Loading...
HomeMy WebLinkAboutPermit D06-340 - Sound Transit - DemolitionSOUND TRANSIT 3800 S 154 ST D06 -340 Parcel No.: Address: Suite No: Tenant: Name: Address: Owner: Name: Address: Phone: Contact Person: Name: Address: Phone: Contractor: Name: Address: Phone: Contractor 0043000210 3800 S 184 ST TUI{W SOUND TRANSIT (DEMO) 3800 S 154 ST , TUXWILA WA Cityif Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: htip : //www.ci.tukwila.wa.us PARTNERS PREFERRED YIELD IN DEPT PT -WA 23116 , PO BOX 25025 91201 TERRY BEALS 401 S JACKSON ST , SEATTLE WA 98104 206 398 -5237 DEVELOPMENT PERMIT J HARPER CONTRACTORS INC 17937 CEDAR GROVE RD SE , MAPLE VALLEY 98038 Value of Construction: $285,500.00 Type of Fire Protection: Type of Construction: VB * *continued on next page ** Permit Number: Issue Date: Permit Expires On: License No: JHARPCIO8187 Expiration Date: 01/22/2009 D06 -340 03/06/2008 09/02/2008 DESCRIPTION OF WORK: DEMOLITION OF (6) STRUCTURES TOTALLING APPROXIMATELY 36,949 SF (AGGREGATE). CAP AND RETIRE UTILITIES AT MAIN. BLDG #1- 1,223 SQ FT; BLDG #2 - 15,946 SQ FT; BLDG #3 10,801 SQ FT; BLDG #4 - 4,647 SQ FT; AND BLDG #5 - 4,332 SQ FT. PROJECT ON WD #125 WATER AND VALLEY VIEW SEWER. PUBLIC WORKS ACTIVITIES INCLUDE TEMPORARY & PERMANENT EROSION CONTROL, STORM DRAINAGE CAPPING. Fees Collected: International Building Code Edition: Occupancy per IBC: $4,667.18 2003 0008 doc: IBC-10 /06 006-340 Printed: 03-06 -2008 Public Works Activities: Channelization / Striping: N Curb Cut / Access / Sidewalk / CSS: N Fire Loop Hydrant: N Number: 0 Size (Inches): 0 Flood Control Zone: N Hauling: N Start Time: End Time: Land Altering: N Volumes: Cut 0 c.y. Fill 0 c.y. Landscape Irrigation: N Moving Oversize Load: N Start Time: End Time: Signature: Print Name: City &Tukwila Water Main Extension: Water Meter: Sanitary Side Sewer: N Sewer Main Extension: N Private: Public: Storm Drainage: Y Street Use: N Profit: N Non - Profit: N Permit Center Authorized Signature I hereby certify that I have read and governing this work will be compile Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us N N Private: Public: Permit Number: D06 -340 Issue Date: 03/06/2008 Permit Expires On: 09/02/2008 Date: taioLetai ed this permit and know the same to be true and correct. All provisions of law and ordinances whether specified herein or not. The granting of permit does not ume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or a performance . I am authorized to sign and obtain this development / perrmit. 3! Date: b7oo This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. doc: IBC -10/06 D06-340 Printed: 03 -06 -2008 Parcel No.: 0043000210 Address: Suite No: Tenant: 3800 S 154 ST TUICW 1: ** *BUILDING DEPARTMENT CONDITIONS * ** City of Tukwila SOUND TRANSIT (DEMO) 9: ** *PUBLIC WORKS DEPARTMENT CONDITIONS * ** Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 - 431 -3665 Web site: http.• / /www.ci.tukwila.wa.us PERMIT CONDITIONS Permit Number: Status: Applied Date: Issue Date: D06 -340 ISSUED 09/14/2006 03/06/2008 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 4: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 8: All construction noise to be in compliance with Chapter 8.22 of the City of Tukwila Municipal Code. A copy can be obtained at City Hail in the office of the City Clerk. 6: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the Cityof Tukwila Permit Center. 7: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206431- 3670). 8: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 10: The applicant must notify the City Utility Inspector at (206)433 -0179 upon commencement and completion of work at least 24 hours in advance. All inspection requests for utility work must also be made 24 hours in advance. 11: Contractor shall notify Public Works Utility Inspector at (206)433 -0179 of commencement and completion of work at least 24 hours in advance. 12: Any material spilled onto any street shall be cleaned up immediately. 13: Temporary erosion control measures shall be implemented as the first order of business to prevent sedimentation off -site or into existing drainage facilities. 14: From October 1 through April 30, cover any slopes and stockpiles that are 311:1 V or steeper and have a vertical rise of 10 feet or more and will be unworked for greater than 12 hours. During this time period, cover or mulch other disturbed areas, if they will be unworked more than 2 days. Covered material must be stockpiled on site at the beginning of this period. Inspect and maintain this stabilization weekly and immediately before, during and following storms. doe: Cond -10/06 D06-340 Printed: 03 -06 -2008 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us 15: From May 1 through September 30, inspect and maintain temporary erosion prevention and sediment at least monthly. All disturbed areas of the site shall be permanently stabilized prior to final construction approval. 16: The site shall have permanent erosion control measures in place as soon as possible after final grading has been completed and prior to the Final Inspection. 17: Sewer capping shall be coordinated with Valley View Sewer District. 18: Water capping shall be coordinated with Water District #125 at (206)242 -9547 * *continued on next page ** doc: Cond -10/06 D06 -340 Printed: 03 -06 -2008 City of Tukwila I hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this pe t does not presume to give authority to violate or cancel the provision of any other work or local laws regulating construction or the prmance of work, signatures :4 pi 2 Print Name: Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us Date: 3 ! ( JOB doc: Cond -10/06 D06 -340 Printed: 03 -06 -2008 SITE LOCATION CITY OF TUKWILA Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 htta://www.cttukwilawa us Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *Please Print ** /52-.45G Peid4t l�wy C. Site Address: 39 00 5 /Sri Tenant Name: New Tenant: ❑ Yes ❑..No Property Owners Name: 5o U.rt cl t r ZtIit jT Mailing Address: 401 S. 50-cif `Sri Building Permit No. FOG"M Mechanical Permit No. Plumbing/Gas Permit No. Public Works Permit No Project No. (For office use only) oot4 3uOcu r 06 King Co Assessor's Tax No.: V)/)g 3 000 2/ 0 Suite Number: Floor: 5 e4.ff(e City L <TF? TS( Oct State Zip CONTACT PERSON Name: wr eats LS Day Telephone: 2GYv 3 9$ - sa7 Mailing Address: 1 401 S. racism sr. Seattle Li h ,(, �,,,,y,. City State Zip E -Mail Address: keaC.sf ® Sf�Lf/il&2D r7 / . Fax Number: Zt' — 3 9ff - 5?104 GENERAL CONTRACTOR INFORMATION — (Contractor Information for Mechanical (pg 4) for Plumbing and Gas Piping (pg 5) ) Company Name: "Mb Mailing Address: Contractor Registration Number: Company Name: i f A Mailing Address: Contact Person: E -Mail Address: state Zip City Contact P erson: Day Telephone: E -Mail Address: Fax Number: Expiration Date: I ARCHITECT OF RECORD - All plans must be wet stamped by Architect of Record s Zip City Day Telephone: Fax Number: ENGINEER OF RECORD -All plans must be wet stamped by Engineer of Record Company Name:TC' _r Mailing Address: 401 S. facPsni Sr' Se - rite ,, {� / Coy State State C 5 Contact Person: Q CJ I f //[ ategan 2 Day Telephone: 2* - (1 - 519? 