Loading...
HomeMy WebLinkAboutPermit L05-011 - PROCK OLIVER - REHABITAT NORTHWEST DESIGN REVIEWFOSTORIA GARDEN HOMES 13534 MACADAM RD S L05 -011 r Department of Community Development To: Mr: "Oliver Prock '5639 16 Ave .SW Seattle, WA '98106 NOTICE OF DECISION ill ecember 20, 2005 cc: King County Assessor's Office This letter serves asra Notice ofDecision- and :is issued pursuantIto TMC 18 104.170. 'On (December 19 2005 the Director of Community Development approved the design review application fora convalescent home located at 13534 Macadam Road S. Design review approval includes an exterior'remodel imp rovements, location of A future building and landscaping. The Directors approval was based on the staff report prepared by City staff, the applicant's response to design review criteria, and building plans date 'stamped December 7 2005 and on fled with the - Building Division of DCD, PROJECT BACKGROUND FILE NUMBER: 1L05.011 APPLICANT Rehabitat NW OWNER' 1Rehabitat NW REQUEST: Administrative Design Review approval for an eXterior remodel, site improVenents, location of future building and installation of landscaping. LOCATION: ASSOCIATED PERMITS: SEPA DETERMINATION;: Exempt 13534 Macadam Road South Building Permit 005 -072) Public Works 1Per ►nit COMPREHENSIVE PLAN /ZONING: Regional Commercial Property owners affected by this decision may request `a change in valuation 'for property tax purposes notwithstanding any program of revaluation. ,Steveri,M.,Mullet, Mayor Steve " Lancaster Director 6300 Southcenter Boulevard, Suite # "100 Tukwila Washington 98188 Phone: 206-431=3670 • ,Fax: :206 =43 "13665 INFORMATIONAL ITEM • • The property had previously contained a non - conforming duplex. Rehabitat NW had requested a code interpretation to determine if any non - conforming rights remained on the property. In September of 2004 the City issued its interpretation (L04 -056) that the non - conforming rights for the duplex had ceased. An appeal period was established and no appeal was filed with the City. All future uses on the property must conform to the C /LI zoning. CONDITIONS The design review application is approved subject to the following condition(s): 1. The applicant shall provide a financial guarantee of $13,231.62 to the City for the landscaping and irrigation that will be included with phase II of the project. A building permit application must be issued for the phase II building by June 1, 2007. As an alternative the applicant can choose to install the required phase II landscaping by June 1, 2007. APPEALS The period for administrative appeals is 14 days, starting from the issuance of this Notice of Decision. The administrative body hearing the appeal is the Board of Architectural Review (BAR). All appeal materials shall be submitted to the Department of Community Development. Appeal materials shall contain: 1. The name of the appealing party 2. The address and phone number of the appealing party, and if the appealing party is a corporation, association or other group, the address and phone number of a contact person authorized to received notices on the appealing party's behalf, a 3. A statement identifying the decision being appealed and the alleged errors in that decision. The Notice of Appeal shall state specific errors of fact or errors in application of the law in the decision being appealed, the harm suffered or anticipated by the appellant, and the relief sought. The scope of an appeal shall be limited to matters or issues raised in the Notice of Appeal. Project materials including the application, any staff reports, and other studies related to the permit(s) are available for inspection at the Tukwila Dept. of Community Development; 6300 Southcenter Blvd.; Suite 100; Tukwila, WA; from Monday through Friday, between 8:30 AM to 5:00 PM. The project planner is Brandon J. Miles, who may be contacted at (206) 431 -3684 or by email a .miles @ci.t wila.wa.us. Nora ierloff Planning Supervisor City of Tukwila Dept. Of Community Development City of Tukwila AFFIDAVIT OF DISTRIBUTION I , tAb1. D , , DECLARE THAT: Notice of Public Hearing Project Number: 1-0 -'(( Mailer's Signature: S/14414/Lry D •y -3/1/04 Determination of Non - Significance Notice of Public Meeting Mitigated Determination of Non - Significance Board of Adjustment Agenda Pkt Determination of Significance & Scoping Notice Board of Appeals Agenda Pkt Notice of Action Planning Commission Agenda Pkt Official Notice Short Subdivision Agenda Notice of Application Shoreline Mgmt Permit Notice of Application for Shoreline Mgmt Permit _ __ FAX To Seattle Times Classifieds Mail: Gail Muller Classifieds PO Box 70 - Seattle WA 98111 Other ih (� � ,� C1 'v 1 le,c4„,sn Was mailed to each of the addresses listed on this year 20 P:GINAWYNETTA/FORMS /AFFIDAVIT -MAIL 08/29/003:31 PM , Project Name: r - La b i r-auf WO- Project Number: 1-0 -'(( Mailer's Signature: S/14414/Lry D •y -3/1/04 Person requesting mailing: di-0i kilta,, Was mailed to each of the addresses listed on this year 20 P:GINAWYNETTA/FORMS /AFFIDAVIT -MAIL 08/29/003:31 PM () U.S. ARMY CORPS OF ENGINEERS () FEDERAL HIGHWAY ADMINISTRATION ( ) DEPT OF FISH & WILDLIFE OFFICE OF ARCHAEOLOGY TRANSPORTATION DEPARTMENT DEPT NATURAL RESOURCES OFFICE OF THE GOVERNOR DEPT OF COMM. TRADE & ECONOMIC DEV. ) DEPT OF FISHERIES & WILDLIFE % KING COUNTY AGENCIES () BOUNDARY REVIEW BOARD () FIRE DISTRICT #11 () FIRE DISTRICT #2 ( ) K.C. WASTEWATER TREATMENT DIVISION () K.C. DEPT OF PARKS & REC . ASSESSOR'S OFFICE ( ) TUKWILA SCHOOL DISTRICT ( ) TUKWILA LIBRARY () RENTON LIBRARY () KENT LIBRARY () CITY OF SEATTLE LIBRARY ( ) QWEST ( ) SEATTLE CITY LIGHT ( ) PUGET SOUND ENERGY () HIGHLINE WATER DISTRICT ( ) SEATTLE WATER DEPARTMENT ( ) AT&T CABLE SERVICES () KENT PLANNING DEPT ( ) TUKWILA CITY DEPARTMENTS: () PUBLIC WORKS () POLICE ( ) PLANNING () PARKS & REC. ( ) CITY CLERK () FIRE ( ) FINANCE () BUILDING ( ) MAYOR ( ) PUGET SOUND REGIONAL COUNCIL () SW K C CHAMBER OF COMMERCE ( ) MUCKLESHOOT INDIAN TRIBE ( ) CULTURAL RESOURCES PROGRAM () FISHERIES PROGRAM ( ) WILDLIFE PROGRAM ( ) SEATTLE TIMES ( ) SOUTH COUNTY JOURNAL P: \ ADMINISTRATIVE \FORMS\CHKLIST. DOC FEDERAL AGENCIES WASHINGTON STATE AGENCIES SCHOOLS/LIBRARIES UTILITIES CITY AGENCIES OTHER LOCAL AGENCIES MEDIA () U.S. ENVIRONMENTAL PROTECTION AGENCY ( ) U.S. DEPT OF H.U.D. () NATIONAL MARINE FISHERIES SERVICE ( ) DEPT OF SOCIAL & HEALTH SERV. () DEPT OF ECOLOGY, SHORELAND DIV () DEPT OF ECOLOGY, SEPA DIVISION* ( ) OFFICE OF ATTORNEY GENERAL SEND CHKLIST WJ DETERMINATIONS • SEND SITE MAPS WITH DECISION () HEALTH DEPT () PORT OF SEATTLE () KC. DEV & ENVIR SERVICES -SEPA INFO CNTR () K.C. TRANSIT DIVISION - SEPA OFFICIAL () K.C. LAND & WATER RESOURCES () FOSTER LIBRARY () K C PUBLIC UBRARY ()HIGHLINE SCHOOL DISTRICT () SEATTLE SCHOOL DISTRICT () RENTON SCHOOL DISTRICT ( ) OLYMPIC PIPELINE ( ) VAL -VUE SEWER DISTRICT () WATER DISTRICT #20 () WATER DISTRICT #125 () CITY OF RENTON PUBLIC WORKS ( ) BRYN MAWR- LAKERIDGE SEWERJWATER DISTRICT () RENTON PLANNING DEPT () CITY OF SEA-TAC ( ) CITY OF BURIEN ( ) TUKWILA PLANNING COMMISSION MEMBERS ( ) TUKWILA CITY COUNCIL MEMBERS ( ) CITY OF SEATTLE - SEPA INFO CENTER - DCLU ( ) STRATEGIC PLANNING OFFICE' • NOTICE OF ALL SEATTLE RELATED PING PROJ. () DUWAMISH INDIAN TRIBE ( ) P.S. AIR POLLUTION CLEAN AGENCY () SOUND TRANSIT () DUWAMISH RIVER CLEAN -UP COALITION 'SEND NOTICE OF ALL APPUCATIONS ON DUWAMISH RIVER ( ) HIGHLINE TIMES ( ) CI.TUKWILA.WA.US.VWVW P.IC NOTICE MAILINGS FOR PI'S SEPA MAILINGS Mail to: (comment period starts on date of mailing) Dept. of Ecology Environmental Review Section *Applicant *Other agencies as necessary (checked off on attached List) *Any parties of record * send only the staff report, site plan and the SEPA Determination KC Transit Division — SEPA Official would like to receive information about all projects that might affect transit demand Send These Documents to DOE: SEPA Determination (3 -part from Sierra) Findings (staff report, usu. with MDNS) SEPA Checklist (filled out by applicant) Drawings/Plans of project (site plan, elevations, etc. from PMT's) Affidavit of Distribution (notice was mailed or sent to newspaper) SHORELINE MAILINGS: Notice of Application for a Substantial Development Permit must be mailed to owners and to property owners within 500 feet of subject property, comments are due 30 days after the notice of application is mailed/posted. The notice of Application for Shoreline Substantial Development Permit must include a statement that any person desiring to submit written comments on the application or desiring to receive notification of the final decision on the application may do so within 30 days of the notice of application. If a hearing will be held on the application, the hearing notice must include the information that written comments may be submitted, or oral presentation made at the hearing. Shoreline Permit Notice of Decision: Mail to: (within 8 days of decision; 21 -day appeal period begins date received by DOE) Department of Ecology Shorelands Section State Attorney General *Applicant *Indian Tribes *Other agencies as necessary (checked off on attached list). 'Any parties of record * send only the staff report, site plan and the SEPA Determination Send These Documents to DOE and Attorney General: Permit Data Sheet Shoreline Substantial Development Permit (3 -part from Sierra) Findings (staff report or memo) Shoreline Permit Application Form (filled out by applicant) Drawings/Plans of project (site plan, elevations, etc. from PMT's) - Site plan, with mean high water mark & improvements — Cross - sections of site with structures & shoreline - Grading Plan — Vicinity map SEPA determination (3 -part from Sierra) Findings (staff report or memo) SEPA Checklist (filled out by applicant) Any background studies related to impacts on shoreline Notice of Application Affidavit of Distribution (notice was mailed) P:IADM MISTRATIVEIFORMSICHXLIST. DOC • • STAFF REPORT TO THE BOARD OF ARCHITECTURAL REVIEW PREPARED 18,Septr 2005 ccollrcr HEARING DATE: N/A Administrative NOTIFICATION: Notification is not required for a type II application FILE NUMBER: L05 -011, D05 -072 APPLICANT: Rehabitat NW OWNERS: Rehabitat NW REQUESTS: Exterior work to an existing building that was previously used as a duplex. The design review application also includes approval of landscaping for the project and the location of a future building on the site. ASSOCIATED PERMITS: Grading Permits Building Permits LOCATION: 13534 Macadam Road S COMPREHENSIVE PLAN DESIGNATION: Commercial Light Industrial (C/LI) ZONE DESIGNATION: Commercial Light Industrial (C /LI) SEPA DETERMINATION: Exempt STAFF: Brandon J. Miles, Assistant Planner • Staff Report to the ATTACHMENTS: Director 13534 Macadam Road A. Applicant's response to Design Review criteria B. Building Permit plans date stamped December 7, 2005 and on file with the Department of Community Development. 2 L05 -011 • Staff Report to the • • Director 13534 Macadam Road VICINITY /SITE INFORMATION Project Description FINDINGS The property currently contains a duplex which has lost its non - conforming rights to be used as a dwelling. The applicant wishes to convert the duplex into a convalescent home and add an addition to the existing structure. The combined square footage of the new building will be 1,900 square feet. The applicant has also proposed constructing an additional building on the site. However, this design review application does not include that phase of the project. The design review does include the site layout (both phase I and phase II) and landscaping on the entire property. Surrounding Land Uses The site is surrounded by commercial and single family residential uses. PUBLIC COMMENT This is an administrative decision and there is no public comment period. DESIGN REVIEW CRITERIA L05 -011 TMC 18.60 provides two categories for reviewing design review applications. The first category is for commercial and light industrial zones and the second category is multi - family, hotel and motel design criteria. The specific criteria laid out for multi- family, hotels, and motels will be used to evaluate the proposed convalescent home. 1. Site Planning. a. Building siting, architecture and landscaping shall be integrated into and blend harmoniously with the neighborhood building scale, natural environment, and development characteristics as envisioned in the Comprehensive Plan. For instance, a multi family development's design need not be harmoniously integrated with adjacent single-family structures if that existing single-family use is designated as "Commercial" or "High Density Residential" in the Comprehensive Plan. However, a "Low Density Residential" designation would require harmonious design. 3 Staff Report to the 1 • L05 -011 Director 13534 Macadam Road Single - family homes are located on the southwest property line of the project site. These properties are zoned LDR. A proposed private access drive will be located between the existing single family home and the proposed convalescent home. The site will feature landscaping that is typical of residential properties. Parking for the proposed convalescent home will be located in the rear of the building behind the proposed phase II structure. Landscaping will be used to screen the parking area from the single family homes. b. Natural features which contribute to desirable neighborhood character shall be preserved to the maximum extent possible. Natural features include, but are not limited to, existing significant trees and stands of trees, wetlands, streams and significant topographic features. The project site is already developed with a dilapidated duplex that has lost its non - conforming use rights. There are no trees, wetlands, or streams on the property. The property does contain steep slopes, these slopes are being incorporated into the site indirectly. c. The site plan shall use landscaping and building shapes to form an aesthetically pleasing and pedestrian scale streetscape. This shall include, but not be limited to facilitating pedestrian travel along the street, using architecture and landscaping to provide a desirable transition from streetscape to the building, and providing an integrated linkage from pedestrian and vehicular facilities to building entries. The applicant shall install a significant amount of landscaping between the proposed use and Macadam Road. The property has a downward slope from Macadam Road. An individual standing on Macadam Road will unlikely be able to see the addition to the existing building or proposed second structure that is part of phase II. This portion of Macadam Road does not have sidewalks. Pedestrian connections will not be provided from the project site to Macadam Road. The buildings on the site will be connected via a pedestrian walkway that will be constructed with concrete or asphalt. The slope of the walkway will not exceed eight percent in grade and will meet ADA requirements. d. Pedestrian and vehicular entries shall provide a high quality visual focus using building siting, shapes, and landscaping. Such a feature establishes a physical transition between the project and public area, and establishes the initial sense of high quality development. 4 • Staff Report to the g. • • Only one vehicle access point will be provided to the facility. 5 L05 -011 Director 13534 Macadam Road Access to the facility will be provided by a private access drive which also provides access to three single family homes that are located south of the project area. A small driveway will connect the main facility to the private access drive. Landscaping has been provided directly along the access road near Macadam Road and along both sides of the driveway. e. Vehicular circulation design shall minimize driveway intersections with the street. f Site perimeter design (i. e. landscaping, structures, and horizontal width) shall be coordinated with site development to ensure a harmonious transition between adjacent projects. A minimum of ten feet of type III landscaping will be used along the north property line. Ten feet of type II landscaping will be installed along the east property line. 12.5 feet of type II landscaping will be used along Macadam Road South. Varying degrees of privacy for the individual residents shall be provided; increasing from the public right of way, to common areas, to individual residences. This can be accomplished through the use of symbolic and actual physical barriers to define the degree of privacy appropriate to specific site area functions. Landscaping will be utilized along the front of the main building to provide a separation between the public right of way and the bedrooms that are part of the convalescent home. Only one bedroom has been located along Macadam Road. h. Parking and service areas shall be located, designed, and screened to interrupt and reduce the visual impact of large paved areas. The parking area for the convalescent home will be located in the rear of the building. Landscaping is also proposed to screen the parking area. i. The height, bulk, footprint, and scale of each building shall be in harmony with its site and adjacent long -term structures. The proposed remodel and addition to the existing structure will utilize materials and features that will allow the use to blend in with the surrounding residential uses. The roof will have a 6 to 12 pitch and will utilize composite shingles. The building will feature two layers and will consist of vertical siding and band board. A deck will be constructed on the east and south elevation. ' Staff Report to the Director 13534 Macadam Road 2. Building Design • • L05 -011 a. Architectural style is not restricted, evaluation of a project shall be based on the quality of its design and its ability to harmonize building texture, shape, lines and mass with the surrounding neighborhood. The proposed remodel and addition to the existing structure will utilize materials and features that will allow the use to blend in with the surrounding residential uses. The roof will have a 6 to 12 pitch and will utilize composite shingles. The building will feature two layers and will consist of vertical siding and band board. A deck will be constructed on the east and south elevation. b. Buildings shall be of appropriate height, scale, and design/shape to be in harmony with those existing permanent neighboring development which are consistent with, or envisioned, in the Comprehensive Plan. This will be especially important for perimeter structures. Adjacent structures that are not in conformance with the Comprehensive Plan should be considered to be transitional. The degree of architectural harmony required should be consistent with the non - conforming structures anticipated permanence. The existing structure on the property is a two story duplex. As noted, the duplex has lost its non - conforming status and can longer be used for that specific purpose. The finished structure will be 30 feet in height from final grade. The topography of the site also reduces the apparent size of the structure. The maximum permitted height in the C /LI zone is 45 feet. The adjacent properties are zoned LDR and the proposed height of the facility is consistent with the permitted height in the LDR zone. c. Building components such as windows, doors, eaves, parapets, stairs and decks shall be integrated into the overall building design. Particular emphasis shall be given to harmonious proportions of these components with those of adjacent developments. Building components and ancillary parts shall be consistent with the anticipated life of the structure. Small windows will be installed along all four elevations of the proposed building. Decks will be located on the east and south elevations. The decks will both be accessed via French Doors. As the proposed use is as a convalescent home a wheelchair ramp will be added on the south elevation. d. The overall color scheme shall work to reduce the building prominence and shall blend in with the natural environment. The proposed colors will be brown shingles, cedar wall shakes, beige wood, and white wood used as trim. 6 ' Staff Report to the Director 13534 Macadam Road e. Monotony of design in single or multiple building projects shall be avoided. Variety of detail, form, and siting shall be used to provide visual interest. Otherwise monotonous flat walls and uniform vertical planes of individual modulation, stairs, decks, railings, and focal entries. Multiple building developments shall use siting and additional architectural variety to avoid inappropriate repetition of building designs and appearance to surrounding properties. Modulation has been used to break up the large flat walls. The building will have three layers, a bottom layer which will consists of horizontal vinyl siding, vertical vinyl siding as a middle, and cedar wall shakes for the top. 3. Landscaping and Site Treatment • • L05 -011 a. Existing natural topographic patterns and significant vegetation shall be reflected in project design when they contribute to the natural beauty of the area or are important to defining neighborhood identity or a sense of place. b. Landscape treatment shall enhance existing natural and architectural features, help separate public from private spaces, strengthen vistas and important views, provide shade to moderate the affects of large paved areas, and break up visual mass. c. Walkways, parking spaces, terraces, and other paved areas shall promote safety and provide an inviting and stable appearance. Direct pedestrian linkages to the public street, to on -site recreation areas, and to adjacent public recreation areas shall be provided. Approximately 7,160 square feet of the lot will be used for landscaping. The street frontage will include 12.5 feet of type II landscaping, the north and south property line will include ten feet of type III landscaping, and the east property line will include ten feet of type II landscaping. The landscaping plan notes that 48 trees will be placed on the property. The following trees will be used on the property, Vine maple, Hinoki False Cypress, Flowering Pear, and Emerald Green Maple. The landscaping areas will also include 270 shrubs. There will also be two large grass areas available for residents of the convalescent home. All landscaped areas will be provided with automatic irrigation. Since the project will occur in phases some of the required landscaping will not be provided until phase II of the project. Staff Report to the • • Director 13534 Macadam Road A pedestrian walkway will eventually connect the two buildings that will be constructed on the site. The walkway will also connect to the main parking area located east of the phase II building on the site. The pedestrian walkway will be constructed of concrete or asphalt. 