Loading...
HomeMy WebLinkAboutPermit L93-0030 - KING COUNTY - METRO SOUTH OPERATING BASE / ENVIRONMENTAL IMPACT STATEMENT (EIS)l93-0030 metro south operating base underground storage tank replacement sepa ENVIRONMENTAL IMPACT STATEMENT (EIS) ►:METRO" Municipality of Metropolitan Seattle Exchange Building • 821 Second Ave. • Seattle, WA 98104 -1598 • (206) 684 -2100 ADDENDUM to the ENVIRONMENTAL CHECKLIST and DETERMINATION OF NONSIGNIFICANCE (DNS) issued for the SOUTH OPERATING BASE UNDERGROUND STORAGE TANK REPLACEMENT PROJECT )g3-co3o INTRODUCTION: On November 27, 1991, The Municipality of Metropolitan Seattle (METRO) issued a Determination of Nonsignificance (DNS) and Environmental Checklist for the South Operating Base Underground Storage Tank Replacement Project. A consultant study to determine the extent of possible soil and groundwater contamination was in progress at the time of issuance of the DNS and Checklist. This addendum describes the results of that study and provides details about the remediation of soil and groundwater contamination on the site. BACKGROUND On January 21, 1992, the consultant firm Enviros completed a focused soil and groundwater assessment at Metro's South Operating Base as part of the project pre - design effort. The results of the assessment indicated that there was petroleum contamination of soils and groundwater at the site. Soil and groundwater samples were taken around the existing UST's, and assumtions were made where samples could not be obtained. The estimated volumes of petroleum- contaminated material that will require cleanup are 6,620 cubic yards (excavated volume) of soil and 800,000 gallons of groundwater. Larger or smaller volumes could be found during actual construction. Metro staff believes the estimated volumes are conservative (high). Because the estimated contamination volumes were considerably higher than planning level estimates, construction of the project was postponed by one year to permit further assessment and design efforts. Metro and Enviros proceeded with additional site assessments, treatment process studies, and a feasibility study. A final report by Enviros outlined the work performed and presented a refined recommendation for the cleanup method. Below is a summary of findings, conclusions and proposed treatment processes from that report. A copy of the final report is available for review upon request. The attached project site plan contains additional details. PROPOSED SOIL TREATMENT PROCESS The above volumes of contaminated soil are assumed to contain a high percentage of fine - grained sands and silty sands. In the worst -case scenario, the contaminants would consist of approximately equal percentages of gasoline, diesel and heavy oils. Metro staff believes that these assumptions are conservative and that up to 8010 of the contaminated soils will be gravels and coarse - grained sand, contaminated primarily with gasoline. €Y < i�T The recommended cleanup methods include a combination of the thin spread (commonly termed "landfarm ") and aerated pile processes to treat the contaminated soils. The treatment work by these processes would be performed in a 2 -acre area of the undeveloped portion of the South Base Annex facility. Under the surface thin - spread treatment, the soils would be placed into a lined and bermed cell and would be periodically tilled and mixed with water, oxygen and nutrients. This process could be used to treat