HomeMy WebLinkAboutTrans 2014-11-24 COMPLETE AGENDA PACKETCity of Tukwila Transportation Committee • Allan Ekberg, Chair • Dennis Robertson • Kate Kruller AGENDA Distribution: A. Ekberg D. Robertson K. Kruller D. Quinn Mayor Haggerton D. Cline L. Humphrey B. Giberson F. Iriarte R. Tischmak G. Labanara P. Brodin R. Turpin M. Hart Clerk File Copy 2 Extra Place pkt pdf on Z: \TC -UC Agendas e -mail cover to: A. Le, C. O'Flaherty, D. Almberg, B. Saxton, S. Norris, M. Hart, L. Humphrey MONDAY, NOVEMBER 24, 2014 — 5:15 PM FOSTER CONFERENCE ROOM — 6300 BUILDING (formerly known as Conference Room #1) Item Recommended Action Page 1. PRESENTATION(S) 2. BUSINESS AGENDA a) 42nd Ave South /Allentown Roadside Barrier a) Information Only Pg. 1 Project Update b) Thorndyke Safe Routes to School Project b) Information Only Pg. 7 Winter Project Shutdown c) 42nd Avenue S Phase III (Southcenter Blvd to S 160th St) c) Information Only Pg. 11 Briefing on Design of 42nd Ave S S/S 160th St Intersection d) Tukwila Urban Center — Transit Center and Andover Pk W Widening d) Forward to 12/1/14 Pg. 13 Puget Sound Energy Change Order #3 Regular Consent Agenda 3. SCATBd e) • October 21, 2014 Meeting Summary e) Information only Pg. 19 • November 18, 2014 Meeting Agenda 4. MISCELLANEOUS f) Transportation Improvement Board f) Discussion Only Grant Results 5. ANNOUNCEMENTS Future Agendas: Automated Traffic Enforcement Next Scheduled Meeting: Monday, December 8, 2014 S. The City of Tukwila strives to accommodate individuals with disabilities. Please contact the Public Works Department at 206 - 433 -0179 for assistance. City of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM TO: Mayor Haggerton Transportation Committee FROM: Bob Giberson, Public Works Director BY: Dave Sorensen, Project Manager DATE: November 21, 2014 SUBJECT: 42nd Ave South /Allentown Roadside Barrier Project No. 91310301 Project Update ISSUE Present an update for the 42nd Ave South /Allentown Roadside Barrier Project. BACKGROUND A project to study guardrail and /or barrier warrants along the Duwamish River adjacent to 42nd Ave South and S 115th St in Allentown was funded as part of the Small Roadway & Safety Improvements in the Capital Improvement Program (CIP). The technical analysis is complete and the design phase is underway with the project plans at approximately 30% complete. Please refer to the attached Project Status Report. ANALYSIS The goal of the study is to evaluate applicable design and safety standards, to identify recommended locations to install new roadside barriers, and to identify any upgrades /modifications to existing guardrail and concrete barriers. Based on Washington State Department of Transportation (WSDOT) and American Association of State Highway and Transportation Officials (AASHTO) standards, several areas of the river bank along 42nd Ave S and S 115th St are being recommended for guardrail and /or barrier installation. Construction will include the highest risk and highest priority areas along the Duwamish River. A safety grant was submitted to WSDOT for construction funding and grant awards are expected to be announced in mid - December 2014. The safety grant has requested funding that would allow the City to install all recommended guardrails and /or barriers. If the City is not awarded the grant funds, City funds will be used to construct the guardrail and barrier in phases over multiple years (subject to CIP funding). FISCAL IMPACT The estimated construction costs for all recommended guardrail and barrier installations is $299,970 based on the calculations of the current 30% design. This includes a 10% contingency and with construction management at 15 %, the total project cost estimate is $344,465. Without grant funding, the 2015 construction budget is $70,000. Additional City funds will be needed for the Small Roadway & Safety Improvements Program if the grant funds are not awarded to the City. Construction costs could be spread over the next 6 years to minimize the impact to the Residential Street Fund (103 Fund). RECOMMENDATION For information only. Attachments: Page 5, Proposed 2015 CIP for