4. Miscellaneous Structures a. Miscellaneous structures shall be designed as an integral part of the architectural concept and landscape. Materials shall be compatible with buildings, scale shall be appropriate, colors shall be in harmony with buildings and surroundings, and structure proportions shall be in scale. b. The use of walls, fencing, planting, berms, or combinations of these shall accomplish screening of service yards, and other places that tend to be unsightly. Screening shall be effective in winter and summer. c. Mechanical equipment or other utility hardware on roof ground or buildings shall be screened from view. Screening shall be designed as an integral part of the architecture (i.e. raised parapets and fully enclosed under rooJ and landscaping. d. Exterior lighting standards and fixtures shall be of a design and size consistent with safety, building architecture and adjacent area. Lighting shall be shield and restrained in design with no off-site glare spill over. Excessive brightness and brilliant colors shall not be used unless clearly demonstrated to be integral to building architecture. Miscellaneous structures on the site are minimal. A slatted chain -link fence will be used to screen the dumpster /trash enclosure from view. The fence will be located on the north property line and the dumpster area will be located via the parking area. The plans submitted to the City show no outdoor mechanical equipment. CONCLUSIONS L05 -011 Small lights will be located on the buildings and will provide lighting typical for residential uses. The Director of Community Development, pursuant to Tukwila Municipal Code (TMC) Section 18.108.020, and upon finding of the facts above, hereby makes the following conclusions under the city's Design Review Criteria (TMC 18.60.050) and Determination of Consistency with Adopted Plans and Regulations for type 2 approvals (TMC 18.100.20.) The applicant is converting an illegal duplex to an allowed use under the City's Zoning Code. Since the applicant is retaining the existing structure limitations occur on making modifications to the site or the building. (1) Relationship of Structure to Site. 8 Staff Report to the Director 13534 Macadam Road The site plan provides an adequate transition between the streetscape and the main building on the site. The applicant has utilized landscaping along Macadam Road in order to provide a streetscape. Pedestrian connections do not exist between Macadam Road South and the convalescent home. However given the fact that there are no public sidewalks along Macadam Road South there is no need at this time to provide a pedestrian connection from the project site to the City street. (2) Building Design • • L05 -011 While the proposed use is a commercial structure it is located directly adjacent to single - family residential uses. The features of the building, such as the roof pitch, choice of materials, and modulation allow the structure to be compatible with the surrounding residential uses. The proposed height of the building is consistent with the surrounding residential uses. Additionally, the topography of the site reduces the height and bulk of the proposed building. The proposed features to the building are to scale with the building as a whole. The colors are also consistent with the surrounding residential uses and as required by code "blend with the natural environment ". The applicant has utilized modulation and varying color to break up the large mass of the proposed commercial structure. (3) Landscaping and Site Treatment. There is a curve in Macadam Road South that results in the subject site being a visual focal point for all eyes looking and traveling southbound on Macadam Road. The layout of the site and the building do take advantage of this feature. The applicant has chosen vegetation that is both appropriate for a residential style use and for providing screening for the proposed use. A financial guarantee will need to be provided in order to insure that the proper landscaping is provided on the site. (5) Miscellaneous Structures and Street Furniture. The lighting proposed is adequate for the proposed use and will not have any offsite impacts. (6) Comprehensive Plan Policies. The applicant is converting an illegal duplex into a permitted use in the Commercial/Light Industrial zone. The proposed use is also consistent with Goal 3.4 of the Comprehensive Plan, which notes that a goal of the City is to provide a full range of housing for persons in all stages of 9 Staff Report to the • 1 L05 -011 Director 13534 Macadam Road life. The proposed use of the site as a convalescent home will help achieve this goal by providing a facility for senior community members. RECOMMENDATION Approve the application with the following conditions: 1. The applicant shall provide a financial guarantee of $13,231.62 to the City for the landscaping and irrigation that will be included with phase II of the project. A building permit application must be issued for the phase II building by June 1, 2007. As an alternative the applicant can choose to install the required phase II landscaping by June 1, 2007. 10 June 1, 2009 DEUTSCHE BANK NATIONAL TRUST 616 1ST AVE #500 SEATTLE WA 98104 RE: King County Parcel, 2613200049 Dear Property Owner: Brdndon . Miles Senior Planner cc. File City of Tukwila Department of Community Det r O 1. Article Addressed to: DEUTSCHE BANK NATL TRUST 616 1 AVE , #500 SEATTLE, WA 98104 eI v r rY" r t * Kt im Domestic Mai#1Only NofinsurancetCoverageyProvrde F„or tlel' iiyery;,, irifo�rtiation�, �visit�our�welisite ,�at�,www7usps�com ® ,�j Certified Fee Retum Reclept Fee (Endorsement Required) Restricted Delivery Fee (Endorsement Required) Total Postage 8 Sent To Street Apt. No.; or PO Box No. City, State, Z /P+5 According to King County records you have become the owner of King County Parcel 2613200049 which is addressed as 13534 Macadam Road S, Tukwila, WA 98188. This letter is to inform you of the legal permitted uses allowed for the subject property. While the structure on the site may function and appear to be a residential use, the zoning for the property specifically limits the use of the structure to non - residential uses. The property you own is zoned Commercial /Light Industrial (C /LI) by the City of Tukwila. Residential units are not a permitted use within the C /LI zone. Up until 2004, the property was legally non - conforming as a duplex. In 2004, a review the status of the non - conforming rights concluded that the property had lost its non - conforming rights due to failure of the property owners to maintain the legal non - conforming use. In 2005, Rehabitat NW submitted an application to the City to convert the duplex into a convalescent home (L05 -011). Convalescent homes are a permitted use within the C /LI zone. There is a long list of permitted uses within the C /LI Zone and I have included a copy of the appropriate Tukwila Municipal Code (TMC) Chapter. If you have any questions, please call (206) 431 -3684 or send an email to bmiles • ci. wila.wa.us. ® Complete items 1, 2, and 3. Also complete Item 4 if Restricted Delivery is desired. ® Print your name and address on the reverse so that we can return the card to you. In Attach this card to the back of the mallpiece, or on the front if space permits. Postage t‘air'04 Articld'tn►umbe�; . t a .. .: din 6300 Southcenter Boulevard, Suite #100 • 'h°m 226U UI706 4161] 0430 Postmark Here DEUTSCHE BANK NATL TRUST 616 1 AVE , #500 SEATTLE, WA 98104 eiegt516,0W ee Rever_se to lnsirgctiorLS SENDER: COMPLETE' SECTION' COMPLETE THIS SECTION DELIVERY , A. Signature X C ❑ Agent ❑ Address • l i . f � Deliv, D. Is del' =ry address different from item 1? 0 Yes If YES, enter delivery address below: 0 No 3. Service Type )S i Certfled Mall Ofppress Mall Registered ARetum Receipt for Merchandl ❑ Insured Mail ❑ C.O.D. 4. Restricted Delivery? (Edna Fee) D Yes May 22, 2009 Steve Detwiller 3601 West Marginal Way SW Seattle, WA 98106 RE: Bond Release, King County Parcel 261320 -0049 L05 -011 Dear Mr. Detwiller: Gity of Tukwila Department of Community Development Jack Pace, Director The Department has reviewed your letter dated April 30, 2009 regarding releasing the landscaping bond that the City has for the above project. At this time the City cannot release the landscaping bond. The project, L05 -011, was a design review application for the conversion of an existing structure into a convalescent home. The proposed exterior renovations triggered design review which required the entire landscaping on the property to be brought up to City standards, including the installation of perimeter landscaping. When this project was permitted, Rehabitat NW noted that a second phase would occur on the property in the near future and that it would seem more logical to install the remaining landscaping when phase II was constructed. The City agreed to delay the installation of some of the landscaping until phase II. The City's Notice of Decision for the design review application noted the following: "The applicant shall provide a financial guarantee of $13,231 to the City for the landscaping and irrigation that will be included with phase II of the project. A building permit application must be issued for the phase II building by June 1, 2007. As an alternative the applicant can choose to install the required phase II landscaping by June 1, 2007". Rehabitat NW sold the property in October of 2006. At the time of the sale, the City had conversations with your company and the buyer and it was made clear to the City that the required landscaping would be installed. However, the required landscaping has not been installed. Jim Haggerton, Mayor Rehabitat's landscaping bond can be released under the following scenarios: 1. Install the required landscaping; or 2. Have the current property owner provide a new landscaping bond which will allow the current bond to be released. The City had the authority to require the landscaping to be installed prior to signing off on the Phase I building permit. In order to be flexible and work with Rehabitat NW on this issue the City accepted a bond in lieu of the landscaping work. Landscaping bonds are intended to be temporary deferrals of work, to be completed and released in a specific time period. In this case it is now two years past the deadline and in the absence of a building permit for Phase II the landscaping should be installed. If you have any questions please call (206) 431 -3684 or send an email to bmiles - ci.t ila.wa.us. Sincerely, Br don J. Miles Senior Planner cc. Nora Gierloff, Deputy Director Brenda Holt, Permirdinator File (L05 -011) Thanks -Steve Sincerely, 4/30/2009 Reha.bitat west From Attention Steve Detwiller City of Tukwila - Planning Dept 206 255 3474 -Cell 206 932 7355 - Office Brenda 206 - 933 - 7355 -Fax 206 -431 -3665 Hi Brenda, I have enclosed an old bond that is up for renewal that should have been released. Can you take care of that for me? Steve Detwiller, President Rehabitat Northwest, Inc. 3601 West Marginal Woy SW, Seattle WA 98106 Mobile 206 255 3474 Office 206 932 7355 Fox 206 933 7355 www,rehobitatnorthwest,com TNA sechaco MP GRO SUBDIVISION PERFORMANCE BOND Bond No. 576950S KNOW ALL MEN BY THESE PRESENTS: THAT we, Rehabitat Northwest In . 3601 W Mar • inal a SW Seattle WA 98106, as Principal, and Indemnity Company of California, a corporation organized and doing business under and by virtue of the laws of the State of California and duly licensed to conduct surety business in the State of Washington, as Surety, are held and firmly bound unto the City of Tukwila, 6300 Southcenter Blvd., Suite 100, Tukwila. WA 981$8, as Obligee, in the sum of Thirteen Thousand Two Hundred Thirty_One and 621100ths ($13,231.62) Del jam. for which payment, well and truly to be made, we bind ourselves, our heirs, executors and successors, jointly and severally firmly by these presents. THE CONDITION OF THE OBLIGATION IS SUCH THAT: WHEREAS, the above named Principal entered Into an agreement or agreements with said Obligee to complete landscaping and irrigation improvements for Macadam Convalescent project, Tax Parcel 261320 -0049. NOW, THEREFORE, the condition of this obligation is such, that if the above Principal shall well and truly perform sald agreement or agreements during the original term thereof, or any extension of said term that may be granted by the Obligee with or without notice to the Surety, and upon receipt of a written discharge from the Obligee, then this obligation shall be void, otherwise to remain in full force and effect. IN WITNESS WHEREOF, the seal and signature of said Principal Is hereto affixed and the corporate seal and the name of the said Surety is hereto affixed and attested by its duly authorized Attorney -in -Fact thls Lit day of April, 2006. Rehabitat Northwest, Inc. Indemnity Company of California By: By : Steven P. Detwiller, President Larry C. Sears, Sr., Attorney -In -Fact Insco Insurance Services, Inc. 9750 Third Avenue NE • Suite 305 • Seattle, WA 98115 (206) 525 -8201 • (800) 522.8201 • Fax (206) 525 -8268 • httpJ/www,in9coDico.com Underwriting Manager for. Developers Surety and Indemnity Company • Indemnity Company of California January 24, 2007 Mr. Steve Detwiller Rehabitat Northwest 5639 16 Avenue SW Seattle, WA 98106 City of Tukwila Department of Community Development Steve Lancaster, Director RE: Landscaping 13534 Macadam Rd S L05 -011 Dear Mr. Detwiller: Today, at the request of Wayne Chu, Planning staff conducted an inspection of the landscaping at 13534 Macadam Road South. The City approved the landscaping as part of the overall design review application (L05 -011). Generally, given the constraints of the site, the landscaping looked good. However, there are two items that need to be addressed: 1. Groundcover in most of the landscaped areas has not been installed. 2. Along the north property line the evergreen huckleberry shrubs need to be installed. Once these two items have been addressed, Planning will be able to final the outstanding building permit. If you have any questions, please call (206) 431 -3684 or send an email to bmiles ' ci.tukwila.wa.us. Sinc Brandon J. Miles Assistant Planner cc. Lourdes Chu File (L05 -011) Steven M. Mullet, Mayor h .Sn,thrpntpr Rn .Snitp #Inn • Tukwila. Washington 98188 • Phone: 206- 431 -3670 • Fax: 206- 431 -3665 Improving neighborhoods...One home at a time • October 7, 2005 License Q REHABN'016MA Responses to Design Review Comment Letter 13534 Macadam Road South L05 -011 Please see the attached comments for items Coordination of Plans 1. We have conducted a detailed review of all plans submitted to the City for this project, the revisions have been made and all plans have been updated. The retaining wall identified on the Landscaping Plan was correct and has been added to Al . The garbage enclosure and parking lot noted on the Landscaping plan has been added to A l . 2. The only new retaining wall to be added is at the West end of the upper parking lot to the South of the existing structure. The wall will be built with keystone bricks as noted on Al and shall not exceed 2' in height. This is being built to ensure the slope does not exceed 5% as required by TMC. 3. The proposed parking stalls on the West side of Phase I will be built to not exceed a slope of 5 %. If necessary, a keystone retaining wall will be constructed on the West and North sides of the parking stall to ensure the parking stalls comply with slope requirements. This retaining wall will not exceed 2' in height. 4. The building permit will be revised to show the proposed addition will be R -4 occupancy. Site Layout 1. The crushed walkway on the Landscaping Plan has been removed. 2. The buildings will be connected with a walkway that connects the two structures as required by the City. The walkway will be constructed with poured concrete or asphalt to ensure easy travel for wheelchairs and walkers. The slope of the walkway will not exceed 8% in grade and be built to ADA standards. 3. Garbage /Recycling for Phase I will be placed to the West of the upper parking area and will use the wood - slated chain link gate and screening per TMC 18.52.090. Ref: LI 4. This area will be used to access the Garbage and Recycling located in the NE corner of the property. The existing asphalt pad referenced by C 1 of 2 was installed by the adjacent property owner and is encroaching on the property. This area will be used by Rehabitat Northwest, Inc for the Garbage /Recycling purpose. No current easements exist for this area. 5. Per the survey, the existing dilapidated fence on the North property line is off -site; therefore the fence can not be replaced as part of this project. The screening 5639 16th Avenue SW Seattle, Washington 98106 Steve Detwiller General Contractor Direct 206.255.3474 Fax 206.933.7355 stevedetwiller @hotmail.com 4 a proposed by the Landscape Architect should provide adequate screening as to not deter with the design aspects of the proposed project. 6. The three parking spaces in front of Phase II have been relocated to the East side of the building. Architectural Style 1. No additional windows can be added, without damaging the structural integrity of the building. The 6'0" patio door should allow enough light into the Dining Room. The Garage wall on the East Elevation is designed as a shear wall, which prevents any windows from being installed to break up this area. 2. 2x8 Band Board has been added between each floor, along with each gable shall be cedar shake. This should ensure architectural continuity for each side of the building, as requested by the City. Landscaping Plan 1. The landscaping plan has been revised to match the other plan sheets for this project. 