all contaminated soils expected at South Base, at a batch production rate of approximately 2,000 cubic yards every 2 months. Under aerated pile treatment, the soils would be partially sealed into a lined and bermed cell containing an embedded system of perforated piping through which oxygen is drawn. This process would be used for treating sand and gravely soils contaminated with light hydrocarbons such as gasoline, at a production rate of approximately 500 cubic yards per week. This treatment is not effective in removing diesels and heavy oils. The proposed treatment combination will not leave highly contaminated residuals difficult to treat or dispose of, such as the rinsate and sludge by- products of soil washing. If, at the time of excavation, the nature and extent of contamination is significantly different than anticipated, thermal or mechanical soil washing units could be mobilized for remediation. Procedures for contaminated soils treatment will be as follows: 1. The thin spread and aerated pile processes would be performed in a 2 -acre area of the undeveloped portion of the South Base Annex facility (see attached site plan). 2. Treated soils will be used as backfill material for the UST project to the maximum extent consistent with the construction schedule. 3. If treated soils are not available for incorporation to the UST /Pavement project as backfill, the contractor will import clean backfill material as required to maintain contruction work uninterrupted. 4. Soils that do not respond to the selected treatment process in time to be used as backfill, but meet the MTCA Class 2 standard by March, 1994, will be disposed of by the contractor as construction debris. Other soils will continue to be treated at the South Base Annex through September of 1994. After that, soils that meet the MTCA Class 2 standard will also be disposed of as construction debris under a separate contract, or used as backfill material for projects that Metro may have under construction at the time. 5. Soils that have not attained the MTCA Class 2 standard by September of 1994, may continue to be treated and dispersed at the Annex if economicaly feasible. Otherwise, they will be disposed of as contaminated material at a permitted site. The treatment operations will be conducted in accordance with the Washington Department of Ecology guidance and regulations. During operation of the treatment system, best management practices will be used to minimize the contact of contaminated soils with surface water. Leachate will be controlled in a lined collector ditch and will be pumped out periodically during treatment to prevent runoff to surface water. Erosion control will be implemented during treatment operations in accordance with King County standards. 2 PROPOSED GROUNDWATER TREATMENT PROCESS The recommended treatment process for contaminated groundwater is air stripping. The treatment work by this process will be performed in a 1,000 square foot area, east of the Fuel /Wash Building at South Base (see attached site plan). The treatment equipment will consist of a stripping tower and an oil /water separator. Once the contaminants have been removed to allowable levels, the treated groundwater will be disposed of in the existing sanitary sewer. Treatment will be accomplished as construction of the UST project progresses. Air stripping treatment removes contaminants by distributing water downward in a tower packed with