Small Roadway & Safety Improvements Consultant Project Status Report with Vicinity Map and Aerial Layout 1 W: \PW Eng \ PROJECTS \A- RW & RS Projects \42nd Ave S Allentown Roadside Barrier (91310301) \Design \November 24th TC Project Updatellnfo Memo 42nd Ave S Barrier draft report - sb.docx CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2015 to 2020 91310301 PROJECT: Small Roadway and Safety Improvements Project No. Varies Programmatic approach to addressing small roadway and safety concerns through a variety of methods. DESCRIPTION: Addresses needs not included in general maintenance, traffic calming, or other approaches. Increasing public demand on staff time. Local access streets in residential neighborhoods may need minor JUSTIFICATION: roadway or safety improvements that can not be addressed with any other City program. 42nd Ave B/AUentuwn Roadside Barrier iopmpooedinphenos Project Full design in 2014 STATUS: phases, 91310301. and critical areas constructed in 2015. Additional construction in 2016 is grant dependent. ~°,,==�,. Federal con�mcUnngnamispmposad for *35o'uOOfmm the Q�G�e�whhno local m�chrequired. FW| ���°�"'' program is only feasible if Public Works adds a Traffic Engineer to staff (same position as Traffic Calming). FINANCIAL (in $000's) EXPENSES Design Land (R/W) ConaLMgmL Construction TOTAL EXPENSES Through Estimated 2013 2014 2015 2016 2017 2018 2019 2020 BEYOND TOTAL 8 8 88 88 20 10 60 90 50 300 350 0 0 o u 0 116 O 60 360 536 FUND SOURCES Awarded Grant Proposed Gran Mitigation Actual Mitigation Expected City Oper. Revenue TOTAL SOURCES 8 8 88 88 90 90 350 O 350 0 o 0 0 0 0 0 V 0 0 O 350 0 O 186 536 Project Location 2015 - 2020 Capital Improvement Program 5 2 Project Status Report To: Dave Sorensen, RE. — City of Tukwila From: Nelson Davis - KPG Date: 11/13/2014 Re: 42nd Ave S — Roadside Barrier Warrant Analysis Project No: City # 91310301.1000.100 (KPG # 13093) BACKGROUND: The City of Tukwila intends to install roadside barrier along 42nd Avenue S and S 115th Street in general accordance with the recommendations contained in the '42nd Avenue S — Roadside Barrier Analysis' prepared by KPG (9/25/2013). The proposed improvements include installation/replacement of approximately 2,400 linear feet of barrier along the west side of 42nd Avenue S / south side of S 115th Street. The roadway is located adjacent to the Duwamish River and the barrier will improve safety along this stretch of the roadway. CURRENT PROJECT STATUS: KPG has completed utility locates, survey, geotechnical review and prepared 30% Plans and Construction Cost Estimate that is currently under review with the City. The Plans generally match the recommendations included in the original Roadside Barrier Analysis that combines the use of of anchored concrete barrier and WSDOT standard galvanized beam guardrail on timber posts. In some locations, beam guardrail was recommended in the original Barrier Analysis, but has been upgraded to anchored concrete barrier in the current 30% design due to discovery of underground utilities. The underground utilities would conflict with timber post installation and result in greater costs associated with utility relocation and pavement repair compared with changing the type of barrier. ESTIMATED COSTS AND ALTERNATIVES CONSIDERED: The estimated construction cost at the 30% design level is $300,000 compared with a preliminary estimate of $275,000 during the 2013 Barrier Analysis. The increased cost is primarily due to the need for additional anchored concrete barrier in lieu of beam guardrail due to underground utility conflicts. As requested, we also reviewed alternate guardrail materials as follows: • Use of weathering steel guardrail to replace galvanized beam guardrail would result in a cost increase of approximately $30,000 over the current estimate. • Use of steel backed timber guardrail to replace galvanized beam guardrail would result in a cost increase of approximately $120,000 over the current estimate. 