2. The South property line has been added to the Landscaping plan. 3. A 10' Type II planting strip has been added to the East property line 4. A cost estimate for the Phase II landscaping labor and materials has been provided with the revised plans submittal. Prior to issuance a bond will be in place for 150% of this total for the completion of these items. General Questions 1. No, the existing rockeries will remain intact per all site plans. Existing Structure 1. Label on Al and Landscaping Plan has been changed to "Existing Structure" per City's request. Let me know if you have any additional questions or requirements that need to be met for this project. Thank you for your time. Sincerely, Chad Detwiller Rehabitat Northwest, Inc (206) 932 -7355 chad @rehabitatnorthwest.com Improving neighborhoods...One home . at a time! Northwest Engineer's Estimate for Phase II Landscaping: Landscaping Costs: Planting Materials Planting Labor Groundcover Materials Groundcover Labor Total Landscaping Costs Irrigation Costs: License 4: REHABN•016MA $2,034.60 $1,740.00 $1,110.98 $1,460.50 $6,346.08 Materials $1,275.00 Labor to Install $1,200.00 Total Irrigation Costs $2,475.00 Total Landscaping Costs For Phase II $8,821.08 Total Bond (150% of Costs) $13,231.62 5639 16th Avenue SW Seattle, Washington 98106 Steve Detwiller General Contractor Direct 206.255.3474 Fax 206.933.7355 stevedetwiller @hotmail.com 10/07/2005 14 : 5b FAX l4'25tS'21 U81 1 Company name Rehabltat NW Address 5639 16th AVE SW Address Seattle, WA 96106 phone 206 - 932.735 fax 206 - 933 -7355 Job Name: Aha$a 11 Delivery Date: Job Address: Contact Name: Chad Quantity 7 Acer circinatum Picea amorika 23 Rhododendron 'PJM' 4 Symphoricarpos alba Arctosta• los uva -ursi Comments: Plant Description UANUN I, ,n Instant Lawn BidlAcceptence Sheet Size 8' 6' 6' Each 360.00 565.00 5135,00 1 Chamaecyparis obtuse 2 Pyrus calleryana 'Redspire' 2" $115.00 c Arbutus unedo 'Compacta' 5 a� 513.50 3 Ceanothus 'Dark Star' 5 sal 517.95 24 _ Ilex crenate 'Convexa' 2 al 59.75 33 Poi stichum munitum 1 gal 53.75 20 Prunus laurocerasus 'Otto Luyken:' 5 gal 515.50 18" 515.50 15" 512.50 4•• $1.50 Arctostaph Tiarella cordifolie Vince minor Vince minor los uva -urs 1 gal 1 al 4" 1 gal 33.95 $0.00 $1.50 53.75 $0.00 3' spacin. $.42 •er square foot $0.00 $0.00 30.00 $0.00 $0.00 30.00 30.00 50.00 50.00 50.00 30.00 50.00 50.00 50.00 TOTAL Total 3420.00 7 - $0.00 $135.00 7-8' $230.00 5121.50 $53.85 3234,00 sub3 :allon 5123.75 3310.00 sub 18 -24" $356.50 550.00 sub 5 •allon 30.00 2' spacing 3.38 per square foot 75c: $0.00 3' spacing 3.44 per square foot /,„2 30.00 50.00 2' s • acing 5,38 per s uare foot 50.00 50,00 50.00 $0.00 30,00 30.00 50.00 $0,00 30,00 50.00 30.00 50.00 30.00 50,00 32,034.60 Prepared 13y: MEO /Jw Date Prepared: 10/7/2005 I hereby acknowledge that my signature commits me to the above stipulations and requirements of JB Nursery. Thank you for your business! to 002/002 JB Instant Lawn - Nursery Division 14020 NE 124TH ST Redmond, WA 98034 Phone.(425)821 -04 Toll Free: (800) 599-2699 Fax: (425) 821 -0613 Substitutes/ Slxe /Type /Comments All orders must be placed 7 to 14 business days prior to shipping. Price & evalability are subject to change without notice. The above listed Items may be unavailable at the time of the signed bid acceptance. Substitutions may be obtained with your approval. A 25% deposit Is required for orders with delivery date beyond 30 days. Plants held 30 days beyond Delivery Date will be charged e 15% maintenance feeper month All field dug trees must be taken no later than April 15th. A 25% restocking fee will be charged on material bought In good faith and then cancelled for the Job. A summer dig fee may apply. within 5 days of delivery: thereafter All discrepancies In quantities /quality must be received, In writing, merit for credit will be forfeited. 10/7/2005 Page 1 of 2 a a ocr. 2IC 26° "VV •QIC[D SY CN[CR[D F. O. B. POINT IUANTIT V 10 PO. Box 64271 University Place, WA 98464 253.460.7673 );loyal Waldock Irrigation Consultant RE,NAsITAT 1.1es +wE.61T TUKW ILA 1 WM 1-}bIJATt JOS ADDRESS CONTRACTOR DESCRIPTION tge--• • 20• Ab) - f ll�l Blp_.0 I BD4 a+. -A) - - - INIcL Wt iw sTI r Mist• LIST PRICE DISCOUNT TOTAL AsE PAGE I21V1E. E A S T I M A N\AT i I)01 r� August 29, 2005 Mr. Steve Detwiller Rehabitat Northwest 5639 16 Avenue SW Seattle, WA 98106 RE: Design Review Comment Letter 13534 Macadam Rd S L05 -011 Dear Mr. Detwiller: 0 City of Tukwila Department of Community Development The above application for administrative design review to convert an illegal duplex into a convalescent home was submitted on February 22, 2005. The application was deemed incomplete on March 2, 2005. A submittal of the required documents was submitted on June 2, 2005. A building permit was submitted for the project on July 21, 2005. It has been noted to City staff that the project will proceed in phases with phase one being conversion of illegal duplex into convalescent home for at least six persons. Phase II will be the construction of a second structure on the property with additional bedrooms. Phase II will require the approval of a Conditional Use Permit (CUP) by the City's Planning Commission. A review of the submitted plans shows significant issues with the design of the building, site layout, as well as issues with phasing. The following comments are only with regards to design review, however, these comments may require that changes be made to the pending building permit application. Plans reviewed were: Building Permit Plans stamped received by the City on July 21, 2005 and Design Review Plans stamped received by the City on June 2, 2005. Coordination of Plans 1. The plans that have been submitted do not match. Most notably is the landscaping plan and sheet A1. Sheet Al shows retaining walls that are not shown on the landscaping plan. Additionally, the landscaping plan shows a retaining wall that is Steven M. Mullet, Mayor Steve Lancaster, Director 6300 Southcenter Boulevard, Suite #100• • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665 • • not shown on sheet A1. The landscaping plans shows a crushed gravel walkway, however, that walkway is not shown on sheet Al. The landscaping plan appears not to reflect the true shape of the convalescent home. The landscaping plans shows a garbage enclosure and parking yet this is not reflected on sheet Al. 2. Also, a detailed plan needs to be prepared for the new retaining walls on the property. The plan needs to include the exact location, height and materials to be used in the construction of the walls. Ecology blocks are not an appropriate material for the retaining walls. An example of a good material would be keystone bricks. It must be demonstrated prior to issuance of any permits that the retaining walls can meet City requirements for height and setbacks. 3. Show the proposed parking stalls on sheet Al. Under TMC 18.56.040 (4) the slope of any off- street parking spaces shall not exceed five percent. It appears that some of the parking stalls on this site will have difficulty meeting this requirement. Please add contour lines on sheet Al at two feet intervals. Please be advised that merely putting a note on the plans that are parking stalls shall not exceed five percent will not suffice. It must be demonstrated prior to issuance of building permits how the parking stalls will meet the slope requirements of the City. 4. The building permit (D05 -072) notes that the occupancy of the structure is R -3. However, it has been noted in the design review application that the facility may house up to nine residents, this would make the occupancy an R -4. Site Layout 1. The walkway located to the north of the first building on the site cannot be crushed gravel. Walkways in the city at commercial sites must be an approved durable surface such as concrete, asphalt or other approved surface such as stone or pavers. Additionally, the use of crushed gravel seems inappropriate for a site that will be used as a convalescent home where residents may be in wheel chairs, use walkers, or just have difficultly in walking. 2. Since the site will be one complex consisting of two buildings, the walkway needs to be extended to the second building. Insure that the grade of the walk meets ADA requirements. 3. Where will the garbage and recycling functions be for the building constructed under Phase one. The landscaping plan shows that these facilities will be located on the northeast property line, yet this area will be constructed during phase II. The dumpster and recycling enclosures cannot be stand -alone and must be adequately screened from view (TMC 18.52.090). A split face CMU wall with slatted chain - link fence needs to be used for screening. The trash enclosure also needs to meet setbacks, which are five feet from the sides and five feet from the rear. 4. What is the purpose of the area south of the current dumpster location and east of the proposed phase II building? This area is not shown on the landscaping plan or sheet A.1. Sheet C 1 of 2 appears to show some type of concrete or asphalt pad that extends on to the property. What is the purpose of this pad? Will it remain and if so how is it used? Is the area used by another property owner and if so do easements exist for this area? Architectural Style Landscaping Plan • • 5. On the north property line there is a dilapidated fence that needs to be replaced. Please show the fence on the landscaping plan and sheet Al. If the fence is located on the project site it will need to be replaced. The City's suggestion is to use a wood slated fence. 6. The location of the three parking stalls along the private access drive is inappropriate. These stalls will border a LDR zone and need to relocated to insure adequate screening. 1. Large blank walls should be avoided on the building. Please consider some measures to break up the large blanks walls on the east elevation and south elevation Windows in these areas would break up the large walls while at the same time provide lighting within the structures, most notably the dinning and sitting rooms. 2. Some type of architectural accent needs to be added around the entire building. 1. As noted above, the landscaping plan must match the other plan sheets for this project. 2. The landscaping plans need to show all property lines. 3. The landscaping plan notes that there is ten feet of type II landscaping along the east property line. However, the plan does not show any landscaping along the east property line. 4. Provide a cost estimate for materials and labor for the landscaping plan. Please break the cost up between phase I and phase II. A bond will be required for the landscaping that is part of phase II. This is due to the fact that required perimeter landscaping will not be capable of being installed until phase II. The bond will be 150 percent of the estimate cost for labor and materials for the landscaping included in phase II. 5. All deciduous trees must be at least two inches in caliper measured foot feet above ground. Please reference this requirement on the landscaping plan. 6. All existing trees four inches in caliper need to be shown on the landscaping plan. 7. Provide separate landscaping plans for the areas around the retaining walls. Show the retaining walls to scale. It appears that the retaining walls will conflict with the landscaping. General Questions 1. Will all the existing retaining walls on the property be removed? Existing Structure As you aware, the existing structure had previously been used as a duplex. The zoning on the property is Commercial/Light Industrial (C/LI) and residential uses are not permitted in the C/LI zone. The duplex had been vested legally non - conforming, however, in October of 2004 the City issued a Code Interpretation that the non- conforming use rights for the duplex had expired since the duplex was not occupied for two years. The Code Interpretation specified an appeal period for the City's determination and no appeal was filed with the City. In the design review narrative submitted to the City the following statement has been made: "Further, we believe we are following the objective of the City, by developing additional family housing that is not apartment style ". The building cannot be used for family housing. The permitted use is a convalescent care facility with accommodations for employees. The only way that the property can be used for multi - family housing is to have the zoning on the property changed through a formal comprehensive plan change. 1. Please remove all references to the "existing duplex" simply label as "existing structure ". Next Step • • Your next step is to address the comments raised in this letter and resubmit the necessary plan documents for review. Please insure that all plans submitted match and reflect the construction activities that will take place on the property. If you have any questions, please call (206) 431 -3684 or send an email to bmiles@ci.tukwila.wa.us. Sincerely, J Brandon J. Mil Assistant Planner cc. File (L05 -011) Improving neighborhoods...One home at a time!. • Rehabitat Northwest June 3, 2005 License k; RLHABN'016MA Rehabitat Northwest, Inc Project: L05 -01 1 — 13534 Macadam Road South Responses to Notice of Incomplete Application: 1) Please see attached written discussion addressing the aspects of the project. 2) Please find copy of Geotechnical Report within the TIR report. 3) This should be addressed in the Site Engineering report. JUN 0 22005 04 a Steve Detwiiller General Contractor Direct 206.255.3474 Fax 206.933.7355 slevedetwiller@hotmail.cojn 4) Please find the accompanying storm drainage drawings and technical reports prepared by PACE Engineering. fiopose., Cam+ : /oo41 112 PAPJ l: 5) Please find the scalable building elevations in 1/8" = 1' scale as part of the material board. Screening is illustrated on accompanying landscape plan. 6) Please find accompanying materials and color board to illustrate intended finished materials and colors. 7) The luminaire plan will comply with TMC 18.50.100 and fixture will be placed according to the elevations. 8) No existing signage exists on the property. Proposed signage will consist of one sign 24" x 18" to a height of 30" from the final grade placed on the south side of the proposed structure. Color of signage will match the proposed residence. Lel me know if you have any additional questions or requirements that need to be met for this project. Thank you for your time. Sincerely, Chad Detwiller (206) 932 -7355 chad@rehabitatnorthwest.com 5639 16th Avenue SW Seattle, Washington 98106 PROJECT: ADDRESS; OWNER: CONTACT: Design Criteria Discussion Macadam Convalescent Home 13534 Macadam Rd. S. Tukwila, Wa. Rehabitat Northwest, Inc. Steve Detwiller- 206 - 255 -3474 1. Relationship to Structure to Site. a. The site should be planned to accomplish a desirable transition with the streetscape and to provide for adequate landscaping and pedestrian movement. The existing structure is setback approximately 15' from Macadam Rd. which provides a planting strip on which existing mature trees and proposed plantings will establish a screen of green between pedestrian movement (paved shoulder) and the existing dwelling. See attached landscape plan. b. Parking and service areas should be located, designed and screened to moderate the visual impact of large paved areas. The proposal does not require large areas of parking (see attached plan). The required number of parking stalls have been located strategically on the site to allow for landscape screening. c. The height and scale of each building should be considered in relation to its site. The site is 22,400 s.f., the proposed structures footprint is approximately 1900 s.f. (8% of lot coverage). The height will be 2 stories (@35') The scale of building to site will be more than proportional to surrounding sites. 2. Landscape and Site Treatment a. Harmony in texture, line and masses is encouraged. In a spirit of the Craftsman style the proposed structure will blend architectural composition roofing with a combination of cedar shake and Vinyl siding. b. Appropriate landscape transition to adjoining properties should be provided. The proposed site will be fully landscaped (see attached drawing). Property that adjoins to the south is single family new construction that we have developed that will also be fully landscaped, to include the transitional private access roadway. c. Public buildings and structures should be consistent with the established neighborhood character. We have actively pursued a proposal that would be " neighborhood friendly" despite the fact that the site had a change of zoning making it much more difficult to blend with single family homes. We have gone to great lengths to provide the type of development, architectural style, color, massing and character that would "charm" the neighborhood rather than maximize the full value of its commercial zoning. d. Compatibility of vehicular and pedestrian circulation patterns and loading facilities in terms of safety, efficiency and convenience should be encouraged. By providing all off street parking coupled with screening the vehicular traffic with landscape plantings (see attached plan) from the neighborhood and from the pedestrian patterns will ensure that the minimal impact of a Boarding Homes' traffic will be silenced. e. Compatibility of on -site vehicular circulation with street circulation should be encouraged. Proposal provides for all on -site traffic with no need to back out onto or navigate the circulation of street traffic except directly. 3. Landscape and Site Treatment a. Where existing topography patterns contribute to beauty and utility of a development, they should be recognized, preserved and enhanced. The site provides some slope to accommodate the screening of traffic and traffic patterns from Macadam Rd. Further the slope provides lots to be "stepped" with rockeries, plantings, etc. to provide yet another means of privacy and separation. b. Grades of walks, parking spaces, terraces and paved areas should promote safety and provide an inviting and stable appearance. The terraced lawn provided between structures will promote a social gathering area in addition to green space that separates structure and parking. Areas providing parking spaces have been integrated into the natural topography of the lot to enhance, separate and provide as flat of an area for vehicular exiting as possible. Graded walkways providing wheelchair accessibility will make a connection with the common areas (see attached plan) c. Landscape treatment should enhance architectural features, strengthen vista and important axis, and provide shade. The lawn areas located on the east and west side of the proposed structures provide not only privacy for gathering but practical shade. Visually challenged necessities such as parking and garbage have strategically been placed —see attached plan. d. In locations where plants will be susceptible to injury by pedestrian or motor traffic, mitigating steps should take place. Areas that are provided for vehicular and pedestrian use will have a shallow curb that separates the paved area from the landscaping. e. Where building sites limit planting, the placement of trees or schrubs in paved areas is encouraged. This site and the building coverage provide for more the adequate landscape planting locations. f. Screening of service yards and other places, which tend to be unsightly should be accomplished by the use of walls, fencing, planting or combinations of these. Screening should be effective in winter and summer. The garbage area has been strategically placed, screened by fencing and plantings. See attached plan. g. In areas where general planting will not prosper, other materials such as fences, walls, and paving of wood, brick, stone or gravel may be used. Fortunately the site provides adequate location where planting will prosper. Landscape rockeries have been used at grade change locations. See attached drawings. h. Exterior lighting, when used, should enhance the building design and the adjoining landscape. Lighting standards and fixtures should be of a design and size compatible with the building and adjacent area. Lighting should be shielded, and restrained in design. Excessive brightness and brilliant colors should be avoided. Given the challenge of designing a commercial building in a predominately residential setting, product selection and sensitivity was important. The exterior lighting will be proportional in size and color, relative to comparable light intensity of exterior lighting found on single family homes. Lighting will be found at all exterior door locations as well as low intensity sidewalk lighting. 