August 10, 2007
To: Mike Cusick, Applicant
Washington State Department of Ecology
Agencies with Jurisdiction
All Parties of Record
Fred Luco, Time Warner Telecom
PROJECT: Southcenter Blvd water main replacement/Time Warner fiber optic cable.
FILE NUMBERS: E05 -001 (SEPA) and L05 -053 (Shoreline)
APPLICANT: Mike Cusick, City of Tukwila, Public Works.
REQUEST: The original SEPA and Shoreline permits were issued for the installation of
10 -inch water main within 200 feet the Duwamish River and attaching the
water line to the 66 Ave Bridge. The revised proposal included installation
of 4" conduits for fiber optic cable within the existing trenches laid for the
water line. The fiber optic conduits are also proposed to be attached to the
66 Ave Bridge.
LOCATION: The project is located in the City of Tukwila along Southcenter Boulevard
and across the 66 Avenue Bridge and along the Green River to Tukwila Parkway.
This notice is to confirm the decision reached by Tukwila's SEPA Official to adopt an
addendum to the Determination of Non - significance (DNS) for the above project and
approving the revision to the Shoreline Substantial Development Permit.
Project materials including the application, any staff reports, and other studies related to
the permits are available for inspection at:
Tukwila Department of Community Development
6300 Southcenter Blvd., Suite 100
Tukwila, WA 98188
Monday through Friday 8:30 a.m. - 5:00 p.m.
The project planner is Minnie Dhaliwal, who may be contacted at (206) 431 -3685 for
further information.
Last saved 08/09/07
Steven M. Mullet, Mayor
6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665
Description of original proposal:
Description of this Addendum:
Proponent:
Location of Proposal:
City of Tukwila
Department of Community Development Steve Lancaster, Director
DETERMINATION OF NONSIGNIFICANCE (DNS) ADDENDUM
Lead Agency: City of Tukwila
File Number: E05 -001
0 �•
Jack ! ace, SEPA Official for the City of Tukwila, Washington.
CITY OF TUKWILA
6300 Southcenter Boulevard Tukwila WA 98188. (206)- 431 -3670
s
Steven M. Mullet, Mayor
The project involved construction of a 10 -inch water main
for about 1900 linear feet in order to upgrade the City of
Tukwila's water system. The water line Was also proposed
to cross the Duwamish River by attaching it to the 66` Ave
Bridge.
In addition to the water line installation the scope of work
is expanded to include the installation of 4" conduit for
Time Warner's fiber optic cable in the City's open cut
trench laid out for the water line. The conduit for fiber optic
cable will also be attached to the underside of the 66` Ave
Bridge.
City of Tukwila
Public Works Department, Mike Cusick
6300 Southcenter Boulevard
Tukwila, WA 98188
The project is located in the City of Tukwila along Southcenter
Boulevard and across 66 Ave Bridge and along Green River to
Tukwila Parkway.
The City has determined that the addendum does not have a probable significant adverse impact
on the environment. An environmental impact statement (EIS) is not required under RCW
43.21C.030(2)(C). The original DNS was issued December 14, 2005. This addendum is adopted
on August 10, 2007.
6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone. 206 = 431 -3670 • Fax: 206- 431 -3665
Project Name:
City of Tukwila
TO: Mike Cusick, Applicant
Washington State Department of Ecology
Agencies with Jurisdiction
All Parties of Record
Fred Luc°, Time Warner Telecom
August 10, 2007
NOTICE OF REVISION TO THE SHORELINE SUBSTANTIAL DEVELOPMENT
PERMIT
I. PROJECT INFORMATION
Project File Number: L05 -053 (Shoreline Substantial Development Permit)
MD Page 1 of2
Q:Ashoreline \L05= 053 = Southeenter Blvd. water main -Tune Warner revision:doc
Steven M. Mullet, Mayor
Department of Community Development Steve Lancaster, Director
Southcenter Boulevard water main replacement/Time Warner
Telecom fiber optic cable:
Original Project Description: The project involved construction of a 10 -inch water main for
about 1900 linear feet in order to upgrade the City of Tukwila's
water system. The Water line was also proposed to cross the
Duwamish River by attaching it to the 66 Ave Bridge. The original
decision on the shoreline permit was made on February 14, 2006
with an expiration date of February 14, 2008.
Description of the Revision: In addition to the water line installation the scope of work is
expanded to include installation of 4" conduit for Time Warner's
fiber optic cable in the City's open cut trench laid out for the water
line. The conduit for fiber optic cable will also be attached to the
underside of the 66 Ave Bridge.
Applicant: City of Tukwila
Public Works Department, Mike Cusick
6300 Southcenter Boulevard
Tukwila, WA 98188
Location: The project is located in the City of Tukwila along Southcenter Boulevard
and across 66 Ave Bridge and along Green River to Tukwila Parkway.
Zoning and Comprehensive
Plan Designation: The current Zoning and Comprehensive Plan designation for the adjacent
properties in the vicinity of the project area is Tukwila Urban Center
(TUC), Low Density Residential (LDR) and Commercial /Light Industrial
(C /LI).
08/10/2007
6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 = 431 -3670 • Fax: 206 - 431 =3665
II. DECISION
SEPA Determination: The City's SEPA Responsible Official issued the original Determination of
Non - Significance (DNS) on December 14, 2005. A SEPA addendum for the revised scope of work
that included Time Warner's conduits was issued on August 10, 2007.
Decision on proposed revision to the permit: The revised scope of work is considered within the
"scope and intent of the original" Shoreline permit consistent with the criteria for listed under
WAC173 -27- 100(2). Following is the discussion how the proposed revision meets the criteria:
1) No additional over water construction is involved. The original proposal included
installation of water line within 200 feet of the Duwamish River and attaching the water line
to the 66 Ave Bridge. Time Warner is proposing to use the same trench used for the water
line to lay their 4" conduit within the shoreline area and then attaching their conduit to the
66 Ave Bridge.
2) There is no increase in the ground area coverage or height.
3) The revised permit does not authorize development to exceed height, lot coverage, setback,
or any other requirements of the applicable master program.
4) No changes are proposed to the landscaping.
5) The original proposal was to install water line and the revised proposal is to include conduits
for fiber optic cable in the same trench. The use authorized pursuant to the original permit
has not changed.
6) No adverse environmental impact will be caused by the project revision.
Dep. nt of Community Development
City of ila
MD Page 2 of 2 08/10/2007
Q: \shoreline \L05 -053- Southcenter Blvd. water main -Time Warner revision.doc
Shoreline Management Act
Permit Data Sheet and Transmittal Letter
From: City of Tukwila
Department of Community Development
6300 Southcenter Blvd. Suite 100
Tukwila WA 98188
Applicant Information:
Name: City of Tukwila
Address: 6300 Southcenter Boulevard Ste 100
Tukwila WA 98188
Phone: 206 - 431 -3685
Is the applicant the property owner? Yes, all work in right -of -way
Location of the property: Along Southcenter Boulevard
Water Body Name: Duwamish/Green River
Shoreline of Statewide Significance: Yes
Environment Designation: Urban
Description of Project:
Notice of Application Date: 08 -10 -2007 Final Decision Date:
By: Minnie Dhaliwal, Senior Planner, City of Tukwila
Phone Number: (206) 431 -3685
•
To: Ms. Sandra Lange, Environmental Planner
Department of Ecology
NW Regional Office
3190 160 Ave SE
Bellevue WA 98008
Date of Transmittal: 08 -10 -07 Date of Receipt:
Type of Permit: Revision to the Shoreline Substantial Development
Local Government Decision: Approval
Dept. Of Community Development
City of Tukwila •
AFFIDAVIT OF DISTRIBUTION
th____ HEREBY DECLARE THA
Notice of Public Hearing
Project Number: L D y J 9
Deter
i ation f No - Significance
a, bigt
Notice of Public Meeting
Mitigated Determination of Non-
Significance
Board of Adjustment Agenda Pkt
Determination of Significance & Scoping
Notice
Board of Appeals Agenda Pkt
Notice of Action
Planning Commission Agenda Pkt
Official Notice
Short Subdivision Agenda
Notice of Application
4
horeline,Mgmt Permit
i VlblDil
Notice of Application for Shoreline Mgmt
Permit
--
FAX To Seattle Times
Classifieds
Mail: Gail Muller Classifieds
PO Box 70 - Seattle WA 98111
1
Otf�ex, C ��? 1
aJpn '
•
-11
Project Name: O1 -- 1(1) etAnie4 Tdra M
Project Number: L D y J 9
Mailer's Signature: tal6 '- e -
Person requesting mailing: f) ((J/I,vu _ � a ,P
Was maile to each of the addresses listed on this (3day of
year .20
P: IADMINLSTRATIVEFORMSWORMS \AFFWAVITOFDISTRIBUTION
in the
I/ 5,4 U.S. ARMY CUKrb ur Cwuinc...a U.S. DEPT OF H.U.D.
FAL /( D EFT EPT OF HIGHWAY D LIFE TRATION j , TIONAL MARINE FRIES SERVICE
/ADEPT FISH &WILDLIFE ✓ �^C
WASHINGTON STATE AGENCIES
( DEPT OF SOCIAL & HEALTH SERV.
) DEPT OF ECOLOGY, SHORELAND DIV
3 COLO SE
OFFICE OF ATTORNEY GENERAL
• SEND CH W/ DETERMINATIONS
• SEND SITE MAPS WITH DECISION
OFFICE OF ARCHAEOLOGY
TRANSPORTATION DEPARTMENT
VVV () DEPT NATURAL RESOURCES
() OFFICE OF THE GOVERNOR
( TRADE
DEPT OF FISHERIES WILDLIFE
O « C DEV.
() BOUNDARY REVIEW BOARD
() FIRE DISTRICT *11
() FIRE DISTRICT #2
() K.C. WASTEWATER TREATMENT DIVISION
j�Y C. DEPT OF PARKS & REC
/J KC. ASSESSORS OFFICE
( ) TUKWILA SCHOOL DISTRICT
( ) TUKWILA LIBRARY
() RENTON UBRARY
() KENT UBRARY
() CITY OF SEATTLE UBRARY
() QWEST
( ) SEATTLE CITY UGHT
PUGET SOUND ENERGY
HIGHUNE WATER DISTRICT
() SEATTLE WATER DEPARTMENT
( ) AT &T CABLE SERVICES
() KENT PLANNING DEPT
( ) TUKWILA CTTY DEPARTMENTS:
() PUBLIC WORKS () FIRE
() POUCE () FINANCE
() PLANNING () BUILDING
() PARKS & REC. () MAYOR
() CITY CLERK
( ) PUGET SOUND REGIONAL COUNCIL
( ) SW K C CHAMBER OF COMMERCE
(4) MUCKLESHOOT INDIAN TRIBE
(1) CULTURAL RESOURCES PROGRAM
CS) FISHERIES PROGRAM
( ) SEATTLE TIMES
( ) SOUTH COUNTY JOURNAL
P: ADMINISTRATIVE \FORMSCHKLIST.DOC
ri cal
e l o b
( 6 -vs 1,3f 9 WIC
KING COUNTY AGENCIES
SCHOOLS/LIBRARIES
UTILITIES
CITY AGENCIES
OTHER LOCAL AGENCI
MEDIA
9
MAW
1
„ "� P
iyi ( ) HEALTH DEPT b.• .I�'f � 4 " -
( ) PORT OF SEATTLE vvy:
( ) KC. DEV & ENVIR SERVICES-SEPA INFO CNTR
KC. TRANSIT DMSION - SEPA OFFICIAL
,( .XC. LAND & WATER RESOURCES
( ) FOSTER LIBRARY
( ) K C PUBUC LIBRARY
( ) HIGHUNE SCHOOL DISTRICT
( ) SEATTLE SCHOOL DISTRICT
( ) RENTON SCHOOL DISTRICT
( ) OLYMPIC PIPELINE
( ) VAL -VUE SEWER DISTRICT
( ) WATER DISTRICT H2O
() WATER DISTRICT &125
O CITY OF RENTON PUBUC WORKS
() BRYN MAWR- LAXERIDGE SEWERIWATER DISTRICT
() RENTON PLANNING DEPT
() CITY OF SEA -TAC
() CITY OF BURIEN
( ) TUKWILA PLANNING COMMISSION MEMBERS
( ) TUKIMLA CITY COUNCIL MEMBERS
() CITY OF SEATTLE - SEPA INFO CENTER - DCLU
() STRATEGIC PLANNING OFFICE•
• NOTICE OF ALL SEATTLE RELATED PLNG PROJ.
(.).DUWAMISH INDIAN TRIBE
( .S. AIR POLLUTION CLEAN AGENCY
SOUND TRANSIT
(UWAMISH RIVER CLEAN -UP COALITION
'SEND NOTICE OF ALL APPUCATIONS ON OUWAMISH RIVER
( ) HIGHLINE TIMES
( ) C1.TUKWILA.WA USW WV
D
a C-) A,u(, h 1( I
P�j
S.e,. - -(--e ', c . Off'
Po P)D) 3L-j of £�
e- 1 wi 812 -yokk
OK. CL-
Y����C
SEPA MAILINGS
Mail to: (comment p on date of mailing)
Dept. of Ecology Envnu ental Review Section
*Applicant
*Other agencies as necessary (checked off on attached list)
`Any Parties of record .
•' send only the staff report, site plan and the SEPA Determination
KC Transit Division —SEPA Official would lute to receive information about all projects that might affect transit demand
Send These Documents to DOE:
SEPA Determination (3 -part from Siena)
Findings (staff report, usu. with MDNS)
SEPA Checklist (filled out by applicant)
Drawings/Plans of project (site plan, elevations, etc. from PMT's)
Affidavit of Distribution (notice was mailed or sent to newspaper)
SHORELINE MAILINGS:
Notke ofAppllcatlon for a Substantial Development Permit must be mailed to owners and to property owners within 500
feet of subject property, comments are due 30 days after the notice of application is mailed/posted. The notice of
Application for Shoreline Substantial Development Permit must include a statement that any person desiring to submit
written comments on the application or desiring to receive notification of the final decision on the application may do so
within 30 days of the notice of application. If a hearing will be held on the application, the hearing notice must include the
information that written comments may be submitted, or oral presentation made at the hearing.