9 E -Mail Address: PP Q'tk la naeZ 62$ erreS/) ay Fax Number: QUppacetiansWatme- Applications On ImN -2006 - Pamil APPL W iandoc Revised: 42006 bh wig 9f/of Page I of 6 BUILDING PERMIT INFORMATION - 206 -431 -3670 Valuation of Project (contractor's bid price): $ 111) Scope of Work (please provide detailed information): yprmrimtdi 36, Q I f9 , a09$ - leer 4.99r late ). Ca, ad /Mite 47itMes aritif Will there be new rack storage? ❑.. Yes rg...No (If yes, a separate permit and plan submittal will be required) Provide All Building Areas in Square Footage Below )'LANNING DIVISION: Single- family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) °For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area for accessory dwelling: "Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? ❑....Yes ❑..No If `yes ", explain: FIRE PROTECTION/HAZARDOUS MATERIALS: ❑.. Sprinklers ❑..Automatic Fire Alarm ❑..None ❑..Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑.. Yes ❑.. No If"yes", attach list of materials and storage locations on a separate 8-1/2 x II paper indicating quantities and Material Safety Data Sheets. SEPTIC SYSTEM: On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. Q epacadanWavuApplications On Line \3 -2006. Permit Applictdoc Revised: 42006 Existing Building Valuation: $ 7Kc[_ / S Ora Page 2 of 6 Existing Interior Remodel Addition to Existing Structure New Type of Construction per IBC Type of Occupancy per IBC 1" Floor 2a Floor 3r Floor Floors thru Basement Accessory Structure' Attached Garage Detached Garage Attached Carport Detached Carport Covered Deck Uncovered Deck BUILDING PERMIT INFORMATION - 206 -431 -3670 Valuation of Project (contractor's bid price): $ 111) Scope of Work (please provide detailed information): yprmrimtdi 36, Q I f9 , a09$ - leer 4.99r late ). Ca, ad /Mite 47itMes aritif Will there be new rack storage? ❑.. Yes rg...No (If yes, a separate permit and plan submittal will be required) Provide All Building Areas in Square Footage Below )'LANNING DIVISION: Single- family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) °For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area for accessory dwelling: "Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? ❑....Yes ❑..No If `yes ", explain: FIRE PROTECTION/HAZARDOUS MATERIALS: ❑.. Sprinklers ❑..Automatic Fire Alarm ❑..None ❑..Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑.. Yes ❑.. No If"yes", attach list of materials and storage locations on a separate 8-1/2 x II paper indicating quantities and Material Safety Data Sheets. SEPTIC SYSTEM: On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. Q epacadanWavuApplications On Line \3 -2006. Permit Applictdoc Revised: 42006 Existing Building Valuation: $ 7Kc[_ / S Ora Page 2 of 6 PERMIT APPLICATION NOTES — Applicable to all permits in this application Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. $uilding and Mechanical Permit The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). plumhin¢ Permit The Building Official may grant one extension of time for an additional period not exceeding 180 days. The extension shall be requested in writing and justifiable cause demonstrated. Section 103.4.3 Uniform Plumbing code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OW.f(ER OR AUTHO'�' AGE . Signature: ......, S ..L i � Print Name: / / � ,3� Mailing Address: X1 .5 5 . t'Thc (504 ST. Date Application Expires: i 4z Io" I Date Application Accepted: oil IHJae Q wliea aeWom - Applicatime On line' -2006 - Pamit Applicationdec Revived: 4-2006 hh Date: /977/i Day Telephone: Cxx) ,391- sa 3 7 Seat/1e ler 4- et /O'/ City State Zip Page 6 of 6 Parcel No.: 0043000210 Address: 3800 3154 ST TUKW Suite No: Applicant: SOUND TRANSIT (DEMO) Receipt No.: RO8 -00635 Initials: JEM User ID: 1165 Payee: SOUND TRANSIT City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http: //www.ci.tukwila.wa.us TRANSACTION LIST: Type Method Descriptio Amount Payment Check 00059766 2,927.32 ACCOUNT ITEM LIST: Description BUILDING - NONRES PW BASE APPLICATION FEE PW PERMIT /INSPECTION FEE PW PLAN REVIEW STATE BUILDING SURCHARGE Account Code Current Prate 000/322.100 000/322.100 000/342.400 000/345.830 000/386.904 RECEIPT 2,522.82 250.00 75.00 75.00 4.50 Total: $2,927.32 Permit Number: D06 -340 Status: APPROVED Applied Date: 09/14/2006 Issue Date: Payment Amount: 52,927.32 Payment Date: 03/06/2008 09:54 AM Balance: $0.00 9505 03/06 9710 TOTAL 8971.85 (167/ dot: Receipt -06 Printed: 03 -06 -2008 Receipt No.: R07 -00027 Payee: SOUND TRANSIT ACCOUNT ITEM LIST: Description PLAN CHECK - NONRES City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us RECEIPT Parcel No.: 0043000210 Permit Number: D06 -340 Address: 3800 S 159 ST TUKW Status: PENDING Suite No: Applied Date: 09/14/2006 Applicant: SOUND TRANSIT (DEMO) Issue Date: Initials: JEM Payment Date: 01/08/2007 10:01 AM User ID: 1165 Balance: 32,527.32 TRANSACTION LIST: Type Method Description Amount Payment Check 00051788 1,639.83 Account Code Current Pmts 000/345.830 1,639.83 Total: $1,639.83 Payment Amount: $1,639.83 3559 01/08 9716 TOTAL 1639.87 doc: Receiot -06 Printed: 01-08-2007 Project: Type of Inspection: Die ( Si /ikpn v 7 ti , r/ SCni 4 4 c Address: _ 3130'0 5 15 q s-t Date Called: Special Instructions: Date Wantfed: 4 / Z- / Ur> a.m. 0 Requester: Phone No: 2O6 3o'/ -779? 1 06 -3 INSPECTION NO. PERMFT NO. CITY OF TUKWILA BUILDING DIVISION 1 ' 6300 Southcenter Blvd., #100, Tukwia, WA 98188 (206)431 -3 ?Approved per applicable codes. INSPECTION RECORD Retain a copy with permit El Corrections required prior to approval. COMMENTS: Re ; (e)enI 4 /iJA nspect I Rec ' ' No.: ig $60. t REINSPECTION paid t 6300 Southcente r A - . L • � L7 IDat4 E A I ,REOUIRED Prior to inspection, fee must be lvd., Suite 1 0. Call to schedule reinspection. 'Date • /_ Firpject: ler 10\ile/101 I 0 thtYnt Type opnspection: V AVgbo So. ic4- ate Called: Special Instructions: Date Wanted: D i 0 _ a.m Requester: • P M N 4):504- . 14-1 INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431-3670 El Approved per applicable codes. INSPECTION RECORD Retain a copy with permit bcQ-340 PERMIT NO. Corrections required prior to approval. COMMENTS: s( ?7/;-7K r ri,)- '74> ru,-fLoi F z„...trt Inspector: 'Date: 4)170 r rl $60.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be ' at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. 'Receipt No.: 'Date: COMMENTS: C D u' p to , k i a A t i~ -)C .oA n e -- - - - - & G,∎r M P_.I k: fin. X1,4 • ) V c f\ ee -A. -I kA� j\ v‘ ak:, • O D r 6C5 2 2)0 IL-- t. O�-t-- k x EE O. Stzi \y d ■k) C 3 u b t l - , ^ ' < Jet e rX ; L- p - - - -.') -• l ki` L , — o ^-c C � �,, / > u o n 6 00 l l P i 1» ✓\T nP. J-tT At r r 0/ 'tom p Project: Type of Inspection: D —Ae # 7 Pr oe Address: JS 1 n Date Called: . Rk00 50.j ' i Special Instructions: Date Wanted: MJo 1„61;( 0°4 0°4 f_ b s. Z7 -- p� Oc M D • J Requester: Phone No: 9 , 0 1 3 0 4 —` r 4 EE O. Stzi \y d ■k) C 3 u b PERMIT NO. CITY OF TUKWILA BUILDING DIVISION ?• 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 Approved per applicable codes. Inspect r: INSPECTION RECORD Retain a copy with permit r El $60.00 REINSPECTION FEE REQUIRE' rior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. 