HomeMy WebLinkAboutPermit L93-0067 - SEGALE BUSINESS PARK - SEPA ENVIRONMENTAL IMPACT STATEMENTl93-0067
6101 south 180th street segale retail
STATE OF WASHINGTON
DEPARTMENT OF ECOLOGY
P.O. BOX 47600 • Olympia, Washington 98504 -7600 • (206) 459 -6000
October 27, 1993
Mr. Rick Beeler
City of Tukwila
6300 Southcenter Blvd
Tukwila WA 98188
Dear Mr. Beeler:
Thank you for the opportunity to comment on the determination of
nonsignificance for the construction of a retail building and
associated parking, proposed by Segale Business Park ( #L93- 0067).
We reviewed the ENVIRONMENTAL IMPACT STATEMENT SEPA environmental checklist and have the following
comments.
The temporary erosion control must adequately protect the
stormdrainage system.
If, you have any questions, please call Mr. Ron Devitt with our
Water Quality Program at (206) 649 -7028.
Rebecca J. Inman
RI:
93 -7570
cc: Ron Devitt, NWRO
Janet Thompson, NWRO
RECEIVED
OCT 2 91993
COMtvium 1
DEVELOPMENT
To:
From:
Date:
Subject:
Jack Pace Col 1993
Ron Cameron
September 30, 1993
Segale Retail and Simulcast mitigation -V LQFfo l
Segale Retail traffic mitigations total $169,782
Segale Simulcast traffic mitigations total $89,839
Total $259,621
Crediting Segale costs ($367,000) to make mitigated Andover
Pk W /Strander intersection improvements exceeding sidewalk
ordinance required frontal improvements has several
advantages for Segale and the City. Credits would offset
mitgation fairshare costs for the construction cost of:
1. removing .c/g/sw, widening, and replacing on Andover
south of Strander
2. removing c/g widening, and replacing on Andover
north of Strander
3. widening Strander east of Andover Pk W
4. signalization changes at Strander /Andover Pk W
which provides north /south left turn lanes and widened lanes on
Strander. These credits are different from the June 24 memo and
are based on costs exceeding frontal improvement costs and on
the costs of improvements that would be part of the Andover Pk
W /Strander capacity improvement project.
The initial cost estimate for this work exceeds the identified
fairshare mitigation costs ($259,621). Two alternatives are
being considered and will be presented to Council for selection
and approval. This will take 2 weeks to a month.
One is to proceed with Segale making the Andover Pk W /Strander
improvements and credit the difference to future mitigation
costs when the simulcast facility changes to retail. The change
is likely to generate more traffic and require additional
mitigations. If not, the "banked" amount would be held for
other future development mitigation credit.
The second is to accept the mitigation funds and make the
Andover Pk W /Strander widening as a city project.
Segale will agree to either alternative. They would like their
Simulcast permits to start utility and foundation work before
the fall rains. This is advantageous to the City to avoid mud
and other weather related construction difficulties affecting
Segale and the City. As well as reducing Christmas shopping
traffic affects by the construction.
It is recommended to issue the Utility and Building permits with
the condition that C of 0 issuance requires mitigation
agreement. This allows construction to proceed before the
weather changes while the mitigation alternative is decided.
To: Vernon Umetsu, Associate Planner
From: Ron Cameron, City Engineer
Subject: Segale Retail (S 180 S
Date: September 29, 1993
This memo supersedes the September 27 memo and contains mitigation lan-
guage that serves the city and the developer.
Our Public Works review is complete and John has listed water, sewer,
surface water, and permit comments. The August 1993 David I. Hamlin &
Associates report analyzes traffic for a 36,400 sf furniture and 80,000
sf specialty retail. These have low trip rates but are comparable to
the Longacres simulcast facility trip generation.
The.site will function as a simulcast facility for up to two years and,
then, transform to retail. The mitigations for the development are in
two parts:
1. the up to 2 year simulcast facility use
2. future retail.
The volumes and mitigations provided in the report are the best ap-
proach for initial use. With the condition that if safety or capacity
issues arise by additional or different traffic then is projected,
then, corrective mitigating measures will be provided. Any adverse im-
pacts should be identified within 6 months, temporary or permanent
mitigations determined to correct safety or capacity impacts resulting
from additional or different traffic, and the mitigations implemented.
The mitigations are foreseen as temporary primarily, such as manual
traffic control, peak hour turning restrictions, or internal parking
circulation revisions. Any permanent mitigations that are mutually
agreed to will be credited toward potential future mitigations for con-
version to retail.
For the future retail phase, mitigations will be evaluated to determine
if the traffic volumes increase from the Traffic Study projections.
Corresponding mitigations will be assessed for the increased peak traf-
fic at that time. The measurement will be by ITE trip generation and
affirmed by actual counts. Future additional mitigations will be as-
sessed by the trip mitigation payment system for the change of peak
traffic (increase above the August 1993 Hamlin study) with the change
in use from the betting facility to retail. The assessment will be
made 6 months after the conversion to retail.
The traffic study showing Furniture and Specialty Shop uses gener-
ates 2,192 daily trips and 286 noon peak hour for 36,400 furniture
store and 50,000 specialty store with an ITE formula calculated
passby.
Development traffic mitigations are determined from identified ca-
pacity or safety improvements needed for traffic increases. The
Traffic Deficiencies Study identifies increased traffic and im-
provements needed to provide the safety and capacity for 2010 traf-
fic. The cost of the capacity improvement is divided by the
"1990" to 2010 traffic increase to determine the prorated share
To: Vernon U.
From: Ron C.
Subject: Segale Retail (S 180 St)
Date: September 29, 1993
cost. Mitigations are determined from the development's increased
peak hour traffic and the cost /trip. Segale Retail peak hour traf-
fic affects five intersections with improvements planned for con-
struction within the next 5 years:
Southcenter Parkway /Strander. The increase to 2010 is 954 peak
hour trips and improvement cost is $134,000. The prorated share is
$140 /trip. Segale Retail's 65 noon peak hour trips mitgation is
$9,100.
Andover. Park W /Strander. The increase to 2010 is 934 trips and im-
provement cost is $296,000. The prorated share is $317 /trip.
Segale Retail's 57 peak hour trips mitgation is $18,069.
Andover Park E /Strander. The increase to 2010 is 694 peak hour
trips and improvement cost is $94,000. The prorated share is
$135 /trip. Segale Retail's 57 peak hour trips mitgation is $7,695.
