Loading...
HomeMy WebLinkAboutPermit L05-053 - CITY OF TUKWILA - SHORELINE SUBSTANTIAL DEVELOPMENTCITY OF TUKWILA PW ALONG SC BLVD FAMILY FUN CENTER TO TUKWILA PY 10" WATER MAIN UPGRADE CITY WATER SYSTEM s LOS-053 City of Tukwila Department of Community Development Steve Lancaster, Director NOTICE OF DECISION August 10, 2007 To: Mike Cusick, Applicant Washington State Department of Ecology Agencies with Jurisdiction All Parties of Record Fred Luco, Time Warner Telecom PROJECT: Southcenter Blvd water main replacement/Time Warner fiber optic cable. FILE NUMBERS: E05 -001 (SEPA) and L05 -053 (Shoreline) APPLICANT: Mike Cusick, City of Tukwila, Public Works. REQUEST: The original SEPA and Shoreline permits were issued for the installation of 10 -inch water main within 200 feet the Duwamish River and attaching the water line to the 66 Ave Bridge. The revised proposal included installation of 4" conduits for fiber optic cable within the existing trenches laid for the water line. The fiber optic conduits are also proposed to be attached to the 66 Ave Bridge. LOCATION: The project is located in the City of Tukwila along Southcenter Boulevard and across the 66 Avenue Bridge and along the Green River to Tukwila Parkway. This notice is to confirm the decision reached by Tukwila's SEPA Official to adopt an addendum to the Determination of Non - significance (DNS) for the above project and approving the revision to the Shoreline Substantial Development Permit. Project materials including the application, any staff reports, and other studies related to the permits are available for inspection at: Tukwila Department of Community Development 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 Monday through Friday 8:30 a.m. - 5:00 p.m. The project planner is Minnie Dhaliwal, who may be contacted at (206) 431 -3685 for further information. Last saved 08/09/07 Steven M. Mullet, Mayor 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665 Description of original proposal: Description of this Addendum: Proponent: Location of Proposal: City of Tukwila Department of Community Development Steve Lancaster, Director DETERMINATION OF NONSIGNIFICANCE (DNS) ADDENDUM Lead Agency: City of Tukwila File Number: E05 -001 0 �• Jack ! ace, SEPA Official for the City of Tukwila, Washington. CITY OF TUKWILA 6300 Southcenter Boulevard Tukwila WA 98188. (206)- 431 -3670 s Steven M. Mullet, Mayor The project involved construction of a 10 -inch water main for about 1900 linear feet in order to upgrade the City of Tukwila's water system. The water line Was also proposed to cross the Duwamish River by attaching it to the 66` Ave Bridge. In addition to the water line installation the scope of work is expanded to include the installation of 4" conduit for Time Warner's fiber optic cable in the City's open cut trench laid out for the water line. The conduit for fiber optic cable will also be attached to the underside of the 66` Ave Bridge. City of Tukwila Public Works Department, Mike Cusick 6300 Southcenter Boulevard Tukwila, WA 98188 The project is located in the City of Tukwila along Southcenter Boulevard and across 66 Ave Bridge and along Green River to Tukwila Parkway. The City has determined that the addendum does not have a probable significant adverse impact on the environment. An environmental impact statement (EIS) is not required under RCW 43.21C.030(2)(C). The original DNS was issued December 14, 2005. This addendum is adopted on August 10, 2007. 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone. 206 = 431 -3670 • Fax: 206- 431 -3665 Project Name: City of Tukwila TO: Mike Cusick, Applicant Washington State Department of Ecology Agencies with Jurisdiction All Parties of Record Fred Luc°, Time Warner Telecom August 10, 2007 NOTICE OF REVISION TO THE SHORELINE SUBSTANTIAL DEVELOPMENT PERMIT I. PROJECT INFORMATION Project File Number: L05 -053 (Shoreline Substantial Development Permit) MD Page 1 of2 Q:Ashoreline \L05= 053 = Southeenter Blvd. water main -Tune Warner revision:doc Steven M. Mullet, Mayor Department of Community Development Steve Lancaster, Director Southcenter Boulevard water main replacement/Time Warner Telecom fiber optic cable: Original Project Description: The project involved construction of a 10 -inch water main for about 1900 linear feet in order to upgrade the City of Tukwila's water system. The Water line was also proposed to cross the Duwamish River by attaching it to the 66 Ave Bridge. The original decision on the shoreline permit was made on February 14, 2006 with an expiration date of February 14, 2008. Description of the Revision: In addition to the water line installation the scope of work is expanded to include installation of 4" conduit for Time Warner's fiber optic cable in the City's open cut trench laid out for the water line. The conduit for fiber optic cable will also be attached to the underside of the 66 Ave Bridge. Applicant: City of Tukwila Public Works Department, Mike Cusick 6300 Southcenter Boulevard Tukwila, WA 98188 Location: The project is located in the City of Tukwila along Southcenter Boulevard and across 66 Ave Bridge and along Green River to Tukwila Parkway. Zoning and Comprehensive Plan Designation: The current Zoning and Comprehensive Plan designation for the adjacent properties in the vicinity of the project area is Tukwila Urban Center (TUC), Low Density Residential (LDR) and Commercial /Light Industrial (C /LI). 08/10/2007 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 = 431 -3670 • Fax: 206 - 431 =3665 II. DECISION SEPA Determination: The City's SEPA Responsible Official issued the original Determination of Non - Significance (DNS) on December 14, 2005. A SEPA addendum for the revised scope of work that included Time Warner's conduits was issued on August 10, 2007. Decision on proposed revision to the permit: The revised scope of work is considered within the "scope and intent of the original" Shoreline permit consistent with the criteria for listed under WAC173 -27- 100(2). Following is the discussion how the proposed revision meets the criteria: 1) No additional over water construction is involved. The original proposal included installation of water line within 200 feet of the Duwamish River and attaching the water line to the 66 Ave Bridge. Time Warner is proposing to use the same trench used for the water line to lay their 4" conduit within the shoreline area and then attaching their conduit to the 66 Ave Bridge. 2) There is no increase in the ground area coverage or height. 3) The revised permit does not authorize development to exceed height, lot coverage, setback, or any other requirements of the applicable master program. 4) No changes are proposed to the landscaping. 5) The original proposal was to install water line and the revised proposal is to include conduits for fiber optic cable in the same trench. The use authorized pursuant to the original permit has not changed. 6) No adverse environmental impact will be caused by the project revision. Dep. nt of Community Development City of ila MD Page 2 of 2 08/10/2007 Q: \shoreline \L05 -053- Southcenter Blvd. water main -Time Warner revision.doc Shoreline Management Act Permit Data Sheet and Transmittal Letter From: City of Tukwila Department of Community Development 6300 Southcenter Blvd. Suite 100 Tukwila WA 98188 Applicant Information: Name: City of Tukwila Address: 6300 Southcenter Boulevard Ste 100 Tukwila WA 98188 Phone: 206 - 431 -3685 Is the applicant the property owner? Yes, all work in right -of -way Location of the property: Along Southcenter Boulevard Water Body Name: Duwamish/Green River Shoreline of Statewide Significance: Yes Environment Designation: Urban Description of Project: Notice of Application Date: 08 -10 -2007 Final Decision Date: By: Minnie Dhaliwal, Senior Planner, City of Tukwila Phone Number: (206) 431 -3685 • To: Ms. Sandra Lange, Environmental Planner Department of Ecology NW Regional Office 3190 160 Ave SE Bellevue WA 98008 Date of Transmittal: 08 -10 -07 Date of Receipt: Type of Permit: Revision to the Shoreline Substantial Development Local Government Decision: Approval Dept. Of Community Development City of Tukwila • AFFIDAVIT OF DISTRIBUTION th____ HEREBY DECLARE THA Notice of Public Hearing Project Number: L D y J 9 Deter i ation f No - Significance a, bigt Notice of Public Meeting Mitigated Determination of Non- Significance Board of Adjustment Agenda Pkt Determination of Significance & Scoping Notice Board of Appeals Agenda Pkt Notice of Action Planning Commission Agenda Pkt Official Notice Short Subdivision Agenda Notice of Application 4 horeline,Mgmt Permit i VlblDil Notice of Application for Shoreline Mgmt Permit -- FAX To Seattle Times Classifieds Mail: Gail Muller Classifieds PO Box 70 - Seattle WA 98111 1 Otf�ex, C ��? 1 aJpn ' • -11 Project Name: O1 -- 1(1) etAnie4 Tdra M Project Number: L D y J 9 Mailer's Signature: tal6 '- e - Person requesting mailing: f) ((J/I,vu _ � a ,P Was maile to each of the addresses listed on this (3day of year .20 P: IADMINLSTRATIVEFORMSWORMS \AFFWAVITOFDISTRIBUTION in the I/ 5,4 U.S. ARMY CUKrb ur Cwuinc...a U.S. DEPT OF H.U.D. FAL /( D EFT EPT OF HIGHWAY D LIFE TRATION j , TIONAL MARINE FRIES SERVICE /ADEPT FISH &WILDLIFE ✓ �^C WASHINGTON STATE AGENCIES ( DEPT OF SOCIAL & HEALTH SERV. ) DEPT OF ECOLOGY, SHORELAND DIV 3 COLO SE OFFICE OF ATTORNEY GENERAL • SEND CH W/ DETERMINATIONS • SEND SITE MAPS WITH DECISION OFFICE OF ARCHAEOLOGY TRANSPORTATION DEPARTMENT VVV () DEPT NATURAL RESOURCES () OFFICE OF THE GOVERNOR ( TRADE DEPT OF FISHERIES WILDLIFE O « C DEV. () BOUNDARY REVIEW BOARD () FIRE DISTRICT *11 () FIRE DISTRICT #2 () K.C. WASTEWATER TREATMENT DIVISION j�Y C. DEPT OF PARKS & REC /J KC. ASSESSORS OFFICE ( ) TUKWILA SCHOOL DISTRICT ( ) TUKWILA LIBRARY () RENTON UBRARY () KENT UBRARY () CITY OF SEATTLE UBRARY () QWEST ( ) SEATTLE CITY UGHT PUGET SOUND ENERGY HIGHUNE WATER DISTRICT () SEATTLE WATER DEPARTMENT ( ) AT &T CABLE SERVICES () KENT PLANNING DEPT ( ) TUKWILA CTTY DEPARTMENTS: () PUBLIC WORKS () FIRE () POUCE () FINANCE () PLANNING () BUILDING () PARKS & REC. () MAYOR () CITY CLERK ( ) PUGET SOUND REGIONAL COUNCIL ( ) SW K C CHAMBER OF COMMERCE (4) MUCKLESHOOT INDIAN TRIBE (1) CULTURAL RESOURCES PROGRAM CS) FISHERIES PROGRAM ( ) SEATTLE TIMES ( ) SOUTH COUNTY JOURNAL P: ADMINISTRATIVE \FORMSCHKLIST.DOC ri cal e l o b ( 6 -vs 1,3f 9 WIC KING COUNTY AGENCIES SCHOOLS/LIBRARIES UTILITIES CITY AGENCIES OTHER LOCAL AGENCI MEDIA 9 MAW 1 „ "� P iyi ( ) HEALTH DEPT b.