'Receipt No.: t Date: Doi 34o Corrections required prior to approval. ( Date: gi g Z# _ n4 I rat VAL VUE SEWER DISTRICT REPAIRS APPLICATION FOR DEPOSIT $ 6°- sit Am-pm HOUSE ADORES-5J A 2 e — NAME SUE-DMMIS0114-11Aa itteatie-41 . 11 • • • • • SIDE SEWER PERMIT 24-6 P0 ' " : I : • : • : . DISTRICT APPROVAL It TEST anum2ttf2ep /642 • LOT No.. ILL palm N2 03644 EASEMENT No— CARD DATE CottrucrotZfrimS BASEMENTs YES— Na T - . . .. ; H H . : 1 , : : : •-• - . , . . i : :. 1 11 -, 1 i !--- , 1 1 I :. : : ; . • i ' H ' ; i ; ! i I • • • I - ; :, : ; : . . ; i • ; i I i :. :, -.,• ! , ; ; : ! 1k1, • : : : i i ; '' L.._ h, '...-I. -...-.;•:.-; !..1.-1.-ik4.111 ; . : , • ..: I.•;-:.-••• " • - • ' • : ' - : • t H !. • .• • ; , • •.. ;.! .. • : . .: : . I, i i : I. ! - ...!.....t.t.:1...-C.!..1.i ....t !.. - )1 I I -;-,1.; ri • .. : ; : : I ; - - : : ; i.;.• • :I.L.•; • ; I - • ; ! ' ! : : • i ; ■ ; ; .: • -: • ; ; ! ! 1 3 : . 1 ' 1 . • ! - I - I i , .....; , : : I.. • - .. . : . ; • I • • : : • ! 1 .-•'.1:::i1:11;ii:;;•::iii: ; ; • , . : r j 1 • - ''.• , • : t : ! :. ; ; - ., 1 - ' ' ; • - ; : ; ; ; : : , . , ow : ! . f ee 6 1472-090/ : . i . .. ; ! , -, .1 .• ,, I -; :: . !: i ; ;34-tz • i ii7 et ..; . : • ; ; ;..... :I i • 1 i i :: :; ' 1 : i .; . : l • ',. % . : 1 :. : ' ''. • 'i eifItttlYel> . 25) c; , iiii:■:: , •i•!: •: -, •:ii .' . . • . •• • . I • • • ii: : • i : : .,• -;: i •.:!: - . ! : i : . : . • • 4:44K. I • ! . . . " i : ; : •i 1 ; EC EIV a , • : - • ' :;H .:I; I I I I • r; F: ; . , • •:•••.: : . : . - 1 . I "i ''i 1 Li t i ■-• • ! i t ! : I '.- • ' 1 ••*4:4-1.-",-4--H-j.,--LIHEi;;;•, ;,!;....ii,;, _..,....,..!.........!CAmi.i.;!!.:!!!: ! 1: ii• -!:-:;.,; ..-1--i-,---•----:- -;--; r i :!-; ! • ; :•:1 - : •, ; i ; l''' i : : ''' ' ! ; ' ' ; . ' "I iT: .: : -: ; .; ! ; : : ; ; ; ; • !. ..; • ' : ' •1-1.• ::-•!...; :1:•--i-:;: •i i i- i- j- . !-i-:i-i : : • ; I • ' • I ; : I : : • : • • ; • •• : I ; ; • : • : ; ; : • , ; • • : : .•; !;•! .. ... !.. . ; ; • , . . FEB , 1 %42006 • • • • TuKvvrtA Fl-ks PUBLIC WORKS IT ..-... I HEREBY CERTIFY THAT THE ABOVE CONNECTION HAS BEEN MAPS AS SHOWN, PMOS TO BACKFIU .42,6 07 -29 -2008 TERRY BEALS 401 S JACKSON ST SEATTLE WA 98104 RE: Permit No. D06 -340 3800 S 154 ST TUKW Dear Permit Holder: In reviewing our current records the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code and/or the International Mechanical Code, every permit issued by the Building Division under the provisions of this code shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within 180 days from the date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work is commenced for a period of 180 days. Based on the above, you are hereby advised to: Call the City of Tukwila Inspection Request Line at 206 - 431 -2451 to schedule for the next or final inspection. This inspection is intended to determine if substantial work has been accomplished since issuance of the permit or last inspection; or if the project should be considered abandoned. If such determination is made, the Building Code does allow the Building Official to approve one or more extensions of time for additional periods not exceeding 90 days each. Extension requests must be in writing and provide satisfactory reasons why circumstances beyond the applicants control have prevented action from being taken. In the event you do not call for the above inspection and receive an extension prior to 09 /02/2008 , your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, Ter Marshall, it Technician xc: Permit File No. D06 -340 City of Tukwila Jim Haggerton, Mayor Department of Community Development Jack Pace, Director 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206- 431 -3670 • Fax: 206 - 431 - 3665 SOUNDTRANSIT March 3, 2008 Mr. Bob Benedicto Building Official Department of Community Development City of Tukwila 6300 Southcenter Boulevard, Suite # 100 Tukwila, WA 98188 Permit Extension Request for DCD Permit D06 -340 North Parking Lot Public Storage Demolition: Link Light Rail Project: Contract C759, Southcenter Blvd Improvements Dear Mr, Benedicto: Pursuant to IBC 2006, § 105.5, Sound Transit respectfully requests a 180 - day extension to DCD permit D06 -340. The permit expiration date is currently scheduled for March 7, 2008. The demo permit is ready to be issued but it will take Sound Transit several days to prepare the check to pay the final fees owing and may not be ready prior to the expiration date. An extension to this permit application by your department will ensure that the application will not expire and allow the permit to be issued shortly thereafter. If you have any questions regarding this request, please contact me immediately at the number listed below. Sincere Terry Bea Link Ligh Rail Permit Manager (206) 398 -5237 C: Ginger Ferguson, C759 RE Gordon Wellwood, 059 Construction Manager Jennifer Marshall, City of Tukwila LDCC (CM 1430; C759) Central Puget Sound Regional Transit Authority • Union Station 401 S. Jackson St., Seattle, WA 98104 -2829 • Reception: 20 6-390 -5000 0/1(‘ 0006 e RECEIVED CITY OF TIJKWILA. \ MAR 0 3 200E r FAX 209-39 0-5499 • w,nw.soundtransd.org BOARD CHAIR Greg Nickels Seattle Mawr BOARD VICE CHAIRS Aaron Reardon Snohomish CounyStoutive Claudia Thomas lekelwodCoundbnember BOARD MEMBERS Juke Anderson Tacoma Coundanember Mary-Alyce Budelg►i Kirldend CaundUnember Fred Butler Issaquah Deputy Council .President Richard Conlin Seale Coma President DON Constantino King CounyCoundt Woe Chair Deanna Dawson Ednonds Couna%mamber Dave EnsIw SumnerMayor Paula J. Hammond, P.E. Washington State Secretary of Transportation John W. Ladenburg Pierce CouunyEacuthe John Marcmone Redmond Mawr Julia Patterson King County Council Chair Larry Phillips Kirg CountyCounc*nembar Paul Roberts Everett Councimenter Ron Slms King Cauny Stourwe Peter von Rddib uer King County Councilvembar CHIEF EXECUTIVE OFFICER Joni Earl 02-12 -2008 TERRY BEALS 401 S JACKSON ST SEATTLE WA 98104 RE: Permit Application No. D06 -340 3800 S 154 ST TUKW Dear Permit Applicant: In reviewing our current permit application files, it appears that your permit application applied for on 09/14/2006 , has not been issued by the City of Tukwila Permit Center. Per the International Building Code and/or the International Mechanical Code, every permit application not issued within 180 days from the date of application shall expire by limitation and become null and void. Your permit application expires on 03/07/2008 . If you choose to pursue your project, a written request for extension of your application addressed to the Building Official, demonstrating justifiable cause, will need to be received at the Permit Center prior to your expiration date of 03/07/2008. If it is determined that an extension is granted, your application will be extended for an additional 90 days from the expiration date. In the event we do not receive your written request for extension, your permit application will become null and void and your project will require a new permit application, plans and specifications, and associated fees. Thank you for your cooperation