HomeMy WebLinkAboutRes 1845 - 2015-2016 Consolidated Permit Fee Schedule (Repealed by Res 1867)%`. T 1
Washington
Cover page to Resolution 1845
The full text of the resolution follows this cover page.
RESOLUTION LUTION OIL THE ITY COUNCIL OF THE CITE' OF
TUIKWIL , WASHINGTON, REPEALING RESOLUTION NO
'18 5; ADOPTING ONSOLI TIE ! PERMIT FEE
SCHEDULE; AND PROVIDING FOR A BUILDING PERMIT
PEE DEFERRAL PROCESS TO ENCOURAGE RESIDENTIAL
DEVELOPMENT WITHIN CERTAIN PORTIONS OF THE
SOUTHCENTER AREA OFTHE CITE''.
Resolution 1845 was amended or repealed by the
following resolutions.
7Section!) ReF ed Repealed by Res*
1867
City of Tukwila
Washington
Resolution No. 1845
A RESOLUTION OF THE CITY COUNCIL OF THE
CITY OF TUKWILA, WASHINGTON, ADOPTING A
CONSOLIDATED PERMIT FEE SCHEDULE AND
REPEALING RESOLUTION NO. 1803.
WHEREAS, the City intends to update permit fees on an annual basis, with any
increases tied to growth in City expenses for providing permit services; and
WHEREAS, the City Council wishes to recover a portion of the City's costs for
review and processing of permit applications; and
WHEREAS, the City has adopted a biennial budget process; and
WHEREAS, salaries for represented City employees are adjusted by 90% of the
Seattle CPI-W, which was 2.2% for the June 2013-2014 period; and
WHEREAS, greater compliance with environmental regulations can be encouraged
by offering reduced permit fees for residential homeowners on specific sensitive area
permits; and
WHEREAS, greater permitting compliance and streamlined disaster recovery can
be encouraged by offering a flat permit fee for small residential remodels;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, HEREBY RESOLVES AS FOLLOWS:
Section 1. For 2015 and 2016, the Technology Fee shall be set at 5% of the
applicable permit fee.
W:\Word Processing \Resolutions \Consolidated permit fee schedule-2015-2016 10-14-14
NG:bjs
Page 1 of 10
Section 2. Public Works fees will be charged according to the following schedule:
PUBLIC WORKS FEE SCHEDULE
PERMIT DESCRIPTION
FEE
Type A (Short-Term Non-profit)
$ 5O.U0+ Technology Fee
Type B (Short-Term Profit)
$1OO.00+ Technology Fee
Type C
(Infrastructure and Grading on Private Property
and City Right-of-Way and Disturbance of City
Right-of-Way)
$250.00 application base fee, Technology Fee, plus
four components based on construction value:
1) Plan Review
2) Construction Inspection
3) Pavement Mitigation
4) Grading Plan Review
Type D (Long-Term)
$100.00 + Technology Fee
Type E (Potential Disturbance of
City Right-of-Way) )
$1OO� OO+ Technology Fee
^ (Blanket
Type
$250.00 plus $5.00O.00 cash deposit,
� '
vv�hdraw$1OO.00 per instance for inspection
Franchise — Telecommunications
$5,000.00 administrative fee
Franchise — Cable
$5.000.00 plus 5% of total revenue
Street Vacation
31.200.00
.
Loteonmer s Agreements
$500.00 processing fee. plus 17% administrative fee,
plus $500.00 segregation fee
Flood Zone Control Permit
$50.00 + Technology Fee
Section 3. Land use permit and processing fees will be charged according to the
following schedule:
LAND USE FEE SCHEDULE
All peer review fees will be passed through to the applicant per TMC Section 18.5O2UO.
