Loading...
HomeMy WebLinkAboutPermit M95-0159 - JAS FORWARDING1 r - • • . , J 3 C:=41 J. n \ L.c) — ' I • rbRwii‘gbi,f6 1Y)615-0159 City of Tukwila k, (206) 431 -3670 Community Development / Public Works • 6300 SouthcenterBoulevard, Suite 100 • Tukwila, Washington 98188 MECHANICAL PERMIT Permit No: M95 -0159 Type: B- MECHAN Category: NRES 115 4 C___im 9 no-1 lei. Address: Location: Parcel #: 102304 -9076 Contractor License No: PARSLEI077MK Status: ISSUED Issued: 10/17/1995 Expires: 04/14/1996 Suite: TENANT JAS FORWARDING II 6I EmarsinoJ wys TUKWILA, WA 98168 OWNER SGA CORPORATION ATTN 808 HART, 6414 204TH ST, LYNNWOOD WA 98036 CONTRACTOR PARSLEY ENGINEERING INC. Phone: 206 836 -2926 4620 232ND AVENUE N.E.,'REDMOND, WA 98053 CONTACT DANO MARITH Phone: 206 836 -2926 4620 232ND AVENUE N.E. , REDMOND, WA 98053 ******************* * * * * * * * ** * * * * * * * * * * * * * * * * *. * * ** * * * * * *' ** ** * *** *qtr * * ** * **** Permit Description: INSTALL:THREE NEW ROOFTOP A/C UNITS TOTALLING' 16 1/2TONS WITH SUPPLY :AND RETURN DUCTWORK... INSTALL FIVE EXHAUST. FANS FOR TOILET ROOMS AND LUNCHROOM. INSTALL GAS UNIT HEATER FOR WAREHOUSE FOR.FREEZE PROTECTION. UMC Edition: 1994 Valuation: Total Permit Fee: 17,144.00 139.06 ********4*********'*****************'***** * * * * * * * * * * * * * *.k * * * * * *: * * * * * * ** /017 5 e t'Cent�r/ Authorized signature • Date I hereby,certify that I have read and.examined this permit and know the sane tobe true and correct. All pravisions.of law and ordinances governing:•this•work will be complied'with,'whether specified herein or not. The granting. of this permit does not presume to give authority, to violate or cancel the - provisions of any other state' or local.:laws regulating construction or th performance of work. I am author.ized.to sign for and obtain this bui.l,d/ g permit. Signature:____ s�-�2 Date: ,/a-2Z- 9k ' Print Name. - //t5 4g �,L�y Title' ("..04770 This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. CITY OF TUKWI A Department of Community Development — Permit Center 6300 Southcenter Boulevard - #100, Tukwila, WA 98188 (206) 431 -3670 Mechanical Permit Application Tracking PLAN CHECK NUMBER ma5-045q PROJECT NAME CONTACTED NNW), f 111 5 • O1- w(vain) mur c na1 Wy5 SUITE NO. SITE ADDRESS 5D I INSTRUCTIONS TO STAFF • Contacts with applicants or requests for information should be summarized in writing by staff so that the status of the project may be ascertained at any time. • Plan corrections shall be completed and approved prior to sending to the next department. • Any conditions or requirements for the permit shall be noted in the Sierra system or summarized concisely in the form of a formal letter or memo, which will be attached to the permit. • Please fill out your section of the tracking chart completely. Where information requested is not applicable, so note by using "N /A ", date and initial. DEPARTMENTAL REVIEW "X" in box indicates which departments need to review the project. D PARTMEN .. BUILDING - initial review TEIN; FIRE l 0 O PLANNING O ED /0/ l/ ei r Q.UIREMENT MEN: CONSULTANT: Date Sent Date Approved - FIRE PROTECTION: Sprinklers Detectors ■ N/A INIT: FIRE DEPT. LETTER DATED: / ///77 J INSPECTOR: ,S-'/ / ZONING: BAR/LAND USE CONDITIONS? CWETWIr SCREENING REQUIRED? 0 Yes 0 No REFERENCE FILE NOS.: O OTHER .BUILDING - final review BUILDING �o �� ,v OFFICIAL UMC EDITION (year): X11 Li REVIEW COMPLETED AMOUNT � OWING: � n , \ pp) 01P CONTACTED NNW), f 111 9 --% k 1 n BY: (init.) DATE NOTIFIED `` (� n " � (U --16 2nd NOTIFICATION BY: (. init. 3RD NOTIFICATION BY: Unit.) 01/07/93 CITY OF TUKWILA M ECHA,ICAL PERMIT APPLICATION Department of Community Development - Building Division 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 PLAN CHECK NUMBER FEES (for staff use only) DESCRIPTION BASIC PERMIT FEE UNIT(S) FEE PLAN CHECK FEE OTHER: AMOUNT RCPT .# DATE APPLICATVON MUST BE FILLED OUT COMPLETELY TOTAL - SITE ADDRESS J (5,1 E Mixi ) .4 5 SUITE # Vf UE OF CONSSTRDCT ION - $ 17) /4-i. [,Ci14 - PHONE g 3� • • 0 PROJECT NAME/TENANT J.A. 5. ASSESSOR ACCOUNT # /023x4 —go76 ZIP `1go53 TYPE OF WORK: New /Addition 0 Modifications Q Repair 0 Other: A/C Un/•ls 'Wk./Wag / h. Tam s wh o . Fa hs -Eor &lef wa►nva P+d M(4 -e on+, DESCRIBE WORK TO BE,DO E: F rni'Sh ospial /n All (3)New toe 1vp h��7/QY 1e 6d $ RV•fvfl1 ,;:e14`. r o F- o/( r WFvarn y ti s4e h../ ci r n oe7SprEX leV, TYPE RATING /SIZE ::: NUMBER OF UNITS .00 r, : 6 %a c s Un' / �- • YYl • 1 , •C. / f CI- g Reznor das Untf /-1 • er 40 M,'/{ aviov-/ / /2eznbr Gas Li viii- /Jra k /32 Alen ev-tput l BUILDING USE (office, warehouse, etc.) &frece /W e? re ho ci5.e NATURE OF BUSINESS: WILL THERE BE A CHANGE IN USE? -allo O Yes IF YES, EXPLAIN: WILL THERE BE STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE BUILDING? No 0 Yes IF YES, EXPLAIN: r PROPERTY OWNER LIpHAi _ y._ LLC PHONE //3-ow — r /fl /fin 6 /NAL (7� 7U /R [,Ci14 - PHONE g 3� ZIP .- 2q 26 I CONTRACTOR Q pry! hh e • Pars ley tgr e e rr ADDRESS 4 6 2 o - 23 2 A4V 4 ve, ,V 6; 1116)4, WA— ZIP `1go53 WA. ST. CONTRACTOR'S LICENSE # ,OA g S L SZ 4 77— /111.f EXP. DATE EREBY CERTIFYTHAT i HAVE RE-AD AND EXAMINED:THIS APPLICATION AND KNOW;:THE SAME, :AND CORRECT, AND! AM'AUTHORIZED TO APPLY FOR::THIS PERMIT `.` ` ''" :. BUILDING OWNER SIGNA �,, p OR taco 'a-UAW AUTHORIZED PRIN A E 04(..t Zlti PE 1ebt-I_EL . PHONE $ 36 _dcia, AGENT ADDRESS ,r/ 132410 A.V. � C- pmMUw16 (,DI¢ CITY/ZIPP`.—�oiob►W &C13 CONTACT PERSON Dom /t%Qr (...m PHONE S36 _2 q 26 DATE APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill out the application completely and follow the plan submittal checklist on the reverse side of this form. Application and plans must be complete in order to be accepted for plan review. BUILDING OWNER /AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or contractor licens( by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal. VALUATION OF CONSTRUCTION The valuation is for the work covered by this permit and must be filled in by the applicant. This figure is used for budget reporting purposes only and not to calculate your fees. EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may extend the time for action by the applicant for a period not exceeding 18 days upon written request by the applicant as defined in Section 304(d) of the Uniform Mechanical Code (current edition). No application shall be extended more than once. If you have any questions about our process or plan submittal requirements, please contact the Department of Community Development at 431 -3670. DATE APPLICATION ACCEPTED to- q5 DATE APPLICATION EXPIRES Li 00/1 SI�SMITTAL CHECkLIST MECHANICAL nCompleted mechanical permit application (one for each structure or tenant) Two (2) sets of mechanical plans, which include: iPIoor plan .4ystern layout.', /Elevations (for roof mounted equipment) •cleat Loss Calculations Structural calculations stamped,by a Washington State licensed engineer may be ,`required,if structural.work is to.be done (2 sets) „, Note: Hood and duct systems require a building permit for the duct shaft. Water,heaters and vents are included in the UMC — please include any water. heaters. or; vents being installed or replaced. ' INSPECTION RECORD Retain a copy with permit CITY OF TUKWILA BUILDING DIVISION Southcenter Blvd., #100, Tukwila, WA 9818: k2Q6) 1_36 0 Project: , A , S Type of In Eon: t' rir 0 f Address II X71 ►! Olf IAGt e Special Instructions: ate Wanted; 1 / c4 V am p.m. Requester: A Phone Noe/ Z 2, ?