Loading...
HomeMy WebLinkAboutPermit DR-06-77 - LONG KEN / BENAROYA COMPANY - BURGER KING RESTAURANT DESIGN REVIEWDR-6-77 17333 SOUTHCENTER PARKWAY BURGER KING RESTAURANT PLANNING PARKS RECREATION BUILDING 2 March 1977 CITY of TUKWILA OFFICE of COMMUNITY DEVELOPMENT Mr. Ken Long Benaroya Company 5950 - 6th Avenue South Seattle, Washington 98108 Dear Mr. Long: The Tukwila Planning Commission, at its regular February meeting, reviewed the site plan submitted by you for the Burger King Restaurant proposed to be located in the Parkway Plaza West development area in Tukwila. The Commission, after due consideration, approved the site plan subject to the following stipulations: 1. Any outside refuse station be screened in an architecturally complementary manner; same to be approved by Staff. 2. Detailed landscape plan be approved by the Commission prior to issuance of Occupancy Permit. 3. This approval is subject to compliance with all other applicable local regulations and shall not be construed as approval, in1any manner, of any future development within the remainder of the overall site. 4. Exterior treatment conform to the photographs submitted with the site plan with the exception of signs and landscaping. Should you have any questions regarding this correspondence, please contact me at your convenience. Sincerely, Gary Crutchfield Assistant Planner GC /cw cc: Bldg Off 6230 Southcenter Boulevard a Tukwila, Washington 98188 is (206) 242 -2177 Planning Commission Page 2 Minutes 24 February 1977 Mr. Don Olson, architect, stated his major concern with the Staff's recom- mendation is that the tenant who will occupy the south end of the building needs the truck door indicated and will only use 30 -foot trucks. Chairman Kirsop noted this problem had been discussed on other site plans in this vicinity and also noted the size of trucks cannot be enforced. Mr. Olson also stated potential use of parking in rear of building for employees and desires to maintain it. Stated he would have to confer with his client before eliminating the truck door on the south end of the building and requested the Commission delay action. Motion by Mr. Bowen, seconded by Mr. West and carried to table action on this matter to allow the applicant time to respond. Landscape Plan for Segale Project #763 Mr. Crutchfield read the Staff Report recommending the Commission approve the landscape plan as presented. Motion by Mr. Bowen, seconded by Mr. West and carried to approve the landscape plan as presented. Lite Plan for Burger King Restaurant (Parkway Plaza West) Mr. Crutchfield displayed site plan and read the Staff Report. Mr. Ken Long, Benaroya Company, explained relationships to existing and potential traffic patterns, the exterior treatment of the building and signing. Considerable discussion amongst the Commission with respect to the potential overall development of Parkway Plaza West. Motion by Mr. Richards, seconded by Mr. West and carried to approve the Burger King site plan with the following stipulations: 1. Any outside refuse station be screened in an architecturally complementary manner; same to be approved by Staff. 2. Detailed landscape plan be approved by the Commission prior to issuance of Occupancy Permit. 3. This approval is subject to compliance with all other applicable local regulations and shall not be construed as approval, in any manner, of any future development within the remainder of the overall site. 4. Exterior treatment conform to the photographs submitted with the site plan with the exception of signs and landscaping.