Decision Type
2015
Fee
2016
Fee
Plus
Hearing
Examiner
Fees
Plus
Technology
Appeal
Type 1.2 and 4Decisions
$602
SEPA MDNS Appeal
$602
Appeal of Sign Code Decision
$602
Impact Fee Appeals:
Fire
$602
Parks
$602
Transportation
$602
W:\Word permit fee ochouvle-201n-2n1s10-1*-1*
NG:bjs
Page 2 of 10
Decision Type
2015
Fee
2016
Fee
Plus
Hearing
Examiner
Fees
Plus
Technology
Fee (TF)
Sign Permit (TMC Chapter 19)
Permanent
$243
$248
+ TF
Temporary
+ TF
Pole/Banner nitiaI Application
$243
$248
+ TF
Special Event
+ TF
Pole/Banner Annual Renewal
$53
$54
+ TF
New Billboard
$602
+ TF
Master Sign Program—Admin
$2,173
$2,216
+ TF
Master Sign Program—BAR
$3,479
$3,549
+ TF
TUC Zone Modifications
Modification to TUC Corridor Standards
(TMC Section 18.28.131C)
$591
$602
+ TF
Modification to TUC Open Space Regulations
(TNC Section 1828250[l4.d)
$591
$602
+ TF
Transit Reduction to Parkin Requirements
(TMC Section 18.28.260.B.5.b)
DEsign Review (MC Section 18 60 030)
$591
$602
+ TF
Administrative
$2,236
$2,281
+ TF
Public Hearing
$4,006
+ TF
Major Modification
$1,370
$1,397
+ TF
Minor Modification
$622
$635
+ TF
Parking Variances and Special Permissions
Administrative Parking Variance
(Type 2— TMC Section 18.56.140)
Parking Variance
(Type 3—TMC Section 18.56.140)
Parking Standard for use not specified
/77NCY8.2825DD.4.d.Y and TMCY8.56/DCV
$602
+ TF
$969
+ HE
+ TF
$579
+ TF
Residential Parking Reduction
(TMC Section 18.56.065)
$602
+ TF
Shared, covenant, Complementary Parking
Reduction (TMC Section 18.56.070)
$602
+ TF
Parking Lot Restriping
(TMC Section 18.56.120)
$602
+ TF
W:\Word permit fee ucheuule-2o10-2o1s10-14-14
NG:bjs
Page 3 of 10
Decision Type
2015
Fee
2016
Fee
Plus
Hearing
Examiner
Fees
Plus
Technology
Fee (TF)
Variances Special Permissions and Site Plan Review
Variances
(TMC Section 18.72)
+ HE
+ TF
Environmentally Sensitive Areas Deviation,
BufharReduoUon(77MCChapb*r/fi45}
Reduced fee for LDR homeowners, no
associated short plat
Reasonable Use Exception
(TMC Section 18.45.180)
$1,495
$1.525
$602
+ TF
$2,991
$3,050
+ HE
+ TF
Exception from Singe Family Design Standard
(TMC Section 18.50.050)
Special Permission Cargo Container
(T7NC Section Y858DSO)
$602
+ TF
$602
+ TF
Landscape Perimeter Averaging
(TMC Section 18.52.060)
Tree and Landscape Modification Permit and
ExoepUono/77NCChepherY8.54/
$602
+ TF
+ TF
Lot Creation and Consolidation
Boundary Line Adjustment
(TMC Chapter 17.08)
$1,677
$1,710
+ TF
Lot Consolidation
(TMC Chapter 17.08)
$622
$635
+ TF
Short Plat (2-4lots)
(TMC Chapter 17.12)
$3,817
$3,893
+ TF
Short Plat (5-8lots)
(TMC Chapter 17.12)
$4,344
$4,431
+ TF
Subdivision:
Preliminary Plat (1O+lots)
(TMC Section 17.14.020)
$4,986
+ HE
+ TF
Final Plat (10+lots)
(TMC Section 17.12.030)
$2,991
$3,050
+ TF
Binding Site Improvement PIan
(TMC Chapter 17.16)
$3,817
$3,893
+ TF
Planned Residential
Administrative (TMC Section 18.46.110)
$2,216
+ TF
Pub|ioHeahng/T7NCSecbonf84MYYCy
$4,986
$5,085
+ TF
K8inorK8odification/T7NC Section 18.46.130)
$602
+ TF
K8 j rModification(Y7NCSectionY84Gf30)
$2,425
$2,473
+ TF
W:\Word permit fee schedule-20 5-2016 10-14-14
NG:bjs
Page 4 of 10
Decision Type
2015
Fee
2016
Fee
Plus
Hearing
Examiner
Fees
Plus
Technology
Fee (TF)
Wireless Communication Facili
(TMC Chapter 18.58.050)
Minor (Type 1)
$591
$602
+ TF
Administrative (Type 2)
$1,677
1,710
+ TF
Major or Height Waiver (Type 3)
$3,352
$3,419
+ HE
+ TF
SERA and Environmental
Checklist
$1,709
$1,743
+ TF
SEPA EIS
$2,991
$3,050
+ TF
SEPA Planned Action
$591
$602
+ TF
SEPA Addendum
$591
$602
+ TF
SEPA Exemption Letter
$348
$355
+ TF
Sensitive Area Master Plan Overlay
