Loading...
HomeMy WebLinkAboutPermit BLA-06-77 - MCCANN - SOUTHCENTER SOUTH PLATbla-6-77 LAND INFORMATION SYSTEM SOUTHCENTER SOUTH INDUSTRIAL PARK MCCANN SOUTHCENTER SOUTH PLAT BOUNDARY LINE ADJUSTMENT ( ) Vs) BOUNDARY LINE ADJUSTMENT NO. IN A- (0-77 To Plat of SOUTHCENTER SOUTH INDUSTRIAL PARK as recorded in Volurne 97 of Plats, Pages 22 to 25, records of King County, Washington TUKWILA, WASHINGTON This space reserved for recorder's use Filed for record at the request of: Name LEGAL DESCRIPTION APPROVAL Department of Planning Examined and approved this 8 . day. of 1Upde b - , 1977 Di a or, Depar eent of Planning Per tached letter from Bruce McCann dated. Nov. 8., . 1977.. . .Department of Public Works Examined and approved this Cr :day of /ay. : • ,.1977 • ri /i A // / //1' ' L. irector • • Per attwched letter from Bruce . McCann dated Nov. 8, 1977. The boundary lines of Lot 13 of the above referenced Plat are adjusted as follows: Lot 13: As amended and set forth in the Legal Description attached hereto as Exhibit "A ". The boundary lines of Lot 14, adjacent to Lot 13, are adjusted to conform with the boundary lines of Lot 13 as shown on Page 3. DECLARATION: F - o all en by these presents that we, the undersigned, owner (s) in fee simple and contract purchaser(s) of the land herein described-do hereby make a boundary line adjustment to the lots hereinabove des - cribed in the Plat of Southcenter South Industrial Park as recorded in Volume 97 of Plats, pages . 22 to 25, records of King County, Wash-... ington. The undersigned further declare,this.boundary line adjustment is made with the free consent and in accordance with the desire of the owner(s). page 1 of 3. • • • • In witness whereof we have set our hands and seals. By: By: STATE OF NEW YORK ) ss. COUNTY OF NEW (lYORK) On this oC 74: day of CORPORATE ROPERTY INVESTORS By: Name ' eremiah W. O'Connor, Jr. - Exec. By : / %%�- Name Randall A. Hack -I Asst. Secretar VP and' 1• 1 . -Name appeared \ cinZaiL 0049((7.191%) and Wand (J VP and to me kno to be the Exec. V.P. and /Assistant Secretary, respectively, of the Massachusetts business trust that executed the foregoing instrument, and acknowledged said instrument to be the free and voluntary act and deed of said Massachusetts business trust, for the uses and purposes therein mentioned, and on oath stated that they are authorized to execute the said instrument and that the seal affixed is the corporate seal of said Massachusetts business trust. 19.-0 , personally' / „'•.1 ' ids /4 .4At. IN WITNESS WHEREOF, I have hereunto set my hand and affixed my official seal the day and year first above written. hOUNnARY TINE ADJUSTMENT NO. a:c2-(464 Notary Public -in and for the state of New. York, residing at /G4f VA;tc-t ct: .•d - cl�, n v /0 304 VICTORIA- REGINA E. RICE Notary Public. State of New York No. 31- 4523188 Ou lified In New York County, Commission Expires March 30, 7 S • Page • � . bi o � pfl 4 p t 0� 0 p� o A3 3 •V ,0 • A3� .ti1 ry b 4 by V IS -- 25...18 ■ Tti DAY /P/C A GZ-/ ± 37.5137.5 . I O,'d 'i").3% Lime /5 Land Surveyor's Certificate:. . )U. Ch The above sketch is based upon a survey $� got �u \'i made by me and is a true and accurate �o` representation of the boundary line adjustment pertaining to the Southcenter South Industrial Park plat as recorded in Volume 97 of Plats, pages 22 -25, records of King County, Washington. 725,, /977 gat._ Certificate No: 8393 / "'. /00' Page 3 of • EXHIBIT "A" CHADWICK SURVEYING AND ENGINEERING 4011 Stone Way North, Seattle, WA. 632 -3366 98103 October 6, 1977 File 77440 McCann Construction Co., Inc. Legal Description of Project No. 380 Site. That portion of Lots 13 and 14 of the plat of Southcenter South Industrial Park as recorded in Volume 97 of Plats, Pages 22, 23, 24 and 25, records of King County, Washington described as follows: Beginning at the southeast corner of said Lot 13•,• Thence N 11 °23'50" E along the east line of said Lot 13 a distance of 25.58 feet to the true point of beginning; Thence S 78 °36'10" W