 'If so, generally describe. No erosion expectedodue to flat site. g. About what percent of the site will be covered with impervious surfaces after project construction (for example, asphalt or buildings) ?___ Total will have about 20% building coverage and 60% asphalt. Evaluation for -Agency Use Only h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: None required 2. Air a. What types of emissions to the air would result from the proposal (i.e., dust, automobile odors, industrial wood smoke) during construction and when the project is completed? If any, generally describe and give approximate quantities if known. Auto, truck and equipment during construe- tion, none being significant. Auto and truck emissions after construction. b. Are there any off -site sources of emissions or odor , that may affect your proposal? If so, generally describe. No c. Proposed measures to reduce or control emissions or other impacts to air, if any: During earthwork activity, dust control measures will be implemented. 3. Water a. Surface: I) Is there any surface water body on or in the immediate vicinity of the site (including year - round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names. If appropriate, state what stream or river it flows into. No water on site. Duwamish River is adjacent to site. y ".".t. •nr.,. fa..,r .tnM�x .�t.......^anr.l`.: Y.`...M._ x...r..r... .e.. . Evaluation for Agency Use Only 2) Will the project require any work over, in, or adjacent to (within 200 feet) the described waters? If yes, please describe and attach available plans. Yes - Landscaping, parking and building structure within 200 feet inaccordance with regulations as shown on the attached site plan. 3) Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of. the site that would. be affected. Indicate the source of fill material. None 4) Will the proposal require surface water withdrawals or diversions? Give general description, purpose, and approximate quan- tities, if known. No 5) Does the proposal lie within a 100 -year floodplain? If so, note location on the site plan. Site is above flood plain. 6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and anticipated volume of discharge. No Evaluation for Agency Use Only b. Ground: 1) Will ground water be withdrawn, or will water be discharged to ground water? Give general description, purpose, and approximate quan- tities, if known. No 2) Describe waste materials that will be discharged into the ground from septic tanks or other sour- ces, if any (for example: Domestic sewage; industrial, containing the following chemicals...; agricultural; etc.) Describe the general size of the system, the number of such systems, the number of houses to be served (if applicable), or the number of animals or humans the system(s) are expected to serve. None c. Water Runoff (including storm water): 1) Describe the source of runoff (including storm water) and method of collection and disposal, if any (include quantities, if known). Where will this water flow? Will this water flow into other waters? If so, describe. Storm drainage to be in accordance with drainage system designed with master plan in 1989. Water will sheet -flow into biofiltratiQn;;. swales. Outfall is the Duwamish River. Evaluation for Agency Use Only 2) Could waste materials enter ground or surface waters? If so, generally describe. No d. Proposed measures to reduce or control surface, ground, and runoff water impacts, if any: __ Potential imjacts to be insignificant 4. Plants a. Check or circle types of vegetation found on the site: _ deciduous tree: alder, maple, aspen, other evergreen tree: fir, cedar, pine, other shrubs grass pasture crop or grain wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other water plants: water lily, eelgrass, milfoil, other _ other types of vegetation b. What kind and amount of vegetation will be removed or altered? ___ Weeds and grass - Development will add trees shrubs and more appealing_ landscapinj__ and vegetation. c. List threatened or endangered species known to be on or near the site. None valuation for \--Agency Use Only d. Proposed landscaping, use of. native plants, or other measures to preserve or enhance vegetation on the site, if any: Landscaping will utilize Northewst native plant material,grass,_deciduous_____ and evergreen. 