(TMC 18.45.160)
$4,986
$5,085
+ TF
Shoreline Permits
Substantial Development Permit: (TMC Chapter 18.44)
Project value: $5,000 - $10,000
$1,181
$1,205
+ TF
$10,001 - $50,000
$2,763
$2,818
+ TF
$50,001 - $500,000
$4,406
$4,495
+ TF
More than $500,000
$5,588
$5,699
+ TF
Permit Exemption Letter, Shoreline
$243
$248
+ TF
Conditional Use Permit, Shoreline
(TMC 18.44.050)
$3,879
$3,957
+ HE
+ TF
Shoreline Tree Permit
(TMC Chapter 18.44)
$105
$107
+ TF
Shoreline Environment Redesignation
$2,991
$3,050
+ TF
Noise Variance (TMC Section 8 22 120)
Type I
$485
$494
+ TF
Type II
$654
$667
+ TF
Type III
$1,454
$1,483
+ HE
+ TF
Use Permits
Conditional Use Permit
(TMC Section 18.64.020)
Unclassified Use Permit
(TMC Chapter 18.66)
$3,879
$3,957
+ HE
+ TF
$4,986
$5,085
+ TF
ISO Special Permission Use
(TMC Section 18.41.060)
$969
$988
+ HE
+ TF
W:\Word Processing \Resolutions\Consolidated permit fee schedule-2015-2016 1 0-1 4-14
NG:bjs
Page 5 of 10
Decision Type
2015
Fee
2016
Fee
Plus
Hearing
Examiner
Fees
Plus
Technology
Fee (TF)
Comprehensive Plan Changes (TMC Chapter 18 84)
Rezone (Map Change
$3,489
$3,559
+ TF
Comprehensive PIan Amendment
$3,988
$4,068
+ TF
Zoning Code Text Amendment
$4,533
$4,624
+ TF
MisOellaneous SerVices, and ,Charges
Development Agreement
$1,994
$2,034
+ TF
Cmde|nterpretaUon/TMCSeobonY�90.0f0
$348
$355
+ TF
Zoning Verification Letter
$348
$355
+ TF
Legal Lot Verification
$559
$570
+ TF
Preapplication Meeting
$485
$494
+ TF
Mailing Fee to Generate Labels, per project
$458
$467
Public Notice Mailing Fee per address for each
mailing
$1
$1
Section 4. Building permit fees will be charged according to the following
schedule:
BUILDING PERMIT FEE SCHEDULE
Total Valuation
Building Permit Fees
$1 to $500
$O5.00+ Technology Fee
$501 to $2,000
$65.00 for the first $500. plus $4.30 for each additional $1O0.orfraction
thereof, to and including $2,000 + Technology Fee
$2,001 to $25,000
$12Q.5O for the first $2.O00. plus $1S.GO for each additional $1.000.or
fraction thereof, to and including $25,000 + Technology Fee
$25,001 to $50,000
$GOO.4O for the first s25.00O. plus $15.3D for each additional $1.00O.or
fraction thereof, to and including $5O.UO0+ Technology Fee
$50,001 to $100,000
$983.25 for the first $5O.00O. plus $10.GU for each additional $1.UOO.or
fraction thereof, to and including $100,000 + Technology Fee
$100.001to$500.000
$1.511.GU for the first $1OO.00O. plus $8.5O for each additional $1.OU0.or
fraction thereof, to and including $500,000 + Technology Fee
$500.001bu$1.000.000
$4,906.30 for the first $5OO.0O0. plus $7.00 for each additional $1.0OU.or
fraction thereof, to and including $1,000,000 + Technology Fee
$1.000.001to$5.000.000
$8,443.25 for the first $1.O0O.00O. plus $478 for each additional $1'OUU'
or fraction thereof, to and including $5,000,000 + Technology Fee
$5,000,001 and up
$27,243.25 for the first $5.O0O.O8O. plus $4.5O for each $1.00Oorfraction
thereof + Technology Fee
W:\Word permit fee »ohndule-2O1s-2o1o1*11'1*
NG:bjs
Page 6 of 10
1. Non-Structural Plan Review Fee. A non-structural plan review fee shall be paid at the
time of submitting plans and s ons for review. The non-structural plan review fee shall be 65% of
the calculated permit fee as set forth in the permit fee schedule. The non-structural plan review fee
specified herein is a separate fee from the permit fee and is in addition to the permit fee.
2. Structural Plan Review Fee. Where a structural plan review is deemed neoessary, a
structural plan review fee shall be charged. The structural plan review fee shall be 35% of the calculated
non-structural plan review fee.
