Loading...
HomeMy WebLinkAboutPermit L93-0081 - WARREN DANA - SEGALE BUSINESS PARK SEPA ENVIRONMENTAL IMPACT STATEMENTl93-0081 18200 andover park west l93-0082 segale business park CITY OF TUKWILA MITIGATED( TERMINATION OF NONSIGNIFI: 4CE (MDNS) DESCRIPTION OF PROPOSAL: Construction of a 783 space parking lot with landscaping as shown in attachments A -I. The lot is partially developed. Developing the final 5.5 acres of this 8.35 acre lot will leave it fully used, with an impervious surface coverage of about 95 percent. Portions of landscaping will be located on adjacent lots to the east and west. PROPONENT: DANA WARREN LOCATION OF PROPOSAL, INCLUDING STREET ADDRESS, IF ANY:. ADDRESS: 18200 ANDOVER PK W PARCEL NO: 352304 -9120 SEC /TWN /RNG: NE 35 -23 -4 LEAD AGENCY: CITY OF TUKWILA FILE NO: L93 -0081 The City has determined that the proposal does not have a probable significant adverse impact on the environment. An environmental impact statement (EIS) is not required under RCW 43.21c.030(2)(c). This decision was made after review of a completed environmental checklist and other information on file with the lead agency. This information is available to the public on request. The conditions to this SEPA Determination are attached. s DNS is issuedA der 197 -11- 340(2). Comments must be submitted by /9 9 The lead agency will not act on this proposal 15 days from the date below. L. R ck Beeler, Responsible Official City of Tukwila, (206) 431 -3680 6300 Southcenter Boulevard Tukwila, WA 98188 4./ff* You may appeal this determination to the City Clerk at City Hall, 6200 Southcenter Boulevard, Tukwila, WA 98188 no later than 10 days from the above signature date by written appeal stating the basis of the appeal for specific factual objections. You may be required to bear some of the expenses for an appeal. Copies of the procedures for SEPA appeals are available with the City Clerk and Department of Community Development. B.3.d. Mitigating Conditions to the Environmental Determination of Non - significance for L93 -0081 (Segale Business Park Parking Area) January 10, 1994 (i) The property owner will provide King County a permanent right of entry for inspection, repair and maintenance by King County and its agents, of the left bank of the Green River within the property owner's land in Section 35, Township 23 North, Range 4 East, WM in King County. This right of entry shall be provided to King County in recordable form prior to final approval of the construction. The basis for this easement is a previous agreement between the property owner and King County during construction of certain flood control work (e.g., the dike). Execution of this easement will complete the earlier agreement within a specific time frame. (ii) The City and County plan to provide a levee repair and improvement project design in 1994, with construction in 1995, within the dike maintenance easement area (see above). If the property owner desires to fill over the levee drainage material prior to construction of the project by the City and King County, the property owner will build the levee drainage collection facility (pipe) and place filter fabric on top of the facility in accordance with City of Tukwila specifications prior to any grading /fill construction. Should the City and King County fail to construct the levee drainage collection facility prior to December 31, 1995, the property owner may fill over the levee drainage material by placing filter fabric (no pipe) on top of the facility in accordance with City of Tukwila specifications. (iii) A portion of the proposed construction encroaches into the northern easement area tacit ). This and any other materials placed within the dike easement area as a result of the proposed construction, shall be removed by the property owner within thirty days of written request of the City to allow installation of the levee drainage collection facility. Construction of this facility is anticipated in 1995. L93 -0081: Segale Business Park January 3, 1994 B.14.g. B.4.d. Page 2 Additional traffic mitigation may be required if the Simulcast facility, which this parking lot supports, generates more traffic than anticipated, and /or unanticipated traffic safety or capacity problems are created that are directly attributable to the separated 783 stall parking lot. The traffic analysis and mitigation from the associated simulcast wagering facility from Tukwila file number L93 -0067 is herewith incorporated into this environmental determination. (i) The property owner shall submit a letter of agreement to provide landscaping as shown in ;it? A, within 60 days of a written request by the City of Tukwila following completion of the dike levee repair and improvement project (see B.3.d.(ii)), or determination by the City of Tukwila that the dike levee repair and improvement project will not be funded or built prior to December 31, 1995. The applicant is willing to provide required landscaping now. However, installation at this time would result in needless costs, since the plants would have to be taken out and replaced as part of the 1995 levee maintenance project. This letter shall be provided prior to final construction approval. (ii) Plantings on the dike bank may be modified or removed upon a clear demonstration of compelling safety needs (e.g., to ensure dike stability) and no feasible alternatives. (iii) The following landscape easements shall be recorded prior to final approval of the construction in order to provide the landscaping as proposed in (1) A 5 ft. width along the western project site property line from Lot 2 of Tukwila Boundary Line Adjustment file L93 -0085 (2) An area of varying width between the project site's eastern property line and the western edge of the top of the left bank dike, from Lot 352304 -9018 (4ttachmo 4). file:sgle180 \dns SEPA ENVIRONMENTAL IMPACT STATEMENT ENVIRONMENTAL CHECKLIST Control No. P -6- 93 -0 14- Epic File No. L?.?