5. Animals a. Circle any birds and animals which have ' been observed on or near the site or are known to be on or near the site: birds: hawk, heron, eagle, songbirds, other: None mammals: deer, bear, elk, beaver, other: None fish: bass, salmon, trout, herring, shellfish, other: None b. List any threatened or endangered species known to be on or near the site. None c. Is the site part of a migration route? If so, explain. None d. Proposed measures to preserve or enhance wildlife, if any: None ri 40. R ,tr:' t:' 6. Energy and Natural Resources a. What kinds of energy (electric, natural gas, oil, wood stove, solor) will be used to meet the completed project's energy needs? Describe whether it will be used for heating, manufacturing, etc. Natural _gas for heat. Electric_____ _ ____ for power andlighting,_ __ b. Would your project affect the potential use of, solar energy by adjacent properties? If so, generally describe. No c. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts, if any: Building would be.designed to meet State Energy Code. 7. Environmental Health a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal? If so, describe. None 1) Describe special emergency services that might be required. None 2) Proposed measures to reduce or control environ- mental health hazards, if any: N/A �- h'i'..4rG.•l•�V.•�v�..ww ,Evaluation for Agency Use Only Evaluation for Agency Use Only b. Noise . 1) What types of noise exist in the area which may affect your project (for example: traffic, equipment, operation, other) ?____ East Marginal Way 2) What types and levels of noise would be created by or associated with the project on a short - term or a long -term basis (for example: traf- fic, construction, operation, other)? Indicate what hours noise would come from the site. Construction noise from lam to 6pm Auto and truck traffic will not be significant. 3) Proposed measures to reduce or control noise impacts, if any: Mufflers on construction vehicles. 8. Land and Shoreline Use a. What is the current use of the site and adjacent properties? Site is currently a vacant lot. b. Has the site been used for agriculture? If so, describe. No knowledge of past agriculture use. C. Describe any structures on the site. None Vi 1,ttin Evaluation for Agency Use Only d. Will any structures be 'demolished? If so, what? No e. What is the current zoning classification of the site? M -1 f. What is the current comprehensive plan designation of the site? Light manufacturing g. If applicable, what is the current shoreline master program designation of the site? Urban h. Has any part of the site been classified as an "environmentally sensitive" area? If so, specify. No i. Approximately how many people would reside or work in the completed project? +/- 50 j• Approximately how many people would the completed project displace? None k. Proposed measures to avoid or reduce displacement impacts, if any: None required 1. Proposed measures to ensure the proposal is com- patible with existing and projected land uses and plans, if any: Project will be in compliance with all applicable codes and ordinances. -12- 9. Housing a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low- income Dousing ?__ None`___________ b. Approximately how many units, if any, would be eli- minated? Indicate whether high, middle, or low - income housing. None c. Proposed measures to reduce or control housing impacts, if any: N/A Evaluation for 4`` Agency Use Only 10. Aesthetics a. What is the tallest_ height of any proposed structure(s), not including antennas; what is the principal exterior building material(s) proposed? Heiglht is approximately 24 feet . exterior tilt -up structure with reveals; Fainted with a three color _ scheme. b. What views in the immediate vicinity would be altered or obstructed? None c. Proposed measures to reduce or control aesthetic impacts, if any: Truck loading is hidden behind wings of the _Landscaping, all around break up .�t...l,n'is•.:N�..i'.... � ....:^},^:.: tt".}?' F,....,., �.. .�.,wi:'IiSil:! ^....s....;i':', .. Evaluation for Agency Use Only 11. Light and Glare a. What type of light or glare will the proposal produce? What time of day would it mainly occur? Tight at_ night- at p rkinn T and 1_ o. dng arras _ b. Could light or glare from the finished project be a safety hazard or interfere with views? No c. What existing off -site sources of light or glare may affect your proposal? Street lighting will not have a negative effect. d. Proposed measures to reduce or control light and glare impacts, if any: Light fixtures will be directed down to parking and walkways. 12. Recreation a. What designed and informal recreational oppor- tunities are in the immediate vicinity? A trail is planned along the Duwamish River. b. Would the proposed project displace any existing recreational uses? If so, describe. No c. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be provided by the project or applicant, if any:__ No negative impact. Project to provide plaza and /or picnic tables along River. Evaluation for Agency Use Only 13. Historic and Cultural Preservation a. Are there any places or objects listed on, or pro- posed for, national, state, or local preservation registers known to be on or next to the site? If so, generally describe. No b. Generally describe any landmarks or evidence' of historic, archaeological, scientific, or cultural importance known to be on or next to the site. None c. Proposed measures to reduce or control impacts, if any: N/A 14. Transportation a. Identify public streets and highways serving the site, and describe proposed accss to the existing street system. Show on site plans, if any. So. 116th Street is the primal road'which serves Gateway North from East Marginal Way. b. Is the site currently served by public transit? If not, what is the approximate distance to the nearest transit stop? Yes — Bus Routes alonq East Marginal Way. c. How many parking spaces would the completed project have? How many would the project eliminate? Project would provide approximately 65 parking stalls. .t.':l�.i:J:...... .: .. .. r ..... {t15... S ". ��� 3'.%'t:'., .. .. ... , or•...trn.r.�rr.. er>ar.w.s .yv.nx..e.n w r.n....r... w .......................o-a.✓N,.. Evaluation for Agency Use Only d. Will the proposal require any new roads or streets, or improvements to existing roads or streets, not including driveways? If so, generally describe (indicate whether public or private). No e. Will the project use (or occur in the immediate vicinity of) water, rail, or air transportation? If so, generally describe. No f. How many vehicular trips per day would be generated by the completed project? If known, indicate when peak volumes would occur. Approximately 300 daily trips. g. Proposed measures to reduce or control transpor- tation impacts, if any: Encourage ride sharing and public - transportation. 15. Public Services a. Would the project result in an increased need for public services (for example: fire protection, police protection, health care, schools, other)? If so, generally describe. Increased need is not expected. b. Proposed measures to reduce or control direct impacts on public services, if any. Design factors should minimize impacts on public services, ie., fully sprinklered buildings with 24 hour monitoring. 16. Utilities • Evaluation for Agency Use Only 141e at the site: 'water refuse service, septic system, other. b. Describe the utilities that are proposed for the project, the utility providing the service, and the general construction activities on the site or in the immediate vicinity which might be needed. All utilities are stubbed to the site as part of the master plan development in 1989/1990. C. Signature The above answers are true and complete to the best of my knowledge. I understand that the lead agency is relying on them to make its decision. ‘■ Signature: Date Submitted: PLEASE CONTINUE TO THE NEXT PAGE. TO B D. Beca to r the When prop the or ment 1. 2. ,r a:::, :,, •:.u.:.,y .. >.,,:: e.;:. COMPLETED :Y SUPPLEMENTAL (do not use use these questions ead them in environment. answering osal, or the proposal, would it a faster ed. Respond How would tie to water; emissions release of toxic of noise? ,,., ... ,.....,......: ..: -., ,.., .:: i. ...:..,,..•,:,...v rh:r.,.. •r'e:.S:it3:::..::4 " :; ✓.. ... ._.. :.:at45C.... ,,.yJ.p.;;.q.p:y.; APPLIC SHEET FOR NONPROJECT ACTIONS his sheet for project actions) are very general, it may be helpful onjunction with the list of the elements of hese questions, be aware of the extent the types of activities likely to result from affect the item at a greater intensity rate than if the proposal were not .imple- briefly and in general terms. proposal be likely to increase discharge to air; production, storage, or or hazardous substances; or production . Proposed measures to avoid or reduce such increases are: How would the mals, fish, proposal be likely to affect plants, ani- or marine life? Proposed measures mals, fish, to protect or conserve plants, ani- or marine life are: -18- Evaluation for Agency Use Only Evaluation for Agency Use Only 3. How would the proposal be likely to deplete energy or natural resources? Proposed measures to protect or conserve energy and natural resourses are: 4. How would the proposal be likely to use or affect environmentally sensitive areas or areas designated (or eligible or under study) for governmental protection; such as parks, wilderness, wild and scenic rivers, threatened or endangered species habitat, historic or cultural sites, wetlands, floodplains, or prime farmlands? Proposed measures to protect such resources or to avoid or reduce impacts are: 5. How would the proposal be likely to affect land and shoreline