• .I�'f � 4 " - ( ) PORT OF SEATTLE vvy: ( ) KC. DEV & ENVIR SERVICES-SEPA INFO CNTR KC. TRANSIT DMSION - SEPA OFFICIAL ,( .XC. LAND & WATER RESOURCES ( ) FOSTER LIBRARY ( ) K C PUBUC LIBRARY ( ) HIGHUNE SCHOOL DISTRICT ( ) SEATTLE SCHOOL DISTRICT ( ) RENTON SCHOOL DISTRICT ( ) OLYMPIC PIPELINE ( ) VAL -VUE SEWER DISTRICT ( ) WATER DISTRICT H2O () WATER DISTRICT &125 O CITY OF RENTON PUBUC WORKS () BRYN MAWR- LAXERIDGE SEWERIWATER DISTRICT () RENTON PLANNING DEPT () CITY OF SEA -TAC () CITY OF BURIEN ( ) TUKWILA PLANNING COMMISSION MEMBERS ( ) TUKIMLA CITY COUNCIL MEMBERS () CITY OF SEATTLE - SEPA INFO CENTER - DCLU () STRATEGIC PLANNING OFFICE• • NOTICE OF ALL SEATTLE RELATED PLNG PROJ. (.).DUWAMISH INDIAN TRIBE ( .S. AIR POLLUTION CLEAN AGENCY SOUND TRANSIT (UWAMISH RIVER CLEAN -UP COALITION 'SEND NOTICE OF ALL APPUCATIONS ON OUWAMISH RIVER ( ) HIGHLINE TIMES ( ) C1.TUKWILA.WA USW WV D a C-) A,u(, h 1( I P�j S.e,. - -(--e ', c . Off' Po P)D) 3L-j of £� e- 1 wi 812 -yokk OK. CL- Y����C SEPA MAILINGS Mail to: (comment p on date of mailing) Dept. of Ecology Envnu ental Review Section *Applicant *Other agencies as necessary (checked off on attached list) `Any Parties of record . •' send only the staff report, site plan and the SEPA Determination KC Transit Division —SEPA Official would lute to receive information about all projects that might affect transit demand Send These Documents to DOE: SEPA Determination (3 -part from Siena) Findings (staff report, usu. with MDNS) SEPA Checklist (filled out by applicant) Drawings/Plans of project (site plan, elevations, etc. from PMT's) Affidavit of Distribution (notice was mailed or sent to newspaper) SHORELINE MAILINGS: Notke ofAppllcatlon for a Substantial Development Permit must be mailed to owners and to property owners within 500 feet of subject property, comments are due 30 days after the notice of application is mailed/posted. The notice of Application for Shoreline Substantial Development Permit must include a statement that any person desiring to submit written comments on the application or desiring to receive notification of the final decision on the application may do so within 30 days of the notice of application. If a hearing will be held on the application, the hearing notice must include the information that written comments may be submitted, or oral presentation made at the hearing. Shoreline Permit Notice of Decision: Mail to: (within 8 days of decision; 21-day appeal period begins date received by DOE) Department of Ecology Shorelands Section State Attorney General 'Applicant . ' Tribes . *Other agencies as necessary (checked off on attached list). *Any parties of record ' send only the staff report, site plan and the SEPA Determination Send These Documents to DOE and Attorney General: Permit Data Sheet Shoreline Substantial Development Permit (3 -part from Sierra) Findings (staff report or memo) Shoreline Permit Application Form (filled out by applicant) Drawings/Plans of project (site plan, elevations, etc. from PMT's) — Site plan, with mean high water mark & improvements — Cross- sections of site with structures & shoreline — Grading Plan — Vicinity map ' SEPA determination (3 -part from Sierra) Findings (staff report or memo) SEPA Checklist (filled out by applicant) Any background studies related to impacts on shoreline Notice of Application Affidavit of Distribution (notice was mailed) P: ADM[MSTRATIVEWFORMS'CFQCUST.DOC TO: City of Tukwila Department of Community Development February 14, 2006 NOTICE OF DECISION Mike Cusick, Applicant Washington State Department of Ecology Agencies with Jurisdiction All Parties of Record Steven M. Mullet, Mayor Steve Lancaster, Director This letter serves as a notice of decision and is issued pursuant to TMC 18.104.170 on the following project and permit approval. I. PROJECT INFORMATION Project File Number: L05 - 053 (Shoreline Substantial Development Permit) Project Name: Southcenter Boulevard water main replacement. Project Description: The project involves construction of a new 1900 linear feet of a 10 -inch water main for the upgrades to the City of Tukwila's water system. Applicant: Location: The project is located in the City of Tukwila along Southcenter Boulevard and across 66` Ave bridge and along Green River to Tukwila Parkway. See attached map for the exact location. Zoning and Comprehensive Plan Designation: The current Zoning and Comprehensive Plan designation for the adjacent properties in the vicinity of the project area is Tukwila Urban Center (TUC), Low Density Residential (LDR) and Commercial /Light Industrial (C /LI). 1I. DECISION SEPA Determination: The City SEPA Responsible Official has previously determined that the project, as proposed, does not create a probable significant environmental impact and issued a Determination of Non - Significance (DNS). Decision on Substantive Permit: The City Community Development Director has determined that the application for a Shoreline Substantial Development Permit does comply with applicable City and state code requirements and has approved that application based on the findings and conclusions contained in the staff report and subject to the following condition: If any artifacts are encountered during any of the excavation activities, all work will be stopped and the State Office of Archaeology and Historic Preservation and the concerned tribes cultural committees and the City of Tukwila staff must be notified. MD Page 1 of 2 Q:Ashorelinev1.05 -053- Southcentei watei main replacement- NOD1.dot_ City of Tukwila Public Works Department, Mike Cusick 6300 Southcenter Boulevard Tukwila, WA 98188 (206) 433-0179 02/14/2006 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665 The Decision on this Permit Application is a Type 2 decision pursuant to Tukwila Municipal Code §18.104.010. Other land use applications related to this project may still be pending. III. YOUR APPEAL RIGHTS One administrative appeal to the Shorelines Hearings Board of the Decision is permitted. Any person appealing to the Shorelines Hearings Board may raise certain SEPA issues as part of the appeal to the Shorelines Hearings Board. Appellants should consult the rules and procedures of the Shorelines Hearings Board for details. The requirements and procedures for appeals to the Shorelines Hearings Board are set forth in RCW 90.58 and WAC 461.08. Project materials including the application, any staff reports, and other studies related to the Shoreline Substantial Development Permit are available for inspection at the Tukwila Department of Community Development, 6300 Southcenter Blvd., Suite 100, Tukwila, Washington 98188 from Monday through Friday between 8:30 a.m. and 5:00 p.m. The project planner is Minnie Dhaliwal, who may be contacted at 206 -431- 3685 for further information. Property owners affected by this decision may request a change in valuation for their property tax purposes. Contact the King County Assessor's Office for further information regarding property tax valuation changes. • • IV. PROCEDURES AND TIME FOR APPEALING V. INSPECTION OF INFORMATION ON THE APPLICATION Department of Community Development City of Tukwila M D Page 2 of 2 02/14/2006 Q:\shorelinc \L05- 053 - Southcenter Blvd. water main replacement- NOD1.doc File Number: L05 -053 Applied: 08/17/2005 Approved: 02/14/2006 Expiration: 02/14/2008 doc: Shore1971 • • City of Tukwila Department of Community Development / 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670 SHORELINE MANAGEMENT ACT OF 1971 PERMIT FOR SHORELINE MANAGEMENT SUBSTANTIAL DEVELOPMENT A permit is hereby granted to: CITY OF TUKWILA- PUBLIC WORKS to: Water main extension from Interurban Avenue /Southcenter Boulevard to Andover Park East. Upon the following property: Address: Parcel Number: Section/Township /Range: SE 23- 23N -04E & SW 24- 23N -04E The following master program provisions are applicable to this development: TUKWILA SHORELINE MASTER PROGRAM Development under this permit shall comply with the following conditions. 1: If any artifacts are encountered during any of the excavation activities, all work will be stopped and the State Office of Archaeology and Historic Preservation and the concerned tribes cultural committees and the City of Tukwila staff must be notified. This permit is granted pursuant to the Shoreline Management Act of 1971 and nothing in this permit shall excuse the applicant from compliance with any other Federal, State or local statutes, ordinances or regulations applicable to this project, but not inconsistent with the Shoreline Management Act (Chapter 90.58 RCW). This permit may be rescinded pursuant to RCW 90.58.140(8) in the event the permittee fails to comply with the project as approved and any conditions thereof. CONSTRUCTION PURSUANT TO THIS PERMIT MAY NOT BEGIN AND IS NOT AUTHORIZED UNTIL TWENTY -ONE (21) DAYS FROM THE DATE OF FILING WITH THE DEPARTMENT OF ECOLOGY (D.O.E.) AS DEFINED IN RCW 90.58.140(6) AND WAC 173 -14 -090, OR UNTIL ALL REVIEW PROCEEDINGS INITIATED WITHIN TWENTY -ONE (21) DAYS FROM THE DATE OF SUCH FILING HAVE TERMINATED; EXCEPT AS PROVIDED IN RCW 90.58.140(5)(a)(b)(c). Pursuant to RCW 90.58.180 the decision by the City of Tukwila to issue this Shoreline Substantial Development Permit may only be appealed to the Shoreline Hearing Board. Appeals must be filed with the Shorelines Hearing Board within 21 -days from the filing of this permit with D.O.E. as defined in RCW 90.58.140. For more detail information on appeals, refer to RCW 90.58 and WAC 461.08. Date: Steve Lancaster, Director of Department of Community Development Construction or substantial progress toward construction must begin within two (2) years from the effective date of the permit (the date the permit is filed with D.O.E.), per RCW 90.58.143(4). L05 -053 Printed: 02 -10 -2006 From: City of Tukwila Department of Community Development 6300 Southcenter Blvd. Suite 100 Tukwila WA 98188 Date of Transmittal: Shoreline Management Act Permit Data Sheet and Transmittal Letter Type of Permit: Substantial Development Local Government Decision: Approval Applicant Information: Name: City of Tukwila Address: 6300 Southcenter Boulevard Ste 100 Tukwila WA 98188 Phone: 206 - 431 -3685 To: Ms. Sandra Lange, Environmental Planner Department of Ecology NW Regional Office 3190 160 Ave SE Bellevue WA 98008 02 -14 -06 Date of Receipt: Is the applicant the property owner? Yes, all work in right -of -way Location of the property: Along Southcenter Boulevard Water Body Name: Duwamish/Green River Shoreline of Statewide Significance: Yes Environment Designation: Urban Description of Project: Notice of Application Date: 08 -19 -2005 Final Decision Date: Februaryl4, 2006 By: Minnie Dhaliwal, Senior Planner, City of Tukwila Phone Number: (206) 431 -3685 Dept. Of Community Development City of Tukwila AFFIDAVIT OF DISTRIBUTION I, S HEREBY DECLARE THAT: Project Name: - /CIQ C �4 - � • �) Tlk-k-- r� k �� ��-� Notice of Public Hearing Determination of Non - Significance Mailer's Signature: V , i__,,,, Notice of Public Meeting 6./"' 111 4 Mitigated Determination of Non - Significance Board of Adjustment Agenda Pkt Determination of Significance & Scoping Notice Board of Appeals Agenda Pkt Notice of Action Planning Commissioi Agenda Pkt Official Notice Short Subdivision'Agenda Notice of Application horeline Mgmt Permit Notice of Application for Shoreline Mgmt Permit __ __ FAX To Seattle Times Classifieds Mail: Gail Muller Classifieds PO Box 70 - Seattle WA 98111 Other Was mailed to each of the addresses listed on this day of f- docin the year 20O( P:GINAWYNETTA/FORMS /AFFIDAVIT -MAIL 08/29/003:31 PM •A Project Name: - /CIQ C �4 - � • �) Tlk-k-- r� k �� ��-� Project Number: Lo c - aS.3' Mailer's Signature: V , i__,,,, Person requesting mailing: �/� oriA A, D 6./"' 111 4 Was mailed to each of the addresses listed on this day of f- docin the year 20O( P:GINAWYNETTA/FORMS /AFFIDAVIT -MAIL 08/29/003:31 PM ( ) TUKWILA SCHOOL DISTRICT ( ) TUKWILA LIBRARY () RENTON LIBRARY () KENT LIBRARY () CITY