porous media, and blowing air upward through the packing media. SURFACE WATER RUNOFF Surface water controls are designed based on the "King County Surface Water Design Manual." On site runoff controls are provided for the 2 -yr /24 hr, 10- yr /24 -hr, 100- yr /24 -hr, and 100 -yr /7 -day storm events, such that post - development runoff from the site will discharge at no more than 0.5 cfs greater than pre - development rates. Water runoff quality and sediment control will also be provided using a wetpond and an oil pollution control on the outlet structure. The wetpond and detention pond are "stacked" into one pond as allowed by the Design Manual. Temporary and erosion controls will be implemented during construction of the facility in accordance with King County requirements. Off -site drainage which runs on to the proposed treatment facility will be collected in storm drain collectors and routed around the site. Stormwater from the detention facility and the off -site drainage collectors will then be routed north of the property to a natural drainage which discharges to the Duwamish channel approximately 1/4 -mile north of the South Base Annex. See attached site plan for details. GRADING PLAN Following is a summary of the grading plan for approximately 2 acres of property at the Metro South Base that will be used as a temporary treatment facility for petroleum hydrocarbon - containing soils. The cut and fill volumes were calculated by dividing the site into three areas: the remediation area, the detention pond, and the drainage ditch. The cross sections of these areas were simplified. No fill was required for the initial grading, and the volume cut was determined to be approximately 560 cubic yards. This volume is based on a 1 percent downhill gradient in the remediation area from south to north. Approximately 550 cubic yards of soil is needed to line the thin spread area (6 inches thick) before the affected soil is placed. This soil can be taken from the excess soil that was cut during grading; therefore, alleviating the need for borrow material. Approximately 1320 cubic yards of imported base course material is required to allow a 4 -inch layer under the pavement. The following material is required for the stormwater control facility. The spillway between the two detention ponds, the ditch overflow, and the rip rap for outfall require 35 cubic yards of quarry spalls. The gravel filter berm requires 45 cubic yards of gravel. The flexible pipe requires 150 cubic yards of gravel bedding, and the catch basins require 5 cubic yards of pea gravel for bedding. 3 . . ..,. PROJECT SCHEDULE Based on the scope of work detailed above for the recommended alternative, the major milestones of the project schedule would be as follows: Design Completion 03/26/93 Bid Opening 04/26/93 Notice to Proceed 06/10/93 Completion of Pavement Work and Underground Installations 12/31/93 Completion of other work 03/05/94 Completion of Soils Treatment 03/05/94 Final Completion 03/05/94 DATE: April 14, 1993 CONTACT PERSON: Gary Kriedt, Environmental Planner TELEPHONE NUMBER: (206) 684 -1166 ADDRESS: 821 Second Avenue, M.S. 120, Seattle, Washington 98104 This addendum is available in accessible formats on request. A t" 11 25.: N 00°25' 06 E L.311319'' (10.00' R) SOUTH R/W SR 599 i N 88 °13' 2Y E R EXISTING CHAIN LINK FENCE FT.AM STOR LP CCM FUEL �. F EXIST SLIDING GATE EDGE OF EXISTING ASPHALT PAVEMENT RE11174 comic coacaETE AS 910wN AS B DRAINAGE TO APPROXIMATELY 1/41 SH RIVER MILE FACILITIES MAINTENANCE LP. NEW T SEE OCT //B C503 ASPH NEW DRIVEWAY ENTRANCE REVISION No. EXIST GATE POST (2 TYP) EXIST JOINT 0 CURB Pt BY 08'38' 44' R. 1492.40' L= 225.19' -.