-* COB 8 Fee $325.00 Receipt No. A BACKGROUND 1. Name of proposed project, if applicable: Segale Business Park - Temporary parking lot 2. Name of applicant: Segale Business Park 3. Address and phone number of applicant and contact person: Segale Business Park P.O.Box 88050 Tukwila, Washington 98138 Contact person: Dana Warren - tel #: 575 -2000 4. Date checklist prepared: October 20, 1993 5. Agency requesting Checklist: City of Tukwila 6. Proposed timing or schedule (including phasing, if applicable): SEPA Permit 10/22/93 - 1/22/94 Shoreline Permit 10/22/93 - 1/22/94 Grading & Paving Permit 11/22/93 - 1/22/94 Temporary parking lot construction 1/23/94 - 1/30/94 7. Do you have any plans for future additions, expansion, or further activity related to or connected with this proposal? If yes, explain. No 8. List any environmental information you know about that has been prepared, or will be prepared, directly related to this proposal. EIS for Segale Business Park - 1974 Shoreline permit application 9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the property covered by your proposal? If yes, explain. No 10. List any governmenL-- approvals or permits that -rill be needed for your proposal. SEPA Permit Shoreline Permit Grading & Paving Permit 11. Give brief, complete description of your proposal, including the proposed uses and the size of the project and site. There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You do not need to repeat those answers on this page. Section E requires a complete description of the objectives and alternatives of your proposal and should not be summarized here. The project involves the construction of a temporary (maximum 2 years) parking lot in support of a simulcast /wagering facility as previously reviewed under SEPA L93 -0067. A'' - ,i NA L YS e s FlZ or, Trm-r -D c c. u,k.A Chr. r r1-r47' fiCrfc.C(UcTr,` IN c_o2PoILA 7-0 THt-S ONC- 12. Location of the proposal. Give sufficient information for a person to understand the precise location of your proposed project, including a street address, if any, and section, township, and range, if known. If a proposal would occur over a range of area, provide the range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist. The development area is shown on the attached site plan (Attachment A) The project site is located on tax lots 352304 -9120 and 352304 -9121 at 18120 Andover Park W e s t . . 13. Does the proposal lie within an area designated on the City's Comprehensive Land Use Policy Plan map as environmentally sensitive? Yes, the eastern portion of the property lies within 200 feet of the Green River shoreline. A e C cm 7" E 0 0 1'47)A R Y L r iN' C'"" A ,:l CJ S%7-1 es rr Y IS k . ( I . . P r.r•r -r..D 11'/ A_/. �-A C 6/ ilEY.1 r A . 7-(767- PR a ,Y CC. "7- r /S L c) CA r S CCA( L -O -47) -7-K (....J (C,A Po ut1' bARY I I1\/0- /C TUS --1-7-1 C'.'1\(( F/L W Lrf.a 0a8 .. G, OT. 1 1 /c- lcrra AI0U7r �,S AC_(Z..E-S. TO BE COMPLETED BY APPL1.:ANT B. ENVIRONMENTAL ELEMENTS 1. Earth 2 a. General description of the site (circle one): Flat, rolling, hilly, steep slopes, mountainous, other. Flat b. What is the steepest slope on the site (approximate percent slope)? Approximately 2 percent c. What general types of soils are found on the site (for example, clay, sand, gravel, peat, muck)? If you know the classification of agricultural soils, specify them and note any prime farmland. Sand and gravely soils d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, describe. No e. Describe the purpose, type, and approximate quantities of any filling or grading proposed. Indicate source of fill. Approximately material will cut /fill. 3,700 cu yds of on site be graded for a balanced f. Could erosion occur as a result of construction, or use? If so, describe. g. None is expected relatively flat. clearing, generally because the site is About what percent of the site will be covered with impervious surfaces after project construction (for example, asphalt or buildings)? Approximately 95 percent of the site will be covered with impervious surface. -3- Evaluation for Agency Use Only h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: Silt fences and siltation ponds will be used to control storm water prior to discharge into existing catchbasins. 2. Air a. What types of emissions to the air would result from the proposal (i.e., dust, automobile odors, industrial wood smoke) during construction and when the project is completed? If any, generally describe and give approximate quantities, if known. Normal emissions and dust associated with use of construction equipment. After construction normal exhaust associated with passenger vehicles. b. Are there any off -site sources of emissions or odor that may affect your proposal? If so, generally describe. No c. Proposed measures to reduce or control emissions or other impacts to air, if any: During grading water (via water truck) will be used to minimize dust. Construction equipment will meet local, state and federal emission standards. 3. Water a. Surface: 1) Is there any surface water body on or in the immediate vicinity of the site (including year -round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names. if appropriate, state what stream or river it flows into. Yes, the Green River is along the eastern property line. There is a dike separating the property from the Green River. Storm water from the site will flow into the City of Tukwila storm water system -4- Evaluation for Agency Use Only �rfCr Ab7-AC c.?\C l Fc. -0 1) 7 "le 0 c., 1); ( rf ` C T) OF HA (use" ? - { r•c F�tZ !N( A Kg- ovS FR- "M l T, and is conveyed to the P -17 pond for retention /detention prior to discharge into the Green River. 2) Will the project require any work over, in, or adjacent to (within 200 feet) the described waters? If yes, please describe and attach available plans. Yes, The site will be graded and paved for temporary use as a parking lot. (see attachment A site plan) 3) Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site what would be affected. Indicate the source of fill material. 4 None Will the proposal require surface water withdrawals or diversions? Give general description, purpose, and approximate quantities, if known. No 5) Does the proposal lie within a 100 -year floodplain? If so, note location on the site plan. No 6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and anticipated volume of discharge. No b. Ground: 1) Will ground water be withdrawn, or will water be discharged to ground water? Give general description, purpose, and approximate quantities, if known. No -5- Evaluation for Agency Use Only 2) Describe waste materials that will be discharged into the ground from septic tanks or other sources, if any (for example: domestic sewage; industrial, containing the following chemicals...; agricultural; etc.). Describe the general size of the system, the number of such systems, the number of houses to be served (if applicable), or the number of animals or humans the system(s) are expected to serve. No waste materials will be discharged. c. Water Runoff (including storm water): 1) Describe the source of runoff (including storm water) and method of collection and disposal, if any (include quantities, if known). Where will this water flow? Will this water flow into other waters? If so, describe. Runoff from parking area will flow into existing catch basins which are connected to City of Tukwila Storm drainage system and is conveyed to the P -17 pond for retention /detention prior to discharge into the Green River. 2) Could waste materials enter ground or surface waters? If so, generally describe. No. d. Proposed measures to reduce or control surface, ground, and runoff water impacts, if any: Storm water from the parking lot will flow via the P -17 channel to the P -17 Detention pond. The P -17 channel provides biofiltration. 