MITIGATED( TERMINATION OF NONSIGNIFI: 4CE (MDNS)
DESCRIPTION OF PROPOSAL:
Construction of a 783 space parking lot with
landscaping as shown in attachments A -I. The lot
is partially developed. Developing the final 5.5
acres of this 8.35 acre lot will leave it fully
used, with an impervious surface coverage of about
95 percent. Portions of landscaping will be
located on adjacent lots to the east and west.
PROPONENT: DANA WARREN
LOCATION OF PROPOSAL, INCLUDING STREET ADDRESS, IF ANY:.
ADDRESS: 18200 ANDOVER PK W
PARCEL NO: 352304 -9120
SEC /TWN /RNG: NE 35 -23 -4
LEAD AGENCY: CITY OF TUKWILA FILE NO: L93 -0081
The City has determined that the proposal does not have a probable
significant adverse impact on the environment. An
environmental impact statement (EIS) is not required under RCW 43.21c.030(2)(c). This
decision was made after review of a completed environmental checklist
and other information on file with the lead agency. This information
is available to the public on request. The conditions to this SEPA
Determination are attached.
s DNS is issuedA der 197 -11- 340(2). Comments must be submitted by
/9 9 The lead agency will not act on this
proposal 15 days from the date below.
L. R ck Beeler, Responsible Official
City of Tukwila, (206) 431 -3680
6300 Southcenter Boulevard
Tukwila, WA 98188
4./ff*
You may appeal this determination to the City Clerk at City Hall, 6200
Southcenter Boulevard, Tukwila, WA 98188 no later than 10 days from the
above signature date by written appeal stating the basis of the appeal
for specific factual objections. You may be required to bear some of
the expenses for an appeal.
Copies of the procedures for SEPA appeals are available with the City
Clerk and Department of Community Development.
B.3.d.
Mitigating Conditions to the Environmental
Determination of Non - significance for
L93 -0081 (Segale Business Park Parking Area)
January 10, 1994
(i) The property owner will provide King County a
permanent right of entry for inspection, repair and
maintenance by King County and its agents, of the left
bank of the Green River within the property owner's
land in Section 35, Township 23 North, Range 4 East, WM
in King County. This right of entry shall be provided
to King County in recordable form prior to final
approval of the construction.
The basis for this easement is a previous agreement
between the property owner and King County during
construction of certain flood control work (e.g., the
dike). Execution of this easement will complete the
earlier agreement within a specific time frame.
(ii) The City and County plan to provide a levee
repair and improvement project design in 1994, with
construction in 1995, within the dike maintenance
easement area (see above). If the property owner
desires to fill over the levee drainage material prior
to construction of the project by the City and King
County, the property owner will build the levee
drainage collection facility (pipe) and place filter
fabric on top of the facility in accordance with City
of Tukwila specifications prior to any grading /fill
construction. Should the City and King County fail to
construct the levee drainage collection facility prior
to December 31, 1995, the property owner may fill over
the levee drainage material by placing filter fabric
(no pipe) on top of the facility in accordance with
City of Tukwila specifications.
(iii) A portion of the proposed construction
encroaches into the northern easement area tacit
). This and any other materials placed within the
dike easement area as a result of the proposed
construction, shall be removed by the property owner
within thirty days of written request of the City to
allow installation of the levee drainage collection
facility. Construction of this facility is anticipated
in 1995.
L93 -0081: Segale Business Park
January 3, 1994
B.14.g.
B.4.d.
Page 2
Additional traffic mitigation may be required if the
Simulcast facility, which this parking lot supports,
generates more traffic than anticipated, and /or
unanticipated traffic safety or capacity problems are
created that are directly attributable to the separated
783 stall parking lot. The traffic analysis and
mitigation from the associated simulcast wagering
facility from Tukwila file number L93 -0067 is herewith
incorporated into this environmental determination.
(i) The property owner shall submit a letter of
agreement to provide landscaping as shown in ;it?
A, within 60 days of a written request by the City of
Tukwila following completion of the dike levee repair
and improvement project (see B.3.d.(ii)), or
determination by the City of Tukwila that the dike
levee repair and improvement project will not be funded
or built prior to December 31, 1995.
The applicant is willing to provide required
landscaping now. However, installation at this time
would result in needless costs, since the plants would
have to be taken out and replaced as part of the 1995
levee maintenance project. This letter shall be
provided prior to final construction approval.
(ii) Plantings on the dike bank may be modified or
removed upon a clear demonstration of compelling safety
needs (e.g., to ensure dike stability) and no feasible
alternatives.
(iii) The following landscape easements shall be
recorded prior to final approval of the construction in
order to provide the landscaping as proposed in
(1) A 5 ft. width along the western project site
property line from Lot 2 of Tukwila Boundary Line
Adjustment file L93 -0085
(2) An area of varying width between the project
site's eastern property line and the western edge of
the top of the left bank dike, from Lot 352304 -9018
(4ttachmo 4).
file:sgle180 \dns
SEPA ENVIRONMENTAL IMPACT STATEMENT
ENVIRONMENTAL CHECKLIST
Control No. P -6- 93 -0 14-
Epic File No. L?.?-* COB
8
Fee $325.00 Receipt No.
A BACKGROUND
1. Name of proposed project, if applicable:
Segale Business Park - Temporary parking lot
2. Name of applicant:
Segale Business Park
3. Address and phone number of applicant and contact person:
Segale Business Park
P.O.Box 88050
Tukwila, Washington 98138
Contact person: Dana Warren - tel #: 575 -2000
4. Date checklist prepared:
October 20, 1993
5. Agency requesting Checklist: City of Tukwila
6. Proposed timing or schedule (including phasing, if applicable):
SEPA Permit 10/22/93 - 1/22/94
Shoreline Permit 10/22/93 - 1/22/94
Grading & Paving Permit 11/22/93 - 1/22/94
Temporary parking lot construction 1/23/94 - 1/30/94
7. Do you have any plans for future additions, expansion, or further
activity related to or connected with this proposal? If yes, explain.
No
8. List any environmental information you know about that has been
prepared, or will be prepared, directly related to this proposal.
EIS for Segale Business Park - 1974
Shoreline permit application
9. Do you know whether applications are pending for governmental approvals
of other proposals directly affecting the property covered by your
proposal? If yes, explain.
No
10. List any governmenL-- approvals or permits that -rill be needed for your
proposal.
SEPA Permit
Shoreline Permit
Grading & Paving Permit
11. Give brief, complete description of your proposal, including the
proposed uses and the size of the project and site. There are several
questions later in this checklist that ask you to describe certain
aspects of your proposal. You do not need to repeat those answers on
this page. Section E requires a complete description of the objectives
and alternatives of your proposal and should not be summarized here.
The project involves the construction of a temporary (maximum 2 years)
parking lot in support of a simulcast /wagering facility as previously
reviewed under SEPA L93 -0067. A'' - ,i NA L YS e s FlZ or, Trm-r -D c c. u,k.A Chr. r r1-r47'
fiCrfc.C(UcTr,` IN c_o2PoILA 7-0 THt-S ONC-
12. Location of the proposal. Give sufficient information for a person to
understand the precise location of your proposed project, including a
street address, if any, and section, township, and range, if known. If
a proposal would occur over a range of area, provide the range or
boundaries of the site(s). Provide a legal description, site plan,
vicinity map, and topographic map, if reasonably available. While you
should submit any plans required by the agency, you are not required to
duplicate maps or detailed plans submitted with any permit applications
related to this checklist.
The development area is shown on the attached site plan (Attachment A)
The project site is located on tax lots 352304 -9120 and 352304 -9121 at
18120 Andover Park W e s t .
.
13. Does the proposal lie within an area designated on the City's
Comprehensive Land Use Policy Plan map as environmentally sensitive?
Yes, the eastern portion of the property lies within 200 feet of the
Green River shoreline.
A e C cm 7" E 0 0 1'47)A R Y L r iN' C'"" A ,:l CJ S%7-1 es rr Y IS
k . ( I . . P r.r•r -r..D 11'/ A_/. �-A C 6/ ilEY.1 r A . 7-(767- PR a ,Y CC. "7-
r /S L c) CA r S CCA( L -O -47) -7-K (....J (C,A Po ut1' bARY
I I1\/0- /C TUS --1-7-1 C'.'1\(( F/L W Lrf.a 0a8 .. G, OT.
1
1
/c- lcrra AI0U7r �,S AC_(Z..E-S.
TO BE COMPLETED BY APPL1.:ANT
B. ENVIRONMENTAL ELEMENTS
1. Earth
2
a. General description of the site (circle one):
Flat, rolling, hilly, steep slopes,
mountainous, other.
Flat
b. What is the steepest slope on the site
(approximate percent slope)?
Approximately 2 percent
c. What general types of soils are found on the
site (for example, clay, sand, gravel, peat,
muck)? If you know the classification of
agricultural soils, specify them and note any
prime farmland.
Sand and gravely soils
d. Are there surface indications or history of
unstable soils in the immediate vicinity? If
so, describe.
No
e. Describe the purpose, type, and approximate
quantities of any filling or grading
proposed. Indicate source of fill.
Approximately
material will
cut /fill.
3,700 cu yds of on site
be graded for a balanced
f. Could erosion occur as a result of
construction, or use? If so,
describe.
g.