753 9' Avenue North, Seattle, WA 98109 P: 206.286.1640 F: 206.286.1639 www.kpg.com 3 These estimates are for replacement of the beam guardrail portion of the project only, which is approximately 50% of the proposed barrier. The remaining 50% of barrier would remain as anchored concrete barrier due to either physical site conditions or conflicts with subsurface utilities that would result from timber post installation. SCHEDULE: A grant application was submitted for construction funding through the Highway Safety Improvement Program (HSIP) in July, 2014. If the City is awarded grant funds, the intent would be to construct all of the improvements under a single construction contract in 2015. If the funding is not approved, the project will be split into phases to be completed over the next few years in accordance with the current budget. Determination of grant funding is scheduled for December 2014, at which time we will proceed with final design and permitting of the improvements. A phasing strategy will be developed in the event that grant funds are not available. If grant funds are awarded to the City, additional environmental documentation will be required to satisfy federal funding requirements; however, the goal is to complete the permitting and design for construction in the summer/fall of 2015. Page 12 753 9th Avenue North, Seattle, WA 98109 P: 206.286.1640 F: 206.286.1639 www.kpg.com 4 IP Vicinity Map PROJECT LOCATION Page 13 753 9th Avenue North, Seattle, WA 98109 P: 206.286.1640 F: 206.286.1639 www.kpg.com 5 42ND V) W 0 CO to 0) LEGEND '— co N r co PROPOSED GUARDRAL PROPOSED CONCRETE BARRIER EASING CONCRETE BARRIER TO REMAIN 42nd Ave S Roadside Barrier Analysis 30% Design Summary 753 9th Ave N 2502 Jefferson Ave Seattle, WA 98109 Tacoma, WA 98402 (206) 286 -1640 (253) 627 -0720 www.kpg.com City of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM TO: Mayor Haggerton Transportation Committee FROM: Bob Giberson, Public Works Directo BY: Grant Griffin, Senior Engineer DATE: November 21, 2014 SUBJECT: Thorndvke Safe Routes to School Project Project No. 91210302, Contract No. 13-160 Winter Project Shutdown ISSUE Report the winter shutdown of the Thorndyke Safe Routes to School Construction Project. BACKGROUND A call for bids was advertised on May 8 and 15, 2014 and three bids were opened on May 29, 2014. The lowest bidder was Road Construction Northwest, Inc. (RCNW) with a bid of $1,136,256.00 and the contract was awarded on June 23, 2014. RCNW requested and was granted a September 14, 2014 Notice to Proceed date due to their work load. While some preliminary work and detour set-up was completed, construction did not start in earnest until October 23, 2014, after which they diligently pursued the work. DISCUSSION RCNW finished all of the underground storm drainage and utility work by November 14, 2014. At this point they hesitated to remove the existing pavement with the threat of November rainstorms on a jobsite with such steep grades. A request for a winter shutdown was sent on November 11, 2014 and after review by the City, was granted. Because of the late construction start, the City will bear no costs associated with the project shutdown, site maintenance, or resumption of construction in the Spring. The construction shutdown is expected to last from November 14, 2014 to no earlier than March 1, 2014 and no later than April 1, 2014. The City has required that RCNW maintain the construction zone and ensure that the site is in satisfactory condition during the construction shutdown. FINANCIAL IMPACT There is no financial impact as outlined in the attached Project Serial Letter 03. RECOMMENDATION Information only. Attachments: RCNW Request for Winter Shutdown letter Project Serial Letter 03 7 W:\PW Eng \ PROJECTS \A- RW & RS Projects Safe Routes to School - Thorndyke (91210302)\CN Award\ Info Memo Winter Shutdown TC Update 11-21-14 - sb.docx Road Construction Northwest, Inc. PO Box 188 Renton, Washington 98057 (425) 254 -9999 (425) 254 -1334 fax November 11, 2014 City of Tukwila 6300 Southcenter Blvd. Tukwila, WA 98188 Attn: Mr. Grant Griffin Mr. Scott Moore Mr. Nathan Monroe City of Tukwila — Thorndyke Elementary Safe Routes to School City Project No.: 91210302 RCNW Project Number: 1408 