4. Plants 2 a. Check or circle types of vegetation found on the site: X Deciduous tree: alder, maple, aspen, other: London Plain Trees Evergreen tree: fir, cedar, pine, other X Shrubs Grass Pasture Crop or grain Wet soil plants: cattail, buttercup, bulrush, skunk cabbage, other Water plants: water lily, eelgrass, milfoil, other Other types of vegetation b. What kind and amount of vegetation will be removed or altered? None, the proposed parking area is clear of vegetation. c. List threatened or endangered species known to be on or near the site. None d. Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation on the site, if any: None, proposed at this time. 5. Animals a. Circle any birds and animals which have been observed on or near the site or are known to be on or near the site: Birds: hawk, heron, eagle, songbirds, other: None observed Mammals: deer, bear, elk, beaver, other: None observed Fish: bass, salmon, trout, herring, shellfish, other: None observed, although the Green River is known to contain fish. -7- b. List any threatened or endangered species known to be on or near the site. None c. Is the site part of a migration route? If so, explain. Part of the Pacific flyway d. Proposed measures to preserve or enhance wildlife, if any: None 6. Energy and Natural Resources a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet the completed project's energy needs? Describe whether it will be used for heating, manufacturing, etc. None required b. Would your project affect the potential use of solar energy by adjacent properties? If so, generally describe. No c. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts, if any: None 7. Environmental Health a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal? If so, describe. No -8- • 1) Describe special emergency services that might be required. None 2) Proposed measures to reduce or control environmental health hazards, if any: None b. Noise 1) What types of noise exist in the area which may affect your project (for example: traffic, equipment, operation, other) ? 3 Existing traffic on adjacent streets. What types and levels of noise would be created by or associated with the project on a short -term or a long -term basis (for example: traffic, construction, operation, other)? Indicate what hours noise would come from the site. Normal noise from construction equipment during construction (approximately 7:00 am to 5:00 pm) . Noise from vehicles once the lot is in use (approximately 10:00 am to 8:00 pm). Proposed measures to reduce or control noise impacts, if any: All equipment will be operated with required local, State and Federal mufflers. 8. Land and Shoreline Use a. What is the current use of the site and adjacent properties? Current use of the site: Vacant land Adjacent properties current use: Warehouse and office. b. Has the site been used for agriculture? If so, describe. No -9- Evaluation for Agency Use Only Evaluation for Agency Use Only c. Describe any structures on the site. None d. Will any structures be demolished? If so, what? No e. What is the current zoning classification of the site? M -2 (Heavy Industry) f. What is the current comprehensive plan designation of the site? Heavy Industrial g. If applicable, what is the current shoreline master program designation of the site? Urban h. Has any part of the site been classified as an "environmentally sensitive" area? If so, specify. This site is shown on the City maps as being within a "sensitive area" described to be "of potential seismic instability, with soft, loose sand and a shallow ground water table". i. Approximately how many people would reside or work in the completed project? j None Approximately how many people would the completed project displace? None k. Proposed measure to avoid or reduce displacement impacts, if any: N/A 1. Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, if any: Proposal is consistent with current zoning and comprehensive plan designation. -10- Evaluation for Agency Use Only 9. Housing a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low- income housing? None b. Approximately how many units, if any, would be eliminated? Indicate whether high, middle, or low- income housing. None c. Proposed measure to reduce or control housing impacts, if any. None 10. Aesthetics a. What is the tallest height of any proposed structure(s), not including antennas; what is the principal exterior building material(s) proposed? No structures are proposed. b. What views in the immediate vicinity would be altered or obstructed? None c. Proposed measure to reduce or control aesthetic impacts, if any: None 11. Light and Glare a. What type of light or glare will the proposal produce? What time of day would it mainly occur? None b. Could light or glare from the finished project be a safety hazard or interfere with views? No c. What existing off -site sources of light or glare may affect your proposal? None d. Proposed measures to reduce or control light and glare impacts, if any: None 12. Recreation a. What designed and informal recreational opportunities are in the immediate vicinity? There is a pedestrian /bike trail that runs along the East side of the Green River (opposite river bank). b. Would the proposed project displace any existing recreational uses? If so, describe. No c. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be provided by the project or applicant, if any: None 13. Historic and Cultural Preservation a. Are there any places or objects listed on, or proposed for, national, state, or local preservation registers known to be on or next to the site? If so, generally describe. None b. Generally describe any landmarks or evidence of historic, archaeological, scientific, or cultural importance known to be on or next to the site. None c. Proposed measures to reduce or control impacts, if any: None -12- Evaluation for Agency Use Only Evaluation for Agency Use Only 14. Transportation a. Identify public streets and highways serving the site, and describe proposed access to the existing street system. Show on site plans, if any. Andover Park West (private street) on the west which connects to South 180th on the north. (See Attachment A site plan) b. Is the site currently served by public transit? If not, what is the approximate distance to the nearest transit stop Yes Metro presently has service along both Andover Park West and South 180th Street. c. How many parking spaces would the completed project have? How many would the project eliminate? Added 780 Deleted None d. Will the proposal require any new roads or streets, or improvements to existing roads or streets, not including driveways? If so, generally describe (indicate whether public or private). Andover Park West (private street) is fully improved with curb and gutter. Three (3) new curb cuts will be made. 2 e. Will the project use (or occur in the immediate vicinity of) water, rail, or air transportation? If so, generally describe. There is an existing rail line along the northern property line. The proposed temporary use will not use rail. f. How many vehicular trips per day would be generated by the completed project? If known, indicate when peak volumes would occur. None, this parking lot is being developed in -13- g. Evaluation for Agency Use Only support of a simulcast /wagering facility as previously discussed in SEPA L93 -0063 Proposed measures to reduce or control transportation impacts, if any: Traffic mitigation as discussed in SEPA L93- 0063 for simulcast /wagering facility. 