S 180 St /SR181. The increase to 2010 is 3,200 trips and improve-
ment cost is $1,520,000. The prorated share is $475. Segale
Retail's 61 peak hour trips mitgation is $28,975.
Interurban /I405. The improvement cost at this location totaling
over 13,000,000 and complexity of weaving traffic would result in
prorated shares exceeding $5,000 /trip. It has been previously de-
termined to use a "fairshare" of $1,000 /trip with increased traffic
at this location. Segale Retail's 26 peak hour trips mitgation is
$26,000.
-'-
The subject project will require mitigations for land altering,
surface water runoff and traffic impacts.
Mitigations for land altering include the submittal of a plan which
addresses temporary and permanent erosion and sedimentation control
measures. Measures such as silt fences and sedimentation ponds, as
mentioned in the environmental checklist, are examples.
Mitigations for surface water runoff consist of directing all sur-
face water runoff through coalescing plate oil /water separators
prior to conveyance into the public system and eventual discharge
into the Green River.
Mitigations for traffic impacts are addressed in detail in the at-
tached memo, dated today, from Ron Cameron.
If you have any questions, please let me know.
Attachment a/s
cf: Ron Cameron, City Engineer
Development File
JAP /jap
R CE VED
SEP 2 9 1993
CO■viNiLlN I r Y
DEVELOPMENT
CITY OF TUKWILA
DETERMINATION OF NONSIGNIFICANCE (DNS)
DESCRIPTION OF PROPOSAL:
CONSTRUCT AN 36,400 SOFT RETAIL. BLDG W/461 PARKING
,; r
PROPONENT: SEGALE BUSINESS PARK.
LOCATION OF PROPOSAL, INCLUDING: STREET ADDRESS, IF ANY:
ADDRESS:6101S 180 ST
PARCEL NO:' '•352304 -9119
SEC /TWN / RNG: N: E. .SEC. 35 TWN. 23 RGE. 4
LEAD AGENC1f..Y. ,CITY OF TUKWILA • FILE NO: L93 -0067
The Cityhas determined that the proposal does not have•a probable
significant adverse impact on the envir "onment, An environmental
impact 5ateinent (EIS) 1 =. not required under RCW 43.21 c..030(2) (c) .
This dr.ciSi.n was made oftc:r.'r'ev :i.ew of a completed environmental
checkl is.t
ad i ather it formation .on file with the lead agency. This
information i s ava i 1ab l e ' to the public on request.
k A k' ' R 'k 'K 'k 'k C 'k 'k k 'r' 'R 'A '.i . N k k A ∎ k 1 n R n R , n .A k , A A A k A A .A k k k A A k k 'k 'k k k k k k* k k k k :k A .k k k .k
This term in t ion
19,3.
4,01-41111,16.
s final and signed this _2
. ick Beeler., Responsible. Official
City of Tukw i.1 a,. (206) 4313630
6300 Southcenter Bou 1 evar'd
Tukwila, WA 981'83
day of
You May appeal this determination to the City Clerk at City Hall, 6200
Southcenter• Boulevard, Tukwila, WA 981813 no later than 10 days from the
above signature date by written appeal stating the basis of the appeal for
specific factual objections. 'You.may be required to bear some of the
e,,pense_ for an appeal.
Copies of the procedures for SEPA appeals are available with the City
Clerk and Department of Community Development.
LEGAL DESCRIPTION (Lot 3) Proposed
That portion of the southwest quarter of the northeast quarter of
Section 35, Township 23 North, Range 4 East, W.M., in King County,
Washington, described as follows:
COMMENCING at the northwest corner of the southwest quarter of the
northeast quarter of said Section 35; thence South 87° 50' 09" East
along the North line thereof, 449.30 feet; thence South 02° 09' 51"
West, 36.00 feet to the South margin of South 180th Street and the
TRUE POINT OF BEGINNING; thence South 87° 50' 09" East along said
South margin, 786.92 feet; thence along a curve to the right having
a radius of 50.00 feet through a central angle of 950 35' 05 ", an
arc distance of 83.41 feet; thence South 07° 44' 56" West, 348.56
feet; thence North 87° 50' 09" West, 802.76 feet; thence North 02°
09' 51" East, 401.77 feet to the TRUE POINT OF BEGINNING.
Containing: 329,742.15 SF or 7.57 Acres
LEGAL DESCRIPTION (Lot 4) Proposed
RECEIVE
AUG 2 71993
COMMUNITY
DEVELOPMENT
That portion of the southwest quarter of the northeast quarter and
Government Lots 2 and 5 in Section 35, Township 23 North, Range 4
East, W.M., in King County, Washington, described as follows:
COMMENCING at the northeast corner of the southwest quarter of the
northeast quarter of said Section 35; thence South 07° 44' 56" West,
346.40 feet; thence South 82° 15' 04" East, 30.00 feet to the TRUE
POINT OF BEGINNING; thence North 75° 05' 56" East, 75.10 feet;
thence along a curve to the left having a radius of 409.26 feet
through a central angle of 58° 14' 17 ", an arc distance of 415.99
feet to a point of compound curve; thence along a curve to the left
having a radius of 572.96 feet through a central angle of 000 25'
39 ", an arc distance of 4.28 feet to a point on the South margin
of South 180th Street; thence northeasterly along said South margin
on a curve to the left the center of which bears North 03° 56' 50"
West, having a radius of 336.00 feet through a central angle of 16°
23' 31 ", an arc distance of 96.13 feet; thence South 36° 31' 53"
West, 135.86 feet; thence along a curve to the left having a radius
of 430.00 feet through a central angle of 14° 28' 22 ", an arc
distance of 108.63 feet; thence South 22° 03' 26" West, 34.28 feet;
thence along a curve to the left having a radius of 800.00 feet
through a central angle of 18° 44' 11 ", an arc distance of 261.61
feet ; thence South 03° 19' 15" West, 141.75 feet; thence along a
curve to the left having a radius of 3500.00 feet through a central
angle of 03° 41' 20 ", an arc distance of 225.34 feet; thence South
07° 00' 35" West, 20.08 feet; thence South 090 03' 25" West, 579.24
feet; thence South 06° 44' 45" West, 82.23 feet; thence North 66°
54' 09" West, 338.39 feet; thence in a northerly direction along a
curve to the left the center of which bears North 71° 16' 17" West,
having a radius of 2530.00 feet through a central angle of 100 58'
47 ", an arc distance of 484.83 feet, thence North 07° 44' 56" East,
610.27 feet to the TRUE POINT OF BEGINNING.