Shoreline Permit Notice of Decision:
Mail to: (within 8 days of decision; 21-day appeal period begins date received by DOE)
Department of Ecology Shorelands Section
State Attorney General
'Applicant .
' Tribes .
*Other agencies as necessary (checked off on attached list).
*Any parties of record
' send only the staff report, site plan and the SEPA Determination
Send These Documents to DOE and Attorney General:
Permit Data Sheet
Shoreline Substantial Development Permit (3 -part from Sierra)
Findings (staff report or memo)
Shoreline Permit Application Form (filled out by applicant)
Drawings/Plans of project (site plan, elevations, etc. from PMT's)
— Site plan, with mean high water mark & improvements
— Cross- sections of site with structures & shoreline
— Grading Plan
— Vicinity map '
SEPA determination (3 -part from Sierra)
Findings (staff report or memo)
SEPA Checklist (filled out by applicant)
Any background studies related to impacts on shoreline
Notice of Application
Affidavit of Distribution (notice was mailed)
P: ADM[MSTRATIVEWFORMS'CFQCUST.DOC
TO:
City of Tukwila
Department of Community Development
February 14, 2006
NOTICE OF DECISION
Mike Cusick, Applicant
Washington State Department of Ecology
Agencies with Jurisdiction
All Parties of Record
Steven M. Mullet, Mayor
Steve Lancaster, Director
This letter serves as a notice of decision and is issued pursuant to TMC 18.104.170 on the following project
and permit approval.
I. PROJECT INFORMATION
Project File Number: L05 - 053 (Shoreline Substantial Development Permit)
Project Name: Southcenter Boulevard water main replacement.
Project Description: The project involves construction of a new 1900 linear feet of a 10 -inch water main for the
upgrades to the City of Tukwila's water system.
Applicant:
Location: The project is located in the City of Tukwila along Southcenter Boulevard and across 66`
Ave bridge and along Green River to Tukwila Parkway. See attached map for the exact
location.
Zoning and Comprehensive
Plan Designation: The current Zoning and Comprehensive Plan designation for the adjacent properties in
the vicinity of the project area is Tukwila Urban Center (TUC), Low Density Residential
(LDR) and Commercial /Light Industrial (C /LI).
1I. DECISION
SEPA Determination: The City SEPA Responsible Official has previously determined that the project, as
proposed, does not create a probable significant environmental impact and issued a Determination of Non -
Significance (DNS).
Decision on Substantive Permit: The City Community Development Director has determined that the
application for a Shoreline Substantial Development Permit does comply with applicable City and state code
requirements and has approved that application based on the findings and conclusions contained in the staff
report and subject to the following condition:
If any artifacts are encountered during any of the excavation activities, all work will be stopped and the
State Office of Archaeology and Historic Preservation and the concerned tribes cultural committees and the
City of Tukwila staff must be notified.
MD Page 1 of 2
Q:Ashorelinev1.05 -053- Southcentei watei main replacement- NOD1.dot_
City of Tukwila
Public Works Department, Mike Cusick
6300 Southcenter Boulevard
Tukwila, WA 98188
(206) 433-0179
02/14/2006
6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665
The Decision on this Permit Application is a Type 2 decision pursuant to Tukwila Municipal Code
§18.104.010. Other land use applications related to this project may still be pending.
III. YOUR APPEAL RIGHTS
One administrative appeal to the Shorelines Hearings Board of the Decision is permitted. Any person
appealing to the Shorelines Hearings Board may raise certain SEPA issues as part of the appeal to the
Shorelines Hearings Board. Appellants should consult the rules and procedures of the Shorelines Hearings
Board for details.
The requirements and procedures for appeals to the Shorelines Hearings Board are set forth in RCW
90.58 and WAC 461.08.
Project materials including the application, any staff reports, and other studies related to the Shoreline
Substantial Development Permit are available for inspection at the Tukwila Department of Community
Development, 6300 Southcenter Blvd., Suite 100, Tukwila, Washington 98188 from Monday through Friday
between 8:30 a.m. and 5:00 p.m. The project planner is Minnie Dhaliwal, who may be contacted at 206 -431-
3685 for further information.
Property owners affected by this decision may request a change in valuation for their property tax purposes.
Contact the King County Assessor's Office for further information regarding property tax valuation changes.
• •
IV. PROCEDURES AND TIME FOR APPEALING
V. INSPECTION OF INFORMATION ON THE APPLICATION
Department of Community Development
City of Tukwila
M D Page 2 of 2 02/14/2006
Q:\shorelinc \L05- 053 - Southcenter Blvd. water main replacement- NOD1.doc
File Number: L05 -053
Applied: 08/17/2005
Approved: 02/14/2006
Expiration: 02/14/2008
doc: Shore1971
• •
City of Tukwila
Department of Community Development / 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670
SHORELINE MANAGEMENT ACT OF 1971
PERMIT FOR SHORELINE MANAGEMENT SUBSTANTIAL DEVELOPMENT
A permit is hereby granted to: CITY OF TUKWILA- PUBLIC WORKS
to: Water main extension from Interurban Avenue /Southcenter Boulevard to Andover Park East.
Upon the following property:
Address:
Parcel Number:
Section/Township /Range: SE 23- 23N -04E & SW 24- 23N -04E
The following master program provisions are applicable to this development:
TUKWILA SHORELINE MASTER PROGRAM
Development under this permit shall comply with the following conditions.
1: If any artifacts are encountered during any of the excavation activities, all work will be stopped and the State Office
of Archaeology and Historic Preservation and the concerned tribes cultural committees and the City of Tukwila staff
must be notified.
This permit is granted pursuant to the Shoreline Management Act of 1971 and nothing in this permit shall excuse the applicant
from compliance with any other Federal, State or local statutes, ordinances or regulations applicable to this project, but not
inconsistent with the Shoreline Management Act (Chapter 90.58 RCW).
This permit may be rescinded pursuant to RCW 90.58.140(8) in the event the permittee fails to comply with the project as
approved and any conditions thereof.
CONSTRUCTION PURSUANT TO THIS PERMIT MAY NOT BEGIN AND IS NOT AUTHORIZED UNTIL TWENTY -ONE (21)
DAYS FROM THE DATE OF FILING WITH THE DEPARTMENT OF ECOLOGY (D.O.E.) AS DEFINED IN RCW 90.58.140(6)
AND WAC 173 -14 -090, OR UNTIL ALL REVIEW PROCEEDINGS INITIATED WITHIN TWENTY -ONE (21) DAYS FROM THE
DATE OF SUCH FILING HAVE TERMINATED; EXCEPT AS PROVIDED IN RCW 90.58.140(5)(a)(b)(c).
Pursuant to RCW 90.58.180 the decision by the City of Tukwila to issue this Shoreline Substantial Development Permit may only
be appealed to the Shoreline Hearing Board. Appeals must be filed with the Shorelines Hearing Board within 21 -days from the
filing of this permit with D.O.E. as defined in RCW 90.58.140. For more detail information on appeals, refer to RCW 90.58 and
WAC 461.08.
Date: Steve Lancaster, Director of Department of Community Development
Construction or substantial progress toward construction must begin within two (2) years from the effective date of the
permit (the date the permit is filed with D.O.E.), per RCW 90.58.143(4).
L05 -053 Printed: 02 -10 -2006
From: City of Tukwila
Department of Community Development
6300 Southcenter Blvd. Suite 100
Tukwila WA 98188
Date of Transmittal:
Shoreline Management Act
Permit Data Sheet and Transmittal Letter
Type of Permit: Substantial Development
Local Government Decision: Approval
Applicant Information:
Name: City of Tukwila
Address: 6300 Southcenter Boulevard Ste 100
Tukwila WA 98188
Phone: 206 - 431 -3685
To: Ms. Sandra Lange, Environmental Planner
Department of Ecology
NW Regional Office
3190 160 Ave SE
Bellevue WA 98008
02 -14 -06 Date of Receipt:
Is the applicant the property owner? Yes, all work in right -of -way
Location of the property: Along Southcenter Boulevard
Water Body Name: Duwamish/Green River
Shoreline of Statewide Significance: Yes
Environment Designation: Urban
Description of Project:
Notice of Application Date: 08 -19 -2005 Final Decision Date: Februaryl4, 2006
By: Minnie Dhaliwal, Senior Planner, City of Tukwila
Phone Number: (206) 431 -3685
Dept. Of Community Development
City of Tukwila
AFFIDAVIT OF DISTRIBUTION
I, S
HEREBY DECLARE THAT:
Project Name: - /CIQ C �4 -
� • �) Tlk-k-- r� k �� ��-�
Notice of Public Hearing
Determination of Non - Significance
Mailer's Signature: V , i__,,,,
Notice of Public Meeting
6./"' 111 4
Mitigated Determination of Non -
Significance
Board of Adjustment Agenda Pkt
Determination of Significance & Scoping
Notice
Board of Appeals Agenda Pkt
Notice of Action
Planning Commissioi Agenda Pkt
Official Notice
Short Subdivision'Agenda
Notice of Application
horeline Mgmt Permit
Notice of Application for Shoreline Mgmt
Permit
__
__
FAX To Seattle Times
Classifieds
Mail: Gail Muller Classifieds
PO Box 70 - Seattle WA 98111
Other
Was mailed to each of the addresses listed on this day of f- docin the
year 20O(
P:GINAWYNETTA/FORMS /AFFIDAVIT -MAIL 08/29/003:31 PM
•A
Project Name: - /CIQ C �4 -
� • �) Tlk-k-- r� k �� ��-�
Project Number: Lo c - aS.3'
Mailer's Signature: V , i__,,,,
Person requesting mailing: �/� oriA A, D
6./"' 111 4
Was mailed to each of the addresses listed on this day of f- docin the
year 20O(
P:GINAWYNETTA/FORMS /AFFIDAVIT -MAIL 08/29/003:31 PM
( ) TUKWILA SCHOOL DISTRICT
( ) TUKWILA LIBRARY
() RENTON LIBRARY
() KENT LIBRARY
() CITY OF SEATTLE LIBRARY
()(U.S. ARMY CORPS OF ENGINEERS
FEDERAL HIGHWAY ADMINISTRATION
( )OEPT OF FISH & WILDLIFE
OFFICE OF ARCHAEOLOGY
TRANSPORTATION DEPARTMENT
() EPT NATURAL RESOURCES
( ) OFFICE OF THE GOVERNOR
() DEPT OF COMM. TRADE & ECONOMIC DEV.
p<(EPT OF FISHERIES & WILDLIFE >
KING COUNTY AGENCIES
() BOUNDARY REVIEW BOARD
( ) FIRE DISTRICT #11
( ) FIRE DISTRICT #2
() K.C. WASTEWATER TREATMENT DIVISION
( ) KC. DEPT OF PARKS & REC
$K.C. ASSESSORS OFFICE
( ) QWEST
( ) SEATTLE CITY LIGHT
( ) PUGET SOUND ENERGY
HIGHLINE WATER DISTRICT
() SEATTLE WATER DEPARTMENT
( ) AT &T CABLE SERVICES
() KENT PLANNING DEPT
( ) TUKWILA CITY DEPARTMENTS:
() PUBLIC WORKS () FIRE
() POLICE () FINANCE
() PLANNING () BUILDING
() PARKS & REC. () MAYOR
( ) CITY CLERK
() PUGET SOUND REGIONAL COUNCIL
( ) SW K C CHAMBER OF COMMERCE
JMUCKLESHOOT INDIAN TRIBE
(,CULTURAL RESOURCES PROGRAM' t`
(FISHERIES PROGRAM
WILDLIFE PROGRAM
() SEATTLE TIMES
( ) SOUTH COUNTY JOURNAL
:\ADMINISTRATIVE \FORMS \CHKLIST.DOC
(PIRA AelA
FEDERAL AGENCIES
WASHINGTON STATE AGENCIES
() DEPT OF SOCIAL & HEALTH SERV.
() DEPT OF ECOLOGY, SHORELAND DIV
j DEPT OF ECOLOGY, SEPA DMSION'
OFFICE OF ATTORNEY GENERAL g listo
SEND CHKLIST W/ DETERMINATIONS
SEND SITE MAPS WITH DECISION
SCHOOLS/LIBRARIES
UTILITIES
CITY AGENCIES
OTHER LOCAL AGENCIES
MEDIA
AA; [c__ ec,,s i 4
; s. 4 T 1P .
•
U.S. ENVIRONMENTAL PROTECTION AGENCY
() U.S. DEPT OF H.U.D.