15. Public Services a. Would the project result in an increased need for public services (for example: fire protection, police protection, health care, schools, other)? If so, generally describe. No b. Proposed measures to reduce or control direct impacts on public services, if any. None 16. Utilities a. Underline utilities currently available at the site: electricity, natural gas, water, refuse service, telephone, sanitary sewer, septic system, other. b. Describe the utilities that are proposed for the project, the utility providing the service, and the general construction activities on the site or in the immediate vicinity which might be needed. None C. Signature The above answers are true and complete to the best of my knowledge. I understand that the lead agency is relying on them to make its decision. Signature 04/1.1144eW Date Submitted /6043 PLEASE CONTINUE TO THE NEXT PAGE. -14- TO BE COMPLETED BY APPLICANT Evaluation for Agency Use Only E. SUPPLEMENTAL SHEET FOR ALL PROJECT AND NON - PROJECT PROPOSALS The objectives and the alternative means of reaching the objectives for a proposal will be helpful in reviewing the foregoing items of the Environmental Checklist. This information provides a general overall perspective of the proposed action in the context of the environmental information provided and the submitted plans, documents, supportive information, studies, etc. 1. What are the objective(s) of the proposal? Construct a temporary parking lot to support a simulcast /wagering facility. 2. What are the alternative means of accomplishing these objectives? Finding another site. 3. Please compare the alternative means and indicate the preferred course of action: This property is owned by the proponent and as is indicated in this check list is ready to build. Therefore, this site is preferred for accommodation of this use. 4. Does the proposal conflict with policies of the Tukwila Comprehensive Land Use Policy Plan? If so, what policies of the Plan? No 5. Proposed measures to avoid or reduce the conflict(s) are: N/A -15- „- .i;i:��:d. za r' ✓.l �Y�rt.. �+. rtb'r!ytt`72�awi�:..`:7ty�sM -: ol«,: k. t�ti5Y "£'J�h:?,..S:,��;'.'iY..1;�.FRt N: J; 3'. ^,4�_:»rti.�4Y17..+r.+r�vmw.oYv Determination of Non - significance for L93 -0081 (Segale Business Park Parking Area) List of Attachments January 10, 1994 A. Property Location Map B. Site Plan Showing Shoreline Permit Sections, Landscape Easement Locations and Final Grades. C. Shoreline Cross - sections A -A through D -D D. Shoreline Cross - sections E -E through H -H E. Shoreline Cross - sections I -I through L -L F. Shoreline Cross - sections M -M through P -P G. Shoreline Cross - sections Q -Q through T -T H. Landscape Plan I. Existing Levee Improvement With Approximate Location of Landward Repair /Maintenance Easement Area and Shoreward Edge of Proposed Parking Improvements. City Tukwila DEVELOPER'S PROJECT WARRANTY REQUEST FORM .:.. td .. . � ..d�relo ar�thorJ�ed .. 1 ;:: �.: >::::: >: >:;:: <, °'<� ...:.............. .. b ..I .sta :.. NAMEOFDEVELOPMENT: SEGALE BUSINESS PARK - LOT 4 PARKING LOT DATE: MARCH 1, 199943 DEVELOPMENTADDRESS: 18120 ANDOVER PARK WEST PERMITNO.: ptii94- 0015 -0081 CASH ASSIGNMENT NAME: MARIO A. SEGALE, d //b /a 1 SEGALE BUSINESS PARK TEL. NO. (206) 575 -2000 ; SHALL BE REFUNDED BY MAILING TO: ADDRESS: p . 0. Box 88050 (please print) CITY/STATE/ZIP Tukwila, WA. 98138 DESCRIPTION OF ITEMS TO BE COMPLETED (REFERENCE PLANS/DOCUMENTS WHERE ITEMS ARE DESCRIBEDI: Install an additional one (1) foot of landscaping along the western portion of Lot 4 within Segale Business Park for a total of fifteen (15) feet of front yard landscaping. Reference: SEPA Permit #L -93 -0081; Public Works (Land Altering) Permit 4 /PW94 -0015 As the owner, or authorized agent of the owner, I hereby submit cash or cash equivalent in the amount of $ 4,478.67 ($150% of value to complete work described above) and attach supporting documentation for value of work. I will have this wort( carried out and call for a final Inspection by this date: ( 03 / 01 / 96 ), or risk having the City use these funds to carry out the work with their own contractor or in -house manpower. If I fail to carry out the wort(, I hereby authorize the City to go onto the property to carry out completion of the above deficiencies. I further agree to complete all work listed abov rior to requesting inspection and release of these funds. SIGNED: �� Mario A. Segale, /b /abEGALE BUSINESS PARK TITLE: Owner THIS FUND IS AUT SIGNED: AMOUNT /1 4 4 7 8, 6 7 CASH ) DEPARTMENT H 0 BE ACCEPTED. CASH EQUIVALENT DEPOSITED THIS DATE: 3 CITY RECEIPT NO. s sU 1007A 9CO .HDIN.OXIYC4MCN \`NWNigY.9Ci00. '\ Vh 'OG�n9CS�i90XA \ \JpV:4.a'�+"�": RECEIVED BY: • ..cTTM. .IKC?:M •T \•M�(•T \.`•.v,SCttC�(i.:q C.MttC:� \ \W�1..xt »:cc `!C \tigT:`\M\tC XS». ..».»nc- .,QN» \nC:A..' .\ (�`. `\`'cC Z:...x.cct,\\..X,»»...xw.., :•r.i @E 72 HOUR NOTIFICATION FOR INSPECTION AND RELEASE OF FUNDS DEVELOPERS REPRESENTATIVE: All work identified in Section 1 of this form has now been completed and returned to department which authorized warranty. I hereby request inspection and release of my cash/cash equivalent. DATE: icr CHECKED BY: I have reviewed the above work and found it acceptable and therefore authorize the release of the above cash assignment. AUTHORIZED BY: DEPARTMENT: • to be cO pt®ted ysr CASH EQUIVALENT - LETTER AUTHORIZING RELEASE CASH CITY CHECK NO. Upon completion through Section 2, Finance personnel shall send copies to: - Developer - Finance Department - Permit Coordinator, DCD AMOUNT: RELEASED THIS DATE: RELEASED BY: , FINANCE DEPT. Upon completion of entire form, Finance personnel shall send copies to: - Developer - Finance Department - Permit Coordinator, DCD 0013190 March 1, 1994 SEGALE BUSINESS PARK PARKING LOT CORRECTION Lot 4 @ 18120 Andover Park West Work Item # of Units Unit Price Extension Remove asphalt (1' width) 87.5 SY $5.00 /SY $435.00 Remove curb 785 LF $0.50 /LF 392.50 Restripe parking area 90 LF $0.25/LF • 22.50 Install curb 785 LF $1.90 /LF 1,491.50 Install landscaping w /in 1' area (22 CY topsoil) 22 CY $19.00/CY 418.00 SUBTOTAL 2,759.50 Sales Tax (pa 8.2 %) 226.28 TOTAL $2,985.78 Filed for Record at Request of 9403011034 Name MARIO A. SEGALE, D /B /A SEGALE BUSINESS PARK rJ Address c/o ANN J. NICHOLS P. 0. Box 88050 ; a City and State TUKWILA, WASHINGTON 98138 LANDSCAPE EASEMENT 