4. Building Design a. Architectural style is not restricted, evaluation of a project should be based on quality of design and relationship to surrounding The proposed project will be comparable to the Craftsman style of newly completed homes adjacent to the proposed project. The exterior finishes proposed and submitted will enhance and blend with surrounding buildings. b. Buildings should be to appropriate scale and be in harmony with permanent neighboring developments. Relative to lot coverage the proposed project will harmonize well with surrounding single family homes. The fact that the proposed project will have more "open" space that is fully landscaped than adjacent single family lots (7000 s.f.) will only enhance the neighborhood. c. Building components, such as windows, doors, eaves and parapets, should have good proportions and relationship to one another. Building components and ancillary parts shall be consistent with anticipated life of the structure. Architecturally the proposed project has height, mass, glazing, roof pitch, overhang, siding type and style that mirrors the adjacent single family homes. The building components have a useful life similar to that of materials used on single family homes. Roof -30 years, Siding -40, Windows -30 d. Colors should be harmonious, with bright or brilliant colors used only to accent. The siding base color will be beige with white trim accents (see enclosed samples) Roofing shall be Oakridge. No "bright" colors will be used. e. Mechanical equipment or other utility hardware on roof, ground or buildings should be screened from view. All mechanical equipment will be within the structure in a designated utility room. f. Exterior lighting should be part of the architectural concept. Fixtures, standards and all exposed accessories should be harmonious with building design. See comments on 3 -h. g. Monotony of design in single or multiple building projects should be avoided. Variety of detail, form and fitting should be used to provide visual interest. Change in window configuration, roof direction, footprint configuration and exterior finishes will all add interest to what will be a visually attractive building. (See enclosed drawing) 5. Miscellaneous Structures and Street Furniture a. Miscellaneous structures and street furniture should be designed to be part of the architectural concept of design and landscape. Materials should be compatible with buildings, scale should be appropriate, colors should be in harmony with buildings and surroundings, and proportions should be to scale. No misc structures or street furniture proposed. b. Lighting in connection with miscellaneous structures and street furniture should meet the guidelines applicable to site, landscape and buildings. No misc structures or street furniture proposed. 6. Demonstrate the manner in which the proposal is consistent with, carries out and helps implement applicable state laws and the regulations, policies, objectives and goals of the City of Tukwila Comprehensive Plan, the City of Tukwila's Development Regulations and other official laws, policies and objectives of the City of Tukwila. The proposed site (re -zoned to C/LI) was purchased by Rehabitat Northwest, Inc. in 2004. The site contains an existing duplex in poor repair. It is our desire to follow the goals of the City of Tukwila by renovating the substandard structure and return it to a far superior usage as a Convalescent Care facility. Further, we believe we are following the objective of the City, by developing additional family housing that is not apartment style. The building will be constructed in a manner consistent with state and local codes to include DSHS, RCW and WAC requirements. The TMC 18.30.020 (16) allows for the development of Convalescent and nursing homes for not more than 12 patients. The proposed facility has been designed and will be licensed to provide care for up to 9 patients (Phase 1) The Macadam Rd. Convalescent Care Home will provide direct employment for 6 full time and 6 part time staff. The Home will also generate contract employment for nursing, transportation, maintenance, food service and caregivers. March 3, 2005 Mr. Oliver Prock 5639 I n Ave S v Seattle, WA 98106 Dear Mr Prock: City of Tukwila Location of all sensit.ix c areas (e.g. streams, wetlands, slopes over 15 percent, cr.a1 mine areas and irrportant geological and archaeological sites). b. Lc,.ation (Wall required sensitive area buffers, setback tracts and protection measures. c. Show all trees over lour inches in caliper, indicating those to be retained. d. Existing and proposed building footprints 4. Civil Plans must be provided and must include the following Steven M. Mullet, Mayor Department of Community Development Steve Lancaster, Director Notice of incomplete Application Design Review for 13534 Macadam Rd S The City of Tukwila's Planning Department received your application for Administrative Design Review on February 22, 2005. On March 2, 2005 it was deemed to be incomplete because certain requirements of the application were not provided: Please provide the following,: 1. A written discussion of the project consistency with decision criteria. The one page provided does not address any of the design review criteria that was listed in the application material. 2. The property contains steep slope, provide a Geotechnical report prepared by a quaililed prof :.sicna1. 3 A sensitive areas plan needs to be prepared, the plan must include the following: a. One set of all civil plan and :analyses shall be stamped, signed and dated by a rrolcssional engineer. include a graphic scale and north arrow. Maxim..+m size is 24 is - ,chcs by 36 inches. 6300 Southcenter Boulevard, Suite #100 0 Tukwila, Washington 98188 o Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665 h. Vertical datum NAVD 1988 and horizontal datum NAD 83/91. Conversion calculations to NGVD 1929, if in flood zone or flood prone area., c. Existing (dashed) and proposed (solid) topography at two foot intervals. d. Total expected cut and fill P- e. Existing and proposed utility easements and improvements, on site and in street (water, sewer, power, natural gas, telephone, cable). Schematic designs to be provided regardless of purveyor (e.g. site line size, location, and size of public main). No capacity calculations, invert depth, valve locations or the like are needed. f. Storm drainage design at least 90 percent complete, which meets the TIR and KCSWDM. Include all storm drainage maintenance access and safety features. Call out total existing and proposed impervious surfaces in square feet. vg. Locate the nearest existing hydrant and all proposed hydrants. h. Plan, profile and cross- section for any right of way improvements. i. Show planned access to buildings, driveways, fire access lanes and turn- arounds. 5. Dimensioned and scalable building elevations with keyed colors and materials. Show mechanical equipment and /or proposed screening. Maximum size 24 inches by 36 inces. 6. Color and materials board accurately representing the proposed project. 7. Luminaire plan including location and type of street and site lighting if any changes to the existing fixtures are proposed. Include proposed fixture cut sheets, site light levels (foot candles), and measures to shield adjacent properties from glare. 8. All existing and proposed signage with sign design and locations. Once the above - mentioned information is provided, City staff can begin to review the application. If you have any questions, please feel free to call me at (206) 431 -3684 or you can email me at bmiles(ii)ci.tukwila.wa.us. Sincerely, , Brandon .1. Miles Assistant Planner cc. File (L05-011) One, on- premises sign not electrical or illuminated, four square feet in area or Tess, which is affixed permanently on a plane parallel to the wall that is located entirely on private property. As this business has not yet been established, we cannot provide name or font. Color will match the structure Placed by side entrance 3 18 " 24" 0" May 24, 2005 Mr. Steve Detwiller Rehabitat Northwest 5639 16 Avenue SW Seattle, WA 98106 Dear Mr. Detwiller: City of Tukwila • Department of Community Development Steve Lancaster, Director RE: Your letter dated May 19, 2005 The Department of Community Development has received your letter dated May 19, 2005. The letter requests an extension with regards to the Notice of Incompleteness that the City issued on March 3, 2005. The City seeks to work with all developers cooperatively. Our goal is to ensure a smooth review process and to that end have found Pre - Application meetings to be a very useful tool. The City provided you guidance on this project at a pre - application meeting on December 2, 2004. At the meeting the City provided specific requirements that would need to be submitted with any land use application in order for the application to be complete. The City also noted the presence of steep slopes on the property and the need to provide a geotechnical report along with the other required items. To provide additional guidance to potential applicants, the City's land use applications include a checklist identifying what items need to be provided with the application. Despite the guidance provided via the Pre - Application Checklist and verbal comments from staff at the meeting, there were a number of required items missing from your application materials. Your request for an extension is not granted. In your letter you noted that the required items would be submitted within two weeks, which would allow the required items to be submitted before June 3, 2005. The application will be canceled if the required items listed in the City's March 3, 2005 letter on not presented to the City by 5:00, June 3, 2005. If you have any questions, please call (206) 431 -3684 or send an email to bmiles@ci.tukwila.wa.us. Sincerely Br on i es Assistant Planner cc. Nora Gierloff, Planning Supervisor File (L05 -011) Q: \Developments \Rehabitat \Letters \May 24.doc Steven M. Mullet, Mayor 6300 Southcenter Boulevard. Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665 Improving neighborhoods...One home,at a time! May 19, 2005 Mr. Brandon Miles Assistant Planner City of Tukwila Dept of Community Development Dear Mr. Miles, Ref; Notice of Incomplete Application deadline L05 -011 Please accept this letter as our request for an extension of time for the design review process. The request by the City of Tukwila for full geotechnical, environmental, drainage, and topographic engineering has required more time to prepare then anticipated. We expect this information to be ready to submit within the next 2 weeks. Please consider that we are more than motivated to move this project along. The financial burden that this 12 month long process (to date) has caused far exceeds what normally one would expect from renovation of blighted structures. We would hope that the City of Tukwila would see the value in cooperatively working in harmony with the developer of such projects. Thank You for your consideration in our request for an extension of time. teve Detwiller President Rehabitat Northwest, Inc. 206 - 255 -3474 License #: REHABN'016MA • crEwso Ma y 3 T*5 DevELOP meg 5639 16th Avenue SW Seattle, Washington 98106 Steve Detwiller General Contractor Direct 206.255.3474 Fax 206.933.7355 stevedetwiller @hotmail.com May 17, 2005 Mr. Oliver Prock 5639 16 Ave SW Seattle, WA 98106 RE: Dear Mr. Prock: w Ciiy of Tukwila Department of Community Development Steve Lancaster, Director Notice of Incomplete Application Design Review 13534 Macadam Rd S L05 -011 On March 3, 2005, the City sent you a "Notice of Incomplete Application ". A copy of that letter has been attached for your reference. As of today, the requested information has not been submitted to the City. Please note that the Department shall cancel an incomplete application if the applicant fails to submit the requested information within 90 -days following notification from the Department that the application is incomplete. The Department may extend up to 120 days if the applicant submits a written request for an extension prior to cancellation. The request must clearly demonstrate that the delay is due to circumstances beyond the applicant's control (such as the need for seasonal wetland data) or unusual circumstance not typically faced by other applicants, and that a good faith effort has been made to provide the requested materials (TMC 18.104.070). If the requested material is not submitted to the City by June 3, 2005 or a request is made to increase the 90 -day period to 120 -days, your application will be canceled. Any request for an extension must clearly demonstrate how you were unable to provide the requested information with your original submittal and why the items could not be provided within the 90 -day period. If you have any questions, please call (206) 431 -3684 or send an email to bmiles u,ci.tukwila.wa.us. Sincerely, "Br don 1V tles Assistant Planner cc. File (L05 -011) Q:\ Developments \Rehabitat \90days.doc Steven M. Mullet, Mayor 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665 1 March 3, 2005 Mr. Oliver Prock 5639 16 Ave SW Seattle, WA 98106 Dear Mr Prock: • Cizy of Tukwila Department of Community Development Steve Lancaster, Director Notice of Incomplete Application Design Review for 13534 Macadam Rd S 4. Civil Plans must be provided and must include the following The City of Tukwila's Planning Department received your application for Administrative Design Review on February 22, 2005. On March 2, 2005 it was deemed to be incomplete because certain requirements of the application were not provided: Please provide the following: 1. A written discussion of the project consistency with decision criteria. The one page provided does not address any of the design review criteria that was listed in the application' material. 2. The property contains steep slope, provide a Geotechnical report prepared by a quailifed professional. 3. A sensitive areas plan needs to be prepared, the plan must include the following: a. Location of all sensitive areas (e.g. streams, wetlands, slopes over 15 percent, coal mine areas and important geological and archaeological sites). b. Location of all required sensitive area buffers, setback tracts and protection measures. c. Show all trees over four inches in caliper, indicating those to be retained. d. Existing and proposed building footprints a. One set of all civil plans and analyses shall be stamped, signed and dated by a licensed professional engineer. Include a graphic scale and north arrow. Maximum size is 24 inches by 36 inches. Steven M. Mullet, Mayor 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665 1 Sincerely, j Brandon J. Miles Assistant Planner cc. File (L05 -011) b. Vertical datum NAVD 1988 and horizontal datum NAD 83/91. Conversion calculations to NGVD 1929, if in flood zone or flood prone area. c. Existing (dashed) and proposed (solid) topography at two foot intervals. d. Total expected cut and fill e. Existing and proposed utility easements and improvements, on site and in street (water, sewer, power, natural gas, telephone, cable). Schematic designs to be provided regardless of purveyor (e.g. site line size, location, and size of public main). No capacity calculations, invert depth, valve locations or the like are needed. f. Storm drainage design at least 90 percent complete, which meets the TIR and KCSWDM. Include all storm drainage maintenance access and safety features. Call out total existing and proposed impervious surfaces in square feet. g. Locate the nearest existing hydrant and all proposed hydrants. h. Plan, profile and cross - section for any right of way improvements. i. Show planned access to buildings, driveways, fire access lanes and turn- arounds. 5. Dimensioned and scalable building elevations with keyed colors and materials. Show mechanical equipment and/or proposed screening. Maximum size 24 inches by 36 inces. 6. Color and materials board accurately representing the proposed project. 7. Luminaire plan including location and type of street and site lighting if any changes to the existing fixtures are proposed. Include proposed fixture cut sheets, site light levels (foot candles), and measures to shield adjacent properties from glare. 8. All existing and proposed signage with sign design and locations. Once the above - mentioned information is provided, City staff can begin to review the application. If you have any questions, please feel free to call me at (206) 431 -3684 or you can email me at bmiles@ci.tukwila.wa.us. JUNE 2005 PREPARED FOR Rehabitat NW — Steve Detwiller 5639 16 Ave SW Seattle, WA 98106 PREPARED BY 750 Sixth Street South Kirkland, WA 98033 Phone: 425- 827 -2014 Fax: 425- 827 -5043 Penhallegon Associates Consulting Engineers, Inc REC E IV E ,J1 co 2 2005 D EVE L ° MITur Rehabitat NW — Macadam Rd Commercial Site June 2005 — Preliminary Technical Information Report Page 1 I. PROJECT OVERVIEW The 0.50 -acre developed area for parcel# 2613200049 for the Rehabitat Northwest Macadam Rd Commercial Site project is located along the northeast side of Macadam Rd S (S 135 St) approximately 350 ft northwest of 48 Ave S, in the City of Tukwila. This site is within the NE 1/4 of Section 15, Township 23 North, Range 4 East, West Meridian, in the City of Tukwila, King County, Washington. For general location, see Figure 2, Vicinity Map. The property is zoned Commercial by the City of Tukwila. The scope of work for the Macadam Rd Commercial Site Adjustment project includes the re- development of approximately 0.50 acres for a new boarding home and an expansion of an existing home to be used as a boarding home. Proposed improvements are to include an onsite storm drainage system. Site grading, onsite water system, gas & power, and onsite side sewer system have been designed and constructed by other firms. Grading and utility installation are currently underway. No frontage improvements are included as part of this proposal. Existing site conditions used for storm system design calculations were taken from the topographic survey provided by Fox Dobbs Survey Mapping, aerial photographs, and from a visual inspection of the site. Under existing conditions there are 0.43 acres of outwash grass and 0.06 acres of effective impervious area. Under proposed development conditions the total impervious area would be approximately 0.27 acres or 54% of the total site. The additional 0.21 acres would be outwash grass. This project site is outside of the limits for the King County Soils Mapping. Soil type was determined as "outwash" based on the Geotechnical Engineering Report by LIU & Associates, Inc. The site is underlain by outwash soils and generally slopes from south to north from an elevation of 86 in the south comer of the site to an elevation of 44 in the north corner of the site. Ave. slopes range from approximately 10% to 29% across the site. Part 6 SITE CHARACTERISTICS � -;- _ Drainage Basin Duwamish River Drainage Basin River Floodplain (Middle Fork Snoqualmie) ■ ■ Stream Wetlands (adjacent to site) ■ ■ Critical Stream Reach Seeps /Springs ■ ■ ■ Depressions /Swales High Groundwater Table ■ ■ Lake C Groundwater Recharge ■ Steep Slope: • Part 5, SIT TYAND DRAINAGE BASIN' ' ` { ° �'� .rek�, _.. ,, d ..3.... ,,,,. L.�..