Containing: 363,872.75 SF or 8.35 Acres
RECEIVED
AUG 2 71993
COMMUNITY
DEVELOPMENT
ENVIRONMENTAL CHECKLIST Control No.
Epic File No. OC(07
Fee $325.00 Receipt No.
A BACKGROUND
1. Name of proposed project, if applicable:
Segale Retail at 180th Street
2. Name of applicant:
Segale Business Park
3. Address and phone number of applicant and contact person:
Segale Business Park
P.O.Box 88050
Tukwila, Washington 98138
Contact person: Dana Warren - tel #: 575 -2000
4. Date checklist prepared:
August 23, 1993
5. Agency requesting Checklist: City of Tukwila
6. Proposed timing or schedule (including phasing, if applicable):
Design 6/1/93 - 8/26/93
SEPA Permit 8/26/93 - 9/17/93
Grading & Utility Permit 9/1/93 - 9/17/93
Building Permit 9/1/93 - 10/1/93
Site Grading & Utility Construction 9/18/93 - 10/8/93
Building Construction 10/9/93 - 12/31/93
The new building on Parcel #3 will be temporarily used as a simulcast
facility (a facility for the viewing of live horse racing via simulcast
display on TV screens) for a period of one year after which time the
building will be used for retail. Parcel #4 will be used as a temporary
parking lot for the simulcast facility for a period of one year.
Note: There are only two parcels associated with this proposal. Those
parcels are identified as Parcel #3 and #4 on the attached site plan.
7. Do you have any plans for future additions, expansion, or further
activity related to or connected with this proposal? If yes, explain.
No
8. List any environme'intal information you know about that has been
prepared, or will be prepared, directly related to this proposal.
EIS for Segale Business Park - 1974
Traffic Study - David Hamlin & Assoc. (attached)
Geotechnical Report - Geo Engineers, to be completed 8/30/93
9. Do you know whether applications are pending for governmental approvals
of other proposals directly affecting the property covered by your
proposal? If yes, explain.
No
10. List any government approvals or permits that will be needed for your
proposal.
SEPA
Grading & Utility
Building
Mechanical
Electrical
Fire protection
Plumbing & Side Sewer
Signage
11. Give brief, complete description of your proposal, including the
proposed uses and the size of the project and site. There are several
questions later in this checklist that ask you to describe certain
aspects of your proposal. You do not need to repeat those answers on
this page. Section E requires a complete description of the objectives
and alternatives of your proposal and should not be summarized here.
The project involves constructing approximately 86,400 sq. ft. retail
building with approximately 461 parking spaces on parcel #3 (7.57
acres), and construction of a temporary parking lot of approximately 761
spaces on parcel #4 (8.35 acres).
12. Location of the proposal. Give sufficient information for a person to
understand the precise location of your proposed project, including a
street address, if any, and section, township, and range, if known. If
a proposal would occur over a range of area, provide the range or
boundaries of the site(s). Provide a legal description, site plan,
vicinity map, and topographic map, if reasonably available. While you
should submit any plans required by the agency, you are not required to
duplicate maps or detailed plans submitted with any permit applications
related to this checklist.
Parcel #3 is located on the SW corner of South 180th Street and Andover
Park West. Parcel #4 is located East of Andover Park West, 100 yards
South of South 180th Street. (see attached legal descriptions)
13. Does the proposal lie within an area designated on the City's
Comprehensive Land Use Policy Plan map as environmentally sensitive?
Yes, Parcel #4 is partially located within the shoreline zone.
-2-
TO BE COMPLETED BY APPLLCANT Evaluation for
Agency Use Only
B. ENVIRONMENTAL ELEMENTS
1. Earth
a. General description of the site (circle one):
Flat, rolling, hilly, steep slopes,
mountainous, other.
Flat
b. What is the steepest slope on the site
(approximate percent slope)?
Parcel #3 - Approximately 2 percent
Parcel #4 - There existing preload which
will be spread over the site to a grade of
approximately 2 percent.
c. What general types of soils are found on the
site (for example, clay, sand, gravel, peat,
muck)? If you know the classification of
agricultural soils, specify them and note any
prime farmland.
Sand and gravely soils
d. Are there surface indications or history of
unstable soils in the immediate vicinity? If
so, describe.
No
e. Describe the purpose, type, and approximate
quantities of any filling or grading
proposed. Indicate source of fill.
Parcel #3 - The site is level and ready for
building, approximately 10,000 cubic yards of
existing on -site material will be moved
during fine grading.
Parcel #4 - The existing preload will be
spread over the site. Approximately 40,000
cubic yards will be moved.
f. Could erosion occur as a result of clearing,
construction, or use? If so, generally
describe.
None is expected because the site is
relatively flat.
-3-
g. About what percent of the site will be
covered with impervious surfaces after
project construction (for example, asphalt or
buildings)?
Approximately 90 percent of the site will be
covered with impervious surfaces. This
includes buildings, parking, driveways and
sidewalks.
h. Proposed measures to reduce or control
erosion, or other impacts to the earth, if
any:
Silt fences and siltation ponds will be used
to control storm water prior to discharge
into existing catchbasins.
2. Air
a. What types of emissions to the air would
result from the proposal (i.e., dust,
automobile odors, industrial wood smoke)
during construction and when the project is
completed? If any, generally describe and
give approximate quantities, if known.
Normal emissions and dust associated with use
of construction equipment. After construction
normal exhaust associated with customer and
deliver vehicles.
b. Are there any off -site sources of emissions
or odor that may affect your proposal? If
so, generally describe.
No
c. Proposed measures to reduce or control
emissions or other impacts to air, if any:
During grading and earthwork construction
water (via water truck) will be used to
minimize dust. Construction equipment will
meet local, state and federal emission
standards.
3. Water
a. Surface:
1) Is there any surface water body on or in
the immediate vicinity of the site
-4-
(including year -round and seasonal
streams, saltwater, lakes, ponds,
wetlands)? If yes, describe type and
provide names. if appropriate, state
what stream or river it flows into.
Parcel #3 - Yes, the Green River is
approximately 390 ft from the Southeast
corner.
Parcel #4 - Yes, the Green River is
adjacent to the Eastern boundary. The
Green River flows into Puget Sound.
Surface water does not flow directly into
the Green River from either Parcel
because there is a dike separating these
parcels from the river. Storm water from
both parcels flows into the City of
Tukwila storm water system and is
conveyed to the P -17 pond for detention
prior to discharge into the Green River.
2) Will the project require any work over,
in, or adjacent to (within 200 feet) the
described waters? If yes, please
describe and attach available plans.