-----1 FH SOUTH R/W SR 599 MH APP'0 DATE 1- - LP OITTFALL 10 E105ING ORMNAGE SEE DETAJC DITCH05 81 46' 24 E(j93.60') G . LP EXIST COMMUNICATIONS CONDUIT EXISTING ASPHALT SURFACE 7—px C/C00.3 -1REW miaow ENTRANCE FENCING LP cWG SUONG GATE L°r3.co3o enviros 5808 LAKE WASHINGTON BOLLEVARD NORTHEAST KIRKLAND, WASHINGTON 98033 18'♦CPE CB %5 STA. I!+!0` 15'♦CPE 40, --I GBn STA. 5+10 le. •CPE — i O 0 SKID PAD ��G� ce µ STA. 4+50 18*♦CPE 1P '7 ,,• T w 7 .• .AO ACCESS ROAD mder-SEE DWG 0002 FOR EINJIRGED PI M EDGE OF EXISTING PAVING (FOR TORNI DING ) UNE Cl2 1r♦cPE STA. 1+50 18' • CPE LP �IO 5S CONTRACTOR'S GATE (EXIST 28' SLIDING GATE) 25' ORNEWAY Mime 444, • SANITARY SEWER 1OLP � PUMP STATION GATE F r CAN UNK FENCE RN — .— — NAGS 01TGH — �_ 29"w(365.H8') N85 )2'54' W114.H2 ° O G HILL HOLDING N87 i%/ TRANSIT RR 0' 10' S0' 100' 1'-50' TT STOR PROPERTY UNE - — CENTER UNE - ---- PROPERTY LINE - - _ � EASEMENT LINE .—.— FENCE ♦� FH FIRE HYDRANT o LP LIGHT POLE ° PROTECTION POST O FP FLAG POLE __SS-- SANITARY SEWER (CONCRETEPIPE NOT 01 DUCTILE IRON O GCO CLEAN -OUT TO GRADE st TI{RV REMO CK IiHAC0EiIT SOUTH BASE ANNEX SITE IMPROVEMENTS C ♦ D A E L F N • DRAINAGE TO DUWAMISH RIVER APPROXIMATELY 1/4 MILE :E IllllltJrf; FH POST POINT 9 AK 08 "38' 44' R. 1492.40' L= 225.19' SOUTH R/W SR 599 LP CONDUIT EXISTING ASPHALT SURFACE NEN BUS ACCESS. R3R PAVEMENT SEE DET /C603 -NEW DRIVEWAY EMRANCE SEE DET A/C601 FENCING cosmic SLUING GATE L13.c�,o MCFALL TO EMI** SEE De' A/C605 N 81 46' 24-E(393.601 — LP 188 • CPE C8 /6 STA. 6+60 16'•CPE - - - - � Its STA 5+10 ORNHAGE DITCH CO µ STA 4+50 ier•CPE LP 7 T W 7 ..40' — ACCESS ROAD CHAIN UNK FENCE f ▪ f- — N 86.45' 29"W(365.88') �- LP 0 LP �1tCN DNA SKID PAD EDGE OF EXISTING PAVING NEVI STORM MANAGE GE COLLECTION (FOR PROFILE SEE DRO C604) 12' • CPE STA 1+b0\ 16' • CPE CONTRACTOR'S GATE (EXIST 28' SLIDING GATE) 25' DRIVEWAY SANITARY SEWER PUMP STATION N87.30' 37" TRANSIT TRAININ A 100' 1..50' N 85 32' 54" W 114 HILL HOLDING — - — CENTER UNE — - - — PROPERTY LINE — - - - — EASEMENT LINE — —•— FENCE •}* FH FIRE HYDRANT o LP UGHT POLE PROTECTION POST O FP FLAG POLE —S5— SANITARY SEWER (CONCRETE PIPE UNLESS NOTED) DI DUCTILE IRON O GCO CLEAN -OUT TO GRADE PROPERTY UNE N715'43'27"E (61.96) enviros 5808 LAKE WASHINGTON BOILEVARD NORTHEAST KIRKLAND. WASHINGTON 98033 OESIONIIN R3No/lJh METRO IIAJC memo ,663 TWAIN DUPE& ZILE co RAC NO: SOUTH 15$ / UNIT REPAIR UIUEICROMO TAM REPLACEMENT SOUTH BASE ANNEX SITE IMPROVEMENTS ME Net X14 OMWC IQ C601 : BY APP'D DATE DAIS AR•17YFA �d T/Y 11-43 WU No Or 30 63 1S1' 411wkimwwwm imlow A EXIST COMMUNICATION CONDUIT ENcE�TO WISTING FENCE�f SEE TtET A/CRO3 FOR ENLARGED KIN FENCE TCONSTRUCTER uNE UP mITH OF EMPORARY tJNK] MST ASPHALT PAVEMENT WATCH DOSTING PAVERW1 OUTLINE OF EXISTING ASPHALT PAVEMENT III MATCH COSTING ACCESS ROAD 1513 c030 REVISION EDGE OF EXISTING PAVING ,rrrrrrrr!rrlrr/rr/////41fcW// •��: Tin ib • IO0 APPRO>aMTE 5.0 GRADE SEE DEN& 9/0003 K _.._.___..._._..._ .11.5' enviros 5808 LAKE WASHINGTON BOULEVARD NORTHEAST KIRKLAND, WASHINGTON 98033 REINFORCED POLVETIIYLETIE LINED DETENTION DIiCN 10.5' _........ , ...... ... x-- • PAVE AROUND ETOST UTIUTf VAULTS 0 EXIST ELECTRIC CONDUIT 1 1DPORARf Ma TO E70STING FENCE LP »LOCoaLE MANDATE NEMI 3' ROE SEE NOTE tls1•'_ 4 EXISTING CHAIN LINK FENCE SANITARY SEWER PUMP STATION Y'a tog4S Z-TE 0%5.051 EXISTI LINK F IRRIGATION CONTROL VALVES SLOPE 1•+ WISTING GRADE • CHAIN NCE SLOPE N tr L V NOTES: _ 1 EXISTING FENCE FOR METRO SOUTH CONSTRUCTION _120•-- NEW CONTOURS ----•t2.0' EXISTING CONTOURS EDGE OF NEW ASPHALT -- CENTER UNE - --- PROPERTY UNE EASEMENT UNE --X-- CONSTRUCTION FENCE — .—•— EXISTING FENCE -� FH FIRE HYDRANT o Lp UGHT POLE • PROTECTION POST o FP RAG POLE — SS SANITARY SEWER (CONC. PIPE UNLESS NOTED) DI DUCTILE IRON o GC0 CLEAN -OUT TO GRADE t0 20 30 40 50 SCALE: I. - 20' SOUR NTERWi. EQUALS OA F001 GIMETRO IINDRIFoltY °"`°l'" %NW* SOWN pIPSE / UNIT RE INA UNDERGROUND TANK REPLACEMDIT SOUTH BASE ANNEX GRADING AND PAVING PLAN EDGE OF EXISTING PAVING • • 12.0• ASPFMLT ACCESS ROAD z." z lr1✓///J///I////e//,/ySPHALT LMEI} OffC1_✓////J GRADE BREW r 1 1,5' 3TW (726.40') immiwor AF4ROTUMTE 5>< GRADE NEW ASPHALT PAVING SEE DETAL B/CtT03' AIL en viros 5808 LAKE WASHINGTON BOULEVARD NORTHEAST KIRKLAND• WASHINGTON 98033 -- 10.5'.. •__.___._.__. -•-•". t 1 REINFORCED POLYETHYLENE UNED DETENTION DITCH 11.5•••••` sawn rho_ EXIST ELECTRIC CONDUIT 12.5•-- CONNECT NOV TEMPOSARt FENCE ID E70 MHG FEE LP LOCIS' WOE LOCKABLE WOKE SEE NOTE 1 EXISTING CHAIN LINK FENCE SANITARY SEWER PUMP STATION i IRRIGATION CONTROL VALVES EXISTING CHAIN LINK FENCE N NOTES: 1. CONTRACTOR TO INSTALL 3' 'NICE LOCKABLE CHAIN UNK GATE IN EXISTING FENCE FOR METRO SOUTH CONSTRUCTION ACCESS. —14.0'— NEW CONTOURS L y,p•__... EXISTING CONTOURS - -- EDGE OF NEW ASPHALT PAVEMENT - — — CENTER UNE _ _ PROPERTY UNE EASEMENT LINE X CONSTRUCTION FENCE - —_— EXISTING FENCE -4 Fri FIRE HYDRANT o Lp UGHT POLE PROTECTION POST O FP FLAG POLE — SS — SANITARY SEWER (CONCRETE PIPE UNLESS NOTED) DI DUCTILE IRON • O GCO CLEAN -OUT TO GRADE 10 20 30 40 50 SCALE: 1' •• 20' CONTOUR INTERVAL EQUhIS 0.5 FOOT A 8 C 0 F H 5 4 4 4 EL 11.0' EL 11.5' EL 4.87' EL 8.67' EL 10.9' MAXIMUM WATER SURFACE OF DESIGN STORM G VE LI ER eERAT RIP RAP, 1'-O. MIN THICKNESS FLOW CONTROL STRUCTURE SEE DWG A/C604 R-25' MIN EL 11.0' EL 8.67' EL 4.87' 1%/:11T1T EL 10.5' GRAVEL ACCESS ROAD, EL 8.67' EL 11.5' EL 10.0' EL 7.5' EL 11.0' EL 10.1' EL 11.0' 11.0' EL 8.17' WET POND AND STORMWATER DETENTION FACILITY 3'ACP DD• dp• DV• • a�Dp•pDVpo7pp• p•p Qa�vDo D oa4�vpaav' 4�v_ p4•a d• Dp4p .d Dp4 •D dvv p•6, .D•d'R`1�'p0 D d0 4' COMPACTED AGGREGATE BASE rrV-0' i MIN '4//> \r‘\‘ MIN 2'-0• MIN COMPACTED SUBGRADE TO A DEPTH OF 8' TYPICAL PAVEMENT CROSS SECTION EL 11.5' DETAIL (B SCALE: r - 1'-Or C601 C602 POLYETHYLENE LINER EL 11.0' EL 8.25' MAX / \ 18'-O MIN STORMWATER DETENTION DITCH SECTION SCALE 1/4' - 1'-D• Lq3-GDSo No. REVISION BY APP'D DATE GRAVEL FILTER BERM SEE DWG C/C603 NEW ASPHALT CONCRETE PAVEMENT 3'-0' MIN en viros 5808 LAKE WASHINGTON BOULEVARD NORTHEAST KIRKLAND, WASHINGTON 98033 1727 EL 11.5' EL 8.25' GRAB FILTER BERM SEE DWG / EL 11.0' ASPHALT PAVEMENT ON ADJACENT SITE INTO POND \t„ SITE BOUNDARY J i OMENCIk vs(4/Wh BERM POND PROFILE HORIZONTAL SCALE: 1' - 20' VERTICAL SCALE: 1' - 5' GRAVEL ACCESS ROAD POND ACCESS ROAD WITH ASPHALT SURFACE POND ACCESS ROAD SECTION HORIZONTAL SCALE: 1' - 10' VERTICAL SCALE 1' - 5' 3/4 TO r CRUSHED ROCK WITH LESS THAN 5/1 FINES NEW ASPHALT CONCRI PAVEMENT ASPHALT-LNED DITCH GRAVEL FLL SEEDWGI THIN SPRE 11< di mOTRO d thatu. Malt *11 await MUMNMOCCM AS NOTED CONTIOcT ram T/11 11-93 SOWN RASE / IJIT REPAR