parallel to said south line of Lot 13 a distance of 511.04 feet to the west boundary of said Lot 13; Thence along the west boundary of said Lots 13 and 14 with . the following bearings and distances: N 43 °17'00" E 71.16 feet; N 34 °05'00" E 99.00 feet; N 26 °27'00" E 98.00 feet; N 20 °26'00" E 100.00 feet; N 15 °42'006 E 99.00 feet; N 11 °32'00" E 100.00 feet; N 09 °15'00" E 97.00 feet; N 10 °51'00" E 82.30 feet; Thence leaving said west boundary S 78 °36'10" E a distance of 390.87 feet to the west margin of Olympic Avenue South produced north; Thence S 11 °23'50" W along said west margin produced north a distance of 723.10 feet to the true point of beginning. Situate in the City of Tukwila, King County, Washington. CITY of TUKWILA OFFICE of COMMUNITY DEVELOPMENT 8 November 1977 Bruce McCann McCann Development Corp. P.O. Box 88314 Tukwila, Washington 98188 Dear Bruce: Enclosed please find the approved boundary line adjustments for Lots 13, 14, and 15. Please note that your letter dated 8 Novem- ber 1977 has been incorporated as a condition of approval. If you have any questions, please feel free to call. ectfully, N. Satterstrom Planning Supervisor FNS /ch Enclosure 6230 Southcenter Boulevard a Tukwila, Washington 98188. • (206) 242 -2177 McCANN DEVELOPMENT CORP. P. O. BOX 88314 • TUKWILA BRANCH SEATTLE, WASHINGTON 98188 November 8, 1977 Mr. Fred N. Satterstrom Associate Planner City of Tukwila 6230 Southcenter Boulevard Tukwila, Washington 98188 Dear Fred: iCE.11 NOV 081977 CITY OF TUKWILA 575.4334 AREA CODE 206 Lots 13, 14 and 15 Southcenter South Industrial Park This letter will confirm your discussions with our counsel, Gary E. Fluhrer of Foster, Pepper & Riviera, regarding the boundary line adjustments submitted for Lots 13, 14 and 15. We agree not to construct a northerly extension of Olympic Avenue South beyond Todd Boulevard, nor to construct improve- ments upon Lots 14 and 15 without first submitting and obtaining approval of a short plat or BSIP for Lots 14 and 15 and the ex- tension of Olympic Avenue South. While it is clear that Olympic Avenue South will have to be extended northerly at some time, submittal of a short plat or BSIP for Lots 14 and 15 defining how far Olympic will be extended at this time is premature be- cause the development plans for Lots 14 and 15 are not finalized. These plans cannot be finalized until purchasers or users for Lots 14 and 15 are available and make their needs known. At that time, a short plat and BSIP for Lots 14 and 15 will be sub- mitted for your consideration and approval. APPROVED by City as a condition of boundary line adjustment for Lots #13, 14, and 15 by: ommuni y Development Di recL2 :»,jbl i c Works Dept. .'f /x /27 Date Sincerely yours, CORPORATE PROPERTY INVESTORS, a Massachusetts business trust Bruce E. McCann, agent 950 ANDOVER PARK EAST • TUKWILA, WASHINGTON 98188 PAUL P. ASHLEY OF COUNSEL THOMAS B. FOSTER LOUIS H. PEPPER DANIEL J. RIVIERA PETER V. GULICK WILLIAM H. ELLIS DAVID W. SANDELL RICHARD E. KEEFE CAMDEN M. HALL MICHAEL E. STANSBURY JEROME D. WHALEN CHARLES P. NOMELLINI ROBERT J. DIERCKS W. V. TANNER QeeI -19591 JOHN P. GARVIN (Ieee -1972) ■ FOSTER, PEPPER & RIVIERA 4400 SEATTLE FIRST NATIONAL BANK BUILDING SEATTLE, WASHINGTON 98154 (206) 447 -4400 November 2, 1977 Mr. Fred N. Satterstrom Associate Planner City of Tukwila 6230 Southcenter Boulevard Tukwila, Washington 98188 Dear Fred: BARRIE L. ALTHOFF JOHN T. BLANCHARD MIKE E. BRANDEBERRY FAY L. CHAPMAN GARY E.FLUHRER JOSEPH M. GAFFNEY MARCO J. MAGNANO, JR 0. DOUGLAS MATSON MICHAEL K. MURRAY JONATHAN 5. NOLL BARBARA OMNICK DOUGLAS 5. PALMER, JR ANNE M. REDMAN ARMISTEAD P. ROOD RICHARD M. SHUTE V. RAFAEL STONE CARL J. WEST W JUDITH M. 2USERBUHLER You will have delivered to you today boundary line adjust- ments for Lots 13 and 15 in Southcenter South. If you have any questions or comments please call. It would be appreciated if you would give this your immediate attention. Thank you. GEF /kr cc: Mr. Bruce McCann. Mr. Randy Hack Gary E. Fluhrer