OF SEATTLE LIBRARY ()(U.S. ARMY CORPS OF ENGINEERS FEDERAL HIGHWAY ADMINISTRATION ( )OEPT OF FISH & WILDLIFE OFFICE OF ARCHAEOLOGY TRANSPORTATION DEPARTMENT () EPT NATURAL RESOURCES ( ) OFFICE OF THE GOVERNOR () DEPT OF COMM. TRADE & ECONOMIC DEV. p<(EPT OF FISHERIES & WILDLIFE > KING COUNTY AGENCIES () BOUNDARY REVIEW BOARD ( ) FIRE DISTRICT #11 ( ) FIRE DISTRICT #2 () K.C. WASTEWATER TREATMENT DIVISION ( ) KC. DEPT OF PARKS & REC $K.C. ASSESSORS OFFICE ( ) QWEST ( ) SEATTLE CITY LIGHT ( ) PUGET SOUND ENERGY HIGHLINE WATER DISTRICT () SEATTLE WATER DEPARTMENT ( ) AT &T CABLE SERVICES () KENT PLANNING DEPT ( ) TUKWILA CITY DEPARTMENTS: () PUBLIC WORKS () FIRE () POLICE () FINANCE () PLANNING () BUILDING () PARKS & REC. () MAYOR ( ) CITY CLERK () PUGET SOUND REGIONAL COUNCIL ( ) SW K C CHAMBER OF COMMERCE JMUCKLESHOOT INDIAN TRIBE (,CULTURAL RESOURCES PROGRAM' t` (FISHERIES PROGRAM WILDLIFE PROGRAM () SEATTLE TIMES ( ) SOUTH COUNTY JOURNAL :\ADMINISTRATIVE \FORMS \CHKLIST.DOC (PIRA AelA FEDERAL AGENCIES WASHINGTON STATE AGENCIES () DEPT OF SOCIAL & HEALTH SERV. () DEPT OF ECOLOGY, SHORELAND DIV j DEPT OF ECOLOGY, SEPA DMSION' OFFICE OF ATTORNEY GENERAL g listo SEND CHKLIST W/ DETERMINATIONS SEND SITE MAPS WITH DECISION SCHOOLS/LIBRARIES UTILITIES CITY AGENCIES OTHER LOCAL AGENCIES MEDIA AA; [c__ ec,,s i 4 ; s. 4 T 1P . • U.S. ENVIRONMENTAL PROTECTION AGENCY () U.S. DEPT OF H.U.D. (,NATIONAL MARINE FISHERIES SERVICE () HEALTH DEPT () PORT OF SEATTLE () KC. DEV & ENV!R SERVICES-SEPA INFO CNTR () K.C. TRANSIT DIVISION - SEPA OFFICIAL (4KC. LAND & WATER RESOURCES () FOSTER LIBRARY () K C PUBLIC UBRARY ( ) HIGHLINE SCHOOL DISTRICT () SEATTLE SCHOOL DISTRICT () RENTON SCHOOL DISTRICT ( ) OLYMPIC PIPELINE ( ) VAL -VUE SEWER DISTRICT () WATER DISTRICT #20 ( ) WATER DISTRICT #125 ( ) CITY OF RENTON PUBLIC WORKS ( ) BRYN MAWR- LAKERIDGE SEWERIWATER DISTRICT () RENTON PLANNING DEPT () CITY OF SEA -TAC () CITY OF BURIEN ( ) TUKWILA PLANNING COMMISSION MEMBERS ( ) TUKWILA CITY COUNCIL MEMBERS ( ) CITY OF SEATTLE - SEPA INFO CENTER - DCLU () STRATEGIC PLANNING OFFICE' ' NOTICE OF AU. SEATTLE RELATED PLNG PROJ. j DUWAMISH INDIAN TRIBE () P.S. AIR POLLUTION CLEAN AGENCY () SOUND TRANSIT DUWAMISH RIVER CLEAN -UP COALITION SEND NOTICE OF ALL APPUCATIONS ON DUWAMISH RIVER ( ) HIGHLINE TIMES ( ) CI.TUKWILA.WA.US.VWWV o 1250■6,624a, ■\ &Jr__ r V-1-AA 0 PD LO 10j ca& 4969, PSIC NOTICE MAILINGS FOR ADMITS SEPA MAILINGS Mail to: (comment period starts on date of mailing) Dept. of Ecology Environmental Review Section *Applicant *Other agencies as necessary (checked off on attached list) Any parties of record * send only the staff report, site plan and the SEPA Determination KC Transit Division —.SEPA Official would like to receive information about all projects that might affect transit demand Send These Documents to DOE: SEPA Determination (3 -part from Sierra) Findings (staff report, usu. with MDNS) SEPA Checklist (filled out by applicant) Drawings/Plans of project (site plan, elevations, etc. from PMI's) Affidavit of Distribution (notice was mailed or sent to newspaper) SHORELINE MAILINGS: Notice of Application for a Substantial Development Permit must be mailed to owners and to property owners within 500 feet of subject property, comments are due 30 days after the notice of application is mailed/posted. The notice of Application for Shoreline Substantial Development Permit must include a statement that any person desiring to submit written comments on the application or des iring to receive notification of the final decision on the application may do so within 30 days of the notice of application. If a hearing will be held on the application, the hearing notice must include the information that written comments may be submitted, or oral presentation made at the hearing. Shoreline Permit Notice of Decision: Mail to: (within 8 days of decision; 2.1 -day appeal period begins date received by DOE) Department of Ecology Shorelands Section State Attorney General *Applicant 'Indian Tribes *Other agencies as necessary (checked off on attached list). Any parties of record ' send only the staff report, site plan and the SEPA Determination Send These Documents to DOE and Attorney General: Permit Data Sheet Shoreline Substantial Development Permit (3 -part from Sierra) Findings (staff report or memo) Shoreline Permit Application Form (filled out by applicant) Drawings/Plans of project (site plan, elevations, etc. from PMT'S) - Site plan, with mean high water mark & improvements — Cross- sections of site with structures & shoreline - Grading Plan — Vicinity map • SEPA determination (3 -part from Sierra) Findings (staff report or memo) SEPA Checklist (filled out by applicant) Any background studies related to impacts on shoreline Notice of Application Affidavit of Distribution (notice was mailed) P:1ADM IMSTRATIVEIFORMS\CHKLIST.DOC ITEMS INCLUDED IN 2/16/06 MAILING: 1. Shoreline Management Act Permit Data Sheet and Transmittal Letter 2. Shoreline Management Act of 1971 Permit for Shoreline Management Substantial Development (L05 -053) 3. Notice of Decision dated 2/14/06 4. Staff report to the Director Department of Community Development dated 2/10/06 5. Map indicating proposed water line Determination of Non - Significance (E05 -001) 7. Final Staff Evaluation for Southcenter Blvd. Water Main Replacement (E05 -001) 8. Environmental Checklist 9. Copy of 8/19/05 Notice of Application mailing 10. Southcenter Blvd. Water Main Replacement — Shoreline Sections plans ov fi- • Gity of Tukw1 Department of Community Development Steve Lancaster, Director STAFF REPORT TO THE DIRECTOR DEPARTMENT OF COMMUNITY DEVELOPMENT February 10, 2006 II. GENERAL INFORMATION Project Name: Southcenter Boulevard water main replacement. Applicant: Location: Zoning: Comprehensive Plan Designation: I1. Project Description City of Tukwila Public Works Department, Mike Cusick 6300 Southcenter Boulevard Tukwila, WA 98188 (206) 433-0179 The project is located in the City of Tukwila along Southcenter Boulevard and across 66` Ave bridge and along Green River to Tukwila Parkway. See attached map for the exact location. The current zoning for the adjacent properties in the vicinity of the project area is Tukwila Urban Center (TUC), Low Density Residential (LDR) and Commercial /Light Industrial (C /L1). The current Comprehensive Plan depicts the areas adjacent to the project site as Tukwila Urban Center (TUC), Low Density Residential (LDR) and Commercial /Light Industrial (C /LI). The project involves construction of a new 1900 linear feet of a 10-inch water main for the upgrades to the City of Tukwila's water system. III. Policies of the Shoreline Management Act /Shoreline Master Program The project is subject to Tukwila Shoreline Master Program. Steven M. Mullet, Mayor 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 = 431 =3670 • Fax: 206 - 431 -3665 • • IV. Shoreline Regulations Shoreline Substantial Development Permit (18.44.80) Any substantial development within 200 feet of any shoreline must receive a shoreline substantial development permit prior to issuance of any local permits by the City. The construction of the proposed water main is within the paved portion of Tukwila Parkway and then it follows under the paved trail along the Green River. Further along it is attached to the bridge crossing the Green River and then it is follows along the paved portion of the Southcenter Boulevard. The project area is within 200 feet of the Green River. General Shoreline Regulations (18.44.110) 1. The use is in conformance with the regulations of the underlying district The project location is within City of Tukwila right of way. Adjacent zoning designations include Tukwila Urban Center (TUC), Low Density Residential (LDR) and Commercial /Light Industrial (C /LI). No specific development regulations govern the installation of a water main. The proposed water main would not cause any foreseeable conflicts with the adjacent TUC, LDR and C /LI zoning and thus would conform to applicable zoning regulations. 2. The use does not conflict with the goals and policies of the shoreline master program or the provisions of the Shoreline Act and shoreline regulations: The proposed project to construct a 10" water main line includes working within paved portions of the existing streets. A portion of the proposed line is under the paved trail along Green River and then it is attached to the bridge that crosses the Green River. The proposed project would cause no impacts to the shoreline environment. The use is consistent with the goals and policies of the shoreline master program and the provisions of the Shoreline Act and shoreline regulations. 3. No structures or accessory facilities shall be located over the river unless such structure protects or promotes the public interest. The proposed water line is attached to an existing bridge over the Green River. No structures will be constructed over the Green River. No impacts are anticipated to the river as a result of this project. MD Page 2 of 5 02/10/2006 Q: \shoreline \L05 -053- Southcenter Blvd. water main replacement- SR.doc N/A • • 4. There shall be no disruption of existing trees or vegetation within the river environment unless necessary for public safety or flood control, or if allowed as part of an approved shoreline substantial development permit. The water line will be installed in paved or landscaped areas only. After the line is installed, the areas will be restored to the original condition. S. No effluent shall be discharged into the Green River, which exceeds the water quality classification as established by the State for the adjacent portion of the river. No discharge of effluent will occur due to proposal. 6. All States and federal water quality regulations shall be strictly complied with. Applicant is responsible for meeting all state and federal water quality regulations. 7. Wildlife habitat in and along the river shall be protected Wildlife should not be impacted by this project. 8. All perimeters of landfills and other land forms susceptible to erosion shall be provided with vegetation, retaining walls, or other satisfactory mechanism for erosion prevention. Erosion and sedimentation controls will be used to ensure minimal disturbance to the river. Much of the area adjacent to right -of -way is developed. If any areas are disturbed, they shall be restored and re- vegetated immediately. 9. All necessary permits shall be obtained from Federal, State, County or municipal agencies. The project was issued a SEPA Determination of Non - Significance (DNS) by the City of Tukwila. Applicant is responsible for obtaining any applicable Federal or State approvals. 10. Dredging for purposes other than for navigational improvements or flood control is prohibited. MD Page 3 of 5 02/10/2006 Q: \shoreline \L05 -053- Southcenter Blvd. water maid replacement - SR.doc • • 1L Mining is prohibited along the river shoreline N/A 12. Solid waste disposal is prohibited along the shoreline N/A 13. No property will be acquired for public use without dedication by or just compensation to the owner All work is proposed within existing right -of -way or existing easements. 