4:. A. MARIO A. SEGALE, A MARRIED MAN, ACTING WITH RESPECT TO HIS SEPARATE PROPERTY AND ESTATE, d /b /a SEGALE BUSINESS PARK ( "Grantor "), is the owner of that certain real property located in King County, Washington and legally described as follows: Lot 2 of City of Tukwila Boundary Line Adjustment No. 93 -0085, recorded under King County? Auditor's File No. 9311301961. E B. MARIO A. SEGALE, A MARRIED MAN, ACTING WITH RESPECT TO HIS SEPARAT PROPERTY AND ESTATE, d /b /a SEGALE BUSINESS PARK ( "Grantee "), is the owner of that certain re al property located in King County, Washington and legally described as follows: Lot 4 of City of Tukwila Boundary Line Adjustment No. 93 -0085, recorded under King County Auditor's File No. 9311301961. C. Grantor desires to establish a landscape easement over portions of Lot 2 for the benefit of Lot 4. NOW THEREFORE, there are hereby created, declared and established, the following easements: 1. A nonexclusive easement is hereby reserved over the easterly five (5) feet of Lot 2 as it adjoins Lot 4 (hereinafter the "Easement Area ") for the purpose of providing landscaping to benefit Lot 4. 2. The easement hereby created and imposed upon Lot 2 shall run with the land, and shall inure to the benefit of and be binding upon said Lot 2 and the owners thereof, and their heirs, successors and assigns. 3. All maintenance of the landscaping within the easement established herein shall be undertaken by Grantee, its heirs, successors and assigns. 4. Grantee, its heirs, successors and assigns shall save, defend indemnify and hold Grantor its heirs, successors and assigns harmless from all liability or damage arising out of any act or acts of Grantee within the easement area. IN WITNESS WHEREOF, this instrument has been executed this 23rd day o -Febrt y-, \1994. ,tip' \'''''' ORIGIN !'''''' i '.''' ' - - . 1 . 1 \\I.._ Mario A. Segale, d \b \a Segale Business Park STATE OF WASHINGTON COUNTY OF KING ss. ) On this day personally appeared before me MARIO A. SEGALE, a married man dealing in his separate property and estate, d /b /a SEGALE BUSINESS PARK, known to me to be the individual described in and who executed the foregoing instrument, and acknowledged that he signed the same as his free and voluntary act and deed for the uses and purposes therein mentioned. z + (° c%4 \SBP1D O C S\LOT2LS. ESM Signature of Notar 6e4,-L. 1 Stamp Nark of Notary Print or p y Notary Public in and fo the State of Washington, residing at My commission expires 1 cf December 29,1993 SEGA L E ;BUSINESS FA ARK Ross Earnst City of Tukwila Public Works 6300 Southcenter Blvd. Tukwila, Wa. 98188 Re: Temporary Parking Lot for Simulcast Facility SEPA Comments for Dike Drainage Easement Dear Ross: We have reviewed Public Works comments with regards to the SEPA review for the temporary parking lot for the simulcast facility and request that the following clarifications be made: o The City and County plan to provide a levee repair and improvement project design in 1994 and construction in 1995. If the property owner desires to fill over the levee drainage material prior to construction of the project by the City and King County, the property owner will build the levee drainage collection facility (pipe) and place filter fabric on top of the facility in accordance with City of Tukwila specifications prior to any grading /fill construction. o If required by the City of Tukwila the materials already placed within the dike maintenance easement over the existing dike drainage system will be removed by the property owner within thirty days of written request of the City to allow installation of the levee drainage collection facility. Construction of this facility is anticipated in 1995. O • • • r The property owner will provide King County a permanent right of entry for inspection, repair and maintenance by King County and its agents, of the left hank of the Green River within property owner's land in Section 35,Township 23 North, Range 4 East, W.M., in King County. This right of entry shall he provided to King County in recordable form prior to issuance of the Certificate of Occupancy. P ;; , .. 111 Srr/NG i ON 111 TELEPHONE 206 2000 • FAX 205 575 -; 837 Additional traffic mitigation wo. may be required if the Simulcast generates more traffic than anticipated, and /or unanticipated traffic safety or capacity problems are created that are directly attributable to the separated 783 ' "' stall parking lot. Yours very truly, SEGALE BUSINESS PARK (i7o4 Dana Warren summary property line location map -- MAP Land Surveyor's Certificate: This Boundary Line Adjustment /Lot Consolidation correctly represents a survey* made by me or under. my direction in conformance with the requirements of appropriate State statute. Certificate No. /5—.0 3 3 A lot consolidation does not require a survey of the perimeter unless the lines are adjusted. Map on File Direction: Scale: Stamp: Page 9- MAP Land Surveyor's Certificate: This Boundary Line Adjustment /Lot Consolidation correctly represents a survey* made by me or under. my direction in conformance with the requirements of ap ropriate State statute. Certificate No. /5; 3 3 A lot consolidation does not require a survey of the perimeter unless the lines are adjusted. Lq3ooV Map on File Direction: Scale: Stamp: Page 30206-7C OS tmrr 4-/ZC- AC COI 7V 1/4 IC 1/1 SEC 3>. T234 44C VN 2112 1• + 30' A GREEN E RIVER H 0-A MW 2 17.7 * \ - SITE PLAN i•• 30' AND VER PARK WEST - VICINITY MAP SEGALE BUSINESS PARK 0 600' 1200' 1000' LAND USE DATA: ?IMPOSED ?AMONG STALLS • 743 CONSTRUCTION NOTES: 1. ALL VOON IANS127 010 140124 ALS SHALL MOWN 10 11C CITT d TNAIY7LA'S SIMDAD20 AND SPCC91CAT111NS. TIC DRAIIN1. PAVING AND WAINACC CONSTRUCTION 0204.4 IC21 CITT OS IUNVIIA g0U111E1CN1S. 2. ONE SITE WADING IS SALANC20 K1VE(N TIC OMITS •447• MD 4ILL• NATEDIAL LEGEND: {S • D IST LIGHT STA00M0 • 10.231 SMUG TIES • MST =AVM 7102 • MST 11I0114A SHOAT 04 • 21a3T WAWA VALVE U • 2lIST nu NTOIIANT • 287017G CONTI= 2L+« • 2101244 7AV'NT ELEVATION X74— • SWISH COMM [- aoOi,C.7 1111.614; PROPERTY LINE CAD PILE NAME. APEPARK3 /201 SEGALE BUSINESS PARK I W 1 30' I•+ 00/79/93 ANDOVER PARK VEST TEMPORARY PARKING LOT 7Y TM SITE PLAN =R w CR NONE 201 -932%0 LAS•bc•in PROPERTY LINE 1 M N GREEN RI VER I' a 30' Q R Z EXISTING AC -PARKING - LOT rein ANDOVER ATE PARK WEST O SITE PLAN 1'= 30' / / 4.41:%47 8223' PROPERTY LINO LEGEND: .0.