(,NATIONAL MARINE FISHERIES SERVICE
() HEALTH DEPT
() PORT OF SEATTLE
() KC. DEV & ENV!R SERVICES-SEPA INFO CNTR
() K.C. TRANSIT DIVISION - SEPA OFFICIAL
(4KC. LAND & WATER RESOURCES
() FOSTER LIBRARY
() K C PUBLIC UBRARY
( ) HIGHLINE SCHOOL DISTRICT
() SEATTLE SCHOOL DISTRICT
() RENTON SCHOOL DISTRICT
( ) OLYMPIC PIPELINE
( ) VAL -VUE SEWER DISTRICT
() WATER DISTRICT #20
( ) WATER DISTRICT #125
( ) CITY OF RENTON PUBLIC WORKS
( ) BRYN MAWR- LAKERIDGE SEWERIWATER DISTRICT
() RENTON PLANNING DEPT
() CITY OF SEA -TAC
() CITY OF BURIEN
( ) TUKWILA PLANNING COMMISSION MEMBERS
( ) TUKWILA CITY COUNCIL MEMBERS
( ) CITY OF SEATTLE - SEPA INFO CENTER - DCLU
() STRATEGIC PLANNING OFFICE'
' NOTICE OF AU. SEATTLE RELATED PLNG PROJ.
j DUWAMISH INDIAN TRIBE
() P.S. AIR POLLUTION CLEAN AGENCY
() SOUND TRANSIT
DUWAMISH RIVER CLEAN -UP COALITION
SEND NOTICE OF ALL APPUCATIONS ON DUWAMISH RIVER
( ) HIGHLINE TIMES
( ) CI.TUKWILA.WA.US.VWWV
o 1250■6,624a, ■\ &Jr__
r
V-1-AA 0 PD LO
10j ca& 4969,
PSIC NOTICE MAILINGS FOR ADMITS
SEPA MAILINGS
Mail to: (comment period starts on date of mailing)
Dept. of Ecology Environmental Review Section
*Applicant
*Other agencies as necessary (checked off on attached list)
Any parties of record
* send only the staff report, site plan and the SEPA Determination
KC Transit Division —.SEPA Official would like to receive information about all projects that might affect transit demand
Send These Documents to DOE:
SEPA Determination (3 -part from Sierra)
Findings (staff report, usu. with MDNS)
SEPA Checklist (filled out by applicant)
Drawings/Plans of project (site plan, elevations, etc. from PMI's)
Affidavit of Distribution (notice was mailed or sent to newspaper)
SHORELINE MAILINGS:
Notice of Application for a Substantial Development Permit must be mailed to owners and to property owners within 500
feet of subject property, comments are due 30 days after the notice of application is mailed/posted. The notice of
Application for Shoreline Substantial Development Permit must include a statement that any person desiring to submit
written comments on the application or des iring to receive notification of the final decision on the application may do so
within 30 days of the notice of application. If a hearing will be held on the application, the hearing notice must include the
information that written comments may be submitted, or oral presentation made at the hearing.
Shoreline Permit Notice of Decision:
Mail to: (within 8 days of decision; 2.1 -day appeal period begins date received by DOE)
Department of Ecology Shorelands Section
State Attorney General
*Applicant
'Indian Tribes
*Other agencies as necessary (checked off on attached list).
Any parties of record
' send only the staff report, site plan and the SEPA Determination
Send These Documents to DOE and Attorney General:
Permit Data Sheet
Shoreline Substantial Development Permit (3 -part from Sierra)
Findings (staff report or memo)
Shoreline Permit Application Form (filled out by applicant)
Drawings/Plans of project (site plan, elevations, etc. from PMT'S)
- Site plan, with mean high water mark & improvements
— Cross- sections of site with structures & shoreline
- Grading Plan
— Vicinity map •
SEPA determination (3 -part from Sierra)
Findings (staff report or memo)
SEPA Checklist (filled out by applicant)
Any background studies related to impacts on shoreline
Notice of Application
Affidavit of Distribution (notice was mailed)
P:1ADM IMSTRATIVEIFORMS\CHKLIST.DOC
ITEMS INCLUDED IN 2/16/06 MAILING:
1. Shoreline Management Act Permit Data Sheet and Transmittal Letter
2. Shoreline Management Act of 1971 Permit for Shoreline Management Substantial
Development (L05 -053)
3. Notice of Decision dated 2/14/06
4. Staff report to the Director Department of Community Development dated 2/10/06
5. Map indicating proposed water line
Determination of Non - Significance (E05 -001)
7. Final Staff Evaluation for Southcenter Blvd. Water Main Replacement (E05 -001)
8. Environmental Checklist
9. Copy of 8/19/05 Notice of Application mailing
10. Southcenter Blvd. Water Main Replacement — Shoreline Sections plans
ov fi-
•
Gity of Tukw1
Department of Community Development Steve Lancaster, Director
STAFF REPORT TO THE DIRECTOR
DEPARTMENT OF COMMUNITY DEVELOPMENT
February 10, 2006
II. GENERAL INFORMATION
Project Name: Southcenter Boulevard water main replacement.
Applicant:
Location:
Zoning:
Comprehensive
Plan Designation:
I1. Project Description
City of Tukwila
Public Works Department, Mike Cusick
6300 Southcenter Boulevard
Tukwila, WA 98188
(206) 433-0179
The project is located in the City of Tukwila along Southcenter
Boulevard and across 66` Ave bridge and along Green River to
Tukwila Parkway. See attached map for the exact location.
The current zoning for the adjacent properties in the vicinity of the
project area is Tukwila Urban Center (TUC), Low Density
Residential (LDR) and Commercial /Light Industrial (C /L1).
The current Comprehensive Plan depicts the areas adjacent to the
project site as Tukwila Urban Center (TUC), Low Density
Residential (LDR) and Commercial /Light Industrial (C /LI).
The project involves construction of a new 1900 linear feet of a 10-inch water
main for the upgrades to the City of Tukwila's water system.
III. Policies of the Shoreline Management Act /Shoreline Master Program
The project is subject to Tukwila Shoreline Master Program.
Steven M. Mullet, Mayor
6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 = 431 =3670 • Fax: 206 - 431 -3665
• •
IV. Shoreline Regulations
Shoreline Substantial Development Permit (18.44.80)
Any substantial development within 200 feet of any shoreline must receive a
shoreline substantial development permit prior to issuance of any local permits
by the City.
The construction of the proposed water main is within the paved portion of
Tukwila Parkway and then it follows under the paved trail along the Green River.
Further along it is attached to the bridge crossing the Green River and then it is
follows along the paved portion of the Southcenter Boulevard. The project area is
within 200 feet of the Green River.
General Shoreline Regulations (18.44.110)
1. The use is in conformance with the regulations of the underlying district
The project location is within City of Tukwila right of way. Adjacent
zoning designations include Tukwila Urban Center (TUC), Low Density
Residential (LDR) and Commercial /Light Industrial (C /LI). No specific
development regulations govern the installation of a water main. The
proposed water main would not cause any foreseeable conflicts with the
adjacent TUC, LDR and C /LI zoning and thus would conform to
applicable zoning regulations.
2. The use does not conflict with the goals and policies of the shoreline
master program or the provisions of the Shoreline Act and shoreline
regulations:
The proposed project to construct a 10" water main line includes working
within paved portions of the existing streets. A portion of the proposed
line is under the paved trail along Green River and then it is attached to the
bridge that crosses the Green River. The proposed project would cause no
impacts to the shoreline environment. The use is consistent with the goals
and policies of the shoreline master program and the provisions of the
Shoreline Act and shoreline regulations.
3. No structures or accessory facilities shall be located over the river unless
such structure protects or promotes the public interest.
The proposed water line is attached to an existing bridge over the Green
River. No structures will be constructed over the Green River. No impacts
are anticipated to the river as a result of this project.
MD Page 2 of 5 02/10/2006
Q: \shoreline \L05 -053- Southcenter Blvd. water main replacement- SR.doc
N/A
• •
4. There shall be no disruption of existing trees or vegetation within the
river environment unless necessary for public safety or flood control, or
if allowed as part of an approved shoreline substantial development
permit.
The water line will be installed in paved or landscaped areas only. After
the line is installed, the areas will be restored to the original condition.
S. No effluent shall be discharged into the Green River, which exceeds the
water quality classification as established by the State for the adjacent
portion of the river.
No discharge of effluent will occur due to proposal.
6. All States and federal water quality regulations shall be strictly complied
with.
Applicant is responsible for meeting all state and federal water quality
regulations.
7. Wildlife habitat in and along the river shall be protected
Wildlife should not be impacted by this project.
8. All perimeters of landfills and other land forms susceptible to erosion
shall be provided with vegetation, retaining walls, or other satisfactory
mechanism for erosion prevention.
Erosion and sedimentation controls will be used to ensure minimal
disturbance to the river. Much of the area adjacent to right -of -way is
developed. If any areas are disturbed, they shall be restored and re-
vegetated immediately.
9. All necessary permits shall be obtained from Federal, State, County or
municipal agencies.
The project was issued a SEPA Determination of Non - Significance (DNS)
by the City of Tukwila. Applicant is responsible for obtaining any
applicable Federal or State approvals.
10. Dredging for purposes other than for navigational improvements or
flood control is prohibited.
MD Page 3 of 5 02/10/2006
Q: \shoreline \L05 -053- Southcenter Blvd. water maid replacement - SR.doc
• •
1L Mining is prohibited along the river shoreline
N/A
12. Solid waste disposal is prohibited along the shoreline
N/A
13. No property will be acquired for public use without dedication by or just
compensation to the owner
All work is proposed within existing right -of -way or existing easements.
14. Landfilling is prohibited within the river channel, unless such landfall is
determined by the Planning Commission to protect or promote the
public interest.
N/A
15. Notwithstanding any provisions of the Code to the contrary, removal of
any cottonwood tree within the river environment, or the low impact
environment, which tree is 12 inches or greater in diameter as
measured 4.5 feet above grade, shall be subject to the requirements of
TMC Chapter 18.54, Tree Regulations.
No removal of vegetation is proposed for this project.
Specific Shoreline Regulations
The project falls within river impact, low impact and high impact environments.
There are no anticipated impacts to the shoreline as the project is located within
the existing developed right -of -way and under the paved trail along the Green
River.
Specific use regulations -river impact environment (18.44.130)
This portion of the code requires that `utility easements where necessary shall be
landscaped with live ground cover or natural grass cover ". The project is to
construct a 10" sanitary sewer within the paved asphalt trail. No other
disturbances are anticipated as a result of this project.
Specific use regulations -low impact environment (18.44.140)
Utilities are permitted in the low - impact environment.
Specific use regulations -high impact environment (18.44.150)
All uses allowed in the underlying zoning district are allowed in the high impact
environment.
M D Page 4 of 5 02/10/2006
Q: \shoreline \L05 -053- Southcenter Blvd. water main replacement- SR.doc
V. Comments
• •
A letter was received from Muckleshoot Cultural Resources Program stating that
the area along South Grady Way to Southcenter Boulevard is an area that they
have flagged as high potential for archaeological discovery. The letter also
requested an archaeological field study by a professional archaeologist. The
project engineer, Mike Cusick talked to Laura Murphy, Tribal Archaeologist and
explained that the project includes working only in the area that has been
previously disturbed and that the water line will be attached to an existing bridge.
Further if any artifacts are encountered during any of the excavation activities, all
work will be stopped and the State Office of Archaeology and Historic
Preservation and concerned tribes cultural committees and staff will be notified.
A comment letter was also received from City of Seattle, Public Utilities
requesting a copy of the plans and informing that Seattle Public Utilities operates
60" concrete cylinder pipeline. The Project Engineer provided them with a copy of
the plans and will co- ordinate with them during construction.
V. SEPA and other approvals
The project was also subject to SEPA review and was issued a Determination of
Non - Significance by the City of Tukwila on December 14, 2005.
VI. Recommendations
Approval of the shoreline substantial development permit.
If any artifacts are encountered during any of the excavation activities, all work
will be stopped and the State Office of Archaeology and Historic Preservation and
the concerned tribes cultural committees and the City of Tukwila staff must be
notified.
Minnie Dhaliwal, Senior Planner
—JO — 06
Date
MD Page 5 of 5 02/10/2006
Q: \shoreline \L05 -053 - Southcenter Blvd. water man replacement- SR.doc
t
August 30, 2007
Dear Mr. Cusick:
What Happens Next?
Mr. Mike Cusick
Tukwila Public Works Department
6300 South Center Boulevard
Tukwila, WA 98188
STATE OF WASHINGTON
DEPARTMENT OF ECOLOGY
Northwest Regional Office • 3190 160th Avenue SE • Bellevue, Washington 98008 -5452 • (425) 649 -7
I certify that I mailed a copy of this document
to the persons and addresses listed herein,
postage prepaid, �e ■� - -•tacle for United
States mail in ,r `
Washington, o •
1 •
Signature
Subject: City of Tukwila Permit # L05 -053 - Approved
Tukwila Public Works Department - Applicant
Revised Shoreline Substantial Development Permit # 2005 NW 80011
Purpose: Notification of Receipt and Local Approval of Revised Substantial Development
Permit (SDP).
On August 14, 2007 the Department of Ecology received notice that City of Everett approved
your application for a revised SDP. Your permit is for installing of 4 inch conduit for fiber optic
cables within existing construction trenches within shoreline jurisdiction of the Green River.
(Chapter 90.58 RCW).
By law, local governments must review all SDPs for compliance with the following:
• The Shoreline Management Act (Chapter 90.58 RCW)
• Ecology's Substantial Development Permit approval criteria (Chapter 173 -27 -150 WAC)
• The City Of Tukwila Local Shoreline Master Program
Local governments, after reviewing the SDP for compliance, are required to submit the SDPs to
Ecology for filing.
Your approved application for a revised SDP has been received and subsequently filed with
Ecology.
Before you begin activities authorized by this permit, the law requires you to wait at least 21
days from the date we received the decision letter from City of Tukwila on August 14, 2007.
This waiting period allows anyone (including you) who disagrees with any aspect of this permit,
0
Mike Cusick
August 30, 2007
Page 2 of 2
to appeal the decision to the state Shorelines Hearings Board. You must wait for the conclusion
of an appeal before you can begin the activities authorized by this permit.
If no appeal is submitted you may begin activities any time after September 4, 2007.
The Shorelines Hearings Board will notify you by letter if they receive an appeal. We
recommend, however, you contact the Shorelines Hearings Board before you begin permit
activities to ensure no appeal has been received. They can be reached at (360) 459 -6327 or
http : / /www. eho wa. gov/B oards /S HB. asp.
If you want to appeal this decision, you can find appeal instructions (Chapter 461 -08 WAC) at
the Shorelines Hearings Board website above. They are also posted on the website of the
Washington State Legislature at: http: / /apps.leg.wa.gov /wac.
If this permit is NOT appealed, this letter constitutes the Department of Ecology's final
notification of action on this permit.