None is expected
relatively flat.
clearing,
generally
because the site is
About what percent of the site will be
covered with impervious surfaces after
project construction (for example, asphalt or
buildings)?
Approximately 95 percent of the site will be
covered with impervious surface.
-3-
Evaluation for
Agency Use Only
h. Proposed measures to reduce or control
erosion, or other impacts to the earth, if
any:
Silt fences and siltation ponds will be used
to control storm water prior to discharge
into existing catchbasins.
2. Air
a. What types of emissions to the air would
result from the proposal (i.e., dust,
automobile odors, industrial wood smoke)
during construction and when the project is
completed? If any, generally describe and
give approximate quantities, if known.
Normal emissions and dust associated with use
of construction equipment. After construction
normal exhaust associated with passenger
vehicles.
b. Are there any off -site sources of emissions
or odor that may affect your proposal? If
so, generally describe.
No
c. Proposed measures to reduce or control
emissions or other impacts to air, if any:
During grading water (via water truck) will
be used to minimize dust. Construction
equipment will meet local, state and federal
emission standards.
3. Water
a. Surface:
1) Is there any surface water body on or in
the immediate vicinity of the site
(including year -round and seasonal
streams, saltwater, lakes, ponds,
wetlands)? If yes, describe type and
provide names. if appropriate, state
what stream or river it flows into.
Yes, the Green River is along the eastern
property line. There is a dike separating
the property from the Green River.
Storm water from the site will flow into
the City of Tukwila storm water system
-4-
Evaluation for
Agency Use Only
�rfCr Ab7-AC c.?\C l
Fc. -0 1) 7 "le 0 c.,
1); ( rf
` C T) OF HA (use" ? - { r•c
F�tZ !N( A Kg- ovS
FR- "M l T,
and is conveyed to the P -17 pond for
retention /detention prior to discharge
into the Green River.
2) Will the project require any work over,
in, or adjacent to (within 200 feet) the
described waters? If yes, please
describe and attach available plans.
Yes, The site will be graded and paved
for temporary use as a parking lot. (see
attachment A site plan)
3) Estimate the amount of fill and dredge
material that would be placed in or
removed from surface water or wetlands
and indicate the area of the site what
would be affected. Indicate the source
of fill material.
4
None
Will the proposal require surface water
withdrawals or diversions? Give general
description, purpose, and approximate
quantities, if known.
No
5) Does the proposal lie within a 100 -year
floodplain? If so, note location on the
site plan.
No
6) Does the proposal involve any discharges
of waste materials to surface waters? If
so, describe the type of waste and
anticipated volume of discharge.
No
b. Ground:
1) Will ground water be withdrawn, or will
water be discharged to ground water?
Give general description, purpose, and
approximate quantities, if known.
No
-5-
Evaluation for
Agency Use Only
2) Describe waste materials that will be
discharged into the ground from septic
tanks or other sources, if any (for
example: domestic sewage; industrial,
containing the following chemicals...;
agricultural; etc.). Describe the
general size of the system, the number of
such systems, the number of houses to be
served (if applicable), or the number of
animals or humans the system(s) are
expected to serve.
No waste materials will be discharged.
c. Water Runoff (including storm water):
1) Describe the source of runoff (including
storm water) and method of collection and
disposal, if any (include quantities, if
known). Where will this water flow?
Will this water flow into other waters?
If so, describe.
Runoff from parking area will flow into
existing catch basins which are connected
to City of Tukwila Storm drainage system
and is conveyed to the P -17 pond for
retention /detention prior to discharge
into the Green River.
2) Could waste materials enter ground or
surface waters? If so, generally
describe.
No.
d. Proposed measures to reduce or control
surface, ground, and runoff water impacts, if
any:
Storm water from the parking lot will flow
via the P -17 channel to the P -17 Detention
pond. The P -17 channel provides
biofiltration.
4. Plants
2
a. Check or circle types of vegetation found on
the site:
X Deciduous tree: alder, maple, aspen,
other: London Plain Trees
Evergreen tree: fir, cedar, pine, other
X Shrubs
Grass
Pasture
Crop or grain
Wet soil plants: cattail, buttercup,
bulrush, skunk cabbage, other
Water plants: water lily, eelgrass,
milfoil, other
Other types of vegetation
b. What kind and amount of vegetation will be
removed or altered?
None, the proposed parking area is clear of
vegetation.
c. List threatened or endangered species known
to be on or near the site.
None
d. Proposed landscaping, use of native plants,
or other measures to preserve or enhance
vegetation on the site, if any:
None, proposed at this time.
5. Animals
a. Circle any birds and animals which have been
observed on or near the site or are known to
be on or near the site:
Birds: hawk, heron, eagle, songbirds, other:
None observed
Mammals: deer, bear, elk, beaver, other:
None observed
Fish: bass, salmon, trout, herring,
shellfish, other: None observed, although the
Green River is known to contain fish.
-7-
b. List any threatened or endangered species
known to be on or near the site.
None
c. Is the site part of a migration route? If
so, explain.
Part of the Pacific flyway
d. Proposed measures to preserve or enhance
wildlife, if any:
None
6. Energy and Natural Resources
a. What kinds of energy (electric, natural gas,
oil, wood stove, solar) will be used to meet
the completed project's energy needs?
Describe whether it will be used for heating,
manufacturing, etc.
None required
b. Would your project affect the potential use
of solar energy by adjacent properties? If
so, generally describe.
No
c. What kinds of energy conservation features
are included in the plans of this proposal?
List other proposed measures to reduce or
control energy impacts, if any:
None
7. Environmental Health
a. Are there any environmental health hazards,
including exposure to toxic chemicals, risk
of fire and explosion, spill, or hazardous
waste, that could occur as a result of this
proposal? If so, describe.
No
-8-
•
1) Describe special emergency services that
might be required.
None
2) Proposed measures to reduce or control
environmental health hazards, if any:
None
b. Noise
1) What types of noise exist in the area
which may affect your project (for
example: traffic, equipment, operation,
other) ?
3
Existing traffic on adjacent streets.
What types and levels of noise would be
created by or associated with the project
on a short -term or a long -term basis (for
example: traffic, construction,
operation, other)? Indicate what hours
noise would come from the site.
Normal noise from construction equipment
during construction (approximately 7:00
am to 5:00 pm) . Noise from vehicles once
the lot is in use (approximately 10:00
am to 8:00 pm).
Proposed measures to reduce or control
noise impacts, if any:
All equipment will be operated with
required local, State and Federal
mufflers.
8. Land and Shoreline Use
a. What is the current use of the site and
adjacent properties?
Current use of the site: Vacant land
Adjacent properties current use: Warehouse
and office.
b. Has the site been used for agriculture? If
so, describe.
No
-9-
Evaluation for
Agency Use Only
Evaluation for
Agency Use Only
c. Describe any structures on the site.
None
d. Will any structures be demolished? If so,
what?
No
e. What is the current zoning classification of
the site?
M -2 (Heavy Industry)
f. What is the current comprehensive plan
designation of the site?
Heavy Industrial
g. If applicable, what is the current shoreline
master program designation of the site?
Urban
h. Has any part of the site been classified as
an "environmentally sensitive" area? If so,
specify.
This site is shown on the City maps as being
within a "sensitive area" described to be "of
potential seismic instability, with soft,
loose sand and a shallow ground water table".
i. Approximately how many people would reside or
work in the completed project?
j
None
Approximately how many people would the
completed project displace?
None
k. Proposed measure to avoid or reduce
displacement impacts, if any:
N/A
1. Proposed measures to ensure the proposal is
compatible with existing and projected land
uses and plans, if any:
Proposal is consistent with current zoning
and comprehensive plan designation.
-10-
Evaluation for
Agency Use Only
9. Housing
a. Approximately how many units would be
provided, if any? Indicate whether high,
middle, or low- income housing?
None
b. Approximately how many units, if any, would
be eliminated? Indicate whether high,
middle, or low- income housing.
None
c. Proposed measure to reduce or control housing
impacts, if any.
None
10. Aesthetics
a. What is the tallest height of any proposed
structure(s), not including antennas; what is
the principal exterior building material(s)
proposed?
No structures are proposed.
b. What views in the immediate vicinity would be
altered or obstructed?
None
c. Proposed measure to reduce or control
aesthetic impacts, if any:
None
11. Light and Glare
a. What type of light or glare will the proposal
produce? What time of day would it mainly
occur?
None
b. Could light or glare from the finished
project be a safety hazard or interfere with
views?
No
c. What existing off -site sources of light or
glare may affect your proposal?
None
d. Proposed measures to reduce or control light
and glare impacts, if any:
None
12. Recreation
a. What designed and informal recreational
opportunities are in the immediate vicinity?
There is a pedestrian /bike trail that runs
along the East side of the Green River
(opposite river bank).
b. Would the proposed project displace any
existing recreational uses? If so, describe.
No
c. Proposed measures to reduce or control
impacts on recreation, including recreation
opportunities to be provided by the project
or applicant, if any:
None
13. Historic and Cultural Preservation
a. Are there any places or objects listed on, or
proposed for, national, state, or local
preservation registers known to be on or next
to the site? If so, generally describe.
None
b. Generally describe any landmarks or evidence
of historic, archaeological, scientific, or
cultural importance known to be on or next to
the site.