in this matter. Sincerely, fer Marshall Pemmit Technician a xc: Permit File No. D06 -340 City of Tukwila Jim Haggerton, Mayor Department of Community Development Jack Pace, Director 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206-431-3670 • Fax: 206 - 431 -3665 August 10, 2007 Terry Beals Sound Transit 401 S Jackson St Seattle WA 98104 -2826 Dear Mr. Beals: Sincerely, File: Permit No.1306 -340 City of Tukwila RE: Request for Permit Application Extension #3 Development Permit Application No. D06 -340 Sound Transit (Demo) — 3800 S 154 St If you should have any questions, please contact our office at (206) 431 -3670. P:Pennit CentenEsteosion Lonna \Permit Appdcations\D066340 p3 Application Extension.doc jam Steven M. Mullet, Mayor Department of Community Development Steve Lancaster; Director This letter is in response to your written request for an extension to Permit Application No. D06- 340. The Building Official has reviewed your letter and considered your request to extend the above referenced permit application. The City of Tukwila Building Division will be extending the expiration date of your permit application for an additional 180 days (through March 7, 2008) as requested. 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206-431-3670 • Fax: 206-431-3665 i SOUNDTRa►usIT August 6, 2007 Mr. Bob Benedicto Building Official Department of Community Development City of Tukwila 6300 Southcenter Boulevard, Suite # 100 Tukwila, WA 98188 Permit Application Extension Request # 3 for DCD Permit D06 -340, Demolition ST Contract C759 Southcenter Boulevard Improvements and North Parking Lot Dear Mr. Benedicto, Sound Transit respectfully requests a 180 -day permit application extension to DCD permit 006 -340, for building demolition located at 3800 S. 154 Street in support of Contract C759, Southcenter Boulevard Improvements and North Parking Lot. The permit application is scheduled to expire on September 9, 2007. The extenuating circumstances surrounding the project have been resolved resulting in a new construction schedule being developed. Currently, the C759 design package is scheduled to be advertised in September 2007 with a tentative Notice to Proceed date set for December 2007 At this time, Sound Transit does not know who the contractor will be; therefore, your decision to grant an additional 180 days to the permit application will help protect the schedule and the Link light rail project in the City of Tukwila. If you have any questions regarding this request, please contact me immediately at the number listed below. I appreciate your careful consideration and patience on this request. Terry B Link Light Rail Permit Manager (206) 398 -5237 C: Jennifer Marshall, City of Tukwila Rod Kempkes, ST LDCC (CM1430; C759) CA lea a 08-09-07 p tit IodL c / °15 Central Puget Sound Regional Transit Authodty • Union Station 401 S. Jackson St., Seattle, WA 98104 -2826 • Reception: (206) 398 -5000 • FAX: (206) 398 -5499 • www.soundtransit.org BOARD CHAIR John W. Iadenburg Pierce County Executive BOARD VICE CHAIRS Connie Marshall Bellevue Councilmember Mark Olson Everett Councilmember BOARD MEMBERS Julie Anderson Tacoma Councilmember Mary -Alyce Budeigh Kirkland Councilmember Fred Butler Issaquah Deputy Council President Dow Constantine King County Councibnember Dave Enslow Sumner Mayor Doug MacDonald Washington State Department of Transportation Secretary Richard Mann Edmonds Councibnember Richard McIver Seattle Councilmember Greg Nickels Seattle Mayor Julia Patterson King County Councilmember Larry Phillips Chair, King County Council Aaron Reardon Snohomish County Executive Ron Sims King County Executive Claudia Thomas Lakewood Mayor Pete von Relchbauer Vice Chair, King County Council CHIEF EXECUTIVE OFFICER Joni Earl 07 -31 -2007 TERRY BEALS 401 S JACKSON ST SEATTLE WA 98104 RE: Permit Application No. D06 -340 3800 S 154 ST TUKW Dear Permit Applicant: In reviewing our current permit application files, it appears that your permit application applied for on 09/14/2006 , has not been issued by the City of Tukwila Permit Center. Per the International Building Code and/or the International Mechanical Code, every permit application not issued within 180 days from the date of application shall expire by limitation and become null and void. Your permit application expires on 09/09/2007 . If you choose to pursue your project, a written request for extension of your application addressed to the Building Official, demonstrating justifiable cause, will need to be received at the Permit Center prior to your expiration date of 09/09/2007. If it is determined that an extension is granted, your application will be extended for an additional 90 days from the expiration date. In the event we do not receive your written request for extension, your permit application will become null and void and your project will require a new permit application, plans and specifications, and associated fees. Thank you for your cooperation in this matter. Sincerely, xc: Permit File No. IX6-340 U City of Tukwila Steven M. Mullet, Mayor Department of Community Development Steve Lancaster, Director 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206- 431 -3670 • Fax: 206-431-3665 May 18, 2007 Terry Beals Sound Transit 401 S Jackson St Seattle WA 98104 -2826 RE: Request for Permit Application Extension #2 Development Permit Application No. D06 -340 Sound Transit (Demo) — 3800 S 154 St Dear Mr. Beals: This letter is in response to your written request for an extension to Permit Application No. D06- 340. The Building Official has reviewed your letter and considered your request to extend the above referenced permit application. The City of Tukwila Building Division will be extending the expiration date of your permit application for an additional 90 days (through September 09, 2007) as requested. If you should have any questions, please contact our office at (206) 431 -3670. Sincerely, arshall Permit 'I echnician File: Permit No. D06 -340 P:\Pen it CentertExtension Letten\Pemut Applications\D06340 #2 Application Extension.doc jam G City of Tukwila Steven M. Mullet, Mayor Department of Community Development Steve Lancaster, Director 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206-431-3670 • Fax: 206 - 431 -3665 T SOUNDTRANSIT May 11, 2007 Mr. Bob Benedicto Building Official Department of Community Development City of Tukwila 6300 Southcenter Boulevard, Suite # 100 Tukwila, WA 98188 Permit Application Extension Request # 2 for DCD Permit D06 -340, Demolition, Link Light Rail Project: Contract C759, Southcenter Boulevard Improvements Dear Mr. Benedicto, Sound Transit respectfully requests a 90-day permit application extension to DCD permit D06 -340, for building demolition located at 3800 S. 154 Street in support of Contract C759, Southcenter Boulevard Improvements. The permit application is scheduled to expire on June 11, 2007. The extenuating circumstances surrounding the project have been resolved resulting in a new construction schedule being developed. Currently, the C759 design package is scheduled to be advertised in September 2007 with a tentative Notice to Proceed date set for December 2007. Since