use, inclduing whether it would allow or encourage land or shoreline uses incompatible with existing plans? Evaluation for Agency Use Only Proposed measures to avoid or reduce shoreline and land use impacts area: How does the proposal conform to the Tukwila Shoreline Master Plan? 6. How would the proposal be likely to increase demands on transportation or public services and utilities? Proposed measures to reduce or respond to such demand(s) are: 7. Identify, if possible, whether the proposal may conflict with local, state, or federal laws or requirements for the protection of the environment. Evaluation for Agency Use Only 8. Does the proposal conflict with policies of the Tukwila Comprehensive Land Use Policy Plan? If so, what poli- cies of the Plan? Proposed measures to avoid or reduce the conflict(s) are: TO BE COMPLETED BY APPLIC E. SUPPLEMENTAL SHEET FOR ALL PROJECT AND NON PROJECT PROPOSALS The objectives and the alternative means of reaching the objectives for a proposal will be helpful in reviewing the aforegoing items of the Environmental Checklist. This information provides a general overall perspective of the proposed action in the context of the environmental infor- mation provided and the submitted plans, documents, suppor- tive information, studies, etc. 1. What are the objective(s) of the proposal? 2. What are the alternative means of accomplishing these objectives? 3. Please compare the alternative means and indicate the preferred course of action: Evaluation for Agency Use Only Evaluation for Agency Use Only 4. Does the proposal conflict with policies of the Tukwila Comprehensive Land Use Policy Plan? If so, what poli- cies of the Plan? Proposed measures to avoid or reduce the conflict(s) are: - 23- SHORELINE SUBSTAtr-iAL DEVELOPMENT eWb APPLICATION CITY OF TUKWILA DEPARTMENT OF COMMUNITY DEVELOPMENT 6300 Southcenter Boulevard, Tukwila, WA 98188 Telephone: (206) 431 -3680 FOR STAFF USE ONLY Number: 1. BRIEFLY DESCRIBE YOUR PROPOSAL: & r b 611-1(91, WbVe} -10 C41166. 4fotuet tt?rt Me-o-1,111,16 tirt6 64p Vek.414.1 fi h`( t1EME?U" 2. PROJECT LOCATION: (Give street address or, if vacant, indicate lot(s), block, and sub- division; or tax lot number, access street, and nearest intersection) • . 1 rt o I i-12 Quarter: Section: P • Township: 2-3 Range: 4 (This information may be found on your tax statement) 3. APPLICANT:* Name: rav [i7 EFL e Address: 1287 I i }u.lefta LVW .''b. � 1 Glib. iMttb e• -b1g7 Signature: Date: 13 •� 4 2 * The applicant is the person whom the staff will contact regarding the application, and to whom all notices and reports shall be sent, unless otherwise stipulated by applicant. AFFIDAVIT OF OWNERSHIP 4. PROPERTY Name: b L� OWNER Address: 12120 atiatt R2tsit 'ti 10'1 Phone: ! ' 110V I /WE,[signature(s)] swear that I /we are the owner(s) or contract purchaser(s) of the property involved in this application and that the foregoing statements and answers contained in this application are true and correct to the best of my /our knowledge and belief. Date: 4- + •q' AM' 1 4 1!c93 IVJL DEVELOPMENT 5. Present use of proper' -•: \/kbl.t 6. Total construction cost and fair market value of proposed project nclude additional future developments contemplated but not included in this application)' 7. List the master program policies (use program sections or page numbers) which are applicable to this development: gietie20 FicAlEer Nbmztr tht5 8. List any other permits for this project from state, federal or local governmental agencies for which you have applied or will apply, including the name of the issuing agency, whether the permit has been applied for (and if so, the date of the application), whether the application was approved or denied and the date of same, and the number of the application or permit: /3tlft,o11-1G E12111 rt' - OirtLi or lbr43 6 - � �1 — o -M ui� 9. Nature of the existing shoreline. Describe type of shoreline, such as stream, lake, marsh, flood plain, floodway, delta; type of beach, such as erosion, high bank, low bank, or dike; material such as sand, gravel, mud, clay, rock, riprap; and extent and type of bulkheading, if any (to be completed by local official): 10. In the event that any of the proposed builidngs or structures will exceed a height of thirty-five feet above the average grade level, indicate the approximate location of and number of residential units existing and potential, that will have an obstructed view (to be completed by Local official): 11. If the application invo1' i Conditional Use or Variance, set f Clin full that portion of the Master Program which provides that the proposed use may be a Conditional Use or, in the case of a Variance, from which the