Other federal, state and local permits may be required in addition to this shoreline permit.
If you have any questions about this letter, please contact me at 425- 649 -4253.
Sincer
avid Pater, Shorelands Specialist
Shorelands and Environmental Assistance Program
DP:cja
cc: Minnie Dhaliwal, City of Tukwila Community Development
DEPARTMENT OF ARCHAEOLOGY & HISTORIC PRESERVATION
1063 S. Capitol Way, Suite 106 • Olympia, Washington 98501
Mailing address: PO Box 48343 • Olympia, Washington 98504 -8343
(360) 586 -3065 • Fax Number (360) 586 -3067 • Website: www.dahp.wa.gov
August 22, 2007
1
c
U �ufc
Log: 082207 -18 -KI r
Property: E05 -001 and L05 -053 Southcenter Blvd water main replacement
Ms. Minnie Dhaliwal
Community Development
City Of Tukwila
6300 Southcenter Blvd., #100
Tukwila, WA 98188
Re: Archaeology - Survey Requested
Dear Ms. Dhaliwal:
We have reviewed the materials forwarded to our office for the proposed project referenced above. The
water main installation as described appears to pass through or near site 45 -KI -6, and this plus the
location near the Duwamish River indicates the project area has the potential for archaeological resources.
Further, the scale of the proposed ground disturbing actions would destroy any archaeological resources
present. We recommend a professional archaeological survey of the project area, including subsurface
testing through trenches or boreholes, be conducted prior to implementing the project. We also
recommend consultation with the concerned Tribes' cultural committees and staff regarding cultural
resource issues.
If any federal funds or permits are involved Section 106 of the National Historic Preservation Act, as
amended, and its implementing regulations, 36CFR800, must be followed. This is a separate process
from SEPA and requires formal government -to- government consultation with the affected Tribes and this
agency.
These comments are based on the information available at the time of this review and on behalf of the
State Historic Preservation Officer. Should additional information become available, our assessment may
be revised. Thank you for the opportunity to comment on this project and we look forward to receiving
the survey report. Should you have any questions, please feel free to contact me at (360) 586 -3088 or
Scott.Williams@dahp.wa.gov.
Sincerely,
440
Scott Williams
Williams
Assistant State Archaeologist
(360) 586 -3088
scott.williams @dahp.wa.gov
CC: Charles Sundberg, King County
• •
STATE OF WASHINGTON
I
IAUR 2 41007
Pivo
t -0,4(
a "� -1 a � D�
1 (1 / ea xA % -- 4,
1
March 15, 2006
Michael Cusick
City of Tukwila Public Works Department
6200 Southcenter Blvd.
Tukwila, WA 98188
Purpose of this letter
Sin
San /a Lange, Shoreline Planner
cc: Minnie Dhaliwal, City of Tukwila
STATE OF WASHINGTON
DEPARTMENT OF ECOLOGY
PO Box 47600 • Olympia, WA 98504 -7600 • 360- 407 -6000
TTY 711 or 800- 833 -6388 (for the speech or hearing impaired)
Re: City of Tukwila Shoreline Substantial Development Permit #L05 -053
City of Tukwila Public Works — Owner /Applicant
Ecology Shoreline Substantial Development Permit # 2006 -NW -50012
RECEIVED
C.ON NIUNI T
DEVELOPMENT
This letter is to inform you that on February 21, 2006, the Department of Ecology received
notice that the City of Tukwila approved your application to construct a new 1900 linear foot by
10 inch diameter water main upgrade in the Urban Shoreline Environment of the
Duwamish/Green River.
The law requires you to wait at least twenty -one (21) days from the date Ecology received this
decision from the City of Tukwila before you begin the specific activities authorized by this
permit. This waiting period is to allow anyone disagreeing with any aspect of your permit to
appeal to the Washington State Shorelines Hearings Board. The Shorelines Hearings Board will
notify you by letter if they receive an appeal, and if they do you must wait until the appeal is
over before you start work.
To be sure that the Shorelines Hearings Board has not received an appeal, we advise you to call
them at (360) 459 -6327 before you begin work. Other federal, state and local permits may be
required in addition to this shoreline permit. Please contact me at 425- 649 -4260 or
slan461@ecy.wa.gov if you have any questions about this letter.
S City of Seattle
• •
Gregory J. Nickels. Mayor
Gregory J. Nickels, Mayor
Seattle Public Utilities
Chuck Clarke, Director
September 8, 2005
Minnie Dhaliwal
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, WA 98188
RE: Notice of Application
Construction of a 10 inch water main from Interurban Avenue South to Andover
Park East (approximately 1900 linear feet)
L05 -053 (Shoreline permit), E05 -001 (SEPA)
Dear Minnie:
Thank you for sending Seattle Public Utilities a copy of your Notice of Application for this
project.
This letter is to provide notice that Seattle Public Utilities operates a 60" inch concrete
cylinder pipeline within Southcenter Boulevard to Andover Park East in the vicinity of this
project. This pipeline is one of our main water transmission lines which supplies water
communities in South King County.
I have enclosed copies of our map book sheets showing the approximate location of the 60"
inch concrete cylinder pipeline. If there is to be operation of heavy equipment, excavation or
construction performed in the area of our pipe, Seattle Public Utilities should be included in
the pre - construction process, plan review and the actual construction.
Information needed by SPU
• Three copies of scalable Plan, Section and Profile drawings that show the planned
improvements in proximity to our pipe. These plans will be reviewed for comment by
SPU Operations staff & engineers.
• The planned start and finish dates.
C GCR,•".) . . n
R e o
SEP 0 9 2005
commuNnv
° LOPmENT
Key Tower Building, 700 5th Avenue, Suite 4900, Seattle, WA 98104 -5004
Tel: (206) 684 -5851, TTY/TDD: (206) 233 -7241, Fax: (206) 684 -4631, Internet Address: http: / /www.seattle.gov /util/
An equal employment opportunity, affirmative action employer. Accommodations for people with disabilities provided upon request.
• •
Information you may need
• Record plans of our facilities can be obtained from the City of Seattle Vault which is
located at the 47 floor of the Seattle Municipal Tower, 700 5th Ave., Suite 4700,
Seattle, 98124. The phone number there is 206 - 684 -5132.
• Any work in close proximity to our pipeline (including locating by potholing)
must be supervised by SPU. Call SPU's Lake Youngs Headquarters at 425 -255-
2242 at least 48 hours in advance.
• Pipe protection may be necessary if heavy equipment crosses the pipe. Typical
temporary bridging would be timbers and steel plate.
If anyone connected with this project should need additional information please contact me at
206 - 684 -5969 or e-mail Bob.gambill @seattle.gov.
Sincerel
/( AI- _‘ .‘ 7 4 c ,„_ L //
ob Gambill
Sr. Real Property Agent
Enclosure: Map book page 334 showing approximate location of the Cedar River Pipe
Line.
23- & 223
. i
•
.HST
•
• :c1 —
\ I0S5
\ CUSH. U.
,-. 4901 53R0 AVE
FOR' * ; 6" SERVICE
it155770 'TV
7 Iry divot " pitk iti
1101$111 1215
7571094 ,
TK 15
•
VII
' < - •
'4,7 4 • 4 ..4. Z
•
S lbOTH ST
11 1 1- `,„ \ N
256+22:4 \
•
•
^ I •
•
I A
I
% •\ •
..
I.
• i
> '
co 3 /
tes V
UH
256+ 5 I
V
+++ DRUM UNE
\ \*tk • ‘='=', OVER 421 OF MH,FRWY
\
\ -c m DRAIN 36.
\ \ st, / ; CD 1.1
ow, •••••
) mInts
1 1.1
S 163RD PA
•
i
dN
1> •
3
6300
\
• \
SLADE
go
UN
245+20
12"CULVERT
211
60° CCP SLIPLINED
W/ 54" OR 55" STE
ID X 0.4° WALL
FROM STA 244+91 TO
STA 251+33
PLAN 11120-23'
05
5700 6800 5900 8200 8300 8400
I • , • t f ; ;- ' •
' •
a. .„ ,:10
171376
/ TO TUKWILA
/ i 12 K " 1 F 2 L & 0 T
Qo j tr i 246+10
f?, s 5,
. '.."!" \ it ■
I
CO" `\‘.
% . cg
U ▪ i
I i
1,.,
as
, - 1
1 ..._,
326:
TOKWILA
13
a
'3'
`,...,
O .....„,
-----_,.
`---.., '----,...
0 .. N
"•..,...,
'`....,
30' STORPISEWER
,,...„ . ,..,
0 "....... - 11
-.1-,,, N i
,,,
t 1 sit
30' STORM SEWER
OVER
460
SOUTHCENTER
MALL
•
• 30' STORM SEWER
✓ OVER
IIH
334A
•
• •CC
CR PI 14
TUKU/11A PARKWAY
1
BAKER BLVD
8,500 •
•
ANDOVER
gi •
tifiF
INDUSTRIAL
PARK
g
Z.::
IW
• :
CHV
•
:10
ir-
4' GAS
60'W OF BOV '
239: r
LINE XING
`cONO X414G
36" DEEP'
,
:1ra.ii_.tc__?_----- ‘
--210F0.1R9 • "4 0,
ELECTRAC CONDUITS
71"W OF BOV
> - , •
4.%A.11
XING
SOS BOVE J
COVI4
205+45
t • 335
it • 20.5.t25
2 ELK CONDIA1
2 RING OVER
1125E8009
12•V
205+80
Cc .
i97+69
3 ELCtRIC - CO Dun's
i
X-I OVER' ' .- . .i.
V HIGH LTAGE.
PSP , 2' GU May : ' .
September 1, 2005
Minnie Dhaliwal
Planner, City of Tukwila
6300 Southcenter Boulevard
Suite 100
Tukwila, WA 98188
Dear Ms. Dhaliwal:
• •
MUCKLESHOOT
CULTURAL RESOURCES PROGRAM
39015 172nd Avenue S.E. • Auburn, Washington 98092 -9763
Phone: (253) 939 -3311 • FAX: (253) 876 -3312
RE: Southcenter Boulevard Water Main Replacement
RECEIVED
SEP 0 6 2005'
DEVELOPMENT
On behalf of the Cultural Resources Committee, I have reviewed the information sent on
8/19/05 regarding the Southcenter Boulevard Water Main Replacement and have the following
comments. The along South Grady Way to Southcenter Boulevard property is an area the Tribe
has flagged as high potential for archaeological discovery. Information regarding previous
surveys and recorded archaeological sites is available from the Office of Archaeology and
Historic Preservation, in Olympia. If the project area has been previously surveyed, then the
following requests can be disregarded.
Due to the project's ground disturbing activities and the potential for archaeological
discovery, the Cultural Committee is requesting:
1. An archaeological field study of the project APE by a professional archaeologist.
2. The option of sending a tribal monitor during the field survey
3. To review the draft survey for completeness and accuracy
4. A copy of the final technical report for our files
The Cultural Resources Program does not represent the Wildlife Program and the
Fisheries Program which are separate departments under the Muckleshoot Indian Tribe. Please
contact these departments separately for their input on this project.
We appreciate the effort to coordinate with the Muckleshoot Tribe prior to site
preparation. The destructive nature of construction excavation can often destroy a site and cause
delays and unnecessary expense for the contractor. If you have any questions, please contact me
at 253- 876 -3272. Thank you for keeping the Tribe informed.
Sin y,
Laura Murphy, Tribal Arch'ologist
CC:Melissa Calvert, Wildlife & Culture Director
Stephenie Kramer, Assistant State Archaeologist, OAHP
•
August 26, 2005
Mr. Mike P. Cusik, PE
City of Tukwila
6300 Southcenter Blvd, Suite 100
Tukwila, WA 98188
RE: Notice of Incomplete Application
Shoreline Permit
L05 -053
Dear Mr. Cusik:
The City of Tukwila's Planning Department received your application for shoreline permit
approval on August 17, 2005. On August 26, 2005 it was deemed to be incomplete because
certain requirements of the application were not provided:
Please provide the following:
•
City of Tukwila
•
Steven M. Mullet, Mayor
Department of Community Development Steve Lancaster, Director
1. Application fee in the amount of $2,000
2. King County Assessor's map(s), which shows the location of each property within 500
feet of the proposed work.
3. Two sets of mailing labels for all property owners and tenants (residents and businesses)
within 500 feet of the subject property. Note: Each unit in multiple family buildings e.g
apartments, condos, trailer parks must be included.
4. Vicinity map with site location
5. A written discussion of the project consistency with decision criteria (See Application).
Check with a planner if you are unsure of what criteria to apply to your project.
6. If additional impervious surface is proposed provide a Technical Information Report
(TIR) including feasibility analysis per King County Surface Water Design Manual
(KCSWDM).
7. Provide sensitive area studies as needed per Tukwila's Sensitive Areas Ordinance (TMC
18.45). Provide a geotechnical analysis of river bank stability if alteration is proposed.
8. Landscaping planting plan by a Washington State licensed landscape architect. One set
of all plans and analyses shall have the original Washington State registered Landscape
6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665
Architect stamp and signature. Plans must include the type, quantity, spacing and
location of all plantings. Maximum size 24" by 36 ".
a. Show all existing trees to be retained and any tree protection measures required
(for example fencing at drip lines).
b. Location of all sensitive areas (e.g. streams, wetlands, slopes over 15 percent, coal
mine areas and important geological and archaeological sites). For stream
frontage provide existing and proposed top of stream bank, stream bank toe,
stream mean high water mark, and base flood elevation (i.e. 100 year flood plain).
Maximum size is 24 inches by 36 inches.
c. Location of all required sensitive area buffers, setback tracts and protection
measures.
d. Show all trees over four inch caliper, indicating those to be retained.