the NTP date comes approximately three months after the approval of this extension request, assuming you grant this request, a third extension request will most likely occur before Sound Transit knows who the contractor -elect will be. Therefore, your decision to grant an additional 90 days to the permit application will help protect the schedule and the Link light rail project in the City of Tukwila. If you have any questions regarding this request, please contact me immediately at the number listed below. I appreciate your careful consideration and patience on this request. Sinp ly, . _ / / Terry /ls Link Jght Rail Permit Manager (206) 398-5237 C: Jennifer Marshall, City of Tukwila LDCC (CM1430; C759) IMAY 14 2001 Atta vile to- Central Puget Sound Regional Transit Authority • Union Station 401 S. Jackson St., Seattle, WA 98104 -2826 • Reception: (206) 398 -5000 • FAX: (206) 398 -5499 • www.soundtransit.org BOARD CHAIR John W. Ladenburg Pierce County Executive BOARD VICE CHAIRS Connie Marshall Bellevue Councilmember Mark Olson Everett Councilmember BOARD MEMBERS Julie Anderson Tacoma Councilmember Mary-Alyce Budeigh Kirkland Councilmember Fred Butler Issaquah Deputy Council President Dow Constantine King County Councilmember Dave Enslow Sumner Mayor Doug MacDonald Washington State Department of Transportation Secretary Richard Madn Edmonds Councilmember Richard McIver Seattle Councilmember ' Greg Nickels Seattle Mayor Julia Patterson King County Councilmember Larry Phillips Chair, King County Council Aaron Reardon Snohomish County Executive Ron Sims King County Executive Claudia Thomas Lakewood Mayor Pete von Reichbauer Vice Chair, King County Council CHIEF EXECUTIVE OFFICER Joni Earl 05 -07 -2007 TERRY BEALS 401 S JACKSON ST SEATTLE WA 98104 RE: Permit Application No. D06 -340 3800 S 154 ST TUKW Dear Permit Applicant: In reviewing our current permit application files, it appears that your permit application applied for on 09/14/2006 , has not been issued by the City of T ukwila Permit Center. Per the International Building Code and/or the International Mechanical Code, every permit application not issued within 180 days from the date of application shall expire by limitation and become null and void. Your permit application expires on 06/11/2007 . If you choose to pursue your project, a written request for extension of your application addressed to the Building Official, demonstrating justifiable cause, will need to be received at the Permit Center prior to your expiration date of 06/11/2007. If it is determined that an extension is granted, your application will be extended for an additional 90 days from the expiration date. In the event we do not receive your written request for extension, your permit application will become null and void and your project will require a new permit application, plans and specifications, and associated fees. Thank you for your cooperation in this matter. Sincerely, P xc: fer Marshall t Technician Permit File No. D06 -340 C Steven M. Mullet, Mayor Department of Community Development Steve Lancaster, Director 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 -431 -3670 • Fax: 206-431-3665 February 16, 2007 Terry Beals Sound Transit 401 S Jackson St Seattle WA 98104 -2826 Dear Mr. Beals: Sincerely, arshall echnician File: Permit No. D06 -340 ' City of Tukwila RE: Request for Permit Application Extension Development Permit Application No. D06 -340 Sound Transit (Demo) — 3800 S 154 St This letter is in response to your written request for an extension to Permit Application No. D06- 340. The Building Official has reviewed your letter and considered your request to extend the above referenced permit application. The City of Tukwila Building Division will be extending the expiration date of your permit application for an additional 90 days (through June 11, 2007). If you should have any questions, please contact our office at (206) 431 -3670. P:Vcnnifer Extension LettersWetn it Applicationa\D06340 Application Extension doc Jnn G Steven M. Mullet, Mayor Department of Community Development Steve Lancaster, Director 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206- 431 -3670 • Fax: 206 - 431 -3665 T SOUNDTRANSIT February 6, 2007 Mr. Bob Benedicto Building Official Department of Community Development City of Tukwila 6300 Southcenter Boulevard, Suite # 100 Tukwila, WA 98188 Permit Application Extension Request for DCD Permit D06 -340, Demolition, Link Light Rail Project: Contract C759, Southcenter Boulevard Improvements Dear Mr. Benedicto, Sound Transit respectfully requests a 90-day permit application extension to DCD permit D06 -340, for building demolition located at 3800 S. 154 Street in support of Contract C759, Southcenter Boulevard Improvements. The permit application is scheduled to expire on March 13, 2007. Sound Transit's schedule for this work has been delayed due to on -going 3n party negotiations and other extenuating circumstances beyond our control. As soon as these issues are resolved, ST will be in a much better position to advertise this contract and reestablish a working schedule. Your decision to grant an additional 90 days to the permit application will help facilitate Sound Transit's endeavors to continue moving forward in the build out of the Central Link light rail project in the City of Tukwila. If you have any questions regarding this request, please contact me immediately at the number listed below. I appreciate your careful consideration and patience on this request. Terry B y's Link Light Rail Permit Manager (206) 398 -5237 C: Jennifer Marshall, City of Tukwila LDCC (CM1430; C759) c o1 . REC frsD c. o bei tee iV irY Atter s�06 , Central Puget Sound Regional Transit Authority • Union Station aZ ••'O7•""{.[/�' 401 S. Jackson SC, Seattle, WA 98104 -2826 • Reception: (206) 398 -5000 • FAX: (206) 398 -5499 • www.soundtransitorg -ser b diIitdw- BOARD CHAIR John W. Ladenburg Pierce County Executive BOARD VICE CHAIRS Connie Marshall Bellevue Councilmember Mark Olson Everett Councilmember BOARD MEMBERS Julie Anderson Tacoma Councilmember Mary -Alyce Burleigh Kirkland Councilmember Fred Butler Issaquah Deputy Council President Dow Constantine King County Councilmember Dave Endow Sumner Mayor Doug MacDonald Washington State Department of Transportation Secretary Richard Marin Edmonds Councilmember Richard Mdver Seattle Councilmember Greg Nickels Seattle Mayor Julia Patterson King County Councilmember Larry Phillips Chair, King County Council Aaron Reardon Snohomish County Executive Ron Sims King County Executive Claudia Thomas Lakewood Mayor Pete von Reichbauer Vice Chair, King County Council CHIEF EXECUTIVE OFFICER Joni Earl 02 -02 -2007 TERRY BEALS 401 S JACKSON ST SEATTLE WA 98104 RE: Permit Application No. D06 -340 3800 S 154 ST TUKW Dear Permit Applicant: City of Tukwila G Steven M. Mullet, Mayor Department of Community Development Steve Lancaster, Director In reviewing our current permit application files, it appears that your permit application applied for on 09/14/2006 , has not been issued by the City of Tukwila Permit Center. Per the International Building Code and/or the International Mechanical Code, every