None
c. Proposed measures to reduce or control
impacts, if any:
None
-12-
Evaluation for
Agency Use Only
Evaluation for
Agency Use Only
14. Transportation
a. Identify public streets and highways serving
the site, and describe proposed access to the
existing street system. Show on site plans,
if any.
Andover Park West (private street) on the
west which connects to South 180th on the
north. (See Attachment A site plan)
b. Is the site currently served by public
transit? If not, what is the approximate
distance to the nearest transit stop
Yes Metro presently has service along both
Andover Park West and South 180th Street.
c. How many parking spaces would the completed
project have? How many would the project
eliminate?
Added
780
Deleted
None
d. Will the proposal require any new roads or
streets, or improvements to existing roads or
streets, not including driveways? If so,
generally describe (indicate whether public
or private).
Andover Park West (private street) is fully
improved with curb and gutter. Three (3) new
curb cuts will be made.
2 e. Will the project use (or occur in the
immediate vicinity of) water, rail, or air
transportation? If so, generally describe.
There is an existing rail line along the
northern property line. The proposed
temporary use will not use rail.
f. How many vehicular trips per day would be
generated by the completed project? If
known, indicate when peak volumes would
occur.
None, this parking lot is being developed in
-13-
g.
Evaluation for
Agency Use Only
support of a simulcast /wagering facility as
previously discussed in SEPA L93 -0063
Proposed measures to reduce or control
transportation impacts, if any:
Traffic mitigation as discussed in SEPA L93-
0063 for simulcast /wagering facility.
15. Public Services
a. Would the project result in an increased need
for public services (for example: fire
protection, police protection, health care,
schools, other)? If so, generally describe.
No
b. Proposed measures to reduce or control direct
impacts on public services, if any.
None
16. Utilities
a. Underline utilities currently available at
the site: electricity, natural gas, water,
refuse service, telephone, sanitary sewer,
septic system, other.
b. Describe the utilities that are proposed for
the project, the utility providing the
service, and the general construction
activities on the site or in the immediate
vicinity which might be needed.
None
C. Signature
The above answers are true and complete to the
best of my knowledge. I understand that the lead
agency is relying on them to make its decision.
Signature 04/1.1144eW
Date Submitted /6043
PLEASE CONTINUE TO THE NEXT PAGE.
-14-
TO BE COMPLETED BY APPLICANT Evaluation for
Agency Use Only
E. SUPPLEMENTAL SHEET FOR ALL PROJECT AND NON -
PROJECT PROPOSALS
The objectives and the alternative means of
reaching the objectives for a proposal will be
helpful in reviewing the foregoing items of the
Environmental Checklist. This information
provides a general overall perspective of the
proposed action in the context of the
environmental information provided and the
submitted plans, documents, supportive
information, studies, etc.
1. What are the objective(s) of the proposal?
Construct a temporary parking lot to support a
simulcast /wagering facility.
2. What are the alternative means of accomplishing
these objectives?
Finding another site.
3. Please compare the alternative means and indicate
the preferred course of action:
This property is owned by the proponent and as is
indicated in this check list is ready to build.
Therefore, this site is preferred for
accommodation of this use.
4. Does the proposal conflict with policies of the
Tukwila Comprehensive Land Use Policy Plan? If
so, what policies of the Plan?
No
5. Proposed measures to avoid or reduce the
conflict(s) are:
N/A
-15-
„- .i;i:��:d. za r' ✓.l �Y�rt.. �+. rtb'r!ytt`72�awi�:..`:7ty�sM -: ol«,: k. t�ti5Y "£'J�h:?,..S:,��;'.'iY..1;�.FRt N: J; 3'. ^,4�_:»rti.�4Y17..+r.+r�vmw.oYv
Determination of Non - significance for
L93 -0081 (Segale Business Park Parking Area)
List of Attachments
January 10, 1994
A. Property Location Map
B. Site Plan Showing Shoreline Permit Sections, Landscape
Easement Locations and Final Grades.
C. Shoreline Cross - sections A -A through D -D
D. Shoreline Cross - sections E -E through H -H
E. Shoreline Cross - sections I -I through L -L
F. Shoreline Cross - sections M -M through P -P
G. Shoreline Cross - sections Q -Q through T -T
H. Landscape Plan
I. Existing Levee Improvement With Approximate Location of
Landward Repair /Maintenance Easement Area and Shoreward Edge
of Proposed Parking Improvements.
City Tukwila
DEVELOPER'S PROJECT WARRANTY
REQUEST FORM
.:.. td .. . � ..d�relo ar�thorJ�ed .. 1 ;:: �.: >::::: >: >:;:: <, °'<� ...:..............
.. b ..I .sta :..
NAMEOFDEVELOPMENT: SEGALE BUSINESS PARK - LOT 4 PARKING LOT DATE: MARCH 1, 199943
DEVELOPMENTADDRESS: 18120 ANDOVER PARK WEST PERMITNO.: ptii94- 0015 -0081
CASH ASSIGNMENT NAME: MARIO A. SEGALE, d //b /a 1
SEGALE BUSINESS PARK TEL. NO. (206) 575 -2000 ;
SHALL BE REFUNDED
BY MAILING TO: ADDRESS: p . 0. Box 88050
(please print) CITY/STATE/ZIP Tukwila, WA. 98138
DESCRIPTION OF ITEMS TO BE COMPLETED (REFERENCE
PLANS/DOCUMENTS WHERE ITEMS ARE DESCRIBEDI:
Install an additional one (1) foot of landscaping along the western portion of Lot 4 within
Segale Business Park for a total of fifteen (15) feet of front yard landscaping.
Reference: SEPA Permit #L -93 -0081; Public Works (Land Altering) Permit 4 /PW94 -0015
As the owner, or authorized agent of the owner, I hereby submit cash or cash equivalent in the amount of
$ 4,478.67 ($150% of value to complete work described above) and attach supporting
documentation for value of work. I will have this wort( carried out and call for a final Inspection by this date:
( 03 / 01 / 96 ), or risk having the City use these funds to carry out the work with their own contractor or
in -house manpower. If I fail to carry out the wort(, I hereby authorize the City to go onto the property to carry out
completion of the above deficiencies. I further agree to complete all work listed abov rior to requesting inspection and
release of these funds. SIGNED: ��
Mario A. Segale, /b /abEGALE BUSINESS PARK
TITLE: Owner
THIS FUND IS AUT
SIGNED:
AMOUNT /1 4 4 7 8, 6 7
CASH
)
DEPARTMENT H
0 BE ACCEPTED.
CASH EQUIVALENT
DEPOSITED THIS DATE: 3
CITY RECEIPT NO. s sU
1007A 9CO .HDIN.OXIYC4MCN \`NWNigY.9Ci00. '\ Vh 'OG�n9CS�i90XA \ \JpV:4.a'�+"�":
RECEIVED BY:
•
..cTTM. .IKC?:M •T \•M�(•T \.`•.v,SCttC�(i.:q C.MttC:� \ \W�1..xt »:cc `!C \tigT:`\M\tC XS». ..».»nc- .,QN» \nC:A..' .\ (�`. `\`'cC Z:...x.cct,\\..X,»»...xw.., :•r.i
@E
72 HOUR NOTIFICATION FOR
INSPECTION AND RELEASE OF FUNDS
DEVELOPERS REPRESENTATIVE:
All work identified in Section 1 of this form has now been completed
and returned to department which authorized warranty. I hereby
request inspection and release of my cash/cash equivalent.
DATE:
icr
CHECKED BY:
I have reviewed the above work and found it acceptable and therefore
authorize the release of the above cash assignment.
AUTHORIZED BY:
DEPARTMENT:
• to be cO pt®ted
ysr
CASH EQUIVALENT - LETTER AUTHORIZING RELEASE
CASH CITY CHECK NO.
Upon completion through Section 2, Finance personnel shall
send copies to: - Developer
- Finance Department
- Permit Coordinator, DCD
AMOUNT:
RELEASED THIS DATE:
RELEASED BY:
, FINANCE DEPT.
Upon completion of entire form, Finance personnel shall
send copies to: - Developer
- Finance Department
- Permit Coordinator, DCD
0013190
March 1, 1994
SEGALE BUSINESS PARK
PARKING LOT CORRECTION
Lot 4 @ 18120 Andover Park West
Work Item
# of Units
Unit Price
Extension
Remove asphalt (1' width)
87.5 SY
$5.00 /SY
$435.00
Remove curb
785 LF
$0.50 /LF
392.50
Restripe parking area
90 LF
$0.25/LF
• 22.50
Install curb
785 LF
$1.90 /LF
1,491.50
Install landscaping w /in 1' area
(22 CY topsoil)
22 CY
$19.00/CY
418.00
SUBTOTAL
2,759.50
Sales Tax (pa 8.2 %)
226.28
TOTAL
$2,985.78
Filed for Record at Request of
9403011034
Name MARIO A. SEGALE, D /B /A SEGALE BUSINESS PARK
rJ
Address c/o ANN J. NICHOLS
P. 0. Box 88050 ; a
City and State TUKWILA, WASHINGTON 98138
LANDSCAPE EASEMENT
4:.