9. One set of all civil plans and analyses shall be stamped, signed and dated by a licensed
professional engineer. Include a graphic scale and north arrow. Maximum size is 24
inches by 36 inches.
a. Vertical datum NAVD 1988 and horizontal datum NAD 83/91. Conversion
calculations to NGVD 1929, if in a flood zone or flood -prone area.
b. Existing (dashed) and proposed (solid) topography at 2 inch intervals.
c. Construction limit lines, areas of clearing/grading /filling and volume and type of
expected cut and fill.
d. Existing and proposed utility easements and improvements, on site in street
(water, sewer, power, natural gas, telephone, cable). Schematic designs to be
provided regardless of purveyor. No capacity calculations, invert depth, valve
locations, or the like are needed.
e. If additional impervious surface is proposed provide a storm drainage design at
least 90 percent complete, which meets TIR and KCSWDM. Include all storm
drainage maintenance access and safety features. Call out total existing and
proposed impervious surface in square feet.
f. Show the 100 year flood plain boundary and elevation as shown on FEMA maps.
g. Footprints of all existing and proposed buildings.
h. Fences, rockeries, and retaining walls.
10. Shoreline site map showing the following
a. Existing and top of bank, landward catch point toe of levee, riverbank toe, mean
high water mark and base flood elevation.
b. For work riverward of the mean high water mark show the distance the work
extends into the river and distance to Federal projects and navigation channels.
c. If the project is within the Tukwila shoreline master program show the limitis of
the 40 foot river, 100 foot low impacts and 200 foot high impact environments.
d. Dike /riverbank maintenance easements if applclable.
e. Public access and/or trails.
f. Construction limit lines, areas of clearing /grading /filling
g. Parking lots, loading service areas.
h. Street furniture such as benches and bike racks.
11. Shoreline Cross Sections showing the following:
a. Provide shoreline cross sections at a maximum 75 feet intervals along the project
river site.
b. Show all existing and proposed improvements.
c. If the project is within the Tukwila Shoreline Master Program show the limit of
the 40 -foot river, 100 -foot low impact, and 200 -foot high impact environments.
d. Existing top of bank, landward catch point toe of levee, riverbank toe, mean high
water mark and base flood elevation.
Please note that the Department shall cancel an incomplete application if the applicant fails to
submit the requested information within 90 -days following notification from the Department that
the application is incomplete. The Department may extend up to 120 days if the applicant
submits a written request for an extension prior to cancellation. The request must clearly,
demonstrate that the delay is due to circumstances beyond the applicant's control (such as the
need for seasonal wetland data) or unusual circumstance not typically faced by other applicants,
and that a good faith effort has been made to provide the requested materials (TMC 18.104.070).
Once the above - mentioned information is provided, City staff can begin to review the
application. If you have any questions, please feel free to call me at (206) 431 -3684 or you can
email me at bmiles @ci.tukwila.wa.us.
randon J. Miles
Assistant Planner
cc. Nora Gierloff, Planning Supervisor
File (L05 -053)
August 24, 2005
TDK:maf
•
City of Tukwila
Dept. of Community Development
6300 Southcenter Blvd., Suite 100
Tukwila, WA 98188
Re: File Numbers - L05 -053 Shoreline Permit, E05 -001 (SEPA)
10" Water Main Installation from Interurban Ave. S. to Andover Park E.
To Whom It May Concern:
Thank you for the opportunity to review the Shoreline permit and the SEPA checklist on
the above - referenced project.
We have no comments at this time and wish you good luck with this endeavor.
Sincerely,
Thomas D. Keown, P.E.
Construction /Operations Manager
• rfEcoveo
AUG 25 20
QE°F o M Ty
�i-- 4- 4- N „',-
Serving the Southwest Metropolitan Area since 1946
23828 - 30th Ave. S. • P.O. Box 3867 • Kent, WA 98032 • (206) 824 -0375 / FAX: (206) 824 -0806
•
City of Tukwila
Department of Community Development Steve Lancaster, Director
The following applications have been submitted to the City of Tukwila Department of Community Development:
PROPOSAL: The project involves construction of a 10 inch water main from Interurban Avenue South
to Andover Park East (approximately 1900 linear feet).
APPLICANT: City of Tukwila, Public Works.
LOCATION:
NOTICE OF APPLICATION
DATED AUGUST 19, 2005
FILE NUMBERS: L05 -053 (Shoreline permit), E05 -001 (SEPA)
•
Steven M. Mullet, Mayor
The project is located along South Grady Way to Southcenter Boulevard to Andover
Park East. The water line will be attached to the existing bridge over the Green River and
will be underneath a paved trail along the river.
These files can be reviewed at the Department of Community Development, 6300 Southcenter Blvd., #100,
Tukwila, WA. Please call (206) 431 -3670 to ensure that the file(s) will be available.
OPPORTUNITY FOR PUBLIC COMMENT
You can submit comments on this application. You must submit your comments in writing to the
Department of Community Development. Comments regarding the State Environmental Protection Act
Permit (E05 -001) are due by 5:00 p.m. on September 2, 2005 and comments regarding the Shoreline
Permit (L05 -053) are due by 5:00 p.m. on September 19, 2005. If you have questions about this proposal
contact Minnie Dhaliwal, the Planner in charge of this file, at (206) 431 -3685. Anyone who submits written
comments will become parties of record and will be notified of any decision on this project.
APPEALS
You may request a copy of any decision on this project or obtain information on your appeal rights by contacting
the Department of Community Development at 206 -431 -3670. Decision related to the Shoreline is made by the
Director of Community Development and may be appealed to the State Shorelines Hearing Board. The
Department will provide you with information on appeals if you are interested.
6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665
Dept. Of Community Development
i ity Of Tukwila : °"'
AFFIDAVIT 1 DISTRIBUTION . . . ti, w4;
Pt' c,
I, HEREBY DECLARE THAT:
(/0(tet 4-
Notice of Public Hearing
Determination of. Non - Significance
•
Notice of Public Meeting
Mitigated Determination of'Non-
Significance"
Board of Adjustment Agenda Pkt
Determination':of Significance & Scoping
Notice
Board of Appeals Agenda Pkt
Notice of Action • l
Planning Commission Agenda Pkt
Official Notice
Subdivision Agenda
y,, Short
Notice of Application.
Shoreline Mgmt Permit
Notice of Application ; fbr - Shoreline:,Mgmt
Permit - , - ,,,;:}
__
FAX To Seattle Times
Classifieds
Gail Muller Classifieds
PO Box 70 - Seattle WA 98111
Other �k
;.;, g `
f:
Was mailed to each of the addresses listed on this I, `''`: day o
year 20
P:GINAWYNETTA/FORMS /AFFIDAVIT -MAIL 08/29/003:31 PM
Project Name:
Tait-w; ca
Project Number: r O('14�3 05— (
w
D. &
Mailer's Signature:
,� D
Person requesting mailing: Dif-2a,6t.,D4 1 �t
FOR STAFF USE ONLY Sierra Type: P -SHORE
Planner:
File Number: LO C— — o
3
Application Complete (Date:
)
Project File Number:
Application Incomplete (Date:
)
Other File Numbers:
APPLICATION
NAME OF PROJECT/DEVELOPMENT: s ( ") "
12 PL A -->- T
LOCATION OF PROJECT/DEVELOPMENT: Give street address or, if vacant, indicate lot(s), block and subdivision,
access street, and nearest intersection. LIST ALL 10 DIGIT PARCEL NUMBERS.
4
7 a a r'os e
SO.li�1Cy - "v: i r. IC?; LUt�
i v.. L Ma k r r'A2
Quarter: 5 L.' Section: 2y Township: Z 3a Range: 4 / E
-7- 273 -z 3 N G} C
(This information may be found on your tax statement.)
DEVELOPMENT COORDINATOR :
The individual who:
• has decision making authority on behalf of the applicant in meetings with City staff,
• has full responsibility for identifying and satisfying all relevant and sometimes overlapping development standards,
and
• is the primary contact with the City, to whom all notices and reports will be sent.
ill IL 144C- r G v5 rc� —
Name:
Address: S S Li n4 C -re-Z , 2 Lvr-� s i IUv
Phone: ' 7 - 4 4 .
4 1 3 / 2
E -mail: feusg-14- tvecal,A w Li
Signature:
G:\APPHAN\LANDUSE. APP\SHORLINE.DOC, 09/11/03
ilk F,4 n' 1
CITY OF TUKWILA SHORELINE
Department of Community DevelopmRi F c r' 7r) n
6300 Southcenter Boulevard, Tukwila, WA 98188 PERMIT
Telephone: (206) 431 -3670 FAX (206) 431 -36AUG 1 2005
E -mail: tukplan @ci.tukwila.wa.us
COMMUNITY
DEVELOPMENT
13 ✓V . c_..A;
r ri . TLS
T��
FAX: -G - c/ — 3 L C-
Date: Z / /S10s
A i4
rZ lz- (.✓1 L
• •
Response to 18.44.110 General Shoreline Regulations
for the installation of the water line
from SW Grady Way to Andover Park East
1. The use is in conformance with the regulations of the underlying zone district.
The installation of the water line is in conformance with the regulations of the underlying
zone district.
2. The use does not conflict with the goals and policies of the shoreline master program
or the provisions of the Shoreline Act and shoreline regulations.
The installation of the water line is not in conflict with the goals and policies of the
shoreline master program or provisions of the shoreline act and shoreline regulations.
3. No structures or accessory facilities shall be located over the river unless such
structure protects or promotes the public interest.
The installation of the water line under the existing bridge and m the river dike protects and
promotes the public interest by providing domestic and fire water to the people of Tukwila.
4. There shall be no disruption of existing trees or vegetation within the river
environment unless necessary for public safety or flood control, or if allowed as a part
of an approved shoreline substantial development permit.
The water line will be installed in paved or landscaped areas only. After the line is
installed, the areas will be restored to the original condition. The project will obtain all
State and federal permits for installation of the water line.
5. No effluent shall be discharged into the Green River which exceeds the water quality
classification as established by the State for the adjacent portion of the river.
The project will not discharge effluents into the Green River. The line will carry domestic
water.
6. All State and federal water quality regulations shall be strictly complied with.
The project will comply with all State and federal water quality regulations.
7. Wildlife habitat in and along the river should be protected.
The project will protect all wildlife habitat in and along the river during the installation of
the water line.
8. All perimeters of landfills or other land forms susceptible to erosion shall be provided
with vegetation, retaining walls or other satisfactory mechanisms for erosion
prevention.
The project will provide erosion control during the installation of the water line. The plan
will prevent sediments from entering the Green River.
Response to Shoreline Regulations
Page 2
• •
9. All necessary permits shall be obtained from federal, State, County or municipal
agencies.
The project will obtain all necessary permits from federal, State, County and municipal
agencies.
10. Dredging for purposes other than for navigational improvements or flood control is
prohibited.
The project will not be doing any dredging for the installation of the water line.
11. Mining is prohibited along the river shoreline.
The project will not be doing any mining along the riverbank for the installation of the
water line.
12. Solid waste disposal is prohibited along the river shoreline.
No solid waste will be disposed of in the shoreline area during the installation of the water
line.
13. No property will be acquired for public use without dedication by or just
compensation to the owner.
The water line will be installed in existing right -of -ways and easements. No property will
be acquired.
14. Landfilling is prohibited within the river channel unless such landfill is determined by
the Planning Commission to protect or promote the public interest.
No landfill will be installed during installation of the water line.
15. Notwithstanding any provisions of this Code to the contrary, removal of any
cottonwood tree within the river environment or the low- impact environment, which
tree is 12 inches or greater in diameter as measured 4.5 feet above grade, shall be -
subject to the requirements of TMC Chapter 18.54, Tree Regulations.
No cottonwood trees will be removed for the installation of the water line. If any trees are
disturbed, they will be replaced in kind and size.
(Laurie Admin/Mike /Response to General Shoreline Regulations)
42
40
38
36
34
32
30
28
26
24
22
20
18
16
14
12
10
8
6
4
EXISTING ABUTMENT
PENETRATION @ 32.69
PROPOSED WATER. LINE SUSPENDED FROM BRIDGE
ELEV. OF WATER LINE VARIES
EXISITING 25' STEEL
SLEEVE IN ABUTMENT
inn natAr■
ELEV 10.70r
SCALE 1''=10 SECTION AT EAST SIDE OF BRIE)GE
LOOKING NORTH
U 1
1-11 =1 PI
11
1G v g tifil
- - Ai* gRariga WENR1 kirgaligggigro
ORDINARY HIGH WATFR
W=S=IFWo
d llwii
_
AREISIZI
,figmainnaormarinamigengsmir
SOUTHCENTER BLVD, WATER MAIN REPLACEMENT
SHORE LINE SECTIONS JULY 2005 BY M. CUSICK
350505 5 .3953 3A 3 510359 005 689 50 pueig JeuolleNN,
3,365005 3053 5133165 DO L 590 55
360005 .3060353513206905 90.51.
42
40
38
36
34
32
30
28
26
24
22
20
18
16
14
12
10
6
2
4 '
-111-1L1=111=1
rilli=1 1 1 iz
1
ABUTMENT
SOUTHCENTER
...
.•
11TrETBLYD
BRIDGE
----r-
• • ... q '. .. . •
1 iiE
42
40
38
36
34
32
30
28
26
24
22
20
18
16
14
12
10
8
6
4
EXISTING ABUTMENT
PENETRATION @ 32.69
PROPOSED WATER. LINE SUSPENDED FROM BRIDGE
ELEV. OF WATER LINE VARIES
EXISITING 25' STEEL
SLEEVE IN ABUTMENT
inn natAr■
ELEV 10.70r
SCALE 1''=10 SECTION AT EAST SIDE OF BRIE)GE
LOOKING NORTH
U 1
1-11 =1 PI
11
1G v g tifil
- - Ai* gRariga WENR1 kirgaligggigro
ORDINARY HIGH WATFR
W=S=IFWo
d llwii
_
AREISIZI
,figmainnaormarinamigengsmir
SOUTHCENTER BLVD, WATER MAIN REPLACEMENT
SHORE LINE SECTIONS JULY 2005 BY M. CUSICK
350505 5 .3953 3A 3 510359 005 689 50 pueig JeuolleNN,
3,365005 3053 5133165 DO L 590 55
360005 .3060353513206905 90.51.