3
4
Parcel #3 - No
Parcel #4 - Yes, grading and paving of
the temporary parking lot. (see attached
plan.)
Estimate the amount of fill and dredge
material that would be placed in or
removed from surface water or wetlands
and indicate the area of the site what
would be affected. Indicate the source
of fill material.
None
Will the proposal require surface water
withdrawals or diversions? Give general
description, purpose, and approximate
quantities, if known.
No
Evaluation for
Agency Use Only
Evaluation for
Agency Use Only
5) Does the proposal lie within a 100 -year
floodplain? If so, note location on the
site plan.
No
6) Does the proposal involve any discharges
of waste materials to surface waters? If
so, describe the type of waste and
anticipated volume of discharge.
No
b. Ground:
1) Will ground water be withdrawn, or will
water be discharged to ground water?
Give general description, purpose, and
approximate quantities, if known.
2
No
Describe waste materials that will be
discharged into the ground from septic
tanks or other sources, if any (for
example: domestic sewage; industrial,
containing the following chemicals...;
agricultural; etc.). Describe the
general size of the system, the number of
such systems, the number of houses to be
served (if applicable), or the number of
animals or humans the system(s) are
expected to serve.
No waste materials will be discharged.
c. Water Runoff (including storm water):
1) Describe the source of runoff (including
storm water) and method of collection and
disposal, if any (include quantities, if
known). Where will this water flow?
Will this water flow into other waters?
If so, describe.
Runoff from parking areas and building
roof will be collected and gravity flowed
to the existing City Storm drainage
system. The City system lies within the
P -17 basin.
-6-
Evaluation for
Agency Use Only
2) Could waste materials enter ground or
surface waters? If so, generally
describe.
No unless a oil /water separator fails.
Such failures are unexpected.
d. Proposed measures to reduce or control
surface, ground, and runoff water impacts, if
any:
Runoff from parking areas will pass through
oil /water separators before discharging to
the City of Tukwila storm sewer.
4. Plants
a. Check or circle types of vegetation found on
the site:
X Deciduous tree: alder, maple, aspen,
other: London Plain Trees
X Evergreen tree: fir, cedar, pine, other
X Shrubs
Grass
Pasture
Crop or grain
Wet soil plants: cattail, buttercup,
bulrush, skunk cabbage, other
Water plants: water lily, eelgrass,
milfoil, other
Other types of vegetation
b. What kind and amount of vegetation will be
removed or altered?
None
c. List threatened or endangered species known
to be on or near the site.
None
d. Proposed landscaping, use of native plants,
or other measures to preserve or enhance
vegetation on the site, if any:
Parcel #3 will be landscaped using native
vegetation. No additional landscaping is
proposed for the temporary use on Parcel #4.
-7-
5. Animals
a. Circle any birds and animals which have been
observed on or near the site or are known to
be on or near the site:
Birds: hawk, heron, eagle, songbirds, other:
None observed
Mammals: deer, bear, elk, beaver, other:
None observed
Fish: bass, salmon, trout, herring,
shellfish, other: None observed
b. List any threatened or endangered species
known to be on or near the site.
None
c. Is the site part of a migration route? If
so, explain.
Do not know
d. Proposed measures to preserve or enhance
wildlife, if any:
None
6. Energy and Natural Resources
a. What kinds of energy (electric, natural gas,
oil, wood stove, solar) will be used to meet
the completed project's energy needs?
Describe whether it will be used for heating,
manufacturing, etc.
Electricity will be used for lighting, and
natural gas and electricity will be used for
HVAC.
b. Would your project affect the potential use
of solar energy by adjacent properties? If
so, generally describe.
No
-8-
Evaluation for
Agency Use Only
c. What kinds of energy conservation features
are included in the plans of this proposal?
List other proposed measures to reduce or
control energy impacts, if any:
The building will be designed to meet the
Washington State Energy code to save energy
in heating and cooling the building.
7. Environmental Health
a. Are there any environmental health hazards,
including exposure to toxic chemicals, risk
of fire and explosion, spill, or hazardous
waste, that could occur as a result of this
proposal? If so, describe.
No
1) Describe special emergency services that
might be required.
None
2) Proposed measures to reduce or control
environmental health hazards, if any:
None
b. Noise
1) What types of noise exist in the area
which may affect your project (for
example: traffic, equipment, operation,
other)?
2
)
Existing traffic on 180th Steet.
What types and levels of noise would be
created by or associated with the project
on a short -term or a long -term basis (for
example: traffic, construction,
operation, other)? Indicate what hours
noise would come from the site.
Normal noise from construction equipment
during construction (approximately 7:00
am to 5:00 pm). Noise from pedestrian
vehicles and delivery trucks once the
building is open for business
(approximately 9:00 am to 9:00 pm).
-9-
_,;...
3) Proposed measures to reduce or control
noise impacts, if any:
All equipment will be operated with
required local, State and Federal
mufflers.
8. Land and Shoreline Use
a. What is the current use of the site and
adjacent properties?
Parcel #3: There is a deli on the Northeast
corner of the intersection of South 180th and
Andover Park West, this deli will remain. The
remainder of Parcel #3 and #4 is vacant.
Adjacent properties: Retail, office and
warehouse.
b. Has the site been used for agriculture? If
so, describe.
No
c. Describe any structures on the site.
Existing deli to remain.
d. Will any structures be demolished? If so,
what?
No
e. What is the current zoning classification of
the site?
M -2
f. What is the current comprehensive plan
designation of the site?
g.
Heavy Industrial
If applicable, what is the current shoreline
master program designation of the site?
Urban
-10-
Evaluation for
Agency Use Only
Evaluation for
Agency Use Only
h. Has any part of the site been classified as
an "environmentally sensitive" area? If so,
specify.
Both Parcel #3 and #4 are shown on the City
maps as being within a "sensitive area"
described to be "of potential seismic
instability, with soft, loose sand and a
shallow ground water table". (See Soils Report
for evaluation of soil conditions)
Parcel #4 is within 200 feet of the Green
River.
i. Approximately how many people would reside or
work in the completed project?
j
During the first year of the temporary use as
a simulcast facility 120 people will work
there. After the first year when it becomes
a retail building approximately 50 people
will work there.
Approximately how many people would the
completed project displace?
None
k. Proposed measure to avoid or reduce
displacement impacts, if any:
N/A
1. Proposed measures to ensure the proposal is
compatible with existing and projected land
uses and plans, if any:
Proposal is consistent with current zoning
and comprehensive plan designation.