(�./ 7� r 0 0 Approved per applicable codes. ❑ Corrections required prior to approval. COMMENTS: ❑ 130.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule relnspection. IReceipt No.: • INSPECTION RECORD Retain a copy with permit o. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206) 431 -3670 ro ed:" -AS rolz.,,A .1N &( T ot ns.w 0v.... 5-1465.-.. DoW/� Addee2 -I F1667 !. 4 A. L Date .: y r t. -- %.Q Special Instructions: W S ,,, WK-E.;-beM7...., - !,-so--F/A. Date Wanted: j - +-j - `A Ca am. p.m. Requester: VR. -, co. r- a Phwer43.: --11(; — 1-45C0 ❑ Approved per applicable codes. ❑ Corrections required prior to approval. COMMENTS: 44...#1.-// • _ i/'i S' pia n v 4+ 0 -AI `S, 40f4•00-e 4/11( elrim /.r of � 1- a beEv e � , ea iJ(rf/ / ~�� 9 '47 6 -1/ V,. Alk ❑ 530.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. CaII.to schedule reinspection. Dale: �� 1 INSPECTION RECORD Retain a copy with permit CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206) 431-3670 • . : s ype 0 ns : ■ . AI A iial-Ve9"( Z C.,,,id■ 6 0 pa ea 47 oi,,,i_ .': ress: ,..2 , /1"../ Alfit)Wi i li • :, Arm' _ , Special Instructions: Date Wanted: (-2-17.7-.-- am. .m. Requester: 4) )4,26 -/-zi:e.›-to.iy. 12 — /,-) 91- eO-P--- e4e7-7J1_5(, Phone No: 1".0 *--A7 ev 0 Approved per applicable codes. Corrections required prior to approval. ' COMMENTS: ' s I) "%I-4C- I fGa iial-Ve9"( Z C.,,,id■ 6 0 pa ea 47 oi,,,i_ _ , 3) 64-ef---- cm i'A fOLL, 074--S 0 rigi/ )-2 7I-ii 4v/ ‘ f 4) )4,26 -/-zi:e.›-to.iy. 12 — /,-) 91- eO-P--- e4e7-7J1_5(, 44? 1".0 *--A7 ev I7 5/pee-let:II-I, tle-6e2,4/- J 1 inspectoc4) Date: /2 "2 1 0 $ 3 0 . 0 0 REINSPECTION F E REQUIRED. Prior to reinspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. 7P°.: TO2e: (- City of Tukwila Fire Department Project Name John W. Rants, Mayor TUKWILA FIRE DEPARTMENT FINAL APPROVAL FORM jr1 5 /.1. 1) ii1/7 Thomas P. Keefe, Fire Chief Permit No. 41 5''' - 01.51 1 Address / 2 / , i( / // Retain current inspection schedule /k--Needs shift inspection Suite # C Approved without correction notice Approved with correction notice issued Sprinklers: Fire Alarm: Hood & Duct: Halon: Monitor: Pre-Fire: Permits: Authorized Signature FINALAPP.FRM Date T.F.D. Form F.P. 85 Headquarters Station: 444 Andover Park East • Tukwila, Washington 98188 • Phone: (206) 5754404 • Fax (206) 5754439 *+*++****++a*A+4.++++4, +* ++*4.*+++�******+A.A*A*� �ITY OF TUKNILA, NA � ~- 8 -- TRANGM1T ;*+�+*A*4,+4*A**+*+****+*++ ir.**+^h++fy* *4.****k*4*4+a4*+*+****+ TRANSMIT Number: 94003119 Amount: 139.06 10/17/99,1 Payment Method: CHECK Notation: .PARSLEY MR In{t:�.��� Permit No: M93-0159 Typo: O-NECHANMECHAN%CAi PERMIT Parcel No: 102304-9076 Bite Address: 3514 8 116 ST Total Pees: 139.06. This, Payment 139.06 'fetal ALL Pmts: 139.0:6' _ Balance: ,. "00 � *^*A*+**A*kA*^+*a***++A+A*6+*+ka**+*+*+***+A+**.k.A**4%**+*+«*a** Aoc0uat Code Dgscriptj0D Amount. 00O/345.830 ` PLAN CHECK.- NONRES . . 27.81 0O0/322.100 ,MECHANICAL - NDNREG 111.25' ' GENERA 139.06 TOTAL 139.06 CHECK 139"06 CHANGE 0.00 ?122A000 15438 ` Address: 3514 .5 116 ST Suite: Tenant: JAS FORWARDING Type: B- MECHAN Parcel #: 102304 -9076 • k*• 1,** •k* ***•k•k'b*bk *•k•k *1,•k14•kkki Permit Conditions CITY OF TUK,WILA' Permit No: M95 -0159 Status: ISSUED Applied: 10/04/1995 Issued: 10/17/1995 k0104k• k kk' k** kk** k**** kkkk• k* •kkkk•k*4k1rkk•kk *44444*•k•k4 1 . No changes wi 11 be made... t_ e: :,p 1'ansr .•Aur - 1'es.s•_.,appr,oved by the Architect or Eng•inee and the...TuI,wi'1aJ "B'ux11dIng D1vision. 2. Al) permits, inspection records #, and approvetf 1an_s sha11 be available at t.hej °;Job site: °;,,pri;or to.t,tQhe .start` ot`.': py�;con- str"uction.. ,The.'e docume,i °,tsti6ai4,,,:t a` be main %aired anti; a v a i 1 - a b 1 e unt i 1 �t'rij na 1 l,,nsp'e.t.,t l`on apps oval., i"s gran,te11.,E ° '� .1 All const,.r7u,ction t`a„ b.e dortiei :,fn''confor�niance with°approve4 p lens. and e�"equ'i c'eme'nts of the��.Uri i,,f arm Bu i 1'cutn+g Code 4:'(19'. Editiona's amended ,,.,Uvii.for:mMech.L61cal Code 't:l994 Ed1tia. and Wa `hington State Energv,r'Code t1'994 Edit ionS' ' -''`' ,':.;r`• 4. 'Vai ids 4y of .Permit,. The.'�i5'su'ance of °; a permit ar. 'appr.Ov�a''1 o;`w` ?' p lans 'speec,ifica.tions,,:•:;:and corrtp,u,t.ations shall not "be '',Cc,, �; str•ue'd; tor%b.e` °ia permit • O'2r, or/Ian—approval of, any violation \' of any of the provisioils of.....•e bu1l,:ding code or of'.�any,fr other f ord?i.nanc,e of theyl or i :.di;i ct i on INo:,p,er"m i t presur i ng to i'Ie authority to,:.,:v.ioiate or4 cane l thew} rovii:ions Ere t f•� ca�e`;gslla 1 1 be ;.';Va'1•i.�... _.`,, , , u �'4 ,,�.; ( $ f^:�, ) ,� % '; �,„ 5. MAf�UFAC�TURER S:+•INSTALLAT�ION'INSTRUCTI NxS .REOUIRED ON SITE ti FORS' THE Bill`LDING °:�IiV' "PE:GTQR5'`( EUIE . e •s 6. Pl LIMO ngpern1,,ts K,la"1 1 b' e/obta',i'ned,,,ttrr,ouglrr�4the Seattl "e -f..j ng Co" t"tment ofu•- ;P,uk�.11c Hea'�1 :th,�g..•,,P•1�umb�ing, wi 11 be A in:;p cted bv, that agency, inc1ud'j'hq 9,1'1r gfa - p•.tping '4;,x,. , (29647224, x ?.tvt3•• v j} ,,, ,.v' °-•+ •-,,r" *-1 1dT 44 3 ` • r'Jl . t y fi i b� ; ..._...�� '6A = _ ry 7. E1ec ; `\ca, "'permtt3 sha11 be abtairyed,�ti`�r ough ,ti' e W ish)an.g•t `state' D1vi ,ion of, Labor and Indus r!es' `a nd,a.' 1, \electric �:1, work icsA'!� ".l be inspected by that a1`g ri y (24�{B -6630 B. Readily:�4cces�. „table 'a`eces:y to root mou"nt,e;d „F ,,equent 1�s . requi red; �' . > qk. r: °r`4 , w5 . tip= i5 N .1•01•111.•1 r 44" •-•-• ... • • 1'4 • • • I, if t ..( " RECEIVED CITY OF TUKWILA ' OCT 0 1995 PERMIT CENTER flvi �4 ?i'�h�,= �Fhv: ✓'M".o�iG# r::+i�: s' spIA' ;:i "•, s:rtri i'LT�!'b. +�I 1i4xenlry+tOTx 13,,,,,;xFl• omr..50,- Amr:Yr ✓ tlY, sria• rr.: AYt^ �rr..«ecr•:q+.rrraen�e++n.aner. m.