42
40
38
36
34
32
30
28
26
24
22
20
18
16
14
12
10
6
2
46
44
42
40
38
36
34
32
30
28
26
24
22
20
18
16
14
12
10
8
30
28
26
24
22
20
18
16
14
12
10
8
EXISTING ABUTMENT
PENETRATION @ 40.60
ABUTMENT
SOUTHCENT
SCALE 1' =10'
13' AC TRAIL
ABUTMENT I -405 11' AC TRAIL
BRIDGE
SCALE 1' =10'
PROPOSED WATER LRNE SUSPENDED FROM BRIDGE 36
34
12' -4 3/4' MIN. CLEARANCE BETWEEN BRIDGE AND TRAIL 32
WATER TENCH SECTION 30
SECTION AT WEST SIDAE OF BRIDGE
LOOKING NORTH
WATER TRENCH SECTION
28
ORDINARY HIGH WATER 24
ELEV 10.70'
22
20
18
16
GREEN RIVER 12
30
28
26
24
22
20
18
16
ORDINARY H G WATEI
♦ � 2
GREEN RIVER 10
8
10
8
4
50
48
46
44
42
40
38
36
34
32
30
28
26
24
22
20
18
16
14
12
10
8
6
4
SCALE V =10'
SECTION ATREAST SIDE OF BRIDGE
36
34
32
EAST ABUTMENT 3
SOUVHCENTER BLVD,
28
26
24
22
20
18
16
14
12
10
c.u1951 S CE]
(ZL81) '4V 41)1 Vd ZI
1NOM
Spry (1 913
•O.
. 1.
1
P
Ir)vd•
1' )_ 1YI N3SOONI
SPAR o9 9
9 }O]'jftog
ir 55 3 3 ''._ .
•
, ? I ' 1 9nww0P;
Olt §.aliv6;
Y6` `
O ~d •Q A1?J►7U •'!
er
•
1;MN31d1SL3
0 J)- . y
a30 -
• ✓•: :
11
DESIGNED
DRAWN
CHECKED
PROJ. ENG.
CITY OF TU
<WILA
S .0
Re
6 " 23 . /
Re ((4 /
/ f p
3
8
MATCHLINE - SEE SHEET 3
PST LIC W :�� a . DEPT.
— ENGINEERING — STREETS — WATER— SEWER— PARKS— BUILDING—
s
/M
/?. 23
2y . CEAY
j? • e
� 9k Y N 1) /
CAy WS J i e 2. 00 ,
s ,, •
/6
0 3
8
SOUTHCENTER BLVD. WATER MAIN REPLACEME \T
DE S IGNE D
CITY OF TUKWILA
THIS BOUNDARY AND TOPOGRAPHIC SURVEY WAS DONE WITHOUTH
THE BENEFIT OF A CURRENT TITLE REPORT. EASEMENTS MAY EXISTS
THAT ARE NOT SHOWN ON THIS SURVEY
NOTE:
LEGAL DESCRIPTIONS FOR INDMDUAL PARCELS CONSOLIDATED IN THE
BOUNDARY SHOWN HEREON HAVE NOT BEEN SHOWN ON THIS SURVEY.
BOUNDARY AND RIGHT -OF -WAY INFORMATION SHOWN HEREON IS BASED
UPON MONUMENTED POSITIONS AND RECORD INFORMATION.
REFERENCE SURVEYS:
RECORD OF SURVEY AT PAGE 7, PAGE 229
PLAT OF ADAMS HOME TRACTS
PLAT OF CHERRY LANE
RECORD OF SURVEY AT PAGE 22, PAGE 30
PLAT OF CLARK'S GARDEN ADDR7ON
RECORD OF SURVEY AT PAGE 148, PAGE 179
RECORD OF SURVEY AT PAGE 89, PAGE 197
RECORD OF SURVEY AT PAGE 15, PAGE 12
RECORD OF SURVEY AT PAGE 29, PAGE 58
ALL RECORDS OF KING COUNTY, STATE OF WASHINGTON.
HORIZONTAL DATUM:
WASHINGTON STATE PLAN COORDINATE SYSTEM, NORTH
ZONE (NAD 83/91). USED CITY OF TUKWILA POINTS AS SHOWN.
COORDINATES SHOWN HEREON HAVE BEEN CONVERTED TO GROUND COORDINATES
TO CONVERT BACK TO GRID COORDINATES SUPPUED BY THE CITY MULTIPLY BY
THE FOLLOWING COMBINED GRID SCALE FACTOR OF: 0.99999393 TO THE GROUND COORDINATE
COORDINATES SHOWN BELOW WERE USED AND SUPPUED BY THE CITY.
GROUND COORDINATE VALUES:
1925
40005
40004
176392.1951
176336.4310
177258.7421
176077.0799
1281054.2216
1282378.8787
1281852.9789
1281492.2427
GRID COORDINATE VALUES:
1925 176391.1242 1281046.4445
1 176335.3605 1282371.0936
40005 177257.6660 1281845.1970
40004 176076.0110 1281484.4630
VERTICAL DATUM:
USED CITY OF TUKWILA VERTICAL DATUM (MVO 88)
BENCHMARKS USED & PROVIDED BY THE CITY OF TUKWILA
USED BENCHMARK NO. 67; EL =358.47 FEET
SUBSTRUCTURE NOTE:
BURIED UTILITIES ARE SHOWN AS INDICATED ON RECORDS MAPS
FURNISHED BY OTHERS AND VERIFIED WHERE POSSIBLE BY FEATURES
LOCATED IN THE FIELD. WE ASSUME NO UABIUTY FOR THE ACCURACY
FOR THE FINAL LOCATION OF EXISTING U77U77E5 IN AREAS CR/I7CAL TO
OF THOSE RECORDS. DESIGN CONTACT THE UTILITY OWNER /AGENCY.
SETBACKS:
CURRENT SETBACK REOUIREMENTS SUBJECT TO SITE PLAN REVIEW.
CURRENT SETBACKS MAY DIFFER FROM THOSE IN EFFECT DURING
DESIGN /CONSTRUCTION OF EXISTING IMPROVEMENTS.
FLOOD ZONE:
THIS SITE APPEARS ON NATIONAL FLOOD INSURANCE RATE MAP, DATED 05/16/95
COMMUNITY PANEL NO. 53033C0960F, AND I5 SITUATED IN ZONE ') AREA
DETERMINED TO BE OUTSIDE 500 -YEAR FLOODPLAIN.
PUBLIC WORKS DEPTO
— ENGINEERING — STREETS — WATER— SEWER— PARKS— BUILDING
324.1072 FD MON IN CASE INT. OF S. 144th ST & 37th AVE S
288.7576 FD MON IN CASE 1/4 COR
283.4500 FD COT PK 71M
308.5800 FD COT PK BM"
324.1072 fD MON IN CASE INT. OF S. 144th ST & 37th AVE 5
288.7576 FD MON IN CASE 1/4 COR
283.4500 FD COT PK BM"
308.5800 fD COT PK BM"
DRAWN
CHECKED
PROJ. ENG.
PROJ. DIR.
SITE
SANITARY SEWER
CITY OF TUKWILA
6300 SOUTHCENTER BLVD
DEPARTMENT OF PUBLIC WORKS
TUKWILA WA 98188
PH /206) 433 -0179
FAX / (206) 433 -3665
WATER
CITY OF TUKWILA
6300 SOUTHCENTER BLVD
DEPARTMENT OF PUBLIC WORKS
TUKWILA, WA 98188
PH / 206) 433 -0179
FAX / (206) 433 -3665
NATURAL GAS
PUGET SOUND ENERGY
MUNICIPAL CONSSRRUCTION PLANNING DEPARTMENT
P.O. BOX 90868 - MAIL STOP: TAC-ANX
BELLEVUE, WA 98009 -0868
PH / 1 -888- 225 -5773, EX1 . 89 -6304
CONTACT: ANDY PADVORAC
SHEET INDEX
1 COVER SHEET
2 WATER PLAN
3 WATER PLAN
4 WATER PLAN
5 WATER PLAN
6 WATER PLAN
VICINITY MAP
NOT TO SCALE
STORM DRAINAGE
CITY OF TUKWILA
6300 SOUTHCENTER BLVD
DEPARTMENT OF PUBUC WORKS
TUKKILA WA 98188
PH / (206) 433 -0179
FAX / (206) 433 -3665
POWER
PUGET SOUND ENERGY
MUNICIPAL CONISIRUC71ON PLANNING DEPARTMENT
P.O. BOX 90868 - MAIL STOP: TAC —ANX
BELLEVUE, WA 98009 -0868
PH / 1- 888 - 225 -5773, EXT. 89 -6304
CONTACT: ANDY PADVORAC
TELEPHONE
US WEST COMMUNICATIONS
1 (800) 244 -111
SOUTHCENTER BLVD. WATER MAIN
REPLACENEN
GUARD RA
RIGHT OF
CENTER L I
FOG UNE
ilia lira ASPHALT
GRAVEL
CONCRETE
RETAINING
FLOW UNL
— W— UNDERGRI
— SS — UNDERGRI
—SD— UNDERGRI
—G(L)— UNDERGRI
—TL— OVERHEAL
—P(L)— UNDERGRI
— PO— OVERHEAL
FENCE
CULVERT
C 'Q ROCKS
VEGETA77L
FOUND M
TRAFf1C
SEWER M
LIGHT PC
WATER V.
POWER V
CABLE 11
GAS MET
FIRE HYL
f7RE DEF
TRAFFIC
WATER V
POST LNL
GAS VALI
CATCH B
WATER M
YARD LIL
TELEPHO
TELEPHO
POWER I
GUY
CATCH E
HANDIC4
HAND HI
YARD OF
BLOW -0
P£DL5UI
fl OVERHE/
O DECIDUO
• CONIFER
CD SHRUB
HAND H
CPP CORRIGA
RCP REINFOR
0
0
P
EX. C8
TOP.33.34
IE =28.24 1i' OUT
IE =28.44 8 STEEL
EX. CB
TOP=33.6
IE =31.50 8' STEEL
ER PARK EA
TOP. -53.05 4 '
EX. CB
TOP -24.37
IE =17.67 6' CLAY
DESIGNED
DRAWN
CHECKED
CITY OF TUKWILA
U LIC W DEPT.
— ENGIN EERING — STREETS — WATER SEWER— PARKS— BUILDING—
! y (NJ
a .' �SFJ � F 7S 8
, s s
• Os
MATCHLINE - SEE SHEET
PROJ. E NG.
W..
76'• 03
7
B
0 4 4 ;
Q4k /NJ/ •
N FJ /. F 2 3 6
6,
10. 1.25. �3
SOUTHCENTER BLVD. WATFR KA A I NI RFPI o r AFNIT
W
W
U)
W
W
(I)
w
z
J
U
DESIGNED
DRAWN
CHECKED
PROJ. ENG.
CITY OF TU 'K WI LA
TOP=47.5O
IE =45.50 t2 RCP SE
IE=46.20 12' PE N
PUBLIC WO
DE T.
- ENGINEERING - STREETS - WATER- SEWER- PARKS - BUILDING-
PROD. DIR.
M ATCHLINE -
SEE SHEET 5
10 ! -BEAMS EQUAL SPACED
SOUTHCENTER BLVD. WATER VAIN REPLACEVE\
li
•
SECTION DETAIL A -A, B-
N 172317.6751
E 290193.6515
WALL END
N 172444. 4'9
E 12903920264
VIEW C
OUT
WALL tN
N 17 7 .
.E. 129020
• SC )JTHCEIJTER • B
OUT
IE EL. 37.90
N 172348.9758
E 1290251.6985
IE 32.69 1.5' DIA W
E
12438.2040 1
E 1290395.9352
WALL END
46
RELOCATE STREET UGHT NAND BOX
AS REOURRED FOR INSTAWTION OF WATER MNN
ROTECT STREET LIGHT DURING 04STALLATION OF WATER UNE
A
A
VIEW A
END SUSPENDED PIPE
AT ABUTMENT
/'• SEE DETAIL ON SHEET
OZION
rt�=i 4;S • tP''4 Aj
D TRAIL OVERLAY
DETAIL PLAN VIEW FACING EAST
N.F.S.
BEAM ( T(P.J
FOR CONFIGURATION
SECTION DETAIL D -D
(FACING EAST)
N. T.S.
U t' LIC WORKS DEPT.
18' KNOCKOUT
IE EL. 32.89
N 172411.6203
E 12903502988
VIEW B
BEGIN SUSPENDED PIP O9ANNT
(2) 10" FLANGE WELDED TO PIPE
10' EX —TEND 200 SERIES f 210F1
FROM EBBA IRON. INC.
AV Aft
/ 41 77: 4
c 1
2.07'
70" DIA PIPE W /IN 12" HOLE Nut
CENTERED. IE ELEV. 40.60
U I —&EAM` EOUAL SPACED
EX. C8
T0P =34.43
EX. C8
TOP =33.44
IE =27.74 12' RCP E
IE =27.84 12' RCP W
0.25' CHAMFER
TYP.
\- 10' DIA. PIPE W /IN 12" HULE NOf
CENTERED /E ELEV. 30.77
CITY OF TUKWILA
REVISED SPOT ELEVATIONS
ADDED SHEET INDEX.
SECTION DETAIL C -C
(FACING WEST) N. T.S.
DETAIL PLAN VIEW FACING WEST
N. T. S.
W
W
W
i1)
W
Z_
J
I-
- ��+±f.134ffiR-
0 10 20
SCALE: 1 " =20'
OBSERVATIJN FROM SINGLE S TATION.