9. Housing
a. Approximately how many units would be
provided, if any? Indicate whether high,
middle, or low - income housing?
None
b. Approximately how many units, if any, would
be eliminated? Indicate whether high,
middle, or low- income housing.
None
c. Proposed measure to reduce or control housing
impacts, if any.
None
10. Aesthetics
a. What is the tallest height of any proposed
structure(s), not including antennas; what is
the principal exterior building material(s)
proposed?
Max. Building Height - 35' -0"
Exterior materials - architectural concrete.
b. What views in the immediate vicinity would be
altered or obstructed?
None
c. Proposed measure to reduce or control
aesthetic impacts, if any:
Building landscaping
11. Light and Glare
a. What type of light or glare will the proposal
produce? What time of day would it mainly
occur?
No anticipated glare from buildings. Parking
lot will be illuminated during business hours
when it is dark.
b. Could light or glare from the finished
project be a safety hazard or interfere with
views?
No
c. What existing off -site sources of light or
glare may affect your proposal?
None
d. Proposed measures to reduce or control light
and glare impacts, if any:
None
-12-
Evaluation for
Agency Use Only
12. Recreation
Evaluation for
Agency Use Only
a. What designed and informal recreational
opportunities are in the immediate vicinity?
There is a pedestrian /bike trail that runs
along the East side of the Green River.
b. Would the proposed project displace any
existing recreational uses? If so, describe.
No
c. Proposed measures to reduce or control
impacts on recreation, including recreation
opportunities to be provided by the project
or applicant, if any:
Sidewalks are provided to allow safe access
to the Green River trail.
13. Historic and Cultural Preservation
a. Are there any places or objects listed on, or
proposed for, national, state, or local
preservation registers known to be on or next
to the site? If so, generally describe.
None
b. Generally describe any landmarks or evidence
of historic, archaeological, scientific, or
cultural importance known to be on or next to
the site.
None
c. Proposed measures to reduce or control
impacts, if any:
None
14. Transportation
a. Identify public streets and highways serving
the site, and describe proposed access to the
existing street system. Show on site plans,
if any.
Parcel #3 - South 180th Street on the North,
Andover Park West on the East, and Segale
Drive "D" (private drive) on the South.
Access to the project is available from all
-13-
these streets.
Parcel #4 - South 180th Street to Andover
Park West
See attached parcel map.
b. Is the site currently served by public
transit? If not, what is the approximate
distance to the nearest transit stop
Yes Metro presently has service along both
Andover Park West and South 180th Street.
c. How many parking spaces would the completed
project have? How many would the project
eliminate?
Added
Parcel #3 - 467 spaces
Parcel #4 - 751 spaces
Deleted
None
d. Will the proposal require any new roads or
streets, or improvements to existing roads or
streets, not including driveways? If so,
generally describe (indicate whether public
or private).
Two (2) new curb cuts along South 180th
Street. All necessary curbs, gutters and
sidewalks are existing.
e. Will the project use (or occur in the
immediate vicinity of) water, rail, or air
transportation? If so, generally describe.
There is an existing rail spur behind the new
building although the building will not be
served by rail.
f. How many vehicular trips per day would be
generated by the completed project? If
known, indicate when peak volumes would
occur.
See attached traffic study by Dave Hamlin &
assoc.
-14-
g.
Proposed measures to reduce or control
transportation impacts, if any:
See attached traffic study by Dave Hamlin &
assoc.
15. Public Services
a. Would the project result in an increased need
for public services (for example: fire
protection, police protection, health care,
schools, other)? If so, generally describe.
Yes, fire protection and police protection by
virtue of the fact that there will be a
building and a operating business on the
site.
b. Proposed measures to reduce or control direct
impacts on public services, if any.
The new business and the property are taxed
which supports public services.
16. Utilities
a. Underline utilities currently available at
the site: electricity, natural gas, water,
refuse service, telephone, sanitary sewer,
septic system, other.
b. Describe the utilities that are proposed for
the project, the utility providing the
service, and the general construction
activities on the site or in the immediate
vicinity which might be needed.
Sanitary Sewer -
Connect to existing City sewer service
in street.
Storm -
Connect to existing City storm line in
street.
Water -
Connect to existing City water line
service in street.
Telephone -
Connect to US West service along the
South property line.
Electricity -
Connect to existing Puget Power service
along south property line.
-15-
Evaluation for
Agency Use Only
Gas -
Connect to existing WNG service in
street.
C. Signature
The above answers are true and complete to the
best of my knowledge. I understand that the lead
agency is relying on them to make its decision.
Signature Vaal( g
Date Submitted f*1/49:
PLEASE CONTINUE TO THE NEXT PAGE.
TO BE COMPLETED BY APPL CANT
E. SUPPLEMENTAL SHEET FOR ALL PROJECT AND NON -
PROJECT PROPOSALS
The objectives and the alternative means of
reaching the objectives for a proposal will be
helpful in reviewing the foregoing items of the
Environmental Checklist. This information
provides a general overall perspective of the
proposed action in the context of the
environmental information provided and the
submitted plans, documents, supportive
information, studies, etc.
1. What are the objective(s) of the proposal?
Construct a new retail center on vacant property.
2. What are the alternative means of accomplishing
these objectives?
Finding another site.
3. Please compare the alternative means and indicate
the preferred course of action:
This proposed temporary use must be up and
running by 1/1/94. This property is owned by the
proponent and as is indicated in this check list
is ready to build. Despite efforts to locate a
suitable alternative site for the proposed
temporary use it is unfeasible to construct this
project on another site. Therefore, this site is
preferred for accommodation of this temporary
use.
4. Does the proposal conflict with policies of the
Tukwila Comprehensive Land Use Policy Plan? If
so, what policies of the Plan?
No
5. Proposed measures to avoid or reduce the
conflict (s) are:
N/A
City of Tukwila
John W. Rants, Mayor
Department of Community Development Rick Beeler, Director
CITY OF TUIKWILA
MITIGATED
DETERMINATION OF NON - SIGNIFICANCE
PROJECT: Segale Retail Center
DATE: June 2, 1993
PROPOSAL: To construct a 123,051 square foot retail facility with
approximately 490 spaces of parking.
LOCATION: Southeast corner of Strander and Andover Park West
APPLICANT: Dana Warren
OWNER: M.A. Segale, Inc.
FILE REFERENCE: L93 -0017
THRESHOLD
DETERMINATION: This is a Mitigated Determination of Non - Significance.