�- Community Highline Planning Area Drainage Basin Duwamish River Drainage Basin Figure 1. '111t Worksheet King County Department of Development and Environmental Services TECHNICAL INFORMATION REPORT (TIR) WORKSHEET Part 1 f •PR`OJECT OWNER PsROJECT ENGINEERf; =; Project Owner Rehabitat NW Address 13534 Macadam Rd S Tukwila, WA 98168 Phone 360 -659 -0808 Project Engineer Peter Paulsen Company PACE Engineers Address /Phone 425 -827 -2014 Part 3 TYPE OF FERMI APP.LI.CATION ; ❑ Subdivision ❑ Short Subdivision ❑ Grading ❑ Commercial ❑ Other (Boundary Line Adjust.) :Part 2 'PROJECT LOCATION'i? ''DESCRIPTION Project Name Macadam Road Commercial Site Location Township 23 N Range 4 E Section 15 Project Size 0.50 acres Upstream Drainage Basin Size N/A Part 4 OTHER REVIEWS AND PERMITSt ❑ DFW HPA ❑ COE 404 ❑ DOE Dam Safety 111 FEMA Floodplain ❑ COE Wetlands ❑ Shoreline Management ❑ Rockery ❑ Structural Vaults ❑ Other o. s Part 9 ESC REQUIREMENTS : s . f r� MINIMUM ESC REQUIREMENTS MINIMUM ESC REQUIREMENTS DURING CONSTRUCTION AFTER CONSTRUCTION X Sedimentation Facilities X Stabilize Exposed Surface ■ Stabilized Construction Entrance X Remove and Restore Temporary ESC Facilities X Clean and Remove All Silt and Debris ■ Perimeter Runoff Control X Ensure Operation of Permanent Facilities II Clearing and Grading Restrictions ■ Flag Limits of SAO and open space II Cover Practices preservation areas ■ Construction Sequence ❑ Other ■ Other Figure 1 - cont. TIR Worksheet Other Part 7 SOILS Soil Type Slopes Outwash 10 -29% ❑ Additional Sheets Erosion Potential Erosive Velocities Medium Medium Part 8 DEVELOPMENT LIMITATIONS REFERENCE ❑ Additional Sheets Attached LIMITATION /SITE CONSTRAINT Figure 1 - cont. TIR Worksheet ,,Part10 : SURFACE WATER SYSTEM ❑ Grass Lined Channel X Pipe System ❑ Open Channel C Dry Pond ❑ Wet Pond X Tank ❑ Vault ❑ Energy Dissapator ❑ Wetland ❑ Stream X Infiltration ❑ Depression C Flow Dispersal ❑ Waiver ❑ Regional Detention Method of Analysis KCRTS Compensation /Mitigation of Eliminated Site Storage Provided Onsite Brief Description of System Operation: Stormwater runoff will be collected and conveyed to a detention /infiltration tank subject to level 1 flow control criteria. Detained runoff will discharge to an existing onsite catch basin. A two- orifice control structure will be used to regulate discharge from the detention tank. Facility Related Site Limitations Reference Facility Limitation Core Req. #3 Infiltration Tank Level 1 Flow Control P 11 STRUCTURAL ANALYSIS ❑ Cast in Place Vault ❑ Retaining Wall ❑ Rockery > 4' High ❑ Structural on Steep Slope ❑ Other Part 12. EASEMENTS/TRACTS ❑ Drainage Easement ❑ Access Easement ❑ Native Growth Protection Easement ❑ Tract ❑ Other Part 13 SIGNATURE: OF, PROFESSIONAL ENGINEER I or a civil engineer under my supervision has visited the site. Actual site conditions as observed were incorporated into this worksheet and the attachments. To the best of my knowledge the information provided here is accurate. Signed/Date Rehabitat NW — Macadam Rd Commercial Site June 2005 — Technical Information Report Figure 2. Vicinity Map If: �' ii Figure 2. Vicinity Map Rehabitat NW — Macadam Rd Commercial Site June 2005 — Preliminary Technical Information Report Page 2 II. CONDITIONS AND REQUIREMENTS SUMMARY Conditions and requirements pertaining to surface water management for this project include the 8 Core Requirements and 5 Special Requirements listed in the 1998 King County Surface water Design Manual (KCSWDM). The following is a summary of the Requirements with a discussion of how the applicant proposes to meet each requirement. Core Requirement #1 — Discharge at the Natural Location Under existing conditions, runoff from the project site sheet flows in a northeasterly direction from Macadam Road and discharges into a catch basin on the north end of the site located in a portion of an existing parking lot that serves an adjacent building to the north of the site. Under proposed conditions, runoff would be conveyed northeasterly to the existing catch basin and discharge at the natural location. Core Requirement #2 — Offsite Analysis A level 1 downstream analysis was conducted on May 13, 2005 in order to assess potential offsite drainage impacts associated with development of the project site, and to propose appropriate mitigations of those impacts. See section III of this TIR for a detailed description of impacts and mitigations associated with the downstream drainage system. Core Requirement #3 — Flow Control This project site is subject to level 1 flow control requirements of the 1998 KCSWDM. Level 1 flow control requires maintaining the predevelopment peak flow rates for the 2- year and 10 -year post development runoff events. An underground infiltration tank is proposed to meet the level 1 flow control requirement for this project. Core Requirement #4 — Conveyance System The conveyance system will be designed to at a minimum convey the 25 -year peak flow. See Section V of this report for conveyance system analysis and design. Core Requirement #5 — Erosion and Sediment Control A Temporary Erosion and Sediment Control (TESC) plan is assumed to be included in plans by others that will cover building construction, site grading, and utility installation. Utility installation & road grading is currently under construction at time of plan preparation. Silt fence will be installed during the installation of the storm drainage system and will meet City of Tukwila standards. Core Requirement #6 — Maintenance and Operations A Maintenance and Operations Manual for the proposed onsite drainage system and facilities is included in Appendix A of this report. Rehabitat NW — Macadam Rd Commercial Site June 2005 — Preliminary Technical Information Report Page 3 Core Requirement #7 — Financial Guarantees and Liability Financial guarantees and liabilities will be posted by Rehabitat NW Inc. as required. Core Requirement #8 — Water Quality Water quality is not required for this site. Detained site runoff will be held and released in an infiltration/detention tank. Special Requirement #1 — Other Adopted Area - Specific Requirements There are no other adopted area- specific requirements that affect this site. Special Requirement #2 — Floodplain/Floodway Delineation The proposed project site is not within a floodplain per online King County IMAP. Special Requirement #3 — Flood Protection Facilities This requirement is not applicable as the site is not subject to flooding. Special Requirement #4 — Source Control The proposed project is subject to source controls in order to prevent rainfall and runoff water from coming into contact with pollutants. Special Requirement #5 — Oil Control The proposed project in not a high use site per the definitions given in section 1.3.5 of the 1998 KCSWDM, and therefore does not require oil control measures under the terms of Special Requirement #5. This site is subject to the Spill Control requirements, which will be met by having a floatable material separator installed in the catch basin immediately upstream of the combined detention/water quality vault. Rehabitat NW — Macadam Rd Commercial Site June 2005 — Preliminary Technical Information Report Page 4 III. OFFSITE ANALYSIS Level 1 Downstream Analysis Task 1. Study Area Definition and Maps For the purposes of task 2 below, the study area shall extend approximately 1/4 mile downstream of the proposed project discharge location. For purposes of tasks 3, 4, and 5, the study area shall extend downstream to a point on the drainage system where the proposed project site constitutes a minimum of 15% of the total tributary drainage area, but not less than 1/4 mile. The 0.50 -acre Rehabitat Northwest Macadam Rd Commercial Site project is located along the northeast side of Macadam Rd S (S 135 St) approximately 350 ft northwest of 48 Ave S, in the City of Tukwila. This site is within the NE 'A of Section 15, Township 23 North, Range 4 East, West Meridian, in the City of Tukwila, King County, Washington. For general location, see Figure 2, Vicinity Map. The property is zoned Residential by the City of Tukwila. Task 2. Resource Review A resource review was conducted to determine potential problems downstream of the project site. The following is a list of references used in gathering information for the downstream analysis. • Site Survey by Fox -Dobbs • Aerial Photograph • King County IMAP Data Task 3. Field Inspection A Level 1 downstream analysis was conducted on Friday May 13, 2005. The weather during the site visit was sunny to partly cloudy. Temperatures ranged in the 60's. The downstream analysis was performed to assess potential offsite drainage impacts associated with development of the project site, and to propose appropriate mitigations of those impacts. One discharge location was evaluated. Task 4. Drainage System Description and Problem Descriptions Under existing conditions, surface runoff sheetflows in a northeasterly direction towards the asphalt pavement parking lot located in the project's northeast property corner. The parking lot serves the adjacent property to the northeast and extends onto the subject site. Drainage entering the parking lot is collected by Type I catch basins that are situated in the center of the parking lot. The closest catch basin that collects onsite drainage is situated approximately 10 -ft. southwest of the easterly property line near the end of the parking lot. Rehabitat NW — Macadam Rd Commercial Site June 2005 — Preliminary Technical Information Report Page 5 Surface runoff collected by the above catch basin is directed in a northeasterly direction over a distance of approximately 115 -ft. via an 8 -inch pipe to another Type I catch basin situated in the center of the parking lot. Drainage then continues to flow in a northeasterly direction for roughly 100 -ft. in an 8 -inch pipe before entering a Type I catch basin (last catch basin in parking lot). Flow exits the aforementioned catch basin through an 8 -inch diameter pipe to flow in a northerly direction. The structure connecting the downstream end of the pipe could not be located. The alignment suggests that the pipe is directed towards two driveways adjacent to each on the west side of South 134 Place. A 48 -inch diameter CMP culvert under the two driveways connects a large roadside ditch that runs along the west side of South 134 Place. It is very possible that the above 8 -inch diameter pipe is connected to the culvert under pavement of the driveways. The north end of the 48 -inch diameter culvert along the west side of South 134 Place is approximately located 90 -ft. north of the catch basin that collects drainage from the parking lot immediately northeast of the subject site. The culvert discharges into a roadside ditch that is approximately 3 -4 -ft. wide and 2 -ft. deep. The ditch is heavily vegetated mainly with grasses and a few small shrubs. The ditch continues in a northwesterly direction along the west side of the roadway for a distance of approximately 110 -ft. before entering another 40 -ft. long 48 -inch diameter culvert under the driveway that provides access to a commercial building. Drainage exits the culvert and continues in another section of an approximately 3 -4 -ft. wide and roughly 2 -ft. wide ditch. The approximately 90 -ft. long ditch is heavily vegetated with grasses. At its northerly end a 48 -inch diameter concrete culvert that is situated under a driveway collects runoff from the ditch. It was noted that sediment in the culvert is within approximately 1 -ft. of the crown of the pipe. The culvert extends roughly 50 -ft. before discharging into a 4 -5 -ft. wide and roughly 2 -ft. deep ditch. The ditch is lined on each side with grasses and provides for an open water surface. The ditch with slow- moving water extends for a distance of approximately 330 -ft. west of South 134 Place before drainage is collected by a weir structure located southwest of the intersection of South 134 Place and South 133 Street. The weir structure appears to direct runoff in a northeasterly direction along South 133 Street towards Task 5. Mitigation of Existing or Potential Problems The proposed project will not result in an increase in runoff for flows up to the 100 -year storm. While the proposed system (Level 1 Flow Control) will match the 2 and 10 -year release rates, the combined infiltration- detention tank will also slightly decrease the 100 - year peak runoff as designed. No adverse conditions for the downstream flowpath are expected as a result of this project. Figure 3. — Downstream Flowpath Basin Outwash Grass Effective Impervious Total Onsite 0.426 0.061 0.487 Basin Outwash Grass Impervious Total Onsite 0.213 0.274 0.487 <� ) (( j Rehabitat NW — Macadam Rd Commercial Site June 2005 — Preliminary Technical Information Report Page 6 IV. FLOW CONTROL AND WATER QUALITY FACILITY ANLAYSIS AND DESIGN Existing Site Hydrology: The existing site is currently developed with an existing 1,130 square foot home and the land cover is grass with one tree. The 0.50 -acre site is rectangular in shape and is bounded by the paved Macadam Rd S to the southwest and developed commercial properties to the northwest and northeast. The southeast border of the site is adjacent to two residential lots with homes that are currently under construction. The project site slopes to the northeast with slopes ranging from 10 to 29 %. The site lies outside of the range of the King County Soils Mapping. Therefore, the KCRTS soil type was determined based on the soil types given in the geotechnical report. The geotechnical report lists the top 12" layer of soil as brown, loose, silty fine with fine roots underlain by a light -brown gravelly, silty, fine to medium sand deposit. These layers are underlain by gravelly, silty sand deposit which is dense and remained stable at vertical cut. It was determined that these soils have a good potential for infiltrating runoff and a KCRTS "outwash" soil group was assigned to the site. The regional scale factor (used in computing peak runoff) is 1.0 SeaTac. Under existing conditions, surface water runoff sheet flows away from the site to the north where it is collected by an existing catch basin located in the northern corner of the site. This existing catch basin routes the storm water off of the site towards the northeast. The following table gives the existing condition land use assumptions: Table 1. Existing Condition Land Use Assumptions (acres Developed Site Hydrology: Under developed conditions the majority of the land will be disturbed. The following is a description of how the site runoff will be detained and treated prior to discharge. Site runoff will be conveyed to an underground infiltration/detention tank at the east comer of the site for ground infiltration and storm water detention, and then will be discharged to an existing storm system that exits on the north side of the site. The following table gives the post - developed condition land use assumptions: Table 2. Developed Condition Land Use Assumptions (acres Performance Standards: Detention improvements to this site were designed using the 1998 King County Surface Water Design Manual (KCSWDM) with level 1 flow control. Level 1 flow control Rehabitat NW — Macadam Rd Commercial Site June 2005 — Preliminary Technical Information Report Page 7 requires maintaining the predevelopment peak flow rates for the 2 -year and 10 -year post development runoff events. Flow Control System: An infiltration tank is being used for onsite flow control. Approximately 745 cubic feet of detention storage is required based on a preliminary design infiltration rate recommended by Julian Liu of Liu Associates Inc. as 3 in/hr. No infiltration tests have yet been provided for the proposed infiltration tank location. See Appendix B for flow control sizing calculations. Water Quality System: Water quality is not required per 1998 KCSWDM because this project proposes to construct less than 5,000 square feet of new pollution generating surfaces. A floatable material separator will be installed in the first catch basin upstream of the infiltration tank provided as a spill control measure. Rehabitat NW — Macadam Rd Commercial Site June 2005 — Preliminary Technical Information Report Page 8 V. CONVEYANCE SYSTEM ANALYSIS AND DESIGN Conveyance capacity was sized for the 25 -year peak storm. The 25 -year design flow rate over the entire drainage basin of the site is 0.10 cfs. Assuming the smallest most shallow pipe in the system is a 4" PVC pipe at a slope of 0.020, the maximum flow through this pipe is 0.29 cfs. Since the 4" PVC pipe only handles a portion of the drainage basins storm water, the conveyance system can handle a 25 -year peak storm. Rehabitat NW — Macadam Rd Commercial Site June 2005 — Preliminary Technical Information Report Page 9 VI. SPECIAL REPORTS AND STUDIES The following reports and special studies have been prepared and included in the Appendix for this project. July 23, 2004 — Geotechnical Evaluation and Rockery Design Geotechnical Engineering Report by LIU & Associates, Inc. Rehabitat NW — Macadam Rd Commercial Site June 2005 — Preliminary Technical Information Report Page 10 VII. OTHER PERMITS The following is a list of potential permits and approvals associated with the proposed project that may need to be obtained: Rehabitat NW — Macadam Rd Commercial Site June 2005 — Preliminary Technical Information Report Page 11 VIII. ESC ANALYSIS AND DESIGN An Erosion and Sedimentation Control (ESC) plan is assumed to be provided by others to cover building construction, site grading, and utility installation currently underway. Silt fence will be installed for the installation of the Storm Drainage system and will meet City of Tukwila standards. Rehabitat NW — Macadam Rd Commercial Site June 2005 — Preliminary Technical Information Report Page 12 IX. BOND QUANTITIES, FACILITY SUMMARIES, AND DECLARATION OF COVENANT The Bond Quantities Worksheet will be provided at a later date as required. See Appendix D for Storm Water Facilities Summary Sheet. No Declaration of Covenant will be filed for this site. Rehabitat NW — Macadam Rd Commercial Site June 2005 — Preliminary Technical Information Report Page 13 X. OPERATIONS AND MAINTENANCE MANUAL Appendix A "Maintenance Standards for Privately Maintained Drainage Facilities" from the 1998 KCSWDM has been included as the operations and maintenance manual for the drainage facilities proposed for this site. APPENDIX A Maintenance Component General Storage Area Filter Bags Rock Filters NO. 2 - INFILTRATION Side Slopes of Pond Emergency Overflow Spillway Settling Ponds'and Vaults Defect Trash & Debris Poisonous Vegetation Pollution Unmowed Grass/ Ground Cover Rodent Holes Insects Sediment Sheet Cover (If Applicable) Sump Filled with Sediment and Debris (If Applicable) Filled with Sediment and Debris Sediment and Debris Erosion Rock Missing Sediment KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL MAINTENANCE STANDARDS FOR PRIVATELY MAINTAINED DRAINAGE FACILITIES Conditions When Maintenance Is Needed See "Ponds" Standard No. 1 See "Ponds" Standard No. 1 See "Ponds" Standard No. 1 See "Ponds" Standard No. 1 See "Ponds" Standard No. 1 See "Ponds" Standard No. 1 A percolation test pit or test of facility indicates facility is only working at 90% of its designed capabilities. If two inches or more sediment is present, remove. Sheet cover is visible and has more that three 1/4 -inch holes in it. Any sediment and debris filling vault to 10% of depth from sump bottom to bottom of outlet pipe or obstructing flow into the connector pipe. Sediment and debris fill bag more than 1/2 full. By visual inspection, little or no water flows through filter during heavy rain storms. See "Ponds" Standard No. 1 See "Ponds" Standard No. 1 Remove when 6" or more. Results Expected When Maintenance Is Performed See "Ponds" Standard No. 1 See "Ponds" Standard No. 1 See "Ponds" Standard No. 1 See "Ponds" Standard No. 1 See "Ponds" Standard No. 1 See "Ponds" Standard No. 1 Sediment is removed and /or facility is cleaned so that infiltration system works according to design. Sheet cover repaired or replaced. Clean out sump to design depth. Replace filter bag or redesign system. Replace gravel in rock filter. See "Ponds" Standard No. 1 Note: Sediment accumulation of more than .25 inches per year may indicate excessive erosion is occurring upstream of the facility or that conveyance systems are not being properly maintained. The contributing drainage area should be checked for erosion problems or inadequate maintenance of conveyance systems if excessive sedimentation is noted in an infiltration facility. Check twice a year during first 2 years of operation; once a year thereafter. Clean manholes/catch basins, repair damaged inlets/outlets, than trash racks. 