+:nrc,...wn eol4l4r� Ware house. f-62- = 2/ 7 0 g 74t2- Tr Z) /iehl = 44600 8' ti /32, croc t-/ / 72,600 ti-&A 6 -6c,A. _ 172, 000 6i fz 21, 70S''a 7,72 a-c441L1 fz 'WY Mechanical Summ( MECH -SUM 1994 Washington State Nonresidential Energy Code Compliance Forms July, 1994 Project Info Project Address J.A.S. Model No.1 Capacity2 Date 9/29/95 OSA CFM Econo 3514 SOUTH 116TH STREET IPLV3 Location For Building Dept. Use RECEIVED CITY OF TUKWILA r r ,. r� i. Inn' t PERMIT CENTER YORK TUKWILA, WA 90MBH 3000.0 Applicant Name: PARSLEY ENGINEERING, INC N/A ROOF Applicant Address: 4620 - 232ND AVE. N.E. - REDMOND, WA 98053 Applicant Phone: 836 -2926 10.2 N/A Project Description FURNISH AND INSTALL 3 NEW ROOFTOP AC UNITS TOTALLING 16 -1/2 TONS Briefly describe mechanical system WITH SUPPLY AND RETURN DUCT. FURNISH AND INSTALL 5 EXHAUST FANS type and features. FOR TOILET ROOMS AND LUNCH ROOM. Compliance Option ■P Simple System ❑ Complex System ❑ Systems Analysis (See Decision Flowchart (over) for qualifications) Equipment Schedules The following Information is required to be incorporated with the mechanical equipment schedules on the plans. For projects without plans, fill In the required information below. Cooling Equipment Schedule Equip. ID Brand Name' Model No.1 Capacity2 Total CFM OSA CFM Econo SEER or EER IPLV3 Location AC -1 YORK D3C0090N13046ST 90MBH 3000.0 YES 8.9 N/A ROOF AC -2 YORK D6C0060N07946 60 MBH 2000.0 YES 10.2 N/A ROOF AC -3 YORK D600048N06046 48 MBH 1600.0 0 -25% 10.4 N/A ROOF 014 -1 i2tZh0V 50 Mt3N 46 MBN U({-2 Reznor 145 M8/1 132M H Heating Equipment Schedule Equip. ID Brand Name' Model No.1 Capacity2 Total CFM OSA cfm Econo Input Btuh Output Btuh Efficiency's AC -1 YORK D300090N130469T N/A 3000.0 N/A 163 MBH 130 MBH 79.0 AC -2 YORK D6CG060N07946 N/A 2000.0 N/A 100 MBH 79 MBH 79.0 AC -3 YORK D6CG048N06046 N/A 1600.0 N/A 75MBH 62 MBH 80.5 014 -1 i2tZh0V 50 Mt3N 46 MBN U({-2 Reznor 145 M8/1 132M H Fan Equipment Schedule Equip. ID Brand Name' Model No.1 CFM SP1 HP /BHP Flow Control5 Location of Service 1If available. 2 As tested accord ng to Table 14 -1, 14 -2 or 14 -3. 3 If required. 4 COP, HSPF, Combustion Efficiency, or AFUE, as applicable. 6 Flow control types: VAV, constant volume, or variable speed. Mechanical Sumrr (back) MECH -SUM System Description See Section 1421 for full description of Simple System qualifications. If Heating /Cooling or Cooling Only: ►i, Constant vol? Split system? El Air cooled? ■B Packaged sys? ❑ <54,000 Btuh? ►Ii Economizer included? If Heating Only: J <5000 cfm? ❑ <701/4 outside air? Decision Flowchart Use this flowchart to determine if project qualifles for Simple System Option. If not, either the Complex System or Systems Analysis Options must be used. Start System Typ Heating 0 <5000 cf n <70% O no 2 eating /Coolin r yes yes y �Referenc' Sec. 1421 5Tor 7 ,2-ro n oC nsta?�tt�� olumeYo it Coole no 4,000 B r 1900 cf • ackag �• yste 0 4To h U niA 'Include Econo Reference o es Sec. 1423 no Simple Syste Allowed Reference Sec. 1420 • Split yste yes r no 4,000 B u 1900 cf yes Use Complex ( Reference System Sec. 1430 Complex Systems Refer to MECH -COMP Mechanical Complex Systems for assistance in determining which Complex Systems requirements are applicable to this project. 1994 Washinaton State ',residential Enerav Cos1�C_omnlianoe�ot Mechanical Permit I 'ans 1994 Washington Slate Energy Code Compliance Forms Checklist MECH -CHK July, 1994 Project Address J.A.S. 'Date 9/29/95 The following information is necessary to check a mechanical permit application for compliance with the mechanical requirements in the Washington State Nonresidential Energy Code. Applicability (show with X) Code Section Component Information Required Location on Plans Building Department Notes HVAC REQ IREME S (Sections 140 -1424) 1411 Eqpmt performance x no n. a T411.4 Pkg. elec. htg.& clg. List heat pumps on schedule Ml x no n. a 1411.1 Minimum efficiency Equipment schedule with type, capacity, efficiency M>. 1412 HVAC controls x no n. a 1412.1 ' temperature zones Indicate locations on plans M7, x no n.a 1412.2 Deadband control Indicate 5 degree deadband minimum Mi yee no x 1412.3 Humidity control Indicate humidistat x no n. a 1412.4 Automatic setback Indicate thermostat with night setback and 7 diff. day types Ml x no n. a 1412.4.1 Dampers Indicate damper Location and automatic controls Mi yes no x 1412.5 Heat pump control Indicate microprocessor on thermostat schedule yes no x 1412.6 Combustion htg. Indicate modulating or staged control x no n.a 1412.7 Balancing Indicate balancing features on plans Ml yee no x 1422 Thermostat interlock Indicate thermostat interlock on plans x no n. a 1423 Economizers Equipment schedule Mi 1413 Air economizers x no n. a 1413.1 Operation Indicate 100% capability on schedule M1 yes no x 1413.2 Control Indicate controls able to evaluate outside air yea no x 1413.3 Integrated operation Indicate capability for partial cooling 1414 Ducting systems x no n.a 1414.1 Duct sealing Indicate sealing necessary Ml X no n.a • . Iuc insu a on n•Ica a - -va ue o insu a ion on •uc M3 yea no x 1415.1 Piping insulation Indicate R -value of insulation on piping yes no x 1424 Separate air sys. Indicate separate systems on plans x no Mech. Sum. Form Completed and attached. Equipment schedule with types, Input/output, efficiency, cfm, hp, economizer SERVICE WATER HEATING AND HEA ec ions 1440 Service water htg. yes no x 1442 ec. wa er ea er Shut -off controls n•ica e -- 1 insu a on un•er an Indicate automatic shut -off yea no x 1450 Heated pools yes no x -oo wa er ea ers n • ica e no a ec ric res s ance yea no x 1453 Pool heater controls Indicate switch and • •agree con ro yea no x • • • oo covers n • ica a vapor re ar• an cover yea no x 1454 Pools 90+ degrees Indicate R -12 pool cover no is circled Tor any question, provtae explanation: • � A A a • • pa ;... - rr -1 _ i' , • • - •ii• • I - Mechanical Permit ,t ans Checklist 1994 Washington State Energy Code Compliance Forms •1 -- - •i MECH -CHK July, 1994 Mechanical - General Requirements 1412 Controls 1412.1 Temperature Controls: Each system shall be provided with at least one temperature control device. Each zone shall be controlled by Individual thermostatic controls responding to temperature within the zone. At a minimum, each floor of a building shall be considered as a separate zone. 1412.2 Deadband Controls: When used to control both comfort heating and cooling, zone thermostatic controls shall be capable of a deadband of at least 5 degrees F within which the supply of heating and coding energy to the zone is shut off or reduced to a minimum. Exceptions: 1. Special occupancy, special usage, or code requirements where deadband controls are not appropriate. 2. Buildings complying with Section 1141.4, if in the proposed building energy analysis, heating and cooling thermostat setpoints are set to the same temperature between 70 degrees F and 75 degrees F inclusive, and assumed to be constant throughout the year. 3. Thermostats that require manual changeover between heating and cooling modes. 1412.3 Humidity Controls: If a system is equipped with a means for adding moisture, a humidistat shall be provided. 1412.4 Setback and Shut -Off: I-1VAC systems shall be equipped with automatic controls capable of accomplishing a reduction of energy use through control setback or equipment shutdown during periods of non -use or alternate use of the spaces served by the system. The automatic controls shall have a minimum seven -day clock and be capable of being set for seven different day types per week. Exceptions: 1. Systems serving areas which require continuous operation at the same temperature setpdnt. 2. Equipment with full load demands of 2 kW (6,826 Btu/h) or less may be controlled by readily accessible manual off - hour controls. 