Section 5. Mechanical permit fees will be charged according to the following
schedule:
MECHANICAL PERMIT FEE SCHEDULE
Valuation of
Work (Total
Contract Amount
Mechanical Permit Fee
Unit Fee Schedule (in addition to base fee above:
$32.50 for issuance of each permit (base fee) + Technology Fee
$25Oorless
$65.00 + Technology Fee
$251 to $500
$65.00 for first $250. plus $7.83 for each $1OOor fraction thereof, to
and including $500 + Technology Fee
$501to$1.000
$84.60 for the first $500, plus $8.70 for each $100 or fraction thereof, to
and including $1,000 + Technology Fee
$1.001ho$5.000
$128.1O for the first $1.00O. plus $S.G5 for each $1.000orfraction
thereof, to and including $5,000 + Technology Fee
$5,001 to $50,000
1SG.7O for the first $5.0OU. plus $1O.05 for each $1.O0Oprfraction
thereof, to and including $50,000 + Technology Fee
$50.001 to $250.000
$639.20 for the first $50.000. plus $8.40 for each $1.000 or fraction
thereof, to and including $250,000 + Technology Fee
$250.001to$1.000.000
$2,319.20 for the first $250,000, plus $7.4U for each $1.00Oorfraction
thereof, to and including $1.000.0UO+ Technology Fee
$1.O0O.UU1 and up
$7,869.20 for the first $1.UOO.0OO. plus $G.70 for each $1.OU0nr
fraction thenoof+Techno|ogyFee
Section 6. Plumbing permit fees will be charged according to the following
schedule:
PLUMBING PERMIT FEE SCHEDULE
Permit Issuance—Issuance of each permit (base fee)
$32.50 + Technology Fee
Unit Fee Schedule (in addition to base fee above:
For one plumbing fixture (a fixture is a mink, hoi|et, bathtub, etc.)
65.00 + Technology Fee
For each additional fixture
14.00 + Technology Fee
For each building sewer and each trailer park sewer
24.80 + Technology Fee
Rain vvahersyshem – perdnain (inside building)
14.00 +Teohnn|ogy Fee
For each water heater and/or vent
$14�OU+ Technology Fee
vvAvom permit fee ochedule-2o15-zO161u-1*-1*
NG:bjs
Page 7 of 10
PLUMBING PERMIT FEE SCHEDULE (continued)
For each industrial waste pretreatment interceptor, including its
tnspandvant.excaptforkitchenh/pegnaaseinteroaobors
�28� OO+ Technology Fee
For each grease interceptor for commercial kitchens
29.10 + Technology Fee
For each repair or alteration of water piping and/or water treating
equipment, each occurrence
$14� OO+ Technology Fee
For each repair or alteration of drainage or vent piping, each
fixture
$14.00 + Technology Fee
For each medical gas piping system serving one to five
in|ets/ouUetsfor a specific gas
$82� 0O+ Technology Fee
16.20 + Technology Fee
For each additional medical gas inlets/outlets
For each lawn sprinkler system on any one (�)meberinu|uding
(1)
backflow protection devices therefor.
$29.10 + Technology Fee
For atmospheric-type vacuum breakers not included in Iawn
sprinkler backflow protection:
1to5.... $14.00 + Technology Fee
Over 5... $14.0O for first 5 plus $3.25 for each additional
+ Technology Fee
For each backflow protective device other than atmospheric type
vacuum breakers:
2-inch diameter and smaller,$29.10 + Technology Fee
Over 2-inch diameter: $32.25 + Technology Fee
Section 7. Fuel Gas Piping permit fees will be charged according to the following
schedule:
FUEL GAS PIPING PERMIT FEE SCHEDULE
1. Permit Issuance:
For issuing each permit (base fee): ($0 if permit is in conjunction with
a plumbing permit for an appliance with both plumbing and gas
connection.)