1998 Surface Water Design Manual 9/1/98 A -1 APPENDIX A MAINTENANCE STANDARDS FOR PRIVATELY MAINTAINED DRAINAGE FACILITIES Maintenance Component Storage Area Manhole Catch Basins NO. 3 - CLOSED DETENTION SYSTEMS (PIPES/TANKS) Defect Plugged Air Vents Debris and Sediment Joints Between Tank/Pipe Section Tank Pipe Bent Out of Shape Cover Not in Place Locking Mechanism Not Working Cover Difficult to Remove Ladder Rungs Unsafe Conditions When Maintenance is Needed One -half of the cross section of a vent is blocked at any point with debris and sediment Accumulated sediment depth exceeds 10% of the diameter of the storage area for % length of storage vault or any point depth exceeds 15% of diameter. Example: 72 -inch storage tank would require cleaning when sediment reaches depth of 7 inches for more than 1 /2 length of tank. Any crack allowing material to be transported into facility Any part of tank/pipe is bent out of shape more than 10% of it's design shape Cover is missing or only partially in place. Any open manhole requires maintenance. Mechanism cannot be opened by one maintenance person with proper tools. Bolts into frame have less than % inch of thread (may not apply to self - locking lids.) One maintenance person cannot remove lid after applying 80Ibs of lift. Intent is to keep cover from sealing off access to maintenance. King County Safety Office and /or maintenance person judges that ladder is unsafe due to missing rungs, misalignment, rust, or cracks. See "Catch Basins" Standards No. 5 A -2 Results Expected When Maintenance is Performed Vents free of debris and sediment All sediment and debris removed from storage area. All joint between tank /pipe sections are sealed Tank/ pipe repaired or replaced to design. Manhole is closed. Mechanism opens with proper tools. Cover can be removed and reinstalled by one maintenance person. Ladder meets design standards allows maintenance person safe access. See "Catch Basins" Standards No. 5 9/1/98 1998 Surface Water Design Manual Maintenance Component General Cleanout Gate Orifice Plate Overflow Pipe Manhole Catch Basin APPENDIX A MAINTENANCE STANDARDS FOR PRIVATELY MAINTAINED DRAINAGE FACILITIES NO. 4 - CONTROL STRUCTURE/FLOW RESTRICTOR Defect Condition When Maintenance is Needed Results Expected When Maintenance is Performed Trash and Debris Distance between debris build -up and bottom of (Includes Sediment) orifice plate is less than 1 -1/2 feet. Structural Damage Structure is not securely attached to manhole wall and outlet pipe structure should support at least 1,000 Ibs of up or down pressure. Structure is not in upright position (allow up to 10% from plumb). Connections to outlet pipe are not watertight and show signs of rust. Any holes —other than designed holes —in the structure. Damaged or Missing Cleanout gate is not watertight or is missing. Damaged or Missing Gate cannot be moved up and down by one maintenance person. Chain leading to gate is missing or damaged. Gate is rusted over 50% of its surface area. Control device is not working properly due to missing, out of place, or bent orifice plate. Obstructions Any trash, debris, sediment, or vegetation blocking the plate. Obstructions Any trash or debris blocking (or having the potential of blocking) the overflow pipe. See "Closed Detention Systems" Standards No. 3 See "Catch Basins" Standards No. 5 All trash and debris removed. Structure securely attached to wall and outlet pipe. Structure in correct position. Connections to outlet pipe are water tight; structure repaired or replaced and works as designed. Structure has no holes other than designed holes. Gate is watertight and works as designed. Gate moves up and down easily and is watertight. Chain is in place and works as designed. Gate is repaired or replaced to meet design standards.. Plate is in place and works as designed. Plate is free of all obstructions and works as designed. Pipe is free of all obstructions and works as designed. See "Closed Detention Systems' Standards No. 3 See 'Catch Basins" Standards No. 5 1998 Surface Water Design Manual 9/1/98 A -3 , APPENDIX A MAINTENANCE STANDARDS FOR PRIVATELY MAINTAINED DRAINAGE FACILITIES Maintenance Component General NO. 5 - CATCH BASINS Defect Trash & Debris (Includes Sediment) Cracks in Basin Walls/ Bottom Sediment/ Misalignment Conditions When Maintenance is Needed Trash or debris of more than 1/2 cubic foot which is located immediately in front of the catch basin opening or is blocking capacity of the basin by more than 10% Trash or debris (in the basin) that exceeds 1/3 the depth from the bottom of basin to invert the lowest pipe into or out of the basin. Trash or debris in any inlet or outlet pipe blocking more than 1/3 of its height. Dead animals or vegetation that could generate odors that could cause complaints or dangerous gases (e.g., methane). Deposits of garbage exceeding 1 cubic foot in volume Structure Damage to Corner of frame extends more than 3/4 inch past Frame and /or Top Slab curb face into the street (If applicable). Top slab has holes larger than 2 square inches or cracks wider than 1/4 inch (intent is to make sure all material is running into basin). Frame not sitting flush on top slab, i.e., separation of more than 3/4 inch of the frame from the top slab. Cracks wider than 1/2 inch and longer than 3 feet, any evidence of soil particles entering catch basin through cracks, or maintenance person judges that structure is unsound. Cracks wider than 1/2 inch and longer than 1 foot at the joint of any inlet/ outlet pipe or any evidence of soil particles entering catch basin through cracks. Basin has settled more than 1 inch or has rotated more than 2 inches out of alignment. Results Expected When Maintenance is performed No Trash or debris located immediately in front of catch basin opening. No trash or debris in the catch basin. Inlet and outlet pipes free of trash or debris. No dead animals or vegetation present within the catch basin. No condition present which would attract or support the breeding of insects or rodents. Frame is even with curb. Top slab is free of holes and cracks. Frame is sitting flush on top slab. Basin replaced or repaired to design standards. No cracks more than 1/4 inch wide at the joint of inlet/outlet pipe. Basin replaced or repaired to design standards. 9/1/98 1998 Surface Water Design Manual A -4 Maintenance Component Ladder Metal Grates (If Applicable) APPENDIX A MAINTENANCE STANDARDS FOR PRIVATELY MAINTAINED DRAINAGE FACILITIES NO. 5 - CATCH BASINS (CONTINUED) Defect Fire Hazard Vegetation Locking Mechanism Not Working Cover Difficult to Remove Ladder Rungs Unsafe Damaged or Missing. Conditions When Maintenance is Needed Presence of chemicals such as natural gas, oil and gasoline. Vegetation growing across and blocking more than 10% of the basin opening. Vegetation growing in inlet/outlet pipe joints that is more than six inches tall and Tess than six inches apart. Pollution Nonflammable chemicals of more than 1/2 cubic foot per three feet of basin length. Catch Basin Cover Cover Not in Place Cover is missing or only partially in place. Any open catch basin requires maintenance. Mechanism cannot be opened by on maintenance person with proper tools. Bolts into frame have less than 1/2 inch of thread. One maintenance person cannot remove lid after applying 80 lbs. of lift; intent is keep cover from sealing off access to maintenance. Ladder is unsafe due to missing rungs, misalignment, rust, cracks, or sharp edges. Grate with opening wider than 7/8 inch. Trash and Debris Trash and debris that is blocking more than 20% of grate surface. Grate missing or broken member(s) of the grate. Results Expected When Maintenance is performed No flammable chemicals present. No vegetation blocking opening to basin. No vegetation or root growth present. No pollution present other than surface film. Catch basin cover is closed Mechanism opens with proper tools. Cover can be removed by one maintenance person. Ladder meets design standards and allows maintenance person safe access. Grate opening meets design standards. Grate free of trash and debris. Grate is in place and meets design standards. 1998 Surface Water Design Manual 9/1/98 A -5 , APPENDIX A MAINTENANCE STANDARDS FOR PRIVATELY MAINTAINED DRAINAGE FACILITIES Maintenance Component Pipes Open Ditches Catch Basins Debris Barriers (e.g., Trash Rack) NO. 10 - CONVEYANCE SYSTEMS (PIPES & DITCHES) Defect Sediment & Debris Vegetation Damaged Trash & Debris Sediment Vegetation Erosion Damage to Slopes Rock Lining Out of Place or Missing (If Applicable). Conditions When Maintenance Is Needed Accumulated sediment that exceeds 20% of the diameter of the pipe. Vegetation that reduces free movement of water through pipes. Protective coating is damaged; rust is causing more than 50% deterioration to any part of pipe. Any dent that decreases the cross section area of pipe by more than 20 %. Trash and debris exceeds 1 cubic foot per 1,000 square feet of ditch and slopes. Accumulated sediment that exceeds 20 % of the design depth. Vegetation that reduces free movement of water through ditches. See "Ponds" Standard No. 1 Maintenance person can see native soil beneath the rock lining. See "Catch Basins: Standard No. 5 See "Debris Barriers" Standard No.6 Results Expected When Maintenance is Performed Pipe cleaned of all sediment and debris. All vegetation removed so water flows freely through pipes. Pipe repaired or replaced. Pipe repaired or replaced. Trash and debris cleared from ditches. Ditch cleaned/ flushed of all sediment and debris so that it matches design. Water flows freely through ditches. See "Ponds° Standard No. 1 Replace rocks to design standards. See "Catch Basins" Standard No. 5 See "Debris Barriers" Standard No. 6 9/1/98 1998 Surface Water Design Manual A -6 Maintenance Component General Road Surface Shoulders and Ditches APPENDIX A MAINTENANCE STANDARDS FOR PRIVATELY MAINTAINED DRAINAGE FACILITIES NO. 12 - ACCESS ROADS / EASEMENTS Defect Trash and Debris Trash and debris exceeds 1 cubic foot per 1,000 Roadway free of debris which square feet i.e., trash and debris would fill up could damage tires. one standards size garbage can. Blocked Roadway Debris which could damage vehicle tires (glass Roadway free of debris which or metal). could damage tires. Any obstruction which reduces clearance above Roadway overhead clear to 14 feet road surface to less than 14 feet. high. Settlement, Potholes, Mush Spots, Ruts Vegetation in Road Surface Condition When Maintenance is Needed Results Expected When Maintenance is Performed Any obstruction restricting the access to a 10 to 12 foot width for a distance of more than 12 feet or any point restricting access to less than a 10 foot width. When any surface defect exceeds 6 inches in depth and 6 square feet in area. In general, any surface defect which hinders or prevents maintenance access. Weeds growing in the road surface that are more than 6 inches tall and less than 6 inches tall and less than 6 inches apart within a 400 - square foot area. Modular Grid Build -up of sediment mildly contaminated with Pavement petroleum hydrocarbons. Erosion Damage Erosion within 1 foot of the roadway more than 8 inches wide and 6 inches deep. Weeds and Brush Weeds and brush exceed 18 inches in height or hinder maintenance access. Obstruction removed to allow at least a 12 foot access. Road surface uniformly smooth with no evidence of settlement, potholes, mush spots, or ruts. Road surface free of weeds taller than 2 inches. Removal of sediment and disposal in keeping with Health Department recommendations for mildly contaminated soils or catch basin sediments. Shoulder free of erosion and matching the surrounding road. Weeds and brush cut to 2 inches in height or cleared in such a way as to allow maintenance access. 1998 Surface Water Design Manual 9/1/98 A -7 TROL CALCULATIONS PROJECT: PROJECT LOCATION: (Check One) SOIL TYPE: AREAS: DETENTION REQUIRED? a P=ROJECT INF.ORMATION /IKCRTS HYDROGR INPUT'SHEE.1 Rehabitat NW X SEATAC SCS TYPE: NB Existing: Till Forest Acres Till Pasture Acres Till Grass Acres Outwash Forest Acres Outwash Pasture Acres Outwash Grass 0.426 Acres Wetland Acres Impervious 0.061 Acres First Interval cutoff = 50% of Exist 2 yr flow = 0.0085 rval size = (exist 50 yr flow - 50% Exist 2yr flow )/ 35 = 0.00124 WATER QUALITY TREATMENT: (Check One) LANDSLIDE HAZARD DRAINAGE AREA: Filenames used: dev predev 0.487 TOTAL Yes No LEVEL OF DETENTION: O 2 3 (Circle One) No Yes No DATE: 5/31/2005 LANSBURG Scale Factor: 1.0 (Circle One) Till Req'd? Yes Type? Basic Outwash Developed: Till Forest Acres Till Pasture Acres Till Grass Acres Outwash Forest Acres Outwash Pasture Acres Outwash Grass 0.213 Acres Wetland Acres Impervious 0.274 Acres Qwq = 0.045 0.487 TOTAL Existing Developed PEAK VALUES AND RETURN PERIODS: Rank Return Period Peak (CFS) Rank Return Period Peak (CFS) 1 100 0.059 1 100 0.145 L. 100 YEAR FLOW = 0.086 2 25 0.038 2 25 0.099 3 10 0.028 3 10 0.089 4 5 0.022 4 5 0.081 5 3 0.018 5 3 0.073 6 2 0.017 6 2 0.071 7 1.3 0.015 7 1.3 0.068 8 1.1 0.013 8 1.1 0.059 50 0.052 50 0.129 Time Step: 15- Minute Date Type: Historic (Circle One) (Hourly ((Circle One) (Reduced Sensitive Lake Resource Stream Additional Key Info: 1. Provide level 1 flow control DESIGNED WA DRAM MM 6ffIXED PDC W APPROXIMATE DRAINAGE BOUNDARY Es, SSMH . \ Rim. 83.96 IMPERVIOUS AREA PERVIOUS AREA Ex Chain link Fence .r�, \ " S E C T ss r Engineering Planning Surveying Penhaliegon Associates Consulting Engineers, Inc. 150 S. Sheaf 50084 . eviden 19 95033 • .0ac«n9r+ n L(� P10 (azs) 827-20 1- goo - gas -5009 FAX: (325) 827-5043 Kirkland • 65.10. Es. SSMH Rim =83.96 Es. CB R':m =43.85 �J. REHEBITAT NORTHWEST REFERENCE INFORMATION FIELD 80019 II - 1I(V. CPU FIE: DATUM: NCVO 1929 DATE JUNE 2005 SCALE AC CHr1W 1 GRAPHIC SCALE 25 0 10 20 PREDEVELOPED CONDITIONS TOTAL DRAINAGE AREA= 21,209 SF 0.487 AC. PERVIOUS AREA OUTWASH GRASS= 18,557 SF 0.426 AC. IMPERVIOUS AREA ROAD /HOUSES= 2,652 SF 0.061 AC. s0 IMPERVIOUS AREA PERVIOUS AREA REHABITAT NW STORM DRAINAGE EXTENSION PREDEVELOPED CONDITIONS JOB NUMBER 05452.00 DWG N0. Dev_Cmddeq (_t n A a 0 0 6 M 0 DESIGNED MAO MANN MAA CHECKED PDC SYU IMPERVIOUS AREA APPROXIMATE DRAINAGE BOUNDARY PERVIOUS AREA REVISION • DATE BY API) Engineering Planning Surveying Pennallegon Associates Consulting Engineers, Inc. 750 Sinn Street 9ou4n =Ado.. 90 95033 •uwiancoongrs.com PH. (425) 827 -201• 1- 800 -945 -8408 843 (425) 522 -5045 Kirkland • alaala REHEBITAT NORTHWEST REFERENCE INFORMATION FIELD BOaC 00— SURV. CPU FILE: DATUM: NGVD 1929 DUPPL. ADJ. 1947 DATE JUNE 2005 SCALE AS SHOWN GRAPHIC SCALE 20 0 10 20 DEVELOPED CONDITION S TOTAL DRAINAGE AREA= 21,209 SF 0.487 AC. PERVIOUS AREA OUTWASH GRASS= 9,294 SF 0.213 AC. IMPERVIOUS AREA ROAD /HOUSES= 11,915 SF 0.274 AC. ( IN FEET ) I Inch = 20 feet PERVIOUS AREA 40 IMPERVIOUS AREA REHABITAT NW STORM' DRAINAGE EXTENSION DEVELOPED CONDITION'S JOB NUMBER 05452.00 04040. Dev —Lend deg SHEET C' -1 DF • Developed and Pre - developed Flow Peaks DEV Time Series File:dev.tsf Project Location:Sea -Tac - -- Annual Peak Flow Rates-- - Flow Rate Rank Time of Peak (CFS) 0.073 5 2/09/01 2:00 0.059 8 .1/05/02 16:00 0.089 3 2/27/03 7:00 0.068 7 8/26/04 2:00 0.081 4 10/28/04 16:00 0.071 6 1/18/06 16:00 0.099 2 10/26/06 0:00 0.145 1 1/09/08 6:00 Computed Peaks PREDEV Flow Frequency Analysis Flow Frequency Analysis Time Series File:predev.tsf Project Location:Sea -Tac - -- Annual Peak Flow Rates-- - Flow Rate Rank Time of Peak (CFS) 0.028 3 2/09/01 2:00 0.013 8 1/05/02 16:00 0.038 2 2/27/03 7:00 0.015 7 8/26/04 2:00 0.018 5 10/28/04 16:00 0.017 6 1/18/06 16:00 0.022 4 10/26/06 0:00 0.059 1 1/09/08 6:00 Computed Peaks Flow Frequency Analysis - - Peaks - - Rank Return Prob (CFS) Period 0.145 1 100.00 0.990 0.099 2 25.00 0.960 0.089 3 10.00 0.900 0.081 4 5.00 0.800 0.073 5 3.00 0.667 0.071 6 2.00 0.500 0.068 7 1.30 0.231 0.059 8 1.10 0.091 0.129 50.00 0.980 Flow Frequency Analysis - - Peaks - - Rank Return Prob (CFS) Period 0.059 1 100.00 0.990 0.038 2 25.00 0.960 0.028 3 10.00 0.900 0.022 4 5.00 0.800 0.018 5 3.00 0.667 0.017 6 2.00 0.500 0.015 7 1.30 0.231 0.013 8 1.10 0.091 0.052 50.00 0.980 Retention /Detention Facility Type of Facility: Infiltration Tank Tank Diameter: 4.00 ft 'Trench Width: 8.00 ft Tank Length: 45. ft Effective Storage Depth: 3.50 ft Stage 0 Elevation: 0.00 ft Storage Volume: 745. cu. ft Vertical Permeability: 20.00 min /in Permeable Surfaces: Bottom Riser Head: 3.50 ft Riser Diameter: 12.00 inches Number of orifices: 2 Full Head Pipe Orifice # Height Diameter Discharge Diameter (ft) (in) (CFS) (in) 1 0.00 0.70 0.025 2 2.60 1.10 0.033 4.0 Top Notch Weir: None Outflow Rating Curve: None Stage. Elevation Storage Discharge Percolation (ft) (ft) (cu. ft) (ac -ft) (cfs) (cfs) 0.00 0.00 0. 0.000 0.000 0.00 0.01 0.01 1. 0.000 0.002 0.03 0.02 0.02 2. 0.000 0.002 0.03 0.03 0.03 3. 0.000 0.002 0.03 0.04 0.04 4. 0.000 0.003 0.03 0.05 0.05 5. 0.000 0.003 0.03 0.06 0.06 7. 0.000 0.003 0.03 0.16 0.16 17. 0.000 0.005 0.03 0.26 0.26 28. 0.001 0.007 0.03 0.36 0.36 73. 0.002 0.008 0.03 0.46 0.46 94. 0.002 0.009 0.03 0.56 0.56 116. 0.003 0.010 0.03 0.66 0.66 138. 0.003 0.011 0.03 0.76 0.76 160. 0.004 0.012 0.03 0.86 0.86 183. 0.004 0.012 0.03 0.96 0.96 206. 0.005 0.013 0.03 1.06 1.06 229. 0.005 0.014 0.03 1.16 1.16 252. 0.006 0.014 0.03 1.26 1.26 275. 0.006 0.015 0.03 1.36 1.36 299. 0.007 0.015 0.03 1.46 1.46 322. 0.007 0.016 0.03 1.56 1.56 345. 0.008 0.017 0.03 1.66 1.66 369. 0.008 0.017 0.03 1.76 1.76 392. 0.009 0.018 0.03 1.86 1.86 415. 0.010 0.018 0.03 1.96 1.96 439. 0.010 0.019 0.03 2.06 '2.06 462. 0.011. 0.019 0.03 2.16 2.16 484. 0.011 0.020 0.03 2.26 2.26 507. 0.012 0.020 0.03 2.36 2.36 529. 0.012 0.020 0.03 2.46 2.46 551. 0.013 0.021 2.56 2.56 573. 0.013 0.021 2.60 2.60 581. 0.013 0.021 2.61 2.61 584.. 0.013 0.022 2.62 2.62 586. 0.013 0.022 2.63 2.63 588. 0.013 0.024 2.65 2.65 592. 0.014 0.026 2.66 2.66 594. 0.014 0.028 2.67 2.67 596. 0.014 0.030 2.68 2.68 598. 0.014 0.031 2.69 2.69 600. 0.014 0.032 2.79 2.79 621. 0.014 0.037 2.89 2.89 641. 0.015 0.040 2.99 2.99 661. 0.015 0.044 3.09 3.09 680. 0.016 0.046 3.19 3.19 698. 0.016 0.049 3.29 3.29 715. 0.016 0.051 3.39 3.39 730. 0.017 0.054 3.49 3.49 744. 0.017 0.056 3.50 3.50 745. 0.017 0.056 3.60 3.60 745. 0.017 0.366 3.70 3.70 745. 0.017 0.931 3.80 3.80 745. 0.017 1.660 3.90 3.90 745. 0.017 2.460 4.00 4.00 745. 0.017 2.740 4.10 4.10 745. 0.017 3.000 4.20 4.20 745. 0.017 3.230 4.30 4.30 745. 0.017 3.450 4.40. 4.40 745. 0.017 3.660 4.50 4.50 745. 0.017 3.860 4.60 4.60 745. 0.017 4.040 4.70 4.70 745. 0.017 4.220 4.80 4.80 745. 0.017 4.390 4.90 4.90 745. 0.017 4.550 5.00 5.00 745. 0.017 4.710 5.10 5.10 745. 0.017 4.870 5.20 5.20 745. 0.017 5.010 5.30 5.30 745. 0.017 5.160 5.40 5.40 745. 0.017 5.300 5.50 5.50 745. 0.017 5.440 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 Hyd Inflow Outflow Peak Storage Target Calc Stage Elev (Cu -Ft) (Ac -Ft) 1 0.14 * * * * * ** 0.11 3.52 3.52 745. 0.017 2 0.10 * * * * * ** 0.02 1.92 1.92 430. 0.010 3 0.09 0.03 0.02 2.34 2.34 524. 0.012 4 0.08 * * * * * ** 0.02 1.71 1.71 381. 0.009 5 0.07 * * * * * ** 0.02 1.97 1.97 442. 0.010 6 0.07 0.02 0.02 2.47 2.47 553. 0.013 7 0.07 * * * * * ** 0.01 0.72 0.72 152. 0.003 8 0.06 * * * * * ** 0.01 0.56 0.56 116. 0.003 714 i ., . �, t�`"x'' .. „ . .. ( . ,x,;: 4 ,.:77.7_,,,..;-_, - - ..,. s ''" _ :*i t. r . PA�BLE 2 B EF�( BE S .S SOIL 1 YP AN CR . TY'ES : -.M t'✓ YLwVO::-.� •1 ifw k.R�'.....'a {..K aL r.. .w. .. m‘..aSr:uw+.'. E ..(" ' ... ..-1,;... ,.; ......«k.L., } '>.1 .. t>e. >'t�H•. SCS Soil Type SCS Hydrologic Soil Group KCRTS Soil Group Notes Alderwood (AgB, AgC, AgD) C Till Arents, Alderwood Material (AmB, AmC) C Till Arents, Everett Material (An) B Outwash 1 Beausite (BeC, BeD, BeF) C Till 2 Bellingham (Bh) D Till 3 Briscot (Br) D TiII 3 Buckley (Bu) D Till 4 Earlmont (Ea) D 1111 3 Edgewick (Ed) C Till 3 Everett (EvB, EvC, EvD, EwC) NB Outwash 1 Indianola (InC, InA, InD) A Outwash 1 Kitsap (KpB, KpC, KpD) C Till Klaus (KsC) C Outwash 1 Neilton (NeC) A Outwash 1 Newberg (Ng) B 1111 3 Nooksack (Nk) C Till 3 Norma (No) D Till 3 Orcas (Or) D Wetland Oridia (Os) D Till 3 Ovall (OvC, OvD, OvF) C Till 2 Pilchuck (Pc) C Till 3 Puget (Pu) D Till 3 Puyallup (Py) B Till 3 Ragnar (RaC, RaD, RaC, gaE) B Outwash 1 Renton (Re) D Till 3 Salal (Sa) C Till 3 Sammamish (Sh) D Till 3 Seattle (Sk) D Wetland Shalcar (Sm) D Till 3 $i (Sn) C Till 3 Snohomish (So, Sr) D Till 3 Sultan (Su) C Till 3 Tukwila (Tu) D Till 3 Woodinville (Wo) D 1911 3 Notes: 1. Where outwash soils are saturated or underlain at shallow depth ( <5 feet) by glacial till, they should be treated as till soils. 2. These are bedrock soils, but calibration of HSPF by King County DNR shows bedrock soils to have similar hydrologic response to till soils. 3. These are alluvial soils, some of which are underlain by glacial till or have a seasonally high water table. In the absence of detailed study, these soils should be treated as till soils. 4. Buckley soils are formed on the low- permeability Osceola mudflow. Hydrologic response is assumed to be similar to that of till soils. 1998 Surface Water Design Manual 3.2.2 KCRTS/RUNOFF FILES METHOD — GENERATING TIME SERIES 3 - 25 9/1/98 LTU 44:ASSKJATIES, 1NC., . . Vioitorga M. $1tvO.PigWillor Rolothl'ad■:4ortliwcsl 019 1' kfthu0 $ Sirtittp; A q81116 Dtar'Nir twIIi July 23; 4Y)()4 tibjtotl tittteanionl ainduation and Runktwy Jnitt-OodDriiertv4 Single-flirollY Itatitionotri I 35xat !vinisAriarn Itcrad tukwilii Wittlirt Tukwila Pub& Works Penn Applioritn Nu. pW04-187 Jub Nu; 4417190 1 We bout completed a geoter.lnical nualustion tbr th runt* goki lit to trr'r Walt 411. 