SUBJ: Project Winter Shutdown Request Gentlemen: Per our conversations with City of Tukwila Senior Inspector Scott Moore this past week, Road Construction Northwest Inc. (RCNW) concurs that demolishing and removing the existing asphalt roadway; and exposing the subgrade to the weather elements this time of year would not be in the best interest of the project. As we discussed at our weekly construction meeting last Thursday, November 6th; after the curb & gutter is installed on the south side, we would need a full week of dry weather to remove the existing pavement, excavate to subgrade, place crushed rock and prepare for asphalt paving. We are getting to the time of year where it is very difficult to get acceptable temperatures and dry weather conditions in order to schedule paving with Lakeside Industries. Also they close their asphalt plants for annual maintenance this time of year. We believe that finishing the remaining storm drainage work and water services work this week would be a good stopping point for a project winter shutdown; with minimal impacts to the project and inconveniences to the local residents. We will hot -mix asphalt patch all roadway trench crossings, install BMP erosion control devices, restore driveway access, remove signs & traffic control devices and demobilize. RCNW will continue to monitor and maintain erosion control devices, and will stay in contact with City Senior Inspector Scott Moore on any other needs in the field. RCNW requests that contract calendar days be suspended at the end of this week, Friday, November 14th for contract work; and that we be allowed to work next week on HMA trench patching, site restoration and preparation for winter shutdown as non - contract days. 8 We will stay in contact with KPG and the City of Tukwila to coordinate an appropriate restart date next Spring 2015, upon which we will present a revised schedule to complete the balance of the Contract Work. Your cooperation and assistance in this matter is appreciated. Should you have any questions or concerns, please contact me at (425) 254-9999 x-22. Very truly yours, Gordon Lee Project Manager 9 November 14, 2014 Gordon Lee P.O. Box 188 2500 E Valley Road, Suite C-3 Renton, WA 98057 Serial Letter 03 Project — Thorndyke Safe Routes to School City Project No.: 91210302 Dear Gordon, This letter is in response to RCNW's letter titled Project Winter Shutdown and dated November 11, 2014. In that letter RCNW requests a p ject suspension beginning 11/14/14 and ending in the Spring of 2015 due to unsuitable weather for the remaining work. After review, the City agrees to the suspension proposal per 1-08.6 of the 2014 WSDOT standard specifications with the stipulations specified below. RCNW shall bear all additional costs necessary to bring the site to a satisfactory condition suitable for suspension as determined by the City. Additionally, all costs to demobilize, remobilize, maintain the site's erosion control, maintain the site's roadway surfaces, and maintain the site's walking surfaces shall be borne exclusively by RCNW. RCNW will remove all equipment from the site at a date no later than 12/15/14. RCNW will visit the site and provide the Engineer with a brief written report cataloguing the site's condition and documenting any maintenance performed at an interval not less than once per week. Any increase in product or labor costs due to the suspension is the sole responsibility of RCNW. The list above is not exclusive; in general, all costs associated with the suspension are the responsibility of RCNW. The project will be suspended from 11/14/14 to a date not earlier than 3/1/15 and not later than 4/1/15, depending on predicted weather and as determined by the Engineer. Sincerely, Nathan Monroe PE KPG, Inc 10 TO: City of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM Mayor Haggerton Transportation Committee FROM: Bob Giberson, Public Works Director"` BY: Cyndy Knighton, Senior Program Manager DATE: November 21, 2014 SUBJECT: 42nd Ave S Phase III (Smuthcemter Blvd —S 160th St) Project No. 99410303 Intersection Improvements at 42nd Ave S and S 160th St