COO' DINATE S ARE ONLY
APPROX MATE AND SHOULD BE
VERIFIED BEFORE CONSTRUCTION
40
is*
DE S IGNE D
DRAWN
CHECKED
PROJ. ENG.
CITY OF TUKWILA
I 20.10 I 0.05 S f
18 RCP 18 RCP
EX. CB
TOP=24.93
IE =21.73 12' RCP W
IE =21.73 12' RCP E
EX. CB
TOP =28.24
IE =21.54 18' RCP NW
IE =21.54 18' RCP SE
TOP=25.79
CROSSWALK
X. SIMI
TOP=33.34
IE =15.64 18' RCP MN
IE =16.04 18' RCP E
TOP=26.11
EX. CB
TOP=25.40
IE =21.80 18' RCP W
IE =21.60 18' RCP E
X. CB
TOP=24.90
1E -21.10 18' RCP E
IE =21.20 18' RCP W
EX. CB
TOP=24.92
IE =20.82 18' RCP N
IEa20.82 18' RCP W
IE =21.42 12' RCP E
26
/S /C
N
PiJBY.IC WO DEPTO
- ENGINEERING - STREETS - WATER- SEWER- PARKS - BUILDING-
EX. CB
TOP=25.62
EX, SOl84
TO'=33.45
IE =16.05 18' RCP W
IE=16.25 18' RCP S
IE =24.43
TEE MJ X FL
VALVE
SOUTHCENTER BLVD. WATER MAIN REPLACEMEN
- r
F
0
sc
CONTACTS
TIME WARNER TELECOM
Fred Luco
223 Taylor Ave. N.
Seattle, Washington 98109
206.676.8066 (Office)
206.459.7180 (Mobile)
TURNKEY TELECOM
Jeff Smith
22011 Paradise Lake Road
Snohomish, Washington 98296
360.668.9329 (Fax)
206.947.6785 (Mobile)
turnkeytelecom ®msn.com
SITE INDEX
1/23 — COVER SHEET /PROJECT LOCATION
2 -20/23 — PLAN VIEW A — S
21/23 — PLAN VIEW OF 1ST & 2ND FLOOR
22/23 — SITE PHOTOGRAPHS
23/23 — STANDARD DETAILS AND SPECIFICATIONS
TIME WARNER . TELECOM
WER D `,° I _ ,'C'[I
SITE LOCATION CORRECTION %SON
LTR# e6007° 054.
V
a)
a
0
L
0
-0
c 1
0
c
4
0)
0 H
cn z
N
0
CO
0 0
o .
O
ao
v I
O 1—
Q.
Q �
a)
CI
2
47
0
0
CD
O
N
co
.. U
0 LO
CL
fD
Sheet:
1/23
Ygnition - 565 Andover Park West
CB
NEW
TWTC
•
AUA WATERUNE
CONSTRUCTION
ENDS HERE
CONSTRUCTION NOTES:
O INSTALL (1) 444LA MANHOLE PER DETAIL ON
SHEET 23/23. LEAVE 100' OF (1) 144CT FIBER
CABLE STORAGE.
O TRENCH UNDER GRASS AREA PER DETAIL ON
SHEET 23/23. INSTALL (4) 1 1/4 "0 HDPE
CONDUITS WITH (1) 144CT FIBER CABLE.
®
PULL (1) 24CT FIBER CABLE THROUGH EXISTNG
MANHOLE /HANDHOLE AND LEAVE 100' OF (1)
144CT FIBER CABLE STORAGE.
PLAN VIEW M
SL
„ Z W
O CORE (1) 4 1/2 "0 HOLE THROUGH CONCRETE
WALL OF EXISTING MANHOLE /HANDHOLE PER
DETAIL ON SHEET 23/23. USE (1) 4 "0 SLEEVE
AND WEATHERSEAL. PULL (1) 144CT FIBER
CABLE THROUGH.
® PULL (1) 1 1/4 "0 INNERDUCT WITH (1) 144CT
FIBER CABLE THROUGH EXISTING 4 "0 CONDUIT.
O INTERCEPT EXISTING 4 "0 AUA WATERLINE CONDUIT AND
EXTEND TO PROPOSED 444LA VAULT.
bcp
OMNI
MIME
7 /W
MVO
galn
* EXISTING UTILITIES -- EXISTING UTILITIES SHOWN ON THE PLANS HAVE BEEN PLOTTED FROM THE BEST INFOMATION
AVAILABLE TO THE DESIGNER. ACCURACY AND COMPLETENESS ARE NOT GUARANTEED. IT SHALL BE THE CONTRACTOR'S
RESPONSIBILITY TO LOCATE ANY EXISTING UTILITIES, WHICH MAY CONFLICT WITH THE CONTRACTOR'S OPERATION, WHETHER
SHOWN ON THE PLANS OR NOT. CALL THE UTILITIES UNDERGROUND LOCATION CENTER AT 1.800.424.5555.
®
PULL (3) 1 1/4 INNERDUCTS WITH (1) 144CT FIBER
CABLE THROUGH EXISTING 4 "0 TIME WARNER TELECOM DUCT
PLACED BY UNDERGROUND CONTRACTOR IN ALIA WATERLINE
CONSTRUCTION.
MIN
O PULL (1) 144CT FIBER CABLE THROUGH EXISTING (1)
3030LA (30"X30 "X36") HANDHOLE PLACED BY UNDERGROUND
CONTRACTOR.
- EL Mr/
.I
tD
MINIM
■
NEW TWTC
POWER '® WATER
® S ORM
® PROPOSED
N.
O
co
O O
iti
o
o
v cc ,
I \
v I
O • H
eL
• 7
N
cp
Co
O
N
CO
LO
• LO
CL
ce
z
CO
E C
O O
O
U U
O )
N
C.)
0
W
tL V
O
I
CO
O
TL.IP.N WKLY
CD
O
Sheet:
14/23
so
so
CB
\ 5•
CONSTRUCTION NOTES:
® PULL (3) 1 1/4 '0 INNERDUCTS WITH (1) 144CT FIBER
CABLE THROUGH EXISTING 4 "0 TIME'. WARNER TELECOM DUCT
PLACED BY UNDERGROUND CONTRACTOR, IN ALIA WATERLINE.
CONSTRUCTION.
PLAN VIEW N
* EXISTING UTILITIES -- EXISTING' UTILITIES SHOWN ON THE PLANS HAVE BEEN PLOTTED FROMi THE BEST' INFOMATION!
AVAILABLE' TO' THE DESIGNER. ACCURACY AND COMPLETENESS ARE NOT GUARANTEED. IT SHALL BE, THE CONTRACTOR'S
RESPONSIBILITY TO LOCATE ANY EXISTING' UTILITIES, WHICH' MAY CONFLICT WITH THE CONTRACTOR'S OPERATION, WHETHER
SHOWN' ON THE PLANS OR NOT CALL THE UTILITIES' UNDERGROUND LOCATION CENTER' AT 11.800.424.5555.
POWER e' WATER
STOR
:• PROPOSED'
ai' o,
11
crc
N
>
C ,
C V)
al Li
'CT)
0 JI
0
01
vi
051
>
o'
CI!
Z
N I '
N'
C' C
0! 0
: 7, .i
U' 0
JI
0 !w
a (f)
La
La
(00
I JI
TURN ` KEY
I
Sheet:
15/23
1 . '
PLAN VIEW 0
CONSTRUCTION NOTES:
®
PULL (3) 1 1/4 "0 INNERDUCTS WITH (1) 144CT FIBER
CABLE THROUGH EXISTING 4 "0 TIME WARNER TELECOM DUCT
PLACED BY UNDERGROUND CONTRACTOR IN ALIA WATERLINE
CONSTRUCTION.
* EXISTING UTILITIES -- EXISTING UTILITIES SHOWN ON THE PLANS HAVE BEEN PLOTTED FROM THE BEST INFOMATION
AVAILABLE TO THE DESIGNER. ACCURACY AND COMPLETENESS ARE NOT GUARANTEED. IT SHALL BE THE CONTRACTOR'S
RESPONSIBILITY TO LOCATE ANY EXISTING UTILITIES, WHICH MAY CONFLICT WITH THE CONTRACTOR'S OPERATION, WHETHER
SHOWN ON THE PLANS OR NOT. CALL THE UTILITIES UNDERGROUND LOCATION CENTER AT 1.800.424.5555.
POWER ®® WATER
4 :7 1 561 S - 0RM
PROPOSED
0
U II
N
N
O
co
O
O
0 0
r-.
CO
O
CD
O t
LL ID
N.
f0
O
TURN KEY
t I i i
Sheet:
16/23
1
1
CONSTRUCTION NOTES:
®
PULL (3) 1 1/4 "0 INNERDUCTS WITH (1) 144CT FIBER
CABLE THROUGH EXISTING 4 "0 TIME WARNER TELECOM DUCT
PLACED BY UNDERGROUND CONTRACTOR IN ALIA WATERUNE
CONSTRUCTION.
®
PULL (1) 144CT FIBER CABLE THROUGH EXISTING (1)
3030LA (30"X30"X36 ") HANDHOLE PLACED BY UNDERGROUND
CONTRACTOR.
®
INSTALL (1) 4 "0 RIGID STEEL CONDUIT AND ATTACH TO
BRIDGE WITH TWO —HOLE CLAMPS AS NEEDED. SEE BRIDGE
ATTACHMENT DETAIL ON SHEETS S1 TO S3.
PLAN VIEW P
* EXISTING UTILITIES -- EXISTING UTILITIES SHOWN ON THE PLANS HAVE BEEN PLOTTED FROM THE BEST INFOMATION
AVAILABLE TO THE DESIGNER. ACCURACY AND COMPLETENESS ARE NOT GUARANTEED. IT SHAD_ BE THE CONTRACTOR'S
RESPONSIBILITY TO LOCATE ANY EXISTING UTILITIES, WHICH MAY CONFLICT WITH THE CONTRACTOR'S OPERATION, WHETHER
SHOWN ON THE PLANS OR NOT. CALL THE UTILITIES UNDERGROUND LOCATION CENTER AT 1.800.424.5555.
POWER ®® WATER
��' S70RM
e;F� PROPOSED
a) re)
U 11
co
4.
0
0
Z
O
Y W
N U
0
U
c0
0
1
0
(00
0
0
0
TURN R KEY
Sheet:
17/23
I
PLAN VIEW Q
CONSTRUCTION NOTES:
PULL (3) 1 1/4 "0 INNERDUCTS' WITH (il) 144CT' FIBER
CABLE THROUGH EXISTING 4 "0 TIME WARNER TELECOM' DUCT
PLACED BY UNDERGROUND CONTRACTOR IN ALIA WATERLINE
CONSTRUCTION.
O PULL (1) 144CT FIBER CABLE THROUGH EXISTING (1):
3030LA (30"X30"X36 ") HANDHOLE PLACED BY UNDERGROUND
CONTRACTOR,
INSTALL (1) 4 "0 RIGID STEEL CONDUIT AND ATTACH TO
BRIDGE WITH TWO —HOLE CLAMPS AS NEEDED. SEE BRIDGE
ATTACHMENT DETAIL ON SHEETS S1 TO S3.
* EXISTING UTILITIES -- EXISTING' UTILITIES. SHOWN ONI THE PLANS HAVE BEEN PLOTTED. FROM THE BEST INFOMATIONI
AVAILABLE TO THE DESIGNER, ACCURACY' AND COMPLETENESS ARE NOT GUARANTEED., IT SHALL BE THE CONTRACTOR'S'
RESPONSIBILITY TO LOCATE' ANY EXISTING UTILITIES, WHICH MAY CONFLICT WITH THE CONTRACTOR'S OPERATION, WHETHER
SHOWN' ON THE PLANS OR NOT. CALL THE UTILITIES' UNDERGROUND' LOCATION CENTER' AT 1.800'.424.555&
POWER ®® WATER'
PROPOSED
oo
O
0 0'
00)
t0,
0)
O )
COI
O
6`
TURN KEY
Sheet:'
1 8/2'31)
PLAN VIEW R
AUA WATERLINE
CONSTRUCTION
ENDS HERE
CONSTRUCTION NOTES:
O INSTALL (1) 444LA MANHOLE PER DETAIL ON
SHEET 23/23. LEAVE 100' OF (1) 144CT FIBER
CABLE STORAGE.
®
BORE/TRENCH UNDER CONCRETE SIDEWALK /GRASS
AREA /ASPHALT PAVEMENT AND INSTALL (4) 1 1/4"0
HDPE CONDUITS WITH (1) 144CT FIBER CABLE.
NEW TWTC
•
•
•
•
•
•,
•
SL
•
•
5
® PULL (3) 1 1/4 "0 INNERDUCTS WITH (1) 144CT FIBER CABLE
THROUGH EXISTING 4 "0 TIME WARNER TELECOM DUCT PLACED BY
UNDERGROUND CONTRACTOR IN ALIA WATERLINE CONSTRUCTION.
* EXISTING UTILITIES -- EXISTING UTILITIES SHOWN ON THE PLANS HAVE BEEN PLOTTED FROM THE BEST INFOMATION
AVAILABLE TO THE DESIGNER. ACCURACY AND COMPLETENESS ARE NOT GUARANTEED. IT SHALL BE THE CONTRACTOR'S
RESPONSIBIUTY TO LOCATE ANY EXISTING UTILITIES, WHICH MAY CONFLICT WITH THE CONTRACTOR'S OPERATION, WHETHER
SHOWN ON THE PLANS OR NOT. CALL THE UTIUTIES UNDERGROUND LOCATION CENTER AT 1.800.424.5555.