- 000T UONT ST49A0D N— • (0319214 COMMA • 4012 SMUG( WI rue. • 300033 PAV131 CLCVAT1OI • OUT SYCAMORE TRL • —e0— • 3•1033 0010. • 0053 P30TY00 31211001 pp • OM 311111 VAVC 7ME • 9009 Mt 111011ANT • CAC FILE NANEM APEPARK3 /:0l SEGALE BUSINESS PARK r S , 30' jaw 10/19/93 re ORM law. NONE ANDOVER PARK VEST TEMPORARY PARKING LOT SITE • PLAN 11Y ••J••5 9X 201- 979%I1 L'I3.'O08I ANDOVER PARK WEST 0 30 25 20 15 10 30 25 20 15 10 fx 0 3 ' 100' WIDE HIGH IMPACT ENVIRONMENT 60' WIDE LOW IMPACT 40' WIDE RIVER ENVIRONMENT ENVIRONMENT 40 � • $g FINISH GRADE(EXISTINC PARKING LOT) 33rn 2 l `z / DIKE \ ;� 0 2 M FINISH GRADE(PARKINO LOT) Hi< DIKE \ .1.41� 4 ..J n 5 0 507[ EXISTING PAVED PARKING LOT \.61i \ g li ' y � y - 2.007t y ooz _, ` C-C a. =a i g GREEN �' WIDE LOW IMPACT CPOSS - SECTION A -A CFOSS CFOSS RP K GREEN nri �J.'iI)( t- >� 12 1- - 20'(H); 1- • 5'(/) 100' WIDE HIGH IMPACT ENVIRONMENT I PO' WIDE LOW IMPACT A0' WIDE RIVER 15 j 6 7 0 2 M FINISH GRADE(PARKINO LOT) Hi< DIKE \ .1.41� 4 0 30 25 20 15 10 GRADED SURFACE FINl9i GRADE(PARKING L011 DIKE 4 VF -�- 5 0 507[ EXISTING PAVED PARKING LOT I 11 40' WIDE RIVER 0 � S ,..i., 1 1 6 W 73 ' iZ O f GREEN 6 W y � y - 2.007t y ooz _, ` C-C a. =a i g GREEN �' WIDE LOW IMPACT - SECTION 1' • 2014): 1' • 5'(V) 100' WIDE HIGH IMPACI B -B ENVIRONMENT CFOSS CFOSS - SECTION CPOSS nri 0 30 25 20 15 10 GRADED SURFACE FINl9i GRADE(PARKING L011 DIKE 4 0 30 25 20 15 10 FINISH GRADE(PARKINO LOT) $ R 4 k VF -�- 0 507[ i i 7Tw � p Y3W'li y � y - 2.007t y ooz _, ` C-C a. =a i g GREEN :,,, ry� a < GREEN i_ id CFOSS - SECTION CPOSS - SECTION �J.'iI)( t- >� r • 20'(H); 1' • 5(J) 100' WIDE HICK IMPAC' ENVIRONMENT GO' WIDE LOW IMPACT ' 40' WIDE RIVER x I$ W 7 0 30 25 20 15 10 FINISH GRADE(PARKINO LOT) $ R 4 k 111 a 0 507[ tsl i < �3a � -200 2 ° _, :,,, ry� a < GREEN i_ id CPOSS - SECTION D -D 1' • 2014): 1' • 5(V) b i 25 20 RIVER 15 10 30 25 20 RIVER 15 10 30 25 20 RIVER 15 10 30 25 20 RIVER 15 10 E=11Z1C51Z11111 I0I•1.IAV CAD F1tE NAME: APED I4115/201(P10T • l0• SCALE) SEGALE BUSINESS PARK ..� AS 910 maw ORM •� NONE ANDOVER PARK WEST TEMPORARY PARKING 10T CROSS- SECTIONS/DETAILS 201 -93XXX L93.00a, 1. ANDOVER PARK WEST 30 25 20 15 IO 30 25 15 10 30 25 20 15 10 25 20 15 10 GRADED SURFACE FINISH GRADE(PARKING LOT) 100' WIDE HIGH IMPACT ENVIRONMENT 2 60' WIDE LOW IMPACT 40' WIDE RIVER ENVIRONMENT ENVIRONMENT _0 4 4. /DIKE b .00xx , '131 C }D SOx a o i 7 ..11 7 a ,WI we, -2 00X -1.00 v. -2.006 -1.006 CROSS - SECTION ,.2,).(8); 1.. 5. T Aaa YV Q P GREEN _-w pi100' WIDE HIGH pi IMPACT ENVIRONMENT 80' WIDE LOW I 1• - 20'(11): r - 5(V) CROSS- SECTION E -E NO 100' WIDE HIGH IMPACT ENVIRONMENT 1 60' WIDE LOW IMPAC- 40' WIDE RIVER IS 6 W GRADED SURFACE FIN1511 GRADE(PARKING 101) S OWE \ �'�•' V ,a aSDS a o lir WAWA ' ■ , ik ,.1 z 7 a ,WI we, -2 00X ...am v. -2.006 -1.006 CROSS - SECTION ,.2,).(8); 1.. 5. F-F _-w pi100' WIDE HIGH pi IMPACT ENVIRONMENT 80' WIDE LOW I GRADED SURFACE FIN101 GRADE(PARKING LOT) 8 DIKE Y1 OW +03 . a o 7 a ,WI v. -2.006 -1.006 war _-w ikul 1111 1 CROSS-SECTK* 1• - 20'(11): r - 5(V) G-G -I -h 100' WIDE HIGH IMPACT ENVIRONMENT 60' WIDE LOW IMPACT 40' WIDE R1 R i GRADED SURFACE F1N1514 GRADE(PARKING LO 30 25 20 RIVER 15 10 30 25 20 GREEN RIVER 15 10 25 2D GREEN RIVER 15 z�z 10 30 25 20 GREEN RIVER 15 10 1 SAO FILE NAME; APEPARK6 /201(PLOT • 20' SCALE) •SEGALE• BUSINESS PARK ID 1bIN" ANDOVER PARK WE52 TEMPORARY PARKING LOT ireu CROSS-SECTIONS/DETAILS ONS/DETAILS gictior 201 -93656 X43 -ao$i OW 0.50 a o v. -2.006 -1.006 war _-w ikul 1111 1 CR •SS- SECTION 1'. 201'.5' -I -h 30 25 20 GREEN RIVER 15 10 1 SAO FILE NAME; APEPARK6 /201(PLOT • 20' SCALE) •SEGALE• BUSINESS PARK ID 1bIN" ANDOVER PARK WE52 TEMPORARY PARKING LOT ireu CROSS-SECTIONS/DETAILS ONS/DETAILS gictior 201 -93656 X43 -ao$i MPACT 40 WIDE • ANDOVER PARK WEST 0 30 25 20 15 10 30 25 20 15 10 30 25 20 15 10 30 25 20 15 10 GRADED SURFACE FINISH GRADE(PARKING LOT) 100' WIDE RICH IMPACT ENVIRONMENT 60' WIDE LOW IMPACT 2 ENVIRONMENT 3 WIE -1 OSS -SECTION I-I 1- . 20(H); 1... 5• V) 100' WIDE HIG,I IMPACT ENVIRONMENT 00' WIDE LOW IM 40 . WIDE VER 4 ISM 111,15: kWit mem rdimar EMI GRADED SURFACE FINISH GRADOPARKING LOT) GRADED SURFACE CROSS-SECTION J-J 1- 20.01): V V) 100 WIDE NIGH IMPACT ENVIRONMENT SW WIDE LOW FINISH GRADE(PMKING LOT) % • 11111/Y , ilif C OSS-SECT1ON I- - 20.04); 1. - 51,6 K-K :... 100 WIDE HIGI IMPACT ENVIRONI/ENT60LIME LOW IMPACT 4021DE RIV:R —2.000 GRADED SURFACE GRADE(PARKING LOT) 25 20 GREEN RISER 15 10 5 0 GREEN RIVER 15 10 6 ° GREEN RIVER .15 CF OSS:AS- . 20110; 1. - 5.04 25 0 20 GREEN RIVER 15 10 • • CAD FILE NAME: APEP00K7/201(PLOT • 20' SCALE) 1=1•01C111711 SEGALE BUSINESS PARK ' Ewa AS SHOWN pow- 5R0 144. 10101/95 1 NONE A▪ N▪ OOVETI PAW WEST TEMPORARY PARKING LOT On& esaa-2- CROSS-SEC111•45/DETAILS 201-03050 IA - boat f ANDOVER PARK WEST 0 30 25 20 1 10 30 25 20 15 10 30 25 20 15 10 30 25 20 15 10 GRADED SURFACE FINISH CRADE(PARXING LOT) 8 -2.002 00A 2 i4 a 100' WIDE 4164 IMPACT ENVIRONMENT 60' WIDE LOW IMPACT 40' WIDE RIVER t.0.24 ENVIRONMENT ENVIRONMENT a " z�. LSE 11111 60 WIDE LOW IM FACT 40' WIDE RIt mai _no LIME � O DIKE 1111Ir CROSS - SECTION M -M 20(4); 1.. 5' V) 100' WIDE HI IMPACT ENVIRONMENT GRADED SURFACE FINISH GRADE(PARKINO LOT) a - 2.00X_ ROHNER S CROSS - SECTION N -N 1' - 20'(11); Y L (V) 4 )( 100' WIDE 1 GRADED SURFACE FINISH GRADE(PARKINC LOT) CH IMPACT ENVIRONMEI T 60' WIDE LOW IMPACT - CRHRONMEY S 40' WIDE CIMR DIKE 3 a a : 5d `J g 3i #0303 6 {aa� }p -I.00X CF OSS- SECTION 1' - 20'(N); 1' . 5'(V) 0-0 . y,'I)( 100 WIDE HICI IMPACT ENVIRONMENT 60' WIDE LOW IMPACT 40' WIDE RI GRADED SURFACE FINISH GRADE(PARKING LOT) 5 20 GREEN RIVER 10 25 20 CREEK RIVER 15 10 30 i GREEN RIVER 10 30 CROSS - SECTION P -P 1• - 20'(11); 1' - 5' 4) • 5 0 GREEN RIVER 15 10 CAD FILE NAME: APEPAR1(6 /20,(PLOT • 20' SCALE) SEGALE BUSINESS PARK r=•011/11C0•1 10,6 (AI ANDOVER PARK *EST TEMPORARY PARKING LOT newt CROSS— SECTIONS/DETAILS 201 -V3XXX L bO8% ANDOVER PARK WEST 30 25 20 1 10 25 -2 20 15 10 30 25 20 15 10 GRADED SURFACE FINISH ORADE(PARKING LOT) 100' WIDE HIGH IMPACT ENVIRONMENT 2 -1.00; SS— SECTION O —O 1' - 20111); 1- - 5'( 1) 100' WIDE HIG1 IMPACT ENVIRONMENT GRADED SURFACE FINISH GRADE(PARKING L00) 60' WIDE LOW IMPACT 40' DE ENVIRONMENT R VER ENVIRONMENT 60' WIDE IOW IM ACT 40' WADE RI • DIKE ylx 8 C 9OSS— SECTION R —R 1- - 20'(11); 1' - 5 (V) .• 100' WIDE FDGH IMPACT ENVIRONMENT 60' WIDE LOW MPACT 40' WIDE IVER FINISH GRADE(PARKING LOT) DIKE NT- NE OF ORDINARY T [FJISlIllMKING 100) �g nA /�b 73a OOt ". CROSS— SECTION 1- - 20111); 1' - 514) S —S 100' WIDE H1G1 IMPACT ENVIRONMENT 60' WIDE LOW IMPACT 40' WIDE RIV'.R 30 m FINISH CRADE(E%IS 1NC PARKING LOT) 3 25 -2.00 20 15 10 t c CROSS—SECTION - -T 1• - 20'(11); 1' - 5(V) • 25 20 GREEN RIVER 15 10 25 20 GREEN RIVER 10 5 ?20 8 i GREEN RIVER TTI5 30 5 0 GREEN RIVER 5 10 CAD FILE NAME: APEPARK9 /201(PLOT • 20' SCALE) SEGALE BUSINESS PARK Gy aELI• lolx•il3 AROOVER PARK WEST TEMPORARY PARKIN0 LOT CROSS- SECTIONS/DETAILS 201 -9300% L4'oO8I GREEN �i of • ��i oi. �i. of . i. ei �i e . . �.���i�.�i�!•i i�' ?��:� of �!.'i�•i • ��i.���i�� ei.� . i�.��� oi�.� . ��•��� l' a eeee.0� •. 1 464; ;� !e•e•e i tie . i•#4 : %�����: /�!�l�i`��!� �i`�� �!� `i ".ii •'poi ` i /e•e1� 4,44 •%; 4•i.:i.eoi� `i.�.i oi�:i :n•�� of '�`i''�;i�i °1` !i�'��i!����oi!� le!e !41$4• %! -4 44,4 „�i��e`i ee e eel re/ i.. �"I�n . OI.i • I.�,. �`IoI,.:��I jl��I. +��i�I jl���► RIVER 32 30 28 26 24 22 20 RIVER NORTHERLY ECOLOGY -BLOCK EXISTING WALL BANK DRIVE AP TELLER,. 