ISSUE Update on proposed improvements at the 42nd Ave S and S 160m St inteuaection, which is a portion of the larger 42nd Ave S Phase Ill Project. BACKGROUND Since early 2012, the City has been working on the design of the combined 42nd Ave S Phase Ill Project and the Gilliam Creek Culvert Replacement Pr ject. The design is between the 60% and 90% level of completeness. Consideration is still being given to modifying the design to include undergrounding of the aerial utilities, which is not currently included. As the undergrounding option is a possibility, construction of the combined p j8CtSvViUnOtOCCu[uOU|th83O1O construction season to allow for additional design to be completed if necessary. DISCUSSION A request was made to present the p improvements at the southernmost intersection of the p ject for discussion at the Transportation Committee. The p ject will widen the roadway LO include sidewalks, buffer zones, and 14-foot wide travel lanes with painted bike sharrows. ADA accessible ramps will be included in the new sidewalks which will vary between 7 and 8 feet wide on the west side and 6 feet wide on the east side throughout the length of the larger project. The 42nd Ave S Phase Ill Project's paving will extend into the S 160m St intarsection, which is entirely located within SeaTac city limits. Walls will need to be constructed near the property lines on the two adjacent parcels as there is significant grade difference between the roadway and the private properties. A larger water meter owned by Water District No. 125 and the existing utility poles will be relocated. Under the current design, a series of poles will need to be installed to carry the weight of the lines as the ownership transfers from Seattle City Light to Puget Sound Energy (power lines), as well as the Comcast and Century link communication lines. FINANCIAL IMPACT None. RECOMMENDATION Discussion only. Attachments: Intersection Desiqn Graphic WaVV EnmmuECrS \A`mxaRS Projects \ 42nd Ave o Phase III (99w0303w+ns03)mesign \ INFO MEMO ^2nd-,uth Intersection TC Briefing nen^ RAT '°».docx 11 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII s: ED SCL PC _E Ill 111111 IYlh )Jii'Il h� 42ND AVE CITY OF SXA TA91 LIMIT CITY OP-TUKWII A LIMIT Ex STING POI EMS TING WA TF VAULT S. 0 tD \ 20 SG,AI_E IN FEET PROPOSED CURB RAM ITYP) FXISIINQ I - I�l —f PROPOSED — L GOIh PROPOSLII WATER VAULT I I I -1-1--I-1-1- 1-1-1-1T-1-1-[-1- -I- -I- I I rr• IIIIIIIII I!I L 6END FITT F1_ILL DEPTH HMA PAVEMP'Nh CEMENT CONCRETE SIDEWALK 12 T{]: City of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM Mayor Haggerton Transportation Committee FROM: Bob Giberson, Public Works Director BY: Peter Lau, Senior Program Manager DATE: November 21, 2014 SUBJECT: Tukwila Urban Center — Transit Center and Andover Park West Widening Puget Sound Energy — Facility Relocation Agreement, Contract No. 13-121 Change Order No. 3 ISSUE Approve Change Order No. 3 for the Utility Relocation Agreement between the City and Puget Sound Energy (PSE). BACKGROUND On July 2, 2013^ a Facility Relocation Agreement was executed between PSE and the City. This agreement defined the roles and financial responsibilities for the relocation of two underground vaults and two above-ground switches related to the Transit Center and Andover Park West Widening construction p ject. The two underground vaults straddled the right-of-way (ROW) line along the Southcenter Mall frontage; therefore, relocation costs to move the vaults out of the ROW are shared by PSE and Tukwila. The two switches are on Westfield Southcenter Mall property and are 100% the financial responsibility of the City. A cost estimate of $738,400.00 was included as part of this Facility Relocation Agreement. One underground vault (V10) and the two switches were then relocated by PSE in 2013. Change Order Nos. 1 and 2 were generated as a result of the extra work to relocate V10 and the two switches respectively. The two Change Orders were approved by City Council on February 18, 2014 for $75.914.80, bringing the total City responsibility to $814,314.80. DISCUSSION PSE has completed relocating the