4 4. 4 g tidal of the itittpostA juirrt 4tiyuo,suy tt.) svr■V tbu xiaglc-ifinttly roidenuti lif b buitl 4KI atiVi0i4 Sitt. The driveway will be sibota 1:t0 rtNet 61 inping per trotri its wdd end where it:pins fArttAdoan . 104 Wu uoderstana It* grodiag of ibf 174vIum wilt mitii re 141, to leaf of md with no fil) its north (411111 sidu, ant/ oft la aiuj lb 4 vl" 40 along the small (dovmhifi) the thilithvoy: i'to*Alood all> 14iet4'i findings nf die sobatirrnue conditions of tbt Oft inJ 1.1Xtr teas>tittettin‘ltwiq 1 11, 11 4 .1.4 , 1 11 1, 1 9.9410*.deil erthe ro114rY $ SQIL rri:PNS. Wo waited the site 011 July 19. 200 tit ol the svils uftjiflt.t, ih hitt, 'lie drsvevaty: 1-tesep The SeiL9 exposed on the , :40.bank alukg tht iorth 4i4 ffIIt' kliivOrry i:onsaa about i0?1 K.404 $likze KeflirQ !4)/tIohirOsiik!, M28 phone (425j 484-0134 - Part ,42p).488-2744 Itity 2A, 2604 StOrve lAtWilloeigebribilaNhithtS§st 1010/ti. dAttP6 Pa 2 12 'tido of brown+ 1tue. silly lino with fine z. uMcth t1qin p„ttjnily, fine RI Modiurn IWO deposit, The tut4rlyine grovtliy, u1b amid durpsit it; Attoc tIrd MII4fPcs4 att4h1e et qCW10 lt.bekery by =biro is not en el/Oresund tetra/Ling Il u tuitir Ik .vaq. :et IthOugh U roeltiey well eau provido stare: deorne +.4 remdisip tP1I ns N!rieti9,1 is to serve rti! penteetive to retool weetliwirita:une rwsion pwoess w thc meth (soak 'behind ihe roidieryi To achieve n,ritiisfosiury wehery wiIt, the curth Ion} behind We roizkers mem tit stotrlt? 1 1 0 if .41 txfilbb, [1:1 44041,1* tockely roast be colistruttod in t pitycr Atly keep the dnriti beak behind ti stablevart besis‘ Th1 north,fivekery well aiundtc uphill side or ay: lifivooky to bunk, while the ih ttaeq, W011 Along the downhill side of the Witte* *ill ate WI Niel( owlesitlimetit. OW! design /Witte rockery inn Philo 1 (Ibr intffiz *34 hooky nod und 21) or i.iAins fill euitonliweitt)ettiteltd herald. CUT WOO R.OcK4 . g gge waycagy, tidy, rine to a:tedium sand deposit exposed 4.6; CIA ban* 4.1441& the italih side Ur the driveway is :dense and was rueulti stable ter a leng,tctin ir 41 0: 4 i P*Wr . 0.41010,1444:4 MGILL'O c:IiI11311 ftickeiy shook' pitteeed iiinthtk.t 1kT Eil Lai & ASSOC1AT N j t frply - 2i, '4004 Notihwest 144 40ti.NR. 04. P111 plated to patio the driveway and to bc lined by auckary nittA,Ift 1 mittiereik with 001pin:a iJI 13 potatiappe with the rettnthnuoilatan pownitai tlit Oln Oni;PtnOili 01*ItiCnittli ihe tpriltitif stoikio pb.41.404: rived .4Pw'n .Jp 4 firtivoodigtiabeti hewing spits, ft nikaptcdu tong-yam ptplolit): tlihll i Iwi u 1 ng4ory shOultl the be oVer then ettc batik u wItpot the r 4; to be sottsonsieit tx t1.4 filiemitanturients filwaltitereiniotektii u:khrtoti umappui m veogi uiurift. $T1Wriri.t. rig< $thacturtil fill to b moil for watiirtg4bc4tivtheuyehottitli:ttattisi ttinat. tt dreitiittg.gitutuha mils whit partiaca nth lar than fear irietata anti sltotthi 1 lid* of cr,tonivinn.i other thiricticto sabnp4 skactigaira:op likr..v a tauftituth tin t within ..oe p -otrritthrth wplswm motteat at the tituaof Oitteeptenh mptlitutt ! moisture emneut c teaks tangent h 1tisH tbat the eoil to be ooftwocteO to the 1110tes4 thy titrueiu, Mr a iiYurr UProfeNthrl.) OW. :$tilti;tunil shnuid be.plt in lib tur 11 !Oft I iiOntOldiA "I 1.0°14 tlL Lb 1 ihotI1 b mit:5100d twat loast:1 .5 parecothge uf tho maxiiu a. tie) tlettsit ttottommtal by AIR 01557 (Mbilifial FrOetiti itesttiVAV TRiler:ClitS-AND SUMMADE Ette iseywuy treticheS Air l'i1 ntxrtli vettrSt: St611's tau (At iffit. sOble. stii14 Papab)n teptjecipg no althwohia bearing lant,nart) 01 kitLA 1.001) ca. anti thouldbe free ofloosatilathbed soi/s standing wort:Nu:m.4 t fIKLacy pinpongtti gikenkinsr sdits fl 1h611e, trenche Should be tiOntlitiettfti with 0 Nibiatthy eornintmir lo rho lo troctiecy ta 1.otite tliaottbott tioa$, 1 etica■totivw.41 nu: ii l kvSAt.4 irenOtleAl Oikatl tit oven-exeuitittni : nod htioldhleti mitt, 2.1o k ,iputts 1 itt liktyt*i) LIU tvt ASSOCIA iNC hily 24i)4 $40e.pawilitilitehobitot North wo4 Job P9, 4A046 Pfte 4 fttebes be wide &lute? such *kilt aid Dtc,4:1 if thv ittyway etticti it at Ittfm itto16 thytti baekbithe bate-course 4184 ger?.0!, 1 itAiN CON:MA stinuici b InitI in ;lit koy*ily trotiniiv bohinti tht fiaoc ooir4so (.1111( anti Ode 4w:ny lieft:4001 Egintniltilwer ilowirto lark : th e fupk.er,p Walls flie atiith 8iI Mould :e011:4ig pritoWd. rgk EVC pipe 'of hikd. eee'etolesi A - 5 ; PiS *.ftiocti in a *Or Of apa fitter Fattii, Mkt WILI:lifif Ca rite Jrt IIv tiuW he ipti4 0'dt tile a storm wawa. or a saitabli at);,a#/wAtet Oiklbsid llffly • kci�iy ItilATLOAL Aisa) connwpo mc3 vtateciai tbr rockery conAntedop ahooki 121.ni. Wu* p'1r 4th3 ti* t4ackg1. fieSIU#alagl sAVIT Thefoeial *ales Nheatd bcatgol> nmiguioattu 44, ramibla. tbp al:auireetiep ai rockery s,huu10 rtglkhi+ tha SitiodittO fitMe LEAALNIELSisligiliritiF di0 Assiiciathal ilia katicary ,Coraraator r 'helot elelies should berstucked tIvAtly tipinat one tasother nin& 4 Krtwv4,11(ht *nil* th�u1d Ito.elanlirti with slaraler soak li•om hid Ih. lii 41 mieniw of the o.tak.ory should Pe tilted back at buttri siatiser dam 4VMI. hi ftrviet) wait 1.itaald be.aeasLruebfai matt that the stoa cifb saccessivo ayuno pft1041 S.laap me: ffJ ittopolikd two previatg course: DUES WO( COUglit flotin foek, epor* i eij 12 inch uS Thick herituutully utxt1 0.1 1 .1,i4 inert reek §P6 .Nhould t» plexsed behind 111.0: awical ip IOW :14 qa;i1 cskairwt ol eta 1111 Sr, OSSOC,11A.TES, iM I Jul 2604 St rie 1.X1wilitrrgOilbital Ntuttiwiht fltiviilb N,. 4A.0% NA 5 6ornplgi8d. Ma: pups f tht= tvithtiwatei' io b1ti 1)4 The riiates:uttiatIvair lin rad itrn 4oil in ICLOSME Wg.ure rikasett pzybo-or!vielia,) ta Oki pitljuo Piwce, &4t1 i; you U4t ituus;iO4u, TAIJ & ASS TES, INC, Ntli1r4, vto . i41 qS('X'lAi 1' N 1 -- -k . ...,--r - r,......... 3. S. (Jullnii) i in, Ph I). P L ( 'ensuithig iitolethilival i'ligiutr APPENDIX D STORM WATER FACILITIES. SUMMARY WORKSHEET ENGINEER DEVELOPER Name: Peter Paulsen Name: Rehabitat NW Inc. Firm: Penhallegon Associates Consulting Engineers, Inc. Firm: Address: 750 Sixth Street South Address: 5639 16 Ave SW Kirkland, WA 98033 Seattle, WA 98106 Phone: 425- 827 -2014 Phone: 206 - 932 -7355 ( t KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL STORMWATER FACILITY SUNIlVIARY SHEET Development Macadam Road Commercial Site Location Tukwila, Washington Date June, 2005 Developed Site: Acres 0.50 Number of lots 1 Number of detention facilities on site: Number of infiltration facilities on site: ponds ponds vaults vaults tanks 1 tanks Flow control provided in regional facility (give location) No flow control required Exemption number Downstream Draina a Basins Number & type of water quality facilities on site: biofiltration swale (regular /wet/ or continuous inflow ?) combined detention/WQ pond (WQ portion basic or large ?) combined detention/wetvault compost filter filter strip flow dispersion landscape management plan plate ?) catch basin inserts: Manufacturer pre - settling pond sand filter (basic or large ?) sand filter, linear (basic or large ?) sand filter vault (basic or large ?) stormwater wetland wetpond (basic or large ?) wetvault farm management plan oil/water separator (baffle or coalescing 1998 Surface Water Design Manual 9/1/98 1 ' ) Manufacturer KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL pre - settling structure: flow - splitter catchbasin DESIGN INFORMATION Water Quality design flow Water Quality treated volume or wetpond Vr INDIVIDUAL BASIN 1 N/A NOTE: Vb= Wetpool Volume Vr = Volume of Runoff from Mean Annual Storm 9/1/98 2 1998 Surface Water Design Manual • RECEIVED • 'FEB 22 2005' o aP it ADMINISTRATIVE CITY OF TUKWILA DESIGN REVIEW Department of Community Development 6300 Southcenter Boulevard, Tukwila, WA 98188 Telephone: (206) 431 -3670 FAX (206) 431- 3665 E -mail: tukplan 0 ci.tukwila.wa.us APPLICATION NAME OF PROJECT / DEVELOPMENT: 'oN7b'?--t Pt G- ZE1J KoME,s LOCATION OF PROJECT/DEVELOPMENT: (Give street address or, if vacant, indicate lot(s), block and subdivision, access street, and nearest intersection. LIST ALL 10 DIGIT PARCEL NUMBERS. I S539 M Pt - CAN PrM . c o K.w 11-k 2.69 1 320ooD 41 Quarter:■1 Section: ( Township: 23 Range: (This information may be found on your tax statement.) DEVELOPMENT COORDINATOR : The individual who: • has decision making authority on behalf of the applicant in meetings with City staff, • has full responsibility for identifying and satisfying all relevant and sometimes overlapping development standards, and • is the primary contact with the City to whom all notices and reports will be sent. Name: 0L111leK .? r— S�T E S�E� WI LLE`� Address: 5G3R k(0 fit- SvJ St , WA lZ 1D to Phone: 2.foG 3Ci 1 9 gr1 1 FAX: 'a 2oCo C 13 . 3 73S5 Date: 4 hos 06- FOR STAFF USE ONLY Sierra Type P -BAR Planner: File Number: L 0t _ c .71 Application Complete (Date: ) Project File Number: Application Incomplete (Date: ) Other File Numbers: • RECEIVED • 'FEB 22 2005' o aP it ADMINISTRATIVE CITY OF TUKWILA DESIGN REVIEW Department of Community Development 6300 Southcenter Boulevard, Tukwila, WA 98188 Telephone: (206) 431 -3670 FAX (206) 431- 3665 E -mail: tukplan 0 ci.tukwila.wa.us APPLICATION NAME OF PROJECT / DEVELOPMENT: 'oN7b'?--t Pt G- ZE1J KoME,s LOCATION OF PROJECT/DEVELOPMENT: (Give street address or, if vacant, indicate lot(s), block and subdivision, access street, and nearest intersection. LIST ALL 10 DIGIT PARCEL NUMBERS. I S539 M Pt - CAN PrM . c o K.w 11-k 2.69 1 320ooD 41 Quarter:■1 Section: ( Township: 23 Range: (This information may be found on your tax statement.) DEVELOPMENT COORDINATOR : The individual who: • has decision making authority on behalf of the applicant in meetings with City staff, • has full responsibility for identifying and satisfying all relevant and sometimes overlapping development standards, and • is the primary contact with the City to whom all notices and reports will be sent. Name: 0L111leK .? r— S�T E S�E� WI LLE`� Address: 5G3R k(0 fit- SvJ St , WA lZ 1D to Phone: 2.foG 3Ci 1 9 gr1 1 FAX: 'a 2oCo C 13 . 3 73S5 Date: 4 hos 06- Check items submitted with application Information Required. May be waived in unusual cases, upon approval of both Public Works and Planning APPLICATION MATERIALS: 1. Application Checklist (1 copy) indicating items 'tted with application. V 2. Completed Application Form and drawing (5 copies .._— Nri4V.v •'.- !\Nf• 1‘\/\ ''r V 3. One set of all plans reduced to 8 1/2" by 11 ". One complete set of PMTs of the final drawing set will be required prior to final approval. V 4. Application Fee $400. ///A 5. SEPA Environmental Checklist if required (see SEPA Application Packet) PUBLIC NOTICE MATERIALS: NIA 6. If the project requires SEPA review a 4' x 4' public notice board will be required on site within 14 days of the Department determining that a complete application has been received (see SEPA Application). PROPERTY INFORMATION: V 7. Vicinity Map with site location. sIs.& -<■0& 8. Document sewer and water availability if provided by other than the City of Tukwila (for new construction only). PROJECT DESCRIPTION AND ANALYSIS: 9. A written discussion of project consistency with decision criteria. (See Application) Nfrt Volt s MCW P' 10. Technical Information Report (TIR) including feasibility analysis per King County Surface Water Design Manual (KCSWDM). For additional guidance contact Public Works. Os 11. Provide sensitive area studies as needed per Tukwila's Sensitive Areas Ordinance (TMC 18.45). • • 7 005 COMPLETE APPLICATION CHECKLIST The materials listed below must be submitted with your application unless specifically waived in writing by the Public Works Department and the Department of Community Development. Please contact each Department if you feel that certain items are not applicable to your project and should be waived, or should be submitted at a later date for use at the public hearing (e.g. colored renderings). Application review will not begin until it is determined to be complete. ADDITIONAL MATERIALS MAY BE REQUIRED. The initial application materials allow starting project review and vesting the applicant's rights. However, they in no way limit the City's ability to require additional information as needed to establish consistency with development standards. City staff are available to answer questions about application materials at 206 - 431 -3670 (Department of Community Development) and 206 - 433 -0179 (Department of Public Works). Check items submitted with application Information Required May be waived in unusual cases, upon approval of both Public Works and Planning SITE PLAN. / 12 (a) The site plan must include a graphic scale, north arrow and project name. Maximum size 24" x 36 ". ✓ (b) Existing and proposed building footprints. (c) Dash in required setback distances from all parcel lot lines. (d) Fire access lanes and turn- arounds per Fire Department standards. / (e) Parking lots with dimensioned stalls and drive aisles. / (f) Loading and service areas. t / (g) Fences, rockeries and retaining walls with called out colors and materials. NA (h) Street furniture such as benches and bike racks. V (i) Pedestrian connections between the building entrance(s) and the sidewalk /public street. m N (j) In MDR and HDR zones provide a development coverage calculation (maximum 50 %). (k) Show all existing and proposed easements. LANDSCAPE PLAN: ✓ 13 (a) If the landscaping will be altered or the existing landscaping does not meet current standards (TMC 18.52) provide a landscape planting plan by a Washington State licensed landscape architect. One set of all plans and analyses shall have an original Washington State registered Landscape Architect stamp and signature. Plans must include the type, quantity, spacing and location of all plantings. Maximum size 24" x 36 ". (b) Show all existing trees to be retained and any tree protection measures required (for example fencing at drip line). SENSITIVE AREAS PLAN (If the project will affect any sensitive areas): 4 14 (a) Location of all sensitive areas (e.g. streams, wetlands, slopes over 20 %, coal mine areas and important geological and archaeological sites). For stream frontage provide existing and proposed top of stream bank, stream bank toe, stream mean high water mark, and base flood elevation (i.e., 100 yr. flood). Maximum size 24" x 36 ". N 1 P. (b) Location of all required sensitive area buffers, setbacks tracts and protection measures. N I k (c) Show all trees over 4" caliper, indicating those to be retained. N I.P.` (d) Existing and proposed building footprints. CIVIL PLANS (If utility or site work is proposed): 15 (a) One set of all civil plans and analyses shall be stamped, signed and dated by a licensed professional engineer. Include a graphic scale and north arrow. Maximum size 24" x 36 ". (b) Vertical datum NAVD 1988 and horizontal datum NAD 83/91. Conversion Check items submitted with application Information Required. May be waived in unusual cases, upon approval of both Public Works and Planning calculations to NGVD 1929, if in a flood zone or flood -prone area. (c) Existing (dashed) and proposed (solid) topography at 2' intervals. (d) Total expected cut and fill. (e) Existing and proposed utility easements and improvements, on site and in street (water, sewer, power, natural gas, telephone, cable). Schematic designs to be provided regardless of purveyor (e.g. site line size, location, and size of public main). No capacity calcs, invert depth, valve locations or the like are needed. (f) Storm drainage design at least 90% complete, which meets the TIR and KCSWDM. Include all storm drainage maintenance access and safety features. Call out total existing and proposed impervious surface in square feet. (g) Locate the nearest existing hydrant and all proposed hydrants. (h) Show the 100 yr. flood plain boundary and elevation as shown on FEMA maps. (i) Plan, profile and cross - section for any right -of -way improvements. (j) Show planned access to buildings, driveways, fire access lanes and turn- arounds. OTHER: 16. Dimensioned and scalable building elevations with keyed colors and materials. Show mechanical equipment and /or any proposed screening. Maximum size 24" x 36 ". 17. Color and materials board accurately representing the proposed project. 18. A rendering is optional. If submitted it must accurately show the project and be from a realistic perspective (5 to 6 feet above the sidewalk). 19. Luminaire plan including location and type of street and site lighting if any changes to the existing fixtures are proposed. Include proposed fixture cut sheets, site light levels (foot - candles), and measures to shield adjacent properties from glare. 20. All existing and proposed signage with sign designs and locations. STATE OF WASHINGTON SUBSCRIBED AND SWORN TO BEFORE to o, 1 • I,, residing a 1 • CITY OF TUKWILA Department of Community Development 6300 Southcenter Boulevard, Tukwila, WA 98188 Telephone: (206) 431-3670 FAX (206) 431 -3665 E -mail: tukplan(h?ci.tukwila.wa.us AFFIDAVIT OF OWNERSHIP AND HOLD HARMLESS PERMISSION TO ENTER PROPERTY ss COUNTY OFFING The undersigned being duly sworn and upon oath states as follows: I . 1 am the current owner of the property which is the subject of this application. 2. All statements contained in the applications have been prepared by me or my agents and are true and correct to the best of my knowledge. 3. The application is being submitted with my knowledge and consent. 4. Owner grants the City, its employees, agents, engineers, contractors or ottjgr representatives the right to enter upon Owner's real property, located at f 353 MACAg R.-3 for the purpose of application review, for the limited time necessary to complete that purpose. 5. Owner agrees to hold the City harmless for any loss or damage to persons or property occurring on the private property during the City's entry upon the property, unless the loss or damage is the result of the sole negligence of the City. 6. The City shall, at its discretion , cancel the application without refund of fees, if the applicant does not respond to specific requests for items on the "Complete Application Checklist' within ninety (90) days. 7. Non - responsiveness to a City information request for ninety (90) or more days, shall be cause to cancel the application(s) without refund of fees. EXECUTED at r _LI. )1 1 d (city), VOA (state), on 2 of FEZ CD L1U C (Print Name) 3sR Ne_ (Address) '2 - 4 ° t GR°ll On this day personally appeared before me Q\ 'J � \U �� ' to me known to be the individual who executed the foregoing instrument and acknowledged that he/she signed the same as his /her voluntary act and deed for the uses and purposes mentioned therein. EO THIS D OF _ ' • ■ A 1 e i& _ U' 4; C i an d 1 r `- , ` ; te%f Washington ' • . 4 C ) - ```b r- RECEIVE/3 'FEB 22 2005 DE 1 Parcel # 2613200049 Address; 13534 Macadam Rd. S. Zoned Commercial /Light Industrial Design Review Narrative We are proposing a Convalescent Home facility. Because the lot adjoins single family residential lots, we chose a structure that would most closely resemble a large single family home and best blend in with the neighborhood. The building will house 6 residents on the top floor and a care giver residence on the 1St. All materials will be standard residential in nature. No commercial grade finishes. Roofing - a 30 year high definition asphalt shingle from Elk, color brown Siding - Dutch lap vinyl siding, color beige Windows - Vinyl sliding and single hung windows from Jeldwen, color white Walkways - Poured concrete with brushed finish. Decks - Stained cedar Landscaping - Architect's design attached Driveways - Paved asphalt Parking Tukwila Municipal Code 18.56.050 - The minimum number of off - street parking spaces for the listed uses shall be as shown in Figure 18 -7. A boarding home for up to 40 residents requires a minimum of 10 parking spaces. We are proposing a maximum of 12 residents between two structures and have provided 10 spaces. These spaces will be split between the two buildings and will more than adequately accommodate the potential total residents. 13534 Design Review Narrative 9 o 9 T.O. Ridge Line fo T.O. Top Plate io ° T.O. Subfloor T.O. Top Plate ° T.O. Subfloor T.O. Foundation Wall ° T.O. Footing �421110 Proposed New Roof w/ 25 -year i11 11 Composite Shingles over 7/16" ■A7 OSB over 15# Felt over Stick- Framed I■4 1■LJ.IQt ■I `+ Trusses @ 24" O.C. �1 ± �� ■11.