permit application not issued within 180 days from the date of application shall expire by limitation and become null and void. Your permit application expires on 03/13/2007 . If you choose to pursue your project, a written request for extension of your application addressed to the Building Official, demonstrating justifiable cause, will need to be received at the Permit Center prior to your expiration date of 03/13/2007. If it is determined that an extension is granted, your application will be extended for an additional 90 days from the expiration date. In the event you do not receive your written request for extension, your permit application will become null and void and your project will require a new permit application, plans and specifications, and associated fees. Thank you for your cooperation in this matter. Sincerely, rshall Pennit Technician Ak.44 xc: Permit File No. 1306 -340 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206- 431 -3670 • Fax: 206 - 431 -3665 December 12, 2006 Terry Beals Sound Transit 401 South Jackson Street Seattle, WA 98104 -2826 RE: North Parking Lot - Demolition D06 -340 Dear Terry: Building Permit Fee $ 2,522.82 Plan Review Fee $ 1,639.83 State Building Code Fee $ 4.50 ‘ City of Tukwila Department of Community Development Steve Lancaster, Director This letter will outline the estimate permit fees due for the demolition permit to remove the 5 buildings on site to the existing permit for the Tukwila Station Site. Based on the estimated cost of $285,500.00 the fees are as follows: This fee estimate does not include any Public Works fees associated with this permit. If you should have any questions, please feel free to contact me at 206 - 431 -3672 or by e -mail at bholt(Wci.tukwila.wa.us. Sincerely, tkai Brenda Holt Permit Coordinator Xc; Jennifer Marshall, Permit Technician Permit File No. D06 -340 Q:\Swnd Transi0D06.340 - permit fee estimate bh Steven M. Mullet, Mayor 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206- 431 -3665 LBrenda Holt - North rarlong tot Demo b06 -340 From: To: Date: Subject: CC: Hi, Brenda Thanks Terry Beals Link Light Rail Permit Manager 206 - 398 -5237 "Beals, Terry" <bealst @soundtransit.org> "Brenda Holt" <bholt @ci.tukwila.wa.us> 11/21/2006 10:01 am North Parking Lot Demo D06 -340 "Jennifer Marshall" <jarshall @ci.tukwila.wa.us> I just now got a cost estimate to demo the structures (Public Storage) on the North Parking Lot and will need from you a note on city letterhead as to what the plan review and permit fees will be based on $285,500.00. Once I get that from you or Jennifer I can initiate a check request from our AP folks. Can one check be cut to pay for both the plan review as well as the permit fee owing due at issuance or should I break it up into 2? November 14, 2006 Terry Beals Sound Transit 401 S Jackson St Seattle WA 98104 RE: CORRECTION LETTER #1 Development Permit Application Number D06 -340 Sound Transit — 3800 S 154 St Dear Mr. Beals, This letter is to inform you of corrections that must be addressed before your development permit(s) can be approved. All correction requests from each department must be addressed at the same time and reflected on your drawings. I have enclosed comments from the Public Works Department. At this time the Building, Fire, and Planning Departments have no comments. Public Works Department: Joanna Spencer, at 206 431 -2440, if you have questions regarding the attached memo. Please address the attached comments in an itemized format with applicable revised plans, specifications, and/or other documentation. The City requires that four (4) complete sets of revised plans, specifications and /or other documentation be resubmitted with the appropriate revision block. In order to better expedite your resubmittal, a `Revision Submittal Sheet' must accompany every resubmittal. I have enclosed one for your convenience. Corrections /revisions must be made in person and will not be accepted through the mail or by a messenger service. If you have any questions, please contact me at (206) 433 -7165. Sincerely, end File No. D06 -340 City of Tukwila Department of Community Development Steve Lancaster, Director hal '" ""\ hnician P:UennifeACorreclion Letters \2006\D06 -340 Correction Ltr #1.DOC jem Steven M. Mullet, Mayor 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206- 431 -3665 PUBLIC WORKS DEPARTMENT COMMENTS www.ci.tukwila.wa.us Development Guidelines and Design and Construction Standards DATE: October 10, 2006 PROJECT: Sound Transit — Demolition of 5 structures 3800 S 154 St/15244 TIB REVIEW #: 1 PERMIT NO: D06 - 340 PLAN REVIEWER: Contact Joanna Spencer at (206) 433 -0179 if you have any questions regarding the following comments. 1) Engineer's stamp and signature is required on all plans. 2) Please clarify extent of proposed demolition. Will the building foundation slabs be removed as well, and what will happen to the holes in the ground left after foundations are removed? Will they be filled with dirt, re- seeded with grass or paved over? Submit an erosion/sediment control plan and include attached Catch Basin Sediment Barrier Detail on plans. 3) Please have the revised plans reviewed by Val Vue Sewer District at (206) 242 -3236 and have them "stamp approved" at least one set of plans. Proof of Val Vue approval shall be submitted to Public Works. 4) Please clarify the extent of storm drainage capping. Note #7 on Drawing No.: PERMIT 01 calls for Storm Drain Inlet Protection; however, there is no note reference on plan. Does it mean that all inlets shall require this type of protection, or certain inlets will be removed as a result of this demolition and only remaining catch basins will require protection? 5) Note #8 calls for protecting 36" SD carrying stream falls and arrow points to storm drain pipe segment between Buildings 2 and 3. How about SD pipe segment south of Building 1, which shows to be protected ST Link Light Rail Project South Corridor, S 154 St Station Drawing P762CR02, see attached. 6) Note #6 needs to be revised to include coordination with Tukwila Fire Department at (206)575 - 4404, since part of fire service retiring includes removal of Fire Hydrants. 7) Please submit a haul route map within Tukwila City for empty and loaded trucks. (P: /Joanna/Comments I D06 -340) September 21, 2006 Terry Beals Sound Transit 401 South Jackson St Seattle, WA 98104 Subject: Sound Transit D06 -340 Dear Mr. Beals: Brenda Holt, Permit Coordinator Xc: Permit File No. D06-340 Parties of Record City of Tukwila Department of Community Development Steve Lancaster, Director 4d- Q:\Notice Application-Decision \D06 -340 - Notice of Complete Application.DOC bh NOTICE OF COMPLETE APPLICATION Steven M. Mullet, Mayor Your application for a demolition permit to demolish the 5 structures located at 3800 South 154th Street, Tukwila, Washington is considered complete on September 19, 2006 for the purposes of meeting state mandated time requirements. The Notice of Application will also be mailed by the City to agencies having jurisdiction and parties of record. This determination of complete application does not preclude the ability of the City to require that you submit additional plans or information, if in our estimation such information is necessary to ensure the project meets the substantive requirements of the City or to complete the review process. This notice of complete application applies only to the permits identified above. It is your responsibility to apply for and obtain all necessary permits issued by other agencies. If you should have any questions, please contact me at (206) 431 -3670. 