UIOERG 0I N D TANK REPLACEMENT SOUTH BASE ANNEX POND FACILITIES & DETAILS B C 0 E F H MAXIMUM WATER SURFACE OF DESIGN STORY EL 11.0' EL 8.67' EL 4.87' EL 4.67' ACCESS ROAD fERT RIP RAP, 1'-O' MIN THICKNESS UCTURE aaPa��a aI?a giV•AAPIo •a • COMPACTED SUBGRADE TO A DEPTH OF r ENT CROSS SECTION Tam C602 POLYETHYLENE LINER EL 11.0' EL 8.25' MAX f MIN EL 10.5' GRAVEL ACCESS ROAD, EL 11.5' EL 10.0' EL 8.67' A loriir YIN ii di !i `� I���L �-1 EL 11.0' EL 10.1' EL 11.0' 11.0' EL 8.17' EL 7.5' WET POND AND STCRMWATER DETENTION FACILITY SFILTER DWG C/ SEE BERM C603 NEW ASPHALT CONCRETE PAVEMENT IETEN11ON DITCH YIN 3'-0" H MIN en viros 5808 LAKE WASHINGTON BOULEVARD NORTHEAST KIRKLAND, WASHINGTON 98033 EL 11.5' EL 8.25' GRAVEL FILTER BERM SEE DWG C/C603 EL 11.0' 11 - 10- 9 8 7 - 6 5 - 4 4 ASPHALT PAVEMENT GRAVEL ACCESS ROAD ON ADJACENT SITE ¢ INTO POND \L„ SITE BOUNDARY 1 3 I 3 Rsy lW C, BERM DETAIL SCALE 1/2^ - 1'-7 POND PROFILE HORIZONTAL SCALE: I. - 20' VERTICAL SCALE: 1' - 5' 3/4" TO r CRUSHED ROCK WITH LESS THAN 5% FINES NEW ASPHALT CONCRETE PAVEMENT f ASPHALT -LINED POND ACCESS ROAD WITH / DITCH / GGRAVEL EE DWG CTER BERM ASPHALT SURFACE - 1 'THIN SPREAD PILE YIN. POND ACCESS ROAD SECTION HORIZONTAL SCALE 1' - 10' VERTICAL SCALE 1• - 5' y "ME T A o Iloablp.Mt, d Netopolltaa Seattle OTT: HATCH 1993 COMM L W.CCW�o/ome r. AS NOTED !WM V.M-'19 AR�PR]f. cONT* cT No: T/II 11-93 SOUTH BASE / UPC REPAR UICERGROUFC TANK LACOE T SOUTH BASE ANNEX POND FACILITIES do DETAILS numo: X14 OMwC No C603 WIT ND Of 32 63 5 4 3 2 Source File PAPROJECTS\TRANIASE\Sl\X14\1X14C603 BY APP'D DATE A 8 • D G H FLEX COUPLING 12- to CPE PIPE- \ SHEAR GATE WITH CONTROL ROD FOR CLEANOUT/DRAIN (SEE KING COUNTRY ROAD STANDARDS DWG 53) 12' • CMP PIPE EL 11.25' 1'-6' MIN EL 10.0' 0.005 FT/FT EL 6.67' PIPE SUPPORT (SEE NOTE 5) 1'-Er LENGTH OF PIPE ATTACHED BY GASKETED BAND TO ALLOW REMOVAL• RESTRICTOR PLATE. WELDED TO PIPE WITH 4.35' ORIFICE NOTES: • 11 EL 6.67' 24 DIA ACCESS OPENING WITH SOLO LOCKING UD, CAST FRAME IN TOP SLAB (SEE NOTE 3 AND KING COUNTY ROAD STANDARDS OWGS 49 & 50) 3/4' GALV REBAR SPACED 4' OC IN FRAME. LENGTH OF OPENING IS 2'-O' /-MAXIMUM WATER SURFACE OF DESIGN STORM 0.005 FT/FT a 1. USE MIN 54' DIA CATCH BASIN TYPE 2. SEE KING COUNTY ROAD STANDARDS DWG 52. 2. OUTLET CAPACITY: NOT LESS THAN COMBINED INLETS. 3. METAL PARTS: CORROSION RESISTANT. GALVANIZED PIPE PARTS TO HAVE ASPHALT TREATMENT 1. 4. FRAME ANO LADDER OR ItPS OFFSET S0: A. CLEANOUT GATE IS VISIBLE FROM TOP. B. CLIMB -DOWN SPACE 1S CLEAR OF RISER AND CLEANOUT GATE. C. FRAME IS CLEAR OF CURB. S. PROVIDE AT LEAST ONE 3' x .090 GAGE SUPPORT BRACKET ANCHORED CONCRETE WALL (MAX 3'-0' VERTICAL SPACING). L-93,-003ci FLOW CONTROL STRUCTURE PLAN SCALE: 3/4' - No. REVISION BY APP'D DATE \--12 • CPE PIPE 54' • TYPE 2 CATCH BASIN (SEE KING COUNTY ROAD STANDARDS DWG 52) 12' • CPE INLET PIPE 24' • ACCE55 OPENING CATCH BASIN STEPS SEE NOTE 4 enviros 5808 LAKE WASHINGTON BOULEVARD NORTHEAST KIRKLAND, WASHINGTON 98033 20.00 15.00 10.00 5.00 20.00 15.00 10.00 5.00 20.00 15.00 10.00 — 5.00 T� com co 4 0 12' DIA CPE PIPE 150' 0 0.005 FT/FT FINISH GRADE N U W I • I ' 0+00 20 I I I 40 60 80 1+00 20 40 18' DIA CPE PIPE 0 + 150' • 0.004 FT/FT EXISTING GRADE T I I I 60 80 2+00 20 40 2+60 STORM DRAIN PROFILE 16' 01A CPE PIPE 18. DIA CPE PIPE DUSTING GRADE I I 2+20 40 60 80 150' • 0.004 FT/FT FINISH GRADE 3+00 20 16' DIA CPE PIPE 40 60 80 I I 4+00 STORM DRAIN PROFILE 60' • 0.004 FT/FT 20 40 80 60 5+00 te' oA CPE PIPE E + ▪ • Ti▪ W 150' • 0.0035 FT/FT EXISTING PAVING 130' • 0.0035 FT/FT SEE DET A/C605 5+00 20 12' DIA CPE PIPE FROM FLOW CONTROL STRUCTURE IE 8.00' 40 60 60 6+00 20 r� y-,14.1 40 60 1. �nI yilti 60 STORM DRAIN PROFILE ocsamck g44/w4 1151. 