14. Landfilling is prohibited within the river channel, unless such landfall is determined by the Planning Commission to protect or promote the public interest. N/A 15. Notwithstanding any provisions of the Code to the contrary, removal of any cottonwood tree within the river environment, or the low impact environment, which tree is 12 inches or greater in diameter as measured 4.5 feet above grade, shall be subject to the requirements of TMC Chapter 18.54, Tree Regulations. No removal of vegetation is proposed for this project. Specific Shoreline Regulations The project falls within river impact, low impact and high impact environments. There are no anticipated impacts to the shoreline as the project is located within the existing developed right -of -way and under the paved trail along the Green River. Specific use regulations -river impact environment (18.44.130) This portion of the code requires that `utility easements where necessary shall be landscaped with live ground cover or natural grass cover ". The project is to construct a 10" sanitary sewer within the paved asphalt trail. No other disturbances are anticipated as a result of this project. Specific use regulations -low impact environment (18.44.140) Utilities are permitted in the low - impact environment. Specific use regulations -high impact environment (18.44.150) All uses allowed in the underlying zoning district are allowed in the high impact environment. M D Page 4 of 5 02/10/2006 Q: \shoreline \L05 -053- Southcenter Blvd. water main replacement- SR.doc V. Comments • • A letter was received from Muckleshoot Cultural Resources Program stating that the area along South Grady Way to Southcenter Boulevard is an area that they have flagged as high potential for archaeological discovery. The letter also requested an archaeological field study by a professional archaeologist. The project engineer, Mike Cusick talked to Laura Murphy, Tribal Archaeologist and explained that the project includes working only in the area that has been previously disturbed and that the water line will be attached to an existing bridge. Further if any artifacts are encountered during any of the excavation activities, all work will be stopped and the State Office of Archaeology and Historic Preservation and concerned tribes cultural committees and staff will be notified. A comment letter was also received from City of Seattle, Public Utilities requesting a copy of the plans and informing that Seattle Public Utilities operates 60" concrete cylinder pipeline. The Project Engineer provided them with a copy of the plans and will co- ordinate with them during construction. V. SEPA and other approvals The project was also subject to SEPA review and was issued a Determination of Non - Significance by the City of Tukwila on December 14, 2005. VI. Recommendations Approval of the shoreline substantial development permit. If any artifacts are encountered during any of the excavation activities, all work will be stopped and the State Office of Archaeology and Historic Preservation and the concerned tribes cultural committees and the City of Tukwila staff must be notified. Minnie Dhaliwal, Senior Planner —JO — 06 Date MD Page 5 of 5 02/10/2006 Q: \shoreline \L05 -053 - Southcenter Blvd. water man replacement- SR.doc t August 30, 2007 Dear Mr. Cusick: What Happens Next? Mr. Mike Cusick Tukwila Public Works Department 6300 South Center Boulevard Tukwila, WA 98188 STATE OF WASHINGTON DEPARTMENT OF ECOLOGY Northwest Regional Office • 3190 160th Avenue SE • Bellevue, Washington 98008 -5452 • (425) 649 -7 I certify that I mailed a copy of this document to the persons and addresses listed herein, postage prepaid, �e ■� - -•tacle for United States mail in ,r ` Washington, o • 1 • Signature Subject: City of Tukwila Permit # L05 -053 - Approved Tukwila Public Works Department - Applicant Revised Shoreline Substantial Development Permit # 2005 NW 80011 Purpose: Notification of Receipt and Local Approval of Revised Substantial Development Permit (SDP). On August 14, 2007 the Department of Ecology received notice that City of Everett approved your application for a revised SDP. Your permit is for installing of 4 inch conduit for fiber optic cables within existing construction trenches within shoreline jurisdiction of the Green River. (Chapter 90.58 RCW). By law, local governments must review all SDPs for compliance with the following: • The Shoreline Management Act (Chapter 90.58 RCW) • Ecology's Substantial Development Permit approval criteria (Chapter 173 -27 -150 WAC) • The City Of Tukwila Local Shoreline Master Program Local governments, after reviewing the SDP for compliance, are required to submit the SDPs to Ecology for filing. Your approved application for a revised SDP has been received and subsequently filed with Ecology. Before you begin activities authorized by this permit, the law requires you to wait at least 21 days from the date we received the decision letter from City of Tukwila on August 14, 2007. This waiting period allows anyone (including you) who disagrees with any aspect of this permit, 0 Mike Cusick August 30, 2007 Page 2 of 2 to appeal the decision to the state Shorelines Hearings Board. You must wait for the conclusion of an appeal before you can begin the activities authorized by this permit. If no appeal is submitted you may begin activities any time after September 4, 2007. The Shorelines Hearings Board will notify you by letter if they receive an appeal. We recommend, however, you contact the Shorelines Hearings Board before you begin permit activities to ensure no appeal has been received. They can be reached at (360) 459 -6327 or http : / /www. eho wa. gov/B oards /S HB. asp. If you want to appeal this decision, you can find appeal instructions (Chapter 461 -08 WAC) at the Shorelines Hearings Board website above. They are also posted on the website of the Washington State Legislature at: http: / /apps.leg.wa.gov /wac. If this permit is NOT appealed, this letter constitutes the Department of Ecology's final notification of action on this permit. Other federal, state and local permits may be required in addition to this shoreline permit. If you have any questions about this letter, please contact me at 425- 649 -4253. Sincer avid Pater, Shorelands Specialist Shorelands and Environmental Assistance Program DP:cja cc: Minnie Dhaliwal, City of Tukwila Community Development DEPARTMENT OF ARCHAEOLOGY & HISTORIC PRESERVATION 1063 S. Capitol Way, Suite 106 • Olympia, Washington 98501 Mailing address: PO Box 48343 • Olympia, Washington 98504 -8343 (360) 586 -3065 • Fax Number (360) 586 -3067 • Website: www.dahp.wa.gov August 22, 2007 1 c U �ufc Log: 082207 -18 -KI r Property: E05 -001 and L05 -053 Southcenter Blvd water main replacement Ms. Minnie Dhaliwal Community Development City Of Tukwila 6300 Southcenter Blvd., #100 Tukwila, WA 98188 Re: Archaeology - Survey Requested Dear Ms. Dhaliwal: We have reviewed the materials forwarded to our office for the proposed project referenced above. The water main installation as described appears to pass through or near site 45 -KI -6, and this plus the location near the Duwamish River indicates the project area has the potential for archaeological resources. Further, the scale of the proposed ground disturbing actions would destroy any archaeological resources present. We recommend a professional archaeological survey of the project area, including subsurface testing through trenches or boreholes, be conducted prior to implementing the project. We also recommend consultation with the concerned Tribes' cultural committees and staff regarding cultural resource issues. If any federal funds or permits are involved Section 106 of the National Historic Preservation Act, as amended, and its implementing regulations, 36CFR800, must be followed. This is a separate process from SEPA and requires formal government -to- government consultation with the affected Tribes and this agency. These comments are based on the information available at the time of this review and on behalf of the State Historic Preservation Officer. Should additional information become available, our assessment may be revised. Thank you for the opportunity to comment on this project and we look forward to receiving the survey report. Should you have any questions, please feel free to contact me at (360) 586 -3088 or Scott.Williams@dahp.wa.gov. Sincerely, 440 Scott Williams Williams Assistant State Archaeologist (360) 586 -3088 scott.williams @dahp.wa.gov CC: Charles Sundberg, King County • • STATE OF WASHINGTON I IAUR 2 41007 Pivo t -0,4( a "� -1 a � D� 1 (1 / ea xA % -- 4, 1 March 15, 2006 Michael Cusick City of Tukwila Public Works Department 6200 Southcenter Blvd. Tukwila, WA 98188 Purpose of this letter Sin San /a Lange, Shoreline Planner cc: Minnie Dhaliwal, City of Tukwila STATE OF WASHINGTON DEPARTMENT OF ECOLOGY PO Box 47600 • Olympia, WA 98504 -7600 • 360- 407 -6000 TTY 711 or 800- 833 -6388 (for the speech or hearing impaired) Re: City of Tukwila Shoreline Substantial Development Permit #L05 -053 City of Tukwila Public Works — Owner /Applicant Ecology Shoreline Substantial Development Permit # 2006 -NW -50012 RECEIVED C.ON NIUNI T DEVELOPMENT This letter is to inform you that on February 21, 2006, the Department of Ecology received notice that the City of Tukwila approved your application to construct a new 1900 linear foot by 10 inch diameter water main upgrade in the Urban Shoreline Environment of the Duwamish/Green River. The law requires you to wait at least twenty -one (21) days from the date Ecology received this decision from the City of Tukwila before you begin the specific activities authorized by this permit. This waiting period is to allow anyone disagreeing with any aspect of your permit to appeal to the Washington State Shorelines Hearings Board. The Shorelines Hearings Board will notify you by letter if they receive an appeal, and if they do you must wait until the appeal is over before you start work. To be sure that the Shorelines Hearings Board has not received an appeal, we advise you to call them at (360) 459 -6327 before you begin work. Other federal, state and local permits may be required in addition to this shoreline permit. Please contact me at 425- 649 -4260 or slan461@ecy.wa.gov if you have any questions about this letter. S City of Seattle • • Gregory J. Nickels. Mayor Gregory J. Nickels, Mayor Seattle Public Utilities Chuck Clarke, Director September 8, 2005 Minnie Dhaliwal Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, WA 98188 RE: Notice of Application Construction of a 10 inch water main from Interurban Avenue South to Andover Park East (approximately 1900 linear feet) L05 -053 (Shoreline permit), E05 -001 (SEPA) Dear Minnie: Thank you for sending Seattle Public Utilities a copy of your Notice of Application for this project. This letter is to provide notice that Seattle Public Utilities operates a 60" inch concrete cylinder pipeline within Southcenter Boulevard to Andover Park East in the vicinity of this project. This pipeline is one of our main water transmission lines which supplies water communities in South King County. I have enclosed copies of our map book sheets showing the approximate location of the 60" inch concrete cylinder pipeline. If there is to be operation of heavy equipment, excavation or construction performed in the area of our pipe, Seattle Public Utilities should be included in the pre - construction process, plan review and the actual construction. Information needed by SPU • Three copies of scalable Plan, Section and Profile drawings that show the planned improvements in proximity to our pipe. These plans will be reviewed for comment by SPU Operations staff & engineers. • The planned start and finish dates. C GCR,•".) . . n R e o SEP 0 9 2005 commuNnv ° LOPmENT Key Tower Building, 700 5th Avenue, Suite 4900, Seattle, WA 98104 -5004 Tel: (206) 684 -5851, TTY/TDD: (206) 233 -7241, Fax: (206) 684 -4631, Internet Address: http: / /www.seattle.gov /util/ An equal employment opportunity, affirmative action employer. Accommodations for people with disabilities provided upon request. • • Information you may need • Record plans of our facilities can be obtained from the City of Seattle Vault which is located at the 47 floor of the Seattle Municipal Tower, 700 5th Ave., Suite 4700, Seattle, 98124. The phone number there is 206 - 684 -5132. • Any work in close proximity to our pipeline (including locating by potholing) must be supervised by SPU. Call SPU's Lake Youngs Headquarters at 425 -255- 2242 at least 48 hours in advance. • Pipe protection may be necessary if heavy equipment crosses the pipe. Typical temporary bridging would be timbers and steel plate. If anyone connected with this project should need additional information please contact me at 206 - 684 -5969 or e-mail Bob.gambill @seattle.gov. Sincerel /( AI- _‘ .