variance is being sought (to be completed by local official): 12. Give a brief narrative description of the general nature of the improvements and land use within one thousand (1,000) feet in all directions from the development site: er)HY119t5V-, Watfilit-1-41 ib keffi Mtc Ctiwbisti1112)1411 b Vboi,t•tt 1574 k:r7: Project Narrative The E.B. Bradley Company is a wholesale distributor of plastic laminates, cabinet hardware and miscellaneous supplies to cabinet manufactures and suppliers. The building program requires a receiving area which will accommodate 1 large semi -truck (once a week) and smaller vans for dock high, a shipping /will call area separated from receiving for on grade access and UPS, and an office area with second floor. The site is a part of the Gateway North Corporate Park project and abuts So. 116th and the Duwamish River. The site layout reflects the park existing street scape of bermed front landscape area buffering the parking areas and setting the building back from the street edge, providing for a spacious entry along the access route. The large loading dock area is placed so as not to face directly either to the road or the river. The intent is to develop the adjacent site with loading opposing. The loading is being shielded by the building from the major site access, and via landscaping and screen wall adjacent to the river. Vistas to the river will be provided between building areas and with 2 or more buildings in the future, no massive blocking elements will occur. Parking is located at both ends, office parking areas for customers and employees parking at westerly end. The building is located adjacent to the river bank setback. The building design reflects not only the existing corporate park elements, but adds to the facade modulation which will break up otherwise flat planes of concrete. The building corners have been cut out to provide modulation and the storefront areas are recessed to add fenestration relief. Structure is expressed via concrete columns which are exposed and add additional rhythm to the facade and texture along the first floor area. The building is also designed with second floor windows which in the warehouse will act as clerestories for daylighting. While not being functionally able to locate the offices directly adjacent to the river, the river facade is being detailed as if it were storefront. Again the columns are exposed providing the structural expression as well as the rhythm and texture like a storefront. The area will be bermed as much as possible. The recessed wall will be scored similar to the windows and a paint band imitating the dark glass will occur. The overall painting scheme will be the same as the balance of the park. By utilizing the same detailing, paint schemes, facade treatment, and materials, this user facility will blend in and will be a key part of the continuing efforts at Gateway North. David Kehle r<< BOARD OF ARCW- TECTURAL REVIEW DESIGLREVIEW APPLICATION CITY OF TUKWILA DEPARTMENT OF COp1MUNITY DEVELOPMENT 6300 Southcenter Boulevard, Tukwila, WA 98188 Telephone: (206) 431 -3680 R•STAFF>USE;ON ross- Reference F 1 1. BRIEFLY DESCRIBE YOUR PROPOSAL: Cb ceipt um r. 2. PROJECT LOCATION: (Give street address or, if vacant, indicate lot(s), block, and sub- division; or tax lot number, access street, and nearest intersection) _T1 I xt4kii-Rvtroll Quarter: Section: ) /0 Township: /4,S Range: 4 (This information may be found on your tax statement) 3. APPLICANT:* Name: r:iv►n h3u,e Address: t1 7P7 littaNe,13bt3 AM bp. e• C i,Ub . l (o > Signature: Date: • 4 -15 * The applicant is the person whom the staff will contact regarding the application, and to whom all notices and reports shall be sent, unless otherwise stipulated by applicant. 4. PROPERTY Name: OWNER AFFIDAVIT OF OWNERSHIP 961m- P66um--k Address: /D CIPALLYIY t;021\* (A1 r er Phone: 111[o3 / / �� I /WE,[signature(s)] . : . __. swear that I /we are the owner(s) or contract intchaser(s) of the property involved in this application and that the foregoing statements and answers contained in this application are true and correct to the 11.. Y._., , , , _ best of my /our knowledge and belief. Date: V 1 BOARD OF ARCHITECTURAL REVIEW DESIGN REVIEW APPLI( ;ION Page 2 CRITERIA The following criteria will be used by the BAR in its decision - making on your proposed project. Please carefully review the criteria, respond to each criterion (if appropriate), and describe how your plans and elevations meet the criteria. If the space provided for response is insufficient, attach additional response to this form. 1. RELATIONSHIP OF STRUCTURE TO SITE A. The site should be planned to accomplish a desirable transition with the streetscape and to provide for adequate landscaping, and pedestrian movement. B. Parking and service areas should be located, designed, and screened to moderate the visual impact of large paved areas. C. The height and scale of each building should be considered in relation to it site. RESPONSE: . }. trauC7 - 2Witht6 II-i� CUIt,rnIq l5 t11 t6 '�+ �L�hDitilcl 1204 WNri , \IlePx.:, AND ). 