23.10 T29.10 3.0 T29.0 PARKING LOT ,STRIPING .-c--"".. C FINISH GRADE ORIGINAL SURFACE RIVER B PROFILE CG-NORTHERLY ECOLOG) EXISTING GRASS SLOPE TOP OF WALL FINISH GRADE ORIGINAL SURFACE 96' PROFILE NORTHERLY ECOLOGY -BLOCK WALL EXISTING GRASS SLOPE NE COR SW 1/4, NE 1/4 SEC 35, Ta3N, R4E, WM DIKE C WALL NE COR SW 1/4, NE 1/4 SEC 35, T23N, R4E, WM SITE 32 30 28 26 24 22 20 Z=1 .1,11M4471:4Z4Z 4.4W 1JL3-W6 1 ANDICAP RA �ddd��,�.*'o add � . � df' ri nips 4 ��.4'd:4 HPS(2) ",,";`���ss;�,,��;�d ANDOVER p ARK (PRIVATE S WES T SITE 1' = PARKING LOT STRIPING . �'• � ' •,-9 _ . J � : A t: A� . C .0 C 0. c te � � �c d d ANDICAP RAMP S<2> �r9•d�94,q�,, � �.4d�- ZJ.f 6�-`r°F4A�> ♦ ` �;i �i� K WE S T `7'45'24 "W ET1 SITE PLAN t' = 30' 486.68' VICINITY MAP SEGALE BUSINESS PARK 0 600' ' 1200' LAND USE DATA: PROPOSED TEMPORARY PARKING' STANDARD STALLS(8161X191) =553 COMPACT STALLS <8'6'X16' +> =230 TOTAL PARKING STALLS =783 1800' CONSTRUCTION NOTES: 1. ALL WORKMANSHIP AND MATERIALS SHALL COQ TUKWILA'S STANDARDS AND SPECIFICATIONS. THE DRAINAGE CONSTRUCTION SHALL MEET CITY OF 2. THE SITE GRADING IS BALANCED BETWEEN TE LEGEND: = EXIST LIGHT STANDARD = EXIST TREE 0= EXIST PHOTINIA SHRUB M = EXIST WATER VALVE IcC = EXIST FIRE HYDRANT NOTE: ALL PROPI CAD FILE NAME: 24 "w VICINITY MAP SEGALE BUSINESS PARK 0 600' 1200' LAND USE DATA: PROPOSED TEMPORARY : PARKING' STANDARD STALLS (8'6'X19') =553 COMPACT STALLS(8'6'X16' +) =230 TOTAL PARKING STALLS =783 1800' CONSTRUCTION NOTES: 1. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO THE CITY OF TUKWILA'S STANDARDS AND SPECIFICATIONS. THE GRADING, PAVING AND DRAINAGE CONSTRUCTION SHALL MEET CITY OF TUKWILA REQUIREMENTS. 2. THE SITE GRADING IS BALANCED BETWEEN THE ONSITE 'CUT' AND FILL LEGEND: ->- = EXIST LIGHT STANDARD = EXIST TREE 0= EXIST PHOTINIA SHRUB N = EXIST WATER VALVE = EXIST FIRE HYDRANT . -- 24 ---*"' P23.05 24 = EXISTING CONTOUR FINISH PAV'MT ELEVATION = FINISH CONTOUR = PROPOSED GRASS = PROPOSED GROUND COVER RECE V :A% b r 199' CO'MMUNI1 r DEVELOPM NOTE: ALL PROPOSED LANDSCAPE WILL BE AUTO IRRIGATED CAD FILE NAME: APEPARK2 /201(PLOT @ 40' SCALE) 162016 REGISTERED ARCH TECT Fig,.; r.i P,SNIMCTON M.A. SEGALE, INC. TUKWILA, WASHINGTON•2 375-3200 seam 1' = 30' DATEr 10/19/93 MAY/4 Pv DRM REV1SEa NONE TITLE. ANDOVER PARK WEST TEMPORARY PARKING LOT SHEET' 1 on 2 SUP T1TLEI SITE AND LANDSCAPE PLAN DRAWING NUMBER' 201 -93XXX D LEGEND: COST UGHT STANDARD. EXIST TREE EXIST PHOIINIA SHRUB pq in EXIST WATER VALVE Ig( • EXIST FIRE HYDRANT EXISTING CONTOUR FINISH PAV'MT ELEVATION FINISH CONTOUR = PROPOSED GRASS = PROPOSED GROUND COVER EXISTING GRASS SLOPE NOTE: ALL PROPOSED LANDSCAPE WILL BE AUTO IRRIGATED a .41J TO IRRIGATED GREEN FIN ORIGINAL SURF AC PRO RIVER - ERLY ECO FINISH GRADE ORIGINAL SURFACE TOP OF WALL 157.50' PROFILE SOUTHERLY ECOLOGY -BLOCK WALL • top • LL STREET DIKE 0'6' 5'0' 6'0' LANDSCAPIN SIDEWALK /GRASSCLA W (.3 +n.nn..._......._. +n O_ 10'0' LANDSCAPING W /GRASSCLAWN) z N 32 30 28 26 24 22 20 TEMPORARY PARKING LOT DIKE EXISTING STREET :TREE . 6'0' SIDEWALK 10'0' 32 30 28 26 24 22 20 TEMPORARY LANDSCAPING W /GRASSCLAWN) 4 ai 00 V PARKING LOT PROPOSED PARKIN�ELO PO c ` 904734 eelila:147#4,10710 HANDICAP RAMPS(2) •.��� v�d''� &to ANDOVER PAR p � E R�VAT K STREET) ST SITE PLAN 1' = 30' SIDE SED Jg'7RA R' PARKING LOT STRIPING WEST SITE PLAN t' = 30' SIDEWALK B22.20 T24.20 HANDICAP RAMP RIPING 822.20 T24.20 C 18 / ,• ;al Je aillp ftvir r• i i • /0 /4, /r r � /0 /0 • • 823.40 T29.40 SOUTHERLY ECOLOGY —BLOCK WALL / EXISTING AC—PARK1NG LOT or A ASPHALT CONCRETE PAVEMENT, CLASS B SECTION A -A ALONG STREET FRONTAGE 1' = 4'(Hw = 2'(V) TEMPORARY PARKING LOT ASPHALT CONCRETE PAVEMENT, CLASS E 2'0' CEDRUS ATLANTICA GLAUCA -- 'BLUE ATLAS CEDAR' JUNIPERUS CHINENSIS PEITZER: 'OLD GOLD JUNIPER' FUTURE FILL SECTION B -B ALONG RIVER FRONT, 1' = 4'(H)il' = 2'(V) CAD FILE NAME' HANDICAP RAMP TITLE' ANDOVER PARK TEMPORARY PAR SU/ TITLE' SITE AND LAND. ASPHALT CONCRETE CLASSEBT' SECTION A -A ALONG STREET FRONTAGE = 4'(H)Jl' = 2' <V) FACE CEDRUS ATLANTICA GLAUCA 'BLUE ATLAS CEDAR' JUNIPERUS CHINENSIS PEITZERIANA 'OLD GOLD JUNIPER' FUTURE FILL GROUND COVE JUNIPERUS HORIZONTALIS 'WILTONI' 'WILTONS BLUE CARPET JUNIFER' ASPHALT CONCRETE PAVEMENT, CLASS E DIKE SECTION B -B ALONG RIVER FRONTAGE 1' = 41(H)J1' = 2'(V) RECD IV r) `t ti i99' COMNMUNIT' DEVELOPIVIEt� CAD FILE NAME' APEPARK3 /201(PLOT a 40' SCALE) M.A. SEGALE, INC. TUKWILA, WASHINGTONc206> 373--3200 SCALE' 1 = 30' ,S STATE OF'W(SNINGT(hk DATE. "TITLTr- ANDOVER ANDOVER PARK WEST TEMPORARY PARKING LOT U$ TITLE' SITE AND LANDSCAPE PLAN DRAVN DY' DRM REVISED' NONE SHEET. 2 oc' 2 !WAVING- MU$)t 201 -93XXX SOIL RAP SHORT PLAT REC N0.8609081152 LANDWARD EDGE OF LANDWARD EDGE RIVER PROTECTION EASEMENT REC NO 60 ,Q15 ,•f Cz/ GRAVEL FILTER TOP OF DIKE EDG ;^ ..,_._..... _.. _ _ REC N0.8609081152 APPROX. ei74E OF PizDFvSe0 TeMp t'Atglo'eC LANDWARD EDGE OF GRAVEL FILTER GRAVEL FILTER , TOP OF DIKE TRyE POINT OF BEGINNIN EDGE OF WATER NOV. 30,1990 GREEN RIVER EXISTING RIVER PROTECTION EASEM NT ?yE POINT OF BEGINNIN S BASIS OF BEARINGS I i t CT ION EASEMNT 1 W:W 0. .2- 141JN • FOUND CONCRETE MONUMENT IN CASE 180TH STREET (1) FOUND CONCRETE MONUMENT IN CASE • _ - ..... ._..... �.. .... _E 1 " =5 0 ' 36' BASIS OF BEARINGS FOUND CONCRETE MONUMENT IN CASE S 180TH STREET FOUND CONCRETE MONUMENT IN CASE DATE 1 RCVISIUN T!TLE AS BUILT 5. SEGA! PERMANE KING CDUNTY SL SUil VEY PO GAMMELL RED/PLOT Iris I PLOT DATEI SPURRELL DEC 90 REMENCESt By KING CDUNTY DEPT. OF PUBLIC WORKS • „ 1 ... :. tty.:^.i r'7 ,.. �;:i';�, .r. Si�, 7'�F'., TITLE AS BUILT SURVEY ATTACHMENT "Cl SEGALE LEVEE REPAIR PERMANENT RIGHT OF ENTRY KING PREPARED FDR' COUNTY SURFACE WATER MANAGEMENT PROJECTIN SU!,VEY PCB GAMMELL RED /PLOT >iYs SPURRELL PLOT DATE DEC 90 SURVEY DATE1 NOV 1990 COCKED PI DATE CHECKEDI LEVESQUE /SPURRELL DEC 90 FIELD DIXIKI SDR DISC IDs ,SEGALE REFERENCES' BY KING COUNTY SURVEY & MAPPING DEPT. OF PUBLIC WORKS TEL 296 -7713 FAX 296 -7719 1I=501 SHEET 1 2 OF : (4 NJ V n..; r3 9. ..., ■ 4ii .,,,. 4. 1:11r-4 * 117 -......Th Q • ............... " • • . 0.4 • • • • • • • • • • • • • • •••••••••••••••••••7••••• • • • • „0...,........x....,...............::::.....E..x.: 0,e Vu ••••••••••••••••••••••••••••• 0 0 0.8 0 • ••••••••••••••:::07 4 6..":"..". " .6=6=10_. ..0"““0. .. • ..... a • • SO • • • • • • • • • • 61$ a . • • • • • • • •••••••............. • • . . . . .. .14.: . • . • . ..10. : ,....i.; ... •• . 4. lila...6...6.1.; . . . . . . .., . : e • • • • • • • • ••••••••• Oe 0 Cr ' • ...::::.....:77.....1..1/ • • •••••••••::::::::::■;„ • •:::::::::. • • • • • • • ,••• •••••••••• eie...••• • •••••••••••:: ••Z• • • • • • • • &V LANDWARD EDGE RIVER PROTECTION EASEMENT REC NO 6027015 • • • '/K172,3) ~ •, • •••••••••••••••••••• • • • • • • • • • • • • • • • • • • LANDWARD EDGE 'S'eP <>As 4, _ANDWARD EDGE 7IVER PROTECTION EASEMENT 2EC NO 6027015 0 LANDWARD EDGE OF GRAVEL FILTER GRAVEL FILTER •• `• • • RIP RAP ZAP anwiesur- S SHORT PLAT REC NO.8609081152 r PLAT REC NO.8609081152 .1' .....'