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206-431-3670 • Fax: 206-431-3665 Keith Neal 6735 Beach Drive SW Seattle, WA 98136 Eric Schweiger 4712 South 134 Street Tukwila, WA 98168 F. Wayne Stollatz 711 West Casino Road, 4C5 Everett, WA 98204 Pauline Tamblyn SPEEA 15205 52" Avenue S Seattle, WA 98188 Melvin Easter Johnson Braund Design Group 15200 52" Avenue S, #200 Seattle, WA 98188 LeAnne Bremer Miller Nash LLP PO Box 694 Vancouver, WA 98666 -0694 Jack Lattemann METRO Mail Stop KSC -TR -0422 201 South Jackson Street Seattle, WA 98104 -3856 Anna Bernhardt 14241 59 Avenue S Tukwila, WA 98188 Norma Larson 14223 55 Avenue S Tukwila, WA 98168 Federal Transportation Admin Region 10 Jackson Federal Building 215 2 Avenue, Suite 3142 Seattle, WA 98174 -1002 Gordon Allen 11835 SE 165 St Renton, WA 98058 Michael P. Griffin 5131 South 151" Street Tukwila, WA 98188 Thong van Tran 4820 South 152 Street Tukwila, WA 98188 Mark Maio 5119 South 151" Street Tukwila, WA 98188 Jennifer Mackay SPEEA 15205 52°" Avenue S Seattle, WA 98188 Roger Lorenzen 14038 Macadam Road S Tukwila, WA 98168 Tony Carosino 11245 East Marginal Way S Tukwila, WA 98168 Peter Coates 6770 East Marginal Way S, "G" Tukwila, WA 98108 Department of Transportation Reg Envir. Program Manager PO Box 330310 Seattle, WA 98133 -9710 PS Regional Council 1011 Western Avenue, #500 Seattle, WA 98104 Greg and Vanessa Zaputil 15171 52" Avenue S, #5 Tukwila, WA 98188 Chris Arkills/Dwight Pelz KC Council 516 Third Avenue, Room 1200 Seattle, WA 98104 -3272 Scott Luke 10242 62 Avenue S Seattle, WA 98178 -2303 Stephenie Kramer OCD Office of Archaeology 1063 South Capitol Way, #106 Olympia, WA 98501 John Niles CETA Technical Director 4005 20 Avenue W, Suite 111 Seattle, WA 98199 Craig Ward City of SeaTac 4800 South 188 Street SeaTac, WA 98188 -8605 Hal cooper 11715 NE 145 Street Kirkland, WA 98134 Mary Loiselle 12834 34 Avenue S Tukwila, WA 98168 Seattle City Light 700 5 Avenue, #3300 Seattle, WA 98104 -5031 US Corp of Engineers 4735 East Marginal Way S Seattle, WA 98124 -2255 WA Fisheries/Wildlife 16018 Mill Creek Blvd Mill Creek, WA 98012 US E.P.A. 1200 6 Avenue Seattle, WA 98101 SOUNDTRANSIT September 12, 2006 Nora Gierloff City of Tukwila 6300 Southcenter Boulevard, Suite 100 Tukwila, WA 98188 Dear Ms Gierloff: The following describes State Environmental Policy Act (SEPA) compliance for City of Tukwila construction and demolition permits for the Sound Transit - controlled properties located at 15244 Pacific Hwy S. and 3800 5.154 Street for Sound Transit's Link light rail project. Compliance with SEPA for the Tukwila segment of Sound Transit's Central Link Light Rail Transit Project was completed with Sound Transit's issuance of the following environmental documents: 1. Central Link Light Rail Transit Project Final Environmental Impact Statement (November 1999) 2. Addendum to the Final Environmental Impact Statement for the Initial Segment (November 2001) 3. Tukwila Freeway Route Final Supplemental Environmental Impact Statement (November 2001) 4. Initial Segment Environmental Assessment (February 2002) 5. Tukwila Addendum to the Tukwila Freeway Route Final Supplemental Environmental Impact Statement (August 2004). The City used these documents unchanged (per WAC 197 -11 -600) in support of the IJUP, Shoreline and other permit actions approved by the City. All subsequent construction documents and permit applications (construction, demolition, grading, etc) based on this design are also entirely covered by the above documents. This includes the construction documents for Project C757, S. Boeing Access Road to S 154 Street Advance Utility Relocation, Central Link Light Rail S. Boeing Access Road to S 154 Street - Contract C755 and the Southcenter Boulevard Improvements — Contract C759. Specifically regarding construction staging and demolition, these topics are primarily addressed in the environmental documents as follows: Central Puget Sound Regional Transit Authority • Union Station RECEIVED CITY IUKWILP SEP 14 2006 PERMIT OMER Vi 401 S. Jackson St., Seattle, WA 98104 -2826 • Reception: (206) 398 -5000 • FAX: (206) 398 -5499 • www.soundtransitorg BOARD CHAIR John W. Ladenburg Pierce County Executive BOARD VICE CHAIRS Connie Marshall Bellevue Councilmember Mark Olson Everett Councilmember BOARD MEMBERS Julie Anderson Tacoma Councilmember Mary - Alyce Burleigh Kirkland Councilmember Fred Butler Issaquah Deputy Council President Dow Constantine King County Councilmember Dave Enslow Sumner Mayor Doug MacDonald Washington State Department of Transportation Secretary Richard Mann Edmonds Councilmember Richard McIver Seattle Councilmember Greg Nickels Seattle Mayor Julia Patterson King County Councilmember Larry Phillips Chair, King County Council Aaron Reardon Snohomish County Executive Ron Sims King County Executive Claudia Thomas Lakewood Mayor Pete von Reichbauer Vice Chair, King County Council CHIEF EXECUTIVE OFFICER Joni Earl Nora Gierloff September 12, 2006 Page Two • Central Link Light Rail Transit Project Final EIS — Section 4.2 Acquisitions, Displacements, and Relocations, Section 4.17 Construction Impacts, and the technical appendices and Background Reports supporting these sections. • Tukwila Freeway Route Final Supplemental EIS — Section 4.2 Acquisitions, Displacements, and Relocations, Section 4.17 Construction Impacts, and the technical appendices supporting these sections. • Tukwila Addendum to the Tukwila Freeway Route Final Supplemental EIS — throughout Addendum, its appendices and referenced design drawings Specific references to these two Sound Transit - controlled properties occur in the Central Link Final EIS (1999) on page 135 of Appendix H and in the Tukwila Addendum (2004) on page A -9. As you are aware, SEPA review should be conducted at the earliest possible point in the planning and decision - making process when the principle features of a proposal and its environmental impacts can be reasonably identified (see WAC 197 -11 -055). SEPA review for the light rail project in Tukwila was conducted consistent with this requirement and some of the micro- detail of the project construction may not be spelled out in detail but is certainly reasonably covered in the environmental documents and appropriate mitigation identified. I recommend the 5 environmental documents listed above be referenced in any permit action for the light rail project as providing the required SEPA compliance. We will also reference them in our permit applications where appropriate. If you have any questions regarding the SEPA compliance for ongoing City permitting actions please contact me at 206.398.5140. Sincerely, James Irish Link Environmental Manager J1:ab State Environmental Policy Act/Tukwila c: Terry Beals PLAN REVIEW /ROUTING SLIP PERMIT COORD COP ACTIVITY NUMBER: D06 -340 DATE: 02 -12 -08 PROJECT NAME: SOUND TRANSIT SITE ADDRESS: 3800 S 154 ST Original Plan Submittal Response to Incomplete Letter # X Response to Correction Letter # 1 Revision # After Permit Issued DEPARTMENTS: Building Division Public Works G ql-z6 -06 Fire Prevention Structural DEpE RMINATION OF COMPLETENESS: (Tues., Thurs.) Complete d Incomplete Comments: Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES/THURS ROUjING: Please Route u Structural Review Required ❑ No further Review Required REVIEWER'S INITIALS: Documents/routing slip.doc 2.28-02 APPROVALS OR CORRECTIONS: Approved ❑ Notation: REVIEWER'S INITIALS: Approved with Conditions ❑ Permit Coordinator DUE DATE: 02-14-08 Not Applicable ❑ DATE: DATE: Planning Division DUE DATE: 03-13-08 Not Approved (attach comments) ❑ Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: Date: fob. 10 dode City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Fax: 206 -431 -3665 Web site: http :• / /www.ci.tukwila.wa.us Steven M. Mullet, Mayor Steve Lancaster, Director Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. Plan Check/Permit Number: ❑ Response to Incomplete Letter # Response to Correction Letter # ❑ Revision # after Permit is Issued ❑ Revision requested by a City Building Inspector or Plans Examiner pad -340 RECEIVED rr CvorrtJh'Wt J , FEB 12 2000 PERMIT CENTER Project Name: C7561 5okl1d I 13n i1Dl'lr(1//1 O S `J� �e Project Address: �. `59 4 sr / /se (pi nra Contact Person: Tr7y 73,7,7/5 `7 Phone Number: t�(7' 35 - Sa37 Summary of Revision: / Pi."--1947 -rise tihrJ,af1-L"-cf re e fiilia / (lam® z d06, Sheet Number(s): Seg2 a C11/, "Cloud" or highlight all areas of revision including date of revision Received at the City of Tukwila Permit Center by "C Entered in Permits Plus on 074 \applications \forms- applications on line\revision submittal Created: 8 -13 -2004 Revised: PUBLIC WORKS DEPARTMENT COMMENTS www.ci.tukwila.wa.us Development Guidelines and Design and Construction Standards DATE: October 10, 2006 PROJECT: Sound Transit — Demolition of 5 structures 3800 S 154 St/15244 TIB REVIEW #: 1 PERMIT NO: D06 - 340 PLAN REVIEWER: Contact Joanna Spencer at (206) 433 -0179 if you have any questions regarding the following comments. Sound Transit Responses Dated February 12, 2008 1) Engineer's stamp and signature is required on all plans. ST Response: Concur. Please see attached stamped and signed engineer drawings. 2) Please clarify extent of proposed demolition. Will the building foundation slabs be removed as well, and what will happen to the holes in the ground left after foundations are removed? Will they be filled with dirt, re- seeded with grass or paved over? Submit an erosion/sediment control plan and include attached Catch Basin Sediment Barrier Detail on plans. ST Response: a. Please see the attached "Demolition Plans and Details". b. Building foundation/slab will be removed and filled with suitable fill to support the new parking lot. c. Please see attached "Erosion Control Plan," sheet numbers: 49, 55 d. Detail provided in the attached Contract Plans. See plan sheet number: 49 3) Please have the revised plans reviewed by Val Vue Sewer District at (206) 242 -3236 and have them "stamp approved" at least one set of plans. Proof of Val Vue approval shall be submitted to Public Works. ST Response: Documentation demonstrating ValVue Sewer District review and approval is attached as requested. 4) Please clarify the extent of storm drainage capping. Note #7 on Drawing No.: PERMIT 01 calls for Storm Drain Inlet Protection; however, there is no note reference on plan. Does it mean that all inlets shall require this type of protection, or certain inlets will be removed as a result of this demolition and only remaining catch basins will require protection? ST Response: Please see attached "Erosion Control Plan," that addresses all site inlet protection. sheet number: 335 5) Note #8 calls for protecting 36" SD carrying stream falls and arrow points to storm drain pipe segment between Buildings 2 and 3. How about SD pipe segment south of Building 1, which shows to be protected ST Link Light Rail Project South Corridor, S 154'" St Station Drawing P762CR02, see attached. ST Response: (P: /Joanna/Comments 1 D06 - 340) This "Detention Pipe" referenced above is for the existing buildings and will be removed. Please see attached "Demolition Plans," sheet numbers: 337 and Permit -01. 6) Note #6 needs to be revised to include coordination with Tukwila Fire Department at (206)575 -4404, since part of fire service retiring includes removal of Fire Hydrants. ST Response: Please see Revised Note # 6 on sheet number Permit -01. 7) Please submit a haul route map within Tukwila City for empty and loaded trucks. ST Response: Please see attached "Haul Route Plan," Sheet number 187. ACTIVITY NUMBER: D06 -340 DATE: 09 -14 -06 PROJECT NAME: SOUND TRANSIT - DEMO STORAGE UNITS SITE ADDRESS: 3800 S 154 ST / 15244 PACIFIC HY S X Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # Revision # After Permit Issued DEPARTMENTS: Buif®ing Division / I ' Pbl>Wor 11144 u- �n-tlo DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete M Comments: Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUESITHURS ROUTING: Please Route Structural Review Required REVIEWER'S INITIALS: APPROVALS OR CORRECTIONS: Approved ❑ Notation: REVIEWER'S INITIALS: Documents/routing slip.doc 2 -2602 PERMIT COORD COPY PLAN REVIEW /ROUTING SLIP Fire rev4Mion (I XJ Structural ❑ Incomplete E DATE: DATE: Mb hp JD -21-00 Planning Division Permit Coordinator DUE DATE: 09-19-06 Not Applicable No further Review Required Approved with Conditions❑ Not Approved (attach comments) DUE DATE: 10-1 7-06 Permit Center Use Only CORRECTION LETTER MAILED: 111141 Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW Staff Initials License Information License JHARPCI081B7 Licensee Name J HARPER CONTRACTORS INC Licensee Type CONSTRUCTION CONTRACTOR UBI 601322160 Ind. Ins. Account Id 80858700 Business Type CORPORATION Address 1 17937 CEDAR GROVE RD SE Address 2 City MAPLE VALLEY County KING State WA Zip 980386220 Phone 2067634383 Status ACTIVE Specialty 1 GENERAL Specialty 2 UNUSED Effective Date 1/27/1992 Expiration Date 1/22/2009 Suspend Date Separation Date Parent Company Previous License JHARPC• 107JT Next License Associated License Business Owner Information Name Role Effective Date Expiration Date KAWAMOTO, STANLEY S 01/01/1980 HARPER, JOAN M 01/01/1980 BRAIN, ROMNEY R AGENT 01 /01/1980 Look Up a Contractor, Electrician or Plumber License Detail Page 1 of 3 Washington State Department of Labor and Industries General/Specialty Contractor A business registered as a construction contractor with L &I to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must mamtain a surety bond or assignment of account and carry general liability insurance. Bond Information Bond Bond Company Name Bond Account Number Effective Date Expiration Date Cancel Date Impaired Date Bond Amount Received Date WESTERN SURETY Until https: // fortress. wa. gov /Ini/bbip /printer.aspx ?License= JHARPCI081B7 03/06/2008 x x x x x x x x x x x x