1412.4.1 Dampors: Outside air Intakes, exhaust outlets and relief outlets serving conditioned spaces shall be equipped with dampers which close automatically when the system is off or upon per failure. Stair shaft and elevator shaft smoke relief openings shall be equipped with normally open dampers. These dampers shall remain closed in normal operation until activated by the fire alarm system or other approved smoke detection system. Exceptions: 1. Systems serving areas which require continuous operation. 2. Combustion air intakes. 1412.5 Heat Pump Controls: Unitary air cooled heat pumps shall Include microprocessor controls that minimize supplemental heat usage during start-up, set -up, and defrost conditions. These controls shall anticipate need for heat and use compression heating as the first stage of heat. Controls shall indicate when supplemental heating is being used through visual means (e.g., LED indicators). 1412.6 Combustion Heating Equipment Controls: Combustion heating equipment with a capacity over 225,000 Btu/h shall have modulating or staged combustion control. Exceptions: 1. Boilers. 2. Radiant Heaters. 1412.7 Balancing: Each air supply outlet or air or water terminal device shall have a means for balancing, including but not limited to, dampers, temperature and pressure test connections and balancing valves. 1413 Air Economizers 1413.1 Operation: Air economizers shall be of automatically modulating outside and retum air dampers to provide 100 percent of the design supply air as outside air to reduce or eliminate the need for mechanical coding. 1413.2 Control: Air economizers shall be controlled by a control system capable of detemmining if outside air can meet part or all of the building's coding loads. 1413.3 Integrated Operation: Building Heating Energy: Air economizers shall be capable of providing partial cooling even when additional mechanical cooling is required to meet the remainder of the coding load. Controls shall not preclude the economizer operation when mechanical cooling is required simultaneously. Exception: Economizers on individual, direct expansion, cooling systems with capacities not greater than 75,000 Bluth may include controls that limit simultaneous operation of the economizer and mechanical coding for the purpose of preventing ice formation on coding coils. 1414 Ducting Systems 1414.1 Sealing: Duct work which is designed to operate at pressures above 1/2 inch water column static pressure shall be sealed in accordance with Standard RS-18. Extent of sealing required is as follows: 1. Static pressure: 1/2 inch to 2 inches; seal transverse joints. 2. Static pressure: 2 inches to 3 inches; seal all transverse joints and longitudinal seams. 3. Static pressure: above 3 inches; seal all transverse joints, longitudinal seams and duct wall penetrations, 1414.2 Insulation: Ducts and plenums that are constructed as part of the building envelope shall meet the requirements of Chapter 13. Other ducts and plenums shall be thermally insulated per Table 14-5. Exceptions: 1. Within the I-1VAC equipment. 2. Exhaust air ducts not subject to condensation. 3. Exposed ductwork within a space that serves that space only. 1415 Piping Systems 1415.1 Insulation: Piping shall be thermally insulated in accordance with Table 14-6. Exception: Piping installed within unitary I-IVAC equipment. Water pipes outside the conditioned space shall be insulated in accordance with Washington State Plumbing Code (WAC 51 -26) 1420 SIMPLE SYSTEMS (PACKAGED UNITARY EQUIPMENT) 1421 System Type: To qualify as a simple system, systems shall be one of the following: a. Air coded, constant volume packaged equipment, which provide heating, coding or both, and require only external connection to duct work and energy services. b. Air cooled, constant volume split systems, which provide heating, coding or both, with cooling capacity of 54,000 Btu/h or less. c. Heating only systems which have a capacity of less than 5,000 cfm or which have a minimum outside air supply of less than 70 percent of the total air circulation. All other systems shall comply with Sections 1430 through 1438. 1422 Controls: In addition to the control requirements in Section 1412, where separate heating and cooling equipment serve the same temperature zone, thermostats shall be interlocked to prevent simultaneous heating and coding. 1423 Economizers: Economizers meeting the requirements of Section 1413 shall be installed on packaged roof top fan - cooling units having a supply capacity of greater than 1,900 cfm or a total cooling capacity greater than 54,000 Btu/h. The total capacity of all units without economizers shall not exceed 240,000 Bluth per building. 1424 Separate Air Distribution Systems: Zones with special process temperature requirements and/or humidity requirements shall be served by separate air distribution systems from those serving zones requiring only comfort conditions. ** PARSLEY ENGINEERING C.* .* MECH. ENGR /CONTRACTORS * ** REDMOND, WA ** FULL COMMERCIAL HVAC LOADS PROGRAM BUILDING MASTER DATA AND DESIGN PARAMETERS: DESIGN MONTH AUGUST JUNE JULY SEPTEMBER JANUARY FEBRUARY WINTER OUTDOOR OUTDOOR INDOOR DRY BULB WET BULB REL.HUM 83 83 83 83 54 59 24 67 67 67 67 48 50 0 ROOF ASHRAE ROOF ROOF SUSP TYPE ROOF # U -FAC COLOR CLG. 1. 5 0.100 DARK YES PART PART TYPE U -FAC 1. 0.081 COOL HEAT T -D T -D 10 31 WALL ASHRAE WALL WALL TYPE GROUP U -FAC COLOR 1. B 0.119 MEDIUM 50% 50% 50% 50% 50% 50% 50% GLASS SUMMER WINTER GLASS INTERIOR NO. U -FAC. U -FAC. SHD.COEF SHADING 1. 0.490 0.540 2. 0.490 0.540 SHADE NO. 0.580 0.580 LEN DIST. DIST. DIST. OF BEYOND BEYOND OVERH HOR RIGHT LEFT ABOVE OVH W -EDGE W -EDGE WIND. 1. 1.75 3.00 3.00 0.00 PROJECT: CLIENT: RECEIVED DATE: CITY OF TUKWILA DESIGNER:OCT 0 1t 1995 INDOOR DRY BULB 75 75 75 75 75 75 70 PERMIT CENTER GRAINS DIFF. 8.80 8.80 8.80 8.80 -24.70 -25.59 0.00 INTERIOR ROOM SHD.COEF CONST NO 0.000 MEDIUM NO 0.000 MEDIUM DIST. DIST. RIGHT R -FIN FIN BEYOND PROJ W -EDGE HT. OF RT. FIN 0.00 0.00 0.00 OFrl(e 5P4C c J.A.S. S.G.A. 09/07/95 D. MARITH IN /OUTDOOR CORRECTION -12 - 12 - 12 - 12 -41 - 36 GLASS GLASS WIDTH HEIGHT 1.00 6.00 1.00 5.50 DIST. DIST. HT. LEFT L -FIN OF FIN BEYOND LEFT PROJ W -EDGE FIN 0.00 0.00 0.00 * ** FULL COMMERCIAL HVAC LOADS PROGRAM BY ELITE SOFTWARE DEVELOPMENT INC * ** 'PARSLEY ENGINEERING REDMOND, WA J.A.S. 09/07/95 PAGE 2 * * * * * * * * * * * * * * * * * * * ** GENERAL PROJECT DATA (CONTINUED) * * * * * * * * * * * * * * * * * * * ** GENERAL PROJECT INFORMATION: PROJECT FILE NAME: PROJECT LOCATION: BAROMETRIC PRESSURE: ALTITUDE: NORTH LATITUDE: MEAN DAILY TEMPERATURE RANGE: ATMOSPHERIC CLEARNESS FACTOR: GROUND REFLECTANCE: STARTING TIME FOR HVAC LOAD CALCULATIONS: ENDING TIME FOR HVAC LOAD CALCULATIONS: FLOOR HEAT LOSS COEFFICIENT: NUMBER OF UNIQUE ZONES IN THIS PROJECT: BUILDING DEFAULT VALUES: CALCULATIONS PERFORMED: LIGHTING REQUIREMENTS: EQUIPMENT REQUIREMENTS: PEOPLE SENSIBLE LOAD MULTIPLIER: PEOPLE LATENT LOAD MULTIPLIER: PEOPLE OCCUPANCY BASIS: ZONE SENSIBLE SAFETY FACTOR: ZONE LATENT SAFETY FACTOR: ZONE HEATING SAFETY FACTOR: PEOPLE DIVERSITY FACTOR: LIGHTING PROFILE NUMBER: EQUIPMENT PROFILE NUMBER: PEOPLE PROFILE NUMBER: BUILDING DEFAULT CLG. HEIGHT: BUILDING DEFAULT WALL HEIGHT: INTERNAL OPERATING LOAD PROFILES (C =100): D:95060C TUKWILA, WA 29.867 IN.HG 50 FEET 47 DEGREES 26 DEG.F 1.00 20 PERCENT 8 AM 6 PM 0.81 BTUH /FT -F 3 BOTH HEATING AND COOLING LOADS 1.50 WATTS PER SQUARE FOOT 0.50 WATTS PER SQUARE FOOT 255 BTUHS PER PERSON 255 BTUHS PER PERSON 1 PERSON PER 150 SQ.FT 10% 100 20% 100% 10 10 10 8.50 FEET 12.00 FEET REF HR HR HR HR HR HR HR HR HR HR HR HR HR HR HR HR HR HR HR HR HR HR HR HR NO. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 1 . C C C C C C C C C C 70 70 70 C C C C C C C C C C C 2. C C C C C C C C C C C C C C C C C C C C C C C C 3. C C C C C C C C C C C C C C C C C C C C C C C C 4. C C C C C C C C C C C C C C C C C C C C C C C C 5. C C C C C C C C C C C C C C C C C C C C C C C C 6. C C C C C C C C C C C C C C C C C C C C C C C C 7. C C C C C C C C C C C C C C C C C C C C C C C C 8. C C C C C C C C C C C C C C C C C C C C C C C C 9. C C C C C C C C C C C C C C C C C C C C C C C C 10. C C C C C C C C C C C C C C C C C C C C C C C C ALL DESIGN DATA TAKEN FROM THE 1989 ASHRAE HANDBOOK OF FUNDAMENTALS * ** FULL COMMERCIAL HVAC IDS PROGRAM BY ELITE SOFTWARE DEVELOPMENT INC * ** 'PARSLEY ENGINEERING REDMOND, WA J.A.S. 09/07/95 PAGE 3 * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** ZONE INPUT DATA * * * * * * * * * * * * * * * * * * * * * * * * * * * ** ZONE ## 1: EAST SIDE (2324 SF) AIR HANDLER NUMBER: 1 ZONE LENGTH (FEET): 28.00 LIGHTING WATTS: PER.SF 3486 NO. OF PEOPLE IN ZONE: PER.SF 15 LIGHTING PROFILE NO: 10 CEILING HEIGHT (FEET): 8.50 SEN.SAFETY FACTOR ( %): 10 SEN.HEAT PER PERSON (BTUH): 255 CLG VENTILATION CFM: 0 HTG VENTILATION CFM: 0 EXHAUST AIR CFM: 0 CLG. SQFT EXPOSED TO PLENUM: -1 LAT. BTUH EQUIP LOAD: 0 ROOF TYPE ASHRAE # U- FACTOR 1. 1 5 0.100 WALL TYPE ASHRAE -G U- FACTOR 1. 1 2. 1 3. 1 4. 1 B B B B 0.119 0.119 0.119 0.119 ZONE OCCURRENCES: ZONE WIDTH (FEET): EQUIPMENT WATTS: PEOPLE PROFILE NO: EQUIPMENT PROFILE NO: HTG.SAFETY FACTOR ( %): LAT.SAFETY FACTOR (%): LAT.HEAT PER PERSON (BTUH): CLG INFILTRATION CFM: HTG INFILTRATION CFM: MINIMUM SUPPLY CFM: EXPOSED FLOOR SLAB EDGE -FT: HTG. & CLG. LOADS CALCULATED 1 83.00 PER.SF 1162 10 10 20 10 255 0 0 0 98.00 COLOR LENGTH WIDTH ROOF -AREA SUSP.CEIL DARK 28.00 44.00 1232.0 YES COLOR HEIGHT WIDTH WALL -AREA DIRECTION MEDIUM 12.00 80.00 MEDIUM 12.00 12.00 MEDIUM 12.00 80.00 MEDIUM 12.00 15.00 GLASS TYPE SUM -UFAC SHD.COEF HEIGHT WIDTH QUANTITY 1. 1 0.490 2. 1 0.490 3. 2 0.490 4. 2 0.490 0.580 0.580 0.580 0.580 6.00 1.00 72.000 6.00 1.00 11.500 5.50 1.00 73.000 5.50 1.00 13.000 960.0 E 144.0 S 960.0 E 180.0 S - 90 - 180 - 90 - 180 AREA SHD TILT REF 432.0 69.0 401.5 71.5 1 90 1 1 90 2 0 90 3 0 90 4 * ** FULL COMMERCIAL HVAC LADS PROGRAM BY ELITE SOFTWARg DEVELOPMENT INC * ** PARSLEY ENGINEERING REDMOND, WA J.A.S. 09/07/95 PAGE 4 * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** ZONE INPUT DATA * * * * * * * * * * * * * * * * * * * * * * * * * * * ** ZONE # 2: SOUTH SIDE (1218 SF) AIR HANDLER NUMBER: 2 ZONE LENGTH (FEET): 14.50 LIGHTING WATTS: PER.SF 1827 NO. OF PEOPLE IN ZONE: PER.SF 8 LIGHTING PROFILE NO: CEILING HEIGHT (FEET): SEN.SAFETY FACTOR ( %): SEN.HEAT PER PERSON (BTUH): CLG VENTILATION CFM: HTG VENTILATION CFM: EXHAUST AIR CFM: CLG. SQFT EXPOSED TO PLENUM: LAT. BTUH EQUIP LOAD: ROOF TYPE ASHRAE # U- FACTOR 1. 1 5 0.100 WALL TYPE ASHRAE-G U- FACTOR 1. 1 2. 1 3. 1 4. 1 B B B B 10 8.50 10 255 0 0 0 -1 0 ZONE OCCURRENCES: ZONE WIDTH (FEET): EQUIPMENT WATTS: PEOPLE PROFILE NO: EQUIPMENT PROFILE NO: HTG.SAFETY FACTOR ( %): LAT.SAFETY FACTOR ( %): LAT.HEAT PER PERSON (BTUH): CLG INFILTRATION CFM: HTG INFILTRATION CFM: MINIMUM SUPPLY CFM: EXPOSED FLOOR SLAB EDGE -FT: HTG. & CLG. LOADS CALCULATED 1 84.00 PER.SF 609 10 10 20 10 255 0 0 0 53.00 COLOR LENGTH WIDTH ROOF -AREA SUSP.CEIL DARK 8.00 84.00 672.0 YES COLOR HEIGHT WIDTH WALL -AREA DIRECTION 0.119 MEDIUM 0.119 MEDIUM 0.119 MEDIUM 0.119 MEDIUM GLASS TYPE SUM -UFAC SHD.COEF HEIGHT 1. 1 0.490 2. 1 0.490 3. 2 0.490 4. 2 0.490 12.00 12.00 12.00 12.00 41.00 12.00 43.00 18.00 492.0 S 144.0 E 516.0 S 216.0 E - 180 - 90 - 180 - 90 WIDTH QUANTITY AREA SHD TILT REF 0.580 6.00 1.00 40.000 240.0 1 90 1 0.580 6.00 1.00 12.000 72.0 1 90 2 0.580 5.50 1.00 40.000 220.0 0 90 3 0.580 5.50 1.00 18.000 99.0 0 90 4 * ** FULL COMMERCIAL HVAC LOADS PROGRAM BY ELITE SOFTWARE DEVELOPMENT INC * ** PARSLEY ENGINEERING REDMOND, WA J.A.S. 09/07/95 PAGE 5 * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** ZONE INPUT DATA * * * * * * * * * * * * * * * * * * * * * * * * * * * ** ZONE # 3: INTERIOR (2345 SF) AIR HANDLER NUMBER: ZONE LENGTH (FEET): LIGHTING WATTS: PER.SF NO. OF PEOPLE IN ZONE: PER.SF LIGHTING PROFILE NO: CEILING HEIGHT (FEET): SEN.SAFETY FACTOR ( %): SEN.HEAT PER PERSON (BTUH): CLG VENTILATION CFM: HTG VENTILATION CFM: EXHAUST AIR CFM: CLG. SQFT EXPOSED TO PLENUM: LAT. BTUH EQUIP LOAD: ROOF TYPE ASHRAE # U- FACTOR 1. 1 5 0.100 3 35.00 3518 16 10 8.50 10 255 0 0 0 -1 0 ZONE OCCURRENCES: ZONE WIDTH (FEET): EQUIPMENT WATTS: PEOPLE PROFILE NO: EQUIPMENT PROFILE NO: HTG.SAFETY FACTOR ( %): LAT.SAFETY FACTOR ( %): LAT.HEAT PER PERSON (BTUH): CLG INFILTRATION CFM: HTG INFILTRATION CFM: MINIMUM SUPPLY CFM: EXPOSED FLOOR SLAB EDGE -FT: HTG. & CLG. LOADS CALCULATED 1 67.00 PER.SF 1173 10 10 20 10 255 0 0 0 0.00 COLOR LENGTH WIDTH ROOF -AREA SUSP.CEIL DARK 19.50 67.00 1306.5 PART TYPE U- FACTOR COOL.T -D HEAT.T -D HEIGHT 1. 1 0.081 WIDTH PART -AREA 10 31 12.00 67.00 804.0 YES * ** FULL COMMERCIAL HVAC LOADS PROGRAM BY ELITE SOFTWARE DEVELOPMENT INC * ** •PARSLEY ENGINEERING REDMOND, WA J.A.S. 09/07/95 PAGE 6 * * * * * * * * * * * * * * * * * ** DETAILED PROJECT ZONE LOAD CALCULATIONS * * * * * * * * * * * * * * ** LOAD DESCRIPTION 1. EAST SIDE SYS# 1 ROOF -1 -5- E. WALL- S. WALL - E. WALL- S. WALL - E. GLS- 16 %S- 1- E. SGLS- 16%S- 1- S. GLS- 42%S- 1- S. SGLS- 42%S- 1- E. GLS- 0 %S- 0- S. GLS- SUSP.0 -D 1 -B -M 1 -B -M 1 -B -M 1 -B -M 1- 90 -TRANS M- NS -SOLAR 1- 90 -TRANS M- NS -SOLAR 1- 90 -TRANS M- NS -SOLAR 1- 90 -TRANS M- NS -SOLAR 2- 90 -TRANS M- NS -SOLAR 2- 90 -TRANS UNIT -SC- CLTD U.FAC QUAN CFAC SHGF -CLF- PEAK TIME 12 PM AUG. SEN. GAIN 1232 1.000 8 0.100 986 528 0.830 6 0.119 185 75 0.830 6 0.119 26 558 0.830 6 0.119 195 108 0.830 6 0.119 38 363 1.000 -3 0.490 -534 363 0.580 212 0.390 17407 69 1.000 -3 0.490 -101 69 0.580 33 0.700 924 40 1.000 -3 0.490 -59 40 0.580 177 0.520 2135 29 1.000 -3 0.490 -43 29 0.580 33 0.700 389 402 1.000 -3 0.490 -591 402 0.580 212 0.390 19278 72 1.000 -3 0.490 -106 0 %S- 0- M- NS -SOLAR 72 0.580 177 0.520 LIGHTS -10 3486.00 1.000 100% 3.410 EQUIPMENT -10 1162.00 1.000 3.410 PEOPLE -10 15.49 1.000 255/255 WINTER INFL 310 FLOOR SLAB 98.00 TOTAL 3844 11887 3962 3951 LAT. HTG. HTG. GAIN MULT. LOSS (28 X 83) = 2324 SF 4.600 5667 5.474 2890 5.474 411 5.474 3054 5.474 591 24.840 9017 24.840 1714 24.840 994 24.840 720 24.840 9986 24.840 1788 0 3951 49.590 37.260 63,773 3,951 X 1.10 X 1.10 15373 3651 55,856 X 1.20 70,150 4,346 67,027 * ** FULL COMMERCIAL HVAC LOBS PROGRAM BY ELITE SOFTWA ' DEVELOPMENT INC * ** PARSLEY ENGINEERING REDMOND, WA