1k451t1 Vion,lei BFI I -tb -tn6 AO MUM a5VOloptit t 146 1411' &e ) . IO") Fil7a5.1; lovx) U*11x ilgt•I,l "Co E1-1u %Afton-4qt I>.a Bu i tA9R-I q Dab U ?tb --Iflc 0,82. 4456k„ 2. RELATIONSHIP OF STRUCTURE AND SITE TO ADJOINING AREA A. Harmony in texture, lines, and masses is encouraged. B. Appropriate landscape transition to adjoining properties should be provided. C. Public buildings and structures should be consistent with the established neighborhood character. D. Compatibility of vehicular pedestrian circulation patterns and loading facilities in terms of safety, efficiency and convenience should be encouraged. E. Compatibility of on -site vehicular circulation with street circulation should be encouraged. RESPONS ti WARD 41206.11 ` ik HI Lola, ,t,i , Voiai &try! d., alma, WILL IMi tb¢.. - Lildt'i.(, regorvim- bc.,0 -tile/ aka.. l'int,ittr GUtu m 60 '"fib MFLIMOT .4449 fi aisli41 N ito e 1116 ob WA ail 3r• fAQokt "Vii; k? — its bit) ct---.00,0 - mot-c/4 ifi6 lb :0 s5tloct d4ito uw., thiptr - 1X1 11-6. (t ettu,ht t P5-tteni,k A I2 - Diu, � � l • • BOARD OF ARCHITECTURAL REVIEW DESIGN REVIEW APPLIC` 'ION r Page 3 3. LANDSCAPE AND SITE TREATMENT A. Where existing topographic patterns contribute to beauty and utility of a development, they should be recognized and preserved and enhanced. B. Grades of walks, parking spaces, terraces, and other paved areas should promote safety and provide an inviting and stable appearance. C. Landscape treatment should enhance architectural features, strengthen vistas and important axis, and provide shade. D. In locations where plants will be susceptible to injury by pedestrian or motor traffic, mitigating steps should be taken. E. Where building sites limit planting, the placement of trees or shrubs in paved areas is encour- aged. F. Screening of service yards, and other places which tend to be unsightly, should be accom- plished by use of walls, fencing, planting or combinations of these. Screening should be effective in winter and summer. G. In areas where general planting will not prosper, other materials such as fences, walls, and pavings of wood, brick, stone, or gravel may be used. H. Exterior lighting, when used, should enhance the building design and the adjoining land- scape. Lighting standards and fixtures should be of a design and size compatible with the building and adjacent area. Lighting should be shielded, and restrained in design. Excessive brightness and brilliant colors should be avoided. RESPONS : y iJ .+ ZE .Ad 1 w. L. It OF ,s1 Lam- 1t1 iwa 1A111 11t (112b Le.. 1146 12b1t, woofici Wm, 1c Id t bti�l H� U(151 1i1G Wu k, t tc4o k Q t41Q -ib Hat apt: antteomaso, tikc, hloarro 1k Ent i� r'L ieini2 e9 t i i4 &Q.t o ,eH -ifl t2.1 VIA b Ct-uc¢5 Whitt awn 4. BUILDING DESIGN A. Architectural style is not restricted, evaluation of a project should be based on quality of its design and relationship to surroundings. B. Buildings should be to appropriate scale and be in harmony with permanent neighboring de- velopments. • • 'BOARD OF ARCHITECTURAL REVIEW DESIGN REVIEW APPLIC )N Page 4 C. Building components - such as windows, doors, eaves, and parapets - should have good pro- portions and relationship to one another. Building components and ancillary parts shall be consistent with anticipated life of the structure. D. Colors should be harmonious, with bright or brilliant colors used only for accent. E. Mechanical equipment or other utility hardware on roof, ground or buildings should be screened from view. F. Exterior lighting should be part of the architectural concept. Fixtures, standards and all ex- posed accessories should be harmonious with building design. G. Monotony of design in single or multiple buildings projects should be avoided. Variety of detail, form, and siting should be used to provide visual interest. RESPONSE; 111- lottillitHOO 1\612RAV5 DI,Ii,vb irtgi 1),k4 Gtr L ►ru,l thaw VlI - * , 0..o att a5- Jo i i5 "t E t tro wt (tik{, Writ 416 tlI siroff ?Q - - i14. 