HomeMy WebLinkAboutTrans 2014-11-24 Item 2B - Discussion - Thorndyke Safe Routes to School - Winter Project ShutdownCity of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM TO: Mayor Haggerton Transportation Committee FROM: Bob Giberson, Public Works Directo BY: Grant Griffin, Senior Engineer DATE: November 21, 2014 SUBJECT: Thorndvke Safe Routes to School Project Project No. 91210302, Contract No. 13-160 Winter Project Shutdown ISSUE Report the winter shutdown of the Thorndyke Safe Routes to School Construction Project. BACKGROUND A call for bids was advertised on May 8 and 15, 2014 and three bids were opened on May 29, 2014. The lowest bidder was Road Construction Northwest, Inc. (RCNW) with a bid of $1,136,256.00 and the contract was awarded on June 23, 2014. RCNW requested and was granted a September 14, 2014 Notice to Proceed date due to their work load. While some preliminary work and detour set-up was completed, construction did not start in earnest until October 23, 2014, after which they diligently pursued the work. DISCUSSION RCNW finished all of the underground storm drainage and utility work by November 14, 2014. At this point they hesitated to remove the existing pavement with the threat of November rainstorms on a jobsite with such steep grades. A request for a winter shutdown was sent on November 11, 2014 and after review by the City, was granted. Because of the late construction start, the City will bear no costs associated with the project shutdown, site maintenance, or resumption of construction in the Spring. The construction shutdown is expected to last from November 14, 2014 to no earlier than March 1, 2014 and no later than April 1, 2014. The City has required that RCNW maintain the construction zone and ensure that the site is in satisfactory condition during the construction shutdown. FINANCIAL IMPACT There is no financial impact as outlined in the attached Project Serial Letter 03. RECOMMENDATION Information only. Attachments: RCNW Request for Winter Shutdown letter Project Serial Letter 03 7 W:\PW Eng \ PROJECTS \A- RW & RS Projects Safe Routes to School - Thorndyke (91210302)\CN Award\ Info Memo Winter Shutdown TC Update 11-21-14 - sb.docx Road Construction Northwest, Inc. PO Box 188 Renton, Washington 98057 (425) 254 -9999 (425) 254 -1334 fax November 11, 2014 City of Tukwila 6300 Southcenter Blvd. Tukwila, WA 98188 Attn: Mr. Grant Griffin Mr. Scott Moore Mr. Nathan Monroe City of Tukwila — Thorndyke Elementary Safe Routes to School City Project No.: 91210302 RCNW Project Number: 1408 SUBJ: Project Winter Shutdown Request Gentlemen: Per our conversations with City of Tukwila Senior Inspector Scott Moore this past week, Road Construction Northwest Inc. (RCNW) concurs that demolishing and removing the existing asphalt roadway; and exposing the subgrade to the weather elements this time of year would not be in the best interest of the project. As we discussed at our weekly construction meeting last Thursday, November 6th; after the curb & gutter is installed on the south side, we would need a full week of dry weather to remove the existing pavement, excavate to subgrade, place crushed rock and prepare for asphalt paving. We are getting to the time of year where it is very difficult to get acceptable temperatures and dry weather conditions in order to schedule paving with Lakeside Industries. Also they close their asphalt plants for annual maintenance this time of year. We believe that finishing the remaining storm drainage work and water services work this week would be a good stopping point for a project winter shutdown; with minimal impacts to the project and inconveniences to the local residents. We will hot -mix asphalt patch all roadway trench crossings, install BMP erosion control devices, restore driveway access, remove signs & traffic control devices and demobilize. RCNW will continue to monitor and maintain erosion control devices, and will stay in contact with City Senior Inspector Scott Moore on any other needs in the field. RCNW requests that contract calendar days be suspended at the end of this week, Friday, November 14th for contract work; and that we be allowed to work next week on HMA trench patching, site restoration and preparation for winter shutdown as non - contract days. 8 We will stay in contact with KPG and the City of Tukwila to coordinate an appropriate restart date next Spring 2015, upon which we will present a revised schedule to complete the balance of the Contract Work. Your cooperation and assistance in this matter is appreciated. Should you have any questions or concerns, please contact me at (425) 254-9999 x-22. Very truly yours, Gordon Lee Project Manager 9 November 14, 2014 Gordon Lee P.O. Box 188 2500 E Valley Road, Suite C-3 Renton, WA 98057 Serial Letter 03 Project — Thorndyke Safe Routes to School City Project No.: 91210302 Dear Gordon, This letter is in response to RCNW's letter titled Project Winter Shutdown and dated November 11, 2014. In that letter RCNW requests a p ject suspension beginning 11/14/14 and ending in the Spring of 2015 due to unsuitable weather for the remaining work. After review, the City agrees to the suspension proposal per 1-08.6 of the 2014 WSDOT standard specifications with the stipulations specified below. RCNW shall bear all additional costs necessary to bring the site to a satisfactory condition suitable for suspension as determined by the City. Additionally, all costs to demobilize, remobilize, maintain the site's erosion control, maintain the site's roadway surfaces, and maintain the site's walking surfaces shall be borne exclusively by RCNW. RCNW will remove all equipment from the site at a date no later than 12/15/14. RCNW will visit the site and provide the Engineer with a brief written report cataloguing the site's condition and documenting any maintenance performed at an interval not less than once per week. Any increase in product or labor costs due to the suspension is the sole responsibility of RCNW. The list above is not exclusive; in general, all costs associated with the suspension are the responsibility of RCNW. The project will be suspended from 11/14/14 to a date not earlier than 3/1/15 and not later than 4/1/15, depending on predicted weather and as determined by the Engineer. Sincerely, Nathan Monroe PE KPG, Inc 10