ENVIRONMENTAL REVIEW RECORD
The environmental review of this proposal consisted of an analysis based on the following
documents included in the environmental record:
A. SEPA Checklist submitted by Dana Warren dated 17 March 93.
B. Letter from Dana Warren, dated 28 May 93 in regard to biofiltration and building
square footage.
C. Letter from David Millard, PE, PLS, dated 25 May 1993 in regard to drainage
analysis.
D. Report by Geo Engineers of 30 November 1992 in regard to Interim Evaluation and
Recommendations Strander Boulevard Property.
E. Traffic Impact Analysis Segale Retail Site by David Hamlin and Associates January
1993, (revised May 1993).
F. Plans and Drawings by Lance Mueller & Associates, dated 10 May 1993.
6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • (206) 431 -3670 • Fax (206) 431-3665
Segale Retail Center MDNS
6/2/93, Page 2
DESCRIPTION OF THE PROPOSAL
The applicant proposes to construct a retail center for five tenants, occupying 123, 051
square feet on a 9.39 acre site. Uses would be for furniture and specialty shops such as a
bookstore and sports equipment sales. The facility would consist of a one -story
structure, ranging from 24 to 35 feet in height. The building would be located at the
southerly and easterly property lines.
Parking would be for approximately 490 vehicles, of which less than 30 percent would be
for compact cars. Customer parking would be between the structure and the adjacent
arterial streets. Service access would be from a combination of the extension of Treck
Drive and from Strander via a former rail road easement.
The property is currently undeveloped and is currently being used to stockpile
approximately 35,000 cubic yards of fill material, arranged in the pattern of the proposed
structure.
PRINCIPAL CHECKLIST ITEMS
TRAFFIC
New trips. The traffic study by David Hamlin (reference E) estimates that the facility
will generate, on a daily basis, 2,427 total new trips on to the city's street system. Of
these, a total of 250 trips will be at the afternoon peak hour, and an additional 318 will
be at the Noon Peak hour. These numbers reflect deductions for pass -by trips, which
are those trips already being made in the vicinity of the project.
Key intersection. At present the intersection of Strander Boulevard and Andover Park
West is operating at a level of service "E" during the noon peak hour. This condition is
primarily due to the lack of left -turn storage lanes in the north/south directions on
Andover Park West.
- Andover is currently a four -lane arterial with curb, gutter, street lights and
sidewalk along most sections of the roadway. There is no sidewalk along the
project's frontage.
- Strander Boulevard is a multi -lane east -west arterial connecting Southcenter
Parkway with West Valley Highway. Strander includes a two -way left-turn lane
between Southcenter Parkway and Andover Park West. East of this intersection
(which is at the proposed site) the street is striped for four lanes. Curb, gutter and
street lights have been installed along the entire length of the street. There is no
sidewalk along the project's frontage.
With the proposed additional traffic, but with no improvements, the present configuration
of Strander and Andover Park West will operate at a level of service "F" (failure). This
deficiency will be eliminated by widening and incorporating left turn lanes on Andover
Park West. The resulting level of service is projected to be "D."
Segale Retail Center MDNS
6/2/93, Page 3
Project access. Traffic movements on Strander and Andover Park West indicate the
need for protected left -turn lanes from these arterials into the proposed facility. If left -
turn lanes are constructed on the arterials, the level of service of service at the site's
access driveways is generally "D" or better. The one exception is for northbound turns
from the site onto Strander at the noon peak hour. That movement will still operate at a
level of service "E."
Queue analysis. This is a study of the expected maximum line -up ( "queue ") for left -turns
at the intersection and into the site.
Andover Park West: The northbound left -turn at the intersection of Strander & Andover
Park should have around 300 feet of storage to accommodate a worst -case condition.
This distance extends just past the main (north) driveway to Burger King. This point is
just across the street from the Segale Center.
-The southbound left-turn from Andover into the Segale Center should have around
75 feet of storage to accommodate the movement during the noon peak hour. The
proposed site access driveway is located approximately 460 feet south of the.
Andover/Strander intersection. The summation of these two queue lengths (i.e., 300
plus 75) could be accommodated within that distance. The resulting space would
allow for storage of 3 -4 vehicles during a 2 minute interval for northbound left -turns
into Burger King.
Strander Boulevard: The westbound left -turn queue from Strander to Andover will
require a similar storage area of 300 feet. Westbound access into the Segale Center will
require 150 feet of storage. These two westbound queue storage lengths would not
overlap or extend beyond the driveway. There is a slight or occasional possibility that the
driveways on the north side of Strander will be blocked by this westbound left turn
queue.
Treck Drive Extension: Treck is a local access street. Currently it is not built alongside
the proposed retail center. It provides service from Andover Park East and dead -ends
at the railroad tracks which are at the southerly property line of the proposed Segale
Retail Center.
Extension of this street from the railroad tracks to Andover Park West would provide
another east -west connection which could be used as an alternate route to Strander
Boulevard. Its use would be somewhat limited since it would not provide direct access to
Southcenter Mall, and vehicles would eventually need to use Strander Boulevard.
The potential use of a completed Treck Drive by patrons of the retail site would likely be
limited to those trips destined to /from the southeast. This would range from 0 -20% of
the retail site traffic, most likely around 10 %.
Segale Retail Center MDNS
6/2/93, Page 4
Service Access. There are two access points proposed for trucks and other services to
the retail center. One will be from Strander in the vicinity of a vacated railroad
easement. This is just west of the access driveway that serves the adjoining Southcenter
Professional Plaza.
The other service access will be from an extension of Treck Drive west from the railroad
tracks to Andover Park West. This extension will consist of constructing two lanes of
roadway and, on the project side, curb, gutter and sidewalk.
The adjoining Marriott Courtyard motel presently takes its access directly from Andover
Park. A future driveway revision, to be done by the City of Tukwila at the time of
completion of Treck Drive, will include relocating Marriott's access from Andover to
Treck Drive. Such a revision is not a part of or a direct consequence of the Segale
Center proposal.
DRAINAGE
Drainage enhancement. As proposed, surface water from the front parking lot will be
diverted through one of two biofiltration strips located at the site's northwest corner.
The areas closest to the building will be taken into catch basins and then will be piped to
the head of the bioswale. The parking areas closest to the northwest portion of the site
will sheet -flow directly into the bioswale. All of this surface water will pass through an
oil -water separator prior to entering the existing system.
Roof drainage and loading area drainage are proposed to be piped without biolfiltration
or water quality enhancement.
All drainage will then be discharged to the existing "tightline" systems in Treck Drive and
Andover Park West.