A. MARIO A. SEGALE, A MARRIED MAN, ACTING WITH RESPECT TO HIS SEPARATE
PROPERTY AND ESTATE, d /b /a SEGALE BUSINESS PARK ( "Grantor "), is the owner of that certain real
property located in King County, Washington and legally described as follows:
Lot 2 of City of Tukwila Boundary Line Adjustment No. 93 -0085, recorded under King County?
Auditor's File No. 9311301961.
E
B. MARIO A. SEGALE, A MARRIED MAN, ACTING WITH RESPECT TO HIS SEPARAT
PROPERTY AND ESTATE, d /b /a SEGALE BUSINESS PARK ( "Grantee "), is the owner of that certain re al
property located in King County, Washington and legally described as follows:
Lot 4 of City of Tukwila Boundary Line Adjustment No. 93 -0085, recorded under King County
Auditor's File No. 9311301961.
C. Grantor desires to establish a landscape easement over portions of Lot 2 for the benefit
of Lot 4.
NOW THEREFORE, there are hereby created, declared and established, the following
easements:
1. A nonexclusive easement is hereby reserved over the easterly five (5) feet of Lot 2 as
it adjoins Lot 4 (hereinafter the "Easement Area ") for the purpose of providing landscaping to benefit
Lot 4.
2. The easement hereby created and imposed upon Lot 2 shall run with the land, and shall
inure to the benefit of and be binding upon said Lot 2 and the owners thereof, and their heirs,
successors and assigns.
3. All maintenance of the landscaping within the easement established herein shall be
undertaken by Grantee, its heirs, successors and assigns.
4. Grantee, its heirs, successors and assigns shall save, defend indemnify and hold Grantor
its heirs, successors and assigns harmless from all liability or damage arising out of any act or acts of
Grantee within the easement area.
IN WITNESS WHEREOF, this instrument has been executed this 23rd day o -Febrt y-, \1994.
,tip'
\'''''' ORIGIN !'''''' i '.''' '
- - . 1 . 1 \\I.._
Mario A. Segale,
d \b \a Segale Business Park
STATE OF WASHINGTON
COUNTY OF KING
ss.
)
On this day personally appeared before me MARIO A. SEGALE, a married man dealing in his
separate property and estate, d /b /a SEGALE BUSINESS PARK, known to me to be the individual
described in and who executed the foregoing instrument, and acknowledged that he signed the same
as his free and voluntary act and deed for the uses and purposes therein mentioned.
z + (° c%4
\SBP1D O C S\LOT2LS. ESM
Signature of Notar
6e4,-L. 1
Stamp Nark of Notary
Print or p y
Notary Public in and fo the State of Washington,
residing at
My commission expires 1 cf
December 29,1993
SEGA L E ;BUSINESS FA ARK
Ross Earnst
City of Tukwila Public Works
6300 Southcenter Blvd.
Tukwila, Wa. 98188
Re: Temporary Parking Lot for Simulcast Facility
SEPA Comments for Dike Drainage Easement
Dear Ross:
We have reviewed Public Works comments with regards to the SEPA review for the temporary parking
lot for the simulcast facility and request that the following clarifications be made:
o The City and County plan to provide a levee repair and improvement project design in 1994 and
construction in 1995. If the property owner desires to fill over the levee drainage material prior
to construction of the project by the City and King County, the property owner will build the
levee drainage collection facility (pipe) and place filter fabric on top of the facility in accordance
with City of Tukwila specifications prior to any grading /fill construction.
o If required by the City of Tukwila the materials already placed within the dike maintenance
easement over the existing dike drainage system will be removed by the property owner within
thirty days of written request of the City to allow installation of the levee drainage collection
facility. Construction of this facility is anticipated in 1995.
O
• •
•
r
The property owner will provide King County a permanent right of entry for inspection, repair
and maintenance by King County and its agents, of the left hank of the Green River within
property owner's land in Section 35,Township 23 North, Range 4 East, W.M., in King County.
This right of entry shall he provided to King County in recordable form prior to issuance of the
Certificate of Occupancy.
P ;; , .. 111 Srr/NG i ON 111 TELEPHONE 206 2000 • FAX 205 575 -; 837
Additional traffic mitigation wo. may be required if the Simulcast generates more traffic than
anticipated, and /or unanticipated traffic safety or capacity problems are created that are directly
attributable to the separated 783 ' "' stall parking
lot.
Yours very truly,
SEGALE BUSINESS PARK
(i7o4
Dana Warren
summary property line location map
--
MAP
Land Surveyor's Certificate:
This Boundary Line Adjustment /Lot Consolidation correctly
represents a survey* made by me or under. my direction in
conformance with the requirements of appropriate State statute.
Certificate No. /5—.0 3 3
A lot consolidation does not require a survey of the
perimeter unless the lines are adjusted.
Map on File
Direction:
Scale:
Stamp:
Page 9-
MAP
Land Surveyor's Certificate:
This Boundary Line Adjustment /Lot Consolidation correctly
represents a survey* made by me or under. my direction in
conformance with the requirements of ap ropriate State statute.
Certificate No. /5; 3 3
A lot consolidation does not require a survey of the
perimeter unless the lines are adjusted.
Lq3ooV
Map on File
Direction:
Scale:
Stamp:
Page
30206-7C
OS tmrr
4-/ZC-
AC COI 7V 1/4 IC 1/1
SEC 3>. T234 44C VN
2112
1• + 30'
A
GREEN
E
RIVER
H
0-A MW
2 17.7 * \ -
SITE PLAN
i•• 30'
AND
VER PARK WEST
-
VICINITY MAP
SEGALE BUSINESS PARK
0 600' 1200' 1000'
LAND USE DATA:
?IMPOSED ?AMONG STALLS • 743
CONSTRUCTION NOTES:
1. ALL VOON IANS127 010 140124 ALS SHALL MOWN 10 11C CITT d
TNAIY7LA'S SIMDAD20 AND SPCC91CAT111NS. TIC DRAIIN1. PAVING AND
WAINACC CONSTRUCTION 0204.4 IC21 CITT OS IUNVIIA g0U111E1CN1S.
2. ONE SITE WADING IS SALANC20 K1VE(N TIC OMITS •447• MD
4ILL• NATEDIAL
LEGEND:
{S • D IST LIGHT STA00M0
• 10.231 SMUG TIES
• MST =AVM 7102
• MST 11I0114A SHOAT
04 • 21a3T WAWA VALVE
U • 2lIST nu NTOIIANT
• 287017G CONTI=
2L+« • 2101244 7AV'NT ELEVATION
X74— • SWISH COMM
[- aoOi,C.7
1111.614;
PROPERTY LINE
CAD PILE NAME. APEPARK3 /201
SEGALE BUSINESS PARK
I W 1 30'
I•+
00/79/93
ANDOVER PARK VEST
TEMPORARY PARKING LOT
7Y TM
SITE PLAN
=R
w CR
NONE
201 -932%0
LAS•bc•in
PROPERTY LINE
1
M
N
GREEN
RI VER
I' a 30'
Q R
Z
EXISTING
AC -PARKING
- LOT
rein
ANDOVER ATE PARK WEST
O
SITE PLAN
1'= 30'
/
/
4.41:%47
8223'
PROPERTY LINO
LEGEND:
.0.- 000T UONT ST49A0D N— • (0319214 COMMA
• 4012 SMUG( WI rue. • 300033 PAV131 CLCVAT1OI
• OUT SYCAMORE TRL • —e0— • 3•1033 0010.
• 0053 P30TY00 31211001
pp • OM 311111 VAVC
7ME • 9009 Mt 111011ANT
•
CAC FILE NANEM APEPARK3 /:0l
SEGALE BUSINESS PARK
r S ,
30'
jaw 10/19/93
re ORM
law. NONE
ANDOVER PARK VEST
TEMPORARY PARKING LOT
SITE
•
PLAN
11Y ••J••5 9X
201- 979%I1
L'I3.'O08I
ANDOVER
PARK
WEST
0
30
25
20
15
10
30
25
20
15
10
fx
0
3 ' 100' WIDE HIGH IMPACT ENVIRONMENT 60' WIDE LOW IMPACT 40' WIDE RIVER
ENVIRONMENT ENVIRONMENT 40
�
•
$g FINISH GRADE(EXISTINC PARKING LOT) 33rn
2 l `z
/ DIKE \ ;�
0
2 M FINISH GRADE(PARKINO LOT)
Hi<
DIKE \ .1.41�
4
..J
n
5
0 507[
EXISTING PAVED
PARKING LOT
\.61i
\
g
li
'
y
�
y
- 2.007t y
ooz
_,
`
C-C
a.
=a
i
g
GREEN
�' WIDE LOW IMPACT
CPOSS
- SECTION
A -A
CFOSS
CFOSS
RP
K
GREEN
nri
�J.'iI)(
t- >�
12
1- - 20'(H); 1- • 5'(/)
100' WIDE HIGH IMPACT
ENVIRONMENT
I PO'
WIDE LOW IMPACT
A0' WIDE RIVER
15
j
6
7
0
2 M FINISH GRADE(PARKINO LOT)
Hi<
DIKE \ .1.41�
4
0
30
25
20
15
10
GRADED SURFACE
FINl9i GRADE(PARKING L011
DIKE
4
VF
-�-
5
0 507[
EXISTING PAVED
PARKING LOT
I
11
40' WIDE RIVER
0 �
S
,..i., 1
1
6
W
73
'
iZ
O
f GREEN
6
W
y
�
y
- 2.007t y
ooz
_,
`
C-C
a.