- y0. ■1mma!1 !Inl��l ■�� ■1 ■In ��. 4-inch Vinyl Siding Existing Roof w/ Composite Shingles 4 Pou ed Concrete — Slab on Grade over = 4" G anular Fit 6x12 I BR Proposed New Roof w/ 25-year Composite Shingles over 7/16" OSB over 15# Felt over Pre - Engineered Trusses @ 24" O.C. New =4 -inch Vinyl Siding (New over 7# - =Vapor Barrier over 7/16" OSB —over 2x6 studs @ 16" O.C. over — =R -19 over 1/2" GWB. Typ @ Ext = =Walls UNO Continuous Footing (Proposed) New Existing Existing Roof w/ Composite Shingles Existing B Poured Concrete Patio (Existing) Finish Grade Continuous Footing (Existing) cyst C levrit on Existing Rockery Retaining Wall T.O. Ridge Line 0 T.O. Top Plate _ (V Finish Grade T.O. Subfloor Lam' - T.O. Top Plate T.O. Subfloor� °_ T.O. Foundation Wall 9 ih 9 T.O. Footing E0 - N:6 Ridge Line T.O. Top Plate T.O. Subfloor T.O. Top Plate 0 T.O. Subfloor _ _ _ T.O. Footing 4x12 ,Existing BR Existing New, . New, . 12 East E0evatiot, BR JA (Ack1W 6x12 25-year Composite Shingles over 15# Building Felt over 7/16" OSB over Pre-Engineered Trusses @ 24" O.C. over R-30 Insulation over 5/8" GWB. Typ @ Proposed New Roof UNO. Final Grade T.O. Ridge Lin 176 — - T.O. Top Plate 0 T.O. Subfloor — - _ T.O. Top Plate to T.O. Subfloor T.O. Footing 0 kr 9 9 T.O. Ridge Line T.O. Top Plate TO. Subfloor T.O. Top Plate 2 Cantilever 0 Subfloor 9 Final Grade 0 - en t‘? T.O. Footing New Existing 4" Vinyl Dutch B La. Sidin I Wei lib —Lr■++++ PAO I I • ibute. IVO 12 BR 11 4 Vinyl Dutch Lap Siding 4" Vinyl Dutch Lap Siding BR BR New Existing ., North Bevatoon 12 4 Vinyl Dutch - Lap Siding 25-year Composite Shingles over 7/16" OSB over 154 Felt over Pre-Engineered Trusses @ 24" O.C. over R-30 Ceiling Insulation 4' Vinyl Dutch Lap Siding Li 4" Poured Concrete Slab on Grade over 4" Granular Fill T.O. Ridge Line T.O. Top Plate 9 0 T.O. Subfloor T.O. Top Plate Existing Rockery. Retaining Wall '7 9 T.O. Subfloor 9 9 T.O. Footing_ t•., T.O. Ridge Line T.O. Top Plate b ° T.O. Subfloor T.O. Top Plate to T.O. Subfloor Existing Rockery Wall'. 6x12 BR 4 -inch Dutch La inyl Siding 1L_ • - Existing BR Existing Foundation Existing New .- Stairway and Handrail Built per IBC. 3 Risers @7.5 "EA New South aav it on / 6" High Railing w/ 2" x 7' spindles spaced to not allow the passage of a 4" sphere per IBC. Built over Existing Deck 4 -inch Siding (New) over 7# Vapor Barrier over 7/16" OSB over 2x6 studs @ 16" O.C. over R -19 over =1/2" GWB. Typ @ Ext Walls UNO f BR 1 Continuous Footing (Proposed) Proposed New Roof w/ 25 -year Composite Shingles over 7/16" OSB over 15# Felt over Pre - Engineered Trusses @ 24' O.C. fl r 6x12 Finish Grade T.O. Ridge Line T.O. Top Plate to to to T.O. Subfloor ° b T.O. Top Plate is T.O. Subfloor 2613200176 2673200174 2613200046 2613200050 2613200182 2613200031 2613200051 2613200027 2613200055 2613200049 0 2613200047 2613200048 2613200032 2613200021 2613200025 2813200029 2613200026 5673000010 2613200028 5673000175 26132001 t _ 2673200178 2613200183 IC) 2001 King County 2673200084 2673200179 613200175 2613200045 2613200169 2673206066 2613 2613200172 173 261 3200181 2613200042 2613200177 2613200043 R E C E FEB 22 00 COMMl1WITY 2616600035 5673000030 «IO 039mi 2616600030 ,Z 2616600072 2616600071 5673000125 5673000135 5673000145 1. 1 6-.' r .'J t? 3, 13' -3 VT 1 r 13'fi la oundadown to 8.-8. 3'J• 1 RFO R(%1M a1 `� I. NIN R I M. (�r ( 3'6'Hgn sD 1T-0 IT Overhang ear r HO ta-0' l� O 0� I - Ka : TI CuN Fpp6rlp St ry ��T s Ts Tel n P BEDROOM ta% - ` m i l . 6 0 3'-0' re 6-0' it 3'-0' T i' 0,1 3'-0' ♦ Pmpaed Re 2410 Joist Ladper •ml 1? Tl004gh Baas / ®tE o.c. Exiting 1410 Rim Jest) dente • 1 •111 e � U_i ® ‘1111111 I 1 6-0' 6'-0' 7-1 0 • GTORA,F • • Beam 6 Roceng • • TEO dY Engineer 1 RAP 1ARA #F mom® 13'9' ���Line d 460443 Wad AE P' -61? 14' -3 1? 4 , 559• Poured Concrete Patio Slab on Grade RITTIN/'. ROOM PINING ROOM 0'-0 4? 4J'-kr 1a -3 1? 5'/ 4 4_•_ RAMS r Rnn53 RFORn0M.2. 14/ SF 14' -11 1? RFO, OOM Ml 0 5F � •a' -0' 1 53 t? Macadam Rd. 55'-0' Tukwila Boarding Home Lower Floor Plan RECEIVED FEB 2 2 2005 COMMUNITY DEVELOPMENT Macadam Rd. 55'-0' Tukwila Boarding Home Upper Floor Plan sa? r r PARCEL NUMBER: PAM[84 2E5200040 LEGAL DESCRIPTION: THAT IMO 6 W 14 ROMA OAKEN 10441; ACCORDED 10 ME PUT MEM SEEM M 1g1DE D OF KM PEE 9th MODS Or 4361 COSITY DTd0D61104 MOWED AS RUM MOM AT 11E MOODIEST COMER O SAD TRACT 1t VMS SOOOEAs*0x A1O10 9E EOM 6Om 1► MIT MET 10.114 REM MIME 50001ESERr 1.061 A ISE PQA1= TO ME MOODIMOLY MEW OF SAD TRACT 14 A DISTANCE O TID IEEE 10 ME TEE PONT Q TI M OO(OOMD SO TI ESIDE.r MAUL 10 ME MOODIEST 001S111M Or SAD AACr 14 A OSDWIE Or 22022 FEET 10 DE 11I1EASE0001 DRII ME ME MOM OF PETER SIDES TIM SODDEA4EDLr A{O61 SAD MM101 0.40 REM D IEM M 49 K 117' E A 06TNMi 1I 221143 DEMd11 4R 15 E • A OWN= OF POT HET TO 11[ TEE PONM ED.EO DATUM & BENCH MARK: MY or MOr1ETT M ME OW coma Or 1.611001141=1) AT I MMMfDMO1 CO s 144TH ST 11 61ST ME S. EIEYA = t. 15E475 an or wawa OOID d 049*0 REHA ITAT ORTHWEST INC CADAM ROAD COMMERCIAL SITE STOM DRAINAGE PORTION OF: NE 1/4 OF SECTION 15, T. 23 N., R. 4 E., W.M. VICINITY MAP baere cer bawd:1 L4 •_ Z IiS•". r•• •._I is e mr plr o.Y•�• PAD Engineering Planning Surveying Penhallegon Associates Consulting Engineers, Inc. 750 SIXTH STREET KIRKIAND. WA 98033 (425) 827 -2014 SMARM PERMIT ITEETUIREIT ROW C5y 01112c024 ING Or4I40N SHEET INDEX: COVER SHEET C1 STORY DRAINAGE PLAN C2 STOW DRAINAGE NOTES & DETAILS OWNER: 1 WY' DO S TUKWILA MEE ( .SE-� ENGINEER: PHDWIE001 ASSOCIATES 009*LVIE 750 MI STREET SOUOI MUM *9014101 10033 P Rq (Sy4Sm �•TO14 SURVEYOR: FOX 00885 61611E1016 11A11961 15255 5161.0061 OLIO. 911E 4-41 109.111. WA 00105 POS-07 1161011& X *0 r 4MNI b sal rw Dl♦eelos Igor E m.a.lb •mai r NO D1DEM eN d b s a 11,41 Ors y ENGINEERS. D1G That ph.. Ave bees =alud by the PWF4 Eras MOeroe¢ for emfoomee e06 meat GAT mods . Am@tep b .b94 b more mad minims ebbb 44 era =dodo rlo/dm d e-Veed sword,. admen the mpemttep Ter d= .de9eep d M OWE. rob - e06 the 10IM. AM EOM a whim n lbea &wisp E= Ms Ye 155 .12 O ammo eta 10 swim • Sra6ebd Embed dwlm EEmI Emma b=dyn a DEN bpeda by die Pub& Nib o®b (spat Dst T= FOR PERMIT SUBMITTAL ONLY FOR DRAINAGE DESIGN ONLY. 7obia • Call before you 1-800- 424 -5555 moms um Cara) • d 1! Iiii 1 1 .5. . go 11 1 " i I 1 g 5: i li il i g i 10 il iliN NI 1 lib ll $ :1101 �� �� il � � qi = pi lyil ill gli i b 1 OW iii 1 igirj riq idl is it s e i ! ii x i 1 gbli fi 1 " iir we P g g g 16 ! 11 1 ! I d [6: i 1 ixil ql a 11 11 b a1 i r g- �C 3 5 i b l � b ile 4" d 4 d ! 9 d C e.! :NH 3 d d d J Z J O O J Z 0 - -3 z W m� coW co 0 Q cc W as et 0 O o LL _ _ , , gayly —' — gl ri" p M�ICADAM R0.9D (S13S71YST) _ (FOSTER —__ — _— X fib€ STPR STR$g� 11 ihi 1 1 R 7a R Piliti ht 4114 *NH IiiiiIii/il f A! 1 $I 1111 a tla9[OKOx AVSLLVA%'3AUG fft a # a b hi " di In VI fi e!g daa a A F 51 , 5 8 8 e E 8 J d M ♦ M 4 w 4 4 5 I I i I 1 ' Si 1 8o8cO SOX AVSMK i YLKS S7j NA nd nd'LOC Y 8 y M LL Aa mcros SKOd\sims\OY� \PO'L W :I//Ytli^i9J 1 n t RENABITAT NORTNWEBT BIQT aanar TOPOORAPIBCAL SURVEY 1 " POR. OF TRACT 14, FOSTORIA GARDEN TRACTS SURVEYING = YAPPING 'TO F®en x PRIMED BY 15255 Suxeooa. BLVD. .SUITE A -41 TUKWILA, WASH. 98188 REV. NO. / DESCRIPTOR BY CNK y 0 cgpQ o • x DATE SCALE: 1" =10' DRAWN BY: SPD Rehabitat Northwest, Inc. - (206) 932 -7355 Tukwila Convalescent Home - Tukwila, WA APPROVED DATE: October 0T, 2005 REVISED DRAWING?,# 2004.008 i BR if ta Al rG A J. J. 1011e' ea y10118' e,'a11C ea' ea' Bi 0 a LJ co m El U 0 P r2 16flr 0 El Rehabitat Northwest, Inc. - (206) 932 -7355 Tukwila Convalescent Home - Tukwila, WA SCALE 1N' • 1' DRAWN E:8PD APPROVED DATE Octubw0,. REVISED MAYAN°.200440e A2 -44 i El 0 0 0 0 Rehabitat Northwest, Inc. - (206) 932 -7355 Tukwila Convalescent Home - Tukwila, WA SCAMS DO a 1' DRAWN BY: SPO APPROVED DAIS: OrA:Eer07, 2006 REVISED DRAWDKil 2004006 A3 AN t� '. s • P -. P qP - oil hi 1 1 I Mr q NI ck II of III lif !flied 1 iw lig tio cif 1 1 qf IT ff 4 a • 4 4 I Rehabitat Northwest, Inc. - (206) 932 -7355 Tukwila Convalescent Home - Tukwila, WA GC E 1M.V DRAWN BT: 8PO APPROVED DATE: Oolobw OT. 1005 REVISED DRAWINGS 2004.000 A4 449 -- zap , i < 1 f ,a 1_ lill 1 . 1 � ., „ i 51 - oil hi 1 1 I Mr q NI ck II of III lif !flied 1 iw lig tio cif 1 1 qf IT ff 4 a • 4 4 I Rehabitat Northwest, Inc. - (206) 932 -7355 Tukwila Convalescent Home - Tukwila, WA GC E 1M.V DRAWN BT: 8PO APPROVED DATE: Oolobw OT. 1005 REVISED DRAWINGS 2004.000 A4 449 4 -1r GT1101D Babe 102rsn ®r5vr . 131deo 0.10wo %dot CT0015Soon 636o A25W0 !Wm 0.1owo Him 'Use Cif 130(160de min) 6ete1cbon=debobbar 6n ss. ar so peat e elm.) e a e0la roaams 'Al Fans loV'eelbQOtls. 'AI caber •... - .. , . of 3334 W.1E.CNA* mud t oat 14 - -r Sd afd 9 UV W41? W -11 yr V-10 yr dant 4-r 14d 4d Tukwila Convalescent Home Upper Floor Plan • .: t:h . LCI not for vlrheelchai Bd : fd 10 1? Macadam Rd. F Fromdna Nolen 1. W1tten D'mlensions take precedence over Scaled D6nensioes. 2 All Headers to be 4x10 D.F. #1 Unless Noted Otherwise (UNO). 3. Bottom of Headers to be 68' this Floor UNO. 4. All Exterior Walls to be 2x8 w/ R-21 insulation UNO. 5. All Frame Nailing to salisy IBC Block all Plywood edges and nail vAth 10D at 6' O.C. Typical all Exterior Walls. 8. Provide Double Joists or Blocking where Partitions max above. 7. Provide Solid Blocking over Supports. 8. Plate Height to be Cr this Floor UNO. 9. Rreblocldtg at all Piano g Penetrations. Penetrations between floors shall comply with 2 -hour separation requirements. ■ Lower Floor Plea Occu anccy: R-3 10. All Storage and Spaces under Staircases to be Fedshed with Mr G.W.B. 110 Denotes Solid Bearing under Concentrated Loads. Use (2) 2x4 at 4' Wafts UNO. 12 Finish all Ceilings with 12' G.W.B. UNO. 13. At Garage use 518' Typer G.W.B. at all Common Walls and Ceilings, wrap all Posts and Beams. 14. Provide 28 -Gauge Galvanized Sheet Metal Flashing Windows and Doors. (Typ) Lap Bolding Paper over. 15. Smoke Detectors Nttercomacted 110V wf Battery 18 Fasten Molt am 2x Beams per IBC. 17. Upper Floor Framing to be 91/r IWist at 18' O.C. UNO Plan shows dkedion. Living 18. Ali Egress Doors shall be built per IBC Section 1003.3.1. above 19. All voids 10 be Fire/Draft Blocked per IBC. 20. Install Water Heater per 1987 NAECA See Sheet 1 Project from Duped per t99111112B. 4006 Z.K.G. 21. Upper Floor shall meet miu4nun dearanoes for al sinks & Grab Bar Locations. See Sheet AT for Betels. WWI 21. Install 2-way Communications Svstemper IBC In all Bedrooms & Bathrooms. Macadam Rd. paw Manufacturer's specs per IBC. 24. Provide Continuous Handrail at all Stabs a min. of 1 1/7 from wall. 25. Note all areas to be ealklpped wllh Airtime= Spridder Systems per BC Sed on 903. 28. Al Bathrooms. Shelves. Closets. Cowden, and Sinks for Upper Floor only shall comply nth ADA Requkeinents. See A7 for betels. Total SF: 4189 SF tcl kij N C1RRECTIOb :a= Arsik$mmoqt Lower Floor 1885 SF EMstingt 988 SF New Living Space: 149 Covered porch: 248 SF Garage: 502 SF Upper Floor 2304 SF Existing; 1145SF Now 1159 Cv ) N C CD o 1— N a) E c• o C }e C U 3 N co O > Z C O 4 U O t le I— 11': 4d r31? ad 133 W _ ,,Inn ! _■ 1:311131=11 120' a < ;i � � t44• Iffid>IIf 10,0' 0) I �$ 1 7. + rd N sb sr M s6 4-7 112 • ,T Wd I 1 r .: -0* LNEKt Mad 1, WO ; :': •'� ,fd § I 0FJ?l3SmiLffi 4 '1111 MIN JI O 0 , 8' 6,0' 0-0': ad 4 4 ad x ad ' '!T g *4 S \ \ 2tt .mblleaoe..mi 11 t adxa d ur Though em. b 240 RiJo opium —= ! ss c30 Ha Proposed Rodgers 1d _— h Ali �' . v c{ ® 1S Phafam Tor l6wlee ]]■ ' ® O 7G E ; Wail sii IMO II l lad 1 I -ri. ..:�: -- -- — +rd — r _ 1 lie bb � Ef Wow 2d 2.C3ardi AGE Vodka leo it MO' —LAe onwdAbove 14 V? 214 1/2 r2.0 — - -- — Earl - - 4 -1r GT1101D Babe 102rsn ®r5vr . 131deo 0.10wo %dot CT0015Soon 636o A25W0 !Wm 0.1owo Him 'Use Cif 130(160de min) 6ete1cbon=debobbar 6n ss. ar so peat e elm.) e a e0la roaams 'Al Fans loV'eelbQOtls. 'AI caber •... - .. , . of 3334 W.1E.CNA* mud t oat 14 - -r Sd afd 9 UV W41? W -11 yr V-10 yr dant 4-r 14d 4d Tukwila Convalescent Home Upper Floor Plan • .: t:h . LCI not for vlrheelchai Bd : fd 10 1? Macadam Rd. F Fromdna Nolen 1. W1tten D'mlensions take precedence over Scaled D6nensioes. 2 All Headers to be 4x10 D.F. #1 Unless Noted Otherwise (UNO). 3. Bottom of Headers to be 68' this Floor UNO. 4. All Exterior Walls to be 2x8 w/ R-21 insulation UNO. 5. All Frame Nailing to salisy IBC Block all Plywood edges and nail vAth 10D at 6' O.C. Typical all Exterior Walls. 8. Provide Double Joists or Blocking where Partitions max above. 7. Provide Solid Blocking over Supports. 8. Plate Height to be Cr this Floor UNO. 9. Rreblocldtg at all Piano g Penetrations. Penetrations between floors shall comply with 2 -hour separation requirements. ■ Lower Floor Plea Occu anccy: R-3 10. All Storage and Spaces under Staircases to be Fedshed with Mr G.W.B. 110 Denotes Solid Bearing under Concentrated Loads. Use (2) 2x4 at 4' Wafts UNO. 12 Finish all Ceilings with 12' G.W.B. UNO. 13. At Garage use 518' Typer G.W.B. at all Common Walls and Ceilings, wrap all Posts and Beams. 14. Provide 28 -Gauge Galvanized Sheet Metal Flashing Windows and Doors. (Typ) Lap Bolding Paper over. 15. Smoke Detectors Nttercomacted 110V wf Battery 18 Fasten Molt am 2x Beams per IBC. 17. Upper Floor Framing to be 91/r IWist at 18' O.C. UNO Plan shows dkedion. Living 18. Ali Egress Doors shall be built per IBC Section 1003.3.1. above 19. All voids 10 be Fire/Draft Blocked per IBC. 20. Install Water Heater per 1987 NAECA See Sheet 1 Project from Duped per t99111112B. 4006 Z.K.G. 21. Upper Floor shall meet miu4nun dearanoes for al sinks & Grab Bar Locations. See Sheet AT for Betels. WWI 21. Install 2-way Communications Svstemper IBC In all Bedrooms & Bathrooms. Macadam Rd. paw Manufacturer's specs per IBC. 24. Provide Continuous Handrail at all Stabs a min. of 1 1/7 from wall. 25. Note all areas to be ealklpped wllh Airtime= Spridder Systems per BC Sed on 903. 28. Al Bathrooms. Shelves. Closets. Cowden, and Sinks for Upper Floor only shall comply nth ADA Requkeinents. See A7 for betels. Total SF: 4189 SF tcl kij N C1RRECTIOb :a= Arsik$mmoqt Lower Floor 1885 SF EMstingt 988 SF New Living Space: 149 Covered porch: 248 SF Garage: 502 SF Upper Floor 2304 SF Existing; 1145SF Now 1159 Cv ) N C CD o 1— N a) E c• o C }e C U 3 N co O > Z C O 4 U O t le I— AVGLFVALUE GLAZING %. 1 7x00 PATIO DOOR I 1 7x00 SLIDER III ill 1 I =48 S910LE HUNG 11 11 II 1 46148 SLIDER PRODUCT CODE TOTAL UNALUE / TOTAL GUI2943 SF eo' sax 4•r e-0'x S-0' 4'dxZd I edx4%0 ea xr - 0' S I SOxso _. z• x 30 �a x44 1nar/ 28246 28248/ 1439 r P ♦ . .. .. . _ - - - i MCA U.VALUE WINDOW TOTALS TOTALS I_ I 2 18 1 1 I IT26 I 3 12 I .. 10 I 4 1 I La» I 11 272 I I 1 1584 1 m ; 11 5 I Rehabitat Tukwila n Inc. - (206) 932 -7355 -cart Home - Tukwila, WA qy I�I 11'4* 15 Tor ro � 14 b e4r 31'4491W R0 sir STALE IN' • T ORAWN SY: 8PD APPROVED DATE: F40nnry 28.2008 REVISED DRAWNGS 20044)OS A6 c v 0 I Rehabitat Northwest, Inc. - (206) 932 -7355 Tukwila Convalescent Home - Tukwila, WA SCALE 1I4 T DRAWN BY: SAD APPROVED DATE F4bwY2342008 REVISED DRAWINGS 2004-003 A7 -4q Pr " '"" P: 1110111y1"111E 1 liPilligligill 42 b qiiiRI !I 11 g a4 P< li i III I II i 1 P r P i I J g ? 4 . p 1 1 14, II IL 111 1 4 1 1 9 v- I NDRmONTAL DIAPHRAGM SCHEDULE (NOTE 1) a $ 7� P14 3 1 w.a I 8HEAR WALL SCHEDULE manse 1, z a 1O) 1 1642 MIN 1 1842 1 1642 MEN /4 11 E F EACH FACE Nr MIN 1118' MN 84' MIN Ur MIN SHEATHING LNG mor (pare 3) 1 1m 0ro.C. (NOTES 8a 8) m0r(1O1E3) moron mOT O.C. m02O.C. m 0ro.C. moro.C. mO ro.c. MEMO QI37E 8 686) lip 81.103 OR JOIST TO TOP PUTE 81OTE84.4611) aia BOTTOM RATE TO 8UO3 OR JOIST Q/OTE86612) for ANCHOR BOLTS 0 rs o. 61r ANCHOR BOLTS Ta os fir ANCHOR 8008 2-8' 0.C. dr ANCHOR BOLTS 0 dr ANCHOR BOLTS Oros 1 Mr ANCHOR BOLTS 040.0. IP 1 (NOTES 7 8 9) 010188 7 & B) (NOTE 7) OAHE 7) "filiolirr8 :011111 !f la Hi 111 I 1 131 ' M i a s I 1 " g gl !Ili 01 11 REVISIONS: f 13 O c z O z O 0 T1 z z -a II la FDN SHEAR WALL, SHEAR WALL SCHEDULE, & GENERAL NOTES T 81 8 PROJECT: frr J ❑° I I I t= 't TUKWILA CONVALESCENT HOME REHABITAT NORTHWEST WANG ENGINEERING, INC. 14735 168TH AVE. NE. WOODINVILLE, WA. 98072 TEL/FAX (425)4e9-0927 / r 1 v i ,jr 5 woJW o; of 51/r x 1r 24F V41.eE oL Ruder P14 9 Wob fe�0. td _JL UPPER FLOOR FRAMING, MAIN SHEAR WALL PLAN SHEET P1.8 6 4 PROJECT: Ei r 4 TUKWILA CONVALESCENT HOME REHABITAT NORTHWEST 4'ld O O WANG ENGINEERING, INC. 14735 168TH AVE. NE. WOODINVILLE, WA. 98072 TEL/FAX: (425)489-0927 -44 0 Cn m z -i 0 m STRUCTURAL ROOF FRAMING & UPPER FLOOR SHEAR WALL PLAN SHEET TUKWILA CONVALESCENT HOME REHABITAT NORTHWEST WANG ENGINEERING, INC. 14735 168TH AVE. NE. WOODINVILLE, WA. 98072 TEL/FAX. (425)489-0927 if 8 111 INKIMPIA gel NwAINP— Fti li &MCA SOMA r 1r r V `�'I g r ,r r i= Iti 4 ii 0 8 IR a P it gt 0 REVISIONEt 1 STRUCTURAL DETAILS SHEET TUKWILA CONVALESCENT HOME REHABITAT NORTHWEST WANG ENGINEERING, INC. 14735 168TH AVE. NE. WOODINVILLE, WA. 98072 TEUFAX: (425)489-0927 f 444 rA i s p F p 3s g F F F 00 GI F REHABITAT NORTHWEST 13534 S. MACADAM ROAD TUKWILA, WA 98168 -6205 m 6 F a 6.11111W g g 11 hi 11 6 1-] 6 0 I c m o r 4 .0 j, P J --444 a REHABITAT NORTHWEST 13534 S. MACADAM ROAD TUKWILA, WA 98168 -6205 a Y t 4 t ZO 449 I I WET Pmt Canatetka N89'6914' W PARKING ccEpact) O IRRIGATION PLAN Va'.P -®a PROPOeED DRIVEIWY PROPERTY LIE PROPERTY LINE Pw.S3-11 corsrnucnox Pm.a -II tiapmafm eaa S 8919'5T W Maud Dram . PROPOeED DWVE1a4Y DW PARKING arrgaisA SEC 97121 FERMICENTFA Beers I Withinpton MCICECIME tLElYa MOO&MU p sms/ H O z Lrj P Box 64271 17-460 -7672 1A6'198464 approved by: Drawl by: SHEET: 3 Irrigation Plan LW AC cArtCY4 gismo!. ' o1M. DCAr441 -11 1071. loop. leo+. ran. 18u • 0.M10 urcroariIou KLC� oo 1 .12•u 0 4 .1.1 If • • • 1as ID 1 6 1.9 . f IlvTo6- 16 1 d etittiO*ilo.Y AU m I I 3 `e.8 r I 4 'i.o 8 • 6' • • •6 • 4' • • . 4 L/ 1* a (I gajelko) xi� • • .4 53T T.. l•ip • AW •tdgo.IbrzLt, 0 i. � 1 A 6 4r , 1(•Pvr•ur1Wi y �rY It4Y - do to' wbV • 1.00 tae WAITS Oh ` + 6*4.4- Von•G ma. toot -43, NCO tx)u$LC isa AS erre4.y Ka ale" • ctW4pla4 MAlaw DpN/l wave. a3D • OW la RAM MD 41.116S.Oarvati N.A f. Vlibl Mlu4 • La • 0 49 io0 Imo] "dip lmt LF . (.0 D�F 40DS r4Ecpot aaaitO► -w LU,. . nevi • P',Caf w' 1 M0Fz .o. *B[pr y. ,Lip leAl*9'XIce I I G(111K/A.ISNA.£/1"W ukt.olawi bb( w /LW 81•40 ---- wrLn pvc 11.5141., eamoar off 54 6 04 0 =.= I I 1 •11 I 14.1• 2/F IlpdE mar4T Naar a ll1 l_wont, WM wiiiir A6 03414stJ, I 1 /MO pt .s 4 t - Auo,ls4at:WASq. i1.. 4.r; N1 A.-1 13•'I ?AZ 4 14.4 + 11.s 4 .1.1 6 5e., lM4J 1 6 1.9 . f IlvTo6- 16 1 KO etittiO*ilo.Y 14.1 l I I 3 `e.8 r I 4 'i.o I.wl1 1‘07e1-. • ._ l • .• f � {It�:IT:piN :(,:Ir)L ='�. ` e,.,J� Backllow Assembly Detail Manual Drain Valve Detail Sprinkler Swing Joint Detail 4 ►•� a14apTfa 11.2111 82/8,01118. pals v'1q"tWep. Point Of Connection Detail N• Remote Control Valve Detail Automatic Controller Detail Eauin ment Legend Project Notes: ve Schedule 1. Irrigation earl a.esi02 plea bad r S /1• s 1/1• water alter with 52.0 lbe. p./ .1.11. water presser., ins to .1.10r gaol.. 1. 11.1.11.11... 2. All .0alust to be 11.0.11.1 per Coda ad the Clip .t T.k.11a .aelfiatiea. Installer to be r..ponalble for r.0nired remit.. S. All aader0roaad wil1 be lee.t.d prior le .p site exa.at /on. Call 1- 500 - 112 -S3SS. O5O 4. The Installer .1.11 be respoesible for keeping lb. .act Ins th tall ..cords ter lb. creation .f e A.- bs111 drawing. s. ....Ia. a1• .l.i.a a..r 0.. 0b. et. Its. .sa wiring and 11. ter all lateral piping. 1. 2.81 tree materiels aba11 be mud to baekf111 01 tr.nrl.a .d the bedding .t plpia. All 717100 10.11 be ...Puled. 232 deonilr ter lsadaosplat. SS* for .1..1100. T. Splice of unreel wires .bail be within valve boxes onI7. wing IN -O0T .lect.Ical pliee kits. 7r..ta. a 22 loo fox .11 wiring inside each valve 500. All car. yellow Tres .ball be visible lesil each control ale* box. D. n et splice lb. glued wire between the matron., l .alas. S. All valve boxes .M11 be enure sad flub .it► the f 1.111 g rad.. 0. T. A eatr.11.r eraw to spar. 2.11w wires, to valve be. Al. pre. 8 controller 4w I. boxes Il. 82 a 22. IS. latall 1 grate. al Il. on in 11... with .11 Ieest/ons recorded low pedal. on A. -1.111 na. 11. All .pigneet I. be 1 as per detail. and I .p..It/ati.a. Beers 1 Withington IneeF '1 4311,4 V ®'Gl� anl2A 011: 0? 2005 RAMT( oEa LAIDSCMC 1192421.8 IwitblhigIB •842213151 Lc) CO CO Co C7) C F-- 0 0 2 a Lf) C'(7 P Boa 64271 6o-767 WA 98464 Irrigation Details Approved by. LW Dlarm by: AC SHEET: 4