J.A.S. 09/07/95 PAGE 7 * * * * * * * * * * * * * * * * * ** DETAILED PROJECT ZONE LOAD CALCULATIONS * * * * * * * * * * * * * * ** LOAD DESCRIPTION 2. SOUTH SIDE SYS# 2 ROOF- 1- 5- SUSP.0 -D S. WALL -1 -B -M E. WALL -1 -B -M S. WALL -1 -B -M E. WALL -1 -B -M S. GLS- 1- 90 -TRANS 26 %S- 1- M- NS -SOLAR S. SGLS- 1- 90 -TRANS 26%S- 1- M- NS -SOLAR E. GLS- 1- 90 -TRANS 11 %S- 1- M- NS -SOLAR E. SGLS- 1- 90 -TRANS 11 %S- 1- M- NS -SOLAR S. GLS- 2- 90 -TRANS 0 %S- 0- M- NS -SOLAR E. GLS- 2- 90 -TRANS UNIT -SC- CLTD U.FAC QUAN CFAC SHGF -CLF- PEAK TIME 2 PM SEP. 672 1.000 18 0.100 252 0.830 11 0.119 72 0.830 6 0.119 296 0.830 11 0.119 117 0.830 6 0.119 178 1.000 1 0.490 178 0.580 218 0.580 62 1.000 1 0.490 62 0.580 27 0.750 64 1.000 1 0.490 64 0.580 193 0.310 8 1.000 1 0.490 8 0.580 27 0.750 220 1.000 1 0.490 220 0.580 218 0.580 99 1.000 1 0.490 0 %S- 0- M- NS -SOLAR 99 0.580 193 0.310 LIGHTS -10 1827.00 1.000 100% 3.410 EQUIPMENT -10 609.00 1.000 3.410 PEOPLE -10 8.12 1.000 255/255 WINTER INFL 162 FLOOR SLAB 53.00 TOTAL 3. INTERIOR SYS# 3 ROOF- 1- 5- SUSP.0 -D PARTITION -1 LIGHTS -10 EQUIPMENT -10 PEOPLE -10 WINTER INFL TOTAL PEAK TIME 6 PM JUN. 1307 1.000 47 0.100 804 10/31 0.081 3518.00 1.000 100% 3.410 1173.00 1.000 3.410 15.63 1.000 255/255 313 SEN. GAIN 1210 213 25 250 41 87 13054 30 728 31 2221 4 94 108 16134 49 3435 6230 2077 2071 LAT. HTG. HTG. GAIN MULT. LOSS (14.5 X 84) = 1218 SF 4.600 3091 5.474 1379 5.474 394 5.474 1620 5.474 640 24.840 4422 24.840 1540 24.840 1590 24.840 199 24.840 5465 24.840 2459 0 2071 49.590 8034 37.260 1975 48,092 2,071 X 1.10 X 1.10 52,901 2,278 6143 651 11996 4000 3987 32,807 X 1.20 39,368 (35 X 67) = 2345 SF 4.600 6012 2.511 2019 0 3987 49.590 15522 26,777 3,987 X 1.10 X 1.10 23,553 X 1.20 29,455 4,386 28,264 •:H<; crtci ^_,:,�a*:un rrr..werexrv+ +�. yam: o*. m.:- mamaurr .^re�.s.,r...�..- .:— :w.:,: * ** FULL COMMERCIAL HVAC LADS PROGRAM BY ELITE SOFTWARE DEVELOPMENT INC * ** •PARSLEY ENGINEERING REDMOND, WA J.A.S. 09/07/95 PAGE 8 * * * * * * * * * * ** AIR SYSTEM # 1 (GAS /ELECTRIC ROOFTOP) ZONE SUMMARY * * * * * * * * * * ** ZN. ZONE - DESCRIPTION FLOOR HTG.LOSS SEN.GAIN LAT.GAIN HTG.CFM CLG.CFM NO. PEAK TIME & MONTH AREA O.A. CFM O.A. CFM EXH. CFM CFM /SF. CFM /SF. 1 EAST SIDE 2324 67,027 70,150 12 PM AUGUST 0 310 ZONE PEAK TOTALS 2,324 67,027 70,150 TOTAL ZONES: 1 0 310 4,346 1,776 3,444 0 0.76 1.48 4,346 0 1,776 3,444 0.76 1.48 * ** FULL COMMERCIAL HVAC LS PROGRAM BY ELITE .PARSLEY ENGINEERING J.A.S. 09/07/95 * * * * * * * ** AIR SYSTEM # 1 (GAS /ELECTRIC ROOFTOP) SOFTW E DEVELOPMENT INC * ** REDMOND, WA PAGE 9 TOTAL LOAD SUMMARY * * * * * * * ** AIR HANDLER DESC: GAS /ELECTRIC ROOFTOP WITH CV (PROPORTION) TERMINALS SUPPLY AIR FAN: DRAW -THRU WITH PROGRAM ESTIMATED HORSEPOWER OF 2.17 HP. FAN INPUT: 50% COMBINED FAN AND MOTOR EFF. WITH 2.00 IN WATER ACROSS THE FAN SENSIBLE HEAT RATIO: 0.95 THIS SYSTEM OCCURS 1 TIME(S) IN THE BUILDING AIR SYSTEM PEAK TIME: 1 PM IN AUGUST OUTDOOR CONDITIONS: 80 DB, 67 WB, 78.40 GRAINS BECAUSE OF THE DIVERSITY IN ZONE, PLENUM, AND VENT. PEAK TIME IN AUGUST AT 12 PM IS DIFFERENT FROM HENCE, THE AIR SYSTEM CFM WAS COMPUTED USING A ZONE INSIDE: 75 DB, 50% RH LOADS, THE ZONE SENSIBLE THE TOTAL SYS. PEAK TIME SEN. LOAD OF 70,150 SUMMER: VENT CONTROLS OUTSIDE AIR WINTER: NONE CONTROLS OUTSIDE AIR ZONE SPACE INFILTRATION OUTSIDE AIR SUPPLY DUCT RETURN DUCT TOTAL SYSTEM SEN.LOSS: SEN.LOSS: SEN.LOSS: SEN.LOSS: SEN.LOSS: SEN.LOSS: 48,579 BTUH 18,448 BTUH 0 BTUH 0 BTUH 0 BTUH SUPPLY AIR: 67,027 / (0.998 X 1.08 X 35) = WINTER VENT OUTSIDE AIR (0.00% OF SUPPLY): ZONE SPACE SEN.GAIN: 69,622 BTUH INFILTRATION SEN.GAIN: 0 BTUH DRAW -THRU FAN SEN.GAIN: 5,492 BTUH SUPPLY DUCT SEN.GAIN: 0 BTUH TOTAL SEN.GAIN ON SUPPLY SIDE OF COIL: SUPPLY AIR: 75,642 / (0.998 X 1.10 X 20) = SUMMER VENT OUTSIDE AIR (9.00% OF SUPPLY): RETURN DUCT SEN.GAIN: 0 BTUH RETURN PLENUM SEN.GAIN: 0 BTUH OUTSIDE AIR SEN.GAIN: 1,702 BTUH BLOW -THRU FAN SEN.GAIN: 0 BTUH TOTAL SEN.GAIN ON RETURN SIDE OF COIL: TOTAL SEN.GAIN ON AIR HANDLING SYSTEM: ZONE SPACE LAT.GAIN: 4,346 BTUH INFILTRATION LAT.GAIN: 0 BTUH OUTSIDE AIR LAT.GAIN: 2,870 BTUH TOTAL LAT.GAIN ON AIR HANDLING SYSTEM: TOTAL SYSTEM SENSIBLE AND LATENT GAIN: TOTAL TONNAGE REQUIRED WITH OUTSIDE AIR: 310 CFM) 0 CFM) 1,776 CFM) 0 CFM) 0 CFM) 3,444 CFM) 310 CFM) 310 CFM) 0 CFM) 310 CFM) 67,027 BTUH 75,114 BTUH 1,702 BTUH 76,816 BTUH 7,216 BTUH 84,032 BTUH 7.00 TONS. ea s # P,rt'm o r *** FULL COMMERCIAL HVAC LDS PROGRAM BY ELITE SOFTWARE DEVELOPMENT INC * ** PARSLEY ENGINEERING REDMOND, WA J.A.S. 09/07/95 PAGE 10 * * * * * * * * * * ** AIR SYSTEM # 2 (GAS /ELECTRIC ROOFTOP) ZONE SUMMARY * * * * * * * * * * ** ZN. ZONE - DESCRIPTION FLOOR HTG.LOSS SEN.GAIN LAT.GAIN HTG.CFM CLG.CFM NO. PEAK TIME & MONTH AREA O.A. CFM O.A. CFM EXH. CFM CFM /SF. CFM /SF. 2 SOUTH SIDE 2 PM SEPTEMBER ZONE PEAK TOTALS TOTAL ZONES: 1 1218 39,368 52,901 2,278 1,043 2,598 0 162 0 0.86 2.13 1,218 39,368 52,901 2,278 1,043 2,598 0 162 0 0.86 2.13 * ** FULL COMMERCIAL HVAC L i)S PROGRAM BY ELITE SOFTWAkt DEVELOPMENT INC * ** PARSLEY ENGINEERING REDMOND, WA J.A.S. 09/07/95 PAGE 11 * * * * * * * ** AIR SYSTEM # 2 (GAS /ELECTRIC ROOFTOP) TOTAL LOAD SUMMARY * * * * * * * ** AIR HANDLER DESC: GAS /ELECTRIC ROOFTOP WITH CV (PROPORTION) TERMINALS SUPPLY AIR FAN: DRAW -THRU WITH PROGRAM ESTIMATED HORSEPOWER OF 1.63 HP. FAN INPUT: 50% COMBINED FAN AND MOTOR EFF. WITH 2.00 IN WATER ACROSS THE FAN SENSIBLE HEAT RATIO: 0.96 THIS SYSTEM OCCURS 1 TIME(S) IN THE BUILDING AIR SYSTEM PEAK TIME: 2 PM IN SEPTEMBER OUTDOOR CONDITIONS: 82 DB, 67 WB, 75.17 GRAINS INSIDE: 75 DB, 50% RH SUMMER: VENT CONTROLS OUTSIDE AIR WINTER: NONE CONTROLS OUTSIDE AIR ZONE SPACE SEN.LOSS: INFILTRATION SEN.LOSS: OUTSIDE AIR SEN.LOSS: SUPPLY DUCT SEN.LOSS: RETURN DUCT SEN.LOSS: TOTAL SYSTEM SEN.LOSS: 29,728 BTUH 9,640 BTUH 0 BTUH 0 BTUH 0 BTUH SUPPLY AIR: 39,368 / (0.998 X 1.08 X 35) = WINTER VENT OUTSIDE AIR (0.00% OF SUPPLY): ZONE SPACE SEN.GAIN: 52,901 BTUH INFILTRATION SEN.GAIN: 0 BTUH DRAW -THRU FAN SEN.GAIN: 4,141 BTUH SUPPLY DUCT SEN.GAIN: 0 BTUH TOTAL SEN.GAIN ON SUPPLY SIDE OF COIL: SUPPLY AIR: 57,042 / (0.998 X 1.10 X 20) = SUMMER VENT OUTSIDE AIR (6.23% OF SUPPLY): ( RETURN DUCT SEN.GAIN: 0 BTUH RETURN PLENUM SEN.GAIN: 0 BTUH OUTSIDE AIR SEN.GAIN: 1,245 BTUH BLOW -THRU FAN SEN.GAIN: 0 BTUH TOTAL SEN.GAIN ON RETURN SIDE OF COIL: 162 CFM) 0 CFM) 1,043 CFM) 0 CFM) 0 CFM) 2,598 CFM) 162 CFM) 162 CFM) 39,368 BTUH 57,042 BTUH 1,245 BTUH TOTAL SEN.GAIN ON AIR HANDLING SYSTEM: 58,287 BTUH ZONE SPACE LAT.GAIN: 2,278 BTUH INFILTRATION LAT.GAIN: 0 BTUH OUTSIDE AIR LAT.GAIN: 1,145 BTUH TOTAL LAT.GAIN ON AIR HANDLING SYSTEM: TOTAL SYSTEM SENSIBLE AND LATENT GAIN: TOTAL TONNAGE REQUIRED WITH OUTSIDE AIR: 0 CFM) 162 CFM) 3,423 BTUH 61,710 BTUH 5.1.4 TONS Sou*(n Peti rnZ /,d",..r.Mar:.rxnw rw..+.r.'n.,t5,sst. .+ra+w r+x«m+e,. �v.... n.. i,. w. .a....................«........ * ** FULL COMMERCIAL HVAC LADS PROGRAM BY ELITE SOFTWARE DEVELOPMENT INC * ** •PARSLEY ENGINEERING REDMOND, WA J.A.S. 09/07/95 PAGE 12 * * * * * * * * * * ** AIR SYSTEM ## 3 (GAS /ELECTRIC ROOFTOP) ZONE SUMMARY * * * * * * * * * * ** ZN. ZONE - DESCRIPTION NO. PEAK TIME & MONTH FLOOR HTG.LOSS SEN.GAIN AREA O.A. CFM O.A. CFM 3 INTERIOR 6 PM JUNE 2345 28,264 0 ZONE PEAK TOTALS 2,345 TOTAL ZONES: 1 28,264 0 29,455 313 29,455 313 LAT.GAIN HTG.CFM CLG.CFM EXH. CFM CFM /SF. CFM /SF. 4,386 0 4,386 0 749 1,446 0.32 0.62 749 1,446 0.32 0.62 * ** FULL COMMERCIAL HVAC IDS PROGRAM BY ELITE SOFTWA E DEVELOPMENT INC * ** PARSLEY ENGINEERING REDMOND, WA J.A.S. 09/07/95 PAGE 13 * * * * * * * ** AIR SYSTEM # 3 (GAS /ELECTRIC ROOFTOP) TOTAL LOAD SUMMARY * * * * * * * ** AIR HANDLER DESC: GAS /ELECTRIC ROOFTOP WITH CV (PROPORTION) TERMINALS SUPPLY AIR FAN: DRAW -THRU WITH PROGRAM ESTIMATED HORSEPOWER OF 0.91 HP. FAN INPUT: 50% COMBINED FAN AND MOTOR EFF. WITH 2.00 IN WATER ACROSS THE FAN SENSIBLE HEAT RATIO: 0.88 THIS SYSTEM OCCURS 1 TIME(S) IN THE BUILDING AIR SYSTEM PEAK TIME: 5 PM IN JUNE OUTDOOR CONDITIONS: 80 DB, 67 WB, 78.40 GRAINS INSIDE: 75 DB, 50% RH BECAUSE OF THE DIVERSITY IN ZONE, PLENUM, AND VENT. LOADS, THE ZONE SENSIBLE PEAK TIME IN JUNE AT 6 PM IS DIFFERENT FROM THE TOTAL SYS. PEAK TIME HENCE, THE AIR SYSTEM CFM WAS COMPUTED USING A ZONE SEN. LOAD OF 29,455 SUMMER: VENT CONTROLS OUTSIDE AIR WINTER: NONE CONTROLS OUTSIDE AIR ZONE SPACE SEN.LOSS: INFILTRATION SEN.LOSS: OUTSIDE AIR SEN.LOSS: SUPPLY DUCT SEN.LOSS: RETURN DUCT SEN.LOSS: TOTAL SYSTEM SEN.LOSS: 9,638 BTUH 18,626 BTUH 0 BTUH ( 0 BTUH 0 BTUH 313 CFM) 0 CFM) SUPPLY AIR: 28,264 / (0.998 X 1.08 X 35) _ ( 749 CFM) WINTER VENT OUTSIDE AIR (0.00% OF SUPPLY): ( 0 CFM) ZONE SPACE SEN.GAIN: 29,455 BTUH INFILTRATION SEN.GAIN: 0 BTUH ( 0 CFM) DRAW -THRU FAN SEN.GAIN: 2,306 BTUH SUPPLY DUCT SEN.GAIN: 0 BTUH TOTAL SEN.GAIN ON SUPPLY SIDE OF COIL: SUPPLY AIR: 31,761 / (0.998 X 1.10 X 20) = ( 1,446 CFM) SUMMER VENT OUTSIDE AIR (21.6% OF SUPPLY): ( 313 CFM) RETURN DUCT SEN.GAIN: 0 BTUH RETURN PLENUM SEN.GAIN: 0 BTUH OUTSIDE AIR SEN.GAIN: 1,718 BTUH ( 313 CFM) BLOW -THRU FAN SEN.GAIN: 0 BTUH TOTAL SEN.GAIN ON RETURN SIDE OF COIL: 28,264 BTUH 31,761 BTUH 1,718 BTUH TOTAL SEN.GAIN ON AIR HANDLING SYSTEM: 33,479 BTUH ZONE SPACE LAT.GAIN: 4,386 BTUH INFILTRATION LAT.GAIN: 0 BTUH OUTSIDE AIR LAT.GAIN: 2,898 BTUH TOTAL LAT.GAIN ON AIR HANDLING SYSTEM: TOTAL SYSTEM SENSIBLE AND LATENT GAIN: TOTAL TONNAGE REQUIRED WITH OUTSIDE AIR: 0 CFM) 313 CFM) 7,284 BTUH 40,763 BTUH 3.40 TONS ant ✓gar * ** FULL COMMERCIAL HVAC LADS PROGRAM BY ELITE SOFTWARE DEVELOPMENT INC * ** 'PARSLEY ENGINEERING REDMOND, WA J.A.S. 09/07/95 PAGE 14 * * * * * * * * * * * * * * * * * * * * * * ** TOTAL BUILDING LOAD SUMMARY * * * * * * * * * * * * * * * * * * * * * ** BUILDING PEAKS IN SEPTEMBER AT 1 PM BLDG. LOAD AREA DESCRIPTIONS QUAN SEN. TOT LOSS LOSS LAT. GAIN + SEN. GAIN = TOTAL TOT GAIN GAIN ROOF WALL GLASS FLOOR SLAB 3,211 2,006 1,606 151 17,723 13.16 13,175 9.78 47,872 35.55 6,751 5.01 0 3,532 0 952 0 83,938 0 0 3,532 1.97 952 0.53 83,938 46.93 0 0.00 SKIN LOADS 6,823 85,521 63.51 0 88,422 88,422 49.44 LIGHTING EQUIPMENT PEOPLE PARTITION VENT 0 INFL 785 DRAW -THRU FAN BLOW -THRU FAN SUPPLY DUCT RETURN DUCT 8,831 2,944 39 804 785 0 0.00 0 0.00 0 0.00 2,423 1.80 0 0.00 0 46,714 34.69 0 0.00 0 0.00 0 0.00 0 0.00 0 0 11,010 0 7,268 0 0 0 0 0 33,125 11,043 11,010 716 4,310 0 11,939 0 0 0 33,125 18.52 11,043 6.17 22,020 12.31 716 0.40 11,578 6.47 0 0.00 11,939 6.68 0 0.00 0 0.00 0 0.00 BUILDING TOTALS 134,658 100.00 18,278 160,565 178,843 100.00 BUILDING SUMMARY LOAD DESCRIPTIONS SEN. TOT LOSS LOSS LAT. GAIN + SEN. GAIN = TOTAL 96-TOT GAIN GAIN VENTILATION INFILTRATION ZONE LOADS PLENUM LOADS FAN & DUCT LOADS 0 0.00 46,714 34.69 87,944 65.31 0 0.00 0 0.00 7,268 0 11,010 0 0 4,310 0 144,316 0 11,939 11,578 6.47 0 0.00 155,326 86.85 0 0.00 11,939 6.68 BUILDING TOTALS 134,658 100.00 18,278 160,565 178,843 100.00 TOTAL BUILDING SUPPLY AIR (BASED ON A 20 TD): TOTAL BUILDING VENT AIR (10.470 OF SUPPLY): TOTAL CONDITIONED AIR SPACE: SUPPLY AIR CFM /SQ.FT. OF CONDITIONED SPACE: SQ.FT OF CONDITIONED AIR SPACE PER TON: TONNAGE PER SQ.FT OF CONDITIONED AIR SPACE: TOTAL HEATING REQUIRED WITH OUTSIDE AIR: TOTAL TONNAGE REQUIRED WITH OUTSIDE AIR: 7,488 CFM 785 CFM 5,887 1.2720 395.0057 0.0025 SQ.FT CFM / SQ.FT SQ.FT /TON TONS /SQ.FT 134.66 MBH 14.90 TONS ( City of Tukwila Fire Department Fire Department Review Control #M95 -0159 (511) John W. Rants, Mayor Thomas P. Keefe, Fire Chief October 12, 1995 Re: JAS Forwarding - 3514 South 116th Street Dear Sir: The attached set of building plans have been reviewed by The Fire Prevention Bureau and are acceptable with the following concerns: 1. H.V.A.C. units rated at 2,000 cfm require auto - shutdown devices. These devices shall be separately zoned in the alarm panel and local U.L. central station supervision is required. (City Ordinance #1742) H.V.A.C. systems supplying air in excess of 2,000 cubic feet per minute to enclosed spaces within buildings shall be equipped with an automatic shutoff. Automatic shutoff shall be accomplished by interrupting the power source of the air - moving equipment upon detection of smoke in the main supply -air duct served by such equipment. Smoke detectors shall be labeled by an approved agency for air -duct installation and shall he installed in accordance with the manufacturer's installation instructions. (UMC 608) Remote indicator lights are required on all above ceiling smoke detectors. (City Ordinance #1742) Duct smoke detectors shall be capable of being reset from the alarm panel. (City Ordinance #1742) 2. The installation of wiring and equipment shall be in accordance with N.F.P.A. 70, Article 760, Fire Protective Signaling Systems. (NFPA 72 -1- 5.5.4) 3. All new fire alarm systems or modifications to Headquarters Station: 444 Andover Park East • Tukwila, Washington 98188 • Phone: (206) 5754404 • Fax (206) 5754439 L City of Tukwila John W. Rants, Mayor Fire Department Page number 2 Thomas P. Keefe, Fire Chief existing systems shall have the written approval of The Tukwila Fire Prevention Bureau. No work shall commence until a fire department permit has been obtained. (City Ordinance #1742) (UFC 1001.3) Call the Tukwila Fire Department at 575 -4407 for approval of any system shut down. Have job site address, name and the Tukwila Fire Department Job Number available to confirm shut down approval. (City Ordinance #1742) Any overlooked hazardous condition and /or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. Yours truly, The Tukwila Fire Prevention Bureau cc: T.F.D. file ncd Headquarters Station: 444 Andover Park East • Tukwila, Washington 98188 • Phone: (206) 5754404 Fax (206) 5754439 '.1�:n2`�.:i iA,V�' �,•�.� r1,r:h,.n...l;.'iv,. �nM IV'.�:.�e•i (iii c CITY OF TUKWILA Id: ROUT130 Keyword: UACT Activity document routing maintenance. MECHANICAL PERMIT Permit No: M95-0159 Tenant: JAS FORWARDING Status: PENDING Address: 3514 S 116 ST Route: 1 Current Route Line: 2 of 5 Packet Units Description Station Status Received Assigned Complete aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa Packet Units Action Station Initials Status Received Assigned Completed MECH 01 01 C BLDG KEN Ap Cond. 10/04/95 10/09/95 10/09/95 Priority (0 /low..9 /high): 0 Regular hours (HH.MM): .00 Overtime Hours(HH.MM): Comments 1[H.V.A.C. OVER 2,000 CFM REQUIRE AUTO SHUT -OFF. ] 2[ ] 3[FIRE PLEASE REVIEW AND COMMENT. BY KEN ] 4[ ] 5[ ] 6[ ] 7[ ] 8[ ] 9[ ] 10[ ] aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa User: 1677 10/09/95 F1 =Help, ESC =Exit current screen. +.