$32.50 + Technology Fee
2. Unit Fee Schedule (in addition to item in subparagraph 7.1):
For each gas piping system of one to five outlets
65.00 + Technology Fee
For each additional gas piping system outlet, per outlet
14.00 + Technology Fee
Section 8. Electrical permit fees will be charged according to the following
schedule:
ELECTRICAL PERMIT FEE SCHEDULE
1. NEW SINGLE-FAMILY DWELLINGS
New single-family dwellings (including a
Garages, pVok�spas and outbuUdings
Low voltage systems
W:\Word permit fee x000dule-2O15-2u1s1o'1*-1*
NG:bjs
152.85 + Technology Fee
81.9O+ Technology Fee
59.85 + Technology Fee
Page 8 of 10
ELECTRICAL PERMIT FEE SCHEDULE (continued)
2. SINGLE-FAMILY REMODEL AND SERVICE CHANGES
Service change or alteration-no added/altered circuits
G1.SO+ Technology Fee
Service change $818Ov��hadded/aheredoircuds plus $81.90 circuits, $11.55
eaohaddedcircuit(moximun�}penn�fee$152.85)
%81 � SO+Teohno|ogyFee
Circuits added/altered without service change (includes uP to
circuits)
$54� GO+ Technology Fee
Circuits $54 �O added/altered without (more �
5 circuits); $7.65 for each added circuit (maximum permit fee $98.70
+ Technology Fee)
$54 � OO + Technology Fee
Meter/mast repair
$68.25 + Technology Fee
Low voltage systems
$59.85 + Technology Fee
3. MULTI-FAMILY AND COMMERCIAL (including Iow voltage)
Valuation of
Work (Total
Contract Amount)
Permit Fee
$25Oorless
$O5.00+ Technology Fee
$251-$1.000
$65.00 for the first $250 plus $4.30 for each $100 or fraction thereof, to and
including $1,000 + Technology Fee
$1.001-$5.000
$S7.OU for the first $1.00U plus $21.8O for each $1.UOOor fraction thereof,
to and including $5,000 + Technology Fee
$5,001 - $50,000
$183.30 for the first $5.00U plus $1T7U for each $1.00Uor fraction thereof,
to and including $50,000 + Technology Fee
$50.001 $250.000
$S7S.15 for the first $5O.00O plus $12.9O for each $1.UOOor fraction thereof,
to and including $250,000 + Technology Fee
$250.001-$1.000.000
$3,567.20 for the first $25O.000 plus $9.1S for each $1.00Oor fraction thereof,
to and including $1,000,000 + Technology Fee
Over $1,000,000
$1O.44O7O plus 0.596of cost over $1.000.0OO+ Technology Fee
4. MISCELLANEOUS ELECTRICAL PERMIT FEES
Temporary service (residential)
$65.00 + Technology Fee
Temporary service/generators
$8O.9O+ Technology Fee
Manufactured/mobile home parks and RV park sites each service
and feeder
$8O� 25+ Technology Fee
Carnivals:
• Base fee
80.60 + Technology Fee
O.8O+ Technology Fee
$10.80 + Technology Fee
$66.50/hour
• Each concession fee
• Each ride and generator truck
Inspections or plan review not specified elsewhere (one-half hour
_minimum), Safety inspections, plan revisions.
Adult family home inspection (paid at the time of scheduling the
inspection)
$66.50
Disaster recovery emergency repair permit (residential structures
on| )
$20.00
W:\Word permit fee schedule-20 5-2016 10-14-14
NG:bjs
Page 9 of 10
Section 9. Other inspections and fees will be charged according to the following
schedule:
OTHER INSPECTIONS AND FEES
Inspections outside of normal business hours (three hour minimum charge)
$100.00/hour
Re-inspection fee
$66.50/hour
Inspection for which no fee is specifically indicated—investigations or safety
ins•ections
$66.50/hour
Additional plan review required by changes, additions, or revisions to approved
(minimum charge one-half hour)
$66.50/hour
_plans
Work commencing before permit issuance shall be subject to an investigation fee
equal to 100% of the permit fee.
100% of the permit
fee
Plan review fee—Mechanical, Plumbing, Fuel Gas Piping and Electrical: The fee
for review shall be 25% of the total calculated permit fee. The plan review fee is a
separate fee from the permit fee and is required when plans are required in order
to document compliance with the code.
Work covered without inspection or work not ready at the time of inspection may
be char.ed a re-inspection fee of $66.50.
Expired permit final – includes two inspections
$133.00
Expired permit final – each additional inspection
$66.50
Minor residential remodel plan review and permit (projects up to $20,000)
$20.00
Section 10. Repealer. Resolution No. 1803 is hereby repealed effective
December 31, 2014.
Section 11. Effective Date. The permit fee schedules contained in this resolution
shall be effective as of January 1, 2015.
PASSED BY THE CITY COUNCILAOF THE CITY OF TUKWILA, WASHINGTON, at
a Regular Meeting thereof this '3 fcii day of 000c, Qv'', 2014.
ATTEST/AUTHENTICATED:
-7 0 VA-
Christy O'F a erty, MMC, City Cler
APPROVED AS TO FORM BY:
Turpin, City Attorney
an Quinn, Council President
Filed with the City Clerk:
Passed by the City Council:
Resolution Number:
W:\Word Processing \Resolutions\Gonsolidated permit fee schedule-2015-2016 10-14-14
NG:bjs
Page 10 of 10