final remaining underground vault (V12) at the west Transit Center bus pull-out lane. The relocation cost has exceeded the original cost estimate due to the following: • The dewatering cost for vault relocation was significantly higher than the cost included in the original cost estimate. • PSE's wire crew had to reroute unknown service cables in vault V12. These unknown service cables were not documented in PSE's own record drawing; and the cable rerouting cost was not anticipated in the original cost estimate. • PSE's work crew had to extend their vault relocation work from two weeks (as estimated) to four weeks due to limited access space as the City's contractor was simultaneously constructing the walls at the west Transit Center. • Extended traffic control and unanticipated pedestrian safety measure costs for the additional two weeks. • PSE was required to replace an existing utility vault lid with a new anti-skid lid and some PSE manhole lids were also readjusted from existing locations to meet ADA requirements. psPro**s1Trans4 Center ' Contract Documents \020' Special Project Agreements & Permits1(005) - Franchise Utility Agreements\lnto Memo tar INFORMATIONAL MEMO Page 2 • The PSE vault relocation work was adjacent to the southbound travel lanes, resulting in the need for additional shoring and steel plates to prevent subgrade sloughing to the adjacent travel lanes. • The original cost estimate in the Facility Relocation Agreement was based on the vault being located within a landscaped area. It was discovered during construction that the vault was partially under the roadway, necessitating the installation of a traf iC bearing lid at additional cost. The bus pull-out was extended to avoid having the vault located directly under the curb and gutter. This re-design altered the grades for the vault, causing it to be installed deeper than originally proposed. The installation costs were increased due to additional subgrade excavation and other physical conflicts. • The original cost estimate in the Facility Relocation Agreement was based on 2012 PSE labor rates. The labor costs were increased since the actual work took place in 2014. FISCAL IMPACT The total amount of the cost increase to relocate Vault V12 was $147,451.00, in which PSE is responsible for 19%O[$28'O15.O9 and the City iS responsible for 81%O[$11S,435.31.The Transit Center P ject construction contingency of $905,626.00 will be used to pay for PSE Change Order No. 3. As of today, nine change orders for $84,887.92 were executed for the Transit Center P ject and there is a remaining $820,738.08 in construction contingency that is adequate to pay for PSE Change Order No. 3. RECOMMENDATION Council is being asked to approve PSE Change Order No. 3 in the amount of $119,435.31 to Contract No. 13-121 for the Tukwila Urban Center Transit Center Utility Rg|ooation, and consider this item on the Consent Agenda at the December 1, 2014 Regular Meeting. Attachment: Change Order No. 3 W:\ PW RS Projects \ Transh Center (90610402)\Construction14.100 - Contract Documents \ 020 'Special Project Agreements aPermits \ (005) - Franchise Utilrly Agreements \Info Memo or PUGET SOUND ENERGY To: City of Tukwila Attn: Cyndy Knighton Project: TUKWILA - Andover Park W P.I Description of work: CHANGE ORDER V12 Date: 9/2/2014 Project Number: 101080841 Project Manager: GRENNER This change order is for the costs In excess of the original estimate provided in "Exhibit C" of the relocation agreement between the City of Tukwila and Puget Sound Energy, These excess costs associated with this portion of the work are detailed on the attached explainatlon of costs. Item Amount Comments Materais 63 346 Construction $ 131 578 Engineering & Management 14 620 Right of Way Overhead 37,718 Estimate Total $ 247,261 Actual Materials 93,527 Construction $ 233,027 Engineering & Management s 22,748 Right of Way Overhead 45,409 Actual Total $ 394,712 Change Order Total $ 147,451 Allocation of Change Order Total Company 19% Government Entity 81% Chan .e Order Total 28,016 $ 119,435 47,451 Note: This change order will be effective only when signed by both