11/4 7+00 20 40 60 60 81 �,'�*.METH O 11121248ntY� "90191• BMWs AS NOTED CCNINCT N0: T/1. 11-93 SOUTH BASE PAST EMIR UNDENG•0190 TAMK REAACEii4T SOUTH BASE ANNEX FLOW CONTROL STRUCTURE AND STORM DRAIN PROFILE • C b W EL 6.67' b N 20.00 24' DIA ACCESS OPENING WITH SOU) LOCKINGUD. CAST FRAME IN TOP SLAB — NOTE 3 AND KING COUNTY ROAD STANDARDS(SEE DWCS 49 & 0) —co oO 15.00 _ c��+ 3/4' GALV REBAR SPACED 4' OC IN FRAME, LENGTH OF OPENING IS 2'—O — MAXIMUM WATER SURFACE �OF DESIGN STORM 0.005 FT/FT SECTION SCALE 3/4' - 1'— ETS. ED PIPE PARTS Xl ClEANOUT GATE. r BRACKET LL.. SPACING). FLOW CONTROL STRUCTURE PLAN SCALE: 3/4' - 1'-0' 12 0 CPE PIPE 54 0 TYPE 2 CATCH BASIN (SEE KING COUNTY ROAD STANDARDS DWG 52) 1r 0 CPE INLET PIPE 24' 0 ACCESS OPENING CATCH BASIN STEPS SEE NOTE 4 10.00 5.00 20.00 15.00 _ 10.00 5.00 20.00 _ 15.00 10.00 5.00 — + O 12' DIA CPE PIPE 150' • 0.005 FT/FT FINISH GRADE 18' DIA CPE PIPE N n U I• 0+00 20 40 60 80 1+00 20 40 60 80 2+00 20 40 2+60 0 150' • 0.004 FT/FT EXISTING GRADE T 1 1 1 1 1 I 1 I I STORM DRAIN PROFILE 18 DIA CPE PIPE 18' DIA CPE PIPE Exotic GRADE 150' • 0.004 FT/FT FINISH GRADE I I I I I I I I 2+20 40 60 80 3+00 20 40 60 80 4+00 20 40 60 80 5+00 STORM DRAIN PROFILE 60' • 0.004 FT/FT 18 DIA CPE PIPE 150' • 0.0035 FT/FT EXISTING PAVING I 18' DIA CPE PIPE 130' • 0.0035 FT/FT 0 SEE DET A/C605 � 1Wi 5+00 12' DA CPE PIPE FROM FLOW CONTROL STRUCTURE IE 8.00' 20 0 60 60 6+00 BY APP'0 DATE en viros 5808 LAKE WASHINGTON BOULEVARD NORTHEAST KIRKLAND, WASHINGTON 98033 20 40 tom' -14 I 6o 80 7+00 STORM DRAIN PROFILE I I i 20 40 60 i 6o 8+00 GEVON17k RJG/W4 114 a ate m ET R o ,dgm,tp.yt, aE 11:feo,dll.• 61wti,. WALE AS NOTED COKI O NO:. T/Y 11-93 SOUTH BASE / UNIT WPM UN0ERG 0U10 TANK REPLACOANT SOUTH BASE ANNEX FLOW CONTROL STRUCTURE AND STORM DRAIN PROFILE DOT.: ilARCH 1013 RE NO: X14 OMwIG NO: C604 WET NO: OF 33 63 A c H 1.I 1 I —I I —111 11111 NOTE EXTEND RIPRAP MINIMUM TO EITHER SIDE OF OUTFALL PIPE. MITER CUT PIPE TO MATCH SIDE Y 0.035FT/FT . F ^ ter DIA CPE PIPE EODUIIADON TANK SPOT* GROUNDWATER EXTRACTION PUMP P1 GROUNDWATER FROM UST EXCAVATION AREAS IE 5.0' RIPRAP. 1'-0. MIN THICKNESS OUTFALL DETAIL (A� SCALE: 3/8" - 1'-0' C601 C604 TRANSFER PUMP P2 SEDIMENT FILTERS do EMISSION J/—CONTROL e UNIT AMBIENT AIR —Er BLOWER 81 SUMP F AR STRIPPER MOBILE GROUNDWATER TREATMENT SYSTEM, PIPING & INSTRUMENTATION DIAGRAM DETAIL SC. ALE NITS Lq3-On30 No. REVISION BY APP'D DATE FLOW METER g TRANSFER PUMP P3 en viros TREATED EFFLUENT CISCHARGE TO SANITARY SEWER 5808 LAKE WASHINGTON BOULEVARD NORTHEAST KIRKLAND, WASHINGTON 98033 LIFT ROD TOP SLAB SHEAR CLJ ROUT GATE 1/3" • CPE PIPE (TYP FLOW — MORTAR FILL REINFORCING STEEL (FOR SEPARATE BASE ONLY) 0.23 SO IN/FT IN EACH DIRECTION FRAME AND GRATE SEE NOTE 2 LADDER RUNG HANDHOLDS LEVEUNG BRICKS OR EQUAL CAP TEE FLDOBLE COUPLING 18' 0 CPE PIPE (TYP) PRECAST BASE AND INTEGRAL RISER REINFORCING STEEL FOR PRECAST CRAL RISER 0.15 SO IN/FT IN EACH DIRECTION 6' MIN BEDDING FOR PRECAST BASE NOTES: 1. FOR MORE DETAILS AND NOTES SEE DWG 33 CATCH BASIN TYPE 2 KING COUNTY ROAD STANDARDS 1967. 