‘ 7 4 c ,„_ L // ob Gambill Sr. Real Property Agent Enclosure: Map book page 334 showing approximate location of the Cedar River Pipe Line. 23- & 223 . i • .HST • • :c1 — \ I0S5 \ CUSH. U. ,-. 4901 53R0 AVE FOR' * ; 6" SERVICE it155770 'TV 7 Iry divot " pitk iti 1101$111 1215 7571094 , TK 15 • VII ' < - • '4,7 4 • 4 ..4. Z • S lbOTH ST 11 1 1- `,„ \ N 256+22:4 \ • • ^ I • • I A I % •\ • .. I. • i > ' co 3 / tes V UH 256+ 5 I V +++ DRUM UNE \ \*tk • ‘='=', OVER 421 OF MH,FRWY \ \ -c m DRAIN 36. \ \ st, / ; CD 1.1 ow, ••••• ) mInts 1 1.1 S 163RD PA • i dN 1> • 3 6300 \ • \ SLADE go UN 245+20 12"CULVERT 211 60° CCP SLIPLINED W/ 54" OR 55" STE ID X 0.4° WALL FROM STA 244+91 TO STA 251+33 PLAN 11120-23' 05 5700 6800 5900 8200 8300 8400 I • , • t f ; ;- ' • ' • a. .„ ,:10 171376 / TO TUKWILA / i 12 K " 1 F 2 L & 0 T Qo j tr i 246+10 f?, s 5, . '.."!" \ it ■ I CO" `\‘. % . cg U ▪ i I i 1,., as , - 1 1 ..._, 326: TOKWILA 13 a '3' `,..., O .....„, -----_,. `---.., '----,... 0 .. N "•..,..., '`...., 30' STORPISEWER ,,...„ . ,.., 0 "....... - 11 -.1-,,, N i ,,, t 1 sit 30' STORM SEWER OVER 460 SOUTHCENTER MALL • • 30' STORM SEWER ✓ OVER IIH 334A • • •CC CR PI 14 TUKU/11A PARKWAY 1 BAKER BLVD 8,500 • • ANDOVER gi • tifiF INDUSTRIAL PARK g Z.:: IW • : CHV • :10 ir- 4' GAS 60'W OF BOV ' 239: r LINE XING `cONO X414G 36" DEEP' , :1ra.ii_.tc__?_----- ‘ --210F0.1R9 • "4 0, ELECTRAC CONDUITS 71"W OF BOV > - , • 4.%A.11 XING SOS BOVE J COVI4 205+45 t • 335 it • 20.5.t25 2 ELK CONDIA1 2 RING OVER 1125E8009 12•V 205+80 Cc . i97+69 3 ELCtRIC - CO Dun's i X-I OVER' ' .- . .i. V HIGH LTAGE. PSP , 2' GU May : ' . September 1, 2005 Minnie Dhaliwal Planner, City of Tukwila 6300 Southcenter Boulevard Suite 100 Tukwila, WA 98188 Dear Ms. Dhaliwal: • • MUCKLESHOOT CULTURAL RESOURCES PROGRAM 39015 172nd Avenue S.E. • Auburn, Washington 98092 -9763 Phone: (253) 939 -3311 • FAX: (253) 876 -3312 RE: Southcenter Boulevard Water Main Replacement RECEIVED SEP 0 6 2005' DEVELOPMENT On behalf of the Cultural Resources Committee, I have reviewed the information sent on 8/19/05 regarding the Southcenter Boulevard Water Main Replacement and have the following comments. The along South Grady Way to Southcenter Boulevard property is an area the Tribe has flagged as high potential for archaeological discovery. Information regarding previous surveys and recorded archaeological sites is available from the Office of Archaeology and Historic Preservation, in Olympia. If the project area has been previously surveyed, then the following requests can be disregarded. Due to the project's ground disturbing activities and the potential for archaeological discovery, the Cultural Committee is requesting: 1. An archaeological field study of the project APE by a professional archaeologist. 2. The option of sending a tribal monitor during the field survey 3. To review the draft survey for completeness and accuracy 4. A copy of the final technical report for our files The Cultural Resources Program does not represent the Wildlife Program and the Fisheries Program which are separate departments under the Muckleshoot Indian Tribe. Please contact these departments separately for their input on this project. We appreciate the effort to coordinate with the Muckleshoot Tribe prior to site preparation. The destructive nature of construction excavation can often destroy a site and cause delays and unnecessary expense for the contractor. If you have any questions, please contact me at 253- 876 -3272. Thank you for keeping the Tribe informed. Sin y, Laura Murphy, Tribal Arch'ologist CC:Melissa Calvert, Wildlife & Culture Director Stephenie Kramer, Assistant State Archaeologist, OAHP • August 26, 2005 Mr. Mike P. Cusik, PE City of Tukwila 6300 Southcenter Blvd, Suite 100 Tukwila, WA 98188 RE: Notice of Incomplete Application Shoreline Permit L05 -053 Dear Mr. Cusik: The City of Tukwila's Planning Department received your application for shoreline permit approval on August 17, 2005. On August 26, 2005 it was deemed to be incomplete because certain requirements of the application were not provided: Please provide the following: • City of Tukwila • Steven M. Mullet, Mayor Department of Community Development Steve Lancaster, Director 1. Application fee in the amount of $2,000 2. King County Assessor's map(s), which shows the location of each property within 500 feet of the proposed work. 3. Two sets of mailing labels for all property owners and tenants (residents and businesses) within 500 feet of the subject property. Note: Each unit in multiple family buildings e.g apartments, condos, trailer parks must be included. 4. Vicinity map with site location 5. A written discussion of the project consistency with decision criteria (See Application). Check with a planner if you are unsure of what criteria to apply to your project. 6. If additional impervious surface is proposed provide a Technical Information Report (TIR) including feasibility analysis per King County Surface Water Design Manual (KCSWDM). 7. Provide sensitive area studies as needed per Tukwila's Sensitive Areas Ordinance (TMC 18.45). Provide a geotechnical analysis of river bank stability if alteration is proposed. 8. Landscaping planting plan by a Washington State licensed landscape architect. One set of all plans and analyses shall have the original Washington State registered Landscape 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665 Architect stamp and signature. Plans must include the type, quantity, spacing and location of all plantings. Maximum size 24" by 36 ". a. Show all existing trees to be retained and any tree protection measures required (for example fencing at drip lines). b. Location of all sensitive areas (e.g. streams, wetlands, slopes over 15 percent, coal mine areas and important geological and archaeological sites). For stream frontage provide existing and proposed top of stream bank, stream bank toe, stream mean high water mark, and base flood elevation (i.e. 100 year flood plain). Maximum size is 24 inches by 36 inches. c. Location of all required sensitive area buffers, setback tracts and protection measures. d. Show all trees over four inch caliper, indicating those to be retained. 9. One set of all civil plans and analyses shall be stamped, signed and dated by a licensed professional engineer. Include a graphic scale and north arrow. Maximum size is 24 inches by 36 inches. a. Vertical datum NAVD 1988 and horizontal datum NAD 83/91. Conversion calculations to NGVD 1929, if in a flood zone or flood -prone area. b. Existing (dashed) and proposed (solid) topography at 2 inch intervals. c. Construction limit lines, areas of clearing/grading /filling and volume and type of expected cut and fill. d. Existing and proposed utility easements and improvements, on site in street (water, sewer, power, natural gas, telephone, cable). Schematic designs to be provided regardless of purveyor. No capacity calculations, invert depth, valve locations, or the like are needed. e. If additional impervious surface is proposed provide a storm drainage design at least 90 percent complete, which meets TIR and KCSWDM. Include all storm drainage maintenance access and safety features. Call out total existing and proposed impervious surface in square feet. f. Show the 100 year flood plain boundary and elevation as shown on FEMA maps. g. Footprints of all existing and proposed buildings. h. Fences, rockeries, and retaining walls. 10. Shoreline site map showing the following a. Existing and top of bank, landward catch point toe of levee, riverbank toe, mean high water mark and base flood elevation. b. For work riverward of the mean high water mark show the distance the work extends into the river and distance to Federal projects and navigation channels. c. If the project is within the Tukwila shoreline master program show the limitis of the 40 foot river, 100 foot low impacts and 200 foot high impact environments. d. Dike /riverbank maintenance easements if applclable. e. Public access and/or trails. f. Construction limit lines, areas of clearing /grading /filling g. Parking lots, loading service areas. h. Street furniture such as benches and bike racks. 