=a
i
g
GREEN
�' WIDE LOW IMPACT
- SECTION
1' • 2014): 1' • 5'(V)
100' WIDE HIGH IMPACI
B -B
ENVIRONMENT
CFOSS
CFOSS
- SECTION
CPOSS
nri
0
30
25
20
15
10
GRADED SURFACE
FINl9i GRADE(PARKING L011
DIKE
4
0
30
25
20
15
10
FINISH GRADE(PARKINO LOT) $ R
4
k
VF
-�-
0 507[
i i
7Tw
�
p
Y3W'li
y
�
y
- 2.007t y
ooz
_,
`
C-C
a.
=a
i
g
GREEN
:,,,
ry� a < GREEN
i_
id
CFOSS
- SECTION
CPOSS
- SECTION
�J.'iI)(
t- >�
r • 20'(H); 1' • 5(J)
100' WIDE HICK IMPAC'
ENVIRONMENT
GO'
WIDE LOW IMPACT
'
40' WIDE RIVER
x
I$
W
7
0
30
25
20
15
10
FINISH GRADE(PARKINO LOT) $ R
4
k
111 a
0 507[
tsl
i <
�3a
�
-200 2 °
_,
:,,,
ry� a < GREEN
i_
id
CPOSS
- SECTION
D -D
1' • 2014): 1' • 5(V)
b
i
25
20
RIVER
15
10
30
25
20
RIVER
15
10
30
25
20
RIVER
15
10
30
25
20
RIVER
15
10
E=11Z1C51Z11111
I0I•1.IAV
CAD F1tE NAME: APED I4115/201(P10T • l0• SCALE)
SEGALE BUSINESS PARK
..� AS 910
maw ORM
•� NONE
ANDOVER PARK WEST
TEMPORARY PARKING 10T
CROSS- SECTIONS/DETAILS
201 -93XXX
L93.00a,
1.
ANDOVER
PARK
WEST
30
25
20
15
IO
30
25
15
10
30
25
20
15
10
25
20
15
10
GRADED SURFACE
FINISH GRADE(PARKING LOT)
100' WIDE HIGH IMPACT ENVIRONMENT
2
60' WIDE LOW IMPACT 40' WIDE RIVER
ENVIRONMENT ENVIRONMENT _0
4 4. /DIKE
b
.00xx ,
'131
C }D SOx
a
o
i
7
..11
7 a
,WI
we,
-2 00X
-1.00
v.
-2.006
-1.006
CROSS
- SECTION
,.2,).(8); 1.. 5.
T
Aaa
YV
Q
P GREEN
_-w
pi100' WIDE HIGH
pi
IMPACT ENVIRONMENT
80' WIDE LOW I
1• - 20'(11): r - 5(V)
CROSS-
SECTION
E -E
NO 100' WIDE HIGH IMPACT
ENVIRONMENT
1 60' WIDE LOW IMPAC-
40' WIDE RIVER
IS
6
W
GRADED SURFACE
FIN1511 GRADE(PARKING 101)
S
OWE \ �'�•'
V
,a
aSDS
a
o
lir
WAWA
'
■ ,
ik ,.1
z
7 a
,WI
we,
-2 00X
...am
v.
-2.006
-1.006
CROSS
- SECTION
,.2,).(8); 1.. 5.
F-F
_-w
pi100' WIDE HIGH
pi
IMPACT ENVIRONMENT
80' WIDE LOW I
GRADED SURFACE
FIN101 GRADE(PARKING LOT)
8
DIKE
Y1
OW
+03 .
a
o
7 a
,WI
v.
-2.006
-1.006
war
_-w
ikul
1111 1
CROSS-SECTK*
1• - 20'(11): r - 5(V)
G-G
-I -h
100' WIDE HIGH
IMPACT ENVIRONMENT
60' WIDE LOW IMPACT
40' WIDE R1
R i
GRADED SURFACE
F1N1514 GRADE(PARKING LO
30
25
20
RIVER
15
10
30
25
20
GREEN RIVER
15
10
25
2D
GREEN RIVER
15
z�z 10
30
25
20
GREEN RIVER
15
10
1
SAO FILE NAME; APEPARK6 /201(PLOT • 20' SCALE)
•SEGALE• BUSINESS PARK
ID 1bIN"
ANDOVER PARK WE52
TEMPORARY PARKING LOT
ireu
CROSS-SECTIONS/DETAILS
ONS/DETAILS
gictior
201 -93656
X43 -ao$i
OW
0.50
a
o
v.
-2.006
-1.006
war
_-w
ikul
1111 1
CR
•SS- SECTION
1'. 201'.5'
-I -h
30
25
20
GREEN RIVER
15
10
1
SAO FILE NAME; APEPARK6 /201(PLOT • 20' SCALE)
•SEGALE• BUSINESS PARK
ID 1bIN"
ANDOVER PARK WE52
TEMPORARY PARKING LOT
ireu
CROSS-SECTIONS/DETAILS
ONS/DETAILS
gictior
201 -93656
X43 -ao$i
MPACT 40 WIDE •
ANDOVER
PARK
WEST
0
30
25
20
15
10
30
25
20
15
10
30
25
20
15
10
30
25
20
15
10
GRADED SURFACE
FINISH GRADE(PARKING LOT)
100' WIDE RICH IMPACT ENVIRONMENT
60' WIDE LOW IMPACT
2
ENVIRONMENT
3
WIE
-1
OSS -SECTION I-I
1- . 20(H); 1... 5• V)
100' WIDE HIG,I IMPACT ENVIRONMENT
00' WIDE LOW IM
40 .
WIDE
VER
4
ISM
111,15:
kWit
mem rdimar
EMI
GRADED SURFACE
FINISH GRADOPARKING LOT)
GRADED SURFACE
CROSS-SECTION J-J
1- 20.01): V V)
100 WIDE NIGH IMPACT ENVIRONMENT
SW WIDE LOW
FINISH GRADE(PMKING LOT)
%
•
11111/Y
,
ilif
C
OSS-SECT1ON
I- - 20.04); 1. - 51,6
K-K
:... 100 WIDE HIGI
IMPACT ENVIRONI/ENT60LIME LOW IMPACT
4021DE RIV:R
—2.000
GRADED SURFACE
GRADE(PARKING LOT)
25
20
GREEN RISER
15
10
5
0
GREEN RIVER
15
10
6 °
GREEN RIVER
.15
CF OSS:AS-
. 20110; 1. - 5.04
25
0
20
GREEN RIVER
15
10
•
•
CAD FILE NAME: APEP00K7/201(PLOT • 20' SCALE)
1=1•01C111711
SEGALE BUSINESS PARK '
Ewa AS SHOWN pow- 5R0
144. 10101/95 1 NONE
A▪ N▪ OOVETI PAW WEST
TEMPORARY PARKING LOT
On& esaa-2-
CROSS-SEC111•45/DETAILS 201-03050
IA - boat
f
ANDOVER
PARK
WEST
0
30
25
20
1
10
30
25
20
15
10
30
25
20
15
10
30
25
20
15
10
GRADED SURFACE
FINISH CRADE(PARXING LOT)
8
-2.002
00A
2
i4
a
100' WIDE 4164 IMPACT ENVIRONMENT 60' WIDE LOW IMPACT 40' WIDE RIVER
t.0.24
ENVIRONMENT ENVIRONMENT
a "
z�.
LSE
11111
60 WIDE LOW IM FACT 40' WIDE RIt
mai _no
LIME
� O
DIKE
1111Ir
CROSS - SECTION M -M
20(4); 1.. 5' V)
100' WIDE HI
IMPACT ENVIRONMENT
GRADED SURFACE
FINISH GRADE(PARKINO LOT)
a
- 2.00X_
ROHNER
S
CROSS - SECTION N -N
1' - 20'(11); Y L (V)
4 )( 100' WIDE 1
GRADED SURFACE
FINISH GRADE(PARKINC LOT)
CH IMPACT ENVIRONMEI T
60' WIDE LOW IMPACT
- CRHRONMEY
S
40' WIDE
CIMR
DIKE
3
a
a
:
5d
`J
g
3i
#0303
6
{aa�
}p
-I.00X
CF
OSS- SECTION
1' - 20'(N); 1' . 5'(V)
0-0
.
y,'I)( 100 WIDE HICI
IMPACT ENVIRONMENT
60' WIDE LOW IMPACT
40' WIDE RI
GRADED SURFACE
FINISH GRADE(PARKING LOT)
5
20
GREEN RIVER
10
25
20
CREEK RIVER
15
10
30
i GREEN RIVER
10
30
CROSS - SECTION P -P
1• - 20'(11); 1' - 5' 4)
•
5
0
GREEN RIVER
15
10
CAD FILE NAME: APEPAR1(6 /20,(PLOT • 20' SCALE)
SEGALE BUSINESS PARK
r=•011/11C0•1
10,6 (AI
ANDOVER PARK *EST
TEMPORARY PARKING LOT
newt
CROSS— SECTIONS/DETAILS
201 -V3XXX
L bO8%
ANDOVER
PARK
WEST
30
25
20
1
10
25
-2
20
15
10
30
25
20
15
10
GRADED SURFACE
FINISH ORADE(PARKING LOT)
100' WIDE HIGH IMPACT ENVIRONMENT
2
-1.00;
SS— SECTION O —O
1' - 20111); 1- - 5'( 1)
100' WIDE HIG1 IMPACT ENVIRONMENT
GRADED SURFACE
FINISH GRADE(PARKING L00)
60' WIDE LOW IMPACT 40' DE
ENVIRONMENT
R
VER
ENVIRONMENT
60' WIDE IOW IM
ACT
40' WADE RI
•
DIKE
ylx
8
C 9OSS— SECTION R —R
1- - 20'(11); 1' - 5 (V)
.•
100' WIDE FDGH IMPACT ENVIRONMENT 60' WIDE LOW MPACT 40' WIDE IVER
FINISH GRADE(PARKING LOT)
DIKE
NT-
NE OF ORDINARY
T
[FJISlIllMKING
100)
�g
nA
/�b
73a
OOt ".