SOILS
The site currently stockpiles approximately 35,000 cubic yards of fill material. This action
was issued a mitigated determination of non - significance on 29 April 1991 under EPIC
file 19 -91. A geotechnical report (Environmental Review reference "D. ") indicates that
the stockpile has acted as a pre -load and that subsidence of the underlying soils has been
monitored intermittently since the August 1991 placement.
The geotechnical report concluded that the upper compressible soil layer has reached
nearly 100 percent of the expected total consolidation due to the influence of the preload
fill. The lower compressible soil layer has reached approximately 65 percent of the
expected total consolidation due to the influence of the preload fill.
The report also concluded that the site has been sufficiently surcharged below the
footprint of the existing preload fill to accommodate the proposed building with little
additional settlement from the compressible soil layers.
Segale Retail Center MDNS
6/2/93, Page 5
The report noted, however, that the currently proposed building will cover a different
footprint area than the area that has been surcharged by the existing preload. A
reconfigured preload was recommended, along with a program of monitoring the
settlement.
CONCLUSIONS AND RECOMMENDATIONS
Issuance of a Mitigated Determination of Non - Significance is appropriate since the
environmental review indicates no probability of significant adverse environmental
impacts from the proposal.
Traffic. •
Mitigation costs. The proposal's traffic study shows that furniture and specialty shop
uses will generate 2,427 daily and 318 peak hour trips. This is a May 1993 refinement of
the initial study for 104,000 square feet of retail originally studied in January 1993. It is
similar to the Eagle Hardware, Computer City and Mervyn's studies in methodology,
studies that have been conducted in the past few years.
The traffic study (Reference E) demonstrates that five intersections will be impacted by
peak hour traffic from the project. Impacts and pro -rata share costs for improvements
are as follows. They are based on the. City's Traffic Deficiencies Study, which identifies
increased traffic and improvements needed to provide the safety and capacity for the
year 2010 traffic The cost of each identified capacity improvement is divided by the
"1990" to 2010 traffic increase to determine the prorated share cost.
Intersection
Southcenter Pkwy
@ Strander
Andover Park West
@ Strander
Andover Park East
@ Strander
S. 180th Street
@ State Route 181
Interurban
@ Interstate 405
Project Pro-rata $ /trip Project Cost
2010 increase
96 $140. $13,440
146 $317 $46,282
116 $135 $15,660
64 $475 $30,400
64 $1,000 $64,000
TOTAL $169,782.00
Segale Retail Center MDNS
6/2/93, Page 6
Site - specific mitigations. The proposal identifies site - specific improvements to Strander
and Andover Park. These include increasing the width of Andover Park to 5 lanes, one
of which will be a protected left -turn lane along the entire length of the site.
A similar .protected left -turn lane will be required for access to the site from Strander.
This may require additional left -turn queue space on Strander east of the project's
eastern boundary. In addition there may also be the need for an eastbound acceleration
taper from the site's main access drive onto Strander Boulevard.
Curb, gutter, and sidewalk will also be provided along the entire site's frontage on these
two boulevards. Street lights and traffic signals /controllers on the project site may have
to be relocated as required to create the necessary right of way.
Treck Drive will be constructed to a two -lane cross section. Curb, gutter and sidewalk
will be required on the north (project) side. Improvements are to be from Andover Park
West to the westerly edge of the present railroad easement at the site's southeast corner.
Given the street's projected low volumes, it does not need to be extended across the
railroad tracks. For similar reasons, improvements are not required at this time on the
south (Marriott Courtyard) side.
Pedestrian improvements. Installation of sidewalk, curb, and gutter on Strander and
Andover Park West will mitigate pedestrian safety issues on these streets. These features
are normally treated as a permit requirements. Pedestrian safety issues are being
addressed in this manner.
Drainage. With exception of the site's loading area, site drainage is in accordance with
City plans.
Water. Analysis in the Water Comprehensive Plan shows a deficiency in waterline
velocities on Strander. This is the same issue as at Mervyn's, and is also a result of
conversion of warehouse to retail and office uses. A Local Improvement District will
provide for the additional waterline to correct the deficiency.
Sewer. Existing sewer is adequate.
Soils. Given the extensive amount of fill material, the 35,000 + /- cubic yard preloading
program appears comprehensive. Details of the resulting ground surcharge and its
monitoring can be provided at the time of application for a building permit.
Segale Retail Center MDNS
6/2/93, Page 7
MITIGATED CONDITIONS OF APPROVAL
TRAFFIC:
1. Capacity /Safety improvements. The applicant is to construct frontal improvements
as shown in the site plan prepared by Lance Mueller Sc Associates dated 10 May
1993. This includes either the dedication or easements necessary to provide five
lanes along the entire frontage of both Strander and Andover Park. This also
includes curb, gutter, sidewalk and relocation of other street utilities as noted in the
conclusion section above.
2. Off -site mitigation. The applicant is to pay $169,782 in mitigation costs at the time
of issuance of the building permit.
3. Treck Drive improvements. The applicant is to grant a 60 foot easement, 30 feet
on either side of the present centerline of Treck Drive. The applicant is to
construct Treck, including curb, gutter and sidewalk on the north side of the
easement plus two lanes of road, all built to City standards.
Should the City choose to purchase this right -of -way in the future, applicant agrees
to accept fair market value for unimproved land at the time of such a purchase.
Utilities for this portion of the site are to be located within the Treck Drive
easement area, and will be as determined at the time of application for the building
permit.
DRAINAGE:
Drainage for the service and loading area on the east and southeast sides of the building
will include the use of oil water separators as water - quality enhancements.
WATER:
Applicant agrees to participate in a Local Improvement District for upgrading the
waterline in Strander Boulevard.
SOILS:
Soils are to be certified as suitable for foundations and other elements by a letter from a
licensed geotechnical engineer at the time of application for a building permit. Details of
the new settlement monitoring program are to be made available at that time.
Prepared by: R. S. Betts
cc: J. Pace
CITY OF TUKWIL A
MITIGATED DETERMINATION OF NONSIGNIFICANCE (MDNS)
DESCRIPTION OF PROPOSAL:
CONSTRUCT NEW 123,051 SQUARE FOOT RETAIL CENTER
WITH APPROXIMATELY 490 PARKING STALLS.
PROPONENT: M.A. SEGALE, INC.
LOCATION OF PROPOSAL, INCLUDING STREET ADDRESS, IF ANY:
ADDRESS:
PARCEL NO: 000480 -0010
SEC/TWN/RNG: NE 1/4 SECTION 26 TOWNSHIP 23N RANGE 4E W.M.