11. Shoreline Cross Sections showing the following: a. Provide shoreline cross sections at a maximum 75 feet intervals along the project river site. b. Show all existing and proposed improvements. c. If the project is within the Tukwila Shoreline Master Program show the limit of the 40 -foot river, 100 -foot low impact, and 200 -foot high impact environments. d. Existing top of bank, landward catch point toe of levee, riverbank toe, mean high water mark and base flood elevation. Please note that the Department shall cancel an incomplete application if the applicant fails to submit the requested information within 90 -days following notification from the Department that the application is incomplete. The Department may extend up to 120 days if the applicant submits a written request for an extension prior to cancellation. The request must clearly, demonstrate that the delay is due to circumstances beyond the applicant's control (such as the need for seasonal wetland data) or unusual circumstance not typically faced by other applicants, and that a good faith effort has been made to provide the requested materials (TMC 18.104.070). Once the above - mentioned information is provided, City staff can begin to review the application. If you have any questions, please feel free to call me at (206) 431 -3684 or you can email me at bmiles @ci.tukwila.wa.us. randon J. Miles Assistant Planner cc. Nora Gierloff, Planning Supervisor File (L05 -053) August 24, 2005 TDK:maf • City of Tukwila Dept. of Community Development 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 Re: File Numbers - L05 -053 Shoreline Permit, E05 -001 (SEPA) 10" Water Main Installation from Interurban Ave. S. to Andover Park E. To Whom It May Concern: Thank you for the opportunity to review the Shoreline permit and the SEPA checklist on the above - referenced project. We have no comments at this time and wish you good luck with this endeavor. Sincerely, Thomas D. Keown, P.E. Construction /Operations Manager • rfEcoveo AUG 25 20 QE°F o M Ty �i-- 4- 4- N „',- Serving the Southwest Metropolitan Area since 1946 23828 - 30th Ave. S. • P.O. Box 3867 • Kent, WA 98032 • (206) 824 -0375 / FAX: (206) 824 -0806 • City of Tukwila Department of Community Development Steve Lancaster, Director The following applications have been submitted to the City of Tukwila Department of Community Development: PROPOSAL: The project involves construction of a 10 inch water main from Interurban Avenue South to Andover Park East (approximately 1900 linear feet). APPLICANT: City of Tukwila, Public Works. LOCATION: NOTICE OF APPLICATION DATED AUGUST 19, 2005 FILE NUMBERS: L05 -053 (Shoreline permit), E05 -001 (SEPA) • Steven M. Mullet, Mayor The project is located along South Grady Way to Southcenter Boulevard to Andover Park East. The water line will be attached to the existing bridge over the Green River and will be underneath a paved trail along the river. These files can be reviewed at the Department of Community Development, 6300 Southcenter Blvd., #100, Tukwila, WA. Please call (206) 431 -3670 to ensure that the file(s) will be available. OPPORTUNITY FOR PUBLIC COMMENT You can submit comments on this application. You must submit your comments in writing to the Department of Community Development. Comments regarding the State Environmental Protection Act Permit (E05 -001) are due by 5:00 p.m. on September 2, 2005 and comments regarding the Shoreline Permit (L05 -053) are due by 5:00 p.m. on September 19, 2005. If you have questions about this proposal contact Minnie Dhaliwal, the Planner in charge of this file, at (206) 431 -3685. Anyone who submits written comments will become parties of record and will be notified of any decision on this project. APPEALS You may request a copy of any decision on this project or obtain information on your appeal rights by contacting the Department of Community Development at 206 -431 -3670. Decision related to the Shoreline is made by the Director of Community Development and may be appealed to the State Shorelines Hearing Board. The Department will provide you with information on appeals if you are interested. 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665 Dept. Of Community Development i ity Of Tukwila : °"' AFFIDAVIT 1 DISTRIBUTION . . . ti, w4; Pt' c, I, HEREBY DECLARE THAT: (/0(tet 4- Notice of Public Hearing Determination of. Non - Significance • Notice of Public Meeting Mitigated Determination of'Non- Significance" Board of Adjustment Agenda Pkt Determination':of Significance & Scoping Notice Board of Appeals Agenda Pkt Notice of Action • l Planning Commission Agenda Pkt Official Notice Subdivision Agenda y,, Short Notice of Application. Shoreline Mgmt Permit Notice of Application ; fbr - Shoreline:,Mgmt Permit - , - ,,,;:} __ FAX To Seattle Times Classifieds Gail Muller Classifieds PO Box 70 - Seattle WA 98111 Other �k ;.;, g ` f: Was mailed to each of the addresses listed on this I, `''`: day o year 20 P:GINAWYNETTA/FORMS /AFFIDAVIT -MAIL 08/29/003:31 PM Project Name: Tait-w; ca Project Number: r O('14�3 05— ( w D. & Mailer's Signature: ,� D Person requesting mailing: Dif-2a,6t.,D4 1 �t FOR STAFF USE ONLY Sierra Type: P -SHORE Planner: File Number: LO C— — o 3 Application Complete (Date: ) Project File Number: Application Incomplete (Date: ) Other File Numbers: APPLICATION NAME OF PROJECT/DEVELOPMENT: s ( ") " 12 PL A -->- T LOCATION OF PROJECT/DEVELOPMENT: Give street address or, if vacant, indicate lot(s), block and subdivision, access street, and nearest intersection. LIST ALL 10 DIGIT PARCEL NUMBERS. 4 7 a a r'os e SO.li�1Cy - "v: i r. IC?; LUt� i v.. L Ma k r r'A2 Quarter: 5 L.' Section: 2y Township: Z 3a Range: 4 / E -7- 273 -z 3 N G} C (This information may be found on your tax statement.) DEVELOPMENT COORDINATOR : The individual who: • has decision making authority on behalf of the applicant in meetings with City staff, • has full responsibility for identifying and satisfying all relevant and sometimes overlapping development standards, and • is the primary contact with the City, to whom all notices and reports will be sent. ill IL 144C- r G v5 rc� — Name: Address: S S Li n4 C -re-Z , 2 Lvr-� s i IUv Phone: ' 7 - 4 4 . 4 1 3 / 2 E -mail: feusg-14- tvecal,A w Li Signature: G:\APPHAN\LANDUSE. APP\SHORLINE.DOC, 09/11/03 ilk F,4 n' 1 CITY OF TUKWILA SHORELINE Department of Community DevelopmRi F c r' 7r) n 6300 Southcenter Boulevard, Tukwila, WA 98188 PERMIT Telephone: (206) 431 -3670 FAX (206) 431 -36AUG 1 2005 E -mail: tukplan @ci.tukwila.wa.us COMMUNITY DEVELOPMENT 13 ✓V . c_..A; r ri . TLS T�� FAX: -G - c/ — 3 L C- Date: Z / /S10s A i4 rZ lz- (.✓1 L • • Response to 18.44.110 General Shoreline Regulations for the installation of the water line from SW Grady Way to Andover Park East 1. The use is in conformance with the regulations of the underlying zone district. The installation of the water line is in conformance with the regulations of the underlying zone district. 2. The use does not conflict with the goals and policies of the shoreline master program or the provisions of the Shoreline Act and shoreline regulations. The installation of the water line is not in conflict with the goals and policies of the shoreline master program or provisions of the shoreline act and shoreline regulations. 3. No structures or accessory facilities shall be located over the river unless such structure protects or promotes the public interest. The installation of the water line under the existing bridge and m the river dike protects and promotes the public interest by providing domestic and fire water to the people of Tukwila. 4. There shall be no disruption of existing trees or vegetation within the river environment unless necessary for public safety or flood control, or if allowed as a part of an approved shoreline substantial development permit. The water line will be installed in paved or landscaped areas only. After the line is installed, the areas will be restored to the original condition. The project will obtain all State and federal permits for installation of the water line. 5. No effluent shall be discharged into the Green River which exceeds the water quality classification as established by the State for the adjacent portion of the river. The project will not discharge effluents into the Green River. The line will carry domestic water. 6. All State and federal water quality regulations shall be strictly complied with. The project will comply with all State and federal water quality regulations. 7. Wildlife habitat in and along the river should be protected. The project will protect all wildlife habitat in and along the river during the installation of the water line. 8. All perimeters of landfills or other land forms susceptible to erosion shall be provided with vegetation, retaining walls or other satisfactory mechanisms for erosion prevention. The project will provide erosion control during the installation of the water line. The plan will prevent sediments from entering the Green River. Response to Shoreline Regulations Page 2 • • 9. All necessary permits shall be obtained from federal, State, County or municipal agencies. The project will obtain all necessary permits from federal, State, County and municipal agencies. 10. Dredging for purposes other than for navigational improvements or flood control is prohibited. The project will not be doing any dredging for the installation of the water line. 11. Mining is prohibited along the river shoreline. The project will not be doing any mining along the riverbank for the installation of the water line. 12. Solid waste disposal is prohibited along the river shoreline. No solid waste will be disposed of in the shoreline area during the installation of the water line. 13. No property will be acquired for public use without dedication by or just compensation to the owner. The water line will be installed in existing right -of -ways and easements. No property will be acquired. 14. Landfilling is prohibited within the river channel unless such landfill is determined by the Planning Commission to protect or promote the public interest. No landfill will be installed during installation of the water line. 15. Notwithstanding any provisions of this Code to the contrary, removal of any cottonwood tree within the river environment or the low- impact environment, which tree is 12 inches or greater in diameter as measured 4.5 feet above grade, shall be - subject to the requirements of TMC Chapter 18.54, Tree Regulations. No cottonwood trees will be removed for the installation of the water line. If any trees are disturbed, they will be replaced in kind and size. (Laurie Admin/Mike /Response to General Shoreline Regulations) 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 EXISTING ABUTMENT PENETRATION @ 32.69 PROPOSED WATER. LINE SUSPENDED FROM BRIDGE ELEV. OF WATER LINE VARIES EXISITING 25' STEEL SLEEVE IN ABUTMENT inn natAr■ ELEV 10.70r SCALE 1''=10 SECTION AT EAST SIDE OF BRIE)GE LOOKING NORTH U 1 1-11 =1 PI 11 1G v g tifil - - Ai* gRariga WENR1 kirgaligggigro ORDINARY HIGH WATFR W=S=IFWo d llwii _ AREISIZI ,figmainnaormarinamigengsmir SOUTHCENTER BLVD, WATER MAIN REPLACEMENT SHORE LINE SECTIONS JULY 2005 BY M. CUSICK 350505 5 .3953 3A 3 510359 005 689 50 pueig JeuolleNN, 3,365005 3053 5133165 DO L 590 55 360005 .3060353513206905 90.51. 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 6 2 4 ' -111-1L1=111=1 rilli=1 1 1 iz 1 ABUTMENT SOUTHCENTER ... .• 11TrETBLYD BRIDGE ----r- • • ... q '. .. . • 1 iiE 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 EXISTING ABUTMENT PENETRATION @ 32.69 PROPOSED WATER. LINE SUSPENDED FROM BRIDGE ELEV. OF WATER LINE VARIES EXISITING 25' STEEL SLEEVE IN ABUTMENT inn natAr■ ELEV 10.70r SCALE 1''=10 SECTION AT EAST SIDE OF BRIE)GE LOOKING NORTH U 1 1-11 =1 PI 11 1G v g tifil - - Ai* gRariga WENR1 kirgaligggigro ORDINARY HIGH WATFR W=S=IFWo d llwii _ AREISIZI ,figmainnaormarinamigengsmir SOUTHCENTER BLVD, WATER MAIN REPLACEMENT SHORE LINE SECTIONS JULY 2005 BY M. CUSICK 350505 5 .3953 3A 3 510359 005 689 50 pueig JeuolleNN, 3,365005 3053 5133165 DO L 590 55 360005 .3060353513206905 90.51. 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 6 2 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 30 28 26 24 22 20 18 16 14 12 10 8 EXISTING ABUTMENT PENETRATION @ 40.60 ABUTMENT SOUTHCENT SCALE 1' =10' 13' AC TRAIL ABUTMENT I -405 11' AC TRAIL BRIDGE SCALE 1' =10' PROPOSED WATER LRNE SUSPENDED FROM BRIDGE 36 34 12' -4 3/4' MIN. CLEARANCE BETWEEN BRIDGE AND TRAIL 32 WATER TENCH SECTION 30 SECTION AT WEST SIDAE OF BRIDGE LOOKING NORTH WATER TRENCH SECTION 28 ORDINARY HIGH WATER 24 ELEV 10.70' 22 20 18 16 GREEN RIVER 12 30 28 26 24 22 20 18 16 ORDINARY H G WATEI ♦ � 2 GREEN RIVER 10 8 10 8 4 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 SCALE V =10' SECTION ATREAST SIDE OF BRIDGE 36 34 32 EAST ABUTMENT 3 SOUVHCENTER BLVD, 28 26 24 22 20 18 16 14 12 10 c.u1951 S CE] (ZL81) '4V 41)1 Vd ZI 1NOM Spry (1 913 •O. . 