CROSS—
SECTION
1- - 20111); 1' - 514)
S —S
100' WIDE H1G1
IMPACT ENVIRONMENT
60' WIDE LOW IMPACT
40' WIDE RIV'.R
30
m FINISH CRADE(E%IS 1NC PARKING LOT)
3
25
-2.00
20
15
10
t
c
CROSS—SECTION - -T
1• - 20'(11); 1' - 5(V)
•
25
20
GREEN RIVER
15
10
25
20
GREEN RIVER
10
5
?20
8
i GREEN RIVER
TTI5
30
5
0
GREEN RIVER
5
10
CAD FILE NAME: APEPARK9 /201(PLOT • 20' SCALE)
SEGALE BUSINESS PARK
Gy aELI•
lolx•il3
AROOVER PARK WEST
TEMPORARY PARKIN0 LOT
CROSS- SECTIONS/DETAILS
201 -9300%
L4'oO8I
GREEN
�i of • ��i oi. �i. of . i. ei �i e . .
�.���i�.�i�!•i i�' ?��:� of �!.'i�•i • ��i.���i�� ei.� . i�.��� oi�.� . ��•���
l' a eeee.0� •. 1 464; ;� !e•e•e i tie . i•#4 : %�����:
/�!�l�i`��!� �i`�� �!� `i ".ii •'poi ` i /e•e1� 4,44 •%; 4•i.:i.eoi�
`i.�.i oi�:i :n•�� of
'�`i''�;i�i °1` !i�'��i!����oi!� le!e !41$4• %! -4 44,4 „�i��e`i ee e eel
re/ i.. �"I�n . OI.i • I.�,. �`IoI,.:��I jl��I. +��i�I jl���►
RIVER
32
30
28
26
24
22
20
RIVER
NORTHERLY
ECOLOGY -BLOCK
EXISTING WALL
BANK DRIVE
AP TELLER,.
23.10
T29.10
3.0
T29.0
PARKING LOT ,STRIPING .-c--""..
C
FINISH GRADE
ORIGINAL SURFACE
RIVER
B
PROFILE
CG-NORTHERLY ECOLOG)
EXISTING GRASS SLOPE
TOP OF WALL
FINISH GRADE
ORIGINAL SURFACE
96'
PROFILE
NORTHERLY ECOLOGY -BLOCK WALL
EXISTING GRASS SLOPE
NE COR SW 1/4, NE 1/4
SEC 35, Ta3N, R4E, WM
DIKE
C WALL
NE COR SW 1/4, NE 1/4
SEC 35, T23N, R4E, WM
SITE
32
30
28
26
24
22
20
Z=1
.1,11M4471:4Z4Z 4.4W
1JL3-W6 1
ANDICAP RA
�ddd��,�.*'o
add � . � df'
ri nips 4 ��.4'd:4
HPS(2) ",,";`���ss;�,,��;�d
ANDOVER p ARK
(PRIVATE S WES T
SITE
1' =
PARKING LOT STRIPING .
�'• � '
•,-9 _ . J � : A t: A� . C .0 C 0.
c te
� � �c d
d ANDICAP RAMP S<2> �r9•d�94,q�,, � �.4d�- ZJ.f 6�-`r°F4A�> ♦ ` �;i �i�
K WE S T `7'45'24 "W
ET1
SITE PLAN
t' = 30'
486.68'
VICINITY MAP
SEGALE BUSINESS PARK
0
600' ' 1200'
LAND USE DATA:
PROPOSED TEMPORARY PARKING'
STANDARD STALLS(8161X191) =553
COMPACT STALLS <8'6'X16' +> =230
TOTAL PARKING STALLS =783
1800'
CONSTRUCTION NOTES:
1. ALL WORKMANSHIP AND MATERIALS SHALL COQ
TUKWILA'S STANDARDS AND SPECIFICATIONS. THE
DRAINAGE CONSTRUCTION SHALL MEET CITY OF
2. THE SITE GRADING IS BALANCED BETWEEN TE
LEGEND:
= EXIST LIGHT STANDARD
= EXIST TREE
0= EXIST PHOTINIA SHRUB
M = EXIST WATER VALVE
IcC = EXIST FIRE HYDRANT
NOTE: ALL PROPI
CAD FILE NAME:
24 "w
VICINITY MAP
SEGALE BUSINESS PARK
0
600'
1200'
LAND USE DATA:
PROPOSED TEMPORARY : PARKING'
STANDARD STALLS (8'6'X19') =553
COMPACT STALLS(8'6'X16' +) =230
TOTAL PARKING STALLS =783
1800'
CONSTRUCTION NOTES:
1. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO THE CITY OF
TUKWILA'S STANDARDS AND SPECIFICATIONS. THE GRADING, PAVING AND
DRAINAGE CONSTRUCTION SHALL MEET CITY OF TUKWILA REQUIREMENTS.
2. THE SITE GRADING IS BALANCED BETWEEN THE ONSITE 'CUT' AND FILL
LEGEND:
->- = EXIST LIGHT STANDARD
= EXIST TREE
0= EXIST PHOTINIA SHRUB
N = EXIST WATER VALVE
= EXIST FIRE HYDRANT
. -- 24 ---*"'
P23.05
24
= EXISTING CONTOUR
FINISH PAV'MT ELEVATION
= FINISH CONTOUR
= PROPOSED GRASS
= PROPOSED GROUND COVER
RECE V
:A% b r 199'
CO'MMUNI1 r
DEVELOPM
NOTE: ALL PROPOSED LANDSCAPE WILL BE AUTO IRRIGATED
CAD FILE NAME: APEPARK2 /201(PLOT @ 40' SCALE)
162016 REGISTERED
ARCH TECT
Fig,.;
r.i
P,SNIMCTON
M.A. SEGALE, INC.
TUKWILA, WASHINGTON•2 375-3200
seam 1' = 30'
DATEr 10/19/93
MAY/4 Pv DRM
REV1SEa NONE
TITLE.
ANDOVER PARK WEST
TEMPORARY PARKING LOT
SHEET' 1 on 2
SUP T1TLEI
SITE AND LANDSCAPE PLAN
DRAWING NUMBER'
201 -93XXX
D
LEGEND:
COST UGHT STANDARD.
EXIST TREE
EXIST PHOIINIA SHRUB
pq in EXIST WATER VALVE
Ig( • EXIST FIRE HYDRANT
EXISTING CONTOUR
FINISH PAV'MT ELEVATION
FINISH CONTOUR
= PROPOSED GRASS
= PROPOSED GROUND COVER
EXISTING GRASS SLOPE
NOTE: ALL PROPOSED LANDSCAPE WILL BE AUTO IRRIGATED
a .41J
TO IRRIGATED
GREEN
FIN
ORIGINAL SURF AC
PRO
RIVER - ERLY ECO
FINISH GRADE
ORIGINAL SURFACE
TOP OF WALL
157.50'
PROFILE
SOUTHERLY ECOLOGY -BLOCK WALL
• top •
LL
STREET
DIKE
0'6'
5'0' 6'0'
LANDSCAPIN SIDEWALK
/GRASSCLA
W
(.3
+n.nn..._......._. +n O_
10'0'
LANDSCAPING
W /GRASSCLAWN) z
N
32
30
28
26
24
22
20
TEMPORARY
PARKING LOT
DIKE
EXISTING
STREET
:TREE .
6'0'
SIDEWALK
10'0'
32
30
28
26
24
22
20
TEMPORARY
LANDSCAPING
W /GRASSCLAWN)
4
ai
00
V
PARKING LOT
PROPOSED
PARKIN�ELO PO
c `
904734 eelila:147#4,10710
HANDICAP RAMPS(2) •.��� v�d''� &to
ANDOVER
PAR p � E R�VAT K
STREET)
ST
SITE PLAN
1' = 30'
SIDE
SED Jg'7RA R'
PARKING LOT STRIPING
WEST
SITE PLAN
t' = 30'
SIDEWALK
B22.20
T24.20
HANDICAP RAMP
RIPING
822.20
T24.20
C 18
/
,•
;al
Je
aillp
ftvir
r•
i
i •
/0
/4,
/r
r
�
/0
/0
•
•
823.40
T29.40
SOUTHERLY
ECOLOGY —BLOCK
WALL /
EXISTING
AC—PARK1NG
LOT
or A
ASPHALT
CONCRETE
PAVEMENT,
CLASS B SECTION A -A
ALONG STREET FRONTAGE
1' = 4'(Hw = 2'(V)
TEMPORARY
PARKING LOT
ASPHALT
CONCRETE
PAVEMENT,
CLASS E
2'0'
CEDRUS ATLANTICA GLAUCA --
'BLUE ATLAS CEDAR'
JUNIPERUS CHINENSIS PEITZER:
'OLD GOLD JUNIPER'
FUTURE FILL
SECTION B -B
ALONG RIVER FRONT,
1' = 4'(H)il' = 2'(V)
CAD FILE NAME'
HANDICAP RAMP
TITLE'
ANDOVER PARK
TEMPORARY PAR
SU/ TITLE'
SITE AND LAND.