4
POWER �® WATER
1 S ORM
• PP
PROPOSED
0
a)
c
LC)
LC)
0
0,
• r o
U II
(n
✓ O
c v)
0' W
. • U
a)
o J
CD
0
c0
ca Lc"
C
O
co
O
CD
O
J
Sheet:
19/23
♦
4
cD
GENERAL NOTES
THE FOLLOWING NOTES APPLY UNLESS SHOWN OTHERWISE ON THE DRAWINGS
BACKGROUND:
PURPOSE: INSTALL A 4" STEEL CONDUIT ON BRIDGE ABUTMENT WALL AT PIERS 1 AND 4, AND THE SOFFIT OF THE CAST -IN -PLACE OVERHANG
BRIDGE DECK.
REFERENCES:
• RECORD DRAWINGS FOR SOUTHCENTER BOULEVARD / GREEN RIVER BRIDGE ( WSDOT BRIDGE NO. 001469D) PREPARED BY
ENTRANCO DATED FEBRUARY 1993.
• PHOTOS FROM MARCH 29, 2007 SITE VISIT.
• AREAL PHOTO FROM GOOGLE EARTH
CRITERIA:
GOVERNING CODE: THE STRUCTURAL CONNECTION HAS BEEN DESIGNED IN ACCORDANCE WITH THE REQUIREMENTS OF THE AASHTO
LRFD BRIDGE DESIGN SPECIFICATIONS 3RD EDITION DATED 2004 AND INTERIMS THROUGH 2005.
STANDARD: ALL MATERIALS AND WORKMANSHIP SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF THE WASHINGTON STATE
DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION, 2006 EDITION AND
AMENDMENTS. THE UTILITY CONDUITS SHALL BE LABEL IN ACCORDANCE WITH SECTION 6-01.10.
ALL STEEL IN UTILITY SUPPORTS, INCLUDING FASTENINGS AND ANCHORAGES, SHALL BE GALVANIZED IN ACCORDANCE WITH AASHTO M -111
OR M -232 (ASTM Al23 OR A153, RESPECTIVELY).
ALL UTILITIES AND UTILITIY SUPPORT SURFACES, INCLUDING ANY GALVANIZED UTILITIES, SHALL BE GIVEN A PRIMER COAT OF STATE
STANDARD FORMULA A-6-86 AND TWO COATS OF STATE STANDARD FORMULA C -9 -86. THE FINAL COAT SHALL MATCH THE BRIDGE COLOR.
ANY PAINT SPLATTERS SHALL BE REMOVED FROM THE BRIDGE.
EXTEND RIGID CONDUIT 10' MINIMUM BEYOND THE BRIDGE STRUCTURE.
INSTALL EPDXY ANCHOR BOLT TO CLEAR REINFORCING STEEL IN BRIDGE DECK SOFFIT. USE REBAR SCANNING DEVICE TO LOCATE REBAR
BEFORE DRILLING. IF REINFORCING STEEL IS HIT WHEN DRILLING, THE DRILLED HOLE SHALL BE ABANDONED AND FILLED WITH NONSHRINK
GROUT CONFORMING TO THE REQUIREMENTS OF SECTION 6-02.3(20). THE DRILLED HOLE SHALL BE MOVED TO CLEAR REINFORCING STEEL.
THERE SHALL BE A MINIMUM EDGE DISTANCE OF 3" FROM THE EDGE OF BRIDGE DECK TO THE CENTER OF DRILLED HOLE.
VERIFICATION: CONTRACTOR SHALL VERIFY ALL EXISTING AND PROPOSED DIMENSIONS, MEMBER SIZES AND CONDITIONS PRIOR TO
FABRICATION AND COMMENCING ANY WORK. NOTIFY THE ENGINEER ABOUT ANY DISCREPANCIES. ALL DIMENSIONS OF EXISTING
CONSTRUCTION SHOWN ON THE DRAWINGS ARE INTENDED AS GUIDELINES ONLY AND MUST BE VERIFIED. THE EXISTING CONDITIONS
SHOWN ON THE DRAWINGS ARE BASED EITHER SITE OBSERVATION, ORIGINAL DRAWINGS OR WERE ASSUMED BASED ON EXPECTED
CONDITIONS. IF THE EXISTING CONDITIONS DO NOT CLOSELY MATCH THE CONDITIONS SHOWN ON THE DRAWINGS, OR IF THE EXISTING
MATERIALS ARE OF QUESTIONABLE OR SUBSTANDARD QUALITY, NOTIFY THE ENGINEER PRIOR TO COMMENCING ANY WORK.
UTILITY:
CONDUIT ASSEMBLY SHALL BE IN ACCORDANCE TO THE FOLLOWINGS:
METAL FRAMING UNISTRUT OR APPROVED EQUAL
ANCHOR BOLT HILTI HVA ADHESIVE ANCHOR SYSTEM OR APPROVED EQUAL
CONDUIT 4" DIAMETER RIGID GALVANIZED STEEL CONDUIT (SCHEDULE 40)
JUNCTION BOX NEMA 4 OR BETTER
DESIGNED BY
D.C. ONG
DRAWN BY
D.C. ONG
DATE
0430 =2007
CIVILTECH
ENGINEERING
VICINITY MAP
STRUCTURAL NAME: SOUTHCENTER BLVD / GREEN RIVER BRIDGE
WSDOT BRIDGE NO: 0014269D
CITY NO: 1320
OWNER: CITY OF TUKWILA
DESCRIPTION: 3 SPANS TOTALLING 245' (PC GIRDER W/ CIP DECK)
YEAR BUILT: 1994
10800 NE 8 Street Suite 820
Bellevue, WA 98004
Phone: 425.453.6488
Fax: 425.453.5848
GENERAL NOTES & VICINITY MAP
TIME WARNER 4" COMMUNICATION CONDUIT
SOUTHCENTER BLVD /GREEN RIVER BRIDGE
TUKWILA, WASHINGTON
JOB NO.
27012
3HT NO.
S -1
0
0
0
0
0
i;
-0
2
L7.
0
ce 0
m
0
0
..•••
- 2 LT
2 a)
x
.exist. ;Voter .The
Pe m _ "
2"`"
6 Luirvincire /
To Rermoirl
,/ //
E.Aisf--. &Lined Telep.
To ate Rslocorect •
Exist 7 - 00 Bar ro
,• 4z/
"Pia •,'
116"
TW J
/ Z.
• " ,/
... •
,a,c. • ...r_- Pr..r ii•steg. rex '
Q g' 40
,, ,PV , E iv , 1T
/
C •
• /, /,/
" '/.
N.GUD. I92s
,
r-is1 s,
•
Type
'
TO ge W
is1E4k
!
Ek.v. ao.00 •
r-
R_VC roc oF F
/ —
y
+ - 7 - 1 7; 7
(
/
7 1
Sre:Leq,a7
/
Ar \ P o " ^or'
/
- _
/
• -1 1 •
i • ,
, ---4
, .
‘ 20: re.i..P.°;,///•::://‘ it
HAND/ TOLE
Pq
‘27"18"1
•••' • •"/ "
///
C -74e
a'o prated Sift •
Ernbeded
anci Ferrel aroijind
.5c3 Line -
atiaXaatd 1
, r. .E=!P i
1
h ti c .LINEISOL17:-.1C BLVD.) 3b/ 130r:r)g
/ I
C. ,;• I a
/
/
•
;
,••••,,
1, )
• SiOn
.
77 11 01
. 1 :FL?' STC1147,
•••-,
1 • /
1 /
•' :
1
•
•
/
Reference Loa Elev.
1
$
LA
memramer4
P I M P P P V C !UT B N
g ziciWtl
Bridgc3)
-3-
E'
rea I Shtd.r.
HAND HOLE..
30"5,30-
Siev .17
Ncre
Grade elevations shove? are Finest grades
at fop oF concrete creck ort • Line3 rid south cemv
Shicl)Ond ore ecucr/ prof 4e groae
DUI , ca4.40 „ oft:7ns, •Sca eine
„' . • flearicir
ri,1 (UNO) FOR TIME W
4" RGS CONDUIT TY17
/
/4:
/
4. • .1
rer,
- fr„ •
•
)
• , , Conek,:it" -1" '
tiurnincrriOn •-•"/ t
Conduit Aoa- / I ; I
' 019riat 1?'"e'zr
, 1 ;
jl
oFRipr•C.,lo
Sear,"ng Piers is A/ OT 'Ora" g"
See Sta. Flan For- :..-rirrbelnkir.ctro
0e*Oil.; Ar:cige ends
R0r Typ,... SP
(Lee"' Side only)
4" RGS CONDUIT TYP,/ FinishC73P)i
(UNO) FOR TIME WARN Plor0enled Sectercrx:4
-2 OrilleGf Sh0Pl
Erroe-•cfc In SeOrock
DESIGNED BY
D. ONG
DRAWN BY
J. ROBERTS
DATE
4-30-07
.
/ c: Socfr,' or
.. .
,,,
/ Po,.'t Soar
,
. / ..? •
,24s (Rack 70 a ack- oP,"\-",,erner.:.,7,5:,!'■.o732)
us'-o• •
---
PLAN
Lower. MR t
• W..s Eles, ze.s
4,•
Ccrrc. inn (5p.)
ELEVATION
evo,-rnal wal-er r—
CITY OF TUKWILA
/
r 1../
-, _ rjr0
110
,,,,,-
.•
I I I, .
LI I I •
CIVILTECH
ENGINEERING
- / ko.x. Fit( .siace
• ae.00'
L ;Sec:frock
I II
L
▪ 51e./ -2.00
LJj
c —t-tP/41 . .434
• Crirem Sedrock
"-- 1L2r atorlicain ...•
404.5e /4 .
Choked we r. 41;x7 -
Match exist. Ground
7 oPRIpt Cp.)
—
- \ -,
, ■• 7.,..,
,.,. .' , ,ho
5h00108,. . •
•
. s.,,
1.-S " • . '
. 0 Slrt at f - .•••0
' Wirtg . \
• Crj• 1.1.2,Alc..6 ''',..., '---• The oF Fill
and SE Corner • ...,,,„,,-/-,,.., 3.--c.i.,....,i- pule 50,.
C...5r- 80+52 1Zr.>
31
, r
C. a 1
1
HAND HOLE
/00 Yr 11F e I
/5,100 CS
PVC CONDUIT
10800 NE 8th Street Suite 820
Bellevue, WA 98004
Phone: 425.453.6488
Fox: 425.453.5848
Etosu: Type. /
orr Ga0 Placem
Cos 5 l/-minal
F Cr Cor,
frterir
Sear
Clow. 5.0
PLAN & ELEVATION
TIME WARNER 4" COMMUNICATION CONDUIT
SOUTHCENTER BLVD/ GREEN RIVER BRIDGE
TUKWILA, WASHINGTON
JOB NO.
27012
SHEET NO.
n
En
E
E
s
0
-
V •
C
3
0
K
c
m
4
2
m
En
3
0
n
0
N —
o K
O o
0
- o
2m
E
j 0
0
O.
P IER 1 ABUTMENT
1 5
MOUF`TI G BRACK
® -ER 8 0
OUTSIDE FACE
OF BARRIER
EDGE OF
BRIDGE DECK
EDGE OF PC
GIRDER - TOP
FLANGE
• 6iev 3 2. h8
EI- v
303
4 L.HLUULt
40 PVC CONDUIT
BARRIER
OVERHANG
1 5/8 "x8" UNISTRUT
® 10' -0" O.C.
W/ 2 -1/2 "0x4 1/2"
EMBED ANCHOR BOLT
4" RGS CONDUIT
FOR TIME WARNER
pvc e =� :
alp ;,.a: td = e
.
(See 01
K j � • ..' - M _
•St t
C.I.P DECK VARIES
(1' -6" TO 2' -10 1/2 ")
t3o ri T a ces ->
SECTION (PIER 1)
6
REFLECTED PLAN
1' a.o u;4:
t1 iu a �'1'v
L�
RGS ��—
CONDUIT
KI
7
E!e, 80.00
del" i ?Ret7Si.J. - e r
r� 8r. paroi +e!
)
arr Sidew01k)
n
PC GIRDER
FLANGE (HALF)
f EXIST GIRDER
MOUNT NEMA 4 J -BOX
TO WALL W/ 1/2 "0x4 1/2"
EMBED ANCHOR BOLT
HAND HOLE
30 "x30" TYP
SP ,.see
:3c She.& SC t6� ---
4" RGS CONDUIT.
FOR TIME WARNER
Cor:dui'•
-�.
ii!urrN ^ a'?O,, 1
0 101 RGS Conti. /
=r 0et C. r
EDGE OF
BRIDGE DECK
CONDUIT CLAMP
(P1109) W/ ISOLATION
MATERIAL (UNICUSHION
P2059)
SECTION (TYP)
OVERHEAD BRACKET
DESIGNED BY
D. ONG
DRAWN BY
J. ROBERTS
DATE
4 -30 -07
8 �
Sraewa? k
wy
k
ror. I c k
.
tea;: F
x;.v_ hkzr.g
cxis'� tax- ,, •'. 1
ti
1
S -2
toxic`
S o�ed o ¢tea
( Cm =U1
1/2 "0x4 1/2" EMBED
HAS -E ANCHOR BOLT
BR DECK SOFFIT
1 5/8" CHANNEL (P1000)
4" RGS CONDUIT
CIVILTECH
ENGINEERING
HAND HOLE . -
30 "x30"
xear-Pace
PIER 4 b, ce)
WINGWALL
. .Cr
10800 NE 8th Street Suite 820
Bellevue, WA 98004
Phone: 425.453.6488
Fox: 425.453.5848
c
LI
EXPANSION JT
SECTION (PIER 4)
5 -2
S -2
0
1`5.ae 17C+G■i(
sc: "De-k•u.)I.i
OVERHEAD BRACKET
BRIDGE DECK
EXPANSION JOINT
FOR RGS
SECTIONS AND DETAILS
RGS CONDUIT
J08 NO
27012.
TIME WARNER 4" COMMUNICATION CONDUIT SHEET NO.
SOUTHCENTER BLVD / GREEN RIVER BRIDGE S - 3 TUKWILA, WASHINGTON