1. 1 P Ir)vd• 1' )_ 1YI N3SOONI SPAR o9 9 9 }O]'jftog ir 55 3 3 ''._ . • , ? I ' 1 9nww0P; Olt §.aliv6; Y6` ` O ~d •Q A1?J►7U •'! er • 1;MN31d1SL3 0 J)- . y a30 - • ✓•: : 11 DESIGNED DRAWN CHECKED PROJ. ENG. CITY OF TU <WILA S .0 Re 6 " 23 . / Re ((4 / / f p 3 8 MATCHLINE - SEE SHEET 3 PST LIC W :�� a . DEPT. — ENGINEERING — STREETS — WATER— SEWER— PARKS— BUILDING— s /M /?. 23 2y . CEAY j? • e � 9k Y N 1) / CAy WS J i e 2. 00 , s ,, • /6 0 3 8 SOUTHCENTER BLVD. WATER MAIN REPLACEME \T DE S IGNE D CITY OF TUKWILA THIS BOUNDARY AND TOPOGRAPHIC SURVEY WAS DONE WITHOUTH THE BENEFIT OF A CURRENT TITLE REPORT. EASEMENTS MAY EXISTS THAT ARE NOT SHOWN ON THIS SURVEY NOTE: LEGAL DESCRIPTIONS FOR INDMDUAL PARCELS CONSOLIDATED IN THE BOUNDARY SHOWN HEREON HAVE NOT BEEN SHOWN ON THIS SURVEY. BOUNDARY AND RIGHT -OF -WAY INFORMATION SHOWN HEREON IS BASED UPON MONUMENTED POSITIONS AND RECORD INFORMATION. REFERENCE SURVEYS: RECORD OF SURVEY AT PAGE 7, PAGE 229 PLAT OF ADAMS HOME TRACTS PLAT OF CHERRY LANE RECORD OF SURVEY AT PAGE 22, PAGE 30 PLAT OF CLARK'S GARDEN ADDR7ON RECORD OF SURVEY AT PAGE 148, PAGE 179 RECORD OF SURVEY AT PAGE 89, PAGE 197 RECORD OF SURVEY AT PAGE 15, PAGE 12 RECORD OF SURVEY AT PAGE 29, PAGE 58 ALL RECORDS OF KING COUNTY, STATE OF WASHINGTON. HORIZONTAL DATUM: WASHINGTON STATE PLAN COORDINATE SYSTEM, NORTH ZONE (NAD 83/91). USED CITY OF TUKWILA POINTS AS SHOWN. COORDINATES SHOWN HEREON HAVE BEEN CONVERTED TO GROUND COORDINATES TO CONVERT BACK TO GRID COORDINATES SUPPUED BY THE CITY MULTIPLY BY THE FOLLOWING COMBINED GRID SCALE FACTOR OF: 0.99999393 TO THE GROUND COORDINATE COORDINATES SHOWN BELOW WERE USED AND SUPPUED BY THE CITY. GROUND COORDINATE VALUES: 1925 40005 40004 176392.1951 176336.4310 177258.7421 176077.0799 1281054.2216 1282378.8787 1281852.9789 1281492.2427 GRID COORDINATE VALUES: 1925 176391.1242 1281046.4445 1 176335.3605 1282371.0936 40005 177257.6660 1281845.1970 40004 176076.0110 1281484.4630 VERTICAL DATUM: USED CITY OF TUKWILA VERTICAL DATUM (MVO 88) BENCHMARKS USED & PROVIDED BY THE CITY OF TUKWILA USED BENCHMARK NO. 67; EL =358.47 FEET SUBSTRUCTURE NOTE: BURIED UTILITIES ARE SHOWN AS INDICATED ON RECORDS MAPS FURNISHED BY OTHERS AND VERIFIED WHERE POSSIBLE BY FEATURES LOCATED IN THE FIELD. WE ASSUME NO UABIUTY FOR THE ACCURACY FOR THE FINAL LOCATION OF EXISTING U77U77E5 IN AREAS CR/I7CAL TO OF THOSE RECORDS. DESIGN CONTACT THE UTILITY OWNER /AGENCY. SETBACKS: CURRENT SETBACK REOUIREMENTS SUBJECT TO SITE PLAN REVIEW. CURRENT SETBACKS MAY DIFFER FROM THOSE IN EFFECT DURING DESIGN /CONSTRUCTION OF EXISTING IMPROVEMENTS. FLOOD ZONE: THIS SITE APPEARS ON NATIONAL FLOOD INSURANCE RATE MAP, DATED 05/16/95 COMMUNITY PANEL NO. 53033C0960F, AND I5 SITUATED IN ZONE ') AREA DETERMINED TO BE OUTSIDE 500 -YEAR FLOODPLAIN. PUBLIC WORKS DEPTO — ENGINEERING — STREETS — WATER— SEWER— PARKS— BUILDING 324.1072 FD MON IN CASE INT. OF S. 144th ST & 37th AVE S 288.7576 FD MON IN CASE 1/4 COR 283.4500 FD COT PK 71M 308.5800 FD COT PK BM" 324.1072 fD MON IN CASE INT. OF S. 144th ST & 37th AVE 5 288.7576 FD MON IN CASE 1/4 COR 283.4500 FD COT PK BM" 308.5800 fD COT PK BM" DRAWN CHECKED PROJ. ENG. PROJ. DIR. SITE SANITARY SEWER CITY OF TUKWILA 6300 SOUTHCENTER BLVD DEPARTMENT OF PUBLIC WORKS TUKWILA WA 98188 PH /206) 433 -0179 FAX / (206) 433 -3665 WATER CITY OF TUKWILA 6300 SOUTHCENTER BLVD DEPARTMENT OF PUBLIC WORKS TUKWILA, WA 98188 PH / 206) 433 -0179 FAX / (206) 433 -3665 NATURAL GAS PUGET SOUND ENERGY MUNICIPAL CONSSRRUCTION PLANNING DEPARTMENT P.O. BOX 90868 - MAIL STOP: TAC-ANX BELLEVUE, WA 98009 -0868 PH / 1 -888- 225 -5773, EX1 . 89 -6304 CONTACT: ANDY PADVORAC SHEET INDEX 1 COVER SHEET 2 WATER PLAN 3 WATER PLAN 4 WATER PLAN 5 WATER PLAN 6 WATER PLAN VICINITY MAP NOT TO SCALE STORM DRAINAGE CITY OF TUKWILA 6300 SOUTHCENTER BLVD DEPARTMENT OF PUBUC WORKS TUKKILA WA 98188 PH / (206) 433 -0179 FAX / (206) 433 -3665 POWER PUGET SOUND ENERGY MUNICIPAL CONISIRUC71ON PLANNING DEPARTMENT P.O. BOX 90868 - MAIL STOP: TAC —ANX BELLEVUE, WA 98009 -0868 PH / 1- 888 - 225 -5773, EXT. 89 -6304 CONTACT: ANDY PADVORAC TELEPHONE US WEST COMMUNICATIONS 1 (800) 244 -111 SOUTHCENTER BLVD. WATER MAIN REPLACENEN GUARD RA RIGHT OF CENTER L I FOG UNE ilia lira ASPHALT GRAVEL CONCRETE RETAINING FLOW UNL — W— UNDERGRI — SS — UNDERGRI —SD— UNDERGRI —G(L)— UNDERGRI —TL— OVERHEAL —P(L)— UNDERGRI — PO— OVERHEAL FENCE CULVERT C 'Q ROCKS VEGETA77L FOUND M TRAFf1C SEWER M LIGHT PC WATER V. POWER V CABLE 11 GAS MET FIRE HYL f7RE DEF TRAFFIC WATER V POST LNL GAS VALI CATCH B WATER M YARD LIL TELEPHO TELEPHO POWER I GUY CATCH E HANDIC4 HAND HI YARD OF BLOW -0 P£DL5UI fl OVERHE/ O DECIDUO • CONIFER CD SHRUB HAND H CPP CORRIGA RCP REINFOR 0 0 P EX. C8 TOP.33.34 IE =28.24 1i' OUT IE =28.44 8 STEEL EX. CB TOP=33.6 IE =31.50 8' STEEL ER PARK EA TOP. -53.05 4 ' EX. CB TOP -24.37 IE =17.67 6' CLAY DESIGNED DRAWN CHECKED CITY OF TUKWILA U LIC W DEPT. — ENGIN EERING — STREETS — WATER SEWER— PARKS— BUILDING— ! y (NJ a .' �SFJ � F 7S 8 , s s • Os MATCHLINE - SEE SHEET PROJ. E NG. W.. 76'• 03 7 B 0 4 4 ; Q4k /NJ/ • N FJ /. F 2 3 6 6, 10. 1.25. �3 SOUTHCENTER BLVD. WATFR KA A I NI RFPI o r AFNIT W W U) W W (I) w z J U DESIGNED DRAWN CHECKED PROJ. ENG. CITY OF TU 'K WI LA TOP=47.5O IE =45.50 t2 RCP SE IE=46.20 12' PE N PUBLIC WO DE T. - ENGINEERING - STREETS - WATER- SEWER- PARKS - BUILDING- PROD. DIR. M ATCHLINE - SEE SHEET 5 10 ! -BEAMS EQUAL SPACED SOUTHCENTER BLVD. WATER VAIN REPLACEVE\ li • SECTION DETAIL A -A, B- N 172317.6751 E 290193.6515 WALL END N 172444. 4'9 E 12903920264 VIEW C OUT WALL tN N 17 7 . .E. 129020 • SC )JTHCEIJTER • B OUT IE EL. 37.90 N 172348.9758 E 1290251.6985 IE 32.69 1.5' DIA W E 12438.2040 1 E 1290395.9352 WALL END 46 RELOCATE STREET UGHT NAND BOX AS REOURRED FOR INSTAWTION OF WATER MNN ROTECT STREET LIGHT DURING 04STALLATION OF WATER UNE A A VIEW A END SUSPENDED PIPE AT ABUTMENT /'• SEE DETAIL ON SHEET OZION rt�=i 4;S • tP''4 Aj D TRAIL OVERLAY DETAIL PLAN VIEW FACING EAST N.F.S. BEAM ( T(P.J FOR CONFIGURATION SECTION DETAIL D -D (FACING EAST) N. T.S. U t' LIC WORKS DEPT. 18' KNOCKOUT IE EL. 32.89 N 172411.6203 E 12903502988 VIEW B BEGIN SUSPENDED PIP O9ANNT (2) 10" FLANGE WELDED TO PIPE 10' EX —TEND 200 SERIES f 210F1 FROM EBBA IRON. INC. AV Aft / 41 77: 4 c 1 2.07' 70" DIA PIPE W /IN 12" HOLE Nut CENTERED. IE ELEV. 40.60 U I —&EAM` EOUAL SPACED EX. C8 T0P =34.43 EX. C8 TOP =33.44 IE =27.74 12' RCP E IE =27.84 12' RCP W 0.25' CHAMFER TYP. \- 10' DIA. PIPE W /IN 12" HULE NOf CENTERED /E ELEV. 30.77 CITY OF TUKWILA REVISED SPOT ELEVATIONS ADDED SHEET INDEX. SECTION DETAIL C -C (FACING WEST) N. T.S. DETAIL PLAN VIEW FACING WEST N. T. S. W W W i1) W Z_ J I- - ��+±f.134ffiR- 0 10 20 SCALE: 1 " =20' OBSERVATIJN FROM SINGLE S TATION. COO' DINATE S ARE ONLY APPROX MATE AND SHOULD BE VERIFIED BEFORE CONSTRUCTION 40 is* DE S IGNE D DRAWN CHECKED PROJ. ENG. CITY OF TUKWILA I 20.10 I 0.05 S f 18 RCP 18 RCP EX. CB TOP=24.93 IE =21.73 12' RCP W IE =21.73 12' RCP E EX. CB TOP =28.24 IE =21.54 18' RCP NW IE =21.54 18' RCP SE TOP=25.79 CROSSWALK X. SIMI TOP=33.34 IE =15.64 18' RCP MN IE =16.04 18' RCP E TOP=26.11 EX. CB TOP=25.40 IE =21.80 18' RCP W IE =21.60 18' RCP E X. CB TOP=24.90 1E -21.10 18' RCP E IE =21.20 18' RCP W EX. CB TOP=24.92 IE =20.82 18' RCP N IEa20.82 18' RCP W IE =21.42 12' RCP E 26 /S /C N PiJBY.IC WO DEPTO - ENGINEERING - STREETS - WATER- SEWER- PARKS - BUILDING- EX. CB TOP=25.62 EX, SOl84 TO'=33.45 IE =16.05 18' RCP W IE=16.25 18' RCP S IE =24.43 TEE MJ X FL VALVE SOUTHCENTER BLVD. WATER MAIN REPLACEMEN - r F 0 sc CONTACTS TIME WARNER TELECOM Fred Luco 223 Taylor Ave. N. Seattle, Washington 98109 206.676.8066 (Office) 206.459.7180 (Mobile) TURNKEY TELECOM Jeff Smith 22011 Paradise Lake Road Snohomish, Washington 98296 360.668.9329 (Fax) 206.947.6785 (Mobile) turnkeytelecom ®msn.com SITE INDEX 1/23 — COVER SHEET /PROJECT LOCATION 2 -20/23 — PLAN VIEW A — S 21/23 — PLAN VIEW OF 1ST & 2ND FLOOR 22/23 — SITE PHOTOGRAPHS 23/23 — STANDARD DETAILS AND SPECIFICATIONS TIME WARNER . TELECOM WER D `,° I _ ,'C'[I SITE LOCATION CORRECTION %SON LTR# e6007° 054. V a) a 0 L 0 -0 c 1 0 c 4 0) 0 H cn z N 0 CO 0 0 o . O ao v I O 1— Q. Q � a) CI 2 47 0 0 CD O N co .. U 0 LO CL fD Sheet: 1/23 Ygnition - 565 Andover Park West CB NEW TWTC • AUA WATERUNE CONSTRUCTION ENDS HERE CONSTRUCTION NOTES: O INSTALL (1) 444LA MANHOLE PER DETAIL ON SHEET 23/23. LEAVE 100' OF (1) 144CT FIBER CABLE STORAGE. O TRENCH UNDER GRASS AREA PER DETAIL ON SHEET 23/23. INSTALL (4) 1 1/4 "0 HDPE CONDUITS WITH (1) 144CT FIBER CABLE. ® PULL (1) 24CT FIBER CABLE THROUGH EXISTNG MANHOLE /HANDHOLE AND LEAVE 100' OF (1) 144CT FIBER CABLE STORAGE. PLAN VIEW M SL „ Z W O CORE (1) 4 1/2 "0 HOLE THROUGH CONCRETE WALL OF EXISTING MANHOLE /HANDHOLE PER DETAIL ON SHEET 23/23. USE (1) 4 "0 SLEEVE AND WEATHERSEAL. PULL (1) 144CT FIBER CABLE THROUGH. ® PULL (1) 1 1/4 "0 INNERDUCT WITH (1) 144CT FIBER CABLE THROUGH EXISTING 4 "0 CONDUIT. O INTERCEPT EXISTING 4 "0 AUA WATERLINE CONDUIT AND EXTEND TO PROPOSED 444LA VAULT. bcp OMNI MIME 7 /W MVO galn * EXISTING UTILITIES -- EXISTING UTILITIES SHOWN ON THE PLANS HAVE BEEN PLOTTED FROM THE BEST INFOMATION AVAILABLE TO THE DESIGNER. ACCURACY AND COMPLETENESS ARE NOT GUARANTEED. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO LOCATE ANY EXISTING UTILITIES, WHICH MAY CONFLICT WITH THE CONTRACTOR'S OPERATION, WHETHER SHOWN ON THE PLANS OR NOT. CALL THE UTILITIES UNDERGROUND LOCATION CENTER AT 1.800.424.5555. ® PULL (3) 1 1/4 INNERDUCTS WITH (1) 144CT FIBER CABLE THROUGH EXISTING 4 "0 TIME WARNER TELECOM DUCT PLACED BY UNDERGROUND CONTRACTOR IN ALIA WATERLINE CONSTRUCTION. MIN O PULL (1) 144CT FIBER CABLE THROUGH EXISTING (1) 3030LA (30"X30 "X36") HANDHOLE PLACED BY UNDERGROUND CONTRACTOR. - EL Mr/ .I tD MINIM ■ NEW TWTC POWER '® WATER ® S ORM ® PROPOSED N. O co O O iti o o v cc , I \ v I O • H eL • 7 N cp Co O N CO LO • LO CL ce z CO E C O O O U U O ) N C.) 0 W tL V O I CO O TL.IP.N WKLY CD O Sheet: 14/23 so so CB \ 5• CONSTRUCTION NOTES: ® PULL (3) 1 1/4 '0 INNERDUCTS WITH (1) 144CT FIBER CABLE THROUGH EXISTING 4 "0 TIME'. WARNER TELECOM DUCT PLACED BY UNDERGROUND CONTRACTOR, IN ALIA WATERLINE. CONSTRUCTION. PLAN VIEW N * EXISTING UTILITIES -- EXISTING' UTILITIES SHOWN ON THE PLANS HAVE BEEN PLOTTED FROMi THE BEST' INFOMATION! AVAILABLE' TO' THE DESIGNER. ACCURACY AND COMPLETENESS ARE NOT GUARANTEED. IT SHALL BE, THE CONTRACTOR'S RESPONSIBILITY TO LOCATE ANY EXISTING' UTILITIES, WHICH' MAY CONFLICT WITH THE CONTRACTOR'S OPERATION, WHETHER SHOWN' ON THE PLANS OR NOT CALL THE UTILITIES' UNDERGROUND LOCATION CENTER' AT 11.800.424.5555. POWER e' WATER STOR :• PROPOSED' ai' o, 11 crc N > C , C V) al Li 'CT) 0 JI 0 01 vi 051 > o' CI! Z N I ' N' C' C 0! 0 : 7, .i U' 0 JI 0 !w a (f) La La (00 I JI TURN ` KEY I Sheet: 15/23 1 . ' PLAN VIEW 0 CONSTRUCTION NOTES: ® PULL (3) 1 1/4 "0 INNERDUCTS WITH (1) 144CT FIBER CABLE THROUGH EXISTING 4 "0 TIME WARNER TELECOM DUCT PLACED BY UNDERGROUND CONTRACTOR IN ALIA WATERLINE CONSTRUCTION. * EXISTING UTILITIES -- EXISTING UTILITIES SHOWN ON THE PLANS HAVE BEEN PLOTTED FROM THE BEST INFOMATION AVAILABLE TO THE DESIGNER. ACCURACY AND COMPLETENESS ARE NOT GUARANTEED. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO LOCATE ANY EXISTING UTILITIES, WHICH MAY CONFLICT WITH THE CONTRACTOR'S OPERATION, WHETHER SHOWN ON THE PLANS OR NOT. CALL THE UTILITIES UNDERGROUND LOCATION CENTER AT 1.800.424.5555. POWER ®® WATER 4 :7 1 561 S - 0RM PROPOSED 0 U II N N O co O O 0 0 r-. CO O CD O t LL ID N. f0 O TURN KEY t I i i Sheet: 16/23 1 1 CONSTRUCTION NOTES: ® PULL (3) 1 1/4 "0 INNERDUCTS WITH (1) 144CT FIBER CABLE THROUGH EXISTING 4 "0 TIME WARNER TELECOM DUCT PLACED BY UNDERGROUND CONTRACTOR IN ALIA WATERUNE CONSTRUCTION. ® PULL (1) 144CT FIBER CABLE THROUGH EXISTING (1) 3030LA (30"X30"X36 ") HANDHOLE PLACED BY UNDERGROUND CONTRACTOR. ® INSTALL (1) 4 "0 RIGID STEEL CONDUIT AND ATTACH TO BRIDGE WITH TWO —HOLE CLAMPS AS NEEDED. SEE BRIDGE ATTACHMENT DETAIL ON SHEETS S1 TO S3. PLAN VIEW P * EXISTING UTILITIES -- EXISTING UTILITIES SHOWN ON THE PLANS HAVE BEEN PLOTTED FROM THE BEST INFOMATION AVAILABLE TO THE DESIGNER. ACCURACY AND COMPLETENESS ARE NOT GUARANTEED. IT SHAD_ BE THE CONTRACTOR'S RESPONSIBILITY TO LOCATE ANY EXISTING UTILITIES, WHICH MAY CONFLICT WITH THE CONTRACTOR'S OPERATION, WHETHER SHOWN ON THE PLANS OR NOT. CALL THE UTILITIES UNDERGROUND LOCATION CENTER AT 1.800.424.5555. POWER ®® WATER ��' S70RM e;F� PROPOSED a) re) U 11 co 4. 0 0 Z O Y W N U 0 U c0 0 1 0 (00 0 0 0 TURN R KEY Sheet: 17/23 I PLAN VIEW Q CONSTRUCTION NOTES: PULL (3) 1 1/4 "0 INNERDUCTS' WITH (il) 144CT' FIBER CABLE THROUGH EXISTING 4 "0 TIME WARNER TELECOM' DUCT PLACED BY UNDERGROUND CONTRACTOR IN ALIA WATERLINE CONSTRUCTION. O PULL (1) 144CT FIBER CABLE THROUGH EXISTING (1): 3030LA (30"X30"X36 ") HANDHOLE PLACED BY UNDERGROUND CONTRACTOR, INSTALL (1) 4 "0 RIGID STEEL CONDUIT AND ATTACH TO BRIDGE WITH TWO —HOLE CLAMPS AS NEEDED. SEE BRIDGE ATTACHMENT DETAIL ON SHEETS S1 TO S3. * EXISTING UTILITIES -- EXISTING' UTILITIES. SHOWN ONI THE PLANS HAVE BEEN PLOTTED. FROM THE BEST INFOMATIONI AVAILABLE TO THE DESIGNER, ACCURACY' AND COMPLETENESS ARE NOT GUARANTEED., IT SHALL BE THE CONTRACTOR'S' RESPONSIBILITY TO LOCATE' ANY EXISTING UTILITIES, WHICH MAY CONFLICT WITH THE CONTRACTOR'S OPERATION, WHETHER SHOWN' ON THE PLANS OR NOT. CALL THE UTILITIES' UNDERGROUND' LOCATION CENTER' AT 1.800'.424.555& POWER ®® WATER' PROPOSED oo O 0 0' 00) t0, 0) O ) COI O 6` TURN KEY Sheet:' 1 8/2'31) PLAN VIEW R AUA WATERLINE CONSTRUCTION ENDS HERE CONSTRUCTION NOTES: O INSTALL (1) 444LA MANHOLE PER DETAIL ON SHEET 23/23. LEAVE 100' OF (1) 144CT FIBER CABLE STORAGE. ® BORE/TRENCH UNDER CONCRETE SIDEWALK /GRASS AREA /ASPHALT PAVEMENT AND INSTALL (4) 1 1/4"0 HDPE CONDUITS WITH (1) 144CT FIBER CABLE. NEW TWTC • • • • • •, • SL • • 5 ® PULL (3) 1 1/4 "0 INNERDUCTS WITH (1) 144CT FIBER CABLE THROUGH EXISTING 4 "0 TIME WARNER TELECOM DUCT PLACED BY UNDERGROUND CONTRACTOR IN ALIA WATERLINE CONSTRUCTION. * EXISTING UTILITIES -- EXISTING UTILITIES SHOWN ON THE PLANS HAVE BEEN PLOTTED FROM THE BEST INFOMATION AVAILABLE TO THE DESIGNER. ACCURACY AND COMPLETENESS ARE NOT GUARANTEED. IT SHALL BE THE CONTRACTOR'S RESPONSIBIUTY TO LOCATE ANY EXISTING UTILITIES, WHICH MAY CONFLICT WITH THE CONTRACTOR'S OPERATION, WHETHER SHOWN ON THE PLANS OR NOT. CALL THE UTIUTIES UNDERGROUND LOCATION CENTER AT 1.800.424.5555. 4 POWER �® WATER 1 S ORM • PP PROPOSED 0 a) c LC) LC) 0 0, • r o U II (n ✓ O c v) 0' W . • U a) o J CD 0 c0 ca Lc" C O co O CD O J Sheet: 19/23 ♦ 4 cD GENERAL NOTES THE FOLLOWING NOTES APPLY UNLESS SHOWN OTHERWISE ON THE DRAWINGS BACKGROUND: PURPOSE: INSTALL A 4" STEEL CONDUIT ON BRIDGE ABUTMENT WALL AT PIERS 1 AND 4, AND THE SOFFIT OF THE CAST -IN -PLACE OVERHANG BRIDGE DECK. REFERENCES: • RECORD DRAWINGS FOR SOUTHCENTER BOULEVARD / GREEN RIVER BRIDGE ( WSDOT BRIDGE NO. 001469D) PREPARED BY ENTRANCO DATED FEBRUARY 1993. • PHOTOS FROM MARCH 29, 2007 SITE VISIT. • AREAL PHOTO FROM GOOGLE EARTH CRITERIA: GOVERNING CODE: THE STRUCTURAL CONNECTION HAS BEEN DESIGNED IN ACCORDANCE WITH THE REQUIREMENTS OF THE AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS 3RD EDITION DATED 2004 AND INTERIMS THROUGH 2005. STANDARD: ALL MATERIALS AND WORKMANSHIP SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF THE WASHINGTON STATE DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION, 2006 EDITION AND AMENDMENTS. THE UTILITY CONDUITS SHALL BE LABEL IN ACCORDANCE WITH SECTION 6-01.10. ALL STEEL IN UTILITY SUPPORTS, INCLUDING FASTENINGS AND ANCHORAGES, SHALL BE GALVANIZED IN ACCORDANCE WITH AASHTO M -111 OR M -232 (ASTM Al23 OR A153, RESPECTIVELY). ALL UTILITIES AND UTILITIY SUPPORT SURFACES, INCLUDING ANY GALVANIZED UTILITIES, SHALL BE GIVEN A PRIMER COAT OF STATE STANDARD FORMULA A-6-86 AND TWO COATS OF STATE STANDARD FORMULA C -9 -86. THE FINAL COAT SHALL MATCH THE BRIDGE COLOR. ANY PAINT SPLATTERS SHALL BE REMOVED FROM THE BRIDGE. EXTEND RIGID CONDUIT 10' MINIMUM BEYOND THE BRIDGE STRUCTURE. INSTALL EPDXY ANCHOR BOLT TO CLEAR REINFORCING STEEL IN BRIDGE DECK SOFFIT. USE REBAR SCANNING DEVICE TO LOCATE REBAR BEFORE DRILLING. IF REINFORCING STEEL IS HIT WHEN DRILLING, THE DRILLED HOLE SHALL BE ABANDONED AND FILLED WITH NONSHRINK GROUT CONFORMING TO THE REQUIREMENTS OF SECTION 6-02.3(20). THE DRILLED HOLE SHALL BE MOVED TO CLEAR REINFORCING STEEL. THERE SHALL BE A MINIMUM EDGE DISTANCE OF 3" FROM THE EDGE OF BRIDGE DECK TO THE CENTER OF DRILLED HOLE. VERIFICATION: CONTRACTOR SHALL VERIFY ALL EXISTING AND PROPOSED DIMENSIONS, MEMBER SIZES AND CONDITIONS PRIOR TO FABRICATION AND COMMENCING ANY WORK. NOTIFY THE ENGINEER ABOUT ANY DISCREPANCIES. ALL DIMENSIONS OF EXISTING CONSTRUCTION SHOWN ON THE DRAWINGS ARE INTENDED AS GUIDELINES ONLY AND MUST BE VERIFIED. THE EXISTING CONDITIONS SHOWN ON THE DRAWINGS ARE BASED EITHER SITE OBSERVATION, ORIGINAL DRAWINGS OR WERE ASSUMED BASED ON EXPECTED CONDITIONS. IF THE EXISTING CONDITIONS DO NOT CLOSELY MATCH THE CONDITIONS SHOWN ON THE DRAWINGS, OR IF THE EXISTING MATERIALS ARE OF QUESTIONABLE OR SUBSTANDARD QUALITY, NOTIFY THE ENGINEER PRIOR TO COMMENCING ANY WORK. UTILITY: CONDUIT ASSEMBLY SHALL BE IN ACCORDANCE TO THE FOLLOWINGS: METAL FRAMING UNISTRUT OR APPROVED EQUAL ANCHOR BOLT HILTI HVA ADHESIVE ANCHOR SYSTEM OR APPROVED EQUAL CONDUIT 4" DIAMETER RIGID GALVANIZED STEEL CONDUIT (SCHEDULE 40) JUNCTION BOX NEMA 4 OR BETTER DESIGNED BY D.C. ONG DRAWN BY D.C. ONG DATE 0430 =2007 CIVILTECH ENGINEERING VICINITY MAP STRUCTURAL NAME: SOUTHCENTER BLVD / GREEN RIVER BRIDGE WSDOT BRIDGE NO: 0014269D CITY NO: 1320 OWNER: CITY OF TUKWILA DESCRIPTION: 3 SPANS TOTALLING 245' (PC GIRDER W/ CIP DECK) YEAR BUILT: 1994 10800 NE 8 Street Suite 820 Bellevue, WA 98004 Phone: 425.453.6488 Fax: 425.453.5848 GENERAL NOTES & VICINITY MAP TIME WARNER 4" COMMUNICATION CONDUIT SOUTHCENTER BLVD /GREEN RIVER BRIDGE TUKWILA, WASHINGTON JOB NO. 27012 3HT NO. S -1 0 0 0 0 0 i; -0 2 L7. 0 ce 0 m 0 0 ..••• - 2 LT 2 a) x .exist. ;Voter .The Pe m _ " 2"`" 6 Luirvincire / To Rermoirl ,/ // E.Aisf--. &Lined Telep. To ate Rslocorect • Exist 7 - 00 Bar ro ,• 4z/ "Pia •,' 116" TW J / Z. • " ,/ ... • ,a,c. • ...r_- Pr..r ii•steg. rex ' Q g' 40 ,, ,PV , E iv , 1T / C • • /, /,/ " '/. N.GUD. I92s , r-is1 s, • Type ' TO ge W is1E4k ! Ek.v. ao.00 • r- R_VC roc oF F / — y + - 7 - 1 7; 7 ( / 7 1 Sre:Leq,a7 / Ar \ P o " ^or' / - _ / • -1 1 • i • , , ---4 , . ‘ 20: re.i..P.°;,///•::://‘ it HAND/ TOLE Pq ‘27"18"1 •••' • •"/ " /// C -74e a'o prated Sift • Ernbeded anci Ferrel aroijind .5c3 Line - atiaXaatd 1 , r. .E=!P i 1 h ti c .LINEISOL17:-.1C BLVD.) 3b/ 130r:r)g / I C. ,;• I a / / • ; ,••••,, 1, ) • SiOn . 77 11 01 . 1 :FL?' STC1147, •••-, 1 • / 1 / •' : 1 • • / Reference Loa Elev. 1 $ LA memramer4 P I M P P P V C !UT B N g ziciWtl Bridgc3) -3- E' rea I Shtd.r. HAND HOLE.. 30"5,30- Siev .17 Ncre Grade elevations shove? are Finest grades at fop oF concrete creck ort • Line3 rid south cemv Shicl)Ond ore ecucr/ prof 4e groae DUI , ca4.40 „ oft:7ns, •Sca eine „' . • flearicir ri,1 (UNO) FOR TIME W 4" RGS CONDUIT TY17 / /4: / 4. • .1 rer, - fr„ • • ) • , , Conek,:it" -1" ' tiurnincrriOn •-•"/ t Conduit Aoa- / I ; I ' 019riat 1?'"e'zr , 1 ; jl oFRipr•C.,lo Sear,"ng Piers is A/ OT 'Ora" g" See Sta. Flan For- :..-rirrbelnkir.ctro 0e*Oil.; Ar:cige ends R0r Typ,... SP (Lee"' Side only) 4" RGS CONDUIT TYP,/ FinishC73P)i (UNO) FOR TIME WARN Plor0enled Sectercrx:4 -2 OrilleGf Sh0Pl Erroe-•cfc In SeOrock DESIGNED BY D. ONG DRAWN BY J. ROBERTS DATE 4-30-07 . / c: Socfr,' or .. . ,,, / Po,.'t Soar , . / ..? • ,24s (Rack 70 a ack- oP,"\-",,erner.:.,7,5:,!'■.o732) us'-o• • --- PLAN Lower. MR t • W..s Eles, ze.s 4,• Ccrrc. inn (5p.) ELEVATION evo,-rnal wal-er r— CITY OF TUKWILA / r 1../ -, _ rjr0 110 ,,,,,- .• I I I, . LI I I • CIVILTECH ENGINEERING - / ko.x. Fit( .siace • ae.00' L ;Sec:frock I II L ▪ 51e./ -2.00 LJj c —t-tP/41 . .434 • Crirem Sedrock "-- 1L2r atorlicain ...• 404.5e /4 . Choked we r. 41;x7 - Match exist. Ground 7 oPRIpt Cp.) — - \ -, , ■• 7.,.., ,.,. .' , ,ho 5h00108,. . • • . s.,, 1.-S " • . ' . 0 Slrt at f - .•••0 ' Wirtg . \ • Crj• 1.1.2,Alc..6 ''',..., '---• The oF Fill and SE Corner • ...,,,„,,-/-,,.., 3.--c.i.,....,i- pule 50,. C...5r- 80+52 1Zr.> 31 , r C. a 1 1 HAND HOLE /00 Yr 11F e I /5,100 CS PVC CONDUIT 10800 NE 8th Street Suite 820 Bellevue, WA 98004 Phone: 425.453.6488 Fox: 425.453.5848 Etosu: Type. / orr Ga0 Placem Cos 5 l/-minal F Cr Cor, frterir Sear Clow. 5.0 PLAN & ELEVATION TIME WARNER 4" COMMUNICATION CONDUIT SOUTHCENTER BLVD/ GREEN RIVER BRIDGE TUKWILA, WASHINGTON JOB NO. 27012 SHEET NO. n En E E s 0 - V • C 3 0 K c m 4 2 m En 3 0 n 0 N — o K O o 0 - o 2m E j 0 0 O. P IER 1 ABUTMENT 1 5 MOUF`TI G BRACK ® -ER 8 0 OUTSIDE FACE OF BARRIER EDGE OF BRIDGE DECK EDGE OF PC GIRDER - TOP FLANGE • 6iev 3 2. h8 EI- v 303 4 L.HLUULt 40 PVC CONDUIT BARRIER OVERHANG 1 5/8 "x8" UNISTRUT ® 10' -0" O.C. W/ 2 -1/2 "0x4 1/2" EMBED ANCHOR BOLT 4" RGS CONDUIT FOR TIME WARNER pvc e =� : alp ;,.a: td = e . (See 01 K j � • ..' - M _ •St t C.I.P DECK VARIES (1' -6" TO 2' -10 1/2 ") t3o ri T a ces -> SECTION (PIER 1) 6 REFLECTED PLAN 1' a.o u;4: t1 iu a �'1'v L� RGS ��— CONDUIT KI 7 E!e, 80.00 del" i ?Ret7Si.J. - e r r� 8r. paroi +e! ) arr Sidew01k) n PC GIRDER FLANGE (HALF) f EXIST GIRDER MOUNT NEMA 4 J -BOX TO WALL W/ 1/2 "0x4 1/2" EMBED ANCHOR BOLT HAND HOLE 30 "x30" TYP SP ,.see :3c She.& SC t6� --- 4" RGS CONDUIT. FOR TIME WARNER Cor:dui'• -�. ii!urrN ^ a'?O,, 1 0 101 RGS Conti. / =r 0et C. r EDGE OF BRIDGE DECK CONDUIT CLAMP (P1109) W/ ISOLATION MATERIAL (UNICUSHION P2059) SECTION (TYP) OVERHEAD BRACKET DESIGNED BY D. ONG DRAWN BY J. ROBERTS DATE 4 -30 -07 8 � Sraewa? k wy k ror. I c k . tea;: F x;.v_ hkzr.g cxis'� tax- ,, •'. 1 ti 1 S -2 toxic` S o�ed o ¢tea ( Cm =U1 1/2 "0x4 1/2" EMBED HAS -E ANCHOR BOLT BR DECK SOFFIT 1 5/8" CHANNEL (P1000) 4" RGS CONDUIT CIVILTECH ENGINEERING HAND HOLE . - 30 "x30" xear-Pace PIER 4 b, ce) WINGWALL . .Cr 10800 NE 8th Street Suite 820 Bellevue, WA 98004 Phone: 425.453.6488 Fox: 425.453.5848 c LI EXPANSION JT SECTION (PIER 4) 5 -2 S -2 0 1`5.ae 17C+G■i( sc: "De-k•u.)I.i OVERHEAD BRACKET BRIDGE DECK EXPANSION JOINT FOR RGS SECTIONS AND DETAILS RGS CONDUIT J08 NO 27012. TIME WARNER 4" COMMUNICATION CONDUIT SHEET NO. SOUTHCENTER BLVD / GREEN RIVER BRIDGE S - 3 TUKWILA, WASHINGTON