ASPHALT
CONCRETE
CLASSEBT' SECTION A -A
ALONG STREET FRONTAGE
= 4'(H)Jl' = 2' <V)
FACE
CEDRUS ATLANTICA GLAUCA
'BLUE ATLAS CEDAR'
JUNIPERUS CHINENSIS PEITZERIANA
'OLD GOLD JUNIPER'
FUTURE FILL
GROUND COVE
JUNIPERUS HORIZONTALIS 'WILTONI'
'WILTONS BLUE CARPET JUNIFER'
ASPHALT
CONCRETE
PAVEMENT,
CLASS E
DIKE
SECTION B -B
ALONG RIVER FRONTAGE
1' = 41(H)J1' = 2'(V)
RECD IV r)
`t
ti i99'
COMNMUNIT'
DEVELOPIVIEt�
CAD FILE NAME' APEPARK3 /201(PLOT a 40' SCALE)
M.A. SEGALE, INC.
TUKWILA, WASHINGTONc206> 373--3200
SCALE' 1
= 30'
,S STATE OF'W(SNINGT(hk
DATE. "TITLTr-
ANDOVER ANDOVER PARK WEST
TEMPORARY PARKING LOT
U$ TITLE'
SITE AND LANDSCAPE PLAN
DRAVN DY' DRM
REVISED' NONE
SHEET. 2 oc' 2
!WAVING- MU$)t
201 -93XXX
SOIL RAP
SHORT PLAT REC N0.8609081152
LANDWARD EDGE OF
LANDWARD EDGE
RIVER PROTECTION EASEMENT
REC NO 60 ,Q15 ,•f Cz/
GRAVEL FILTER
TOP OF DIKE
EDG
;^ ..,_._..... _.. _ _
REC N0.8609081152
APPROX. ei74E OF PizDFvSe0 TeMp t'Atglo'eC
LANDWARD EDGE OF GRAVEL FILTER
GRAVEL FILTER ,
TOP OF DIKE
TRyE POINT OF BEGINNIN
EDGE OF WATER NOV. 30,1990
GREEN RIVER
EXISTING RIVER PROTECTION EASEM NT
?yE POINT OF BEGINNIN
S
BASIS OF BEARINGS
I i
t
CT ION EASEMNT
1
W:W
0.
.2- 141JN
•
FOUND CONCRETE MONUMENT
IN CASE
180TH STREET
(1)
FOUND CONCRETE MONUMENT
IN CASE
•
_ - ..... ._..... �.. ....
_E 1 " =5 0 '
36'
BASIS OF BEARINGS
FOUND CONCRETE MONUMENT
IN CASE
S 180TH STREET
FOUND CONCRETE MONUMENT
IN CASE
DATE 1 RCVISIUN
T!TLE
AS BUILT 5.
SEGA!
PERMANE
KING CDUNTY SL
SUil VEY PO
GAMMELL
RED/PLOT Iris I PLOT DATEI
SPURRELL DEC 90
REMENCESt
By
KING CDUNTY
DEPT. OF PUBLIC WORKS
•
„ 1 ... :. tty.:^.i r'7 ,.. �;:i';�, .r. Si�, 7'�F'.,
TITLE AS
BUILT SURVEY ATTACHMENT "Cl
SEGALE LEVEE REPAIR
PERMANENT RIGHT OF ENTRY
KING
PREPARED FDR'
COUNTY SURFACE WATER MANAGEMENT
PROJECTIN
SU!,VEY PCB
GAMMELL
RED /PLOT >iYs
SPURRELL
PLOT DATE
DEC 90
SURVEY DATE1
NOV 1990
COCKED PI DATE CHECKEDI
LEVESQUE /SPURRELL DEC 90
FIELD DIXIKI
SDR
DISC IDs
,SEGALE
REFERENCES'
BY
KING COUNTY SURVEY & MAPPING
DEPT. OF PUBLIC WORKS TEL 296 -7713 FAX 296 -7719
1I=501
SHEET
1 2
OF
:
(4
NJ
V
n..;
r3
9.
..., ■ 4ii .,,,.
4. 1:11r-4 * 117
-......Th Q • ............... " • • . 0.4 • • • •
• • • • • • • • • • •••••••••••••••••••7••••• • • • •
„0...,........x....,...............::::.....E..x.: 0,e
Vu
•••••••••••••••••••••••••••••
0 0 0.8 0 • ••••••••••••••:::07 4 6..":"..". "
.6=6=10_.
..0"““0. ..
• ..... a • • SO • • • • • • • • • •
61$ a . • • • • • • • •••••••.............
• • . . . . .. .14.: . • . • . ..10. : ,....i.; ... •• . 4. lila...6...6.1.; . . . . . . .., . :
e • • • • • • • • ••••••••• Oe 0
Cr ' • ...::::.....:77.....1..1/
• • •••••••••::::::::::■;„
• •:::::::::. • • • • • • •
,••• ••••••••••
eie...••• • •••••••••••::
••Z• • • • • • • •
&V
LANDWARD EDGE
RIVER PROTECTION EASEMENT
REC NO 6027015
• •
•
'/K172,3)
~ •, •
••••••••••••••••••••
• • • • • • • • •
• • • • • • • • •
LANDWARD EDGE
'S'eP
<>As
4,
_ANDWARD EDGE
7IVER PROTECTION EASEMENT
2EC NO 6027015
0
LANDWARD EDGE OF GRAVEL FILTER
GRAVEL FILTER
•• `• • • RIP RAP
ZAP
anwiesur-
S
SHORT PLAT REC NO.8609081152
r PLAT REC NO.8609081152
.1'
.....'` rUaPa s o• /
• %• lI MC• t & , ; 14' y ;
1 • U'•- c 0 :• cam.
• 0 =C
EDGE OF
ATER NOV. 30.1990
DATE
REVISIUN
<04'4
l BY
RIP
AND
TTL
SUR)
RED,
REFS
.Y> i'';;:t;- `,.5>:JeXLTS Y : \7lYki• " :!'..;' •7V:rr.,...
I
•
•
I
I I
I r
4.
i U • rE ,-.+ n /
% ': ;,`.wa s ' O•: '
..' „ hj t0. Jd3 14• y
••.: fir; . e•39,'g•
LJ
W /
:37 G ,_' 1? Sl . 1' • ,
. .-• .-- ............ ...... .. . .:...:: ..:..:... ...T : . Y X77... . ...
W
°a Ate. (4
7■At'fitiR'::ai °3';.`i.` =q ,. ,.2'W i'^cu', `'+rtER a";,:v:rraur...;, a•.
Armax 0176re oP PRatrosav
ttMr. paRicimor Lor at#wooverteNrS.
EDGE OF WATER NOV. 30,
ION
4c,•
1 BY
RIP RAP COVERED OVER WITH DIRT
AND HYDROSEEDED
W
Z
11
TITLE
AS BUILT SURVEY ATTACHMENT
SEGALE LEVEE REPAIR
PERMANENT RIGHT OF ENTRY
1/
//
PREPARED FORT
KING COUNTY SURFACE WATER MANAGEMENT
PRDJECTN'
SURVEY PC'
GAMMELL
RED /PLOT BY'
SPURRELL
REFERENCES/
PLOT DATE'
DEC 90
1
SURVEY DATE'
NOV 1990
CHECKED BY' DATE CHECKED'
LEVESQUE/SPURRELLI DEC 90
_..
SDRLD BOO*
KING COUNTY SURVEY & MAPPING
DEPT. OF PUBLIC WORKS TEL 296 -7713 FAX 296 -7719
DISC ID'
SEGALE
SCALE'
1' =50'
SHEET
2 OF 2
• •
APProx. oPet.e
temr. pAggitior tor ativovertiet-rrs,
• ,,,
A:0
8.39'42. /
/
---=,.......". s 11.22,19,
/
:::::"....................w........=—..........="...".
w
S
■:—.-2.-V.A.1.3".... • • • • - • • '
. • • • • • • • • • • • • • • • • • ••••••••••••••••• • • • • • • . . :: • ' ' ••••-••••••-r
• • • • 4 • • iv; • • 4 ••• • • ••• ••••• ••• • ••••••••••• • • •••••••• ••••••7rrrri...111
op000.00.01.••••••••••0000000.00•0*•••••••.1000$1M,...
.......QZ141.2.37..:
BY
RIP RAP COVERED OVER WITH DIRT
AND HYDROSEEDED
LJ
LJ
LJ
LJ
LJJ
z
11
_J
TITLE
AS BUILT SURVEY ATTACHMENT 11
SEGALE LEVEE REPAIR
PERMANENT RIGHT OF ENTRY
1/
•
PREPARED FOR.