5. MISCELLANEOUS STRUCTURES AND STREET FURNITURE A. Miscellaneous structures and street furniture should be designed to be part of the architec- tural concept of design and landscape. Materials should be compatible with buildings, scale should be appropriate, colors should be in harmony with buildings and surroundings, and proportions should be to scale. B. Lighting in connection with miscellaneous structures and street furniture should meet the guidelines applicable to site, landscape and buildings. RESPONSE: I6t-11 I- /jvg b !' fan irf ; - I� 1Nq loll fl"! *-1 DbP 5' 0 1Vie. QSN ltoD 09' e*E ? ll-11WOVO RAVIDOUr t3Pbp(oy_ ' BOARD OF ARCHITECTUr) AL REVIEW • DESIGN REVIEW APPLI( ;ION_ ,_. Page 5 INTERURBAN SPECIAL REVIEW DISTRICT The following six criteria are used in the special review of the Interurban area in order to manage the development of this area, to upgrade its general appearance, to provide incentives for compatible uses, to recognize and to capitalize on the benefits to the area of the amenities including the Green River and nearby recreational facilities, to encourage development of more people - oriented use, and to provide for development incentives that will help to spur growth. Please describe how your proposed development relates to the goals for this District. Use additional response space, if necessary. 1. The proposed development design should be sensitive to the natural amenities of the area. urn1t UL&trot-! 1101, 6tw�1,1.,614c� Ipt, W -A eel4�r_ b �j-� { ltt YW&iof 1 ( '/ ! =rL tucift "iN6 tiKt i}.I1 Y4"I eMCNl7 LoITit� 0011211\lt etert9 x1031 .- I- rl % CZUe4-2,. 2. The proposed development use should demonstrate due regard for the use and enjoyment of public recreational areas and facilities. FtWiPil -fir -- -ter: t 1T2hiL) o(fair-7 ad 416 ribiLr CAr-M0q btr �tL�Ur. Ptve_A9A-rosifizti, 3. The proposed development should provide for safe and convenient on -site pedestrian circu- lation. pver-totb3 Goattrtiat Rico 76 i1IA i t iit,►� 10 i-bk ■0; l'f etv *it ortb G v_ eieC.0 tvi►c4. 4. The proposed property use should be compatible with neighboring uses and complementary to the district in which it is located. A(QI2C.1 i1b1rly L b z& ,:(1166/ Wb261-IF1tkz 5. The proposed development should seek to minimize significant adverse environmental im- pacts. awl) bir Pt" tau - t I gut i L /01V055 6. The proposed development should demonstrate due regard for significant historical features in the area. 1,66 iev-r project Narrative The E.B. Bradley Company is a wholesale distributor of plastic laminates, cabinet hardware and miscellaneous supplies to cabinet manufactures and suppliers. The building program requires a receiving area which will accommodate 1 large semi -truck (once a week) and smaller vans for dock high, a shipping /will call area separated from receiving for on grade access and UPS, and an office area with second floor. The site is a part of the Gateway North Corporate Park project and abuts So. 116th and the Duwamish River. The site layout reflects the park existing street scape of bermed front landscape area buffering the parking areas and setting the building back from the street edge, providing for a spacious entry along the access route. The large loading dock area is placed so as not to face directly either to the road or the river. The intent is to develop the adjacent site with loading opposing. The loading is being shielded by the building from the major site access, and via landscaping and screen wall adjacent to the river. ViS.tas to the river will be provided between building areas and with 2 or more buildings in the future, no massive blocking elements will occur. Parking is located at both ends, office parking areas for customers and employees parking at westerly end. The building is located adjacent to the river bank setback. The building design reflects not only the existing corporate park elements, but adds to the facade modulation which will break up otherwise flat planes of concrete. The building corners have been cut out to provide modulation and the storefront areas are recessed to add fenestration relief. Structure is expressed via concrete columns which are exposed and add additional rhythm to the facade and texture along the first floor area. The building is also designed with second floor windows which in the warehouse will act as clerestories for daylighting. While not being functionally able to locate the offices directly adjacent to the river, the river facade is being detailed as if it were storefront. Again the columns are exposed providing the structural expression as well as the rhythm and texture like,,a storefront. The area will be bermed as much as possible. The recessed wall will be scored similar to the windows and a paint band imitating the dark glass will occur. The overall painting scheme will be the same as the balance of the park. By utilizing the same detailing, paint schemes, facade treatment, and materials, this user facility will blend in