parties: Puget Sound 1ergy Signed: Title: Date: (Please sign and return one copy) City of Tukwila Signed: Title: Date: 3591 7-04 Puget Sound Energy PO Box 90868 Bellevue, WA 98009-0868 PUGET SOUND ENERGY a subsidiary of PUGET ENERGY 15 CHANGE ORDER V12 EXPLANATION OF COSTS *ALL COSTS INCLUDE ENGINEERING /MANAGEMENT, EQUIPMENT, SALES TAX, AND OVERHEADS* 1) Dewatering of vaults. Additional costs: $7,000 Original estimate did not include dewatering of vaults due to... 1. Unknown amount of water 2. Unknown schedule for work months (weather) 2) Traffic control and pedestrian safety. Additional costs: $8,532 (11 crew days) A) Original estimate addressed 2 weeks of work. Work was over a 4 week period. B) City and PSE granted extra flaggers for pedestrian safety and increased foot traffic during heavy periods. 3) Wire crew performing rerouting of unknown service cables out of existing vault V12 that were undocumented and unreferenced on the original estimate. Additional costs: $9,203 (one crew day) Original estimate did not include the wire work to remove and relocate street light wire and secondary service cables. 4) Additional time for civil crew caused by lack of access to our vault due to the City's contractor performing their work in the immediate area (limiting our access to one side and doubling time on site). Additional costs: $33,186 (11 crew days) A) Original estimate was an estimated 2 weeks of work. Actual work took 4 weeks. B) Original estimate was based on the City and contractor removing the Firestone canopy to allow for work to be done on the vault with complete access. C) City's contractor removed canopy and immediately began work on the transit center site. Limiting our access to the vault. 5) Additional work per the request of the City to aid in the construction of the transit center. Additional costs: $15,613 (2 crew days) A) Replace lid at J01 with new anti -skid lid B) Adjust location of manhole covers to address the alignment with the City's curb and gutter 6) Shoring and steel plates Additional costs: $12,160 A) Original estimate was an estimated 2 weeks of work. Actual work took 4. 16 B) Due to the location of the vault additional shoring was required to avoid undermining the road during wet weather. 7) Materials Additional costs: $30,181 Original estimate was based off of the best information at the time. Actual materials used differed. 8) Planned to actual differential Additional costs: $31,576 Original estimate was based off of the best information at the time (Footages). Actuals differed. 9) Labor rate increase Original estimate was based off of 2012 labor rates. Actual work was based off of 2014 rates. 17 18 SOUTH COUNTY AREA TRANSPORTATION BOARD (SCATBd) October 21, 2014 MEETING SUMMARY Members Councilmember Marcie Palmer (Chair) Councilmember Bill Peloza (Vice - Chair) Councilmember Barry Ladenburg Councilmember Carol Benson Councilmember Dana Ralph Councilmember Wayne Snoey Deputy Mayor Jeannie Burbidge Justin Leighton Mayor Dave Hill Stacy Trussler Councilmember Stacia Jenkins Chelsea Levy Councilmember Linda Johnson Councilmember Jerry Robison Elizabeth Leavitt Councilmember Jeanette Burrage Commissioner Don Meyer Chris Arkills Councilmember Kathy Hougardy City of Renton City of Auburn City of SeaTac City of Black Diamond City of Kent City of Covington City of Federal Way Pierce Transit Algona WSDOT City of Normandy Park Sound Transit City of Maple Valley City of Burien Port of Seattle City of Des Moines Port of Tacoma King County (Alternate) City of Tukwila I. Open Meeting After opening comments and introductions the Board adopted the meeting summary for their September 16, 2014 meeting. II. Reports, Communications and Citizens Requests to Comment 16:00 Bill Peloza reported on the National League of Cities joint resolution on oil tankers, and said that the resolution will be put before the NLC Board of Directors in November for adoption. Port of Tacoma Commissioner Don Meyer reported on the Ports of Seattle and Tacoma's an alliance to manage the marine cargo business of both ports and reported that the alliance will bring good