�..`fi�t�•..: :*..1r.y�.` s , ,I 4 ; .. y.,0,W• tl,t tri.. N0_,A TMZI W s• tiiy.. z v,. 7.11 f11=vea l nr AW, r:.sr.atto r- v s DEPARTMENT OF LABOR AND INDUSTRIES THIS CERTIFIES THAT THE PERSON NAMED HEREON IS REGISTERED AS PROVIDED BY LAW AS A CONST COW'.T " 'SPECIALTY 9E0141-RATION NUMBER.. ,• :: .. EXPIRATION DATE.' • tFr ECY.I'VE; VA:TE; ;9.7 %1'2%9.3 PA L.EY:'ENGI.NEERI•NG.• C, INC 4640 REDMOND' WA 98053.: STATE OF WASHINGTON 17.414., e F625- Ob7 -(X,i 0 -921 This certifies that the person (or entity) named hereon is registered as provided by law as a legal engineering /construction firm in the State of Washington. The above is a true copy of said license - #PARSLEI077MK, � Date -•! ,� � Subscribed and sworn before me this 5-1/4-11.- day of 19 Notary Public' licse'' My Commission Expires' :I" /, SUBCONT CTORISUPPLIE BY• TITLE (authorized signature) RECEIVED CITY OF. TUKWILA OCT 0 4 1995 PERMIT CENTER fo u w '-.B0 M (133) ON ROOF. /2//2082 /4//4 DB 24/24 RAG. / 1/00 CFM 8/16082 9800 "o5,2" /210 VENT - /O. PE 4V TO /2 2ND FLCOR YENT 10 CJ `OVERHANG FRO M 2415) Faoae- A/4(I ROOF PROTECT COCA 71 N /90 CFM 8c.0 ON ROOF. 5. 11677/ 5T. 233 CFM /6 4 DE2 DROP (2TYR) r- /21/2082 1 01'62), 1 //0CF41 L �/il/ZD62 /O "L -D /� 3o0CFM J2 14/14 062 h$Na D82 24 325 CFM 74/14D82 20/20582 DROP 4i 1-21 A.6- 510 599 24 /24MAG. /8% 8OCFM /2//ZDB2 C .. S I T L- FLAN . No SCALE OVER.VAN6 FROM 2ND FLOOR. (E',. 8 °C.72 Z60CFM /!O CFNI /1/ 20 FLOOR NV/9C LAYOUT SCALE: 1/9" = /' -0° cs aAr.miss VDIQ' TEtT(.FUNSATMNETHNE5E:i%�7ffiOFS_ A •2/7 =nBra '> -mcro xu GFrzxicx 10 :1"606440-04i. G1VI14G31NOUTSIE 16" 7..,WM jNDICA' spA4Y /4„pCTno.41SiTALL -.. fiHt000RD1NATEb 5B- 7iBs4RCAr1ECIURALAND -. i 1 NGS ..ANYCNANGESIN- Th1.SLAYOUTMAY REQUIRE < FNNtSji CE1L1NGHEB lT1NO ICEAREAS WILL.BEB.6'ABOVE. :FLOOR(AF.F) TOBOTCOMOI?'�3N£ TOALLOWBFOR- 1' T. 1GffFBCI1 ,RES;D[TCJWOR&SBALLBEDNSTALL 6NOLOWER 3EXCEPIAS NOTED. - ' SSBALLEAVE TURNING VANES INSTALLEDIN EACH RCONDTRONI NGSYS EMS: 601PP1 Y D1B 13i�U1 5ONFROM-AIREANIH1iONINGUNTIS TODIFF'USFRS. 1,41- FOLLOW:.. • u VE (ALDROPSFR iROOFTOPAJV UNTS SHALL BE I° OR2" THICK TND1cATID;UL.LIYTED, CCAss-I;FISERGLASS DUCT BOARD EXCEPT. iHE00Ba iNEDSiccir MEETAI., S SND1CAi: ED - - IRICATEAND INSTALL PERSMACNA 12" PRESSURE €fiS1FTCATIONS. SUPPLYAi11DISTLUBUTION DUCTWORKF1t•M VERT CAL DROPS TO DIFFDSFRSSHALU BE SAMBAS VERTICAL DROPS. ,R D CTRUNOUTSTOD7iFUSERS SHALL HAVE tlikv 4T1ON.AS INDICATED € P13.4..= UtNLESSLNDICATE D AS 2 ", ALL DUCTRUNOUTS6 I40T BE I THICEC - - wIIEBE_RETURN AIR ISDUCTED,RETURN AIR DUCTWORK SHALL BE .- ., SAMBAS FOR SUPPLY (SEE B" AND 'C ABOVE). TOrLET-EXHAUSTDUCTWORKG 6.. TO$.ET EXHAUST DUCT SHALL BE UNLINED. GALVANIZED SHEET,METAI. >:. (OONLESE OTAEI{WESE INDICATED) WHIT FURNACE PIPE RIB4OUTSAND "HARD" CONNECTIONS TO REGISTER CANS (DO NOT USE F,D'F ;pLICTIN TOILET EXHAUST SYSSEMS0' FABRICATE' AND INSTALL:'. mss„ `PP. wdJ°� L 1P0CATEON.. GENERAL NOTF.C:'-. -. 1.- ALL TRADERTOiEAVE36' 6TB ARANcEHNFRONPOEAR(CONDr11ON1NG AND- -WHFTC LEQUIPMENrACCESSPANELEFOR SIRVIGPVS - A WBATAN62NGDA14PERB DUCFAGLEiS.PANELS, ANDIQU82IEYF ABOVE,TI6ECEILING SHi11 BEASUREDADIDPROVIDED.BY11IE S4ERAI. `CONTRACTOR LAY- I3�JGS (OTiEQIITI£5'OrrABi,EACCE5 S. T ROG . SPL1Ntp.'WOODEN . ETC,WAISSOR.(27LP'TGS WOUmR13 A 3$6!$[118 (OREQUAL)ACCESSDQOR.OFS MII.ARRATI 01'6" W01.0 LEI. INGPRSVIDIDBYTih EGFSNFRALCONIRACIYRF. LGCATIONI SUCH ACCESSDO(115WII.L COOIURNA5FDBYYMECHA1IICAL CUTTING,FRAMING. PATCHING, SEALB4CGAINOPA111NGOFWALL ,CEILING, AND FLOORO GSSHAL BEBY GENERALCO1TTRACTOR • ROOF CURBS FLASTBkIGS. SLEEPERS, ADbTI1ONAL STRUCTURAL SUPPORTS, AND C0Tr1Bw-AM PATCHINGOF ROOF OPENINGS SHALL BE BY GENERAL CONTRACTOR(SEENOTE#5 BELOW). 5.. ROOFTOP AIR CONDITIONERS ARE FURtIISHED WITH FACTORY CURBS" REQUIRING INSULATION, CANTSTRIP,ROOFING, AND COUNTER FLASHING BY GENERAL .CONTRACTOR. :CURB SHALL BE ASSEMBLED AND SET IN PLACE: BY MECHANICAL CONTRACTOR LEVELING, 7RU1NG AND.FASTENING TO ROOF STRUCTURE SHALL BE BY GENERAL CONTRACTOR, AS FOLLOWS: A MAXIMUM ALLOWABLESLOPEEND- TO- ENDIS}2 "., B. MAXIMUM ALLOWABLE SLOPESIDE- TOSIDEIS 1/2" C. TOP OF CURB MUST BE TRUE(FLAT)TO PROVIDEACCEPTABLE MATING AND SEALING SURFACE D. ROOF CURB MUSTBE SECURELY FASTENED TO STRUCTURAL SUPPORT MEMBERS.,. WHERE INLIICATEDIN GRILLE, REGISTER AND DIFFUSER SCHEDULE, SOME ITEMS WILL BE FURNISHED -WITH A FACTORY APPLIED PRIME COAT FINISH. FINAL PAINTENGSHALL BE DONE BY GENERAL CONTRACTOR. 7. THE GENERAL CONTRACTOR SHALL PROVIDE A I "- CUT AT THE FOLLOWING DOORS: WOMENS ROOM DOOR #30 AND #45, MIN'S ROOM DOOR 026 AND #46. ELECTRICAL COORDINATION :.: EXHAUST FANS IN TENANTBAT1lROOMS SHALL HAVE SEPARATE WALL SWITCH. SWITCHING-WITH LIGHTS IS NOT ACCEPTABLE. ELECTRICAL CONTRACTOR SHALL INSTALL AND DO ALL WIRING. INSLIATIONSHALL BEI.LSiL�i)UL- 723,Ct,ASS I - `. 2IES' "ATINGLFSSTkAN25,'i1ND woke DEYElAPp Agpi 1'OR21 IC KASINDICAIFAONPLANSUL.LISTF.D,, BR.(SS DUC1`48A3D FABRICATt•DANDINSTAL T.FII PER �4T 712ARL -AM(r 17 IMMANUF CTIBIERS Y - ' js 1eA lYFEATBONDAiG TAPE. PRisssuKE X 890 3 OI CES¢ SUPPLYA 2L MCA,25M1 25 AMP 10 ECGNO R.A 4 G(rr 22LBS 1(E T1 C4R`IDITION1NG IjrGI(i "N.'APAis k AT 9$ 1'' 1B B RiNGINDOOR. COI.; -60 SFAQSIR" 10.15 2000 b'0;16.7MCA,2SMFS25. '9F RQQF CURBy ECONOMIZER: AND lil `$22LBS *•i`/ 01UC CONDITIONING I;Li�A�IT1r hT95 F • :BT itE1w6 rINDOORCq�.'41 -€0I0_ 9 45. SEER- 00 •1.¢00 - D. 13160 12$MCA,15 #PS,15 LY:'ROOF CURB: TOTAL WEIGI4T =- i $'s LED OINLY:TO CATE LOAANMODEL3141L LTV CFM {a):02T' ESP, 1 ;¢ 50 0S: 7OWArTS.:SEPAAA'TEWAZL;SWITCH BY , ELECTRICAL CO HRACTORSHALL PROVIDE SERVICE POWER AT MECHANICAL EQUIPMENTIN ACCORDANCE WITH 1994 INC AND CITY OF TUKWI.A REQUIREMENTS. ' CONDUIT3+ORROOFTOP A/C UNIT POWER SHALL BE STUBBED -UP THROUGH ROOF OLTIr:S 00 A/C UNPT CURB. - THFRMOSTATCABLE CAN BE BROUGHT UP ... INSIDIN:CURB w .. 11. SMOKE DETECTOR WILL BE REQUIRED AT THE SUPPLY DUCT FORAC -LAND AC 2. SMOKE DETECTOR SHALL BE BY ELECTRICAL CONTRACTOR_ PLUMBING COORDINATION: IT PLUMBER, RHATLROU98 PLUMBL'NG VIlVT;S'SO.AS 'TO .MAINTAIN MINIMUM 10' OF CLEARANCE Fac64 0- UI'$IDF A1RM6TA ON ROOF' 13.:: PLUMBING CONTRACTORCA*N:`k1 'ikALLACONDFNSATE TRAP-AT EACH ROOFTOP:AI( CONDm0N1NGUNTI' • Nfl:f JITTRAif N5SPTH SHALLBE 2" (NET. I� > BS ! a '� , > . �` r 2f1lFrf ..:. _ _ ;. : POLUGMINGCONIRAC70RREFER_ i 8S A ND GAS PIPING T„RotvI.i£ANobRN a 14. GALLRCONN?1A3NT00SATEDRAINSFIOM' r); ONLOW, SITR 33 appro.. are 6024.1101Yr1NM NMGne pprovaIC, 6Jbj d041f4o4.Md lion of any p1oo4 01041 `O of con - dd0Rl64140C® Wedged. SEPARATE PERMIT REQUIRED FOR: ❑ MECHANICAL AELECTRICAL ❑ PLUMBING :GAS PIPING CITY. OF TUKWILA BUILDING DIVISION , m95- 015c1 7301, DING DIV6S10), RECEIVED GTV OF TUKNlILA OCT 0 1995 PERMIT CENTER