Loading...
HomeMy WebLinkAboutUtilities 2014-11-17 Item 2D - Final Acceptance - 6450 Southcenter Boulevard Sewer Repair with Green River ConstructionTO: FROM: BY: DATE: SUBJECT: City of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM Mayor Haggerton Utilities Committee Bob Giberson, Public Works Director ICJ Mike Cwsick, Senior Program Manager November 14, 2014 Sewer Repair at 6450 Southcenter Blvd Project No. 91340203, Contract No. 13-181 Project Completion and Acceptance ISSUE Accept the contract as complete and authorize release of the retainage. BACKGROUND A contract was approved by Council on November 4, 2013 with Green River Construction, Inc. in the amount of $34,164.00 (including sales tax) to install a new manhole and clear any blockage in the emergency sewer repair at 6450 Southcenter Blvd. During the excavation for the manhole, it was determined that the blockage was caused by the installation of two Comcast cable ducts. DISCUSSION The scope of the project changed dnamot\ceUyvvith the discovery of the two Comcast cable ducts, therefore the original contract awarded to Green River Construction did not accurately reflect the work that was required for the project. Work was then tracked on a time and material basis in order to calculate fair compensation for the contractor's effort on the full repair. FINANCIAL IMPACT The original construction contract was for $34,164.00 (including sales tax) for the sewer manhole installation. The additional scope of work included the installation of approximately 100 feet of sewer pipe, traffic control, landscaping, and pavement/sidewalk restoration for a total of S104,462.03. As this was an emergency repair, the p ject was not budgeted and construction costs came from the Sewer Fund's ending fund balance. The City filed a claim against Comcast and their contractor for the damages to the sewer line and costs incurred for the repair by the City. Retainage of $6,329.95 is being withheld. Original Contract Amount $ 31,200.00 Change Orders No. 1&2 95'399.11 Sales Tax (9.5%) 12.026.92 Total $188.820.08 RECOMMENDATION Council is being asked to formally accept the p ject and authorize the release of the retainage, subject to standard claim and lien release procedures for the 2013 Annual Sewer Program for the Sewer Repair at 6450 Southcenter Blvd by Green River Construction, Inc. in the final amount of $138'O20.O3 and consider this item on the Consent Agenda at the December 1, 2014 Regular Meeting. Attachment: Notice of Comp|otion, Contract No. 13'181 °APW Eng\ PROJECTS \A- SW Projects\2013 *nnual Sewer Repair m`»40201mSewerRepair at 6450 SC Blvd (91340203)\Info Memo 65th Closeout"b.doc 31 Date: Original ❑ Revised # NOTICE OF COMPLETION OF PUBLIC WORKS CONTRACT 7- Jun -14 Contractor's UBI Number: Name & Mailing Address o Public Agency City of Tukwila 6200 Southcenter Blvd Tukwila Wa 98188 UBI Number: 91- 6001519 60058249 Department Use Only Assigned to: Date Assigned: Notice is hereby given relative to the completion of contract or project described below Project Name Sewer Repair at 6450 Southcenter Blvd (f `le ' )1 4D;zo3) Contract Number 13 -181 Job Order Contracting ❑ Yes El No Description of Work Done /Include Jobsite Address(es) Repair of the sewer line damaged by the installation of 2 fiber optic Federally funded transportation project? ❑ Yes ducts by private contractor. No (if yes, provide Contract Bond Statement below) Contractor's Name Green River Construction, Inc E -mail Address alison @greenriverconstruction.com Affidavit ID* 514041 Contractor Address 6402 S 144th St Suite 1, Tukwila WA 98188 Te (206) ephone # 246 -9456 If Retainage is not withheld, please select one of the following and List Surety's Name & Bond Number. ❑ Retainage Bond ❑ Contract /Payment bond (valid for federally funded transportation projects) Name: Bond Number: Date Contract Awarded November 4, 2013 Date Work Commenced November 14, 2013 Date Work Completed April, 9, 2014 Date Work Accepted Were Subcontracters used on this project? If so, please complete Addendum A. HI Yes ❑ No Affidavit ID* - No L &I release will be granted until all affidavits are listed Contract Amount Additions (+ ) Reductions ( - ) Sub -Total Amount of Sales Tax 9.500% (If various rates apply, please send a breakdown) OK TOTAL $ 31,200.00 $ 95,399.11. $ 0.00 $ 126,599.11 $ 12,026.92 $ 138,626.03 Liquidated Damages $ 0.00 Amount Disbursed $ 132,296.08 Amount Retained $ 6,329.95 NOTE: These two totals must be equal TOTAL $ 138,626.03 Comment lvutc: 1110 UISUUI sing 0111CCr Must 511011111 LUIS cunipieteu notice IIInfleW aieiy aI Lel acceptance 01 inc woiK uolle u11UC1 uuS C01111act. NO PAYMENT SHALL BE MADE FROM RETAINED FUNDS until receipt of all release certificates. Submitting Form: Please submit the completed form by entail to all three agencies below. Contact Name: Email Address: Department of Revenue Public Works Section (360) 704 -5650 PWC @dor.wa.gov 0 Washington State Department of Labor & Industries Contract Release (855) 545 -8163, option # 4 ContractRelease @LN I. WA.GOV Title: Phone Number: Air Employment Security Department Registration, Inquiry, Standards & Coordination Unit (360) 902 -9450 mihlinwnrkc/nlperi wa nnv 32 REV 31 0020e (4/28/14) F215-038-000 04-2014 AddcoduiuA: Pleasc List all Subcontractors and Sub-tiers Below This acldendurn can be subniitted in other formats. Provide known affidavits at this time. NvL&l release will h, granted until all uffiUuvit`are listed. Subcontractor's Name: UBI Number: (Required) Affidavid ID* FINISHING EDGE WASHINGTON 602677001 507799 ACTION ASPHALT 6022063I2 513155 PERFECT PAINT STRIPPThG 601803400 515385 BRAVO ENVIRNMENTAL 602946216 583618 PACIFIC CONCRETE SERVICES * 602I26314* NO LONGER [N BUSINESS* For tax assistance or to request this document in an alternate format, please call }'800'647-77O6.Teletype (TTY) users may use the Washingto% Relay Service by calling 711. REV 31 0020e Addendum (04/28/14) F215-038-000 04-2014 33