KING COUNTY SURFACE WATER MANAGEMENT
PROJECTM
SURVEY PC.
GAMMELL
SURVEY DATE'
NOV 1990
RED/PLOT By'
SPURRELL
PUNDATEI
DEC 90
CHECKED BY. DATE CHEMED
LEVESQUE/SPURRELLI DEC 90
FIELD BMW
DR
DISC ID.
EGALE
REFERENCESo
SCALE.
11=501
KING COUNTY SURVEY & MAPPING
DEPT. OF PUBLIC WORKS TEL 296-7713 FAX 296-7719
SHEET
2
a
OF
GREEN
RIVER
RIVEI
NORTHERLY
ECOLOGY -BLOCK
EXISTING WALL
BANK DRIVE
P TELLER
PARKING LOT STRIPING
RIVER
FINISH GRA
ORIGINAL SURFACE
CC-NOR
PROFIL
ERLY ECOLO
EXISTING GRASS SLOPE
PARKING LOT STRIPING
TOP OF WALL
FINISH GRADE
ORIGINAL SURFACE
PROFILE
NORTHERLY ECOLOGY -BLOCK WALL
1' = 20'(H);1' = 4'(V)
-- EXISTING GRASS SLOPE
NE COR SW 1/4, NE 1/4
SEC 35, T23N, R4E, •M
10
DIKE
NE COR SW 1/4, NE 1/4
SEC 35, Ta3N, R4E, WM
AND VE --_
(PRIVATE PARK STREET) WEST
SITE
1'
PARKING
LOT
NDICAP RAMPS(2) ti" 'tV,(4 s ; , ., ;,
NEST
SITE PLAN
1' = 30'
486.68'
;1NG LOT
PARKING LOT STRIPING
VICINITY MAP
SEGALE BUSINESS PARK
LAND USE DATA:
PROPOSED TEMPORARY PARKING'
STANDARD STALLS(8'6'X19') =553
COMPACT STALLS(8'6'X16' +) =230
TOTAL PARKING STALLS =783
1800'
CONSTRUCTION NOTES:
1. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO THE CITY OF
TUKWILA'S STANDARDS AND SPECIFICATIONS. THE GRADING, PAVING AND
DRAINAGE CONSTRUCTION SHALL MEET CITY OF TUKWILA REQUIREMENTS.
2. THE SITE GRADING IS BALANCED BETWEEN THE ONSITE 'CUT' AND FI
LEGEND:
-}- = EXIST LIGHT STANDARD
= EXIST TREE
0= EXIST PHOTINIA SHRUB
N = EXIST WATER VALVE
= EXIST FIRE HYDRANT
= EXISTING CONTOUR
= FINISH PAV'MT ELEVATIO
= FINISH CONTOUR
= PROPOSED GRASS
= PROPOSED GROUND COVI
NOTE: ALL PROPOSED LANDSCAPE WILL I
CAD FILE NAME: APEPARK2 /201(PLC
M.A. SEGO
TUKWILA, WASHINC
DATE' 10/19/93
Mrs
ANDOVER PARK WEST
TEMPORARY PARKING LOT
stn TITS
SITE AND LANDSCAPE PLAN
VICINITY MAP
SEGALE BUSINESS PARK
0
600'
1200'
LAND USE DATA:
PROPOSED TEMPORARY PARKING'
STANDARD STALLS(8'6'X19') =553
COMPACT STALLS(8'6'X16' +) =230
TOTAL PARKING STALLS =783
1800'
CONSTRUCTION NOTES:
1. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO THE CITY OF
TUKWILA'S STANDARDS AND SPECIFICATIONS, THE GRADING, PAVING AND
DRAINAGE CONSTRUCTION SHALL MEET CITY OF TUKWILA REQUIREMENTS.
2. THE SITE GRADING IS BALANCED BETWEEN THE ONSITE 'CUT' AND FILL
LEGEND:
-- = EXIST LIGHT STANDARD
= EXIST TREE
0= EXIST PHOTINIA SHRUB
pd = EXIST WATER VALVE
= EXIST FIRE HYDRANT
24 -
P23.05 0
24
= EXISTING CONTOUR
= FINISH PAV'MT ELEVATION
= FINISH CONTOUR
= PROPOSED GRASS
= PROPOSED GROUND COVER
RECEFf
CAI'
COIVMMUN T
DEVELOP1v7:
NOTE: ALL PROPOSED LANDSCAPE WILL BE AUTO IRRIGATED
CAD FILE NAME: APEPARK2 /201(PLDT @ 40' SCALE)
Vs REGISTERED
ARCH }TECT
f 'l
.STATE PROTON
v113
M.A. SEGALE, INC.
TUKWILA, WASHINGTONc oo 575 -3200
scm 1' = 30'
DRAW NY. DRM
DATE' 10/19/93
REVISED NONE
TITLE'
ANDOVER PARK WEST
TEMPORARY PARKING LOT
SHEET. 1 i t 2
SUB TITLE►
SITE AND LANDSCAPE PLAN
DRAVING MUM MI
201 -93XXX
LEGEND:
* at . EXIST LIGHT STANDARD.
Sam EXIST TREE
EXIST PHOTiNIA SHRUB
D4 - EXIST WATER VALVE
TX : EXIST FIRE HYDRANT
EXISTING GRASS SLOPE
= EXISTING CONTOUR
FINISH PAV'MT ELEVATION
2 FINISH CONTOUR
PROPOSED GRASS
= PROPOSED GROUND COVER
NOTE: ALL PROPOSED LANDSCAPE WILL BE AUTO IRRIGATED
GREEN
PARKING LOT STRIPING
GREEN
FINISH GRA
ORIGINAL SURFACE
76.50'
TOP OF WALL
FINISH GRADE
ORIGINAL SURFACE
TOP OF WALL
157,50'
PROFILE
SOUTHERLY ECOLOGY -BLOCK WALL
STREET 5'0' 6'0'
SIDEWALK
/GRASS<LAW 1
DIKE
APING
CLAWN
6'0'
SIDEWALK
'
LANDSCAPING
V /GRASSCLAWN) z
TEMPORARY
PARKING. LOT
12' 12•
15' 15'
PROP.I E
PAR TEMPORARY
KING LOT
fl
remumer_u5draMeffare,~01,110,0 HANDICAP i.. °Hi9.{, , DO% Hs,,s/liyYi % b /isn
ANDOVER gRK (PRIVATE STREET)
WEST
SIDEWAL
SITE PLAN
1' = 30'
i
NTEMPO L 'ARY
PARKING LOT STRIPING
EXISTIt■
AC -PARK
LOT
ST
B22.20
T24.20
HANDICAP RAMP
B22.20
T24.20
:23.40 /
T29.40 /
/ •
c /
/•
/0
1•
to
le
c 18
SOUTHERLY
SOUTHERLY
ECOLOGY—BLOCK
WALL
•
45
823.40
T29.40
B23.40
T29.40
EXISTING
LOT
EXISTING
AC— PARKING
LOT
C.3
4i+v
to-
+0.0Q +Q.°
+0.15
ASPHALT
CONCRETE
PAVEMENT,
CLASS B SECTION A -A
ALONG STREET FRONTAGE
1' = 4'0H)jl' = 2'(V)
TEMPORARY
PARKING LOT
ASPHALT
CONCRETE
PAVEMENT,
CLASS E
2'0'
as
oc CEDRUS ATLANTICA GLAUCA
C.3 'BLUE ATLAS CEDAR'
L
JUNIPERUS CHINENSIS PEITZERIANA
v 'OLD GOLD JUNIPER'
FUTURE FILL —)
'lf
c'1
Qoe
GROUI
JUNIPERUS
'WILTONS B
SECTION B -B
ALONG RIVER FRONTAGE
4'CH)jl' = 2'(V)
CAD FILE NAME' APEPARK3 /20
M.A. SI
TUKWILA, Wi
TITLES
ANDOVER PARK WEST
TEMPORARY PARKING LOT
DATE. 10/19/93
SUP TITLE•
SITE AND LANDSCAPE PLAN
PHALT
INCRETE
.ASS
EBT' SECTION A -A
ALONG STREET FRONTAGE
CEDRUS ATLANTICA GLAUCA /
'BLUE ATLAS CEDAR' /
JUNIPERUS CHINENSIS PEITZERIANA
'OLD GOLD JUNIPER'
FUTURE FILL
SECTION B -B
GROUND COVE
JUNIPERUS HORIZONTALIS 'WILTONI'
'WILTONS BLUE CARPET JUNIFER'
ASPHALT
CONCRETE
PAVEMENT,
CLASS E
DIKE
ALONG RIVER FRONTAGE
i' = 4'(0l' = 2'(V)
RECEIVED
JAN t .l 199f
COMMUNITY_
DEVELOPMENT
CAD FILE NAME' APEPARK3 /201 <PLOT C 40' SCALE)
M.A. SEGALE, INC.
TUKWILA, WASHINGTONc206) 575 -3200
4325. F TGISTERED
ARCH TECT
DRAVN ,r• DRM
DATEs 10/19/93
ANDOVER PARK WEST
TEMPORARY PARKING LOT
REVISE-DI NONE
SHEET,
A
SITE AND LANDSCAPE PLAN
201 -93XXX