` rUaPa s o• / • %• lI MC• t & , ; 14' y ; 1 • U'•- c 0 :• cam. • 0 =C EDGE OF ATER NOV. 30.1990 DATE REVISIUN <04'4 l BY RIP AND TTL SUR) RED, REFS .Y> i'';;:t;- `,.5>:JeXLTS Y : \7lYki• " :!'..;' •7V:rr.,... I • • I I I I r 4. i U • rE ,-.+ n / % ': ;,`.wa s ' O•: ' ..' „ hj t0. Jd3 14• y ••.: fir; . e•39,'g• LJ W / :37 G ,_' 1? Sl . 1' • , . .-• .-- ............ ...... .. . .:...:: ..:..:... ...T : . Y X77... . ... W °a Ate. (4 7■At'fitiR'::ai °3';.`i.` =q ,. ,.2'W i'^cu', `'+rtER a";,:v:rraur...;, a•. Armax 0176re oP PRatrosav ttMr. paRicimor Lor at#wooverteNrS. EDGE OF WATER NOV. 30, ION 4c,• 1 BY RIP RAP COVERED OVER WITH DIRT AND HYDROSEEDED W Z 11 TITLE AS BUILT SURVEY ATTACHMENT SEGALE LEVEE REPAIR PERMANENT RIGHT OF ENTRY 1/ // PREPARED FORT KING COUNTY SURFACE WATER MANAGEMENT PRDJECTN' SURVEY PC' GAMMELL RED /PLOT BY' SPURRELL REFERENCES/ PLOT DATE' DEC 90 1 SURVEY DATE' NOV 1990 CHECKED BY' DATE CHECKED' LEVESQUE/SPURRELLI DEC 90 _.. SDRLD BOO* KING COUNTY SURVEY & MAPPING DEPT. OF PUBLIC WORKS TEL 296 -7713 FAX 296 -7719 DISC ID' SEGALE SCALE' 1' =50' SHEET 2 OF 2 • • APProx. oPet.e temr. pAggitior tor ativovertiet-rrs, • ,,, A:0 8.39'42. / / ---=,.......". s 11.22,19, / :::::"....................w........=—..........="...". w S ■:—.-2.-V.A.1.3".... • • • • - • • ' . • • • • • • • • • • • • • • • • • ••••••••••••••••• • • • • • • . . :: • ' ' ••••-••••••-r • • • • 4 • • iv; • • 4 ••• • • ••• ••••• ••• • ••••••••••• • • •••••••• ••••••7rrrri...111 op000.00.01.••••••••••0000000.00•0*•••••••.1000$1M,... .......QZ141.2.37..: BY RIP RAP COVERED OVER WITH DIRT AND HYDROSEEDED LJ LJ LJ LJ LJJ z 11 _J TITLE AS BUILT SURVEY ATTACHMENT 11 SEGALE LEVEE REPAIR PERMANENT RIGHT OF ENTRY 1/ • PREPARED FOR. KING COUNTY SURFACE WATER MANAGEMENT PROJECTM SURVEY PC. GAMMELL SURVEY DATE' NOV 1990 RED/PLOT By' SPURRELL PUNDATEI DEC 90 CHECKED BY. DATE CHEMED LEVESQUE/SPURRELLI DEC 90 FIELD BMW DR DISC ID. EGALE REFERENCESo SCALE. 11=501 KING COUNTY SURVEY & MAPPING DEPT. OF PUBLIC WORKS TEL 296-7713 FAX 296-7719 SHEET 2 a OF GREEN RIVER RIVEI NORTHERLY ECOLOGY -BLOCK EXISTING WALL BANK DRIVE P TELLER PARKING LOT STRIPING RIVER FINISH GRA ORIGINAL SURFACE CC-NOR PROFIL ERLY ECOLO EXISTING GRASS SLOPE PARKING LOT STRIPING TOP OF WALL FINISH GRADE ORIGINAL SURFACE PROFILE NORTHERLY ECOLOGY -BLOCK WALL 1' = 20'(H);1' = 4'(V) -- EXISTING GRASS SLOPE NE COR SW 1/4, NE 1/4 SEC 35, T23N, R4E, •M 10 DIKE NE COR SW 1/4, NE 1/4 SEC 35, Ta3N, R4E, WM AND VE --_ (PRIVATE PARK STREET) WEST SITE 1' PARKING LOT NDICAP RAMPS(2) ti" 'tV,(4 s ; , ., ;, NEST SITE PLAN 1' = 30' 486.68' ;1NG LOT PARKING LOT STRIPING VICINITY MAP SEGALE BUSINESS PARK LAND USE DATA: PROPOSED TEMPORARY PARKING' STANDARD STALLS(8'6'X19') =553 COMPACT STALLS(8'6'X16' +) =230 TOTAL PARKING STALLS =783 1800' CONSTRUCTION NOTES: 1. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO THE CITY OF TUKWILA'S STANDARDS AND SPECIFICATIONS. THE GRADING, PAVING AND DRAINAGE CONSTRUCTION SHALL MEET CITY OF TUKWILA REQUIREMENTS. 2. THE SITE GRADING IS BALANCED BETWEEN THE ONSITE 'CUT' AND FI LEGEND: -}- = EXIST LIGHT STANDARD = EXIST TREE 0= EXIST PHOTINIA SHRUB N = EXIST WATER VALVE = EXIST FIRE HYDRANT = EXISTING CONTOUR = FINISH PAV'MT ELEVATIO = FINISH CONTOUR = PROPOSED GRASS = PROPOSED GROUND COVI NOTE: ALL PROPOSED LANDSCAPE WILL I CAD FILE NAME: APEPARK2 /201(PLC M.A. SEGO TUKWILA, WASHINC DATE' 10/19/93 Mrs ANDOVER PARK WEST TEMPORARY PARKING LOT stn TITS SITE AND LANDSCAPE PLAN VICINITY MAP SEGALE BUSINESS PARK 0 600' 1200' LAND USE DATA: PROPOSED TEMPORARY PARKING' STANDARD STALLS(8'6'X19') =553 COMPACT STALLS(8'6'X16' +) =230 TOTAL PARKING STALLS =783 1800' CONSTRUCTION NOTES: 1. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO THE CITY OF TUKWILA'S STANDARDS AND SPECIFICATIONS, THE GRADING, PAVING AND DRAINAGE CONSTRUCTION SHALL MEET CITY OF TUKWILA REQUIREMENTS. 2. THE SITE GRADING IS BALANCED BETWEEN THE ONSITE 'CUT' AND FILL LEGEND: -- = EXIST LIGHT STANDARD = EXIST TREE 0= EXIST PHOTINIA SHRUB pd = EXIST WATER VALVE = EXIST FIRE HYDRANT 24 - P23.05 0 24 = EXISTING CONTOUR = FINISH PAV'MT ELEVATION = FINISH CONTOUR = PROPOSED GRASS = PROPOSED GROUND COVER RECEFf CAI' COIVMMUN T DEVELOP1v7: NOTE: ALL PROPOSED LANDSCAPE WILL BE AUTO IRRIGATED CAD FILE NAME: APEPARK2 /201(PLDT @ 40' SCALE) Vs REGISTERED ARCH }TECT f 'l .STATE PROTON v113 M.A. SEGALE, INC. TUKWILA, WASHINGTONc oo 575 -3200 scm 1' = 30' DRAW NY. DRM DATE' 10/19/93 REVISED NONE TITLE' ANDOVER PARK WEST TEMPORARY PARKING LOT SHEET. 1 i t 2 SUB TITLE► SITE AND LANDSCAPE PLAN DRAVING MUM MI 201 -93XXX LEGEND: * at . EXIST LIGHT STANDARD. Sam EXIST TREE EXIST PHOTiNIA SHRUB D4 - EXIST WATER VALVE TX : EXIST FIRE HYDRANT EXISTING GRASS SLOPE = EXISTING CONTOUR FINISH PAV'MT ELEVATION 2 FINISH CONTOUR PROPOSED GRASS = PROPOSED GROUND COVER NOTE: ALL PROPOSED LANDSCAPE WILL BE AUTO IRRIGATED GREEN PARKING LOT STRIPING GREEN FINISH GRA ORIGINAL SURFACE 76.50' TOP OF WALL FINISH GRADE ORIGINAL SURFACE TOP OF WALL 157,50' PROFILE SOUTHERLY ECOLOGY -BLOCK WALL STREET 5'0' 6'0' SIDEWALK /GRASS<LAW 1 DIKE APING CLAWN 6'0' SIDEWALK ' LANDSCAPING V /GRASSCLAWN) z TEMPORARY PARKING. LOT 12' 12• 15' 15' PROP.I E PAR TEMPORARY KING LOT fl remumer_u5draMeffare,~01,110,0 HANDICAP i.. °Hi9.{, , DO% Hs,,s/liyYi % b /isn ANDOVER gRK (PRIVATE STREET) WEST SIDEWAL SITE PLAN 1' = 30' i NTEMPO L 'ARY PARKING LOT STRIPING EXISTIt■ AC -PARK LOT ST B22.20 T24.20 HANDICAP RAMP B22.20 T24.20 :23.40 / T29.40 / / • c / /• /0 1• to le c 18 SOUTHERLY SOUTHERLY ECOLOGY—BLOCK WALL • 45 823.40 T29.40 B23.40 T29.40 EXISTING LOT EXISTING AC— PARKING LOT C.3 4i+v to- +0.0Q +Q.° +0.15 ASPHALT CONCRETE PAVEMENT, CLASS B SECTION A -A ALONG STREET FRONTAGE 1' = 4'0H)jl' = 2'(V) TEMPORARY PARKING LOT ASPHALT CONCRETE PAVEMENT, CLASS E 2'0' as oc CEDRUS ATLANTICA GLAUCA C.3 'BLUE ATLAS CEDAR' L JUNIPERUS CHINENSIS PEITZERIANA v 'OLD GOLD JUNIPER' FUTURE FILL —) 'lf c'1 Qoe GROUI JUNIPERUS 'WILTONS B SECTION B -B ALONG RIVER FRONTAGE 4'CH)jl' = 2'(V) CAD FILE NAME' APEPARK3 /20 M.A. SI TUKWILA, Wi TITLES ANDOVER PARK WEST TEMPORARY PARKING LOT DATE. 10/19/93 SUP TITLE• SITE AND LANDSCAPE PLAN PHALT INCRETE .ASS EBT' SECTION A -A ALONG STREET FRONTAGE CEDRUS ATLANTICA GLAUCA / 'BLUE ATLAS CEDAR' / JUNIPERUS CHINENSIS PEITZERIANA 'OLD GOLD JUNIPER' FUTURE FILL SECTION B -B GROUND COVE JUNIPERUS HORIZONTALIS 'WILTONI' 'WILTONS BLUE CARPET JUNIFER' ASPHALT CONCRETE PAVEMENT, CLASS E DIKE ALONG RIVER FRONTAGE i' = 4'(0l' = 2'(V) RECEIVED JAN t .l 199f COMMUNITY_ DEVELOPMENT CAD FILE NAME' APEPARK3 /201 <PLOT C 40' SCALE) M.A. SEGALE, INC. TUKWILA, WASHINGTONc206) 575 -3200 4325. F TGISTERED ARCH TECT DRAVN ,r• DRM DATEs 10/19/93 ANDOVER PARK WEST TEMPORARY PARKING LOT REVISE-DI NONE SHEET, A SITE AND LANDSCAPE PLAN 201 -93XXX