rates, efficiencies, good service to their customers and will allow the region to be competitive in the global economy. Mr. Meyers said the Board can expect more detail on the alliance at SCATBd's November meeting. Chair Palmer asked for volunteers for the 2015 SCATBd Officers Nominating Committee. Councilmembers Wayne Snoey, Linda Johnson and Dana Ralph volunteered for the committee. The committee said that they will report back to the Board at their November meeting. Chari Palmer reported on the RTC meeting and said King County Councilmember Rod Dembowski participated in the RTC discussion on the Metro service reduction proposal. She said routes were cut in order to put money in a number of Metro reserve funds for funding stability 19 over time. The members of the RTC discussed how much should in the reserve fund, and that cities position was to maintain service first. III. 2015 Transportation Legislation Discussion with Majority Floor Leader Senator Joe Fain and Majority Leader Representative Pat Sullivan The Board was briefed by Senator Fain and Representative Sullivan on possible 2015 transportation package. The Board asked for their advice on what SCATBd could do to help get transportation legislation passed. Senator Fain and Representative Sullivan said there was political will to pass a transportation package in 2015, and said if a package is not passed in 2015 they don't expect to see a package coming out of the Legislature in the near future. They both said they would only support a balanced transportation package that includes funding to complete major corridors such as SR 520, I -405, SR 167 and SR 509; they would not support a "piece meal/maintenance" package. Local options and a distribution of funds to local governments will be part of the discussion and will likely be a large part of any transportation package. The discussion will also include a proposal to remove the levy cap on the property tax icreases. Senator Fain and Representative Sullivan said that a transportation package will rely on a gas tax increase to fund the package. The gas tax increase needs to be more than 11 cents to cover the mega projects, and that tolling and VMT revenues for transportation projects were at least 15 -20 years away. Any package will have some sort of "reforms" woven in, however, they said that "reform" is an over -used word, and these will start being referred to as "outcomes ". They both said that it is important to communicate the State's transportation needs to legislators and the public and why passing a package is needed to support the State's economic development. They also said that the whole state needs to move forward on a transportation package, and that it would be a bad idea to regionalize a transportation vote. IV. SCATBd 2015 Legislative Agenda The Board discussed their 2015 message to the State Legislature and decided to keep carryover their 2014 SCATBd Legislative Message into 2015. Other Attendees: Jason Brown, King County Council SeaTac Councilmember Kathryn Campbell Don Bonner, Covington Rick Perez, Federal Way Ed Conyers, WSDOT Evette Mason, Port of Tacoma Susan Sanderson, SeaTac Monica Whitman, Kent Paul Takamine, King County Maiya Andrews, City of Burien Algona Councilmember Dawn Dofelmire Maryanne Zukowski, Normandy Park Andrew Merges, Des Moines Lyset Cadena, SCA Jim Seitz, Renton Brittany Jarnot Doug Levy 20 SOUTH COUNTY AREA TRANSPORTATION BOARD (SCATBd) MEETING Tuesday, November 18, 2014 9:00 — 11:00 a.m. SeaTac City Hall 4800 South 188th Street SeaTac Agenda 1. Open Meeting • Introductions • Approve summary of September 16, 2014 SCATBd Meeting Summary (Attachment A) Action 9:00 a.m. 2. Reports, Communications and Citizen Requests to Comment • Chair or Vice Chair • Participant Updates from RTC and Other Regional Committees • Public Comment Reports and Discussion 9:05 a.m. 3 SCATBd 2015 Officers Election Action 9:15 a.m. 4. Seaport Alliance Briefing — Port of Tacoma Commissioner Don Meyer and Port of Seattle Commissioner Tom Albro Report and Discussion 9:30 a.m. 4. WSDOT Seismic Retrofit Program — Pat Morin, WSDOT Report and Discussion 10:15 a.m. 21