and will be a key part of the continuing efforts at Gateway North. David Kehle .. ... ,.., .... I I j I V t• I V II • LI/ IV o • O • o 1 9103070405 • —J Z 3af101A 1 -"-I0 w 3 rn Gl 73 rn z >.0 z rn' r� 00 f7 C z -I 0 0 z = NO I 1VNV1dX3 J, c� 0 1 a 3 m 1 MMI Duwan,ish River N cn O O cn G) 0 0 AWEWENIM N J O EMEMIEM UO! A OX3 ;o 0 o AYM31V9 v m 1/99-07 -¢ REJ:W 6•b -89 9103070405 N 0 r N N • ▪ D 1 CZUD 3 D = 3 r -c En 1– 7 m m ( - ) r rn>ZO vrD Zmm' -+ ADO --razz Drc co —1 '0 m C7 c - Z • c m3 ✓ co Hrn Z rn :NOIIVNV1dX3 1 j CO • : • • cri • 6ulplln9 Jauno3 • V A m • • A• CO CO el • • •co ▪ • 0 • • pJ CO CO • n p• ' N T co • • • �•a)•• • CO &• m • •� • N t • V • CO • • N • • •_ V • CO �` V N • • • d? • N O (D • A • • • • • J o • • • ▪ • ■ - • • • • ( l • V N • .....& 0) 0) • N • CO •O ▪ AO 0 • CO • ..a W W CO N $ • • • • A • N 8. A • • • • W • .. A• CO Concrete 6ulplln8 6ulislx3 UOREAEOX3 }p 1IIUrl • • N N N �a 0 • • • • V • m • CO • N • • • W W N • • 0) N • • L• . O •. 3A18a AVM31VJ — o 0 CO LC) SNOI1V3O1 31dVIVS IIOS W • to D -I In C Z 'U D 3 D = r -c D r rnrn rrn0r rn D Z 0 or n n D zrnrn1-4 cn D w -i r�D M 4") C N Z C rn r co �+ rn zu rn N :NOIlyNVidX3 6u!plln8 iawio3 • fNJ • • m N • 0 • • V 0) • V • U fJ W r • ▪ • 8 gJ • W 2r N 8 J • • -' 0 • • U • ▪ • .► • i g m -4 • • • • • -, • • �v 0 OA rgp • 0) 0• • • CO • co QO • A � ) g• N U CO ," ., CO • • (� W •uo • • • • • g • • • •� A W N co i� A• • �• �•: • N • : W • • cn V • U : U• O • • • • • co co • �• _ N • no • N • N • • UOREAEOx3 ;O 3!W!1 L Concrete 6u!plln8 6ugslx3 ooAW tplWnMn0 0 • U • CO • • W • 0) N O • -& 0 • • 3A11:10 AVM3IVO -- o .N n rn z rn rn CO CD CD 0 CJ1 m CO " \ p) A NEW FACILITY FOR: THE E.B. BRADLEY COMPANY GATEWAY NORTH 110TH STREET TUKWILA. WASHINGTON 1041911.1991 1107111HA1NBANAV5 SLATTLEWASNINO10N 9 0 1 1 1 An,T. ,111,, ifs; O M 0 H S z (1) ONIO1III9 ONIISIX3 1 - moos AIYM 1YNID IVN LSY3 A NEW FACILITY POR: THE E.B. BRADLEY COMPANY GATEWAY NOIITN I1STN $TTTTT TUKWILA, WASHINGTON 1011117.1117 11171 NITNUA&N AY S SEATTIEWASHIN3TON 1 1 1 1 1 ^ Cl e� �- I 1 PLANT LEGEND RI - i 1 0 o 11 111111 i111111111liFiII III 0 1 , 1 1 1 i 1 1 il 1 1 _1 1 c 1 1 ■ 1 Yy pp ry i1 � 9 111 � 'i iQ 1 Gil nn R n'0 .,9,17,4, b 1 - moos AIYM 1YNID IVN LSY3 A NEW FACILITY POR: THE E.B. BRADLEY COMPANY GATEWAY NOIITN I1STN $TTTTT TUKWILA, WASHINGTON 1011117.1117 11171 NITNUA&N AY S SEATTIEWASHIN3TON 1 1 1 1 1 ^ 4MNI '441 tc OaaLp7 .......9w .,9,17,4, m CO Chl ',.. a, A NEW FACILITY FOR: THE E.B. BRADLEY COMPANY GATEWAY NORTH IIITH TUKWILA. WASHINGTON 2011133.11997 11171111ERURBAN AV S SEAMEWASHINCITON 9 1 1 6 3 tia m W A N. Q) A NEW FACILITY FOR: THE E.B. BRADLEY COMPANY GATEWAY NORTH 110TH TUKWILA. WASHINGTON 2011+]1•{99] 12171 INTERURBAN AV SFATTLEWASNNOION 9 1 1 { 1 4711417r+ a%IS hom 0 m •-■ 0 NO11VA313 EB2/6 A NEW FACILITY FOR: THE E.B. BRADLEY COMPANY GATEWAY NORTH 116T11 STREET TUKWILA, WASHINGTON 206/.33.'997 csre GIERUIVANAVS SEAT711 WASIIINGION 9 I I 1 :14141 Cy` e ...Mir Vt. •aaps•gte,rtaril ■■■•nr. ''.• e.'1^.- ...1,WIre '''"""kB 4.4 a... :et -----'-------'-------' • S F4 m co IA NEW FACILITY FOR. THE E.B. mune mCOMPANY Ca GATEWAY NONTI1 ,.. II~" 0) ,..,•°'`A. WASHINGTON '^^.",^". Inn ref NURIANAVS — — ■ �° . . ~^~~,^ .— I. ONIOlIOB ONIISIX3 if 3dVOSONV1 ON W SIX3 Ir 0 0 i HIHO S AVM IYNIOHVLY 1553 " u1 0 0 A NEW FACILITY FOR: THE E.B. BRADLEY COMPANY GATEWAY NORTH 114T5 STREET TUKWILA, WASHINGTON Eli •:rn e.1111_:.RVI11vS 5(x11,1 AM.. ,..".`ON r e , 4 L architect '017 c�i • -1 lr I • PLANT LEGEND I ; 11' l h Hil Vii I! 't 'r' 1 1 g P„ e :r: Fa . g N, o F. ii G HIHO S AVM IYNIOHVLY 1553 " u1 0 0 A NEW FACILITY FOR: THE E.B. BRADLEY COMPANY GATEWAY NORTH 114T5 STREET TUKWILA, WASHINGTON Eli •:rn e.1111_:.RVI11vS 5(x11,1 AM.. ,..".`ON r e , 4 L architect '017 c�i • -1 lr I • 0 m A NEW FACILITY POR: THE E.B. BRADLEY COMPANY SATIWAY NORTH 91111tN OTTTTT T000RA. WASHINGTON' 99/I133 :1997 12111 N1ENAOW AY S SF.Sfl ASHIHOT011 1 1 1 1 1 .. d, • /.0611 ,.6.■ •.t r R• .c.urwn...t .1.11640 '., eDMV.D VI.' ' P 00 1It/p �. urw N:fTV L.Zr'1 ' pi, camas. 6. iw■ F. • w m a N • r A NEW FACILITY ThR: THE E.B. BRADLEY COMPANY OATIWAY NORTH 11 0TN STNIIT TONI11L11. WASHINGTON pig miIOUi)I•999r L• 0 1784 WIENIMIGW AVL 91A lLWASNINGION 9 1 I 1 1 ~ r•••LN i}llititi tFtt' tL . 8 Iz 1. 4. .r274 11 11 1 ,i 3 .3 1 E S 1, 7 11 MOOS AVM-WilloVVOI LSVIS A NEW FACILITY Pip VHF F R PRAM. EY COMPANY GATIWAY MONTH TVIIWILA, WASHINGTON 266'6,1•6667 INN ret.sulaw AVS MAINSTMANNGION 6 11 --Ar.tqt 5 b• hsnaf .^ • ■•■t•I■ tmt. 461,6- 6.1 m A NEW FACILITY FOR: THE E.B. BRADLEY dOMPANY GATIWAT NORTH IISTH TUKWILA. WASHINGTON -ev 206/433.1997 N1110313414 AY SEAMEWA130NOION p 1 I 1 W4.2. -N, MoolP 4