J L �••
LEAD AGENCY:
CITY OF TLIKWILA
FILE NO:. L93 -0017
The City :has determined .that the proposal does not have a probable
significant adverse.'impact on the environment. An environmental impact
statement.:—(EIS) is not required under RCW 43.21c.030(2) (c) . This
deC:°.: ion,:•wa 'made after review of a completed environmental checklist
and other :information on file with the lead agency. This information
is available to the public on request. The conditions to this SEPA
Determination: Are attached:
Thi' /'NS is issued under 197 -31- 340(2). Comments must be submitted by
pr .posal f•�r 15 days from the date below.
. The lead agency will not act on this
L'R _e1er, Responsible Official
City of Tukwila, (206) 431 -3630
6300 Southcenter Boulevard
Tukwila, WA 98383
Date
'ou may appeal: this determination to the City Clerk at City Hall, 6200
Southcenter Boulevard, Tukwila, WA 98183 no later than 10 days from the
above signature date by written appeal stating the basis of the appeal
for specific factual cb j ect i ons . You may be required to bear some of
the expenses for an appeal.
Copies _.f the procedures for :EPA appeals are avai ?.ah "e w. _h the City
arcsi r:epartn nt tsTommunity r:evelopment.
CBI
SAFECO
..•ECO INSURANCE COMPANY OF AMERICA
GENERAL INSURANCE COMPANY OF AMERICA
FIRST NATIONAL INSURANCE COMPANY
OF AMERICA
HOME OFFICE: SAFECO PLAZA
SEATTLE, WASHINGTON 98185
Bond No 5765458
KNOW ALL BY THESE PRESENTS, That wc,LA PIANTA LIMITED PARTNERSHIP a
Washington limited partnership
as Principal, and the SAFECO INSURANCE COMPANY OF AMERICA, a corporation organized under the laws of the
State of Washington, and authorized to transact the business of surety in the State of WASHINGTON
as Surety, are held and firmly bound unto THE CITY OF TUKWILA, WASHINGTON
in the just and full sum
EIGHTY -NINE THOUSAND EIGHT HUNDRED THIRTY -
°NINE & 00/ 00********* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Dollars($** *89,839.00 * ** ),
for which sum, well and truly to be paid, we bind ourselves, our heirs, executors, administrators, successors and assigns,
jointly and severally, firmly by these presents.
Sealed with our seals, and dated this 23rd day of February , 1A4
THE CONDITION OF THIS OBLIGATION IS SUCH, That, WHEREAS, LA MANTA ' LIMITED
PARTNERSHIP SHALL FULFILL ITS OBLIGATION TO PAY SAID SUM UPON DEMAND
BY THE CITY IN CONNECTION WITH CERTAIN STREET CAPACITY IMPROVEMENTS
(SEPA #93 -0067)
NOW, THEREFORE, If the said LA PIANTA LIMITED PARTNERSHIP FULFILLS SUCH
OBLIGATION
then this obligation to be void; otherwise, to remain in full force and effect.
LA YI40'.L8_ LIMITED PARTNERSHIP
A Washington limited partnership
by Metro Land Development, IncESeal)
a Washington Corporation, its Principal
General Partner
By (Seal)
Principal
M.A. Segal President
(Seal)
Principal
SAFECO INSURANCE COMPANY OF AMERICA
7
By��`�d`=6` J
Johjil{. Mc oval — Horne -in -F ct
ita
SAFECO
KNOW ALL BY THESE PRESENTS:
POWER
OF ATTORNEY
SAFECO INSURANCE COMPANY OF AMERICA
GENERAL INSURANCE COMPANY OF AMERICA
HOME OFFICE SAFECO PLAZA
SEATTLE. WASHINGTON 00185
No. 337
That SAFECO INSURANCE COMPANY OF AMERICA and GENERAL INSURANCE COMPANY OF AMERICA, each a Washington
corporation. does each hereby appoint
NNNNNNNNNNNNNNNJOHN A. McDONALD; SANDRA W. McDONALD, Seattle, Washington
its true and lawful attorney(s)-in -fact. with full authority to execute on its behalf fidelity and surety bonds or undertakings and other
documents of a similar character issued in the course of its business. and to bind the respective company thereby.
IN WITNESS WHEREOF, SAFECO INSURANCE COMPANY OF AMERICA and GENERAL INSURANCE COMPANY OF AMERICA have each
executed and attested these presents
this 4th day of January , 19 93 .
CERTIFICATE
Extract from the By -Laws of SAFECO INSURANCE COMPANY OF AMERICA
and of GENERAL INSURANCE COMPANY OF AMERICA:
"Article V. Section 13. - FIDELITY AND SURETY BONDS ... the President, any Vice President, the Secretary. and any Assistant Vice
President appointed for that purpose by the officer in charge of surety operations. shall each have authority 10 appoint individuals as
attorneys -in -fact or under other appropriate titles with authority to execute on behalf of the company fidelity and surety bonds and
other documents of similar character issued by the company in the course of its business ... On any instrument making or evidencing
such appointment, the signatures may be affixed by facsimile. On any instrument conferring such authority or on any bond or undertaking
of the company. the seal. or a facsimile thereof. may be impressed or affixed or in any other manner reproduced: provided. however.
that the seal shall not be necessary to the validity of any such instrument or undertaking"
Extract from a Resolution of the Board of Directors of SAFECO INSURANCE COMPANY OF AMERICA
and of GENERAL INSURANCE COMPANY OF AMERICA adopted July 28, 1970.
"On any certificate executed by the Secretary or an assistant secretary of the Ccrnpany setting out.
(1) The provisions of Article V. Section 13 of the By -Laws, and
(ii) A copy of the power-of - attorney appointment. executed pursuant thereto, and
(iii) Certifying that said power -of- attorney appointment is in full force and effect,
the signature of the certifying officer may be by facsimile. and the seal of the Company may be a facsimile thereof."
I, R. A. Pierson, Secretary of SAFECO INSURANCE COMPANY OF AMERICA and of GENERAL INSURANCE COMPANY OF AMERICA,
do hereby certify that the foregoing extracts of the By-Laws and of a Resolution of the Board of Directors of these corporations. and
of a Power of Attorney issued pursuant thereto, are true and correct. and that both the By -Laws. the Resolution and the Power of
Attorney are still in full force and effect.
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the facsimile seal of said corporation
this 23RD day of FEBRUARY
5 -974/EP 1/93
. 19 94
"0 Registered trademark of SAFECO Corporation.