2. FOR CATCH BASINS 4 THROUGH 6 USE 24 DIA MANHOLE RING AND COVER. STORM DRAINAGE CATCH BASIN DETAIL SCALE: 3/44 - 1'-7 R.1G/HJGH NOTES: 1. SEDIMENT IN RUNOFF FROM DISTURBED AREAS SHALL BE CONTROL AT MINIMUM BY FILTER FENCE. STRAW 8111E BARRIERS. DMA SEX DAMS. OR TEMPORARY SEDIMENT TRAPS. 2. RESTORE AREAS OUTSIDE UNITS OF FAL BY LEVELING AND SM0071 THE GROUND SURFACE. 3. REMOVE AND RESTORE DISTURBED AREAS OF ALL TOi0RARY ESC FACILITIES AT COMPLETION OF CONSTRUCTION IN COMPLMNCE WHIN SPECIFICATIONS. 4. ALL REQUIRED STORM WATER DETENTION FACILITIES MUST BE CONS AND IN OPERATION PRIOR TO ANY PAVING UNLESS OTHERWISE APP BY THE ENGINEER. 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CLEAN UP OF STRI AND ADJACENT PROPERTY AS REQUIRED DURING CONSTRUCTION. P & ID LEGEND VALVE AND PIPING SYMBOLS -Ms VALVE CHECK VALVE UNION VALVE OPERATOR SYMBOLS -0To- HANOVMEEL OR LEVER EQUIPMENT SYMBOLS SEDIMENT FILTER m TURBINE OR PROPELLER TYPE O,' MEER BLOWER PUMP UNE SYMBOLS PROCESS PIPES AND CRAWLS ELECTRIC SGNAL PROCESS UNE ABBREVIATIONS • SAMPLE POUR O DRAIN ✓ VENT GENERAL INSTRUMENT SYMBOLS • INTERLOCK • SINGLE VARIABLE mETRO et listreguilm IllsWe r�. ldf44s, WALE: A3 NOTED CONTRACT NO: T/11 11-93 SOUTH BASE / UNIT REPAIR UNDERGROUND TAW RRACE NDR SOUTH BASE ANNEX - GROUNDWATER TREATMENT SYSTEM P & ID AND MISCELLANEOUS DETAILS WRAP 3"-cf MINIMUM NOTE: EXTEND SIDE OF OUTFiU. PIPE. METER CUT PIPE TO MATCH SIDE C601 C604 t.TREATMENT SYSTEM ENTATION DIAGRAM BY APP'D DATE en virus 5808 LAKE WASHINGTON BOULEVARD NORTHEAST KIRKLAND, WASHINGTON 98033 TOP SLAB SHEAR CLEAROUT GATE 16 • CPE PIPE (TYP FLOW — MORTAR nu LIFT ROD FRAME AND GRATE SEE NOTE 2 A REINFORCING STEEL (FOR SEPARATE DBASE ONLY) 0.23 IN EACH DIRECTION - +I SEPARATE CAST IN PLACE BASE OR SEPARATE PRECAST BASE LADOER G HANDHCthS OR EQUALBR CUP TEE FUMBLE COUPLING I • CPE PIPE — . FLAW 7 PRECAST BASE AND INTEGRAL RISER REIFORCING STEEL (FOR INTEGRAL BASE).5 SQ IN/FT IN EACH DIRECTION 9 6' MIN BEDDING FOR PRECAST BASE NOTES: 1. FOR MORE DETAILS AND NOTES SEE DWG 33 CATCH BASIN TYPE 2 KING COUNTY ROAD STANDARDS 1967. 2. FOR CATCH BASINS 4 THROUGH 6 USE 24' DIA MANHOLE RING AND COVER. STORM DRAINAGE CATCH BASIN DETAIL SCALE: 3/4' - 1'-O' NOTES: 1. SEDIMENT IN RUNOFF FROM DISTURBED AREAS SHALL BE CONTROLLED AT MINIMUM BY FILTER FENCE. STRAW BALE BARRIERS. DITCH SEDIMENT DAMS, OR TEMPORARY SEDIMENT TRAPS. 2. RESTORE AREAS OUTSIDE UNITS OF FILL BY LEVELING MID SMOOTHING THE GROUND SURFACE. 3. REMOVE AND RESTORE DISTURBED AREAS OF ALL TEMPORARY ESC FACILITIES AT COMPLETION OF CONSTRUCTION IN COI/PUMICE WRN THE SPECIFICATIONS. 4. ALL REQUIRED STORM WATER DETENTION FACIU11ES MUST BE CONSTRUCTED AND IN OPERATION PRIOR TO ANY PAVING UNLESS OTHERWISE APPROVED BY THE ENGINEER. S. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CLEAR UP OF STREET AND ADJACENT PROPERTY AS REQUIRED DURING CONSTRUCTION. P & ID LEGEND VALVE AND PIPING SYMBOLS —lit- -ijH VALVE CHECK VALVE UrMON VALVE OPERATOR SYMBOLS -DTo-- KM/WHEEL OR LEVER EQUIPMENT SYMBOLS AT — ▪ SEDIMENT FILTER m TYPE OW MEOR PROPELLER BLOWER PUMP LINE SYMBOLS PROCESS PIPES AND CHANNELS ELECTRIC SIGNAL PROCESS UNE ABBREVIATIONS IP SAMPLE POINT D DRAIN V VENT GENERAL INSTRUMENT SYMBOLS Oi INTERLOCK SINGLE VARIABLE ▪ METRO Ylol t>r of ll•hY!•ilsS 11Mattb DAL wog 1663 �J,J? 155 NECONN��orao[ L,l12sy 74V4- > AS NOTED IOIIIR R NO: T/Y 11-93 SOUTH dLSE / UNIT KFJA6t UNDERGROUND TAIL lA1 OE II SOUTH BASE ANNEX GROUNDWATER TREATMENT SYSTEM P & ID AND MISCELLANEOUS DETAILS FIEF X14 OWNING Kt C605 SHUT Or 34 63